NovaScale Blade 2320 Installation and User's Guide

image

Contents

1. 44 NovaScale Blade 2320 Installation and User s Guide Table 5 Abbreviated List of POST Error Messages Cont d POST m message Failing device or problem found Suggested action 162 A device configuration has Make sure that optional devices are installed correctly changed and turned on NOTE If you are unable to start the Configuration Setup Utility program view the system event log in the management module 163 The time of day has not been set Set the date and time 289 A failing DIMM was disabled Make sure that the installed memory is correct for your blade server type and that it is installed properly 301 Keyboard and keyboard controller Make sure that the keyboard video mouse select 303 button LED on the front of the blade server is lit indicating that the blade server is connected to the shared keyboard Make sure that the keyboard cable is connected to the NovaScale Blade Chassis and nothing is resting on the keyboard keys 962 Parallel port configuration error Start the Configuration Setup Utility program and make sure that the parallel port setting is correct 11xx Serial port error Make sure that the serial cable is connected correctly 1162 Serial port configuration conflict Start the Configuration Setup Utility program and make sure that the IRQ and I O port assignments that are needed by the serial port are available 1800 PCI adapter h
2. Some options have device drivers that you must install See the documentation that comes with each option for information about installing device drivers NovaScale Blade 2320 Installation and User s Guide 33 Input Output Connectors and Devices 34 The input output connectors that are available to the blade server are supplied by the NovaScale Blade Chassis See the documentation that comes with the NovaScale Blade Chassis for information about the input output connectors The blade server has two selection buttons on the control panel the media tray select button and the keyboard video mouse select button See Understanding the Control Panel and LEDs on page 8 for information about these buttons and their functions The Ethernet controllers on the blade server communicate with the network through the Ethernet compatible I O modules on the NovaScale Blade Chassis Network signals to and from the blade server or any expansion cards are automatically routed to a same network interface I O module through circuitry in the NovaScale Blade Chassis NovaScale Blade 2320 Installation and User s Guide 4 Configuring the NovaScale Blade 2320 Server The following configuration programs come with the blade server Configuration Setup Utility program The Configuration Setup Utility program is part of the basic input output system BIOS code in the blade server Use it to change system settings such as interrupt requests IRQ
3. Your server should be integrated and serviced only by technically qualified persons You must adhere to the guidelines in this guide and the assembly instructions in your server manuals to ensure and maintain compliance with existing product certifications and approvals Use only the described regulated components specified in this guide Use of other products components will void the UL Listing and other regulatory approvals of the product and may result in noncompliance with product regulations in the region s in which the product is sold Safety Warnings and Cautions To avoid personal injury or property damage before you begin installing the product read observe and adhere to all of the following safety instructions and information The following safety symbols may be used throughout the documentation and may be marked on the product and or the product packaging Indicates the presence of a hazard that may Cause minor personal injury or CAUTION property damage if the CAUTION is ignored Indicates the presence of a hazard that may result in serious personal injury WARNING if the WARNING is ignored Indicates potential hazard if indicated information is ignored Indicates shock hazards that result in serious injury or death if safety instructions are not followed A Indicates hot components or surfaces Indicates do not touch fan blades may result in injury tata Indicates to unplug all AC power cord s
4. Option Problems Symptom Suggested action An option that was just installed does not work Make sure that The option is designed for the blade server You followed the installation instructions that come with the option The option is installed correctly You have not loosened any other installed options or cables If the problem remains call for service An option that used to work does not work now Make sure that all of the option hardware and cable connections are secure If the option comes with its own test instructions use those instructions to test the option If the problem remains call for service NovaScale Blade 2320 Installation and User s Guide 49 Power Problems Symptom Suggested action The blade server does not turn on 1 Make sure that a The power LED on the front of the NovaScale Blade Chassis is lit The LEDs on all the power modules are lit c Ifthe blade server or attached storage expansion unit is in blade bays 7 through 14 in the NovaScale Blade Chassis ensure power modules are in all four power bays d The power LED on the blade server control panel is flashing slowly f the power LED is flashing rapidly and continues to do so the blade server is not communicating with the management module reseat the blade server and go to step 3 f the power LED is off either the blade bay is not receiving power the blade serve
5. mit einer geerdeten Wechselstromsteckdose ausger stet sein ber ausreichend Platz verf gen um Zugang zu den Netzkabeln zu gew hrleisten da der Stromanschlu des Produkts haupts chlich ber die Kabel unterbrochen wird NovaScale Blade 2320 Installation and User s Guide 91 Francais Le bloc d alimentation de ce produit ne contient aucune pi ce pouvant tre r par e par l utilisateur Ce produit peut contenir plus d un bloc d alimentation Veuillez contacter un technicien qualifi en cas de probl me Ne pas essayer d utiliser ni modifier le c ble d alimentation CA fourni s il ne correspond pas exactement au type requis Le nombre de c bles d alimentation CA fournis correspond au nombre de blocs d alimentation du produit Notez que le commutateur CC de mise sous tension hors tension du panneau avant n teint pas l alimentation CA du syst me Pour mettre le syst me hors tension vous devez d brancher chaque c ble d alimentation de sa prise CONSIGNES DE S CURIT Lorsque vous ouvrez le bo tier pour acc der l int rieur du syst me suivez les consignes suivantes 1 Mettez hors tension tous les p riph riques connect s au syst me 2 Mettez le syst me hors tension en mettant l interrupteur g n ral en position OFF bouton poussoir 3 D branchez tous les cordons d alimentation c a du systeme et des prises murales 4 Identifiez et d branchez tous les cables reli s aux connecteu
6. n Manipulaci n del equipo Reduzca el riesgo de da os personales o en el equipo Respete los requisitos de sanidad y seguridad laborales de su pa s cuando traslade y levante el equipo Utilice medios mec nicos u otros que sean adecuados al trasladar o levantar el equipo Para que el peso sea menor para manipularlo con m s facilidad extraiga los componentes que sean de f cil extracci n NovaScale Blade 2320 Installation and User s Guide 79 Advertencias de alimentaci n y el ctricas Precauci n El bot n de encendido indicado con la marca del modo de reposo o stand by NO DESCONECTA completamente la alimentaci n de CA del sistema ya que el modo de reposo de 5 V sigue activo mientras el sistema est enchufado Para desconectar el sistema debe desenchufar el cable de alimentaci n de CA de la toma de la pared Puede usar m s de un cable de alimentaci n de CA con el sistema Asegurese de que todos los cables de alimentaci n de CA est n desenchufados Asegurese de que los cables de alimentaci n de CA est n desenchufado antes de abrir le gabinete agregar o extraer cualquier componente que no es de conexi n en funcionamiento Algunas fuentes de alimentaci n de electricidad de los NovaScale Blade servidores utilizan el polo neutral del fuselaje Para evitar riesgos de choques el ctricos use precauciones al trabajar con las fuentes de alimentaci n que utilizan el polo neutral de fuselaje No intente modificar ni uti
7. that are compatible with the latest PC3200 SDRAM Registered DIMM specification Installing or removing DIMMs changes the configuration information for the blade server After installing or removing a DIMM you must change and save the new NovaScale Blade 2320 Installation and User s Guide 21 configuration information by using the Configuration Setup Utility program When you restart the blade server it displays a message indicating that the memory configuration has changed Start the Configuration Setup Utility program and select Save Settings See Configuration Setup Utility Menu Choices on page 36 for more information To install a DIMM complete the following steps 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 2 Read the documentation that comes with the DIMMs 3 Shut down the operating system turn off the blade server and remove the blade server from the NovaScale Blade Chassis See Removing the NovaScale Blade 2320 Server from a NovaScale Blade Chassis on page 17 for instructions 4 Carefully lay the blade server on a flat non conductive surface 5 Open the blade server cover see Opening the NovaScale Blade 2320 Server Cover on page 18 for instructions NR DIMM slot 3 AF000434 6 Locate the DIMM connectors on the system board see the above illustration Determine the connectors into which you
8. to disconnect AC power CR Please recycle battery NovaScale Blade 2320 Installation and User s Guide 61 Intended Application Uses This product was evaluated as Information Technology Equipment ITE which may be installed in offices schools computer rooms and similar commercial type locations The suitability of this product for other product categories and environments such as medical industrial residential alarm systems and test equipment other than an ITE application may require further evaluation Site Selection The system is designed to operate in a typical office environment Choose a site that is Clean dry and free of airborne particles other than normal room dust Well ventilated and away from sources of heat including direct sunlight and radiators Away from sources of vibration or physical shock Isolated from strong electromagnetic fields produced by electrical devices In regions that are susceptible to electrical storms we recommend you plug your system into a surge suppressor and disconnect telecommunication lines to your modem during an electrical storm Provided with a properly grounded wall outlet Provided with sufficient space to access the power supply cord s because they serve as the product s main power disconnect Equipment Handling Practices Reduce the risk of personal injury or equipment damage Conform to local occupational health and safety requirements whe
9. tre install conform ment aux instructions du fabricant Installez les quipements dans le rack en partant du bas en placant le plus lourd en bas du rack N tendez qu un seul l ment de l quipement partir du rack la fois Vous tes responsable de l installation d un disjoncteur principal d alimentation pour la totalit du rack Ce disjoncteur principal doit tre rapidement accessible et doit tre tiquet comme contr lant toute l unit et pas uniquement le ou les serveurs Pour viter tout risque d lectrocution le rack et chaque l ment de l quipement install dans le rack doivent tre correctement reli s la terre D charges lectrostatiques ESD 76 Attention Les d charges lectrostatiques ESD peuvent endommager les lecteurs de disque dur les cartes et d autres pieces Il est fortement conseill d effectuer l ensemble des proc dures d crites un poste de travail prot g contre les ESD Au cas ou aucun poste de ce type ne serait disponible prot gez vous contre les ESD en portant un bracelet antistatique reli la masse du ch ssis n importe quelle surface m tallique non peinte de votre serveur lorsque que vous manipulez les pi ces Manipulez toujours les cartes avec pr caution Elles peuvent tre extr mement sensibles aux ESD Ne tenez les cartes que par leurs bords Apr s avoir retir une carte de son emballage de protection ou du serveur placez la sur une surface rel
10. L utilisation d autres produits composants annulera la liste UL et les autres approbations r glementaires du produit et le produit peut ne pas tre conforme aux autres lois et r glementations locales applicables au produit S curit avertissements et mises en garde 72 Pour viter de vous blesser ou d endommager votre quipement lisez et respectez toutes les informations et consignes de s curit avant de commencer l installation du produit Les symboles de s curit suivants peuvent tre utilis s tout au long de cette documentation et peuvent figurer sur le produit ou sur son emballage Indique la pr sence d un risque pouvant entrainer des blessures physiques ATTENTION mineures ou endommager l g rement le mat riel si la mise en garde n est pas prise en compte AVERTISSEMENT Indique la pr sence d un risque pouvant entrainer des blessures corporelles graves si l avertissement n est pas pris en compte Indique un risque potentiel si les informations signal es ne sont pas prises en compte Indique des risques d lectrocution pouvant entrainer des blessures corporelles graves ou mortelles si les consignes de s curit ne sont pas respect es Signale des composants ou des surfaces soumis des temp ratures lev es Indique de ne pas toucher aux pales de ventilateur car cela peut entrainer des blessures BM Indique de d brancher tous les cordons d alimentation secteur pour ES d conn
11. LED indicates the power status of the blade server in the following manner NovaScale Blade 2320 Installation and User s Guide 9 Flashing rapidly The service processor BMC on the blade server is handshaking with the management module Flashing slowly The blade server has power but is not turned on Lit continuously The blade server has power and is turned on Power control button This button is behind the control panel door Press this button to turn on or turn off the blade server Note The power control button has effect only if local power control is enabled for the blade server Local power control is enabled and disabled through the management module Web interface System Board lllustration The following illustration shows the system board components including connectors for user installable options for the blade server 1 0 expansion DIMM 1 option DIMM 2 DIMM 3 DIMM 4 Microprocessor 1 and heat sink Microprocessor 2 and heat sink option Control panel connector Battery SAS hard disk drive 0 SAS hard disk drive 1 10 NovaScale Blade 2320 Installation and User s Guide Using Sys
12. Temperature The system temperature has Determine whether a blower on the NovaScale error TEMP exceeded a threshold level Blade Chassis has failed If it has replace the blower Make sure that the room temperature is not too high see NovaScale Blade 2320 Server Specifications on page 3 for temperature information If the problem remains have the blade server serviced System board error S BRD The system board has failed Replace the blade server cover reinsert the blade server in the NovaScale Blade Chassis and then restart the server If the problem remains have the blade server serviced NMI error The system board has failed Replace the blade server cover reinsert the blade server in the NovaScale Blade Chassis and then restart the server Checkthe system error log in the management module for information about the error If the problem remains have the blade server serviced Processor mismatch MIS The processors do not match Make sure that microprocessors 1 and 2 have the same cache size and type and the same clock speed Internal and external clock frequencies must be identical If the problem remains have the blade server serviced NovaScale Blade 2320 Installation and User s Guide 53 54 NovaScale Blade 2320 Installation and User s Guide A Regulatory and Compliance Information Product Regulatory Compliance Warning To ensure regulato
13. Verletzung Stromschlag Feuer und Besch digungen von Ger ten Lesen Sie diese Dokument daher sorgf ltig bevor Sie Ihr NovaScale Blade Serverprodukt installieren oder warten Bei Widerspr chen zwischen den hier vorliegenden Angaben und den Informationen im Lieferumfang des Produkts oder auf der Website des betreffenden Produkts hat die Produktdokumentation Vorrang Die Integration und Wartung des Servers darf nur durch technisch qualifizierte Personen erfolgen Um die Einhaltung der vorhandenen Zulassungen und Genehmigungen f r das Produkt zu gew hrleisten sind die Richtlinien in diesem Handbuch sowie die Montageanleitungen in den Serverhandb chern zu beachten Verwenden Sie nur die beschriebenen zugelassenen Komponenten die im vorliegenden Handbuch angegeben werden Die Verwendung anderer Produkte oder Komponenten f hrt zum Erl schen der UL Zulassung und anderer Genehmigungen f r das Produkt Dadurch kann das Produkt gegen Produktbestimmungen versto en die im Verkaufsland gelten Sicherheitshinweise und VorsichtsmaBnahmen Um Verletzungen und Besch digungen zu vermeiden sollten Sie vor dem Beginn der Produktinstallation die nachfolgend aufgef hrten Sicherheitshinweise und informationen sorgfaltig lesen und befolgen In dem vorliegenden Handbuch sowie auf dem Produkt und auf der Verpackung werden folgende Sicherheitssymbole verwendet Weist auf eine Gefahrenquelle hin die bei Nichtbeachtung des VORSICHT VORSICHTSHINWE
14. abgezogen werden Das System verf gt m glicherweise ber mehrere Netzkabel Vergewissern Sie sich in diesem Fall da alle Netzkabel abgezogen sind Wenn Sie Komponenten ein oder ausbauen m chten die nicht hot plug fahig sind stellen Sie sicher daf zuvor alle Netzkabel abgezogen sind Nehmen Sie keine Anderungen am Netzkabel vor und verwenden Sie kein Kabel das nicht genau dem geforderten Typ entspricht Jedes Netzteil im System muf ber ein eigenes Netzkabel angeschlossen werden Einige Netzteile von NovaScale Blade Servern verwenden Nullleitersicherungen Vorsicht ist geboten im Umgang mit Netzteilen welche Nullleitersicherungen verwenden um das Risiko eines elektrischen Schlages zu vermeiden Das Netzteil in diesem Produkt enth lt keine Teile die vom Benutzer gewartet werden k nnen ffnen Sie das Netzteil nicht Im Netzteil bestehen gef hrliche Spannungen Str me und Energiequellen Schicken Sie das Ger t f r Wartungsarbeiten an den Hersteller zur ck Wenn Sie ein hot plug f higes Netzteil austauschen ziehen Sie dessen Netzkabel ab bevor Sie es aus dem Server ausbauen Zur Vermeidung von Stromschl gen schalten Sie den Server aus und trennen Sie vor dem ffnen des Ger ts das Netzkabel sowie alle an den Server angeschlossene Telekommunikationssysteme Netzwerke und Modems Hinweis f r Netzkabel 68 Wenn kein Netzkabel mit dem Produkt geliefert wurde kaufen Sie ein Kabel das f r die Vorsicht Pr fen Si
15. beachtet werden Gehen Sie bei der Installation von Ger ten im Rack immer von unten nach oben vor und bauen Sie das schwerste Ger t an der untersten Position im Rack ein Ziehen Sie jeweils immer nur ein Ger t aus dem Rack heraus Sie m ssen f r die gesamte Rack Einheit einen Netztrennschalter einrichten Dieser Netztrennschalter mu leicht zug nglich sein und ber eine Kennzeichnung verf gen die besagt da er die Stromzufuhr zur gesamten Einheit steuert und nicht nur zu den Servern Zur Vermeidung von Stromschlaggefahr m ssen das Rack selbst und alle darin eingebauten Ger te ordnungsgem4B geerdet sein Elektrostatische Entladungen ESD 70 Vorsicht Elektrostatische Entladungen k nnen zur Besch digung von Festplatten Platinen und anderen Komponenten f hren Daher sollten Sie alle Arbeiten an einer ESD Workstation ausf hren Steht ein solcher Arbeitsplatz nicht zur Verf gung erzielen Sie einen gewissen Schutz vor elektrostatischen Entladungen durch Tragen einer Antistatik Manschette die Sie w hrend der Arbeit zur Erdung an einem beliebigen unlackierten Metallteil des Computergeh uses befestigen Gehen Sei bei der Handhabung von Platinen immer mit grofter Vorsicht vor Sie k nnen duferst empfindlich gegen ber elektrostatischer Entladung sein Halten Sie Platinen nur an den Kanten fest Legen Sie die Platinen nach dem Auspacken aus der Schutzh lle oder nach dem Ausbau aus dem Server mit der Bauelementseite nach
16. defective component NovaScale Blade 2320 Installation and User s Guide 3 Installing Options This chapter provides instructions for installing hardware options in the NovaScale Blade 2320 Server Some option removal instructions are provided in case you need to remove one option to install another Installation Guidelines Before you begin installing options in the blade server read the following information Read the safety information beginning on page 61 in Appendix B Safety Information and the guidelines in Handling Static sensitive Devices on page 16 This information will help you work safely with the blade server and options Back up all important data before you make changes to disk drives Before you remove a hot swap blade server from the NovaScale Blade Chassis you must shut down the operating system and turn off the blade server You do not have to shut down the NovaScale Blade Chassis itself Blue on a component indicates touch points where you can grip the component to remove it from or install it in the blade server or open or close a latch Green on a component or an green label on or near a component indicates that the component can be hot swapped which means that you can remove or install the component while the NovaScale Blade Chassis is running Green can also indicate touch points on hot swap components See the instructions for removing or installing a specific hot swap component for an
17. direkten Sonnenbestrahlung ausgesetzt Nicht in der N he von Vibrations oder Ersch tterungsquellen Abgeschirmt von starken elektromagnetischen Feldern die durch elektrische Ger te erzeugt werden In gewittergef hrdeten Gebieten sollten Sie das System an einen berspannungsschutz anschlie en und bei einem Gewitter die Telekommunikationskabel zum Modem abziehen Eine ordnungsgem geerdete Wandsteckdose mu vorhanden sein Ausreichender Freiraum f r den Zugang zu den Netzkabeln da diese die Hauptvorrichtung zum Trennen des Produkts von der Stromversorgung sind Handhabung von Ger ten Beachten Sie zur Vermeidung von Verletzungen oder Besch digungen an den Ger ten die folgenden Hinweise Halten Sie beim Transportieren und Anheben von Ger ten die rtlichen Gesundheits und Sicherheitsvorschriften ein Verwenden Sie mechanische oder andere geeignete Hilfsmittel zum Transportieren oder Anheben von Ger ten Entfernen Sie alle Komponenten die sich leicht abnehmen lassen um das Gewicht zu reduzieren und die Handhabung zu erleichtern NovaScale Blade 2320 Installation and User s Guide 67 Warnungen zu Netzspannung und Elektrizitat Vorsicht Durch Bet tigen der mit dem Standby Symbol gekennzeichneten Netztaste wird das System NICHT vollst ndig vom Netz getrennt Es sind weiterhin 5 V aktiv solange das System eingesteckt ist Um das System vollst ndig vom Strom zu trennen mu das Netzkabel aus der Steckdose
18. disconnect NovaScale Blade 2320 Installation and User s Guide Deutsch Benutzer k nnen am Netzger t dieses Produkts keine Reparaturen vornehmen Das Produkt enth lt m glicherweise mehrere Netzger te Wartungsarbeiten m ssen von qualifizierten Technikern ausgef hrt werden Versuchen Sie nicht das mitgelieferte Netzkabel zu ndern oder zu verwenden wenn es sich nicht genau um den erforderlichen Typ handelt Ein Produkt mit mehreren Netzger ten hat f r jedes Netzger t ein eigenes Netzkabel Der Wechselstrom des Systems wird durch den Ein Aus Schalter f r Gleichstrom nicht ausgeschaltet Ziehen Sie jedes Wechselstrom Netzkabel aus der Steckdose bzw dem Netzger t um den StromanschluB des Systems zu unterbrechen SICHERHEISMASSNAHMEN Immer wenn Sie die Geh useabdeckung abnehmen um an das Systeminnere zu gelangen sollten Sie folgende Schritte beachten 1 Schalten Sie alle an Ihr System angeschlossenen Peripherieger te aus 2 Schalten Sie das System mit dem Hauptschalter aus 3 Ziehen Sie den StromanschluBstecker Ihres Systems aus der Steckdose 4 Auf der R ckseite des Systems beschriften und ziehen Sie alle AnschluBkabel von den I O Anschl ssen oder Ports ab 5 Tragen Sie ein geerdetes Antistatik Gelenkband um elektrostatische Ladungen ESD ber blanke Metallstellen bei der Handhabung der Komponenten zu vermeiden 6 Schalten Sie das System niemals ohne ordnungsgem montiertes Geh
19. documentation for information about configuring for failover Important To support failover on the blade server Ethernet controllers the Ethernet switch modules in the NovaScale Blade Chassis must have identical configurations Blade Server Ethernet Controller Enumeration The enumeration of the Ethernet controllers in a blade server is operating system dependent You can verify the Ethernet controller designations that a blade server uses through the operating system settings The routing of an Ethernet controller to a particular I O module bay depends on the type of blade server You can verify which Ethernet controller is routed to which I O module bay by using the following test 1 Install only one Ethernet switch module or pass thru module in I O module bay 1 2 Make sure that the ports on the switch module or pass thru module are enabled click I O module Tasks Management Advanced Management in the management module Web based user interface 3 Enable only one of the Ethernet controllers on the blade server Note the designation that the blade server operating system has for the controller NovaScale Blade 2320 Installation and User s Guide 41 4 Ping an external computer on the network connected to the switch module or pass thru module If you can ping the external computer the Ethernet controller that you enabled is associated with the switch module or pass thru module in I O module bay 1 The other Ethernet controller
20. exit without saving them NovaScale Blade 2320 Installation and User s Guide Using Passwords From the System Security choice you can set change and delete a power on password If you set a power on password you must type the power on password to complete the system startup and to have access to the full Configuration Setup Utility menu You can use any combination of up to seven characters A Z a z and 0 9 for the password Keep a record of your password in a secure place If you forget the power on password you can regain access to the blade server in any of the following ways Remove the blade server battery and then reinstall it see Replacing the Battery on page 28 Change the position of the power on password override switch switch 8 on switch block 2 on the system board to bypass the power on password check the next time the blade server is turned on You can then start the Configuration Setup Utility program and change the power on password You do not have to move the switch back to the previous position after the password is overridden See Using System Board Switches on page 11 for the location of switch block 2 Note Shut down the operating system turn off the blade server and remove the blade server from the NovaScale Blade Chassis to access the switches Using the PXE Boot Agent Utility Program Use the Preboot Execution Environment PXE boot agent utility program to select the boot protocol a
21. iii 16 Removing the NovaScale Blade 2320 Server from a NovaScale Blade Chassis 17 Opening the NovaScale Blade 2320 Server Cover 18 Removing the NovaScale Blade 2320 Server Bezel Assembly 19 Installing a SAS Hard Disk Dive cuates 19 Removing a SAS Hard Disk Drive iii 21 Installing Memory Modules cn a aa 21 Installing Microprocessors sentada 23 Installing an VO expansion Card inicie 27 Replacing the Battery ea etn i teet lant cane omit 28 Completing the Installation canali ii a RARE e dc ata 30 Installing the NovaScale Blade 2320 Server Bezel Assembly 31 Closing the NovaScale Blade 2320 Server Cover i 31 Installing the NovaScale Blade 2320 Server in a NovaScale Blade Chassis 32 Updating the NovaScale Blade 2320 Server Configuration anos 33 NovaScale Blade 2320 Installation and User s Guide iii Input Output Connectors and Devices ss 34 Configuring the NovaScale Blade 2320 Server 1 rrrrriinnnee 35 Using the Configuration Setup Utility program ii 35 Configuration Setup Utility Menu Choices nennen nnns 36 Using ira 99 Using the PXE Boot Agent Utility Program 00 0 0 nnnnnnn nennen nn nnnnnnnnnnnnnnnn nennen 99 Firmware upd
22. in the blade server is associated with the switch module or pass thru module in I O module bay 2 If you have installed an I O expansion card in the blade server communications from the expansion card are routed to I O module bays 3 and 4 if these bays are supported by your NovaScale Blade Chassis You can verify which controller on the card is routed to which I O module bay by performing the same test and using a controller on the expansion card and a compatible switch module or pass thru module in I O module bay 3 or 4 Configuring a SCSI RAID Array Configuring a SCSI RAID array applies to a blade server in which two SAS hard disk drives are installed You can also configure a SCSI RAID array when you have a SCSI expansion unit in which SCSI hard disk drives are installed Two SAS hard disk drives in the blade server can be used to implement and manage RAID level 0 striping or RAID level 1 mirror arrays For the blade server you must configure the SCSI RAID using the LSI Configuration Utility program Using the LSI Logic Configuration Utility Program You can use the LSI Logic Configuration Utility program to Set the SCSI device scan order Set the SCSI ID for the controller Important Depending on your RAID configuration you must create the array before you install the operating system in the blade server Starting the LSI Logic Configuration Utility program 42 To start the LSI configuration utility program complete
23. its compliance VCCI Japan TORE HUES RARE ARS VCCI ORM CES DSRAPMEHEE CT COMBERERATHRT SCR HERBERITIERHHET CORBERA ICH RR ZKLIBRENATEMHVET English translation of the preceding notice This is a Class A product based on the standard of the Voluntary Control Council for Interference VCCI from Information Technology Equipment If this is used near a radio or television receiver in a domestic environment it may cause radio interference Install and use the equipment according to the instruction manual BSMI Taiwan SR RE isa PARRA aoe o He gt REM ERHI TIE een o DES EEES The BSMI Certification Marking and EMC warning is located on the outside rear area of the product NovaScale Blade 2320 Installation and User s Guide 59 Korean Compliance RRL Following is the RRL certification information for Korea 1 dg pace MIC ze 3 P RE Hol us 5 ME NME 1 English translation of the notice above 1 Type of Equipment Model Name On License and Product 2 Certification No On RRL certificate Obtain certificate from Bull Support representative Name of Certification Recipient Intel Corporation 4 Date of Manufacturer Refer to date code on product 5 Manufacturer Nation Intel Corporation Refer to country of origin marked on product Restriction of Hazardous Substances RoHS Compliance We have a system in place to restrict the use of banned substances in accordance
24. metal battery or a battery with heavy metal components be aware of the following environmental consideration Batteries and accumulators that contain heavy metals must not be disposed of with normal domestic waste They will be taken back free of charge by the manufacturer distributor or representative to be recycled or disposed of in a proper manner After you replace the battery you must reconfigure your blade server and reset the system date and time When replacing the lithium battery use only an equivalent type battery recommended by the manufacturer If your system has a module containing a lithium battery replace it only with the same module type made by the same manufacturer The battery contains lithium and can explode if not properly used handled or disposed of NovaScale Blade 2320 Installation and User s Guide Do not Throw or immerse into water Heat to more than 100 C 212 F Repair or disassemble Dispose of the battery as required by local ordinances or regulations Complete the following steps to replace the battery 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 2 Follow any special handling and installation instructions that come with the battery 3 Turn off the blade server and remove it from the NovaScale Blade Chassis see Installing the NovaScale Blade 2320 Server in a NovaScale Blade Chassis on pa
25. oben auf eine geerdete statisch entladene Unterlage Verwenden Sie dazu sofern verf gbar eine leitfahige Schaumstoffunterlage aber niche die Schutzh lle der Platine Ziehen Sie die Platine nicht ber eine Fl che NovaScale Blade 2320 Installation and User s Guide Andere Gefahren Batterieaustausch Vorsicht Wird die Batterie unsachgem ausgetauscht besteht Explosionsgefahr Verwenden Sie als Ersatz nur die vom Ger tehersteller empfohlene Batterie Beachten Sie bei der Entsorgung von Batterien die g ltigen Bestimmungen Versuchen Sie nicht eine Batterie aufzuladen Versuchen Sie nicht eine Batterie zu ffnen oder sonstwie zu besch digen K hlung und Luftstrom Vorsicht Verlegen Sie Kabel sorgf ltig entsprechend der Anleitung um St rungen des Luftstroms und K hlungsprobleme zu vermeiden Zur Gew hrleistung des ordnungsgem en K hlungs und Luftstromverhaltens darf das System nur mit angebrachten Geh useabdeckungen betrieben werden Die Inbetriebnahme des Systems ohne Abdeckung kann zur Besch digung von Systemkomponenten f hren So bringen Sie die Abdeckung wieder an e Vergewissern Sie sich zun chst da Sie keine Werkzeuge oder Teile im Geh use vergessen haben Pr fen Sie ob Kabel Erweiterungskarten sowie weitere Komponenten ordnungsgem angebracht sind Befestigen Sie die Abdeckungen am Geh use des Produkts wie in dessen Anleitung beschrieben Laser Peripherieger te oder Komponent
26. riques laser Attention Pour viter tout risque d exposition aux rayonnements et ou de dommage personnel N ouvrez pas l enceinte d un p riph rique laser Les p riph riques laser ne sont pas r parables par l utilisateur Retournez les au fabricant en cas de probl me NovaScale Blade 2320 Installation and User s Guide 77 Espanol Informacion de seguridad del servidor Este documento se aplica a las tarjetas de NovaScale Blade servidor los gabinetes montaje en rack y en pedestal y los dispositivos perif ricos Para reducir el riesgo de da os corporales descargas el ctricas fuego y en el equipo lea este documento y preste atenci n a todos las advertencias y precauciones de esta gu a antes de instalar o mantener el NovaScale Blade producto En el caso de que haya diferencias entre la informaci n para un producto en particular contenida en este documento y la informaci n proporcionada con dicho producto o en el sitio Web la documentaci n del producto es la que prevalece S lo personal t cnico calificado debe montar y prestar los servicios para el servidor Debe cefiirse a las directrices de esta gu a y a las instrucciones de montaje de los manuales del servidor para asegurar y mantener el cumplimiento con las certificaciones y homologaciones existentes de los productos Utilice s lo los componentes descritos y homologados que se especifican en esta guia El uso de otros productos o componentes anular la homolo
27. un espace suffisant pour acc der aux cordons d alimentation secteur car ils servent de disjoncteur principal d alimentation du produit Pratiques de manipulation de l quipement R duisez le risque de dommages personnels ou mat riels Conformez vous aux exigences de m decine du travail et de s curit lorsque vous d placez et soulevez le mat riel Utilisez l assistance m canique ou toute autre assistance appropri e lorsque vous d placez et soulevez le mat riel Pour r duire le poids en vue de faciliter la manipulation retirez tout composant amovible NovaScale Blade 2320 Installation and User s Guide 73 Alimentation et avertissements en mati re d lectricit Attention Le bouton d alimentation indiqu par le symbole de mise en veille NE COUPE PAS compl tement l alimentation secteur du syst me car le courant de veille 5 V reste actif lorsque le syst me est sous tension Pour couper l alimentation du syst me vous devez d brancher le cordon d alimentation secteur de la prise murale Votre syst me peut utiliser plusieurs cordons d alimentation secteur Assurez vous que tous les cordons d alimentation sont d branch s Vous devez les d brancher avant d ouvrir le ch ssis d ajouter ou de supprimer un composant non connectable chaud Les alimentations de certains serveurs NovaScale Blade sont munies de doubles fusibles p le neutre veuillez observer les pr cautions d usage afin d viter tout risque d
28. utiliza una mufiequera antiest tica sujetada a la toma de tierra del chasis o a cualquier tipo de superficie de metal sin pintar 6 No ponga en marcha el sistema si se han extra do las tapas del chasis Despu s de completar las seis instrucciones de SEGURIDAD mencionadas ya puede extraer las tapas del sistema Para ello 1 Desbloquee y extraiga el bloqueo de seguridad de la parte posterior del sistema si se ha instalado uno 2 Extraiga y guarde todos los tornillos de las tapas Extraiga las tapas 94 NovaScale Blade 2320 Installation and User s Guide Para obtener un enfriamiento y un flujo de aire adecuados reinstale siempre las tapas del chasis antes de poner en marcha el sistema Si pone en funcionamiento el sistema sin las tapas bien colocadas puede da ar los componentes del sistema Para instalar las tapas 1 Asegurese primero de no haber dejado herramientas o componentes sueltos dentro del sistema 2 Compruebe que los cables las placas adicionales y otros componentes se hayan instalado correctamente 3 Incorpore las tapas al chasis mediante los tornillos extra dos anteriormente tens ndolos firmemente 4 Inserte el bloqueo de seguridad en el sistema y bloqu elo para impedir que pueda accederse al mismo sin autorizaci n 5 Conecte todos los cables externos y los cables de alimentaci n CA al sistema Si el sistema ha estado en funcionamiento el microprocesador y el disipador d
29. with the European Directive 2002 95 EC Compliance is based on declaration that materials banned in the RoHS Directive are either 1 below all applicable substance threshold limits or 2 an approved pending RoHS exemption applies Note RoHS implementing details are not fully defined and may change Threshold limits and banned substances are noted as follows Quantity limit of 0 1 by mass 1000 PPM for Lead Mercury Hexavalent chromium Polybrominated biphenyls diphenyl ethers PBDE PBB Quantity limit of 0 01 by mass 100 PPM for Cadmium End of Life Product Recycling Product recycling and end of life take back systems and requirements vary from country to country Contact the retailer or distributor of this product for information on product recycling and or take back 60 NovaScale Blade 2320 Installation and User s Guide B Safety Information English Server Safety Information This document applies to NovaScale Blade server boards server chassis and installed peripherals To reduce the risk of bodily injury electrical shock fire and equipment damage read this document and observe all warnings and precautions in this guide before installing or maintaining your NovaScale Blade server product In the event of a conflict between the information in this document and information provided with the product or on the website for a particular product the product documentation takes precedence
30. A memory error has occurred Make sure that all DIMMs are correctly installed One long beep and two small beeps A video error has occurred and the BIOS cannot initialize the monitor screen to display additional information Beep codes for specific problems Additional beep codes are listed in the following table Table 4 POST Beep Code Descriptions Beep code Descriptions of the POST beep codes 1 1 4 BIOS ROM checksum in progress or failure Action 1 Move the BIOS code page jumper J12 to pins 2 and 3 to start from the backup BIOS code page 2 Restart the blade server and update the BIOS code 3 Move the BIOS code page jumper back to pins 1 and 2 and restart the blade server If the problem remains call for service All other 1 Make sure that the memory modules are installed correctly beep codes 2 Turn off the blade server then restart the blade server If the problem remains call for service POST Error Messages The following table provides an abbreviated list of the error messages that might appear during POST See Diagnostics in the NovaScale Blade Hardware Maintenance Manual and Troubleshooting Guide on the CD ROM NovaScale Blade Resource CD for more information about POST error messages Table 5 Abbreviated List of POST Error Messages POST if 2 message Failing device or problem found Suggested action 161 The real time clock battery has Replace the battery yourself or call for service failed
31. Blade 2320 Installation and User s Guide List of Tables Table 1 Switch Block 2 SW2 Settings 11 Table System Board LEDS niin od rero a ds 13 Table 3 Light Path Diagnostics Panel LEDs 13 Table 4 POST Beep Code DescriptioniS lote terea Ape te ese dan 44 Table 5 Abbreviated List of POST Error 6658065 44 NovaScale Blade 2320 Installation and User s Guide vii viii NovaScale Blade 2320 Installation and User s Guide Safety Information Important Safety Instructions Read all caution and safety statements in this document before performing any of the instructions See also NovaScale Blade Boards and Chassis Safety Information on the CD ROM NovaScale Blade Resource CD Wichtige Sicherheitshinweise Lesen Sie zun chst s mtliche Warnund Sicherheitshinweise in diesem Dokument bevor Sie eine der Anweisungen ausf hren Beachten Sie hierzu auch die NovaScale Blade Boards and Chassis Safety Information unter der CD ROM NovaScale Blade Resource CD Consignes de s curit Lisez attentivement toutes les consignes de s curit et les mises en garde indiqu es dans ce document avant de suivre toute instruction Consultez NovaScale Blade Boards and Chassis Safety Information sur le CD ROM NovaScale Blade Resource CD Instrucciones de seguridad importantes Lea todas las declaraciones de seguridad y precauci n de este docume
32. Cover Release AF000436 To open the blade server cover complete the following steps 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 2 If the blade server is installed in a NovaScale Blade Chassis remove it see Removing the NovaScale Blade 2320 Server from a NovaScale Blade Chassis on page 17 for instructions 3 Carefully lay the blade server down on a flat non conductive surface with the cover side up 4 Press the blade cover release on each side of the blade server and lift the cover open as shown in the illustration 5 Lay the cover flat or lift it from the blade server and store for future use Caution Hazardous energy is present when the blade server is connected to the power source Always replace the blade cover before installing the blade server 18 NovaScale Blade 2320 Installation and User s Guide Removing the NovaScale Blade 2320 Server Bezel Assembly To install certain options you must first remove the blade server bezel assembly The following illustration shows how to remove the bezel assembly Bezel assembly release Bezel assembly release Control panel connector Control panel AF000438 cable To remove the blade server bezel assembly complete the following steps 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Gui
33. ISES zu leichteren Verletzungen bzw Sachbesch digungen f hren kann WARNUNG Weist auf eine Gefahrenquelle hin die bei Nichtbeachtung der WARNUNG zu ernsten Verletzungen f hren kann Weist auf potentielle Gefahr bei Nichtbeachtung der angezeigten Informationen hin Weist auf die Gefahr eines Stromschlags hin der bei Nichtbeachtung der Sicherheitshinweise zu schweren oder t dlichen Verletzungen f hren kann Weist auf Verbrennungsgefahr an heiBen Bauteilen bzw Oberflachen hin Weist darauf hin da das Anfassen des Gebl ses zu Verletzungen f hren kann Sa Bedeutet alle Netzkabel abzuziehen und das Ger t von der Netzspannung zu trennen Bee Bereiten Sie bitte Batterie auf 66 NovaScale Blade 2320 Installation and User s Guide Zielbenutzer der Anwendung Dieses Produkt wurde in seiner Eigenschaft als IT Ger t getestet das in B ros Schulen Computerr umen und hnlichen ffentlichen R umlichkeiten installiert werden kann Die Eignung dieses Produkts f r andere Einsatzbereiche als IT z B Medizin Industrie Alarmsysteme oder Pr fger te kann u U weitere Tests erfordern Standortauswahl Das System ist f r den Betrieb innerhalb normaler B roumgebungen geeignet W hlen Sie einen Standort der folgenden Kriterien entspricht Sauber trocken und frei von Partikeln in der Luft au er dem normalen Raumstaub Gut bel ftet nicht in der N he von W rmequellen und keiner
34. NovaScale Blade 2320 Server Installation and User s Guide LL O lt cao O lt O Z REFERENCE 86 A1 85ER 00 NOVASCALE BLADE NovaScale Blade 2320 Server Installation and User s Guide The following copyright notice protects this book under Copyright laws which prohibit such actions as but not limited to copying distributing modifying and making derivative works Copyright Bull SAS 2006 Copyright Intel Corporation 2006 Printed in France Suggestions and criticisms concerning the form content and presentation of this book are invited A form is provided at the end of this book for this purpose To order additional copies of this book or other Bull Technical Publications you are invited to use the Ordering Form also provided at the end of this book Trademarks and Acknowledgements We acknowledge the right of proprietors of trademarks mentioned in this book Intel Intel Pentium Intel Xeon and Itanium are trademarks or registered trademarks of Intel Corporation or its subsidiaries in the United States or other countries Windows and Microsoft software are registered trademarks of Microsoft Corporation Linux is a registered trademark of Linus Torvalds The information in this document is subject to change without notice Bull will not be liable for errors contained herein or for incidental or consequential damages in connection with the use of this material Contents Safet
35. OMPANY ADDRESS Please give this technical publication remarks form to your BULL representative or mail to Bull Documentation D P 1 Rue de Provence BP 208 38432 ECHIROLLES CEDEX FRANCE info frec bull fr Technical publications ordering form To order additional publications please fill in a copy of this form and send it via mail to BULL CEDOC 357 AVENUE PATTON Phone 33 0 2 41 73 72 66 B P 20845 FAX 33 0 2 41 73 70 66 49008 ANGERS CEDEX 01 E Mail srv Duplicopy bull net FRANCE CEDOC Reference t __ 1 The latest revision will be provided if no revision number is given NAME Date COMPANY ADDRESS PHONE FAX E MAIL For Bull Subsidiaries Identification For Bull Affiliated Customers Customer Code For Bull Internal Customers Budgetary Section For Others Please ask your Bull representative BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 Al 85ER 00
36. Systeminneren beendet haben befestigen Sie die Gehduseabdeckung mit den Originalschrauben bzw befestigungselementen F hren Sie keine Arbeiten im Netzteil aus Das Netzteil enth lt keine f r den Benutzer wartungsbed rftigen Teile Schicken Sie das Ger t f r Wartungsarbeiten an den Hersteller zur ck Schalten Sie den Server aus und ziehen Sie alle Netzkabel ab bevor Sie Komponenten ein oder ausbauen die nicht hot plug f hig sind Wenn Sie ein hot plug fahiges Netzteil austauschen ziehen Sie dessen Netzkabel ab bevor Sie es aus dem Server ausbauen Vorsicht War Ihr Server in Betrieb k nnen die installierten Prozessoren und K hlk rper hei sein Sofern Sie keine Hot Plug Komponenten ein oder ausbauen warten Sie mit dem Abnehmen der Abdeckungen bis das System abgekiihlt ist Gehen Sie beim Aus oder Einbauen von Hot Plug Komponenten sorgf ltig vor um nicht mit hei en Komponenten in Ber hrung zu kommen Vorsicht Ber hren Sie nicht die rotierenden L fterfl gel um Verletzungen zu vermeiden Falls Ihr System mit eine L fterabdeckung besitzt darf es nicht ohne diese Abdeckung betrieben werden NovaScale Blade 2320 Installation and User s Guide 69 Warnhinweise fur Racks Das Ger te Rack mu auf einer geeigneten festen Unterlage verankert werden um ein Umkippen zu vermeiden wenn ein Server oder andere Ger te herausgezogen werden Bei der Installation des Racks m ssen die Anweisungen des Rack Herstellers
37. a cuando se extraiga un servidor o una pieza del mismo El rack debe instalarse siguiendo las instrucciones del fabricante del bastidor Instale el equipo en el rack comenzando desde la parte de abajo con el equipo m s pesado en la parte inferior del rack Extraiga las piezas del equipo del rack de una a una El usuario es el responsable de la instalaci n de un dispositivo de desconexi n de la alimentaci n principal para toda la unidad del rack El acceso a este dispositivo de desconexi n deber ser de f cil acceso y deber n incluirse indicaciones que lo identifiquen como el control de alimentaci n el ctrica de toda la unidad no s lo de los servidores Para evitar el riesgo de descargas el ctricas deber instalar una conexi n a tierra apropiada para el rack y para cada pieza del equipo instalada en el mismo Descarga electrost tica ESD Precauci n 82 Las descargas electrost ticas pueden da ar las unidades de disco las tarjetas y otros componentes Recomendamos que realice todos los procedimientos en una estaci n de trabajo protegida contra descargas electrost ticas En caso de que no haya una disponible prot jase de alguna forma contra las descargas llevando un brazalete antiest tico conectado a la toma de tierra de la carcasa cualquier superficie de metal que no est pintada del servidor cuando manipule las piezas Manipule siempre las tarjetas con el m ximo cuidado Pueden ser sumamente sensibles a la
38. a de acceso No acceda al interior de la fuente de alimentaci n No hay elementos en la fuente de alimentaci n que usted pueda reparar y utilizar Devu lvala al fabricante para repararla Apague el servidor y desconecte todos los cables de alimentaci n antes de agregar o reemplazar cualquier componente que no es de conexi n en funcionamiento Al reemplazar una fuente de alimentaci n de conexi n en funcionamiento desenchufe el cable de alimentaci n de la fuente de alimentaci n que va a reemplazar antes de extraerla del servidor Precauci n Si el servidor se ha estado ejecutando los procesadores y disipadores de calor estar n recalentados A no ser que est instalando o extrayendo un componente de conexi n en funcionamiento deje que el sistema se enfr e antes de abrir las cubiertas Para que no llegue a tocar los componentes que est n calientes cuando est realizando una instalaci n de conexi n en funcionamiento tenga cuidado al extraer o instalar los componentes de conexi n en funcionamiento Precauci n Para evitar posibles da os no toque las aspas en movimiento de los ventiladores Si el sistema se le ha suministrado con una protecci n para el ventilador asegurese de que cuando est funcionando el sistema la protecci n est en su sitio NovaScale Blade 2320 Installation and User s Guide 81 Advertencias sobre el montaje en rack El rack para el equipo se debe sujetar con un soporte fijo para evitar que se caig
39. about the label placement Important Do not place the label on the blade server or in any way block the ventilation holes on the blade server 10 If you have other blade servers to install do so now If you reinstall a blade server that you removed you must install it in the same blade bay from which you removed it Some blade server configuration information and update options are established according to bay number Reinstalling a blade server into a different blade bay from the one from which it was removed could have unintended consequences and you might have to reconfigure the blade server If this is the initial installation for the blade server in the NovaScale Blade Chassis you must configure the blade server through the Configuration Setup Utility program and install the blade server operating system See Updating the NovaScale Blade 2320 Server Configuration on page 33 and Chapter 5 Installing the Operating System on page 51 for details Updating the NovaScale Blade 2320 Server Configuration When the blade server starts for the first time after you add or remove an internal option or an external SCSI device you might receive a message that the configuration has changed The Configuration Setup Utility program automatically starts so that you can save the new configuration settings See Using the Configuration Setup Utility program on page 35 for more information about the Configuration Setup Utility program
40. adjust microprocessor performance settings If enabled hyper threading will only be active if it is supported by your operating system PCI Bus Control Select this choice to view and set interrupts for PCI devices and to configure the master latency timer value for the blade server Baseboard Management Controller BMC Settings Select this choice to enable or disable the Reboot on System NMI option on the menu If you enable this option the blade server will automatically restart 60 seconds after the service processor issues a nonmaskable interrupt NMI to the blade server You can also select this choice to enable or disable and set the time outs for the POST and OS loader watchdog timers and view BMC version information BMC Network Configuration Select this choice to set the network addresses of the BMC BMC System Event Log Select this choice to view and clear BMC event log entries Save Settings Select this choice to save the changes you have made in the settings Restore Settings Select this choice to cancel the changes you have made in the settings and restore the previous settings Load Default Settings Select this choice to cancel the changes you have made in the settings and restore the factory settings Exit Setup Select this choice to exit from the Configuration Setup Utility program If you have not saved the changes you have made in the settings you are asked whether you want to save the changes or
41. ardware interrupt Start the Configuration Setup Utility program and make sure that the interrupt resource settings are correct 2400 Video controller and memory Make sure that the keyboard video mouse select 2462 button LED on the front of the blade server is lit indicating that the blade server is connected to the shared monitor Make sure that the monitor is connected correctly to the NovaScale Blade Chassis 00019xxx Processor x is not functioning or Make sure that processor x is installed correctly If the failed the built in test problem remains replace processor x 00180xxx A PCI adapter requested a Start the Configuration Setup Utility program and resource that is not available make sure that the resources that are needed by the PCI adapter are available 01295085 The blade server failed the ECC Have the system board serviced checking hardware test 012980xx Data for processor x Download and install the latest level of BIOS code 012981xx 01298200 Microprocessor speed mismatch Install microprocessors with identical speeds 19990305 POST could not find an operating Install an operating system system NovaScale Blade 2320 Installation and User s Guide 45 Troubleshooting Charts The following tables list problem symptoms and suggested solutions See the NovaScale Blade Hardware Maintenance Manual and Troubleshooting Guide on the CD ROM NovaScale Blade Resource CD for more detailed troubles
42. aux crit res suivants Le cordon d alimentation doit supporter une intensit sup rieure celle indiqu e sur le produit Lecordon d alimentation doit poss der une broche ou un contact de mise la terre appropri la prise lectrique Les cordons d alimentation lectrique repr sentent le principal dispositif de d connexion raccord l alimentation secteur Les prises de courant doivent se trouver proximit de l quipement et tre facilement accessibles pour une d connexion Les cordons d alimentation doivent tre branch s sur des prises lectriques correctement reli es la terre NovaScale Blade 2320 Installation and User s Guide Avertissements sur l acces au systeme Attention Pour viter de vous blesser ou d endommager votre quipement les consignes de s curit suivantes s appliquent chaque fois que vous acc dez l int rieur du produit Mettez hors tension tous les p riph riques connect s ce produit teignez le syst me en appuyant sur le bouton d alimentation D connectez l alimentation secteur en d branchant tous les cordons d alimentation secteur du syst me ou de la prise murale D connectez l ensemble des c bles et lignes de t l communication qui sont connect s au systeme Mettez toutes les vis ou autres attaches de c t lorsque vous retirez les panneaux d acces Une fois que vous avez termin d acc der l int rieur du produit refixez le panneau d a
43. cables Turn off the storage system and disconnect the power cord telecommunications systems networks and modems attached to the storage system before opening it Otherwise personal injury or equipment damage can result Electrostatic discharge ESD and ESD protection ESD can damage disk drives boards and other parts We recommend that you perform all procedures in this document only at an ESD workstation If one is not available provide some ESD protection by wearing an anti static wrist strap attached to chassis ground any unpainted metal surface on your storage system when handling parts ESD and handling boards Always handle boards carefully They can be extremely sensitive to ESD Hold boards only by their edges Do not touch the connector contacts After removing a board from its protective wrapper or from the storage server place the board component side up on a grounded static free surface Use a conductive foam pad if available but not the board wrapper Do not slide board over any surface Installing or removing jumpers A jumper is a small plastic encased conductor that slips over two jumper pins Some jumpers have a small tab on top that you can grip with your fingertips or with a pair of fine needle nosed pliers If your jumpers do not have such a tab take care when using needle nosed pliers to remove or install a jumper grip the narrow sides of the jumper with the pliers never the wide sides Gripping the wide sides can
44. cces avec les vis ou attaches d origine N essayez pas d acc der l int rieur du bloc d alimentation Il ne contient aucune pi ce r parable Renvoyez le au fabricant en cas de probl me Mettez le serveur hors tension et d branchez tous les cordons d alimentation avant d ajouter ou de remplacer tout composant non connectable chaud Lorsque vous remplacez le bloc d alimentation chaud d branchez le cordon du bloc d alimentation en cours de remplacement avant de retirer le bloc du serveur Attention Si le serveur a t utilis les processeurs et dissipateurs de chaleur install s peuvent tre chauds A moins que vous n ajoutiez ou ne retiriez un composant connectable chaud laissez le syst me refroidir avant d ouvrir les panneaux Pour viter tout risque d entrer en contact avec un composant chaud lors d une installation chaud prenez toutes les pr cautions n cessaires lorsque vous retirez ou installez des composants connectables chaud Attention Pour viter de vous blesser ne touchez pas les pales de ventilateur en mouvement Si votre systeme est fourni avec une protection sur le ventilateur ne mettez pas le syst me en route sans la protection en place NovaScale Blade 2320 Installation and User s Guide 75 Avertissements sur le montage en rack Le rack doit tre fix un support inamovible pour viter qu il ne bascule lors de l extension d un serveur ou d un l ment de l quipement Le rack doit
45. d User s Guide Aplicaciones y usos previstos Este producto ha sido evaluado como equipo de tecnologia informatica ITE que puede instalarse en oficinas escuelas salas de equipos informaticos o lugares de ambito comercial similares Es posible que sea necesario llevar a cabo una evaluaci n adicional para comprobar si este producto es apropiado para otras categor as de productos y entornos adem s de las aplicaciones inform ticas por ejemplo soluciones m dicas industriales residenciales sistemas de alarma y equipos de pruebas Selecci n de la ubicaci n El sistema se ha disefiado para funcionar en un entorno normal de oficinas Seleccione una ubicaci n que est Limpia seca y libre de macropart culas en suspensi n en el aire que no sean el polvo habitual de la habitaci n Bien ventilada y alejada de fuentes de calor incluida la luz solar directa y los radiadores Alejada de fuentes de vibraci n o de golpes f sicos Aislada de campos electromagn ticos producidos por dispositivos el ctricos En zonas propensas a tormentas el ctricas se recomienda que conecte el servidor a un supresor de sobretensiones y desconecte las l neas de telecomunicaciones al m dem durante una tormenta el ctrica Provista de una toma de corriente alterna correctamente conectada a tierra Provista de espacio suficiente para acceder a los cables de la fuente de alimentaci n ya que constituyen la desconexi n principal de la alimentaci
46. d User s Guide 93 Espanol El usuario debe abstenerse de manipular los componentes de la fuente de alimentaci n de este producto cuya reparaci n debe dejarse exclusivamente en manos de personal t cnico especializado Puede que este producto disponga de m s de una fuente de alimentaci n No intente modificar ni usar el cable de alimentaci n de corriente alterna si no corresponde exactamente con el tipo requerido El numero de cables suministrados se corresponden con el numero de fuentes de alimentaci n de corriente alterna que tenga el producto N tese que el interruptor activado desactivado en el panel frontal no desconecta la corriente alterna del sistema Para desconectarla deber desenchufar todos los cables de corriente alterna de la pared o desconectar la fuente de alimentaci n INSTRUCCIONES DE SEGURIDAD Cuando extraiga la tapa del chasis para acceder al interior del sistema siga las siguientes instrucciones 1 Apague todos los dispositivos perif ricos conectados al sistema 2 Apague el sistema presionando el interruptor encendido apagado 3 Desconecte todos los cables de alimentaci n CA del sistema o de las tomas de corriente alterna 4 Identifique y desconecte todos los cables enchufados a los conectores E S o a los puertos situados en la parte posterior del sistema 5 Cuando manipule los componentes es importante protegerse contra la descarga electrost tica ESD Puede hacerlo si
47. d from it The equipment rack must be installed according to the rack manufacturer s instructions Install equipment in the rack from the bottom up with the heaviest equipment at the bottom of the rack Extend only one piece of equipment from the rack at a time You are responsible for installing a main power disconnect for the entire rack unit This main disconnect must be readily accessible and it must be labeled as controlling power to the entire unit not just to the server s To avoid risk of potential electric shock a proper safety ground must be implemented for the rack and each piece of equipment installed in it Electrostatic Discharge ESD 64 Caution ESD can damage disk drives boards and other parts We recommend that you perform all procedures at an ESD workstation If one is not available provide some ESD protection by wearing an antistatic wrist strap attached to chassis ground any unpainted metal surface on your server when handling parts Always handle boards carefully They can be extremely sensitive to ESD Hold boards only by their edges After removing a board from its protective wrapper or from the server place the board component side up on a grounded static free surface Usea NovaScale Blade 2320 Installation and User s Guide conductive foam pad if available but not the board wrapper Do not slide board over any surface Other Hazards Battery Replacement Caution There is the danger of e
48. damage the contacts inside the jumper causing intermittent problems with the function controlled by that jumper Take care to grip with but not squeeze the pliers or other tool you use to remove a jumper or you may bend or break the pins on the board Reinstalling enclosure cover For proper cooling and airflow always install the enclosure cover before turning on the storage system Operating it without the enclosure cover in place can damage system parts x NovaScale Blade 2320 Installation and User s Guide 1 Introduction This high efficiency new blade server is ideally suited for installation environments that require superior microprocessor power density performance efficient memory management flexibility and reliable data storage This Installation and User 5 Guide provides information about Setting up the NovaScale Blade 2320 Server Starting and configuring the NovaScale Blade 2320 Server nstalling hardware options nstalling the operating system Performing basic troubleshooting of the NovaScale Blade 2320 Server Record information about your NovaScale Blade 2320 Server in the following table Note The model number and serial number are on the ID label that is behind the control panel door on the front of the blade server and on a label on the side of the blade server that is visible when the blade server is not in the NovaScale Blade Chassis Product name NovaScale Blade 2320 Product code Model nu
49. date and time and passwords See Using the Configuration Setup Utility program on page 35 for more information LSI Logic Configuration Utility program The LSI Logic Configuration Utility program is part of the BIOS code in the blade server Use it to set the device scan order and to set the SCSI controller IDs See Using the LSI Logic Configuration Utility Program on page 42 for more information Preboot Execution Environment PXE boot agent utility program The PXE boot agent utility program is part of the BIOS code in the blade server Use it to select the boot protocol and other boot options and to select a power management option For information about using this utility program see Using the PXE Boot Agent Utility Program on page 39 Using the Configuration Setup Utility program To start the Configuration Setup Utility program complete the following steps l Turn on the blade server see Turning on the NovaScale Blade 2320 Server on page 7 Immediately give the blade server control of the NovaScale Blade Chassis shared keyboard video and mouse ports Ifyou are managing the blade server using the NovaScale Blade Chassis system console press the KVM select button on the blade server see Understanding the Control Panel and LEDs on page 8 for information Ifyou are managing the blade server from a remote location see the NovaScale Blade Chassis Management Module User s Guide NovaScale Blade C
50. de Resource CD that came with your NovaScale Blade Chassis The screen is blank Make sure that The KVM select button LED on the front of the blade server is lit indicating that the blade server is connected to the shared monitor The NovaScale Blade Chassis power cord is connected to the power module and a working electrical outlet The monitor cables are connected properly The monitor is turned on and the brightness and contrast controls are adjusted correctly Important In some memory configurations the 3 3 3 beep code might sound during POST followed by a blank monitor screen If this occurs and the Boot Fail Count feature in the Start Options of the Configuration Setup Utility program is enabled its default setting you must restart the blade server three times to force the system BIOS to reset the configuration settings to the default configuration the memory connector or bank of connectors enabled If the problem remains call for service Only the cursor appears Make sure that the keyboard video and mouse on the NovaScale Blade Chassis have not been switched to another blade server If the problem remains call for service NovaScale Blade 2320 Installation and User s Guide 47 Symptom Suggested action The monitor has screen jitter or the screen image is wavy unreadable rolling or distorted If the monitor self tests show that the monitor is working correct
51. delines on page 15 Open the blade server cover see Opening the NovaScale Blade 2320 Server Cover on page 18 for instructions Press the bezel assembly release and pull the bezel assembly away from the blade server approximately 1 2 cm 0 5 inch Disconnect the control panel cable from the control panel connector 5 Pull the bezel assembly away from the blade server Store the bezel assembly in a safe place Installing a SAS Hard Disk Drive The blade server has two connectors on the system board for installing optional SFF SAS hard disk drives Each SAS connector is on the same bus Depending on the blade server model at least one SAS hard disk drive might already be installed If the blade server is equipped with one SAS hard disk drive you can install an additional SAS hard disk drive These two SAS hard disk drives can be used to implement and manage a redundant array of independent disks RAID level 1 See Configuring a SCSI RAID Array on page 42 for information about SCSI RAID configuration NovaScale Blade 2320 Installation and User s Guide 19 The following illustration shows how to install a SAS hard disk drive Hard drive release lever AF000435 To install a SAS hard disk drive complete the following steps 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 2 Shut down the operating syste
52. dles de 40 Configuring the Gigabit Ethernet Controllers 41 Blade Server Ethernet Controller Enumeration oooocccccnoccccnonoccccnononcnccnonannncnnnnnnccnnnnnnnccnnnns 41 Configuring a SCSI RAID Array une ds 42 Using the LSI Logic Configuration Utility Program i 42 Starting the LSI Logic Configuration Utility program ii 42 Solving Problems siii 49 Diagnostic Tools Overview siciliana 49 POST Beep Code Descriptions ote tte e peret dd 43 POST Error MESSI nenn EE 44 Troubleshoolind Charts nodes tel a eati der Ee dutem een 46 Memory Problems ee menn ete 46 Microprocessor problems is 47 Monitor Problems 2 DH ei S 47 Mouse Problems coito c ite tiene e la ee diee e eund ei 48 Network Connection Problems sisi 49 Option Probletms ioc iat e a a 49 Power Problems ti cud n teas 50 Service Processor BMC Problems nennen enne nennen 50 Light Path Diagnostics een te ears diode do her e p NR 51 Diagnosing Problems Using Light Path Diagnostics sse 51 Light Path Diagnostics LEDS nme nemen enn nnne nnne 51 A Regulatory and Compliance Information eere 55 Product Regulatory Compliance siano alia us to ut nn een equat da A 55 Product Safety Compliance sisi 55 Product EMC C
53. ds Start Options Select this choice to view or change the start options Changes in the start options take effect when you start the blade server Startup Sequence Options Select this choice to view the startup device sequence that is set for the blade server Note To set the startup sequence which is the order in which the blade server checks devices to find a boot record you must use the management module Web interface You can set keyboard operating characteristics such as whether the blade server starts with the keyboard number lock on or off You can enable the blade server to run without a diskette drive or keyboard You can enable or disable the PXE option for either of the integrated Gigabit Ethernet controllers The default setting is Planar Ethernet 1 which enables the PXE option for the first Ethernet controller on the system board If you enable the boot fail count the BIOS default settings will be restored after three consecutive failures to find a boot record You can enable a virus detection test that checks for changes in the boot record when the blade server starts This choice is on the full Configuration Setup menu only Advanced Setup Select this choice to change settings for advanced hardware features Important The blade server might malfunction if these options are incorrectly configured Follow the instructions on the screen carefully Memory Settings Select this choice to manually enabl
54. e a pair of memory connectors If a memory error is detected during POST or memory configuration the blade server automatically disables the failing memory pair of memory connectors and continues operating with reduced memory After the problem is corrected you must enable the memory connectors Use the arrow keys to highlight the pair of memory connectors that you want to enable and use the arrow keys to select Enable To maintain optimum system operation in the event of a memory failure you can set the Memory Configuration for memory Mirroring or Sparing Memory mirroring stores duplicate data on two DIMMs to prevent data loss if a DIMM fails Memory sparing removes the failed memory from the system configuration and activates a Hot Spare Memory pair of DIMMs to replace the failed memory pair of DIMMs Before you can enable the memory mirroring or sparing at least two pairs of DIMMs must be installed in the blade server that adhere to the NovaScale Blade 2320 Installation and User s Guide 37 special requirements described in Installing Memory Modules on page 21 Set the Memory Configuration to Flat to disable memory mirroring and sparing CPU Options Select this choice to disable the microprocessor cache or to set the microprocessor cache to use the write back or the write through method Write back caching generally provides better system performance You can also select this choice to enable or disable hyper threading and
55. e calor pueden estar a n calientes Tambi n conviene tener en cuenta que en el chasis o en el tablero puede haber piezas cortantes o punzantes Por ello se recomienda precauci n y el uso de guantes protectores Existe peligro de explosi n si la pila no se cambia de forma adecuada Utilice solamente pilas iguales o del mismo tipo que las recomendadas por el fabricante del equipo Para deshacerse de las pilas usadas siga igualmente las instrucciones del fabricante El sistema est dise ado para funcionar en un entorno de trabajo normal Escoja un lugar LE Limpio y libre de part culas en suspensi n salvo el polvo normal Bien ventilado y alejado de fuentes de calor incluida la luz solar directa Alejado de fuentes de vibraci n Aislado de campos electromagn ticos fuertes producidos por dispositivos el ctricos e En regiones con frecuentes tormentas el ctricas se recomienda conectar su sistema a un eliminador de sobrevoltage y desconectar el m dem de las l neas de telecomunicaci n durante las tormentas Provisto de una toma de tierra correctamente instalada Provisto de espacio suficiente como para acceder a los cables de alimentaci n ya que stos hacen de medio principal de desconexi n del sistema NovaScale Blade 2320 Installation and User s Guide 95 Italiano Rivolgersi ad un tecnico specializzato per la riparazione dei componenti dell alimentazione di questo pr
56. e system information Product Data Select this choice to view the machine type and model of the blade server the serial number and the revision level or issue date of the BIOS and diagnostics code stored in electrically erasable programmable ROM EEPROM Devices and I O Ports Select this choice to view or change assignments for devices and input output I O ports You can also enable or disable the integrated SAS and Ethernet controllers all standard ports such as serial and the I O expansion card Enable is the default setting for all controllers If you disable a device it cannot be configured and the operating system will not be able to detect it this is equivalent to disconnecting the device If you disable the Ethernet controller the blade server will have no Ethernet capability Remote Console Redirection Select this choice to enable Serial over LAN SOL and to set remote console communication parameters Video Select this choice to view information about the integrated video controller System MAC Addresses Select this choice to set and view the MAC addresses for the Ethernet controllers on the blade server NovaScale Blade 2320 Installation and User s Guide Date and Time Select this choice to set the system date and time in 24 hour format hour minute second System Security Select this choice to set a power on password See Using Passwords on page 39 for more information about passwor
57. e the following steps 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 2 Shut down the operating system turn off the blade server and remove the blade server from the NovaScale Blade Chassis See Removing the NovaScale Blade 2320 Server from a NovaScale Blade Chassis on page 17 for instructions 3 Carefully lay the blade server on a flat non conductive surface 4 Open the cover see Opening the NovaScale Blade 2320 Server Cover on page 18 for instructions NovaScale Blade 2320 Installation and User s Guide 27 5 Install the small form factor expansion card as shown in the following illustration Expansion card a Orient the expansion card b Slide the notch in the narrow end of the card into the raised hook on the tray then gently pivot the card into the expansion card connectors For device driver and configuration information needed to complete the installation of the expansion card see the documentation that comes with the expansion card 3 If you have other options to install or remove do so now otherwise go to Completing the Installation on page 30 Replacing the Battery Note Caution 28 The lithium battery must be handled correctly to avoid possible danger If you replace the battery you must adhere to the following instructions If you replace the original lithium battery with a heavy
58. e zur Vermeidung von Stromschlag oder Feuergefahr die mit dem Produkt zu verwendenden Netzkabel wie folgt Nehmen Sie keine Anderungen an einem Netzkabel vor und benutzen sie es nicht wenn es nicht genau in die geerdeten Netzsteckdosen pa t Netzkabel m ssen die folgenden Anforderungen erf llen Die Nennbelastbarkeit des Netzkabels muf mindestens so hoch sein wie die am Produkt angegebenen Nennstromaufnahme Das Netzkabel mu einen zur Netzsteckdose passenden Schutzkontakt besitzen Die Netzkabel sind die Hauptvorrichtung zum Trennen des Ger ts vom Stromnetz Die Steckdose muf in der Nahe der Anlage angebracht und gut erreichbar sein Netzkabel m ssen an eine ordnungsgem geerdete Steckdose angeschlossen sein NovaScale Blade 2320 Installation and User s Guide Warnhinweise fur den Systemzugang Vorsicht Um Verletzungen und Beschddigungen zu vermeiden sollten Sie vor Arbeiten im Produktinneren folgende Sicherheitsanweisungen beachten Schalten Sie alle am Produkt angeschlossenen Peripherieger te aus Schalten Sie das System mit dem Netzschalter aus Trennen Sie das Ger t von der Stromquelle indem Sie alle Netzkabel vom System bzw aus der Steckdose ziehen Ziehen Sie alle Kabel und alle an das System angeschlossenen Telekommunikationsleitungen ab Bewahren Sie alle Schrauben und anderen Befestigungselemente gut auf nachdem Sie die Gehduseabdeckung entfernt haben Wenn Sie Ihre Arbeiten im
59. ecter l alimentation p EB Veuillez r utiliser la batterie NovaScale Blade 2320 Installation and User s Guide Domaines d utilisation pr vus Ce produit a t test comme quipement informatique ITE et peut tre install dans des bureaux des coles des salles informatiques et des endroits commerciaux similaires L utilisation du pr sent produit dans des cat gories et environnements de produits et domaines d application par exemple le domaine m dical industriel r sidentiel les syst mes d alarme et les appareils de contr le autres qu ITE doit faire l objet d valuations suppl mentaires S lection d un emplacement Le syst me est concu pour fonctionner dans un environnement standard de bureau Choisissez un emplacement respectant les conditions suivantes Propre sec et exempt de particules en suspension autres que la poussi re normale d une pi ce Bien ventil et l cart des sources de chaleur telles que la lumi re directe du soleil et les radiateurs l cart des sources de vibration ou des chocs physiques Isol des champs lectromagn tiques importants produits par des appareils lectriques Dans les r gions sujettes aux orages magn tiques nous vous recommandons de brancher votre syst me un suppresseur de surtension et de d connecter les lignes de t l communication de votre modem pendant les orages Equip d une prise murale reli e la terre quip d
60. ed rack component in the rack you are installing the microprocessor in for at least 2 seconds then remove the microprocessor from the package Important Do not use any tools or sharp objects to lift the locking lever on the microprocessor socket Doing so might result in permanent damage to the system board c Rotate the locking lever on the microprocessor socket from its closed and locked position until it stops or clicks in the fully open position approximately a 135 degree angle as shown NovaScale Blade 2320 Installation and User s Guide Important You must make sure that the locking lever on the microprocessor socket is in the fully open position before you insert the microprocessor in the socket Failure to do so might result in permanent damage to the microprocessor microprocessor socket or a system board Lever closed d Center the microprocessor over the microprocessor socket Align the triangle on the corner of the microprocessor with the triangle on the comer of the socket and carefully press the microprocessor into the socket Microprocessor Alignment marks Microprocessor socket Important Do not use excessive force when pressing the microprocessor into the socket Make sure that the microprocessor is oriented and aligned correctly in the socket before you try to close the lever NovaScale Blade 2320 Installation and User s Guide 25 e Carefully close the lever to secure the m
61. edia drives and USB ports with the blade server The LED on the button flashes while the request 1s being processed then is lit when the ownership of the removable media drives and USB ports has been transferred to the blade server It can take approximately 20 seconds for the operating system in the blade server to recognize the removable media drives and USB ports The operating system in the blade server must provide USB support for the blade server to recognize and use the removable media drives and USB ports The NovaScale Blade Chassis uses USB for internal communication with these devices If there is no response when you press the media tray select button you can use the management module Web interface to determine whether local control has been disabled on the blade server Activity LED When this green LED is lit it indicates that there is activity on the hard disk drive flash drive or network Location LED When this blue LED is lit it has been turned on by the system administrator to aid in visually locating the blade server The location LED on the NovaScale Blade Chassis will be lit also The location LED can be turned off through the management module Web interface Information LED When this amber LED is lit it indicates that information about a system error for the blade server has been placed in the system error log The information LED can be turned off through the management module Web interface Power on LED This green
62. el ctrocution N essayez pas de modifier ou d utiliser un cordon d alimentation secteur s il ne s agit pas du type exact requis Un cordon secteur est requis pour chaque alimentation syst me Le bloc d alimentation de ce produit ne contient aucun composant r parable par l utilisateur N ouvrez pas le bloc d alimentation L int rieur de celui ci est soumis des niveaux dangereux de tension de courant et d nergie Renvoyez le au fabricant en cas de probl me Lorsque vous remplacez un bloc d alimentation chaud d branchez le cordon du bloc d alimentation en cours de remplacement avant de le retirer du serveur Pour viter tout risque d lectrocution mettez le syst me hors tension et d branchez les cordons d alimentation ainsi que les syst mes de t l communication r seaux et modems reli s au syst me avant d ouvrir ce dernier Avertissements sur le cordon d alimentation 74 Si aucun cordon d alimentation secteur n a t fourni avec votre produit vous devez vous en procurer un qui soit approuv pour une utilisation dans votre pays Attention Pour viter tout risque d lectrocution ou d incendie v rifiez les cordons d alimentation qui seront utilis s avec le produit comme suit e N essayez pas d utiliser ou de modifier les cordons d alimentation en CA s ils ne correspondent pas exactement au type requis pour les prises lectriques reli es la terre Les cordons d alimentation doivent r pondre
63. en Vorsicht Beachten Sie zur Vermeidung von Strahlung und Verletzungen die folgenden Hinweise ffnen Sie keinesfalls das Geh use von Laser Peripherieger ten oder Laser Komponenten Laser Peripherieger te oder Komponenten besitzen keine f r den Benutzer wartungsbed rftigen Teile Schicken Sie das Ger t f r Wartungsarbeiten an den Hersteller zur ck NovaScale Blade 2320 Installation and User s Guide 71 Francais Consignes de s curit sur le serveur Ce document s applique aux cartes serveur NovaScale Blade au chassis sur pieds et sur rack et aux p riph riques install s Pour r duire les risques de dommages corporels d lectrocution d incendie et de dommages mat riels lisez ce document et respectez tous les avertissements et pr cautions mentionn s dans ce guide avant d installer ou de mettre jour votre produit NovaScale Blade En cas de conflit entre les informations fournies dans ce document et celles livr es avec le produit ou publi es sur le site Web pour un produit particulier la documentation du produit prime Votre serveur doit tre int gr et entretenu uniquement par des techniciens qualifi s Vous devez suivre les informations de ce guide et les instructions d assemblage des manuels de serveur pour v rifier et maintenir la conformit avec les certifications et approbations de produit existantes Utilisez uniquement les composants d crits et r glement s sp cifi s dans ce guide
64. er de una capacidad nominal de corriente el ctrica mayor que la capacidad especificada en el producto El cable de alimentaci n debe disponer de una patilla o contacto de conexi n a tierra que sea apto para la toma de corriente Los cables de la fuente de alimentaci n son los dispositivos de desconexi n principales a la corriente alterna El enchufe o enchufes de z calo deben encontrarse NovaScale Blade 2320 Installation and User s Guide cerca del equipo y el acceso a ellos debe poderse efectuar de forma inmediata con el fin de desconectarlos Los cables de la fuente de alimentacion deben estar conectados a los enchufes con una toma de tierra adecuada Advertencias el acceso al sistema Precauci n Para evitar lesiones personales o da os en la propiedad se aplican las siguientes instrucciones de seguridad siempre que se acceda al interior del producto Apague todos los dispositivos perif ricos conectados a este producto Pulse el bot n de alimentaci n para apagar el sistema Desconecte la alimentaci n de CA desenchufando los cables de alimentaci n de CA del sistema o de la toma de corriente alterna Desconecte todos los cables y l neas de telecomunicaci n que est n conectados al sistema Guarde todos los tornillos o elementos de fijaci n cuando retire las cubiertas de acceso Cuando termine de operar en el interior del producto vuelva a colocar los tornillos o los elementos de fijaci n originales de la cubiert
65. following illustration shows how to install the second microprocessor on the system board for the blade server Heat Sink Microprocessor 2 Microprocessor 1 and Heat Sink AF000446 To install an additional microprocessor complete the following steps 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 Shut down the operating system turn off the blade server and remove the blade server from the NovaScale Blade Chassis See Removing the NovaScale Blade 2320 Server from a NovaScale Blade Chassis on page 17 for instructions Carefully lay the blade server on a flat static protective surface Open the blade server cover see Opening the NovaScale Blade 2320 Server Cover on page 18 for instructions Remove the bezel assembly see Removing the NovaScale Blade 2320 Server Bezel Assembly on page 19 for instructions Locate the microprocessor socket on the system board 7 Remove the two screws that secure the heat sink filler and then remove the filler from the microprocessor socket Install the microprocessor a Remove the protective cover tape or label from the surface of the microprocessor socket if one is present b Touch the static protective package that contains the new microprocessor to any unpainted metal surface on the blade server or any unpainted metal surface on any other ground
66. g Padlock wieder an und schlieBen Sie diese um ein unerlaubtes Offnen des Systems zu verhindern 5 SchlieBen Sie alle externen Kabel und den AC Stromanschlu stecker Ihres Systems wieder an Der Mikroprozessor und der K hler sind m glicherweise erhitzt wenn das System in Betrieb ist Au erdem k nnen einige Platinen und Geh useteile scharfe Spitzen und Kanten aufweisen Arbeiten an Platinen und Geh use sollten vorsichtig ausgef hrt werden Sie sollten Schutzhandschuhe tragen Bei falschem Einsetzen einer neuen Batterie besteht Explosionsgefahr Die Batterie darf nur durch denselben oder einen entsprechenden vom Hersteller empfohlenen Batterietyp ersetzt werden Entsorgen Sie verbrauchte Batterien den Anweisungen des Herstellers entsprechend NovaScale Blade 2320 Installation and User s Guide AVS Das System wurde f r den Betrieb in einer normalen B roumgebung entwickelt Der Standort sollte sauber und staubfrei sein Hausstaub ausgenommen gut gel ftet und keinen Heizquellen ausgesetzt sein einschlieBlich direkter Sonneneinstrahlung keinen Ersch tterungen ausgesetzt sein keine starken von elektrischen Ger ten erzeugten elektromagnetischen Felder aufweisen in Regionen in denen elektrische St rme auftreten mit einem Uberspannungsschutzger t verbunden sein w hrend eines elektrischen Sturms sollte keine Verbindung der Telekommunikationsleitungen mit dem Modem bestehen
67. g the NovaScale Blade 2320 Server Cover on page 18 for instructions Locate SAS connector 0 J95 or SAS connector J94 Slowly pull the blue lever at the back of the hard disk drive tray away from the hard disk drive to disengage the drive from its tray From the rear edge of the drive slide the drive out of the SAS connector Installing Memory Modules The following notes describe the types of dual inline memory modules DIMMs that the blade server supports and other information that you must consider when installing DIMMs The system board contains four DIMM connectors and supports two way memory interleaving The DIMM options that are available for the blade server are 256 MB 512 MB 1 GB 2 GB and 4 GB Depending on the memory configuration set in blade server BIOS the blade server can support a minimum of 512 MB and a maximum of 16 GB of system memory Install the DIMMs in the following order Pair DIMM connectors First 1 4113 and 2 J111 Second 3 J112 and 4 J110 When you install memory you must install a pair of matched DIMMs Both DIMMs in a pair must be the same size speed type technology and physical design You can mix compatible DIMMs from different manufacturers The second pair does not have to be DIMMs of the same size speed type technology and physical design as the first pair Install only 1 8 V 240 pin DDR2 PC3200 registered SDRAM with ECC DIMMs
68. gaci n UL y otras certificaciones oficiales del producto pudiendo dejar de ser compatible con las normativas locales de los pa ses en los que se comercializa Advertencias y precauciones sobre seguridad 78 Para reducir la posibilidad de que se produzcan lesiones personales o da os en la propiedad antes de empezar a instalar el producto lea observe y cumpla toda la informaci n e instrucciones de seguridad siguientes Puede que se utilicen los siguientes s mbolos de seguridad en la documentaci n y es posible que aparezcan en el producto o en su embalaje PRECAUCI N Indica la existencia de un riesgo que podr a causar lesiones personales o da os en la propiedad leves si no se tiene en cuenta la PRECAUCION ADVERTENCIA Indica la existencia de un riesgo que podr a causar lesiones personales graves si no se tiene en cuenta la ADVERTENCIA Indica un riesgo potencial si no se tiene en cuenta la informaci n indicada Indica riesgo de descargas el ctricas que podr an causar lesiones graves o la muerte si no se siguen las instrucciones de seguridad Indica componentes o superficies calientes Indica que no se deben tocar las aspas de los ventiladores ya que de lo contrario se podr an producir lesiones Indica que es necesario desenchufar los cables de alimentaci n de CA para desconectar la alimentaci n de CA 3 Sp Recicle por favor la bater a NovaScale Blade 2320 Installation an
69. ge 32 for instructions 4 Open the blade server cover see Opening the NovaScale Blade 2320 Server Cover on page 18 for instructions 5 Locate the battery on the system board Battery 6 To remove the battery use your finger to press the battery down on one side of the battery then slide the battery from the socket A spring mechanism will push the battery out towards you as you slide it from the socket D 5 NovaScale Blade 2320 Installation and User s Guide 29 7 Insert the new battery a Tilt the battery so that you can insert it into the socket b As you slide the battery into place press the battery down into the socket 3 Close the blade server cover see Closing the NovaScale Blade 2320 Server Cover on page 31 Important Hazardous energy is present when the blade server is connected to the power source Always replace the blade cover before installing the blade server 4 Reinsert the blade server into the bay in the NovaScale Blade Chassis 5 Turn on the blade server 6 Start the blade se
70. ght path diagnostics panel on the system board NMI error LED Microprocessor speed mismatch error LED System board error LED Over temperature error LED Light path diagnostics LED CD111 Light path diagnostics switch SW4 Table 3 Light Path Diagnostics Panel LEDs LED error Action NMI Check error log for additional information Restart the blade server If the error still exists call for service mismatch MIS microprocessor speed Check microprocessors to make sure that they are the same speed S BRD system board Restart the blade server If the error still exists call for service TEMP over temperature Check the NovaScale Blade Chassis blowers for correct operation and the air inlets for obstructions Make sure that the temperature of the room where the blade server is installed is within the limits specified by the NovaScale Blade 2320 Server Specifications on page 3 CR111 Light path diagnostics LED Lights to show that the light path diagnostics circuit is active and functioning Check the other light path diagnostic LEDs for errors NovaScale Blade 2320 Installation and User s Guide 13 14 Table 3 Light Path Diagnostics Panel LEDs LED error Action SWA Light path diagnostics button Press SWA to find faults on the system board Ifthe microprocessor or memory LED is lit reseat the component Ifthe LED remains lit replace the
71. h diagnostics to diagnose problems that might occur during installation To locate the actual component that caused the error locate the lit error LED on that component The following steps illustrate how to use the light path diagnostics to diagnose a system error 1 Shut down the operating system turn off the blade server and remove the blade server from the NovaScale Blade Chassis see Turning off the NovaScale Blade 2320 Server on page 7 and Removing the NovaScale Blade 2320 Server from a NovaScale Blade Chassis on page 17 2 Place the blade server on a flat static protective surface 3 Remove the cover from the blade server see Opening the NovaScale Blade 2320 Server Cover on page 18 4 Press and hold the light path diagnostics button to relight the LEDs that were lit before you removed the blade server from the NovaScale Blade Chassis The LEDs will remain lit for as long as you press the button to a maximum of 25 seconds See Understanding the Control Panel and LEDs on page 8 for more information about the control panel buttons and error LEDs Light Path Diagnostics LEDs The following illustrations show the light path diagnostics panel and LEDs on the system board NMI NMI error LED MIS Microprocessor speed mismatch error LED S BR System board error LED TEM Over temperature error LED Light path diagnostics LED CD111 Light path diagnostics switch SW4 NovaScale Blade 2320 Installat
72. hassis Management Module Command Line Interface Reference Guide or Serial over LAN SOL Setup Guide for information and instructions When the Configuration Setup utility message appears press Fl Follow the instructions on the screen NovaScale Blade 2320 Installation and User s Guide 35 Configuration Setup Utility Menu Choices 36 The following choices are on the Configuration Setup Utility main menu Depending on the version of the BIOS code in the blade server some menu choices might differ slightly from these descriptions System Summary Select this choice to display configuration information including the type speed and cache sizes of the microprocessors and the amount of installed memory When you make configuration changes through other options in the Configuration Setup Utility program the changes are reflected in the system summary you cannot change settings directly in the system summary Processor Summary Select this choice to view information about the microprocessors installed in the blade server USB Device Summary Select this choice to view information about the USB devices installed in the blade server System Information Select this choice to display information about the blade server When you make configuration changes through other options in the Configuration Setup Utility program some of those changes are reflected in the system information you cannot change settings directly in th
73. he pins at the rear of the blade server as shown in the illustration Before closing the cover check that all components are installed and seated correctly and that you have not left loose tools or parts inside the blade server NovaScale Blade 2320 Installation and User s Guide 31 4 Pivot the cover to the closed position as shown in the illustration until it clicks into place Installing the NovaScale Blade 2320 Server in a NovaScale Blade Chassis The following illustration shows how to install the blade server into a typical NovaScale Blade Chassis DE DR al 5 5 AF000440 To install a blade server in a NovaScale Blade Chassis complete the following steps Important Hazardous energy is present when the blade server is connected to the power source Always replace the blade cover before installing the blade server 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 through Handling Static sensitive Devices on page 16 2 If you have not done so already install any options that you want such as SAS drives or memory in the blade server 3 Select the bay for the blade server Notes a Ifthe blade server has an expansion unit installed on it the blade server and expansion option require two adjacent bay
74. hernet controller which supports connection to a 10 Mbps 100 Mbps or 1000 Mbps network through an Ethernet compatible switch module in the NovaScale Blade Chassis The controller supports Wake on LAN technology I O expansion The blade server has connectors on the system board for an optional expansion card such as the Fibre Channel expansion card for adding more network communication capabilities to the blade server Large system memory capacity The blade server supports up to 16 GB of system memory The memory controller provides support for up to four industry standard 1 8 V 240 pin double data rate DDR2 400 PC3200 registered synchronous dynamic random access memory SDRAM with error correcting code ECC DIMMs Light path diagnostics Light path diagnostics provides light emitting diodes LEDs to help you diagnose problems Power throttling Each blade server is powered by two redundant power supply modules By enforcing a power policy known as power domain oversubscription the NovaScale Blade Chassis can share the power load between two power modules to ensure efficient power for each device in the NovaScale Blade Chassis This policy 1s enforced when the initial power is applied to the NovaScale Blade Chassis or when a blade server is inserted into the NovaScale Blade Chassis You can configure and monitor the power environment by using the management module For more information about configuring and using power thr
75. hooting charts If you cannot find the problem in these charts run the diagnostic programs Memory Problems Symptom Suggested action The amount of system memory displayed is less than the amount of physical memory installed Make sure that The DIMMs are seated correctly You have installed the correct type of memory f you changed the memory you updated the memory configuration in the Configuration Setup Utility program e All banks of memory are enabled The blade server might have automatically disabled a memory bank when it detected a problem or a memory bank might have been manually disabled Check the POST error log for error message 289 Ifthe DIMM was disabled by a system management interrupt SMI replace the DIMM e Ifthe DIMMs are not installed in pairs install the DIMMs starting with DIMM 1 and DIMM 2 Make sure that there is not an unpopulated DIMM slot in the middle or that DIMM 3 and DIMM 4 are installed before DIMM 1 and DIMM 2 e Ifthe system halts make sure that the DIMMs installed in each pair are the same size speed type technology and physical design Swap DIMM 3 and DIMM 4 with DIMM 1 and DIMM 2 e Ifthe system error is an unsupported memory configuration make sure that there is more than one DIMM installed Install DIMMs in DIMM slots 1 and 2 f this does not fix the error replace the DIMMs flagged in the management module log and indicated through light path diagnos
76. ht be a PS 2 style device communication with the mouse is through an internal USB bus in the NovaScale Blade Chassis Some operating systems enable you to select the type of mouse during installation of the operating system Select USB If the problem remains call for service NovaScale Blade 2320 Installation and User s Guide Network Connection Problems Symptom Suggested action One or more blade servers are unable to communicate with the network Make sure that The I O modules for the network interface that you are using are installed in the correct bays and are configured and operating correctly See the NovaScale Blade Chassis Hardware Maintenance Manual and Troubleshooting Guide on the CD ROM NovaScale Blade Resource CD that came with your NovaScale Blade Chassis for details The settings in the switch module are correct for the blade server settings in the switch module are blade server specific If you installed an optional expansion card make sure that The expansion card is designed for the server You followed the installation instructions that come with the expansion card The option is installed correctly You have not loosened any other installed options or cables You updated the configuration information in the Configuration Setup Utility program Whenever memory or an option is changed you must update the configuration If the problem remains call for service
77. i e la terre exempte de charge statique composants orient s vers le haut Utilisez si possible un tapi de mousse conducteru mais pas l emballage de la carte Veillez ce que la carte ne glisse sur aucune surface NovaScale Blade 2320 Installation and User s Guide Autres risques Remplacement de la pile Attention Il existe un risque d explosion si la pile n est pas correctement remplac e Lors du remplacement de la pile utilisez uniquement celle recommand e par le fabricant du mat riel Mettez la pile au rebut en vous conformant aux r glementations locales N essayez pas de recharger une pile N essayez pas de d monter de percer ou d endommager la pile d une quelconque fa on Refroidissement et ventilation Attention Routez les c bles avec pr caution comme indiqu pour minimiser les blocages de circulation d air et les probl mes de refroidissement Afin de permettre une ventilation et un refroidissement corrects ne mettez le syst me en marche que lorsque les panneaux du ch ssis sont en place L utilisation du syst me sans les panneaux peut endommager les composants syst me Pour installer les panneaux V rifiez tout d abord que vous n avez pas oubli d outils ou de composants d tach s l int rieur du syst me V rifiez que les c bles les cartes d extension et les autres composants sont correctement install s Fixez les panneaux au chassis en suivant les instructions du produit P riph
78. iance Markings This product bears the following regulatory marks Table 1 Product Regulatory Compliance Markings Regulatory Compliance Region Marking cULus Listing Marks USA Canada U CE Mark Europe CE FCC Marking Class A USA This device complies with Part 15 ofthe FCC Rules Operation of this device is subject to the following two conditions 1 This device may not cause harmful interference and 2 This device must accept any interference received including interference that may cause undesired operation Manufactured by Intel Corporation EMC Marking Class A Canada CANADA ICES 003 CLASS A CANADA NMB 003 CLASSE A VCCI Marking Class A Japan LORIE 225 A EIN BBS TORES EROS it HT 5 c e3d503 4 COB fe ASE 10 RIRES Sd SED H SRETLS ZEN VCCI A BSMI Certification Number amp Class A Warning Taiwan O ES iB PRAIA ER EERE AREA REGS ANIA LEA RAEE AEECKERIUR EOS ERIN GOST R Marking Russia es RRL MIC Mark Korea See the regulatory information GMC document for additional ases co Information NovaScale Blade 2320 Installation and User s Guide 57 Electromagnetic Compatibility Notices FCC Verification Statement USA This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 this device may not cause harmfu
79. icroprocessor in the socket 6 Install a heat sink on the microprocessor Important Do not set down the heat sink after you remove the plastic cover Do not touch the thermal grease on the bottom of the heat sink Touching the thermal grease will contaminate it If the thermal grease on the microprocessor or heat sink becomes contaminated contact your service technician Thermal grease Heat sink a Remove the plastic protective cover from the bottom of the heat sink b Align and place the heat sink on top of the microprocessor in the retention bracket grease side down Press firmly on the heat sink c Using a screwdriver secure the heat sink to the retention bracket on the system board using the captive mounting screws Press firmly on the screws and tighten them alternating between them Do not overtighten the screws If you are using a torque wrench tighten the screws to 1 00 to 1 26 Newton meters NM 8 85 to 11 15 inch pounds Refer to the following illustration for recommended order to tighten screws REPEAT SEQUENCE UNTIL TIGHT El lt A AF000637 4 If you have other options to install or remove do so now otherwise go to Completing the Installation on page 30 26 NovaScale Blade 2320 Installation and User s Guide Installing an l O expansion Card If I O expansion is supported by the NovaScale Blade Chassis in which the blade server is installed you can add an I O expans
80. ight path diagnostics power present LED is not lit when the light path diagnostics button is pressed no power is available to light the blade error LEDs and they will be unable to provide any diagnostic information The following table lists the LEDs on the light path diagnostics panel the problems that they indicate and actions to solve the problems LED Problem Action None An error has occurred and cannot Check the system error log in the management be isolated or the service processor module for more information about the error has failed The error is not represented by a light path diagnostics LED 52 NovaScale Blade 2320 Installation and User s Guide LED Problem Action DIMM x error A memory error has occurred Replace the failing DIMM which is indicated by the lit DIMM failure LED NOTE Multiple DIMM LEDs do not necessarily indicate multiple DIMM failures If more than one DIMM LED is lit reseat or replace one DIMM at a time until the error is corrected Check the system error log in the management module for information about the error If the problem remains have the blade server serviced Processor x The microprocessor has failed Make sure that the microprocessor that is indicated error by the lit LED is installed correctly see Installing Microprocessors on page 23 for installation instructions If the problem remains replace the microprocessor
81. installed in each blade bay Note the bay number Reinstalling a blade server into a different bay than the one from which it was removed could have unintended consequences Some configuration information and update options are established according to bay number if you reinstall the blade server into a different bay you might need to reconfigure the blade server To remove the blade server complete the following steps 1 If the blade server 1s operating shut down the operating system then press the power control button behind the blade server control panel door to turn off the blade server see Turning off the NovaScale Blade 2320 Server on page 7 for more information Important Wait at least 30 seconds until the hard disk drives stop spinning before proceeding to the next step 2 Open the two release handles as shown in the illustration The blade server moves out of the bay approximately 0 6 cm 0 25 inch 3 Pull the blade server out of the bay Spring loaded doors further back in the bay move into place to cover the bay temporarily 4 Place either a filler blade or another blade in the bay within 1 minute The recessed spring loaded doors will move out of the way as you insert the blade or filler blade NovaScale Blade 2320 Installation and User s Guide 17 Opening the NovaScale Blade 2320 Server Cover The following illustration shows how to open the cover on a blade server Blade Cover Release Blade
82. ion and User s Guide 51 Light path diagnostics SW4 DIMM 1 error LED CR201 DIMM 2 error LED CR4 Microprocessor 1 error LED CR12 5 DIMM 3 Error LED CR5 i rota L DIMM 4 Error LED CR6 1 0 expansion connectors SAS 1 hard Reserved disk drive LED CR262 Control panel connector Microprocessor 2 error LED CR13 3V lithium battery SAS 0 Hard disk drive LED CR260 SAS trays connectors Power is available to relight the light path diagnostics LEDs for a small period of time after the blade server is removed from the NovaScale Blade Chassis During that period of time you can relight the light path diagnostics LEDs for a maximum of 25 seconds or less depending on the number of LEDs that are lit and the length of time the blade server 1s removed from the chassis by pressing the light path diagnostics button The light path diagnostics power present LED CR111 is lit when the light path diagnostics button is pressed 1f power is available to relight the blade error LEDs If the l
83. ion card to the blade server I O expansion cards give the blade server additional connections for communicating on a network Your blade server supports the installation of one I O expansion card You can install a small form factor expansion card in addition to two SAS hard disk drives The blade server supports a number of daughter cards such as Gigabit Ethernet expansion card Fibre Channel expansion card When you add an I O expansion card you must make sure that the I O modules it is mapped to both support the expansion card network interface type These I O modules are typically installed in I O module bays 3 and 4 on the NovaScale Blade Chassis For example if you add an Ethernet expansion card to a blade server installed in a NovaScale Blade Chassis the I O modules in I O module bays 3 and 4 must both be compatible with the expansion card All other expansion cards that are installed on other blade servers in the NovaScale Blade Chassis must also be compatible with these I O modules In this example you could then install two Ethernet switch modules two pass thru modules or one Ethernet switch module and one pass thru module Because pass thru modules are compatible with a variety of I O expansion cards installing two pass thru modules would enable the use of several different types of compatible I O expansion cards on blade servers within the same NovaScale Blade Chassis To install a small form factor expansion card complet
84. l interference and 2 this device must accept any interference received including interference that may cause undesired operation For questions related to the EMC performance of this product contact Intel Corporation 5200 N E Elam Young Parkway Hillsboro OR 97124 6497 1 800 628 8686 This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna ncrease the separation between the equipment and the receiver Connect the equipment to an outlet on a circuit other than the one to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Any changes or modifications not expressly approved by the grantee of this device could void
85. led 8 NovaScale Blade 2320 Installation and User s Guide Although the keyboard that is attached to the NovaScale Blade Chassis might be a PS 2 style keyboard internal communication with it is through the USB The operating system in the blade server must provide USB support for the blade server to recognize and use the keyboard and mouse When you are not running an operating system that has USB device drivers such as in the following situations the keyboard responds very slowly Running the blade server integrated diagnostics Running a BIOS update diskette on a blade server Updating the diagnostics on a blade server Running the Broadcom firmware CD for a blade server If there is no response when you press the keyboard video mouse select button you can use the management module Web interface to determine whether local control has been disabled on the blade server If you install Microsoft Windows Server 2003 on the blade server while it is not the current owner of the keyboard video and mouse a delay of up to 1 minute occurs the first time you switch the keyboard video and mouse to the blade server During this one time only delay the blade server device manager enumerates the keyboard video and mouse and loads the device drivers All subsequent switching takes place in the normal keyboard video mouse switching time frame up to 20 seconds Media Tray select button Press this button to associate the shared removable m
86. lizar un cable de alimentaci n de CA si no es del tipo exacto requerido Se necesita un cable de CA para cada fuente de alimentaci n del sistema La fuente de alimentaci n de este producto no contiene piezas que puedan ser reparadas por el usuario No abra la fuente de alimentaci n Dentro de la fuente de alimentaci n puede haber niveles de tensi n corriente y energ a peligrosos Devu lvala al fabricante para repararla Al reemplazar una fuente de alimentaci n de conexi n en funcionamiento desenchufe el cable de alimentaci n de la fuente de alimentaci n que va a reemplazar antes de extraerla del servidor Para evitar el riesgo de descargas el ctricas antes de abrir el servidor ap guelo desconecte el cable de alimentaci n los sistemas de telecomunicaciones las redes y los m dems conectados al mismo Advertencias sobre el cable de alimentaci n Si no se ha proporcionado con el producto ning n cable de alimentaci n de CA adquiera alguno cuyo uso est aprobado en su pa s Precauci n Para evitar descargas el ctricas o fuego revise los cables de alimentaci n que usar con 80 el producto tal y como se describe a continuaci n No intente modificar ni utilizar los cables de alimentaci n de CA si no son exactamente del modelo especificado para ajustarse a las tomas de corriente conectadas a tierra Los cables de alimentaci n deben reunir los siguientes requisitos El cable de alimentaci n debe dispon
87. lowly before pressing the power control button Installing the NovaScale Blade 2320 Server Bezel Assembly See the illustration in Removing the NovaScale Blade 2320 Server Bezel Assembly on page 19 for information about installing the bezel assembly To install the blade server bezel assembly complete the following steps 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 2 Connect the control panel cable to the control panel connector on the system board 3 Carefully slide the bezel assembly onto the blade server until it clicks into place Closing the NovaScale Blade 2320 Server Cover Important The blade server cannot be inserted into the NovaScale Blade Chassis until the cover is installed and closed or an expansion unit is installed Do not attempt to override this protection The following illustration shows how to close the blade server cover Blade Cover Release Blade Cover Release AF000437 To close the blade server cover complete the following steps 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 2 If you removed the blade bezel assembly replace it now see Installing the NovaScale Blade 2320 Server Bezel Assembly on page 31 for instructions 3 Lower the cover so that the slots at the rear slide down onto t
88. ly consider the location of the monitor Magnetic fields around other devices such as transformers appliances fluorescent lights and other monitors can cause screen jitter or wavy unreadable rolling or distorted screen images If this happens turn off the monitor Attention Moving a color monitor while it is turned on might cause screen discoloration Move the device and the monitor at least 300 mm 12 in apart and turn on the monitor NOTE To prevent diskette drive read write errors make sure that the distance between the monitor and diskette drives is at least 75 mm 3 in If the problem remains call for service Wrong characters appear on the screen If the wrong language is displayed update the firmware or operating system with the correct language in the blade server that has ownership of the monitor If the problem remains call for service Mouse Problems 48 Symptom Suggested action The mouse does not work Make sure that the KVM select button LED on the front of the blade server is lit indicating that the blade server is connected to the shared mouse Make sure that the mouse cable is securely connected to the management module and that the keyboard and mouse cables are not reversed Make sure that the mouse works correctly with other blade servers Make sure that the mouse is recognized as a USB device not PS 2 by the blade server Although the mouse mig
89. m turn off the blade server and remove the blade server from the NovaScale Blade Chassis See Removing the NovaScale Blade 2320 Server from a NovaScale Blade Chassis on page 17 for instructions 3 Carefully lay the blade server on a flat non conductive surface 4 Open the blade server cover see Opening the NovaScale Blade 2320 Server Cover on page 18 for instructions 5 Locate SAS connector 0 J95 or SAS connector 1 J94 Note Do not press on the top of the drive Pressing the top could damage the drive 6 Put the drive into the tray and push it from the rear edge of the drive into the connector until the drive moves past the lever at the back of the tray 7 If you have other options to install or remove do so now otherwise go to Completing the Installation on page 30 20 NovaScale Blade 2320 Installation and User s Guide Removing a SAS Hard Disk Drive To remove a SAS hard disk drive complete the following steps 1 Read the safety information beginning on page 61 in Appendix B Safety Information and Installation Guidelines on page 15 Shutdown the operating system turn off the blade server and remove the blade server from the NovaScale Blade Chassis See Removing the NovaScale Blade 2320 Server from a NovaScale Blade Chassis on page 17 for instructions Carefully lay the blade server on a flat non conductive surface Open the blade server cover see Openin
90. mber Serial number The following figure shows a front view of the NovaScale Blade 2320 Server NovaScale Blade 2320 Installation and User s Guide Release levers Release button Related Documentation In addition to this Installation and User s Guide the following documentation is provided in Portable Document Format PDF on the CD ROM NovaScale Blade Resource CD that came with your blade server NovaScale Blade Hardware Maintenance Manual and Troubleshooting Guide This document contains information to help you solve problems yourself It also contains information for service technicians Notices and Statements Used in this Document The following notices and statements are used in this document Note These notices provide important tips guidance or advice Important These notices provide information or advice that might help you avoid inconvenient or problem situations Attention These notices indicate possible damage to programs devices or data An attention notice is placed just before the instruction or situation in which damage could occur Caution These statements indicate situations that can be potentially hazardous to you A caution statement is placed just before the description of a potentially hazardous procedure step or situation 2 NovaScale Blade 2320 Installation and User s Guide Danger These statements indicate situations that can be potentiall
91. move the blade server from the NovaScale Blade Chassis and remove the cover to see the components The following illustration shows the major components of the NovaScale Blade Heat Sink Microprocessor 2 Microprocessor 1 and Heat Sink Microprocessor Heat Sink Filler Control Panel Control Panel Connector Cable AF000439 6 NovaScale Blade 2320 Installation and User s Guide 2 Power Controls Jumpers Switches and Indicators This chapter describes the power features how to turn on and turn off the NovaScale Blade 2320 Server what the controls and indicators mean and where the system board jumpers and switches are located and how to use them Turning on the NovaScale Blade 2320 Server After you connect the blade server to power through the NovaScale Blade Chassis the blade server can start in any of the following ways You can press the power control button on the front of the blade server behind the control panel door to start the blade server Notes Wait until the power on LED on the blade server flashes slowly before pressing the blade server power control button During this time the service processor in the management module is initializing therefore the power control button on the blade server does not respond While the blade server is powering up the power on LED on the front of the server is lit If a power failure occurs the NovaScale Blade Chassis and then the blade serve
92. n moving and lifting equipment Use mechanical assistance or other suitable assistance when moving and lifting equipment To reduce the weight for easier handling remove any easily detachable components Power and Electrical Warnings Caution The power button indicated by the stand by power marking DOES NOT completely turn off the system AC power 5V standby power is active whenever the system is plugged in To remove power from system you must unplug the AC power cord from the wall outlet Your system may use more than one AC power cord Make sure all AC power cords are 62 NovaScale Blade 2320 Installation and User s Guide unplugged Make sure the AC power cord s is are unplugged before you open the chassis or add or remove any non hot plug components Do not attempt to modify or use an AC power cord if it is not the exact type required A separate AC cord is required for each system power supply Some power supplies in NovaScale Blade servers use Neutral Pole Fusing To avoid risk of shock use caution when working with power supplies that use Neutral Pole Fusing The power supply in this product contains no user serviceable parts Do not open the power supply Hazardous voltage current and energy levels are present inside the power supply Return to manufacturer for servicing When replacing a hot plug power supply unplug the power cord to the power supply being replaced before removing it from the server To avoid ri
93. nd other boot options and to select a power management option Note The blade server does not support Remote Program Load RPL selection for the boot protocol option To start the PXE boot agent utility program complete the following steps 1 Turn on the server 2 When the Broadcom NetXtreme Boot Agent vX X X prompt appears press Ctrl S You have 2 seconds by default to press Ctrl S after the prompt appears If the PXE setup prompt is not displayed use the Configuration Setup Utility program to set the Enable Ethernet PXE DHCP option 3 Use the arrow keys or press Enter to select a choice from the menu 4 Follow the instructions on the screen to change the settings of the selected items then press Enter NovaScale Blade 2320 Installation and User s Guide 39 Firmware updates Important 40 Bull will periodically provide firmware updates available for the blade server Use the following table to determine the methods that you can use to install these firmware updates To avoid problems and to maintain proper system performance always make sure that the BIOS service processor BMC and diagnostic firmware levels are consistent for all blade servers within the NovaScale Blade Chassis Management Switch Switch a Update Update module module Firmware diskette Xpress Web Web WR Telnet interface interface BIOS code Yes Yes No No No Diagnostic Yes Yes No No No code Service Yes Yes Yes No No process
94. nstalled 3 Attach the covers to the chassis with the screws removed earlier and tighten them firmly 4 Insert and lock the padlock to the system to prevent unauthorized access inside the system 5 Connect all external cables and the AC power cord s to the system A microprocessor and heat sink may be hot if the system has been running Also there may be sharp pins and edges on some board and chassis parts Contact should be made with care Consider wearing protective gloves Danger of explosion if the battery is incorrectly replaced Replace only with the same or equivalent type recommended by the equipment manufacturer Dispose of used batteries according to manufacturer s instructions The system is designed to operate in a typical office environment Choose a site that is Clean and free of airborne particles other than normal room dust Well ventilated and away from sources of heat including direct sunlight Away from sources of vibration or physical shock solated from strong electromagnetic fields produced by electrical devices n regions that are susceptible to electrical storms we recommend you plug your system into a surge suppressor and disconnect telecommunication lines to your modem during an electrical storm Provided with a properly grounded wall outlet Provided with sufficient space to access the power supply cord s because they serve as the product s main power
95. nt Movement can cause static electricity to build up around you Handle the device carefully holding it by its edges or its frame Do not touch solder joints pins or exposed circuitry Do not leave the device where others can handle and damage it While the device is still in its static protective package touch it to an unpainted metal part of the NovaScale Blade Chassis or any unpainted metal surface on any other grounded rack component in the rack you are installing the device in for at least 2 seconds This drains static electricity from the package and from your body Remove the device from its package and install it directly into the blade server without setting it down If it is necessary to set down the device put it back into its static protective package Do not place the device on the blade server cover or on a metal surface Take additional care when handling devices during cold weather Heating reduces indoor humidity and increases static electricity NovaScale Blade 2320 Installation and User s Guide Removing the NovaScale Blade 2320 Server from a NovaScale Blade Chassis The following illustration shows how to remove the blade server from a typical NovaScale Blade Chassis AF000440 Important To maintain proper system cooling do not operate the NovaScale Blade Chassis without a blade server or filler blade
96. nto antes de realizar cualquiera de las instrucciones Vea NovaScale Blade Boards and Chassis Safety Information en el CD ROM NovaScale Blade Resource CD NovaScale Blade 2320 Installation and User s Guide ix Warnings These warnings and cautions apply whenever you remove the enclosure cover to access components inside the blade system Only a technically qualified person should maintain or configure the blade system Heed safety instructions Before working with your server product whether you are using this guide or any other resource as a reference pay close attention to the safety instructions You must adhere to the assembly instructions in this guide to ensure and maintain compliance with existing product certifications and approvals Use only the described regulated components specified in this guide Use of other products components will void the UL listing and other regulatory approvals of the product and will most likely result in noncompliance with product regulations in the region s in which the product is sold System power on off The power button DOES NOT turn off the system AC power To remove power from storage system you must unplug the AC power cord from the wall outlet or the chassis Make sure the AC power cord is unplugged before you open the chassis add or remove any components Hazardous conditions devices and cables Hazardous electrical conditions may be present on power telephone and communication
97. odotto E possibile che il prodotto disponga di pi fonti di alimentazione Non modificare o utilizzare il cavo di alimentazione in c a fornito dal produttore se non corrisponde esattamente al tipo richiesto Ad ogni fonte di alimentazione corrisponde un cavo di alimentazione in c a separato L interruttore attivato disattivato nel pannello anteriore non interrompe l alimentazione in c a del sistema Per interromperla necessario scollegare tutti i cavi di alimentazione in c a dalle prese a muro o dall alimentazione di corrente PASSI DI SICUREZZA Qualora si rimuovano le coperture del telaio per accedere all interno del sistema seguire i seguenti passi 1 Spegnere tutti i dispositivi periferici collegati al sistema 2 Spegnere il sistema usando il pulsante spento acceso dell interruttore del sistema 3 Togliere tutte le spine dei cavi del sistema dalle prese elettriche 4 Identificare e sconnettere tutti i cavi attaccati ai collegamenti I O od alle prese installate sul retro del sistema 5 Qualora si tocchino i componenti proteggersi dallo scarico elettrostatico SES portando un cinghia anti statica da polso che attaccata alla presa a terra del telaio del sistema qualsiasi superficie non dipinta 6 Non far operare il sistema quando il telaio senza le coperture Dopo aver seguito i sei passi di SICUREZZA sopracitati togliere le coperture del telaio del sistema come seque 1 Apri
98. oduttore Per disfarsi delle pile usate seguire le istruzioni del produttore Il sistema progettato per funzionare in un ambiente di lavoro tipo Scegliere una postazione che sia LE Pulita e libera da particelle in sospensione a parte la normale polvere presente nell ambiente No Ben ventilata e lontana da fonti di calore compresa la luce solare diretta e Al riparo da urti e lontana da fonti di vibrazione e Isolata dai forti campi magnetici prodotti da dispositivi elettrici In aree soggette a temporali consigliabile collegare il sistema ad un limitatore di corrente In caso di temporali scollegare le linee di comunicazione dal modem Dotata di una presa a muro correttamente installata Dotata di spazio sufficiente ad accedere ai cavi di alimentazione i quali rappresentano il mezzo principale di scollegamento del sistema NovaScale Blade 2320 Installation and User s Guide 97 98 NovaScale Blade 2320 Installation and User s Guide Technical publication remarks form Title NOVASCALE BLADE NovaScale Blade 2320 Server Installation and User s Guide Reference N 86 A1 85ER 00 Date May 2006 ERRORS IN PUBLICATION SUGGESTIONS FOR IMPROVEMENT TO PUBLICATION Your comments will be promptly investigated by qualified technical personnel and action will be taken as required If you require a written reply please include your complete mailing address below NAME Date C
99. ompliance Class A Compliance iii 56 Certifications Registrations Declarations iii 56 Product Regulatory Compliance Markings i 57 Electromagnetic Compatibility Notices nnet 58 FCC Verification Statement USA iii 58 Industry Canada ICES 003 iii 59 Europe CE Declaration of Conformity ii 59 MEC Japan 59 BSMI T iWaN eiee era de 59 Korean Compliance RRL ie 60 Restriction of Hazardous Substances RoHS Compliance 60 End of Life Product Recycling es oco oap set eot cata 60 iv NovaScale Blade 2320 Installation and User s Guide B Safety Information i 61 English u a E 61 Server Safety Information usines 61 Safety Warnings and Cautions iii 61 Intended Application Uses iii 62 Site S lection tna lite a lo 62 Equipment Handling Practices is 62 Power and Electrical Warnings ie 62 System Access Warnings iii 63 Rack Mount Warnings iaia iaia 64 Electrostatic Discharge ESD iii 64 Other Hazards evita alia einen 65 pz rire ME ten 66 Sicherheitshinweise f r den Server sisi 66 Sicherheitshinweise und VorsichtsmaBinahmen sse 66 Zielbenutzer der Anwendung i 67 Standorlausw hl st rre re tti ta etg T teu c de ee Pere ara 67 Handhabung von Ger ten iii 67 Warnhinweise f r den Systemzugang iii 69 Elektrostati
100. on the blade server again Ifthe operating system stops functioning you can press and hold the power control button for more than 4 seconds to turn off the blade server The management module can turn off the blade server Understanding the Control Panel and LEDs This section describes the controls and LEDs on the NovaScale Blade Note The control panel door is shown in the closed normal position in the following illustration To access the power control button you must open the control panel door Activity LED Location LED Information LED Blade error LED CD diskette USB select button Keyboard mouse video select button i Power control button Power on LED AF000441 Keyboard video mouse KVM select button Press this button to associate the shared NovaScale Blade Chassis keyboard port video port and mouse port with the blade server The LED on this button flashes while the request is being processed then is lit when the ownership of the keyboard video and mouse has been transferred to the blade server It can take approximately 20 seconds to switch the keyboard video and mouse control to the blade server You can also press keyboard keys in the following sequence to switch keyboard video mouse control between blade servers NumLock NumLock blade server number Enter Where blade server number is the two digit number for the blade bay in which the blade server is instal
101. or code BMC code The service processor BMC in the blade server provides the following features Continuous health monitoring and control Configurable notification and alerts Event logs that are timestamped and saved in nonvolatile memory and can be attached to e mail alerts Remote graphics console redirection Point to point protocol PPP support Remote power control Remote firmware update and access to critical server settings Around the clock access to the blade server even if the server is turned off At some time you might have to flash the service processor to apply the latest firmware To get the latest firmware for your blade server service processor contact your Bull Support representative Use the management module Web interface to flash the service processor The Web interface is described in the NovaScale Blade Chassis Management Module Installation and User s Guide NovaScale Blade 2320 Installation and User s Guide Configuring the Gigabit Ethernet Controllers Two Ethernet controllers are integrated on the blade server system board Each controller provides a 1000 Mbps full duplex interface for connecting to one of the Ethernet compatible I O modules in I O module bays 1 and 2 which enables simultaneous transmission and reception of data on the Ethernet local area network LAN Each Ethernet controller on the system board is routed to a different I O module in I O module ba
102. ottling see the management module documentation NovaScale Blade 2320 Installation and User s Guide Reliability Availability and Serviceability Features Three of the most important features in server design are reliability availability and serviceability RAS These RAS features help to ensure the integrity of the data that is stored in the blade server the availability of the blade server when you need it and the ease with which you can diagnose and correct problems The blade server has the following RAS features Advanced Configuration and Power Interface ACPI Automatic error retry or recovery Automatic server restart Built in monitoring for temperature voltage hard disk drives and flash drives x4 SDDC memory for DIMMs with a capacity of 512 MB or greater Customer upgradeable basic input output system BIOS code Diagnostic support of Ethernet controllers Error codes and messages ECC protection on the L2 cache ECC memory Failover Ethernet support Light path diagnostics feature Power on self test POST Predictive Failure Analysis PFA alerts Processor serial number access Service processor that communicates with the management module to enable remote blade server management SDRAM with serial presence detect SPD and vital product data VPD System error logging Wake on LAN capability NovaScale Blade 2320 Installation and User s Guide Major Components of the NovaScale Blade 2320 Server You must re
103. ou install a second microprocessor you must install the same microprocessor type and speed as the first microprocessor To use SMP obtain an SMP capable operating system The following notes describe the type of microprocessor that the server supports and other information that you must consider when installing a microprocessor Always install microprocessors that have the same cache size and type the same clock speed and identical internal and external clock frequencies including system bus speed When only a single microprocessor is to be installed it must be installed in the microprocessor socket U66 For a list of processors that are supported by your blade server contact your Bull Support representative Thoroughly review the documentation that comes with the processor so that you can determine whether you have to update the blade server BIOS code The latest level of BIOS code for your blade server is available from your Bull Support representative The microprocessors terminate themselves therefore no terminator card is required if microprocessor socket 2 is empty However for proper airflow this socket must contain a microprocessor heat sink filler sometimes called a microprocessor baffle The microprocessor speeds are automatically set for this server therefore you do not have to set any microprocessor frequency selection jumpers or switches NovaScale Blade 2320 Installation and User s Guide 23 24 The
104. power cords from the system or wall outlet NovaScale Blade 2320 Installation and User s Guide 63 Caution Caution Disconnect all cables and telecommunication lines that are connected to the system Retain all screws or other fasteners when removing access cover s Upon completion of accessing inside the product refasten access cover with original screws or fasteners Do not access the inside of the power supply There are no serviceable parts in the power supply Return to manufacturer for servicing Power down the server and disconnect all power cords before adding or replacing any non hot plug component When replacing a hot plug power supply unplug the power cord to the power supply being replaced before removing the power supply from the server If the server has been running any installed processor s and heat sink s may be hot Unless you are adding or removing a hot plug component allow the system to cool before opening the covers To avoid the possibility of coming into contact with hot component s during a hot plug installation be careful when removing or installing the hot plug component s To avoid injury do not contact moving fan blades If your system is supplied with a guard over the fan do not operate the system without the fan guard in place Rack Mount Warnings The equipment rack must be anchored to an unmovable support to prevent it from tipping when a server or piece of equipment is extende
105. r LEDs that were turned on during processing These LEDs can be used to help troubleshoot system board component problems See the illustrations in this section Table 2 System Board LEDs on page 13 and Table 3 Light Path Diagnostics Panel LEDs on page 13 for information about locating light path diagnostics LEDs and what to do if there is an error LED lit Light Path Diagnostics LEDs on page 51 provides more information about the light path diagnostics LED locations settings and error solutions Refer to these illustrations and tables when solving problems with the blade server Power is available to relight the light path diagnostics LEDs for a small period of time after the blade server is removed from the NovaScale Blade Chassis During that period of time you can relight the light path diagnostics LEDs for a maximum of 25 seconds or less depending on the number of LEDs that are lit and the length of time the blade server is removed from the NovaScale Blade Chassis by pressing the light path diagnostics button The light path diagnostics power present LED CR111 is lit when the light path diagnostics button is pressed if power is available to relight the blade error LEDs If the light path diagnostics power present LED CR111 is not lit when the light path diagnostics button is pressed no power is available to light the blade error LEDs and they will be unable to provide any diagnostic information The following illustration sho
106. r can start automatically when power is restored if the blade server is configured through the management module to do so You can turn on the blade server remotely by means of the service processor in the management module If the operating system supports the Wake on LAN feature and the blade server power on LED is flashing slowly the Wake on LAN feature can turn on the blade server if the Wake on LAN feature has not been disabled through the management module Web interface Turning off the NovaScale Blade 2320 Server When you turn off the blade server it is still connected to power through the NovaScale Blade Chassis The blade server can respond to requests from the service processor such as a remote request to turn on the blade server To remove all power from the blade server you must remove it from the NovaScale Blade Chassis Shut down the operating system before you turn off the blade server See the operating system documentation for information about shutting down the operating system NovaScale Blade 2320 Installation and User s Guide The blade server can be turned off in any of the following ways You can press the power control button on the blade server behind the control panel door This starts an orderly shutdown of the operating system if this feature is supported by the operating system Note After turning off the blade server wait at least 5 seconds before you press the power control button to turn
107. r is defective or the LED information panel is loose or defective e Local power control for the blade server is enabled use the management module Web interface to verify or the blade server was instructed through the management module to turn on 2 If you just installed an expansion card in the blade server remove it and restart the blade server If the blade server now turns on troubleshoot the option see the documentation that comes with the option for information 3 Try another blade server in the blade bay if it works replace the faulty blade server 4 Ifthe problem remains call for service Service Processor BMC Problems 50 Symptom Suggested action The service processor reports a general monitor failure Shut down the operating system and turn off the blade server then remove the blade server from the NovaScale Blade Chassis wait for 30 seconds reinstall the blade server in the NovaScale Blade Chassis and restart the blade server If the problem remains call for service NovaScale Blade 2320 Installation and User s Guide Light Path Diagnostics If the system error LED on the system LED panel on the front or rear of the NovaScale Blade Chassis is lit one or more error LEDs on the components also might be lit These LEDs help identify the cause of the problem Diagnosing Problems Using Light Path Diagnostics This section provides information about using the light pat
108. rdons d alimentation c a et c bles externes au syst me Le microprocesseur et le dissipateur de chaleur peuvent tre chauds si le syst me a t sous tension Faites galement attention aux broches aigu s des cartes et aux bords tranchants du capot Nous vous recommandons l usage de gants de protection Danger d explosion si la batterie n est pas remont e correctement Remplacer uniquement avec une batterie du m me type ou d un type quivalent recommand par le fabricant Disposez des piles us es selon les instructions du fabricant Le syst me a t concu pour fonctionner dans un cadre de travail normal L emplacement choisi doit tre p e Propre et d pourvu de poussi re en suspension sauf la N poussiere normale Bien a r et loin des sources de chaleur y compris du soleil direct e A l abri des chocs et des sources de vibrations sol de forts champs lectromagn tiques g en r s par des appareils lectriques Dans les r gions sujettes aux orages magn tiques il est recomand de brancher votre systeme un supresseur de surtension et de d brancher toutes les lignes de t l communications de votre modem durant un orage Muni d une prise murale correctement mise la terre Suffisamment spacieux pour vous permettre d acc der aux c bles d alimentation ceux ci tant le seul moyen de mettre le systeme hors tension NovaScale Blade 2320 Installation an
109. re e rimuovere il lucchetto dal retro del sistema qualora ve ne fosse uno installato 2 Togliere e mettere in un posto sicuro tutte le viti delle coperture 3 Togliere le coperture 96 NovaScale Blade 2320 Installation and User s Guide Per il giusto flusso dell aria e raffreddamento del sistema rimettere sempre le coperture del telaio prima di riaccendere il sistema Operare il sistema senza le coperture al loro proprio posto potrebbe danneggiare i componenti del sistema Per rimettere le coperture del telaio 1 Controllare prima che non si siano lasciati degli attrezzi o dei componenti dentro il sistema 2 Controllare che i cavi dei supporti aggiuntivi ed altri componenti siano stati installati appropriatamente 3 Attaccare le coperture al telaio con le viti tolte in precedenza e avvitarle strettamente 4 Inserire e chiudere a chiave il lucchetto sul retro del sistema per impedire l accesso non autorizzato al sistema 5 Ricollegare tutti i cavi esterni e le prolunghe AC del sistema Se il sistema stato a lungo in funzione il microprocessore e il dissipatore di calore potrebbero essere surriscaldati Fare attenzione alla presenza di piedini appuntiti e parti taglienti sulle schede e sul telaio E consigliabile l uso di guanti di protezione Esiste il pericolo di un esplosione se la pila non viene sostituita in modo corretto Utilizzare solo pile uguali o di tipo equivalente a quelle consigliate dal pr
110. riptions on page 43 and the NovaScale Blade Hardware Maintenance Manual and Troubleshooting Guide on the CD ROM NovaScale Blade Resource CD for more information Troubleshooting charts The Troubleshooting Charts on page 46 list problem symptoms and steps to correct the problems Diagnostic programs and error messages Real Time Diagnostics tests the major components of the NovaScale Blade Chassis including the management modules I O modules removable media drives and the blade servers while the operating system is running Note See the NovaScale Blade Hardware Maintenance Manual and Troubleshooting Guide on the CD ROM NovaScale Blade Resource CD for more information Light Path Diagnostics Use light path diagnostics to identify system errors quickly See Light Path Diagnostics on page 51 for more information POST Beep Code Descriptions POST emits one beep to signal successful completion If POST detects a problem during startup other beep codes might occur Use the following beep code descriptions to help diagnose and solve problems that are detected during startup NovaScale Blade 2320 Installation and User s Guide 43 Note See the NovaScale Blade Hardware Maintenance Manual and Troubleshooting Guide on the CD ROM NovaScale Blade Resource CD for more information about POST beep codes One beep POST was completed successfully without finding any errors Repeating long beeps
111. rs d E S ou aux acc s derri re le syst me 5 Pour pr venir les d charges lectrostatiques lorsque vous touchez aux composants portez une bande antistatique pour poignet et reliez la la masse du systeme toute surface m tallique non peinte du boitier 6 Ne faites pas fonctionner le syst me tandis que le boitier est ouvert Une fois TOUTES les tapes pr c dentes accomplies vous pouvez retirer les panneaux du syst me Proc dez comme suit 1 Si un cadenas a t install sur l arri re du syst me d verrouillez le et retirez le 2 Retirez toutes les vis des panneaux et mettez les dans un endroit s r 3 Retirez les panneaux 92 NovaScale Blade 2320 Installation and User s Guide Afin de permettre le refroidissement et l a ration du systeme r installez toujours les panneaux du boitier avant de mettre le systeme sous tension Le fonctionnement du systeme en l absence des panneaux risque d endommager ses pi ces Pour installer les panneaux proc dez comme suit 1 Assurez vous de ne pas avoir oubli d outils ou de pi ces d mont es dans le systeme 2 Assurez vous que les c bles les cartes d extension et les autres composants sont bien install s 3 Revissez solidement les panneaux du boitier avec les vis retir es plus t t 4 Remettez le cadenas en place et verrouillez le afin de pr venir tout acc s non autoris l int rieur du systeme 5 Rebranchez tous les co
112. rver Configuration Setup Utility program and set configuration parameters as needed see Using the Configuration Setup Utility program on page 35 for information Completing the Installation To complete the installation complete the following tasks Instructions for each task are in the following sections 1 Reinstall the blade server bezel assembly if you removed it see Removing the NovaScale Blade 2320 Server Bezel Assembly on page 19 for information on installing the bezel assembly 2 Close the blade server cover unless you installed an optional expansion unit see Closing the NovaScale Blade 2320 Server Cover on page 31 Important Hazardous energy is present when the blade server is connected to the power source Always replace the blade cover before installing the blade server 3 Reinstall the blade server into the NovaScale Blade Chassis see Installing the NovaScale Blade 2320 Server in a NovaScale Blade Chassis on page 32 4 Turn on the blade server see Turning on the NovaScale Blade 2320 Server on page 7 5 For certain options run the blade server Configuration Setup Utility program see Updating the NovaScale Blade 2320 Server Configuration on page 33 30 NovaScale Blade 2320 Installation and User s Guide Note If you have just connected the power cords of the NovaScale Blade Chassis to electrical outlets you must wait until the power on LED on the blade server flashes s
113. ry compliance you must adhere to the assembly instructions in this guide to ensure and maintain compliance with existing product certifications and approvals Use only the described regulated components specified in this guide Use of other products components will void the UL listing and other regulatory approvals of the product and will most likely result in noncompliance with product regulations in the region s in which the product is sold This is an FCC Class A device Integration of it into a Class B chassis does not result in a Class B device Product Safety Compliance This blade server product when correctly integrated per this guide complies with the following safety and electromagnetic compatibility EMC regulations Intended Application This product was evaluated as Information Technology Equipment ITE which may be installed in offices schools computer rooms and similar commercial type locations The suitability of this product for other product categories and environments such as medical industrial telecommunications NEBS residential alarm systems test equipment etc other than an ITE application may require further evaluation Product Safety Compliance The server chassis complies with the following product safety requirements UL60950 1 CSA 60950 1 USA Canada EN60950 1 Europe EC60950 1 International CB Certificate amp Report IEC6095 1 report to include all country national devia
114. s b When any blade server or option is in blade bay 7 through 14 in a NovaScale Blade Chassis power modules must be present in all four power module bays c To help ensure proper cooling performance and system reliability make sure that each of the blade bays on the front of the NovaScale Blade Chassis has a blade server expansion unit or filler blade installed Do not operate the system unit without either a blade server expansion unit or filler blade installed in each blade bay for more than 1 minute for a NovaScale Blade Chassis 4 Make sure that the release handles on the blade server are in the open position perpendicular to the blade server 32 NovaScale Blade 2320 Installation and User s Guide 5 Slide the blade server into the blade bay until it stops The spring loaded doors farther back in the bay that cover the bay opening move out of the way as you insert the blade server 6 Push the release handles on the front of the blade server closed 7 Turn on the blade server see Turning on the NovaScale Blade 2320 Server on page 7 for instructions 8 Make sure that the power on LED on the blade control panel is lit continuously indicating that the blade server is receiving power and is turned on 9 Optional Write identifying information on one of the user labels that come with the blade servers and place the label on the chassis bezel See the documentation for your NovaScale Blade Chassis for information
115. s descargas electrost ticas Suj telas s lo por los bordes Una vez extra da la tarjeta de su envoltorio de protecci n o del servidor col quela con el lado de los componentes hacia arriba sobre una superficie con toma de tierra y sin carga est tica Utilice una almohadilla de espuma conductora si dispone de ella pero nunca el envoltorio de la tarjeta No deslice la tarjeta sobre ninguna superficie NovaScale Blade 2320 Installation and User s Guide Sustituci n de la bater a Precauci n Existe el peligro de explosion si la bater a no se reemplaza correctamente Al reemplazar la bater a utilice s lo la bater a recomendada por el fabricante del equipo Deseche las bater as respetando la normativa local No intente recargar la bater a No intente desmontar pinchar o causar cualquier otro desperfecto a una bater a Enfriamiento y circulaci n de aire Precauci n El tendido de los cables debe realizarse cuidadosamente tal y como se le indica para reducir al m nimo los problemas de obstrucci n de la ventilaci n y de refrigeraci n Para conseguir una refrigeraci n y corriente de aire adecuadas compruebe que cuando sistema est funcionando las cubiertas de la carcasa est n instaladas Si utiliza el sistema sin las cubiertas podr a da ar sus componentes Para instalar las cubiertas Compruebe primero que no ha dejado herramientas o piezas sueltas dentro del sistema Compruebe que los cables tarjetas adicionale
116. s y otros componentes est n instalados correctamente Sujete las cubiertas a la carcasa siguiendo las instrucciones del producto Perif ricos o dispositivos l ser Precauci n Para evitar el riesgo de la exposici n a radiaciones o de danos personales No abra la caja de ningun perif rico o dispositivo l ser Los perif ricos o dispositivos l ser no pueden ser reparados por el usuario Haga que el fabricante los repare NovaScale Blade 2320 Installation and User s Guide 83 84 NovaScale Blade 2320 Installation and User s Guide C Getting Help Contact your Bull Support representative You may also find some information on the Bull Support website http support bull com NovaScale Blade 2320 Installation and User s Guide 85 86 NovaScale Blade 2320 Installation and User s Guide D Installation Assembly Safety Instructions English The power supply in this product contains no user serviceable parts Refer servicing only to qualified personnel Do not attempt to modify or use the supplied AC power cord if it is not the exact type required A product with more than one power supply will have a separate AC power cord for each supply The power button on the system does not turn off system AC power To remove AC power from the system you must unplug each AC power cord from the wall outlet or power supply The power cord s is considered the disconnect device to the main AC power The socke
117. sche Entladungen ESD issues 70 DUPCcIesrcuc uc 71 Fran ais ii dais 72 Consignes de s curit sur le serveur enne nennen nennen 72 S curit avertissements et mises en garde eene 72 Domaines d utilisation pr vus iii 73 S lection d un emplacement iii 73 Pratiques de manipulation de l quipement ss 73 D charges lectrostatiques ESD nennen nennen enne 76 AUTT STISQUES use deed didam A uber UIN 77 eciam T DT 78 Informaci n de seguridad del servidor i 78 Advertencias y precauciones sobre seguridad cocinan 78 Aplicaciones y usos previstos iii 79 Selecci n de la Ubicaci n soria ia rides 79 Manipulaci n del equipo i 79 Advertencias el acceso al sistema 81 Descarga electrost tica ESD sisi 82 85 D Installation Assembly Safety Instructions esee 87 pell e 87 Bro S 89 Fran ais an He dio 92 cire rc O ieee 94 EE qe t n 96 NovaScale Blade 2320 Installation and User s Guide V vi NovaScale
118. sk of electric shock turn off the server and disconnect the power cord telecommunications systems networks and modems attached to the server before opening it Power Cord Warnings Caution If an AC power cord was not provided with your product purchase one that is approved for use in your country To avoid electrical shock or fire check the power cord s that will be used with the product as follows Do not attempt to modify or use the AC power cord s if they are not the exact type required to fit into the grounded electrical outlets The power cord s must meet the following criteria The power cord must have an electrical rating that is greater than that of the electrical current rating marked on the product The power cord must have safety ground pin or contact that is suitable for the electrical outlet The power supply cord s is are the main disconnect device to AC power The socket outlet s must be near the equipment and readily accessible for disconnection The power supply cord s must be plugged into socket outlet s that is are provided with a suitable earth ground System Access Warnings Caution To avoid personal injury or property damage the following safety instructions apply whenever accessing the inside of the product Turn off all peripheral devices connected to this product Turn off the system by pressing the power button to off Disconnect the AC power by unplugging all AC
119. t outlet that the system plugs into shall be installed near the equipment and shall be easily accessible SAFETY STEPS Whenever you remove the chassis covers to access the inside of the system follow these steps 1 Turn off all peripheral devices connected to the system 2 Turn off the system by pressing the power button 3 Unplug all AC power cords from the system or from wall outlets 4 Label and disconnect all cables connected to I O connectors or ports on the back of the system 5 Provide some electrostatic discharge ESD protection by wearing an antistatic wrist strap attached to chassis ground of the system any unpainted metal surface when handling components 6 Do not operate the system with the chassis covers removed After you have completed the six SAFETY steps above you can remove the system covers To do this 1 Unlock and remove the padlock from the back of the system if a padlock has been installed 2 Remove and save all screws from the covers 3 Remove the cover s NovaScale Blade 2320 Installation and User s Guide 87 88 For proper cooling and airflow always reinstall the chassis covers before turning on the system Operating the system without the covers in place can damage system parts To install the covers 1 Check first to make sure you have not left loose tools or parts inside the system 2 Check that cables add in boards and other components are properly i
120. tem Board Switches The following illustration shows the location of switch block 2 SW2 Table 1 Switch Block 2 SW2 Settings on page 11 describes the function of each switch on the switch block og O 0 Switch block SW2 Table 1 Switch Block 2 SW2 Settings Switch number Description SW2 Switch block 2 has eight switches 1 BIOS backup page Off the BIOS starts from the Primary BIOS page On the BIOS starts from the backup BIOS page e 2 Wake On LAN bypass Off Enabled On Disabled default 3 Reserved 4 Reserved 5 Reserved 6 Clear CMOS Off Disabled On Enabled e 7 Reserved 8 Bypass power on password during next server start Off Disabled default On Enabled NovaScale Blade 2320 Installation and User s Guide 11 Using Light Path Diagnostics to Troubleshoot the System Board You have to remove the blade server from the NovaScale Blade Chassis open the cover and press the light path diagnostics switch SW4 to light any erro
121. the following steps 1 Turn on the blade server make sure that the blade server is the owner of the keyboard video and mouse and watch the monitor screen 2 When the lt lt lt Press Ctrl C to start LSI Configuration Logic Utility gt gt gt prompt appears press Ctrl C 3 Use the arrow keys to select the controller channel from the list of adapters then press Enter 4 Follow the instructions on the screen to change the settings of the selected items then press Enter If you select Device Properties and Mirroring Properties additional screens are displayed NovaScale Blade 2320 Installation and User s Guide 5 Solving Problems This section provides basic troubleshooting information to help you solve some common problems that might occur while setting up the blade server If you cannot locate and correct the problem using the information in this chapter see the NovaScale Blade Hardware Maintenance Manual and Troubleshooting Guide on the CD ROM NovaScale Blade Resource CD Diagnostic Tools Overview The following tools are available to help you diagnose and solve hardware related problems POST beep codes The power on self test beep codes indicate the detection of a problem One beep indicates successful completion of POST More than one beep indicates that POST detected a problem Error messages also appear during startup if POST detects a hardware configuration problem See POST Beep Code Desc
122. the user s authority to operate the equipment The customer is responsible for ensuring compliance of the modified product Only peripherals computer input output devices terminals printers etc that comply with FCC Class A or B limits may be attached to this computer product Operation with noncompliant peripherals is likely to result in interference to radio and TV reception All cables used to connect to peripherals must be shielded and grounded Operation with cables connected to peripherals that are not shielded and grounded may result in interference to radio and TV reception 58 NovaScale Blade 2320 Installation and User s Guide Industry Canada ICES 003 Cet appareil num rique respecte les limites bruits radio lectriques applicables aux appareils num riques de Classe A prescrites dans la norme sur le mat riel brouilleur Apparelis Num riques NMB 003 dictee par le Ministre Canadian des Communications English translation of the notice above This digital apparatus does not exceed the Class A limits for radio noise emissions from digital apparatus set out in the interference causing equipment standard entitled Digital Apparatus ICES 003 of the Canadian Department of Communications Europe CE Declaration of Conformity This product has been tested in accordance to and complies with the Low Voltage Directive 73 23 EEC and EMC Directive 89 336 EEC The product has been marked with the CE Mark to illustrate
123. tics LEDs Ifthe DIMM was disabled by the user or by POST run the Configuration Setup Utility program and enable the DIMM e If this error remains replace the DIMM If the problem remains call for service 46 NovaScale Blade 2320 Installation and User s Guide Microprocessor problems Symptom Suggested action The blade server emits a continuous tone during POST The startup boot microprocessor is not working correctly Make sure that the startup microprocessor is seated correctly If it is replace the startup microprocessor If the problem remains call for service Monitor Problems Note The monitor screen remains blank until it is directed to a blade server that is turned on this is normal behavior Symptom Suggested action The monitor screen goes blank when you direct it to a working blade server or it goes blank when you start some application programs in the blade servers Make sure that the monitor cable is connected to the video connector on the management module Some monitors have their own self tests If you suspect a problem with your monitor see the information that comes with the monitor for adjusting and testing instructions If you still cannot find the problem try using the monitor with another blade server If the problem remains see the NovaScale Blade Chassis Hardware Maintenance Manual and Troubleshooting Guide on the CD ROM NovaScale Bla
124. tions GOST R 50377 92 License Russia CE Low Voltage Directive 73 23 EEE Europe e CNS 14336 BSMI Certification Taiwan NovaScale Blade 2320 Installation and User s Guide 55 Product EMC Compliance Class A Compliance This blade server has been tested and verified to comply with the following electromagnetic compatibility EMC regulations when installed in a compatible host system For information on compatible host system s contact your Bull Support representative FCC ICES 003 Emissions USA Canada Verification CISPR 22 Emissions International e EN55022 Emissions Europe EN55024 Immunity Europe EN61000 3 2 Harmonics Europe EN61000 3 3 Voltage Flicker Europe CE EMC Directive 89 336 EEC Europe VCCI Emissions Japan e AS NZS 3548 Emissions Australia New Zealand e BSMI CNS13438 Emissions Taiwan GOST R 29216 91 Emissions Russia GOST R 50628 95 Immunity Russia RRL MIC Notice No 1997 4 EMC amp 1997 42 EMI Korea Certifications Registrations Declarations UL cUL Listing US Canada CE Declaration of Conformity Europe FCC ICES 003 Class A Verification USA Canada VCCI Certification Japan C Tick Declaration of Conformity Australia New Zealand BSMI Certification Taiwan e GOST R Certification License Russia RRL Certification Korea 56 NovaScale Blade 2320 Installation and User s Guide Product Regulatory Compl
125. use ein NovaScale Blade 2320 Installation and User s Guide 89 SICHERHEISMASSNAHMEN Immer wenn Sie die Geh useabdeckung abnehmen um an das Systeminnere zu gelangen sollten Sie folgende Schritte beachten 1 Schalten Sie alle an Ihr System angeschlossenen Peripherieger te aus 2 Schalten Sie das System mit dem Hauptschalter aus 3 Ziehen Sie den Stromanschlu stecker Ihres Systems aus der Steckdose 4 Auf der R ckseite des Systems beschriften und ziehen Sie alle AnschluBkabel von den I O Anschl ssen oder Ports ab 5 Tragen Sie ein geerdetes Antistatik Gelenkband um elektrostatische Ladungen ESD ber blanke Metallstellen bei der Handhabung der Komponenten zu vermeiden 6 Schalten Sie das System niemals ohne ordnungsgem montiertes Geh use ein Zur ordnungsgem en K hlung und L ftung mu die Geh useabdeckung immer wieder vor dem Einschalten installiert werden Ein Betrieb des Systems ohne angebrachte Abdeckung kann Ihrem System oder Teile darin besch digen Um die Abdeckung wieder anzubringen 1 Vergewissern Sie sich da Sie keine Werkzeuge oder Teile im Innern des Systems zur ckgelassen haben 2 berpr fen Sie alle Kabel Zusatzkarten und andere Komponenten auf ordnungsgem en Sitz und Installation 3 Bringen Sie die Abdeckungen wieder am Geh use an indem Sie die zuvor gel sten Schrauben wieder anbringen Ziehen Sie diese gut an 4 Bringen Sie die VerschluBeinrichtun
126. ve Predictive Failure Analysis PFA alerts SAS hard disk Electrical Input 12 V dc Environment Air temperature Blade server on 10 to 35 C 50 to 95 F Altitude O to 914 m 2998 69 ft Blade server on 10 to 32 C 50 to 95 F Altitude 914 m to 2134 m 2998 69 ft to 7000 ft Blade server off 40 to 60 C 40 to 140 F Humidity Blade server on 8 to 80 Blade server off 5 to 80 Size Height 24 5 cm 9 7 inches Depth 44 6 cm 17 6 inches Width 2 9 cm 1 14 inches Maximum weight 5 4 kg 12 Ib NovaScale Blade 2320 Installation and User s Guide Note The operating system in the blade server must provide USB support for the blade server to recognize and use the keyboard mouse CD ROM drive and diskette drive The NovaScale Blade Chassis uses USB for internal communications with these devices NovaScale Blade 2320 Server Features The design of the blade server takes advantage of advancements in memory management and data storage The blade server uses the following features and technologies Disk drive support The blade server supports up to two 2 5 inch small form factor SFF Serial Attached SCSI SAS hard disk drives Impressive performance using the latest microprocessor technology The blade server supports up to two Dual Core Intel Xeon DP microprocessors Integrated network support The blade server comes with an integrated Broadcom BCM5704S Dual Gigabit Et
127. will install the DIMMs 7 Touch the static protective package that contains the DIMM option to any unpainted metal surface on the NovaScale Blade Chassis or any unpainted metal surface on any other grounded rack component in the rack you are installing the DIMM option in for at least 2 seconds then remove the DIMM from its package 8 To install the DIMMs repeat the following steps for each DIMM that you install a Turn the DIMM so that the DIMM keys align correctly with the connector on the system board Important To avoid breaking the retaining clips or damaging the DIMM connectors handle the clips gently 22 NovaScale Blade 2320 Installation and User s Guide 3 b Insert the DIMM by pressing the DIMM along the guides into the connector Make sure that the retaining clips snap into the closed positions Important If there is a gap between the DIMM and the retaining clips the DIMM has not been correctly installed In this case open the retaining clips and remove the DIMM then reinsert the DIMM If you have other options to install or remove do so now otherwise go to Completing the Installation on page 30 Installing Microprocessors The blade server supports two microprocessors With two microprocessors the blade server can operate as a symmetric multiprocessing SMP server With SMP certain operating systems and application programs can distribute the processing load between the microprocessors Note If y
128. ws the LEDs on the system board Light path diagnostics SW4 DIMM 1 error LED CR201 DIMM 2 error LED CR4 Microprocessor 1 error LED CR12 o ab TT S o DIMM 3 Error LED Ak CR5 ges E mm DIMM 4 Error LED CR6 E 1 0 expansion connectors SAS 1 hard Reserved disk drive LED CR262 Control panel connector Microprocessor 2 error LED CR13 3V lithium battery SAS 0 Hard disk drive LED CR260 SAS trays connectors 12 NovaScale Blade 2320 Installation and User s Guide Table 2 System Board LEDs LED name and location Description DIMM 1 error LED CR201 DIMM 2 error LED CR4 DIMM 3 error LED CR5 DIMM 4 error LED CR6 There is a problem with the corresponding DIMM BMC fault LED CR11 There is a problem with the BMC Microprocessor 1 error LED CR12 Microprocessor 2 error LED CR13 There is a problem with the corresponding microprocessor System board fault LED CR30 There is a problem with the system board The following illustration shows the li
129. xplosion if the battery is incorrectly replaced When replacing the battery use only the battery recommended by the equipment manufacturer Dispose of batteries according to local ordinances and regulations Do not attempt to recharge a battery Do not attempt to disassemble puncture or otherwise damage a battery Cooling and Airflow Caution Carefully route cables as directed to minimize airflow blockage and cooling problems For proper cooling and airflow operate the system only with the chassis covers installed Operating the system without the covers in place can damage system parts To install the covers Check first to make sure you have not left loose tools or parts inside the system Check that cables add in boards and other components are properly installed Attach the covers to the chassis according to the product instructions Laser Peripherals or Devices Caution To avoid risk of radiation exposure and or personal injury Do not open the enclosure of any laser peripheral or device Laser peripherals or devices have are not user serviceable Return to manufacturer for servicing NovaScale Blade 2320 Installation and User s Guide 65 Deutsch Sicherhei tshinweise fur den Server Das vorliegende Dokument bezieht sich auf NovaScale Blade Serverplatinen Servergeh use Standfu und Rack sowie installierte Peripherieger te Es enth lt Warnungen und Vorsichtsma nahmen zur Vermeidung von Gefahren durch
130. y 1 or bay 2 The routing from an Ethernet controller to I O module bay will vary based on blade server type and the operating system that is installed See Blade Server Ethernet Controller Enumeration on page 41 for information about how to determine the routing from an Ethernet controller to an I O module bay for the blade server You do not have to set any jumpers or configure the controllers for the blade server operating system However you must install a device driver to enable the blade server operating system to address the Ethernet controllers For device drivers and information about configuring the Ethernet controllers see the Broadcom NetXtreme Gigabit Ethernet Software CD that comes with the blade server The Ethernet controllers in your blade server support failover which provides automatic redundancy for the Ethernet controllers Without failover you can have only one Ethernet controller from each server attached to each virtual LAN or subnet With failover you can configure more than one Ethernet controller from each server to attach to the same virtual LAN or subnet Either one of the integrated Ethernet controllers can be configured as the primary Ethernet controller If you have configured the controllers for failover and the primary link fails the secondary controller takes over When the primary link is restored the Ethernet traffic switches back to the primary Ethernet controller See the operating system device driver
131. y Information csi ix Important Safety Instructions se dada ix Wichtige Sicherheitshinweise sr ix Consignes de s curit u a keine ix Instrucciones de seguridad importantes menn ix x Introduction a araia daai 1 Related Documentation sisi 2 Notices and Statements Used in this Document 2 NovaScale Blade 2320 Server Specifications ooonnoccccnnnocccnnnonccccnnnnnncnnnnannnnnnnnnrncnnnnnnnnnnnnns 3 NovaScale Blade 2320 Server Features is 4 Reliability Availability and Serviceability Features seesseee 5 Major Components of the NovaScale Blade 2320 Server 6 Power Controls Jumpers Switches and Indicators 7 Turning on the NovaScale Blade 2320 Server sse 7 Turning off the NovaScale Blade 2320 Server sse 7 Understanding the Control Panel and LEDS ii 8 System Board lll stfation a anni 10 Using System Board Switches iii 11 Using Light Path Diagnostics to Troubleshoot the System Board 12 Installing Optlons nn 15 Installation Guidelines nn nen 15 System Reliability Guidelines sisi 15 Handling Static sensitive Devices
132. y additional procedures that you might have to perform before you remove or install the component System Reliability Guidelines To help ensure proper cooling and system reliability observe the following guidelines Make sure that microprocessor socket 2 always contains either a microprocessor heat sink filler or a microprocessor and heat sink If the blade server has only one microprocessor it must be installed in the microprocessor socket 1 To maintain proper system cooling do not operate the NovaScale Blade Chassis without a blade server or filler installed in each blade bay See the documentation for your NovaScale Blade Chassis for additional information NovaScale Blade 2320 Installation and User s Guide 15 Handling Static sensitive Devices Important Static electricity can damage the blade server and other electronic devices To avoid damage keep static sensitive devices in their static protective packages until you are ready to install them To reduce the possibility of damage from electrostatic discharge observe the following precautions When working on the NovaScale Blade Chassis use an electrostatic discharge ESD wrist strap especially when you will be handling modules options and blade servers To work properly the wrist strap must have a good contact at both ends touching your skin at one end and firmly connected to the ESD connector on the front or back of the NovaScale Blade Chassis Limit your moveme
133. y lethal or extremely hazardous to you A danger statement is placed just before the description of a potentially lethal or extremely hazardous procedure step or situation NovaScale Blade 2320 Server Specifications The following table is a summary of the features and specifications of the blade server Note Power cooling removable media drives external ports and advanced system management are provided by the NovaScale Blade Chassis Microprocessor Supports up to two microprocessors Dual Core Intel Xeon DP 1 67 GHz or 2 0 GHz Chipset Intel E7520 chipset Memory Dual channel 400 MHz DDR2 with 4 dual inline memory module DIMM slots 16 GB maximum Type 2 way interleaved DDR2 PC3200 ECC SDRAM registered x4 Intel x4 Single Device Data Correction DIMMs only Supports 256 MB 512 MB 1 GB 2 GB and 4 GB 4 DIMM slots Drives Support for two internal small form factor SAS drives Integrated functions Dual Gigabit Ethernet controllers Expansion card interface Baseboard management controller BMC with IPMI firmware ATI Radeon 7000M graphics controller LS 1064 SAS controller Light path diagnostics Local service processor BMC RS 485 interface for communication with the management module Automatic server restart ASR Serial over LAN SOL Intelligent Plattorm Management Interface IPMI 4 USB buses for communication with keyboard mouse diskette drive and CD ROM dri

Download Pdf Manuals

image

Related Search

Related Contents

Compex VITALITY - Coaching Corporel  JELD-WEN H84760 Instructions / Assembly  Samsung GT-P5100 User's Manual  User Manual ALFA(NET) 33 DP -10/+90/C (0,1)  Maternité : une aventure épanouissante où chacun  Manuel d`utilisation  Year-end closing procedures for Microsoft Dynamics GP Payroll  Chroma-Q™  un projet durable - Réseau ©archi.fr  Handbuch Magic  

Copyright © All rights reserved.
Failed to retrieve file