Home
Adsorption dryer SDAT Operating instructions
Contents
1. BE_SDAT doc It is recommended to install a compressed air filter with automatic condensate drain and a sub micro filter before the adsorption dryer Depending on the requirements for the compressed air an active charcoal filter and a further sub micro filter should be installed after the adsorption dryer The sub micro filter must in any case be provided if the small amount of debris from the molecular sieve could cause faults 6 Operation The adsorption dryer can only dry the compressed air perfectly if the specified data as shown on the type plate is complied with operating pressure and volumetric flow A lower volumetric flow has a positive effect on the pressure dew point If a lower pressure is required at the consumer a pressure regulator must be installed after the adsorption dryer The ambient temperature should lie between 4 C und 30 C 7 Maintenance The activity of the molecular sieve is almost fully retained over a long period of time provided that due attention is paid to the treatment of the compressed air before the adsorption dryer Oil borne with the compressed air is particularly damaging It can block openings in the molecular sieve and reduce reactivation during regeneration If the pressure dew point is no longer being reached it is recommended not to draw off any supply air for about 3 to 4 hours In this manner the adsorption dryer can regenerate itself The partial pressure drop between adsorption a
2. ME DRUMAG SPECKEN BEE Solutions to your fluid power problems Adsorption dryer SDAT Tey A DRUMAG SPECKIN Operating instructions Issue 04 2004 DRUMAG GmbH Fluidtechnik Glarnerstrasse 2 D 79713 Bad Sackingen Telefon 49 0 7761 5505 0 Fax 49 0 7761 5505 70 Web www specken drumag com E Mail info specken drumag com CE Contents OND Orem O N gt 1 1 1 2 Technical data page 2 Safety page 2 General page 3 Structure and function page 4to6 Installation page 6 Operation page 7 Maintenance page 7 Ordering spare parts page 7 Technical data general 1 Compressed air section Operating pressure 4 to 10 bar key data Compressed air input temperature lt 30 C Pressure dew point up to 70 C Input volumetric flow lt 350 NI min 2 Electrical equipment Valve insulation class H Protection class IP 65 Ambient temperature 10 to 50 C Permissible frequency tolerance 5 Permissible voltage tolerance 10 The operating pressure maximum permissible volumetric flow and pressure dew point of your adsorption dryer can be read from the type plate Example SDAT G70 420 P5 35 45 PS 230 Pressure dew point C Max volumetric flow l min Norm Min operating pressure bar Safety Attention notice This Attention notice appears at places in this operating manual to which Attention particular attention must be paid 0404 page 2 of 7 BE_SDAT doc Safety instru
3. allation errors be avoided and trouble free operation be guaranteed If you should experience difficulties despite this please contact us our field service employees or our agents We reserve the right to make technical changes Copyright The copyright on this operating manual is retained by SPECKEN DRUMAG DRUMAG GmbH SPECKEN AG Postfach 1142 Im Lorler 6 D 79702 Bad Sackingen CH 8902 Urdorf Tel 07761 5505 0 Tel 01 7340366 Fax 07761 5505 70 Fax 01 7342313 0404 page 3 of 7 BE_SDAT doc 4 Structure and function 4 1 Adsorption dryer 4 11 Structure 1 1 5 2 way solenoid valve tower switching 1 2 3 2 way solenoid valve control of regeneration air 1 3 tower with molecular sieve and surface filter Exhaust muffler for regeneration air molecular sieve load spring regeneration air nozzle Check valve pk ok ks EX ONDA E Air pressure inlet A Air pressure outlet PRG reAliiil A See q AA Fig 1 SDAT The SDAT adsorption dryer is equipped with two direct switching solenoid valves which control the main and regenerating air flows The two towers as well as the base and cover plates are manufactured from anodised aluminium The direct controlled solenoid valves are manufactured from high performance components in a very robust design The 4A molecular sieve is clamped by a stainless steel spring between two 30 um surface filter
4. ctions e The SDAT adsorption dryer has been built in accordance with the state of the art and is safe to operate if installed properly The assessment of the operating safety within the entire plant must be carried out by the manufacturer of the entire plant e Every person who is involved with the installation and maintenance of the SDAT must have read and understood this operating manual and in particular these safety instructions e Electrical work must be carried out by persons who are qualified to do such work e Working on live parts is forbidden e Unauthorised conversions and alterations lead to the loss of the manufacturer s warranty e The SDAT adsorption dryer is dimensioned in accordance with the design data operating pressure temperatures volumetric flow and desired pressure dew point Each change of operating pressure air temperature and or volumetric flow will lead to a change in the pressure dew point Appropriate use as intended SDAT adsorption dryer dry compressed air elimination of water vapour from the compressed air in accordance with the pressure swing adsorption method heatless adsorption Any other use is deemed to be inappropriate The manufacturer shall not be held responsible for any damage resulting from this 3 General Fundamentals Work on electrical and pneumatic systems should only be carried out by employees who are qualified to do such work Only with knowledge of this operating manual can inst
5. nd regeneration influences the attainable pressure dew point It is therefore very important that the silencers for the regenerating air do not build up any back pressure due to contamination The silencers are greatly over dimensioned If the pressure dew point is no longer being reached contaminated silencers could also be a cause If despite the above mentioned measures the specified values are no longer being achieved it is necessary to replace the molecular sieve Please contact SPECKEN DRUMAG regarding this If the operating pressure needs to be reduced or the volumetric flow increased in relation to the specified values this can be done if need be by exchanging the orifice plates and adjusting the switching times Please contact SPECKEN DUMAG in this case 8 Spare parts Please quote the type description and the serial number of the device concerned when ordering spare parts Spare seals are only available in complete sets 0404 page 7 of 7 BE_SDAT doc
6. r It must be noted that no air can flow without electrical control The switching sequence and the change of pressure with time are illustrated in the following diagram fig 2 cycle time adsorption time regeneration time upper cam disc 3 2 WV regeneration air 1 lower cam disc pressure built up time a t 3 2 way valve 5 2 way valve pressure tower 1 pressure tower 2 EV1 5 2 way solenoid valve EV2 3 2 way solenoid valve T1 T2 Adsorption towers DRV1 DRV2_ Throttle check valves L solenoid valve actuated Fig 2 Switching sequence and change of pressure 0 solenoid valve not actuated with time 0404 page 5 of 7 BE_SDAT doc 4 2 Control The valves are controlled by a built in programme switching unit This comprises a drive unit and two programme channels fig 3 The drive unit rotates the two program discs via a sliding coupling Microswitches are actuated via the programme discs In this manner the mechanical information is converted to electrical switching commands The programme switching unit allows interval operation of the adsorption dryer The programme switching unit is installed in a housing which is fastened to the adsorption dryer The overall cycle time is specified by the programme Program channels Mounting bolts ut a i TR S Drive unit switching unit and is either 4 minutes or 10 minu
7. s and two perforated plates The molecular sieve is fixed inside the towers even when they are removed The adjustment of the regenerating air takes place via orifice plates in the base plate 0404 page 4 of 7 BE_SDAT doc 4 12 4 13 DRV1 Functional method The SDAT adsorption dryer has two symmetrical towers While the moist compressed air flows through one tower from top to bottom whereby the water vapour is almost completely removed from the air a part of the dried air flows through the second tower from bottom to top takes up the water vapour again and transports it to the outside After a specified time the regeneration is interrupted and the pressure builds up in the tower concerned Once the pressure level in the two towers is the same switching takes place from one tower to the other At the same time the tower which is now to be regenerated is vented The tower with the dried molecular sieve is now charged whilst the molecular sieve in the other tower is regenerated The amount of regenerating air and hence the bore in the orifice plate is determined by the partial pressure drop between adsorption and regeneration and the temperature of the compressed air The regeneration time is calculated from the selected amount of regenerating air the dynamically used charging and the desired pressure dew point Valve switching sequence The two solenoid valves control switching between the two towers as well as the regenerating ai
8. tes If it Fig 3 Program switching unit should be necessary in exceptional cases to alter the pressure build up time this can be done by rotating the two cam discs against one another Attention Turn off the power to the device before opening the control housing To change the pressure build up time 1 Turn off the power to the device 2 Remove the hood and the cover of the control housing 3 Unscrew the fixing screws on the programme pressure built up time switching unit and remove the drive unit upper together with the cam discs cam disc 4 Pull off the cam disc assembly from the drive motor lower cam disc 5 Rotate the cam disc pairs against one another in the fine notching Greater overlapping of the two cam disc pairs means a longer pressure build up time One notch is equivalent to about 1 2 seconds 4 min device or about 3 seconds 10 min device 6 Reassemble the drive unit tighten the fixing screws 7 Close the control housing cover fit the hood and screw it tight 5 Installation Attention Electrical and mechanical work may only be carried out by qualified persons The adsorption dryer must be mounted in a vertical position Make sure that the pneumatic connecting pipes are free from all dirt The SDAT adsorption dryer is delivered pre wired and adjusted The voltage data of the valve coils must be checked before connecting to the mains supply 0404 page 6 of 7
Download Pdf Manuals
Related Search
Related Contents
Manuel d`utilisation 848 35 00 28 - Icon Heath & Fitness Zambroza avec Acai et Grenade Biostar P4M900-M4 Owner's Manual 100dp/300dp dual pulse stored energy resistance welding power T1000 Manual de Usuario Istruzioni per l`uso Instructions for use Mode d`emploi Instrucciones Ergotron MD Series Monitor Drawer 97712 Copyright © All rights reserved.
Failed to retrieve file