Home
        Historic Mantels PS16000 Installation Guide
         Contents
1. Chateau President Symphony Designer Installation  Installation and cleaning Instructions Chateau Symphony Designer Series Mantel    Historic Mantels Parts    A 2 LEGS    B 1 MANTEL SHELF  C 2 SIDE FILLER PANELS    a ene    D 1 TOP FILLER PANEL  E 3 PIECE HEARTH  included with Chateau  amp   President Series mantels ONLY  PEELEN  Step 1  Hearth Installation  Chateau  amp  President Series mantels ONLY  PL Premium    Center the hearth at the firebox opening and set tight to the wall  The hearth should be level to ensure there are no spaces between the    floor and under side of the hearth  Once centered apply construction   adhesive  we recommend PL Premium  to the under side of the hearth    Step 2   Filler panel installation   Cut the filler panels to the required size  We recommend using an small angle grinder with concrete blade   Apply construction  adhesive to the back of the filler   panels  Place the mantel legs to  determine the correct measurements   Do not screw the legs into the    wall until the filler panels have been  installed               Step 3     Leg Installation    Determine and mark the position of the legs  Mark sure the legs   are level and identical distance on either side of the firebox opening   Use shims to level the mantel legs if required  Apply construction  adhesive to the back of the legs and screw the legs to the wall using  the metal wall ties attached to the top of the legs     Step 4   Install the mantel shelf    Mantel shelves are cast wit
2. h a cavity in the back to accommodate wood blocking for support  Locate the wood blocking position  by off setting the material thickness at the top of the shelf from a TT  pencil line indicating the top edge of the mantel shelf when set on the  mantel legs  Screw wood blocking with wood screws Into the wall  studs for greatest support  Apply adhesive to the back surfaces of the  mantel shelf  top of leg and the top of the wood blocking to ensure  continuous contact with the wall  Use bracing to secure the mantel  shelf tight to the wall until the adhesive sets       Step 5  Finishing    Fill any gaps around the mantel with the cement provided  NOTE the cement provided dries in less then 20 minutes  Add water and apply promptly      mix only a small amount of cement as needed as it dries in 20 min    Historic Mantels are factory treated with a clear water based sealer and do not require additional surface treatment    Step 6  Cleaning    Clean mantel with a damp cloth as needed  Do Not wet the mantel  Water marks may appear if the cloth is wet        HISTORIC MANTELS all rights reserved MAR 2013    
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Blockhead BH1101 User's Manual  Infobrief Flachdach - LUX-top ®  Vade Mecum de la Conservation préventive  NEC Express5800/320Lb Release Notes    1 G Operating instructions - CO2 air quality monitor ......... B  HC-L 5 6    Copyright © All rights reserved. 
   Failed to retrieve file