Home
Design Craft MIllworks 61220 Installation Guide
Contents
1. 2 2 2 20 PLAN VIEW g 2 FRONT ELEVATION SIDE ELEVATION 6 OWT 6 Post Anchor 12 8 13 16 STEP ONE Headers attached with CWT 6 Post to Beam bracket 2 on each corner post 1 on each each center post a 10 20 STEP TWO B 2x6 Joist 24 o c attached flush with with top of header using 2 OWT Flush Joist Hangers one on each side 2 per post 4x8 Curved brackets attached to post using 1 6 timberlock and OWT Hex Cap Nut and to header using 2 6 timberlock and OWT Hex Cap Nut STEP THREE 28 8 feaux rafter tall 24 o c attached flush to bottom of header with STEP FOUR T T a 20 2 LI LLLLLL cc 20 2x4 Faux rafter tail cap 24 o c _ 7 STEP FIVE 15 2 2 Stripping 5 5 o c 19 2 10 7 STEP SIX y 1 11 1 LENIN A El TAE E Al 2x2 stripping 5 5 o c Be CA i E Jl a A E gt me A O 2x4 strippi df x ng and taux a E ze rafter tails 24 o c EE E E E a 2 h 11 faux rafter tails and 2x4 caps 24 o c 19 2 TOP VIEW
Download Pdf Manuals
Related Search
Related Contents
read more - St Paul`s Hospital Millennium Medical College Home Decorators Collection 15294 Installation Guide Continental Electric CE27616 User's Manual Copyright © All rights reserved.
Failed to retrieve file