Home

DuPont HDXXTYVK3 Installation Guide

image

Contents

1. Apply per manufacturers guidelines For non DuPont products DuPont assumes no liability for use of recommended products installers need to evaluate suitability of recommended products in their end use applications Except when installing DuPont Tyvek WRBs over foam and other non nail base sheathings DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Flashing Products PRODUCT DIMENSIONS AREA DuPont FlexWrap NF 6 in x 75 f 37 50 sq ft 9inx75f 56 20 sq ft DuPont StraightFlash 4 in x 150 ft 50 sq ft 9 in x 125 ft 93 75 sq ft DuPont StraightFlash VF 6 in x 125 ft 62 5 sq ft DuPont Flashing Tape 4 in x 100 ft 33 33 sq ft 6 in x 100 ft 50 2 sq ft 9 in x 100 ft 75 sq ft Water Resistive Barrier WRB Code Requirements These mechanically attached barriers meet ICC ES AC 38 Water Resistive and Air Barrier Requirements e CC ES Evaluation Report ESR 2375 DuPont Tyvek HomeWrap DuPont Tyvek StuccoWrap 9 DuPont Tyvek DrainWrap DuPont Tyvek CommercialWrap Necessary Materials DuPont Tyvek WRB e 2 or 3 DuPont Tyvek Tape DuPont Tyvek Wrap Caps or recommended fasteners see step 3 e DuPont Residential Sealant DuPont Commercial Sealant or recommended sealant Warranty Please see warranty requirements for buildings less than 5 stories at www weatherization tyvek com Copyright 2012 E du Pont de Nemours and Compan
2. Tyvek amp DrainWrap Tyvek amp CommercialWrap DuPont ThermaWrap DuPont FlexWrap and DuPont StraightFlash V are registered trademarks or trademarks of DuPont or its affiliates K 16282 2 12
3. DuPont Flashing Tape E 2 u 1 215 E qa opc Fe Epa ae Cb eer es WE STEP 5 All vertical seams shall be taped with DuPont Tyvek Tape When installing as an air barrier also tape all horizontal seams Taping all vertical and horizontal seams and taping or sealing all terminations including but not limited to roof wall interfaces and sill plates is required when installing DuPont Tyvek building wraps as air barriers Use 3 DuPont Tyvek Tape when taping horizontal laps of DuPont Tyvek StuccoWrap and DuPont Tyvek DrainWrap Use DuPont Tyvek Metalized Tape when taping DuPont Tyvek ThermaWrap STEP 6 After water resistive barrier is installed refer to the DuPont Flashing Systems Installation Guidelines to prepare and flash windows and doors DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines DuPont Flashing Systems Integration If windows and doors have not been installed reference the DuPont Flashing Systems Installation Guidelines Installation Instructions for Windows and Doors AFTER Water Resistive Barrier WRB is Installed to prepare the rough opening If windows and doors are already installed and flashed then follow these last 2 integration steps to tie the DuPont Tyvek WRB into the flashing STEP 1 A Verify that the DuPont Tyvek WRB is properly shingled with the bottom of the apron B Cut as shown to exp
4. elastic fiber synthetic rubber adhesive polyurethane adhesive and a top sheet of flash spunbonded high density polyethylene fibers or polypropelene film Additives have been incorporated into these materials to provide ultraviolet light resistance DuPont requires that DuPont Flashing Systems products be covered within four months 120 days of installation Warning DuPont Tyvek air and water barriers are slippery and should not be used in any application where it will be walked on In addition because they are slippery DuPont recommends using kickjacks or scaffolding for exterior work above the first floor If ladders must be used extra caution must be taken to use them safely by following the requirements set forth in ANSI Standards 14 1 14 2 and 14 5 for ladders made of wood aluminum and fiberglass respectively DuPont Tyvek products are combustible and should be protected from a flame and other high heat sources DuPont Tyvek products will melt at 275 F 135 C if the temperature of DuPont Tyvek products reaches 750 F 400 C it will burn and the fire may spread and fall away from the point of ignition For more information call 1 800 44 Tyvek DuPont Flashing Systems products and their release paper are slippery and should not be walked on Remove release paper from work area immediately DuPont Flashing Systems products will melt at temperatures greater than 250 F 121 C DuPont Flashing Systems products are c
5. 4 Unroll directly over windows and doors Upper layer of DuPont Tyvek WRB should overlap bottom layer by a minimum of 6 Refer to the DuPont Flashing Systems Installation Guidelines to prepare and flash window and door openings Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 NOTE If windows are already installed the DuPont Tyvek WRB must be integrated with proper shingling with window flashings If DuPont FlexWrap NF and apron are used install the DuPont Tyvek WRB under the apron to ensure proper shingling If non self adhering sill flashing is used install the WRB under the bottom of the sill flashing to maintain proper shingling STEP 5 All vertical seams shall be taped with DuPont Tyvek Tape When installing as an air barrier also tape all horizontal seams Taping all vertical and horizontal seams and taping or sealing all terminations including but not limited to roof wall interfaces and sill plates is required when installing DuPont Tyvek WRBs as air barriers Use 3 DuPont Tyvek Tape when taping horizontal laps of DuPont Tyvek StuccoWrap and DuPont Tyvek DrainWrap Use DuPont Tyvek Metalized Tape when taping DuPont Tyvek ThermaWrap STEP 6 After DuPont Tyvek WRB is installed refer to the DuPont Flashing Systems Installation Guidelines Installation Instructions for Windows and Doors AFTER Water Resistive Barrier WRB is Installed
6. attach DuPont Tyvek WRBs due to the limited holding power of these fastening methods and will not be in compliance with the DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines f temporary fasteners are used permanent fastening must be applied as soon as practically possible in order to maintain the integrity and performance of the DuPont Tyvek WRB Refer to the DuPont Tyvek Weather Barrier Commercial Installation Guidelines for more complete fastening information Examples of recommended permanent fasteners include DuPont Tyvek Wrap Cap nails for wood frame construction e DuPont Tyvek Wrap Cap Staples for Stinger for wood frame construction e 1 0 inch minimum crown staples for residential low rise construction except when installing DuPont Tyvek WRB over foam sheathing e 1 plastic cap staple with leg length sufficient to achieve 5 8 penetration into wood stud for wood frame construction DuPont Tyvek Wrap Cap 2 plastic cap screws for steel or wood frame construction e 1 1 4 metal gasketed washers with screws for steel frame construction e 2 metal gasketed washers with screws for steel frame construction e Tapcon fasteners with 2 plastic caps for masonry construction Special Considerations Refer to the Technical Specification section for composition UV exposure surface burning characteristics and other special considerations 12 DuPont Tyvek Water Resistive an
7. only residential low rise then skip taping terminations and untaped horizontal seams is allowed All vertical seams must be taped for both air barrier and water resistive barrier installations Penetrations Seal the DuPont Tyvek Products around all penetrations electrical HVAC and plumbing etc with the appropriate DuPont Flashing Systems product DuPont Tyvek Tape DuPont Residential Sealant DuPont Commercial Sealant or recommended sealant Products that have flanges should be integrated into the DuPont Tyvek WRB DuPont StraightFlash DuPont Flashing Tape or DuPont recommended alternate patches should be applied behind fastening plates brick tie base plates metal fastening clips metal channels etc when building envelope design requirements exceed ASTM E1677 65 mph equivalent structural load and 15 mph equivalent wind driven rain water infiltration resistance Please contact 1 800 44 Tyvek for recommended sealants and recommended alternate patches behind fastening plates Overlap Ensure proper shingling with a 6 minimum overlap of the WRB components from the bottom to the top of the wall to help facilitate proper drainage Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 Fasteners Use DuPont fasteners or DuPont recommended alternates per the fastening schedule included in this installation guideline Temporary fasteners should not be relied upon to permanently
8. to prepare and flash windows and doors DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Continuity Gable Ends Completely cover the Gable End with the DuPont Tyvek WRB including a 6 12 overlap at each corner Cut away the excess WRB and tape all seams It is important to maintain the continuity of the water resistive barrier from top to bottom with proper shingling Continue wrapping all the way up the structure overlapping the previous layer of DuPont Tyvek WRB by a minimum of 6 Wrap the entire wall surface including unconditioned spaces 6 12 Overlap Minimum 6 overlap Cantilever Floors Wrap the DuPont Tyvek WRB under and up the Cantilever floor and fold the DuPont Tyvek WRB up the sides of the Cantilever wall a minimum of 6 Tape all corners The Terminations top layer of DuPont Tyvek WRB should go over the bottom layer a minimum of 6 Lap DuPont Tyvek WRB over all flashing e g step flashing wall to roof intersections and thru wall flashings NOTE Make the inside corner as tight as possible using a 1x4 or similar Tp Weep screeds and expansion joints y need to be integrated with flashings and the water resistive barrier Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 6 DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Penetrations There ar
9. B uM m gt DAI SISAY 19 eM JUOGNG eo 55 HH DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines HELPING YOU GET THE JOB DONE RIGHT FOR BUILDINGS LESS THAN 5 STORIES REVISION 2 12 DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Table of Contents Applicable PrOQUCtS ccu oot rti o s tte be Ra cp E M Ee 2 Necessary Materials 2 7 9 22 ien 3 3 General Instr accro ches dene besten Pad alc m pa Deua vo Ra Ra Rd 3 Special Considerations 2 020 000005500000000000000 een nennen 4 Installation 5 Continuity 6 Gable ENA sa e EEOAE 6 6 7 Handling Tears and 7 USC ada Gn 8 DuPont Flashing Systems 222 22 2 2 2 9 FACADES Considerations 10 Use of Tempora
10. Siding DuPont Tyvek water resistive barriers WRB and wood siding shall be installed according to manufacturer s instructions industry standards and applicable codes As recommended by the Western Red Cedar Lumber Association and U S Forest Product Laboratory wood siding should be primed on all six sides before installation Foam sheathing panels often have low vapor permeability and therefore can cause moisture to accumulate on the back of siding and cause staining buckling and damage to finish coats As a result the Western Red Cedar Lumber Association and other wood siding manufacturers recommend that furring strips are used to create an air space between foam sheathing and siding Other recommendations that should be followed to minimize potential problems are Use thicker siding patterns in widths of 8 inches or less Thick narrow siding is more stable than thinner wider patterns and better able to resist dimensional changes Use kiln dried siding over rigid foam sheathing Proper pre finishing is essential Use light color finish coats to maximize heat reflection and reduce dimensional movement e Inall cases it is recommended that house wrap such as DuPont Tyvek DrainWrap be applied over the foam sheathing In high exposure installations enhanced drainage and water management may be provided by using DuPont Tyvek DrainWrap by installing a drainage mesh over the water resistive barrier or by creating rain
11. ation 4 DuPont requires that DuPont Tyvek HomeWrap DuPont Tyvek StuccoWrap DuPont Tyvek DrainWrap and DuPont Tyvek ThermaWrap be covered within 4 months 120 days of installation DuPont Tyvek CommercialWrap and DuPont Tyvek CommercialWrap D must be covered within 9 months 270 days of installation When installing windows and doors prior to the DuPont Tyvek WRB refer to the DuPont Flashing Systems Installation Guidelines Installation Instructions for VVindows and Doors BEFORE Water Resistive Barrier WRB is Installed which will direct you back to this guide at the appropriate step If the windows and doors have already been installed and flashed integrate the DuPont Tyvek WRB by following the DuPont Flashing Systems Integration section in this guide page 9 NOTE If DuPont FlexWrap NF and apron are used install the DuPont Tyvek WRB under the apron to ensure proper shingling If a non self adhering sill flashing product is used please maintain proper shingling Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Installation Instructions Start at the bottom of the structure to ensure proper shingling throughout the installation Proper shingling is required to shed water and to prevent water from entering the wall system STEP 1 UNWRAP roll at corner leaving 6 to 12 vertica
12. d Air Barriers Installation Guidelines PROPER OVERLAP FOR WATER MANAGEMENT A Lap all components from bottom of the wall to the top of the wall B Treat the walls of the building just like a roof Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 NOTE A condition of the DuPont 10 year Limited Warranty is compliance with the Installation Guidelines for DuPont Weatherization Products In the event that a specific detail or installation technique is not part of the Installation Guidelines at the time that you are building then the Key Installation Principles outlined in this document should be followed Please contact DuPont with any questions regarding these Installation Guidelines 13 Technical Specifications DuPont Tyvek WRBs used in construction products are made from 100 flash spunbonded high density polyethylene fibers which have been bonded together by heat and pressure without binders or fillers into a tough durable sheet structure Additives have been incorporated into the polyethylene to provide ultraviolet light resistance DuPont requires that DuPont Tyvek CommercialWrap and CommercialWrap D WRB s be covered within 9 months 270 days of installation and that all other DuPont WRB s be covered within 4 months 120 days of installation DuPont Flashing Systems products are made from a synthetic rubber adhesive and a laminate of polyethylene film polypropelene film
13. e many types of penetrations including dryer vents bathroom exhaust fans exterior electrical outlets exterior lights gas lines etc Seal around all electrical HVAC and plumbing penetrations with DuPont Flashing Systems products DuPont Tyvek Tape DuPont Residential Sealant DuPont Commercial Sealant or recommended sealant Start flashing or taping at bottom of penetrations shingling upper tape over bottom tape NEAS kr NY AR S Products that have flanges should be integrated into the DuPont Tyvek WRB using DuPont Tyvek Tape or DuPont Flashing Systems products Minimum DuPont Overlap Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 Handling Tears and Holes During the course of installing the DuPont Tyvek WRB minor tears may occur Be sure to tape all tears Tears can easily be covered with DuPont Tyvek Tape 2 or 3 or DuPont Flashing Systems products Larger holes greater than 1 may require cutting a piece of DuPont Tyvek WRB to cover the hole maintaining proper shingling Cut a slit 2 above the hole and extending a minimum of 2 on each side of the hole Measure and cut a piece of DuPont Tyvek WRB to fit into the slit and cover the hole Tuck the cut piece of DuPont Tyvek WRB into the slit Tape along the perimeter by starting at the bottom of the patch shingling upper ta
14. ed minimally to tack the DuPont Tyvek WRB in place Small staple fasteners are acceptable with OSB plywood and exterior gypsum sheathing only Small staple fasteners should not be used with fiberboard or foam sheathing Temporary fastener schedule should not exceed four 4 fasteners per square yard Tape all tears and localized damage For larger holes greater than 1 follow instructions on page 7 of this guide Selection and use of temporary fastening methods is an option dependent on building schedule cladding type and local building practices NOTE These Temporary Fastening Guidelines are subject to change based on new technology or testing information and may be superseded at any time It is always important to follow the latest guidelines which may be found on www Weatherization Tyvek com 11 DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Key Installation Requirements for Wraps Continuity It is important to maintain the continuity of the WRB throughout the building envelope The entire wall surface shall be wrapped including unconditioned spaces Special attention should be given to ensure a proper 6 overlap at all terminations seams penetrations and transitions to maintain a continuous downward drainage plane and WRB Installing the DuPont Tyvek WRB as an air barrier is the preferred installation method but when the DuPont Tyvek WRB is being installed as a water resistive barrier
15. erves as the wall system s water resistive barrier and is integrated with window and door flashings the weep screed at the bottom of the wall and any through wall flashings or expansion joints Lath shall be installed over the intervening layer in accordance with ASTM C1063 03 Standard Specification for Installation of Lathing and Furring to Receive Interior and Exterior Portland Cement Based Plaster and applicable codes Rigid foam board when installed over DuPont Tyvek WRB as intervening layer will provide enhanced structural support to the DuPont Tyvek layer WRB and may reduce the required number of fasteners used for the attachment of the DuPont Tyvek WRB if installed as soon as practically possible Brick The 2009 International Residential Code Section R703 7 4 2 requires a nominal 1 inch airspace separating the brick from the water resistive barrier WRB The Brick Industry Association recommends a 1 inch air space in front of wood stud construction and a 2 inch air space in front of steel stud construction Consistent with these requirements and recommendations DuPont Tyvek WRBs shall be separated from the brick veneer by a nominal 1 inch air space Window and door flashing and through wall flashing shall be integrated with the DuPont Tyvek WRB layer ensuring proper shingling For maximum moisture management and drying of the wall system the airspace in front of the DuPont Tyvek WRB shall be vented to the exteri
16. ethods because they do not have substantial holding power and may not provide adequate durability while in service Temporary fasteners should not be relied upon to permanently attach DuPont Tyvek WRB Because these fasteners have limited holding power they are not supported by DuPont as the primary means of attachment Temporary fastening methods can be used if the following guidelines are followed e Temporary fastening methods shall only be used to tack the DuPont Tyvek WRB in place when a permanent fastener is installed immediately after the temporary fasteners are installed In this case permanent fasteners include cladding fasteners such as brick ties lath fasteners for traditional stucco external foam board fasteners or siding installed with nails Cladding shall be installed according to applicable building codes and industry standards Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 e When using adhesives vertical strips spaced approximately every 24 to 36 inches or along every other stud line are acceptable Vertical strips may be applied to the outer face of the sheathing or directly to the studs for open stud construction When using adhesives care must be taken to avoid excessive surface coverage as this may impact the vapor permeability in that area Adhesives should be evaluated for compatibility with DuPont Tyvek WRBs e When using temporary mechanical fasteners they should be us
17. heathing rather than over plastic foam sheathing 10 DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Use of Temporary Fastening Methods Fastener selection and fastening schedule is a function of holding power during exposure and durability while in service DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines require the use of cap fasteners nail staple and screw or 1 crown staples as the means for permanently attaching DuPont Tyvek WRBs In addition to fastener selection DuPont requires a permanent fastener schedule between 6 to 18 inches anchored to the studs These fasteners and schedule are considered a permanent means of attachment and provide substantial holding power during exposure Cap fasteners provide additional protection against moisture and air infiltration at the fastener location especially when the cladding is in intimate contact with the water resistive barrier and there is minimal drainage These fastening guidelines minimize the number of penetrations while maintaining a balance of product durability during exposure Sheathing other than structural OSB and plywood should not be relied on as the fastening base This includes but is not limited to foam fiberboard and gypsum sheathing materials Use of recommended permanent fasteners at reduced schedules other mechanical fasteners such as smaller staples slap staples and adhesives are considered temporary fastening m
18. l overlap Printed stud marks are available on some DuPont Tyvek WRBs to aid in aligning with the studs e g studmarks are 8 apart for DuPont Tyvek HomeWrap STEP 2 Roll should be plumb Bottom edge of roll should extend over sill plate interface at least 2 For maximum air leakage reduction when installing as an air barrier seal wrap at the bottom of the wall with sealant i e DuPont Residential DuPont Commercial Sealant or recommended sealant DuPont Tyvek Tape DuPont StraightFlash or DuPont Flashing Tape Extend to bottom of sill plate for slab on grade foundations For Stucco exteriors integrate with weep screed STEP 3 Secure DuPont Tyvek WRB to the stud or other nail base material i e wood sheathing Fasteners should be spaced no closer than 6 and no farther than 18 on vertical stud lines This may involve penetrating bandboard or other horizontal members to maintain proper spacing Use one or more of the recommended fasteners below for use with DuPont Tyvek WRBs DuPont Tyvek Wrap Cap nails DuPont Tyvek Wrap Cap screws DuPont Tyvek Wrap Cap Staples for Stinger e 1 0 inch minimum crown staples Except when installing DuPont Tyvek WRB over foam and other non nail base sheathings Please see Use of Temporary Fastening Methods later in this guide for more information on alternative fastening schedules and requirements NOTE Do not fasten within 9 of rough opening head STEP
19. ombustible and should be protected from flames and other high heat sources DuPont Flashing Systems products will not support combustion if the heat source is removed However if burning occurs ignited droplets may fall away from the point of ignition For more information call 1 800 44 Tyvek DuPont Residential Sealant and DuPont Commercial Sealant are irritating to skin eyes and respiratory tract For proper usage follow directions stated on the product label For health information refer to the Material Safety Data Sheet or call Chemtrec at 1 800 424 9300 Note When installed in conjunction with other building materials DuPont Flashing Systems products must be properly shingled with these materials such that water is diverted to the exterior of the wall system DuPont Tyvek products are air and water barriers and not the primary water barrier The outer facade is the primary barrier You must follow facade manufacturer s installation and maintenance requirements for all facade systems in order to maintain water holdout properties and ensure performance of DuPont Tyvek products Use of additives coatings or cleansers on or in the facade system may impact the performance of DuPont Tyvek WRB DuPont Tyvek Weatherization Systems products to be used as outlined in this installation guideline DuPont Flashing Systems products should only be used to seal penetrations and flash openings in houses or buildings DuPont Flashing Sy
20. or at the top and bottom of the wall Some types of brick ties will act as additional fasteners for DuPont Tyvek WRBs and if installed as soon as practically possible after the DuPont Tyvek WRB may reduce the required number of fasteners used for the initial attachment of the DuPont Tyvek WRB DuPont StuccoWrap DrainWrap or CommercialWrap D are recommended for this application and meet drainage requirements for one coat stucco and EIFS systems Stone Veneer The 2009 International Building Code Section 1405 7 requires two layers of water resistive barrier WRB behind stone natural manufactured synthetic veneers over wood frame construction When DuPont Tyvek WRBs are used behind stone veneer they should be separated from the stone and mortar by a second layer of DuPont Tyvek WRB a layer of grade D building paper felt rigid foam board or the paper backing of paper backed lath The first layer directly over sheathing or studs serves as the wall system s water resistive barrier and shall be integrated with window and door flashings the weep screed at the bottom of the wall and any through wall flashings or expansion joints When rigid foam board is used as the second layer it is installed in front of the DuPont Tyvek WRB DuPont StuccoWrap DrainWrap or CommercialWrap D is recommended for this application Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 Wood
21. ose window and apron DO NOT CUT THROUGH FLASHING OR APRON DO NOT CUT through flashing or apron Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 STEP 2 A Tape all seams as shown DO NOT TAPE at bottom of window B At the head continuous tape seams as shown with DuPont Tyvek Tape Skip taping at the head is acceptable if an air barrier is not required or if additional drainage is desired DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Facade Considerations Water resistive barrier performance is dependent upon the ability of the facade to drain The following must be considered for specific facades Stucco When stucco is installed over wood based sheathing the 2009 International Building Code Section 2510 6 and the 2009 International Residential Code Section R703 6 3 require a water resistive vapor permeable barrier with a performance at least equivalent to two layers of Grade D paper or a layer of water resistive barrier WRB which is separated from the stucco by an intervening layer When DuPont Tyvek water resistive barriers are used behind stucco they should be separated from the stucco by a second layer of DuPont Tyvek WRB a layer of Grade D building paper felt rigid foam board or the paper backing of paper backed lath The first layer directly over sheathing or studs s
22. pe over bottom tape Tears DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Tilt Wall Instructions STEP 1 Unroll and secure DuPont Tyvek WRB over the wall panel Leave enough lap to ensure a minimum 6 overlap of the DuPont Tyvek WRB on all sides except top of the wall These flaps allow for a DuPont Tyvek WRB to DuPont Tyvek WRB seal with adjacent sides When taping make sure the stud marks printed on the DuPont Tyvek WRB line up with the first stud and that the roll is plumb STEP 2 When starting a wall section fold the beginning side flap over the vertical side of the stud and secure Trim off excess Ensure that the bottom flap overhangs enough so that when the wall is tilted upright it overlaps the sill plate STEP 3 As each wall section is raised ensure that the bottom flaps overlap the sill plate and that the side flaps are on the exterior of the house MALE WE Le Peet Ie ae ZE h od 1 h Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 AS ACN OH cv A Ac STEP 4 Fasten the side flaps and secure the bottom flap to the foundation For maximum air leakage reduction when installing as an air barrier seal wrap at the bottom of the wall with DuPont Residential Sealant DuPont Commercial Sealant or recommended sealant DuPont Tyvek Tape DuPont StraightFlash or
23. ry Fastening 5 2 12 42 242 2 0100 0 000 11 Key Installation Requirements for 2 2 2 2 2 20 02020222 2000 00000000 12 Copyright 2012 E du Pont de Nemours and Company All Rights Reserved Rev 2 12 Applicable Products Water Resistive Barriers WRB PRODUCT DIMENSIONS AREA DuPont Tyvek HomeWrap 3 ftx 100 f 300 sq f 3 ft x 165 f 495 sq f 5 ft x 200 f 1 000 sq f 9 ft x 100 f 900 sq f 9 ft x 150 f 1 350 sq f 10 ft x 100 f 1 000 sq f 10 ft x 150 f 1 500 sq f DuPont Tyvek StuccoWrap 5 ft x 200 f 1 000 sq f DuPont Tyvek DrainWrap 9 ft x 125 f 1 125 sq f 10 ft x 125 f 1 250 sq f DuPont Tyvek ThermaWrap 5 ft x 150 f 750 sq f 9 ft x 100 f 900 sq f DuPont Tyvek CommercialWrap 5 ft x 200 f 1000 sq f 10 ft x 125 f 1250 sq f DuPont Tyvek CommercialWrap D 5 ft x 200 f 1 000 sq f 10 ft x 125 f 1 250 sq f Installation Accessories PRODUCT TYPE QUANTITY DuPont Tyvek Tape 2 Bulk Pack 36 rolls case 3 Bulk Pack 24 rolls case DuPont Tyvek Metallized Tape 2 x 100 Rolls 12 rolls case DuPont Tyvek Wrap Caps for 16 gauge available in 7 8 2000 per box Crossfire Cap Stapler 1 1 4 and 1 1 2 lengths DuPont Tyvek Wrap Caps for 16 gauge 3 8 length 2016 per box Stinger Cap Stapler DuPont Tyvek Wrap Cap with alternate screws 1 0 inch minimum crown staples
24. screen cladding with a larger airspace behind the siding using furring strips If furring is installed over the DuPont Tyvek WRB to create rainscreen the primary fastener spacing can exceed 18 Fiber Cement Siding DuPont Tyvek WRBs and fiber cement siding shall be installed according to manufacturer s instructions and industry standards In high exposure installations enhanced drainage and water management may be provided by using DuPont Tyvek DrainWrap by installing a drainage mesh over the water resistive barrier or by creating rainscreen cladding with a larger airspace behind the siding using furring strips If furring is installed over the DuPont Tyvek water resistive barrier to create a rainscreen the primary fastener spacing can exceed 18 In high wind areas at gable end walls FEMA recommends fiber cement siding be installed over wood sheathing rather than over plastic foam sheathing DuPont Tyvek WRBs and fiber cement siding shall be installed according to manufacturer s instructions industry standards and applicable codes Vinyl Siding Vinyl Siding is installed directly over DuPont Tyvek WRBs Vinyl siding shall be installed in accordance with manufacturer s instructions industry standards and applicable codes including ASTM D4756 06 Standard Practice for Installation of Rigid Poly Vinyl Chloride PVC Siding and Soffit In high wind areas at gable end walls FEMA recommends vinyl siding be installed over wood s
25. stems products are not to be used in roofing applications For superior protection against bulk water penetration DuPont suggests a system combining a quality exterior facade a good secondary WRB and exterior sheathing high quality windows and doors and appropriate flashing materials paying attention to proper installation of each component In a system where no exterior sheathing is used and the DuPont Tyvek WRB is installed directly over the wall studs exterior facade materials should be selected to ensure maximum protection against water intrusion Careful workmanship and proper installation of each component is very important DuPont believes this information to be reliable and accurate This information may be subject to revision as additional experience and knowledge is gained It is the user s responsibility to determine the proper construction materials needed on each project For complete warranty information please visit www Weatherization Tyvek com or call 1 800 44 Tyvek This information is not intended to be used by others for advertising promotion or other publication for commercial purposes For more information about DuPont Weatherization Systems please call 1 800 44 Tyvek or visit us at www Weatherization Tyvek com Tyvek Copyright 2012 E du Pont de Nemours and Company All rights reserved The DuPont Oval Logo DuPont The miracles of science Tyvek Tyvek amp HomeWrap Tyvek StuccoWrap
26. y All Rights Reserved Rev 2 12 DuPont Tyvek CommercialWrap D e CC ESR 1993 DuPont Tyvek ThermaWrap And Industry Standard ASTM E 2556 Type Il Standard Specification for Vapor Permeable Flexible Sheet Water Resistive Barriers Intended for Mechanical Attachment General Instructions The best time to install DuPont Tyvek water resistive barriers is e After the roof sheathing is installed e After the step flashings and kickout flashings have been installed e BEFORE the windows and doors are installed DuPont Tyvek Water Resistive and Air Barriers Installation Guidelines Special Considerations 1 When performance requirements exceed ASTM E1677 65 mph equivalent structural load and 15 mph equivalent wind driven rain water infiltration for buildings less than 5 stories it is recommended to install a high pressure skirt to help prevent water intrusion at the sill or threshold and follow the DuPont Flashing Systems Commercial Installation Guidelines 2 DuPont Tyvek StuccoWrap and DuPont Tyvek DrainWrap must be installed with drainage grooves vertical going up and down 3 To obtain the installed R Value benefits of DuPont Tyvek ThermaWrap it must be installed with shiny metallic side facing towards a clear 34 inch minimum airspace DuPont Tyvek ThermaWrap will still act as a water resistive barrier without an airspace Refer to the DuPont Tyvek ThermaWrap Fact Sheet for more inform

Download Pdf Manuals

image

Related Search

Related Contents

ASRock NF-6GLAN User's Manual  Mode d`emploi    

Copyright © All rights reserved.
Failed to retrieve file