Home

Salsbury Industries 2108FL Installation Guide

image

Contents

1. SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Phone 1 800 624 5269 Int l Phone 323 846 6700 Fax 1 800 624 5299 Int l Fax 323 846 6800 nstallation instructions are provided as general guidelines It is advised that a professional installer be consulted Salsbury Industries assumes no product assembly or installation liability Copyright 2006 Salsbury Industries All rights reserved
2. Americana Mailboxes 2100 Series Front Loading Installation Instructions Thank you for selecting Salsbury s 2100 series Americana mailbox units We are confident that the quality and construction of the mailboxes will prove to be a good investment The units are fully assembled and ready to be installed All 2100 series units have the same outside dimensions regardless of individual door size They are designed to be stacked two 2 high and mount between wall studs These instructions are intended to assist you in a typical wall installation and it should be understood that they can be modified depending upon your choice in fasteners and materials It is also recommended to have the units present before starting the wall construction to obtain the best possible installation Typical Installation Model 2130FL Shown Notes 1 Wall opening and lumber frame must be square 2 Mailboxes should be shielded from direct weather conditions 3 Store keys in a safe place until ready for use 4 Hardware is not included to fasten unit into rough opening Americana Mailbox Instructions 1 The mailboxes are to be recessed in a typical wall that is framed with 2 x 4 wall studs Allowing approximately 24 for the width of each mailbox column and any amount of desired space on each side of the installation frame out the perimeter of the wall and secure to the floor A platform 10 H x 16 D should be constructed for the base of the installa
3. tion and joined with the wall frame Allowing at least a 53 H opening from the platform position studs 24 on center leaving a 22 1 2 W opening for each column of mailboxes to be installed Note Front loading units MUST be installed between wall studs Add additional studs where needed for drywall support Finish the wall and center studs with drywall so all front view surfaces are on the same plane 2 The units will be secured to the studs positioned 24 on center On the front of the unit drill four evenly spaced holes through the flange on each side of the unit Place the first unit on the platform and secure it to the studs using 2 wood screws Place the second unit on top of the first and secure the same way 3 If necessary fasten the lower unit to the platform by drilling two holes through the bottom of the back of the unit and secure with 2 wood screws Likewise fasten the top module to the bottom module using sheet metal screws 4 The installation of the trim at the front of the modules which is optional is the last step in the installation process There is enough trim in each kit for three 3 mailbox columns Fasten the clips to the wall using 1 wood screws around the perimeter of the boxes and between the columns The trim should overlap the seam of the module and drywall After measuring the length of the seam to be covered cut the trim to size mitering the corners at a 45 angle and Clip on

Download Pdf Manuals

image

Related Search

Related Contents

VOICE RECORDING SOFTWARE User Manual  sm-cmd3005 (1.9 Мб)    Power Transmission Installation and Operating Instructions for Brake  Dépannage de l`Électronique LTC Réparation  かんたん操作ガイド  LOT 2013-120  Manualedell`installa- tore  KYOCERA FS-1028MFP  OPERATING INSTRUCTIONS  

Copyright © All rights reserved.
Failed to retrieve file