Home
Cadet BRF12A Installation Guide
Contents
1. 5 Wrap neutral white wire securely around the silver terminal screw Tighten terminal screw securely 9 12 pound inch 1 0 1 4 N m of torque See Figure 1 STEP 6 Wrap hot black wire securely around the brass terminal screw Tighten terminal screw securely 9 12 pound inch 1 0 1 4 N m of torque See Figure 1 IMPORTANT INSTRUCTIONS Turn the electrical power off at the electrical panel board circuit breaker or fuse box and lock or tag the panel board door to prevent someone from turning on power while you are working on the heater Failure to do so could result in serious electrical shock burns or possible death INSTALLATION INSTRUCTIONS STEP 7 Carefully tuck all wires into wiring compartment and attach receptacle to the baseboard heater STEP 8 Turn the power on at the circuit breaker or fuse box onnee EMRE goyncer 9 Separate 120V Supply WARRANTY LIMITED ONE YEAR WARRANTY Cadet will repair or replace any Cadet product including thermostats found to be defective within one year after the date of purchase If you believe your Cadet product is defective please contact Cadet Manufacturing Co at 360 693 2505 during the warranty period for instructions on how to have the repair or replacement processed Warranty claims made after the warranty period has expired will be denied Products returned without authorization will be refused SAVE THESE INSTRUCTIONS Wwww ca
2. SAFETY amp QUALITY BRFi2 Baseboard Heater 120V Receptacle Installation Instructions Front Back Since an electrical outlet may not be installed above a heater National Electric Code you may use a Cadet BRF12 outlet in either end of the Cadet Electric Baseboard to meet local building codes TOOLS REQUIRED 2 Phillips Screwdriver Note A separate 120V circuit and wiring is required for this product Straight Screwdriver DO NOT connect to heater wiring 1 Strain Relief Connector Caution Use copper conductors Wire Strippers 14AWG to 10AWG Read all instructions and safety information All electrical work and materials must comply with the National Electric Code NEC the Occupational Safety and Health Act OSHA and all state and local codes A WARNING STEP 1 Remove one of the wiring compartment covers at either end of the baseboard heater Note if the heater has a built in thermostat use wiring compartment at opposite end STEP 2 Remove the slotted knockout closest to the supply wires and install a strain relief connector DO NOT CONNECT TO HEATER WIRES STEP 3 Pull supply wires through the connector and secure leaving 6 inch wire leads Remove inch of the insulation from the conductors STEP 4 Wrap ground bare wire securely around the green terminal screw Tighten terminal screw securely 9 12 pound inch 1 0 1 4 N m of torque See Figure 1 STEP
3. detea com Tel 360 693 2505 P O Box 1675 Vancouver WA 98668 1675 2009 Cadet Manufacturing Co Printed in U S A Rev 09 09 720043
Download Pdf Manuals
Related Search
Related Contents
Trisa Electronics Cardio Pro 4.0 Teledex C1100 User's Manual Magnavox TB100MW9 TV Converter Box User Manual NetExtreme II Family Adapters Installation and User's Guide Legacy Car Audio LCD95MP3 User's Manual 1 tipo propela bridado (mp) ENARCO, S.A. Xtags User's Guide Copyright © All rights reserved.
Failed to retrieve file