Home

MUSTEE 56BN Instructions / Assembly

image

Contents

1. F ALL 5 PANELS Align center lines using masking tape APPROX 6 LONG temporarily tape center panel in place Position drilled side panel over tub spout and handle s be sure to align front edge with front edge of bathtub temporarily tape in place Temporarily tape remaining side panel in place align front edge of side panel with front edge of bathtub Temporarily tape formed corner panels in place Check panel overlap should not exceed 13 4 and trim flat panels if necessary do not trim formed corner panels With all 5 panels in place draw a light guide line along top and side edges These will be your reference lines for permanently installing panels Remove panels from alcove Caution Do not remove center line mark from center panel PERMANENT INSTALLATION 4 Apply a 1 8 dia bead of adhesive to the back side of the Center Panel using a random zig zag pattern Carefully position panel on backwall of alcove align previously marked centerlines and top edge guide lines Press panel in place working from top edge to bottom Vent panel following procedure described on adhesive cartridge before proceeding Install drilled side panel next be sure to align front and top edge guide line Follow the same procedure for the remaining side wall FORMED CORNERS Align top edge guide lines press panel in place working from top edge to bottom Follow the same procedure for the remaining corner pane
2. MUSTEE INSTALLATION INSTRUCTIONS DURAWALL MODEL 56 5 PC BATHTUB WALLS 18 Hm Saint FITS BATHTUB ALCOVES UP TO 42 DEEP X 72 WIDE TOOLS AND MATERIALS NEEDED Electric or Hand Drill Hole Saw e Caulking Gun e Caulking Tape Measure e Level 24 Min Grease Pencil e Adjustable Wrench e Razor Knife e Masking Tape 2 wide Mineral Spirits Screwdrivers Std amp Phillips Adhesive Recommend LIQUID NAILS for TUB SURROUNDS amp SHOWER WALLS LN 915 NOTICE We recommend that tub shower compartments be equipped with support Grab Bars that comply with ANSI 117 1 1986 requirements Grab Bars must be anchored to structural support behind panels Do Not rely on panels only for grab bar support PREPARATION We do not recommend installing the Durawall Bathtub Wall Panels over any existing tile surfaces The Durawall Bathtub Wall may be installed over drywall plaster painted walls plywood or any solid wall not open studs Wall surfaces must be clean dry and free of grease dust and loose or flakey paint or plaster Shiny smooth surfaces should be sanded or scratched to insure a positive bond E L MUSTEE amp SONS INC 5431 West 164th Street Cleveland Ohio 44142 SI 180 4 02 INSTALLATION Read instructions thoroughly before attempting installation Package should be stored at room temperature 68 F min for at least 6 hours prior to installation Turn off water supply t
3. l 3 SI 180 4 02 MUSTEE INSTALLATION INSTRUCTIONS DURAWALL MODEL 56 5 PC BATHTUB WALLS 5 Clean any excess adhesive immediately with mineral spirits then wash area with a soap water solution 6 Wait approximately 12 hours before apply ing caulking Remember to caulk around faucet spout and handle hole s Follow caulking instructions for clean up of excess caulk 7 Replace faucet spout and handle s turn on water supply to bathtub alcove Wait 24 hours before using tub or shower CARE AND CLEANING The surface of your Durawall Bathtub Wall may be cleaned with a mild soap solution in warm water using a soft cloth For stubborn stains use Soft Scrub by Clorox or Lysol Tub amp Tile Cleaner or a powdered detergent such as Spic n Span Never use abrasive scouring powder or steel wool pads as they will scratch the surface A periodic coating of a silicone based marine polish will help retain the fine finish E L MUSTEE amp SONS INC 5431 West 164th Street Cleveland Ohio 44142 SI 180 4 02
4. o bathtub Remove existing control valve handle s cover plates and filler spout if shower head is mounted less than 58 from top of bathtub it must be removed NOTE Center Panel must be installed first this requires measuring the bathtub backwall to establish the center then positioning panel accordingly Corner Panels overlap the center and side panels Trial fit all five panels before applying adhesive Measure bathtub alcove to find center of backwall Scribe a light grease pencil line at this point at least 59 above top of bathtub Remove any objects that protrude into bathtub alcove area below 59 such as soap dishes or towel bars Measure and lightly mark the center of Bae the top edge of one of the flat panels this will become the center panel FILL IN DIMENSIONS FOR FUTURE REFERENCE Accurately measure tub spout and handle s hole location on alcove side wall and transfer dimensions to one of the remaining flat panels You may want to make a template use shipping car ACCURATELY MEASURE ton to check hole layout before you cut TRANSFER DIMENSIONS holes into side panel After you have TO PROPER SIDE PANEL double checked your measurements using the proper size drill or hole saw cut out holes for outlets TRIAL FIT e NO ADHESIVE 3 Place Center Panel against backwall DRAW GUIDE LINE ALONG TOP AND SIDE resting bottom edge on bathtub rim MASKING TAPE EDGE O

Download Pdf Manuals

image

Related Search

Related Contents

Casio 2637 Watch User Manual  la liste avec les niveaux  Manual  Version PDF du guide Bilan Biodiversité  Manual del Usuario Características técnicas  MP2, MP2E, C2N-MMS and C2N-MMS-SC  Trek Trek  HIGH TRAFFIC COMMERCIAL HEAVY DUTY BRUSHLESS DC  EN Dear Customer, Gigaset Communications GmbH is the legal  L4A User Manual  

Copyright © All rights reserved.
Failed to retrieve file