Home
        none RK1-720A Installation Guide
         Contents
1.      If allowed by   local codes                                                                                                  EA        Mas rs  eet  DRAN oT ay me   e  DIRECTION OF FLOW    Q J 3  Ol  i  l                                                                      3  If the discharge does not stop  refer  to  MAINTENANCE INSTRUCTIONS    Repressurize device as in Step 1  Device  should function properly    4  Slowly open the No  2 shut off valve   The Model 720A is now in service    5  After the Model 720A has been prop   erly installed  test the device  If the device  fails the test  refer to  MAINTENANCE  INSTRUCTIONS     Drain Procedure for Freeze Protection    1  Turn off main shut off  1  that supplies  water to the system    2  Open both inlet and outlet drain valves  in the system  2  amp  6   Open inlet and outlet  shut off valves on the pressure vacuum  breaker  3  amp  5  and all of the test cocks   Leave all valves and test cocks in the half  open half closed  45    position to allow full  drainage of the ball valves and test cocks   3  If you  blow out  the system down   stream of the pressure vacuum breaker   make sure the outlet drain valve  6  is open  and the pressure vacuum breaker shut off  valve  5  is closed    4  Connect an air hose to the outlet drain  valve  6  and inject an adequate volume of  air to remove all water from the downstream  portion of the system    5  CAUTION  Open outlet shut off valve to  the pressure vacuum breaker  5  and 
2.  Air inlet valve does not open as gauge drops to 0 0 psid  1  Air inlet disc stuck to seat     2     Old Style    pressure vacuum breaker  non loaded air    inlet valve      Air inlet valve does not open and differential on gauge will    not drop     Air inlet opens below 1 0 psid     Check valve opens below 1 0 psid        2               Leaking No  1 shut off valve     2  Parallel installation with leaky No  2 shut off valve          Dirty or damaged air inlet disc     2  Scale buildup on seat          Dirty or damaged air inlet disc   2  Damaged seat     ZURN   WILKINS  ZURN WILKINS    1747 Commerce Way  Paso Robles  CA 93446 Phone 855 663 9876 Fax 805 238 5766       IS720A  REV  4 13     www zurn com    
3.  in a building  provide a suit   able drain arrangement to drain off spillage from the air vent   5  Install valve at least 12 inches above the highest piping or water outlet down  stream of the Model 720A Pressure Vacuum Breaker   6  Always consult local codes for installation methods  approvals and guidance   7  The Model 720A Pressure Vacuum Breaker may be installed outdoors only if the  device is protected against any freezing conditions  Warning  do not block air vent  opening with insulation  Exposure to freezing conditions will result in improper  function or damage to the device  The installation location must be kept above 32  F     PLACING THE DEVICE IN SERVICE    After the installation of a Model 720A Pressure Vacuum Breaker has been completed  place  the unit in service as follows   1  Start with both shut off valves and test cocks closed  Open the inlet shut off valve until the  Pressure Vacuum Breaker is completely pressurized   2  A brief discharge from the air vent may occur while the device is pressurizing  The  discharge should cease by the time the shut off valve is in the full open position    TESTCOCKS  4     1    720A PVB   25MM        Fig 1    OUTLET SHUT OFF  VALVE  5           OUTLET DRAIN    VALVE  6     TO IRRIGATION  SYSTEM                                                    INLET  SHUT OFF  VALVE  3     MAIN SHUT OFF  VALVE  1                                   Nei    G T                                                    INLET DRAIN ____   VALVE  2
4. Model 720A    Pressure Vacuum Breaker   1 2   3 4   1   1 1 4   1 1 2   amp  2      ZURN     WILKINS       Installation U Testing Q Maintenance Instructions    INSTALLATION INSTRUCTIONS    CAUTION  Installation of Pressure Vacuum breakers must be performed by qualified   licensed personnel  Faulty installation could result in an improperly functioning device   The installer should be sure the proper device has been selected for the particular installation   ZURN WILKINS Model 720A Pressure Vacuum Breakers are for use on irrigation  industrial   and other non potable services where a health hazard could exist if a backsiphonage situ   ation were to occur  They must not be installed where backpressure may occur   Proper performance depends upon following these installation instructions and prevailing  governmental and industry standards and codes  Failure to do so releases ZURN WILKINS  of any liability that it might otherwise have with respect to that device  Such failure could  also result in an improperly functioning device   1  Before installing the ZURN WILKINS Model 720A Pressure Vacuum Breaker  flush the  lines thoroughly to remove all debris  chips and other foreign matter   2  The Model 720A must be installed in a vertical position  see Fig  1  to provide  proper operation of the air inlet valve   3  Provide adequate space around the installed unit so that the test cocks will be  accessible for testing and servicing   4  CAUTION  If installation of a Model 720A unit is
5. deral Safe Drinking Water Act Lead Free requirements  as of January 4  2014  this product can only be used in water sys           Maintenance    Clean all parts with clean water only     ONDARON    esting Procedures    Close inlet and outlet shut off valves before disassembling device    Remove canopy screws counterclockwise and remove canopy    Bleed off pressure by opening the No  2 test cock    Unscrew the bonnet from the body by turning counterclockwise    Remove the disc  amp  poppet assembly  check spring and spider assembly from body     After completing inspection  replace necessary parts and reassemble  Repair kits are available from your supplier     Retest according to  TEST PROCEDURES            TEST NO  1    Purpose  To test the opening pressure dif   ferential of the air inlet valve    Requirement  The air inlet valve shall open  when the pressure in the body is no less than  1 0 psi above atmospheric pressure  The air  inlet valve shall be fully open when the water  drains from the body     STEPS          Bleed water through both test cocks   to eliminate foreign material    2  Install appropriate fittings for test kit  hoses    3  Remove air inlet valve canopy    4  Install the high side hose of the differ   ential pressure gauge to test cock  2   Open test cock  2 and bleed air from  hose and gauge    5  Close  2 shut off valve then close  1  shut off valve    6  Slowly open the high side bleed needle  valve being especially careful not to  drop the pressure 
6. differential too fast   Record the pressure differential at which  the air inlet valve opens    7  Close test cock  2 and remove equip   ment    8  Open  1 shut off valve     TEST NO  2    Purpose  To test the check valve for tightness  in the direction of flow    Requirement  The check valve shall be drip   tight in the normal direction of flow when the  inlet pressure is 1 0 psi and the outlet pres   sure is atmospheric     STEPS     1  Attach high side hose of differential   gauge to test cock  1  Open test cock    1 and bleed all air from the hose and   the gauge by opening high side bleed   needle valve  Close high side bleed   needle valve    Close  1 shut off valve    Open test cock  2  The air inlet valve   will open and the water in the body will   drain out through test cock  2    When this flow of water stops  the dif    ferential pressure indicated by the   gauge after it has settled will be the   pressure drop across the check valve    This value must be 1 0 psi or greater    Record this value  If water continues   to flow out of test cock  2  then the  1   shut off valve is leaking    4  Close test cocks  1 and  2 and remove  equipment    5  Replace air inlet valve canopy    6  Open  1 shut off valve  then  2 shut   off valve     iN    CANOPY  SCREW N z CANOPY  BONNET   N    PLASTIC    SY WASHER  O RING   O          t   DISC amp   ES   POPPET ASSY  SPRING        s     BALL VALVE li A          TEST COCK 2 J                Troubleshooting  PROBLEM POSSIBLE CAUSES 
7. outlet  drain valve  6  to the half open half closed   45    position after  blow out  process is  completed    6  If drain valves  2  amp  6  are not part of  the system  and if air pressure is not used  to  blow out  the system  the internal com   ponents of the pressure vacuum breaker  should be removed for the duration of the  winter    7  Leave all drain valves  2  amp  6   shut off  valves  3  amp  5  and test cocks in the half  open half closed position  45    for the  duration of the winter to prevent freezing   Caution  Be certain that main shut off  1   remains tightly closed to prevent refilling of  the system  Also  the main shut off valve  must be resilient seated to insure no leak   age of water into the system        be limited to our agreement to repair or replace the valve only     WARRANTY  ZURN WILKINS Valves are guaranteed against defects of material or workmanship when used for the services recom   mended  If in any recommended service  a defect develops due to material or workmanship  and the device is returned  freight prepaid   to ZURN WILKINS within 12 months from date of purchase  it will be repaired or replaced free of charge  ZURN WILKINS   liability shall          or other reproductive harm     Proposition 65 Warning This product contains chemicals known to the State of California to cause cancer or birth defects          tems considered non potable  Please contact your local water utility for further requirements        In accordance with U S  Fe
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
MANUEL MONTAGE/UTILISATION  DCV 700 DC Drives Software Description ABB Industry  システムコントローラ Control Pack CP-317M  木製防火 ドア (開き戸) 施工業者様へ  Air King Fan 9020 User Manual  MODEL MA-300 - Pentair Water Literature  Beipackzettel  Clavier Contrôleur    Copyright © All rights reserved. 
   Failed to retrieve file