Home
Arrow VT1431 Instructions / Assembly
Contents
1. 4 Fasten overlaps using 4 bolts and nuts in each corner assembly 9484 Right Side Eave Channel 1 Parts Needed For Side Door Frames 9467 Ramp 1 9464 Lower Door Track 1 1 Position right side eave channel against support columns Fasten channel to corner panel Fasten col umns to side eave channel using 2 bolts and nuts on each column LongLeg on Top D 3 CT ShortLeg 2 Position lower door track inside Bottom gt the side floor frame Overlap with ramp and fasten from the bottom us ing 3 10 32x1 4 slotted head bolts and square nuts Opening Facing In 3 Position track inside right side eave channel directly over lower door track and ramp and fasten using 4 screws where shown Notch Toward Outside of Building 1 2 Between Ramp amp Panel 23 9474 Lintel 1 9481 Front Frame 1 Step 9 Parts Needed For 6 9480 Front Frame 1 9478 Front Column 2 Front Rear Frames 6947 Column Gusset 1 6938 Rear Frame 1 6939 Rear Frame 1 1 Fasten front frames at the top to front wall panels with 3 screws Do not fasten hole nearest door opening atthis time 2 Fasten front columns tothe frame at bottom and channel with 2 bolts Hint Pull front wall panel slightly away to tighten bolts 3 Position lintel across top of front frames and fasten with 2 bolts and nuts on both side
2. Short Parts Needed For Roll Up Door 7817 Spring Support Bracket 2 10455 Track Strut 2 1 Install spring support brackets to the roof beams using bolts shown 2 Attach the right and left horizontal track tothe right and left vertical track using bolts and nuts shown follow ing Wayne Dalton Instructions 3Fasten track struts to open hole on truss assembly using 1 4 20x1 2 hex head bolt and square nut Fas ten opposite end to spring support bracket and horizontal track using 1 4 20x1 2 hex head boltand square nut 7817 1 4 20 Square Nut Horizontal Track Horizontal Track 1 4 20 Square Nut 10455 1 4 20 x 1 2 Hex Head Bolt and Square Nut 10 32 Square Nut c Roof Beam 10 32x7 16 Bolt ux 10 32x7 16 Bolt and Nut 1 4 20 x 1 1 2 Hex Head Bolt 1 4 20 x 1 2 Hex Head Bolt 41 Parts Needed For Roll Up Door CAUTION FROM THIS POINT ON BE SURE l CHECK TO USE EXTREME CAUTION Be sure that the lift cables do not rub and or the rollers do not UNTIL THE DOOR IS PROPERLY bind in the track when door is opened or closed Recheck the SPRUNG AND OPERATING springs to be sure that there is equal tension on both springs This is extremely important for proper door operation 1 Attach S hooks to both springs Fasten sheave and sheave fork to 3 8 16 1 1 4 pring opposite ends of springs following Hex Head Bolt Wayne Dalton Instruction
3. Makes 8 to 12 20 30cm wide shelves in any length Brackets braces hardware included Lumber is not included Model No SS900 A Grey color 3 shelves e Holds up to 85 Ibs 38kg even weight distribution Some drilling required to fit buildings without mid wall bracing THIS PAGE WAS LEFT BLANK INTENTIONALLY PF THIS PAGE WAS LEFT BLANK INTENTIONALLY Foundation The Foundation For Your Building Concrete Slab The slab should be at least 4 10cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your foundation 2 x 4 s bcm x 10cm will be removed once the concrete cures Concrete 6 Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of 1 part cement parts pea sized gravel 2 1 2 parts clean sand Prepare the Site Construct a Foundation 1 Dig a square 6 15cm deep into the ground remove grass 2 Fill up to 4 10cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 4 Construct a wood frame using four planks of 2x4 5cm x 10cm lumber 5 Pour in concrete to fill in the hole and the frame giving a total of 4 10cm thick concrete Be sure surface is level Allow 3 5 hours for construction and a week for concrete curing time Note Before beginning construction check local building codes regarding
4. Step 3 BXI8 The roof beams join the gables to the truss and supports the roof panels Assembled 1 Align the holes on a left and right roof beam back to back and fasten p together using 8 bolts and nuts Make 10 assemblies 2 On the 14x31 fasten roof beams together in the same manner Make 5 assemblies 8 ES EE _ 9 A Small Holes on Top Align End Holes _ Before Tightening Bolts and Nuts 18 9481 Front Frame 1 9480 Front Frame 1 Step 4 Parts Needed For e 9475 Side Floor Frame 4 Floor Frame Assembly BX19 9460 Side Floor Frame 2 14x31 1 Place the floorframe pieces onthe foundation Assemble the 4 corners of the floor frame using 3 bolts from the bottom with nuts on top at each corner as shown Step 5 Parts Needed For 6 Gusset Center Column BX20 1 Fasten side floor frames together with a column gusset using 2 bolts from the bottom and nuts on top At rear of building repeat procedure 2 Position center column assem blies where floor frames are joined and fasten to gusset with 8 bolts Repeat procedure on sides of build ing for the 14x31 NOTE Support center columns with stakes or other means until wall panels are attached 3 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE Do not fasten the floor frames to your foundation at this time You wil
5. gt 14 5 EA e gt oj Z pes 4 52 gt 5 B2 2 58 RN un lt 6947 Column Gusset 2 amp 6965 Inner Diagonal Brace 2 6964 Lower Chord 2 6958 Inner Truss Bracket 4 9 6963 Upper Chord 2 6966 Outer Diagonal Brace 2 9 7022 Eave Bracket 4 6959 Outer Truss Bracket 4 9 6962 Vertical Brace 2 9497 Outer Truss Bracket 4 e 7004 Right Shear Plate 2 6967 Splice Plate 1 9 Parts Needed For Truss Assembly Step 1 BX16 7003 Left Shear Plate 2 1 Assemble 1 2 truss at a time At tach column gusset to lower chord securely using 1 4 20x1 2 hex head bolts and square nuts All other con nections are to be made loosely 2 Fasten lower chord to upper chord and eave bracket to upper chord 3 Fasten vertical brace to lower chord 4 Fasten right shear plate and left shear plate to vertical brace and upper chord 5 Fasten inner diagonal brace to upper chord and lower chord 6 Fasten 2 inner truss brackets to upper chord and lower chord and inner diagonal brace as shown Mounting Flange of Brackets Must Face Towards Center Of Truss Assembly T Fasten outer diagonal brace to upper chord and lower chord 8 Fasten 2 outer truss brackets to upper chord lower chord and outer diagonal brace 9 Fasten 2 outer truss brackets to upper and lower chords 10 Square up 1 2 truss adjust and tighten all fasteners 1 1 Assemble the
6. other half oftruss 1 2Splice both halves together with the splice plate and join with 4 10 32x7 16 bolts and square nuts through vertical brace Make 1 assembly for the 14x21 Make 2 assemblies for the 14x31 Leave Hole On IMPORTANT 6967 This Side Open Square Up For Track Strut Half Truss e 1800 RO Ny 16 9494 Right Gable 2 Parts Needed For 9495 Left Gable 2 Step 2 6955 Inner Gable Bracket 4 Gables Column Assemblies 9496 Outer Gable Bracket 4 M 9490 Center Column 6 14x21 10 14x31 The gables go on top of the front and rear walls to support the roof beams The center columns supportthe truss and the framework 2 Align the holes on the center columns back to back and fasten together using 6 bolts and nuts Make 3 assemblies for the 14x21 NOTE Make 5 assemblies for the 14x31 The gables are packed nested together and might be mistaken 3Set these pieces aside for later as as one piece Carefully separate sembly them before continuing 1 Attachthe inner and outer gabe gt LC ES brackets to the gables using bolts i washers and nuts where shown NOTE Mounting leg of bracket must face toward outside of building Washer 6955 Attach Narrow Flange STEP of Gable Brackets EN to Gable 17 10457 Left Roof Beam 10 Roof Beam Assemblies 9462 Roof Beam 10 14x31 e Parts Needed For e 10456 Right Roof Beam 10
7. stp PN a Top View Spacer 27 Step 13 Right Gable Assembly 1 BX28 1Liftandfastena right gable assem bly at top of lintel using bolts and nuts 2Spread the 2 halves of a roof beam assembly and fasten the roof beam to the outer gable bracket using 2 bolts and nuts Hint The holes along the length of the beam must be on the top surface and 4 hole cluster must be fastened toward truss 3Fasten the outer end of the roof beam to the outer truss bracket of the truss using 2 bolts and nuts Repeat Steps 2 through 3 for the next roof beam assembly 28 Parts Needed For Gables Roof Beams Roof Beam Assembly 8 Left Gable Assembly 2 Right Gable Assembly 1 9462 Roof Beam Assembly 5 14x31 1 Lift and fasten a left gable assem bly in the same manner 2Join the left and right gables to gether using a bolt and nut in the third hole from the bottom only 3 Apply the weather stripping along the mating edge of the left and right gables as shown Cut the weather stripping to length Ainstall roof beam assemblies to the left side of building in the same manner Slide a roof beam assem bly over center gable flange and other end over shear plates on truss and fasten as before Repeat roof beam procedure for the opposite end of building Note that 4 hole cluster in roof beam assembly must be faste
8. 06 Web ANCHOR KITS Model No AK4 Anchor Kit contains heavy duty steel augers 60 18m of steel cable and 4 cable clamps No digging or concrete ARROW pouring just insert cable under roof U 7 XL over roof beams into augers and twist es augers into the ground For buildings larger than 10 x9 use 2 kits Model No AK100 New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included Model No AK600 Earth Anchor Kit anchors any size Arrow building to the ground Each kit contains heavy duty hot dipped galvanized steel corner gussets and 4 earth anchors TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 65cm steel channels M plus five heavy duty snap in gt hangers and a small tool holder for i screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all Arrow storage buildings SHELF UNITS Heavy duty galvanized steel shelf units help organize storage space They easily mount on the wall or sit on the floor Fits all Arrow buildings SS Fh Model No 58404
9. Owner s Manual amp Assembly Instructions BXO0I Model VT1421 A O 1431 1 ll 697 68612 697 68613 A LI World s Leading Maker of Storage Buildings CAUTION SOME PARTSHAVE SHARP EDGES CARE 713771207 gt BUILDING DIMENSIONS Size rounded off to the nearest foot Exterior Dimensions Storage Area Roof Edge to Roof Edge Sq Ft Cu Ft Width Depth Height Approx Foundation Size Size 14 x21 164 x255 1 2 291 2527 169 260 3 4 116 14 x31 164 x370 1 2 422 3663 169 375 3 4 116 4 3 6 4 4 17mx6 49m 27 0m 71 6m 4 3 9 5 4 17 9 41 39 2m 103 7m 4 29 9 54 2 95 4 29 6 62 2 95 MUST BE TAKEN WHENHANDLING THE VARIOUS PIECES TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES WHEN HANDLING METAL PARTS Interior Dimensions Wall to Wall Width Depth Height 164 255 1 2 114 1 2 164 370 1 2 114 1 2 4 17m 6 49m 2 91m 4 17m 9 41m 2 91m BEFORE YOU BEGIN Owner s Manual Before beginning construction check local building codes regarding footings location and other requirements Study and understand this owner s manual Important information and helpful tips will make your construction easier and more enjoyable Assembly Instructions Instructions are supplied in this manual and contain all appropriate information for your building model Review all i
10. SUB KIT Remove from bag and save for Step 24 65004 8Ax5 16 Screw 813 14 21 65103 65900 66098 1092 14 31 8 32 Hex Nut 2 10Bx1 2 Black Screw 4 Plastic Spacer 6 REMAINING HARDWARE PIECES lt 7022 Eave Bracket Weather Stripping 7972 Roof Trim Cap 66446 Arrow Logo 4 14x21 67293 1 Door Handle 2 right amp 2 left Peak Cap 2 8 14x31 67545 1 14 21 2 14x31 LockBracket 1 amp 00 67488 66464 2 3 16 1 5 16 66769 66260 66382 1 4 20 1 1 2 Heavy S Hook Door Slide 2 Handle 2 Lower Door Guide 2 Bolt 2 Parts List Carton 1 through 5 contain parts for a 14 x 21 Page 14 contains the additional parts for a 14 x 31 Assembly Part Part Key No Number Description Carton 1 Carton 2 Carton 3 Carton 4 Carton 5 2 2 2 2 6 4 4 4 4 2 2 2 2 2 1 2 2 2 1 2 2 1 2 2 2 2 2 2 2 1 1 6 4 4 2 2 Left Roof Trim Right Roof Trim Track Wall Panel Corner Panel Front Wall Panel Door Jamb Right Door Jamb Left Door Jamb Right Gable Left Gable Door Horizontal Door Brace Ridge Cap Side Roof Trim Lintel Side Floor Frame Side Wall Channel Right Side Eave Channel Left Side Eave Channel Right Roof Beam Left Roof Beam Rear Frame Rear Frame Right Rear Wall Channel Left Rear Wall Channel Column Gusse
11. extra fasteners have been supplied for your convenience PLAN AHEAD Watch the Weather Be sure the day you select to install your building is dry and calm Do not attempt to assemble your building on a windy day Be careful on wet or muddy ground Teamwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the materials you will need Required Required Eye Goggles Work Gloves No 2 Phillips Screwdriver Step Ladder Optional Time Savers Foundation Preparation With Hardened Magnetic Tip e Utility Knife Scissors Wrench Nut Driver Hammer and Nails Note A power screwdriver or vari e Pliers Electric Cordless Drill Spade or Shovel able speed drill with Phillips tip at s Hands IP S tachment can speed assembly by Carpenter s Level quare and rower as much as 40 Tape Measure String for squaring frame e Lumber and or Concrete Selecting and Preparing Your Site Before assembly you will want to decide on a location for your building The best location is a level area with good drainage Allow enough working space for ease of
12. fficult and unsafe CARE amp MAINTENANCE Finish For long lasting finish periodically clean and wax the exterior surface Touch up scratches as soon as you notice them on your unit Immediately clean the area with a wire brush wash it and apply touch up paint per manufacturer s recommendation Roof Keep roof clear of leaves and snow with long handled soft bristled broom Heavy amounts of snow on roof can damage building making it unsafe to enter Doors Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the entire floor area with good ventilation will reduce condensation Other Tips Wash off inked part numbers on coated panels with soap and water e Silicone caulking may be used for watertight seals throughout the building Do not store swimming pool chemicals in your building Combustibles and corrosives must be stored in air tight approved containers Keep this Owner s Manual and Assembly Instructions for future reference ACCESSORIES BW
13. footings location and other requirements Welded Wire Fabric Reinforcing Rods Reinforcing Rods Note Finished Slab dimensions with lumber removed Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected Below are recommended ways of anchoring Arrow Anchoring Kit Model No AK4 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 Wood Screws There are 1 4 0 63cm dia Contains 4 Anchors with Cable Clamps and holes provided in the frames for proper anchoring installation instruction OVER THE BEAMS AND INTO THE GROUND Arrow Anchoring Kit Model No AK100 or 68383 Anchoring into Concrete Recommended for use with the concrete foundation 1 For poured concrete slab or footing or patio blocks Contains Corner gussets perimeter clips hardware Use 1 4 x 2 Lag Screws 1 4 masonary drill bit and installation instruction 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 Lag Screws 10 Hardware for Building KIT 1 65101 1 4 20 Square Nut 132 14x21 65408 65958 65914 254 14x31 10 32x1 4 Bolts 3 8 32x7 8 Bolt 2 6Ax7 8 Screw 4 WASHER KIT 65989 65106 65943 66646 1 4 20x1 2 Hex Head Bolt 10 32 Square Nut 10 32x7 16 Bolt Washer 134 14x21 505 14x21 502 14x21 960 14x21 256 14x31 677 14x31 674 14x31 1400 14x31 HARDWARE
14. g as pre viously done for base 5 Anchor frontframeto concrete with 1 4 diameter expandable anchor bolts or other means where shown LINE 2 nA I IC e n m m String To Straighten Side Before Anchoring STEP 1 1 uic Left Track gt Right Track Support 107 Support 2 72m 31 NEED 5 Left Right Roof Panels 9493 Left Roof Panel 2 Step 17 9 Parts Needed For 9 9492 Right Roof Panel 2 Installing the roof panels is best done with an 8 step ladder Each screw andboltinthe roof requires a washer LEFT ROOF PANEL RIGHT ROOF PANEL SCREWS TO ROOF BEAM SCREWS TO ROOF BEAM Pg SLOTTED HOLES MN AT TOP Jl m m EY le FASTEN AT OVERLAP 1 n 8 i ill i t SMALL HOLES uw AT BOTTOM Position rightand left roof panels at the front corners and fasten to the gable and roof beams using screws and bolts as shown Do not fasten FASTEN thelowerendofthepanelstotheside SABE eave channel at this time FASTEN TO GABLE Hint Follow the fastener sequence shown for proper alignment 2install the right and left roof pan els for the rear corners in the position shown 8 thru 11 Step 18 BX33 1 Position a roof panel overlapping rib of left corner roof panel Fasten overlap at center of roof panel r
15. h nuts 3 When you have attached all wall panels in the correct positions the building will look like this 4 Fasten right and left track sup ts to the front columns using 5 05191 9009 pores 10 me 9 COM 5 using Center of Panel Screwed bolts from the inside and nuts out to Wall Channel side CrimpedRib NOTE Undemeath Flanges on track supports must zh face towards front of building Bolt and nut does not go thru wall channel at overlap 26 Step 1 2 Parts Needed For 6 9477 Door Jamb 2 Wall Channel Door Jamb 9466 Wall Channel 2 BX27 The door jambs reinforce the door opening and provide an attractive trim Follow these steps for both door jambs 1 Place wall channels behind wall panel large hole towards door open ing Loosen wall panel and fasten wall channels to side wall channels using 1 screw under panel Replace panel and fasten wall channels to panel using 3 screws 2Overlap the rib of wall panel with a gt Spacer door jamb and fasten at top to side 7 6 eave channel and bottom to side floor frame using 6Ax7 8 screws and spacers Positon spacer inside wall panel rib and channel or frame 3Fasten door jamb at middle holes using 8 32x7 8 bolts spacers and hex nuts Spacer is positioned be tween wall panel rib and wall chan nel ZFasten outer flange of door jamb to wall panel using 4 screws Wall Channe
16. ib using a bolt and nut Fasten to roof beams as done before using screws 2install a roof panel on the left side of building Repeat procedure with 2 more roof panels working side to side At the top beam end of panels fasten 2nd roof panel rib overlaps with a bolt and nut 3Cut the weather stripping tape into 6 strips each strip about 2 bcm long Press 2 strips over the bolt heads on overlaps at the top of pan els Save the other 4 strips forthe rest of roof Acover the join at the peak with weather stripping tape Unroll the tape and press it down over the open ing at the ridge as you install each roof panel Do not cut the tape at this time Crimped Rib is Always Overlapped by Wide Rib of Adjacent Panel Weather Stripping Parts Needed For Roof Panels 9491 Roof Panel 4 ROOF PANEL SCREWS TO ROOF BEAM SLOTTED HOLES AT TOP 1 SCREWS TO is TEN ROOF BEAM OVERLAP FIRST SMALL HOLES Follow Fastener Sequence AT BOTTOM NOTE On the 1431 cut the weather stripping tape into 10 strips WeatherStripping Tape Parts Needed For Step 19 Ridge Cap BX34 install ridge cap on the com pleted roof section using bolts and nuts Do not fasten the ends of the ridge cap at this time 9509 Ridge Ca
17. ide 9472 Wide Side REAR 9472 SIDE TOP VIEW SIDE STEP EN 9472 9472 9473 Crimped Rib EJ Underneath Hi Washer 9482 Right Front Wall Channel 2 9465 Support Column 2 Parts Needed For 9483 Left Front Wall Channel 2 9469 Side Door Channel 2 Ste 7 e 9476 Side Wall Channel 6 9468 Corner Door Channel 2 Mid Frames 6942 Right Rear Wall Channel 2 6 9461 Side Wall Channel 4 14x31 6943 Left Rear Wall Channel 2 BX22 The mid frame pieces give rigidity to 5 Install support column to side the sides and rear wall floor frame and side door channel fastening channel to center column Install 2nd support column to side floor frame and corner door chan nel Fasten channel to corner panel and left rear wall channel NOTE Before installing side wall channels decide at which location you want the side entrance door Do not install the 1x4 side wall channels at 1 of the 4 corner loca tions 1 Fasten side wall channels to NOTE center columns using 2 bolts and to On the 1431 attach the side wall channel between the corner panels using 4 screws center columns using bolts 2 Overlap with the right and left front wall channels fasten to front wall panel using 3 screws Do not fasten hole nearest door open ing 3 Overlap with right and left rear wall channels and fasten to column and wall panel
18. ion to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint 713771207
19. l anchor the building after it is erected The floor frame must be square and level or holes will not align i 2282225 6047 STEP e 6947 1431 A 20 6947 Column Gusset 3 14x21 5 14x31 Center Column Assembly 3 14x21 Center Column Assembly 5 14x31 Parts Needed For 9471 Wall Panel 2 9473 Front Wall Panel 2 Corners 9472 Corner Panel 4 The remainder of the building assembly requires many hours and more than one person Tie down and support assembly before the end of the work day A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall re quires a washer 1 Position a corner panel at the corner of the floor frame as shown The widest part of each corner panel must be placed along the side of the building for all 4 corners Fasten the corner panel to the floor frame with 4 Screws Support the corner panel with a step ladder until a wall panel is attached 2 Attach the front wall panels tothe front corner panels as shown 3 Attach the wall panels to the rear corner panels as shown NOTE Be careful to install the correct panel in each position as shown 4 Double check the part numbers of the wall panels before proceeding The floor frame must be square and level or holes will not align Narrow S
20. moving parts into position during assembly Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside Before you begin the first steps in assembling your parts a foundation should be constructed and an anchoring system should be ready to use SAFETY FIRST Safety precautions are important to follow throughout the construction of your building eCare must be taken when handling various pieces of your building since some contain sharp edges Please wear work gloves eye protection and long sleeves when assembling or performing any maintenance on your build ing fety edge safety edge Keep children and pets away from worksite to avoid distractions and any accidents which may occur eNever concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it ePractice caution with the tools being used in the assembly of this building Be familiar with the operation of all power tools Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call 1 800 851 1085 Do not attempt to assemble the building on a windy day because the large panels acting as a sail can be whipped about by the wind making construction di
21. ned toward truss eee STEP EA 1421 p ae NOTE On the 1431 attach the roof beams between the truss assemblies as before gt Weather Stripping OF SAIS 29 9 Parts Needed For e 6954 Gable Truss Strut Step 15 Gable Truss Strut 8X30 1Fasten gable truss strut to the middle roof beam behind the front gable by placing tab on the end of the strut between the roof beams Align the tab with the holes and fasten the strut with 2 bolts and nuts 2Fasten the lower end of the strut to the center gable flange with 2 bolts Repeat Steps 1 and 2 for the oppo site end of building 3At the truss assembly the gable struts are attached between the middle roof beam and the vertical brace NOTE Do not tighten bolts and nuts until all Struts are assembled 6954 STEP 6954 6954 5 Squaring the Building 1 Square the building on the founda tion and at the top by measuring diagonally from corner to corner as previously done 2Use string to check and see if the sides and rear of building are straight NOTE not bowed inward or outward The 107 2 72m door opening must be held for proper door 3Level the full perimeter of the floor alignment Measure between the left and right track support frame Shim under with wood shin gles if necessary Asquare the front of buildin
22. nstructions before you begin and during assembly follow the step sequence carefully for correct results Foundation and Anchoring Your storage building must be anchored to prevent wind damage A foundation is also necessary as a base in order to construct a square and level building Anchoring and foundation materials are not included with your building We recommend the use of an Arrow Anchoring Kit as an effective method of securing your building to the foundation Available by mail order or at your local dealer or you may construct the foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these numbers before the must agree with the numbers on the parts list elf you find that a part is missing include the model number of your building and contact Arrow Group Industries Inc Customer Service Department Route 50 East Breese Illinois 62230 1 800 851 1085 Separate contents of the carton by the part number while reviewing parts list The first few steps show how to join related parts to make larger sub assemblies which will be used later Familiarize yourself with the hardware and fasteners for easier use during construction These are packaged within the carton Note that
23. or behind door jamb into the lower door track Horizontal Door Brace 3Position the top of the door so that the holes in the door line up with the holes in the door slides it the door to the door slides 2 L9I using two 10Bx1 2 screws per door Lower Door Track OF TRACK slide NOTE The holes in the door slides allow you to adjust the door Place the door in the middle holes Door Slide DPosition door handle lock bracket aligned with handle holes against 10Bx1 2 Screw door jamb Using a pencil mark through holes onto jamb remove bracket and drill 2 1 4 diameter holesin jamb Fasten bracketto door jamb using 2 bolts and nuts 39 St 25 Parts Needed For e Right Vertical Track ep Vertical Tracks Roll Up Door Left Vertical Track BX40 1 Attach rightandleftverticaltracks loosely to right and left track supports using 1 4 20x1 2 hex head bolts and square nuts NOTE Please refer to the Wayne Dalton Instruction Manual for assembly of the garage door and track compo nents This manual is packed with Flagangle the garage door The Arrow Own ers Manual will be used for the Right Track Support attachment of the garage door to he building and for spring snubbe Stud Plate safety cable installation 1 4 20x1 2 Hex Head Bolt gem Jamb Bracket Long Square Nut Left Vertical Track 49 1 8 Jamb Bracket Long 28 1 2 Jamb Bracket 3
24. p 1 Parts Needed For Step 20 Roof Panels amp Ridge Cap 9491 Roof Panel 6 BX35 9509 Ridge Cap 1 1 Install 4 roof panels working side to side NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up 2Unroll the weather stripping tape press it down firmly but do not cut install the second ridge cap over lapping the first ridge cap Align the holes and fasten using bolts Ainstall 2 more roof panels Fasten 5th top overlap and cover with weather strip over head of bolt Pa 9491 Step 21 BX36 1 Install 2 more roof panels 2install the third ridge cap overlap ping the second ridge cap as before Temporarily remove the rear corner roof panels and install the remaining 2 roof panels Fasten 7th top over lap and cover with weather strip over head of bolt 3install the corner roof panels Fas ten ridge cap using bolts and nuts ZFasten the lower end of the panels to the side eave channels using screws and washers Parts Needed For Roof Panels Ridge Caps 10n the 1431 install 2 more roof panels 2install the third ridge cap overlap ping the second ridge cap as before Install6 more roof panels while fas tening 8th and 9th top overlap and cover with weather stri
25. p over head of bolt Fasten ridge cap using bolts and nuts Sinstall2 roof panels andthe fourth ridge cap Temporarily remove the rear corner roof panels and install the remaining 2 roof panels Fasten 11th top overlap and cover with weather strip over head of bolt install the corner roof panels Fas ten ridge cap using bolts and nuts 5 Fasten the lower end of the panels to the side eave channels using screws and washers 9509 Ridge Cap 1 9512 Ridge Cap 1 1431 9491 Roof Panel 4 14 21 12 14x31 9509 Cut WeatherStripping and Fold Under Parts Needed For o 7023 Left Roof trim 2 7024 Right Roof Trim 2 1 9510 Side Roof Trim 6 Roof Trim 9513 Side Roof Trim 2 1431 1 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap NOTE A single screw fastens both trim pieces at the overlap 2 Position left and right roof trim to the ends of roof noting that trim slips under ridge cap but fits on top of side roof trim 3Fasten roof panel rib trim peak cap and ridge cap together using bolts and nuts Fasten the remaining peak cap in the same manner Zusing yourthumb and index finger overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim ca
26. ps fit onto right and left corners 5Fasten trim to side trim using a screw and washer into roof panel 6Fastenthe rooftrim caps tothe side trim using a screw 37 Parts Needed For Side Door Assembly 10490 Door 1 10505 Horizontal Door Brace 2 9500 Vertical Door Brace 2 NOTE To assemble door to slide from left to right opening position door with handle holes on left side of door Position handle holes on right side if door is to slide from right to left opening Each bolt and screw in the door re quires a washer Hola the vertical door brace against the inside surface of door align holes and fasten with 3 screws 2Repeat Step 1 for remaining verti cal door brace Attach the handle tothe door with 2 bolts and nuts as shown a horizontal door brace onto the top edge and bottom edge and fasten with 2 bolts and nuts on each DAttach the lower door guides as shown END VIEW SHOWING Horizontal Door Brace 10505 Parts Needed For Step 24 Door Installation 7972 Door Handle Lock Bracket 1 BX39 Door Assembly 1 1 Position door slides onto the legs from the end of door track as shown in the end view 100881 STEP 4t Door Slide E E 2From inside the building put the 1 bottom of the do
27. s 4 Position column gusset over rear columns and fasten with 8 bolts At tach rear frames to gusset using 2 bolts and opposite end to wall panel using 3 screws II 9480 III D r 1 1 i 1 1 1 1 4 1 4 if 1 24 Truss Assembly 1 14x21 2 14x31 9 Parts Needed For e 9484 Right Side Eave Channel 2 9485 Left Side E Ch 2 Step 10 Truss Top Frames ere oe BX25 1 Position Truss Assembly on build ing by sliding column gussets over center columns and fasten with 8 bolts and nuts on each gusset 2 Position right and left side eave channels over eave brackets and fasten with a bolt and nut Front and rear frames overlap side eave chan nels Fasten overlaps with 3 bolts and nuts Fasten corner panels to channels using 4 screws NOTE On the 1431 fasten the side eave channels over eave brackets using bolts and nuts 9463 i d EC EO 25 10458 Right Track Support 1 Walls Panels Track Supports 910459 Left Track Support 1 Parts Needed For 9470 Wall Panel 17 14x21 8 14x31 Step 11 BX26 Each wall panel has a crimped rib on 1 side The crimped rib should go under the rib of the panel that follows it 1 Fasten the wall panels at the top and bottom with screws 2 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs using screws and bolts wit
28. s Attach spring assemblies to spring support brackets 7 Hook 7817 S fe Bises 3 8 16 ae Hex Nut Steel Sheave Thread cable with one 3 hole clip 3 Hole Clip attached thru a hole in the flagangle then thru the spring and spring sup port bracket Pull tight and attach the 3holecliptothe free endofthe cable Snubber Cable Snubber Flagangle NOTE Recheck all door fasteners and hardware to be sure that each fastener is tight and secure 42 S 28 9 Parts Needed For tep Right Left Door Jambs 1 Position right and left door jambs to right and left track supports with notched end on top facing inside building 2Fasten long flange to track support and short flange to front wall panel using screws and washers 9488 Right Door Jamb 1 9489 Left Door Jamb 1 1421 1431 697 68612 697 68613 A BX44 SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished edges or where scrapes and nicks occur in the protective coating through normal assembly handling and use Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addit
29. t Gable Truss Strut Inner Gable Bracket Inner Truss Bracket Outer Truss Bracket Vertical Brace Upper Chord Lower Chord Inner Diagonal Brace Outer Diagonal Brace Splice Plate Left Shear Plate Right Shear Plate Spring Support Bracket Lower Door Track Support Column Wall Channel Ramp Corner Door Channel Side Door Channel Front Column Front Frame Front Frame Right Front Wall Channel Left Front Wall Channel Right Track Support Left Track Support Center Column Outer Gable Bracket Outer Truss Bracket Vertical Door Brace Track Strut Roof Panel 14 Right Roof Panel 2 Left Roof Panel 2 Wall panel 17 12 en B ES N T CI 2 Z p Q x p E un un lt 13 Additional Parts for amp 14 x 31 Carton 6 amp 7 Assembly Part Part Wayne Dalton Key No Number Description Door Carton 8 Carton 9 Wall Panel Roof Panel Column Gusset Gable Truss Strut Inner Truss Bracket Outer Truss Bracket Vertical Brace Upper Chord Lower Chord Inner Diagonal Brace Outer Diagonal Brace Splice Plate Left Shear Plate Right Shear Plate Side Floor Frame Side Wall Channel Roof Beam Side Eave Channel Center Column Outer Truss Bracket Ridge Cap Side Roof Trim 8 8
Download Pdf Manuals
Related Search
Related Contents
Victor GZ-MC100 User's Manual i p8 digital reproducer overview - Film-Tech Manual de instalación, mantenimiento y funcionamiento Philips Tornado T2 15W Fujitsu FI-4860C User's Manual HP Laptop NX9008 User's Manual IDROBUILD GIUNTOFLEX 120_fr Verbatim Sound Isolating Earphones この取扱説明書には取り付け方や電球の交換方法、 お Copyright © All rights reserved.
Failed to retrieve file