1. ASSEMBLY INSTRUCTIONS um eae 2918 5 2915 6 FEATURE LINE STEEL SHELVING 2918 5 2918 6 2924 5 2924 6 PARTS LIST Nos 2912 6 2915 6 2918 6 2924 6 Nos 2912 5 2915 5 2918 5 2924 5 O 6 Shelves CL 5 Shelves D 4 Posts J 4 Posts D 2 Long Back Braces 2 Long Back Braces C 4 Short Side Braces O 4 Short Side Braces O NB28 Nuts and Be ts Q NB28 Nuts and Bolts 24 Va x 20 x 12 NIB 24 Ya x 20 x 2 NIB 4 x 20 x 3 4 NIB 4 Va x 20 x 3 4 NIB J3 16 Kwik Klips 12 Kwik Klips HOW TO ASSEMBLE UNITS l Preassemble end frames using 2 posts and 2 side stringer braces Bolt side brackets through side flanges at ninth hole from each end See sketch Where 2 or more units are used intermediate frames can be preassembled to greatly speed up Set up time See sketch Use 4 20 x 34 bolts 2 Attach top and bottom shelf with bolts and nuts at two points of each corner 3 Stand box rack up tighten nuts and bolts 4 Insert kwik klips into positions that meet re quirements on all four posts Count equal num ber of holes on posts before inserting klips and shelves to assure level shelves A Shat E Back Grace 5 Bolt 2 long back braces in position diagonally B Post D Side brace across 2 back posts INTERMEDIATE UNIT END UNIT 6 Check unit for squareness and tighten all bolts and nuts 4400 routh packers avenue e chicago illinois 60609