Home
ShelterLogic 72874.0 Instructions / Assembly
Contents
1. weather conditions lf strong winds or severe weather is forecast in your area we recommend removal of cover Check with your insur ance carrier for any damage as you would for any other outdoor structure or personal property claims REPLACEMENT PARTS ASSEMBLY SPECIAL ORDERS Genuine ShelterLogic LLC replacement parts and accessories are available from the factory including anchoring kits for nearly any application replacement covers wall and enclosure kits vent and light kits frame parts zippered doors and other accessories All items are shipped factory direct to your door QUESTIONS CLAIMS SPECIAL ORDERS CALL OUR CUSTOMER SERVICE HOTLINE U S CUSTOMER SERVICE 1 800 524 9970 INTERNATIONAL CUSTOMER SERVICE 001 860 945 6442 CANADA CUSTOMER SERVICE 1 800 559 6175 HOURS OF OPERATION MON FRI 8 30AM 8 00PM EST SAT SUN 8 30AM 5 00PM EST CARE AND CLEANING A tight cover ensures longer life and performance Always maintain a tight cover Loose fabric can accelerate deterioration of cover fabric Immediately remove any accumulated snow or ice from the roof structure with a broom mop or other soft sided instrument Use extreme caution when removing snow from cover always remove from outside the structure DO NOT use hard edged tools or instruments like rakes or shovels to remove snow This could result in punctures to the cover DO NOT use bleach or harsh abrasive products to clean the fabric cover Cover is easily cleaned
2. A Assemble end and middle ribs as shown in Detail B and Detail C Securely fasten all of the joints with the hardware indicated DETAIL DETAIL C End Ribs Middle Ribs 10121 10131 10132 10114 10114 2 Bolt 2 Bolt Item 19 Item 19 10126 All Connections _ All Connections 10121 10131 800464 10132 10132 10223 m 10223 10114 2 Bolt Item 19 10126 All Connections 10114 10126 2 Bolt 19 All Connections 05 10ET13 0B 3 INSTALL SIDE RAILS AND SHELTERLOCK STABILIZER BLOCKS A Place assembled first end rib in the staked area Place the ShelterLock on the upright as shown in Detail From the outside of the rib insert the bolt through the upright and then through the ShelterLock Place the plain end of the side rail over the bolt and nest it into the ShelterLock Install the nut onto the bolt and tighten Repeat these steps for the opposite side and all of the remaining ribs The side rails for the last rib will have two plain ends DETAIL D 4 INSTALL WIND BRACES A Attach wind brace between the end rib and the first middle rib as shown in Detail E Bolts attached at the cross rails should be inserted facing inside the shelter Assemble cover rails as shown END RIB End Rib Cross Rail Clamps Wind Brace 10135 Page 6 05 10ET13 0B 5 INSTALL TOP RAIL Place the f
3. WTH CALER CLP oe Ca wma a Bou tanner _ BOLT CARRIAGE 1 4 X 3 10210 BOLT CARRIAGE 1 4 x2 10114 BOLT CARRIAGE 1 4 X1 5 8 10115 SHELTERLOCK ANTI RACK DEVICE 42X28MM 800260 WIND BRACE FLAT ENDS 62 3 4 X1 1 8 DIA 10135 4 WAY COVER RAIL CLAMP 10111 3 WAY COVER RAIL CLAMP 1 5 8 PIPE 10112 3 WAY TOP CONNECTOR 10121 BASE FOOT 1 3 8 STEEL GRY 10113 CROSS RAIL SWEDGED 48 7 8 X1 1 8 DIA 10133 CROSS RAIL PLAIN ENDS 45 3 4 L 2 HOLES 10110 CROSS RAIL PLAIN END 47 1 1 8 DIA 10134 CROSS RAIL 50 1 2 X1 163 1 SWDG 2 HOLE CROSS RAIL 48 1 2 X1 163 PLAIN ENDS 2 BEND CORNER LEG 21 X1 5 8 DIA CORNER UPRIGHT TUBE 57 3 4 X1 5 8 DIA RAFTER PIPE 46 7 8 X1 5 8 SWG BOTH ENDS GRY SIDE BEND TUBE 15 X1 5 8 DIA TOP BEND TUBE 15 X1 5 8 DIA SWED UPRIGHT TUBE 67 3 4 X1 5 8 D 1 END DESCRIPTION PART NO ATTENTION FOR MISSING OR 10127 REPLACEMENT PARTS 800464 OR QUESTIONS PLEASE 10132 CONTACT 10131 CUSTOMER SERVICE 10126 1 800 524 9970 CANADA 1 800 559 6175 10128 20 carracE 14x3 BOLT caRRIAGE 14a te 1 SHELTERLOCK ANTI RACK DEVICE 42xzemm _ s00260 16 WINDBRACE FLAT ENDS 10135 15 4waycoverratciamp SWAY COVER RAIL CLAMP 1 5 8 PIPE 02 13 swaytopconnector 12 Bascroor taesrecLory Cross Rai sweveen 48 miexi Dia 1033 10 CROS
4. end rib Pass the top cross rail through the gap in the fabric in between the webbing and rib frame Re attach top cross rail to end rib Repeat Step B for side cross rails C If this connection has the wind brace on it remove the wind brace end before pulling the side rail Replace the cross rail and wind brace Replace the bolt and tighten Repeat this on the other side D At the bottom where the webbing exits the pocket on each side of end panel pull webbing to remove the slack Be careful not to pull the webbing through the other side of the webbing pocket Insert the S Hook on ratchet into hole on the leg bend Insert the webbing into the spindle of the ratchet and pull tight Wind the ratchet so that the webbing overlaps itself Position the end panel so that it is centered on the building before fully tightening the end panel F Tighten ratchets alternating from one side to the other until the end panel is centered and tight Zipper Door Panels Zippers must be closed when tightening end panel WRAP END PANEL EDGES TO INSIDE OF FRAME TOP CROSS WRAP END PANEL EDGES TO INSIDE OF FRAME SIDE CROSS RAILS ZIPPERS WEBBING SIDE VIEW OF END RIB Page 8 05 10ET13 0B 8 INSTALLING COVER AND COVER RAILS A Lay the cover on the ground next to the frame with inside of the cover the side with the pipe pockets facing down and the webbing on the front and rear of the corner of the bui
5. 10 W x 8 H or 10 H Peak Style Shelter Assembly Instructions DESCRIPTION 10 x 8 x 8 Peak Style Shelter Gray 10 x 8 10 Peak Style Shelter Gray Please read instructions COMPLETELY before assembly This shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE Before you start 2 individual recommended for assembly approximate time 3 hr ax Shelter_ogic 150 Callender Road atertown www shelterlogic com 1 800 559 6175 6 4 09 Page 1 05 10ET13 0B ATTENTION This shelter product is manufactured with quality materials It is designed to fit the ShelterLogic LLC custom fabric cover included ShelterLogic LLC Shelters offer storage and protection from damage caused by sun light rain tree sap animal bird excrement and light snow Please anchor this ShelterLogic LLC structure properly See manual for more anchoring details Proper anchoring keeping cover tight and free of snow and debris is the responsibility of the consumer Please read and understand the installation detail warnings and cautions prior to beginning installation If you have any questions call the customer service number listed below Please refer to the warranty card inside this package DANGER Prior to installation consult with all local municipal codes regarding installation of temporary shelters Choose the location of your shelter careful
6. 30 306 D 415 571 D 414 564 D 409 310 D 415 572 Page 2 05 10ET13 0B 10 W x 8 H Peak Style Frame Assembly Please read and understand instructions completely before assembly Layout out frame parts as shown END RIB 6 Ce eoo ns COVER RAIL e a l cross RAL PLANENDS assit mo CROSS RAIL 50 1 2 X1 163 1 SWDG 2 HOLE ATTENTION FOR MISSING OR REPLACEMENT PARTS OR QUESTIONS PLEASE BEND CORNER LEG 21 1 5 8 DIA _ as PARTNO Page 3 05 10ET13 0B CONTACT CUSTOMER SERVICE 1 800 524 9970 CANADA 1 800 559 6175 CROSS RAIL PLAIN END 47 X1 1 8 DIA 10134 CROSS RAIL 48 1 2 X1 163 PLAIN ENDS 2 H 02031 RAFTER PIPE 33 3 4 X1 5 8 SWG BOTH ENDS GRY 800464 18 17 16 Em ms CORNER UPRIGHT TUBE 57 4 3 2 10 W x 10 H Peak Style Frame Assembly Please read and understand instructions completely before assembly Layout out frame parts as shown TOP RAIL END RIB 25 END RIB Ca ROTEREN a SeeSee Ca ANCHOR AUGER SKIS
7. SRAILPLAINENDS 4534 L 2 HOLES 1mo 9 cRossRai pLa eno 4r x1 8 bia 8 CROSSRAIL so 1 2 x1 163 02030 7 CROSSRAIL 481 2 X1 163 PLAINENDS2H_ os Benn corner LEG 21x15 DIA we 5 CORNER UPRIGHT TUBE 4 RAFTER PIPE 46 718 x1 518 SWG BOTHENDS GRY 800464 2 tuse 1s xt sie bia 2 ToP Beno o SWED UPRIGHT TUBE 67 314 x1 518 D 1END 10125 Page 4 05 10ET13 0B ASSEMBLY OF PEAK STYLE GARAGE SHELTER NOTE FOR FRAME EXTENSION 70 8 the base frame dimension Your model may have more middle ribs than shown in the illustrations You will receive one extra rib for every extra 4 feet of building length that you purchase The basic frame assembly will remain the same The cover will be the correct size for the length of the building ordered 1 PLOTTING AND SQUARING UP THE FRAME lt 10 gt A Before building your shelter you should choose a flat area on your property and plot your shelter Stake out the area for the frame in the desired spot Check that it measures Nd ft 10 in width and the length would be determined by the size shelter you purchased Tie a rope diagonally from corner to corner LENGTH OF DETAIL A BUILDING B Measure across area end to opposite end See Detail A The measurement should be equal l lt 10 2 ASSEMBLE END AND MIDDLE RIBS
8. irst top rail under each end rib and secure it with a bolt as shown in Detail F The same cross rail should lay on top of the all middle ribs Secure the rails to the frame with the hardware indicated in Detail F The top rail attached to the last rib will be installed under the pipe Install the Top Rail OVER all Middle Ribs DETAIL F 10115 802630 6 PROPERLY ANCHOR THE FRAME A Anchors must be placed inside shelter at the corners of the shelter B Insert a pipe or steel rod through the eyelet of the auger and screw the anchor into the ground until the eyelet is sticking out of the ground by 1 2 so it can be anchored to the legs If ground is too hard dig a hole with a shovel or post hole tool Optional Fill with cement C Wrap cable provided through the eyelet of the anchor and around the frame as shown below Secure the cable with the clamps provided End Rib Anchors 15 Augers are for temporary use only We recommend 30 Augers be used 4 minimum for use in a permanent installation WARNING Serious injury to persons or property could result if cover is installed and shelter is not anchored and is left unattended Shelter must be securely anchored Page 7 05 10ET13 0B 7 DOOR AND SOLID END PANEL INSTALLATION A Hold end panel at the top center with white inner surface facing inside of the shelter Wrap the edges of the fabric panel around the end rib B Disconnect top rail from the
9. lding B Pull cover over the frame making sure to center cover on frame There should be an equal amount of over hang at all four corners Insert the S Hook on ratchet into hole on the leg bend Insert the webbing into the spindle of the ratchet and pull tight Wind the ratchet so that the webbing overlaps itself D Disassemble cover rails and slide through fabric pockets at each leg and reattach with clamps to each leg Repeat this on other side Push down on cover rails to tighten cover before tightening bolts completely E Check and tighten Ratchets and Cover Rails monthly to ensure the cover is tight NOTE The ShelterLogic logo should be oriented as shown below CORRECT REAR _ 10110 COVER RAILS Webbing and Ratchets Securing Cover End Rib Cross Rail Clamps Middle Rib Cross Rail Clamps 10112 7 10115 10111 01010 9 05 10ET13 0B
10. ly DANGER Keep away from electrical wires Check for overhead utility lines tree branches or other structures Check for underground pipes or wires before you dig DO NOT install near roof lines or other structures that could shed snow ice or excessive run off onto your shelter DO NOT hang objects from the roof or support cables WARNING Risk of fire DO NOT smoke or use open flame devices including grills fire pits deep fryers smokers or lanterns in or around the shelter DO NOT store flammable liquids gasoline kerosene propane etc in or around your shelter Do not expose top or sides of the shelter to open fire or other flame source CAUTION Use CAUTION when erecting the frame Use safety goggles during installation Secure and bolt together overhead poles during assembly Beware of pole ends PROPER ANCHORING AND INSTALLATION OF FRAME PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER ShelterLogic LLC is not responsible for damage to the unit or the contents from acts of nature Any shelter that is not anchored securely has the potential to fly away causing damage and is not covered under the warranty Periodically check the anchors to ensure stability of shelter The preferred anchoring system includes the use of bolted cement wedge lags for the frame ShelterLogic LLC cannot be responsible for any shelter that blows away NOTE Your shelter s cover can be quickly removed and stored prior to severe
11. with mild soap and water WARRANTY This shelter carries a full limited warranty against defects in workmanship ShelterLogic LLC warrants to the Original Purchaser that if properly used and installed the product and all associated parts are free from manufacturer s defects for a period of 1 YEAR FOR COVER FABRIC END PANELS AND FRAMEWORK Warranty period is determined by date of shipment from ShelterLogic LLC for factory direct purchases or date of purchase from an authorized reseller please save a copy of your purchase receipt If this product or any associated parts are found to be defective or missing at the time of receipt ShelterLogic LLC will repair or replace at it s option the defective parts at no charge to the original purchaser Replacement parts or repaired parts shall be covered for the remainder of the Original Limited Warranty Period All shipping costs will be the responsibility of the customer Parts and replace ments will be sent C O D You must save the original packaging materials for shipment back If you purchased from a local dealer all claims must have copy of original receipt Check with your insurance carrier for any damage as you would for any other outdoor structure or personal property claim After purchase please fill out and return warranty card for product registration Please see warranty card for more details Covered by U S Patents and patents pending 6 871 614 6 994 099 7 296 584 D 4
Download Pdf Manuals
Related Search
Related Contents
5571298a important 自衛隊中央病院「入札及び契約心得」 取扱説明書 - メトラー・トレド - Mettler Graupner MC 12 Sender Section I Product Identification - Prescott SM, Distributeur de Sanyo E 11583 User's Manual Tender - Egyptian Association for Energy and Manual - Baños de vapor InLine 76107Y networking cable Bedienungsanleitung - Bosch Security Systems Copyright © All rights reserved.
Failed to retrieve file