Home
ShelterLogic 72853.0 Instructions / Assembly
Contents
1. carraca BASE FOOT 1 3 8 STEEL GRY ATTENTION FOR MISSING OR REPLACEMENT PARTS OR QUESTIONS PLEASE tuse orses wos 05 10 13 0 2 CROSS RAIL SWEDGED 48 7 8 X1 1 8 DIA CONTACT CUSTOMER SERVICE 1 800 524 9970 CANADA 1 800 559 6175 oa B 2 oan o o zm O5 o 13 SWAYTOPCONNECTOR o 0 Le 6 5 3 o 3 WAY COVER RAIL CLAMP 1 5 8 PIPE 10 W x 10 H Peak Style Frame Assembly Please read and understand instructions completely before assembly 13 Layout out frame parts as shown TOP RAIL ery END RIB SS 10 W X 10 H 19 CROSS lt RAIL 17 Lz vrnnrerreson zr WH GABLE CLAMP Ca z a sour aoernopmorcresTsmaver owe 8 COVER RAIL Tse o Tre son cneas e wno Brace LAT enos os s ewavcovernancune on a omav COVERRALCLANPTS pee e oa a o a cross ran GROSS RAILPLAWENDS 534 nores a Ts ATTENTION FOR MISSING OR REPLACEMENT PARTS OR QUESTIONS PLEASE TOROS RAL BAKIO PLAN ENOS H SEND corner Lesarar 1 SWED UPRIGHT TUBE 67 314 X1 518 D 1END_ 10126 Page 3 05 10ET13 0A CONTACT CUSTOMER SERVICE CROSS RAIL PLAIN END
2. ON 10132 10132 10114 10114 2 Bolt 2 Item 19 10126 Item All Connections All Connections ae 1 _ 10113 10113 8 HIGH 05 10ET13 0A Page 4 3 INSTALL SIDE RAILS AND SHELTERLOCK STABILIZER BLOCKS A Place assembled first end rib in the staked area Place the ShelterLock on the upright as shown in Detail D From the outside of the rib insert the bolt through the upright and then through the ShelterLock DETAIL D B Place the plain end of the side rail over the bolt and nest it into the ShelterLock Install the nut onto the bolt and tighten Repeat these steps for the opposite side and all of the remaining ribs The side rails for the last rib will have two plain ends oe 9 A Ca 00670 2 4 1 RM a a aa e eo 4 INSTALL WIND BRACES A Attach wind brace between the end rib and the first middle rib as shown in Detail E Bolts attached at the FIRST cross rails should be inserted facing inside the shelter x 02030 DETAIL E WIND BRACE 5 INSTALL TOP RAIL A Place the first top rail under each end rib and secure it with a bolt as shown in Detail F The same cross rail should lay on top of the all middle ribs Secure the rails to the frame with the hardware indicated in Detail F The top rail attached to the last rib will be installed under the pipe Install the Top Rail OVER all Middle Ribs UNDER First and Last Ribs
3. DETAIL F E m ene 10210 00669 5 05 10ET13 0A 6 SECURE BASE FEET A Slide leg pipe over over the base feet line up the holes in the pipe with the holes in the feet and secure with the hard ware indicated in Detail G DETAIL G 01010 Secure 7 INSTALL AUGER ANCHORS A Anchors must be placed inside shelter Start at the corners of the shelter Insert a 94 pipe or steel rod through the eyelet of the auger and screw the anchor into the ground If ground is too hard dig a hole with a shovel or post hole tool OPTIONAL Fill with cement B Space out the remaining anchors evenly along the length of the shelter Screw the anchor into the ground until the eyelet is sticking out of the ground by 1 2 so it can be anchored to the legs C Wrap the cable provided through the eyelet of the anchor and around the frame as indicated in Detail H Secure the cable with the clamps provided D Repeat for middle legs by attaching cable around foot plates 8 ZIPPER DOOR AND OR END PANEL INSTALLATION A Hold the end panel at the top center with the white inner surface facing the inside of the shelter if you have a white shelter the inner surface has the visible weld seams B Unscrew top rail from the top bend and place the webbing in between The top rail should pass through the loop of the webbing Reconnect top rail onto rib and secure it with the screws indicated See Detail I frame and C Remov
4. 10 SECURING YOUR COVER A Install the S hook from the ratchet assembly into the legs of the shelter Pull the webbing carefully to remove the slack from the cover Do not to pull the webbing through the opposite side of the cover B Insert the webbing through the spindle of the ratchet and pull tight See Detail O Wind the ratchet until the webbing overlaps itself Repeat these steps on the opposite side then repeat this on the back side of the shelter C When all of the corners are secured adjust the cover front to back so that it is centered When the cover is centered tighten all of the ratchets Do this an X pattern to be sure it is tightened evenly See Detail O D Install the cover rails 10110 by inserting them into the pipe pockets on each side of the cover Bolt 10115 the rails to the ribs using the 3 way and 4 way clamps as shown in Detail P Check that the rails are evenly spaced 8 above the ground on both sides Push down on the cover rails and connectors one at a time to tighten the bolted clamps and the cover IMPORTANT nstall bolt caps 10150 on exposed bolts on side rails and wind braces to prevent injury DETAIL P NOTE CHECK THAT YOUR COVER IS CORRECTLY PLACED ON THE FRAME The ShelterLogic logo should line up on the left front and right rear corners near the top rail If the logo is not legible and positioned as shown as incorrect the cover has not bee
5. 47 X1 1 8 DIA 10134 ASSEMBLY OF PEAK STYLE GARAGE SHELTER NOTE FOR FRAME EXTENSION KIT 70 8 is the base frame dimension Your model may have more middle ribs than shown in the illustrations You will receive one extra rib for every extra 4 feet of building length that you purchase The basic frame assembly will remain the same The cover will be the correct size for the length of the building ordered 1 PLOTTING AND SQUARING UP THE FRAME A Before building your shelter you should choose a flat area on your property and plot your shelter Stake out the area for the frame in the desired spot Check that it measures 10 in width and the length would be determined by the size shelter you purchased Tie a rope diagonally from corner to corner LENGTH OF B Measure across area end to opposite end See Detail A BUILDING The measurement A should be equal DETAILA 2 ASSEMBLE END AND MIDDLE RIBS A Assemble end and middle ribs as shown in Detail B and Detail C Securely fasten all of the joints with the hardware indicated DETAIL C DETAIL B End Ribs 10121 800464 ee 800464 10132 10132 Middle Ribs 10131 800464 22 ol 800464 A 10132 10223 H 10223 10223 H 10223 10114 10127 2 Boll 10127 10126 10114 10126 Item 19 i All Connections reper All Connections 10128 10128 L 10 HIGH 210113 10113 10121 10131 800464 800464 800464 800464
6. e the nut from the side rail and carefully pull cross rails the side rail away from the ShelterLock pull away only inserted enough to pass the webbing through the connection If through slits this connection has the wind brace on it remove the wind brace end before pulling the side rail Replace the cross rail and wind brace See Detail J Replace the nut and tighten Repeat this on the other side D At the bottom where the webbing exits the pocket on each side of end panel pull webbing to remove the slack Be careful not to pull the webbing through the other side of the panel Install the S hook from the ratchet into the leg of the shelter Insert the webbing into the spindle of the ratchet and pull tight See Detail J Wind the ratchet so that the web bing overlaps itself Repeat this process on the other side of the panel Position the end panel so that it is centered on the building F Tighten the ratchets alternating from one side to the other until the end panel is tight Repeat these steps on the other end of the building Slit in fabric folded around INSIDE VIEW SIDE VIEW DETAIL DETAIL J 05 10ET13 0A Page 6 with bolt and nut eee END PANELS NOT SHOWN FOR CLARITY 9 INSTALLING THE COVER ON THE FRAME A Lay the cover on the ground next to the frame with the inside of the cover the side with the pipe pockets facing down and the webbing on the fr
7. n put on the frame correctly INCORRECT Cover Tightening Tip Check and tighten Ratchets and Cross Rails monthly to ensure the cover is tight CORNER LEG OUTSIDE CORNER VIEW 10110 WARNING Serious injury to persons or property could result if cover is installed and shelter is not completed and is left unattended Shelter must be securely anchored until completed 05 10ET13 0A Page 8 7 5 faa 555 a hs Ane Ta G E 1 b y pa 25 1 ee a gt __ kah lt bo d 10 W x 8 H or 10 H Peak Style Frame Assembly Assembly Instructions Before you start 2 individuals recommended for assembly approximate time 3 hours Recommended tools Power Drill Safety Glasses Rope Tape Measure Ratchet with Socket Set Adjustable Wrench Step Ladder Rubber Mallet Utility Knife 5 8 Concrete Drill Bit Sledge Hammer or 9 O _ eVe eS ShelterLogic LLC 150 Callender Road Watertown CT 06795 www shelterlogic com 1 800 524 9970 4 800 559 6175 05 10ET13 0A 10 W x 8 H Peak Style Frame Assembly Please read and understand instructions completely before assembly 21 22 Layout out frame parts as shown TOP RAIL 13 END RIB END RIB COVER RAIL
8. ont and rear of the corner of the build ing Position the cover so that it is centered on the frame front to back See Detail K B Fold over the side so the pipe pocket is now accessible Insert a cover pipe into the pipe pocket slot at the first middle rib from the front and the first middle rib from the rear Some of the pipe will be exposed For long buildings it may be necessary to use additional pipes in the middle See Detail L Remove pocket pipe to install later C Tie the rope on each of the exposed pipes and throw the other end of the rope over the frame See Detail M D Move to the other side of the frame and pull the cover over the frame with the rope This may require two or more people See Detail N Check that the Logo reads upright as shown DETAIL M DETAIL N Page 7 05 10ET13 0A
Download Pdf Manuals
Related Search
Related Contents
B64-3623-00_Spanish r2.indd 872HN9401 仕様書(pdf) 取扱説明書 7 Manuel de l`utilisateur RDM Index Drives - Industrial Motion Control, LLC Operating Instructions Mode d`emploi Manual de instrucciones Mode d`emploi Dentaplast Opti Copyright © All rights reserved.
Failed to retrieve file