Home
        Best Barns sierra_1220f Instructions / Assembly
         Contents
1.         3 1 2  x 48     Nail Siding Panels  1   Siding Panels    Where They Overlap       Left Frontwall    10  Sidewall    Step 9 Install Back Wall Trim    1  Install 87 3 4  long 1x4 corner trim boards to the rear wall  Install trim flush with the 2x4  top plate and flush with the siding on the sidewalls  Use 8d galv  nails  spaced 12  apart     2  Cut  2  two 1x4 6  trim rs Plate    board to fit between the  corner trim boards     These trim boards d lx4 Th    measure 4 1 4  wide  Im  Side  Wall    Back f ush  WAII  87 3 4  Long 1x4 Corner Trim _     Step 10 Install Front Wall Trim  amp  Door J amb    l                1  Install 87 3 4  long 1x4 corner trim boards and 1x4 trim boards to the front wall   flush with the top plate on the sidewall     2  Install 48  long x 5 3 8  wide primed siding  material on the top of the door opening  2x4 Assembly    3  Install 83  long x 5 3 8  wide primed siding  material on the sides of the door opening      lt A       3 8  Thick Primed  Door Jamb    Step 11 Install Gables    1  Install a gable on the rear wall  The gable siding will extend over the 1x4 trim  on the lower wall  NOT behind the trim     Secure gable to wall by nailing through the gable plate with 10d sinkers  Nail  siding along the 1x4 trim board with 8d galv  nails           Important  Bottom edge of siding  extends over 1x4 trim    2  Repeat to install a gable on the front wall     Step 12 Install 2x4 Tie Plates    1  Install a 2x4 6  board over the sidewall   against 
2.      Important  Make sure the front gable is plumb and the roof sheathing extends 8 1 2  past  the siding along the face of the gable     2  Install a 1x6   7  fascia board  Install a 22 1 2  long 2x4 soffit block  with beveled edge   between the truss     3  Cuta 1x6   7  fascia board flush with the end of the roof sheathing           48  Long  Panel         72  Long Panel               48  Long j    Panel 83 1 2  Long Panel    Remove From Pallet       48  x 48     1x6   7  Fascia Boards 2x4 Block    Sheathing Will Extend  8 1 2  Beyond Gable    Step 18 Install Front Soffit    1  Install 86 1 4  long 2x4s under the roof sheathing  against the front gable     2  Install 86  long 2x4s under the front edge of the roof sheathing  Hold the 2x4s against the  roof sheathing and screw through the sheathing into the 2x4 boards  Use 1 5 8  long screws     Install 8 1 2  wide siding under the gable overhang as the soffit  Use 6d galv  nails     4  Install  2  two 87  long 1x6 trim boards over the 2x4 boards  flush with the top of the roof  sheathing  Use 8d galv  nails     5  Install 83 1 2  long 1x6 fascia boards flush with the 2x4 boards at the front of the building   6  Install 1x6 trim on the back gable      7   7            1x6 Gable Trim       SN    I nstall Optional Door Sill    If you ordered the optional floor  install the  galvanized door sill  Secure sill with pan  head screws     Soffit Panels             Galv  Door Sill    Step 19 Install 2x4 Around Door J amb    1  Instal
3.  Hanger Nails         pd    Siding Panels 48  x 87 1 4   Siding Panels 24  x 87 1 4   Siding Panels Gables 48  x 40   Siding Panels Gables 48  x 28   Roof Sheathing IIU KI   Roof Sheathing 37 1 2  x 48   Roof Sheathing 48  x 72   Roof Sheathing 48  x 59 1 2   Roof Sheathing 48  x 48   Front Gable Soffit 8 1 2  x 48   Sidewall Soffit 5  x 48   2x4 Metal Truss Hangers                                     HN FNM TY JF JH INIA N IO       2  4  6  4  4  4  8  4  8  1  1  1  1       Roof Covering   not supplied in kit    12 bdl  Roof Shingles  9 pes  Roof drip Edge 10        
4.  more screws  on the opposite side in the    49 1 2  board with  center as shown     shorter 2x4 attached    Step 4 Assemble 12  Back Wall    1  Position 2x4 68 1 2  boards together and indicate with  X  marks  where the wall studs  will be located  Mark the ends that will butt together with the letters  A  and  B      68 1 2  Wall Plate 68 1 2  Wall Plate      lt  19 3 4    24   gt   P 2o  ly 24   gt      Da WS  2x4 7  Wall Studs SQ  2  Install 7  wall studs between the top and bottom plates  Assemble wall frames with    10d sinkers  two  2  nails at each stud end  Nail both wall frames together     3  Square wall frame  Measure diagonally  corner to corner   The measurements will be the  same when the wall is square     Install the first siding panel with the  LAP  edge extending 3 1 2  past the wall frame  The  bottom will extend 3 4  below the bottom plate  Use 8d galv  nails spaced 12  apart     5  Install the other siding panels  Cut the last panel to extend 3 1 2  beyond the wall frame     IS The siding will be 1 2  below the  top of the wall frame on all walls  __ N    Edge       Siding Extends 3 1 2   Past 2x4 Stud    Step 5 Assemble 10  Long Sidewalls    1  Position  2  two 2x4 48  boards and  2  two 2x4 72  boards together and indicate with  X   marks  where the wall studs will be located              48  Wall Plate 72  Wall Plate  X X X X X X X  X AN X AN AN FN X    23 1 4      23 1 4    24     48  Wall Plate    72  Wall Plate    iS If you are installing the optio
5.  that is included in our kit is listed on the back page  The optional floor package   if ordered  will be supplied by a local lumber supplier     The door opening is for a 8  wide x 7  high garage door  You will need to order your garage  door with an 9  low headroom kit     The foundation size should measure 12  0  wide by 20  0   Do Not make the foundation larger  than the building size  The siding should project beyond the foundation for water to expel  properly from the sidewalls     IMPORTANT  Unpack the material from the pallet  then unscrew the 2x4s from the pallet   The bit for the screws is packed in the hardware bag  Remove the OSB panel  it will be used  for roof sheathing  The 2x4s will be used for wall bracing and interior door jamb material     When building the trusses  our instructions suggest using the floor as a work area  If your  foundation is a concrete slab it will not be possible to use this method  Build the 12  long back  wall to use as a platform     The LP siding has a 50 year warranty and is already primed  Apply two coats of latex acrylic  paint for the finish coat  Paint the bottom edge of the siding  this is very important  Maintain  6  to 8  of clearance from the bottom edge of the siding and the ground  Don t allow garden  mulch to build up and keep shrubs a minimum of 1  away from the building     Thank you for your purchase  Bill  amp  Linda Rinella  owners    Tool List     _  Hammer  amp  Phillips Screwdriver J Power Drill Screwdriver   _  
6. 2x4s with 6d common nails  Use 14 nails per gusset     Install a 2x4 90  collar tie between the 2x4 boards  Hold in place with 2x4 blocks  Install  12 x24  gussets to the ends of the collar tie  Glue and nail using 14 nails per gusset     Turn this truss over and apply wood gussets to the opposite side     Repeat 2 through 5 to assemble  8  eight more trusses     Do Not remove blocks from floor until completing Step 2              12 x24  Gusset    Top Gusset  gt     Top Truss Member       2x4 Block    2x4 90  Collar Tie     gt  Install collar tie the same  2 ZN    iii distance from edge of floor       n    Me   Ai  S E a  E o  a ae  a T       2x4 Block    Step 2 Assemble Roof Gables    1  Butt  2  two 72  long 2x4s together and secure by nailing a 3 1 2  x 31 3 4  long ply   wood gusset across the top where they butt together  Use glue and 6d common nails     SS ____ 3 4  Plywood Gusset                            72  long 2x4  Place  2  two truss members in the jig  Secure the top together with a barbed metal plate     3  Remove the 2x4 blocks at the corners of the floor and insert the gable plate assembled  above into the bird s mouth  Make sure the 2x4 gable plate is straight  If necessary  tack  2x4 blocks to hold plate straight     Barbed Metal Plate     2 gt      2x4 Gable Plate  2x4 Block    23 1 2  Gable Stud    4 202    el i  a        Screw poe plate to truss  leg with 2 1 2  screw     4  Remove the two 2x4 blocks that held the collar tie in position     5  Install 2
7. 6d galv  nails     2  Install  5  five more full length siding panel under the trusses  Cut the last panel to fit     3  Install soffit panels on the                                                          opposite side  Start witha     7      24  long panel that has a   LAP  edge   Soffit  4  Cut 87 3 4  long 1x4 trim boards Beveled Edge    to length and install at the corners     Step 16 Install 1x6 Fascia    When installing 1x6 fascia  next step  it will be necessary to install 22 1 2  long 2x4  blocks between trusses where the fascia boards meet     The 2x4 blocks have a beveled edged on the top to allow the roof sheathing to rest on   Install block through the end of the trusses with 10d sinkers     Pe ST Ww  NI SOFFIT BLOCK DETAIL                     gt       eee                        xo Fose       2x4 Block   Beveled Edge    Starting at the rear of the building  install 4 x6  OSB roof panels and 1x6 7  white pine fascia  boards on each side flush with the face of the siding on the back gable  Install the fascia so the  bottom edge of the roof sheathing will rest on the 1x6 Use 8d galv  nails to install fascia              1x6   7  Fascia Board    22 1 2  Long 2x4  w  Beveled Edge       Step 17 Install Roof Sheathing    1  Install roof sheathing per layout below  Make sure the trusses are plumb and the roof  sheathing meets the center of the truss  Use 7d sinkers spaced 12  apart  The top row of  roof sheathing will be about 1  below the ridge to allow for ventilation
8. Framing Square  amp  Level  _  Measuring Tape  amp  Chalkline   _  Circular Saw and or Hand Saw  _  2 8  Step Ladders    Always wear Safety glasses when cutting or nailing     Optional Wood Floor System    Shown below is a typical wood floor  Depending on your area  the construction may have to be  changed to meet local codes  The foundation size should be 12    0  x 20    0      1  Cut  2  two treated 2x4 8  boards in half     2  Butt 4x4 10  treated runners together  Use one of the 4  long  2x4s to secure them together  Note  Use 16d galv  nails to  secure all treated framing together             3  Repeat to join the other 4x4 runners     4  Long 2x4    4x4 Treated Runners    4  Cut  2  two 2x4 12  joist headers to 12    0    5  Layout for 12  on center joist spacing   X  marks where floor joist will be placed       2x4  12 0  X LX  X X  Detail 1 Joist Header X X X X  11 4  o 12  oe e    6  Cut all the 2x4 12  boards to 11  9   These boards will be the floor joist  Treated lumber  may be thicker than 1 1 2   Take this into account when cutting the length of floor joists   Shorten joist measurements if necessary to obtain 12  O  building width     7  Install floor joist boards between the joist headers  Install this section over 4x4s          2x4 12  Joist Header    2x4 11  9  Floor Joist Ss    4x4 Runners    10     11        Cut  2  two 2x4 8  treated boards to 8    0      Layout for 12  on center joist spacing  see Detail 1  LLL  y joist spacing    lt  lt              Ass
9. SNEEKER EREEREER EEEE E EEEE EEE EEEE EE EEEE KEKEE EEEE EEE EEEE KE EEE EEEE EEE EEE EEEIEE KEE EE EEEE EEE EEEE    Best Barns USA l  Assembly Book    pat  Revised July 21  2014    VE Ce  L    G           the Sierra 12  x 20     Manufactured by Reynolds Building Systems  Inc   205 Arlington Drive Greenville  PA 16125 724 646 3775    This manual is copyrighted  Under the copyright laws  this manual  may not be copied  in whole or in part  without consent from Reynolds  Building Systems  Inc     Copyright 2012    ZO DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDD DDN    WMA ddd ddd ddd EEE EE EEEE EE EEE EEEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EER EEE EE EEE EE EEE EEEE EEE EEE EE EEE EEEE  ZED DDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DUN    S    IMPORTANT INFORMATION ABOUT YOUR SHED KIT    Thank you for purchasing our Sierra kit  These instructions will construct a 12 x16  building   If you received two books  use the one with the latest revision date     If you have any questions about assembling the kit  call 800 245 1577  If you are calling after  normal business hours  call 724 866 HELP  4357  or email to help  barnkits com     Before you begin construction  be sure to study this assembly manual  Also  obtain a building  permit and check all pertinent building code regulations     The material
10. aged In Lumber Kit    Collar Ties 2x4 90  1 1b  box Sinkers  Truss Rafters 2x4 86 1 4  1 lb  box sd Galv    Wall Studs 2x4 84  1 Ib  box 7d Sinkers  Double Studs 2x4 84  1 Ib  box 6d Galv    Wall Plates 2x4 72 1 Ib  box 6d Common  Wall Plates 2x4 68 1 2  1 Ib  box 1 1 2  Hanger Nails  Door Jamb 2x4 51 1 2  ea  1x4 Metal Plates   Door Assembly 2x4 55  ea  2x4 Metal Truss Hangers  Wall Plates 2x4 48  Wood Screws   Wall Plates 2x4 19    Bottle Glue   Gable Studs 2x4 23 1 2    1x6 Gable Trim 87   Pre built Door Assembly 49 1 2    1x6 Fascia Trim 84   SidingOver Door 3 8  3 1 2  x 48    1x4 Door Trim sides 84   Primed Soffit Boards 3 8  5  x 48    1x4 Door Trim top   51 1 4   Primed Soffit Boards 3 8  5  x 24    7 16  Filler Board 3 1 2  x 44   Primed Soffit Boards 3 8  8 1 2  x 48    7 16  Filler Board 3 1 2  x 48   Primed Door Jamb 3 8  5 3 8  x 48    7 16 Truss Gussets 8  x 20   Primed Door Jamb 3 8  5 3 8  x 83    7 16 Truss Gussets 12  x 24   Plywood Gusset 3 4  x 3 1 2  x 32    7 16  OSB 37 1 2  x 83 1 2                                               NIN NM  A INIO IN IN  A  A A m  IN   gt        Continued On Back Page    Material Packaged In Siding  amp  Roof Sheathing Kit         2x4 Collar Ties 90     2x4 Truss Rafters 86 1 4     2x4 Wall Studs 84     2x4 Wall Plates 48     2x4 Fasica Blocks 22 1 2    1x4 Wall Trim 72    1x4 Corner Trim   7 3 4     716 Wood Gussets 8  x 20     716 Wood Gussets 12  x 24    10d Sinkers Nails   8d Galv  Nails   7d Sinkers   6d Common   1 1 2 
11. emble another floor section   Install over the 4x4s and nail  both floor sections together     Square the floor  See note below  The angle   measurement should be 23    4   Nail several  floor joist to the 4x4 runners to hold the floor AA TM  frame in place          12 Install floor using 8d spiral nails     Notes To Floor    Material Description   12  x 20  shed   Tt is important that the floor be level and square  Square  2x4 Treated the floor as follows  before nailing the flooring  measure    the floor diagonally  corner to corner   Then measure  2x4 Treated 24 pes  12 the opposite corners  These measurements will be the  4x4 Treated Runners  8pcs  10    same ifthe floor is square        Screw Floor Nails 5 lb  Sd  Galv  Box Nails 5lb  16d    Step 1 Assemble Trusses  IS Building Tip  To aid in the assembly of the trusses  temporarily screw 2x4 blocks to    l     5   6     the floor  There are short 2x4s  that may have an angle on one end  supplied in kit   This will insure that all the trusses are assembled the same     Screw  2  two 2x4 blocks to the 12  wide end of the floor at the corner  see below     Place two truss legs together  Position the notch in the 2x4s  called a bird s mouth  into  the 2x4 blocks  Important  You must have 12  0  between the bird s mouth  Affix more  2x4 blocks above the truss legs to hold the truss members in place     Secure the tops together with a wood gusset  Apply wood glue between the 2x4 boards and  the gusset  Nail the gusset to the 
12. l a 2x4   7  on the inside of the door opening to support the door track   Use 2x4 wall bracing material    2  Install 51 1 2  long 2x4s across the top of the door jamb     oy          51 1 2  Long 2x4                Prime Door Jamb o    2x4 7     VIEW FROM INSIDE    Step 20 Install Roofing     Not Supplied in Kit    1  Install metal roof edging perimeter of  the roof area  If you are not installing    shingles at this time  you can purchase x Paper  felt paper to protect the roof sheathing     Install the felt paper before you install a 7    the metal roof edge        1x6 Fascia          2  Install shingles according to the instructions on the wrapper  If you need more detailed  instructions on installing shingles  there are good publications at book stores or newsstands     Building Tip  Install a ridge vent in lieu of shingle caps  Ridge vent provides ideal ventilation   preventing heat or moisture from damaging your building or its contents     ey   a    Shingles       Optional ridge vent provides  ideal ventilation     Space    Optional DoorOpening Frame Door Opening    1  Cut  2  two 80 1 2  long header supports form  2x4 7  boards     Cut  2  two 37 1 2  boards from a 2x4 7   2x4 Header    Cut a 3 1 2  x 37 1 2  filler from a 48  long  OSB board included in the kit     Assemble the door header     5  Install door header over header supports  80 1 2  Header  Supports    a  T        37 1 2  Long 2x4    door opening          34 1 2     _        OSB Filler    Material Pack
13. nal walk in door see the instructions  at the back of the book     2  Install 7  wall studs between the top and bottom plates  Nail both wall frames together     3  Repeat to assemble  3  three more 10  long sidewall frames     4  Square wall frame  Select  1  one of the 2  wide panels with the  tongue  edge and install panel  with the  cut  edge flush with the end of the wall and extending 3 4  below the bottom plate     5 Install  2  two more full width siding panels          Siding 1 2  Below  Top Plate    Tongue Edge    Cut Edge  Siding Extends 3 4  Below Plate    6  Select  1  one of the 10  wall frames and repeat to apply siding to  another sidewall frame     Step 6 Assemble Sidewalls for 20  Building Length    1  Select one of the 10  sidewalls assembled in Step 5  Butt a 10  wall frame against the  wall with siding  DO NOT nail these frames together so they can be separated later     2  Square the wall frame  Install a full width siding panel but do not nail along the long edge  that overlaps the 10  wall frame  You can nail this edge after the wall panels are installed     This will enable you to separate the wall panels making them easier to handle     Bo Not Nail Along This Edge     lt        as    So  a aa 6  Wall Plate    10   Wall Panel from Step 5     lt 7    3  Install another full width siding panel and  the 2  wide siding panel  4  Wall Plate    4  Repeat to apply siding to the other 10  wall frame     Step 7 Assemble Door Walls    1  Locate a7  wall stud wi
14. th a 83 1 2  long 2x4 attached     2  Assemble a wall frame using a 7  wall stud  the double stud  and  2  two 19  long 2x4 wall plates  Use 10d sinkers         2x4 7  Wall Studs    19  Bottom Wall Plat  ieee 83 1 2  Long 2x4    3  Repeat to assemble another wall frame     Mark    Left Frontwall      4  Locate a 24  wide siding panel that has a  LAP  edge   Position this panel with the  LAP  edge flush with the  2x4 header support and extending 3 4  below the bottom  plate          Cut Edge Extends3 1 2   Beyond Frame    LAP Edge    Siding Extends 3 4  Below Plate 83 1 2  Long 2x4    Mark    Right Frontwall    Be  5  Install the remaining siding with the tongue edge flush    with the edge of the 83 1 2  long2x4         Cut Edge Extends3 1 2   ee Beyond Frame    83 1 2  Long 2x4 Bottom Plate    Step8 Set Walls    1  Set wall panels  Secure at corners with 10d sinkers  4 nails per corner   Secure to floor  with 10 sinkers  Disassemble shipping pallet and use the 2x4s to brace the front wall and    the sidewalls     2  Install the pre built 2x4 assembly  from Step 3B  between the front wall panels  Install  assembly on the front wall panels with the side marked with the letter  B  facing the  back of the building     3  Install  2  two 3 1 2  x 48  siding panels over the built up assembly  Note  The trim  boards will hide where the siding panels meet  the fit does not have to be exact     2x4 Wall Brace                      Pre built  2x4 Assembly                                
15. the rear gable plate  Use 10d  sinkers     2x4 6  Tie Plates                   Sidewall    2  Install  2  two more 2x4 6  boards next to the first one   3 Install a 48  long 2x4 at the front of the building   4  Install 2x4 tie plates on the opposite sidewall     2x4 6  Tie Plates                                           2x4 6  Tie Plates          Cut to Fit    Step 13 Layout Roof Trusses    1  Layout the truss spacing from the rear of the building  Measure from the inside of the rear gable  when marking the location of the first truss  Important  When marking the opposite wall  place  the  X  mark on the same side of the line so your trusses are parallel when they are installed     2  Using 1 1 2  hanger nails  install metal hangers to the 2x4 tie plate  The opening should line  up with the  X  mark  the bottom of the opening  flush with the 2x4 tie plate  See Detail  D      Detail  D   2x4 Tie Plate 7  amp         Measure From        Preah at Bae Backside of 2x4  Inside of Building eA ee          21 3 8     X lt        24          Step 14 Set Roof Trusses        Set roof trusses  Secure trusses to metal  hangers with 1 1 2  hanger nails     Rear Gable    Step 15 Install Eave Soffit  amp  Corner Trim    1  Locate a 5  wide x 24  siding panel that has a  tongue  edge  Install this panel under the truss  overhang at the rear of the building  Install the siding soffit panel with the beveled edge flush  with the end of the trusses and the cut edge against the gable siding  Use 
16. x4x23 1 2  gable studs  Nail through the bottom plate with 10d sinkers  and secure the top with barbed metal drive on plates     7  Repeat to assemble another gable  Remove 2x4 blocks     Step 3A Install Siding on Gables    1  Select one of the gable frames  Turn the gable over letting the bottom plate overhang  the floor so the gable lays flat     LAP    2  Install gable siding using 6d galv  nails across Edge RY    the top of the gable frame  Use 8d galv  nails  along the bottom edge  See Note Below               LAP  Edge  SS    Gable trim will cover where  the siding butts together     Siding Extends 3 4   Below Bottom Plate       Install Siding on Ends    3  Install siding on the other gable frame     Step 3B Build 2x4 Assembly  1  Locate  2  two 49 1 2  boards that have shorter 2x4s attached  Butt these boards together     2  Apply glue over the exposed area of the longer boards  Using 6d common   nail a 3 1 2  x 44  OSB filler over the bottom boards  Align the boards  against the floor or other object to make sure the boards are straight  before securing the OSB filler     3  Install a 55  long 2x4 over the OSB filler   For added strength apply glue between  the 2x4 board and the OSB filler  Secure  with  8  eight 2 1 2  long deck screws at  each end and the center                   4  Mark this side  B  so when installed this  side will face the back of the building   Another layer of 2x4s will be installed  after the 1x6 door jamb is installed    5  Install  8  eight
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
MANUAL DE USUARIO  Plasma TV - CNET Content Solutions  SV7728_N 32  Technical Manual  hybrid power 37 hybrid power 40 hybrid power 37 hybrid power 40  s.p . pId tune Inp Al Out Conf CoMM accs Inp. Out l.i np AlM EHit inp  Samsung Farvelaserprinter SL-C1810W Brugervejledning  Cadavres exquis pour le professeur  PNY GM9800GN2F1GS-SB GeForce 9800 GT 1GB graphics card  MAXQDA 10 MAXDictio    Copyright © All rights reserved. 
   Failed to retrieve file