Home

Riverstone MONT-8-BK-PREMIUM Instructions / Assembly

image

Contents

1. 10 5B From the inside place the D 5 door guide bracket into the channel in the base profile lining holes in bracket with holes in bottom door Use two S 3 screws to secure Repeat to install one bracket on each door Knob Door Guide NOTE VIEW FROM INSIDE WWW RSIWW COM 43 of 44 Secure to Platform Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Prepare needed set screws as shown in step 1 1A NOTE Have the hex shaped indent facing up Screw in until it is flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 11 1 The base has predrilled holes in the inside and outside bolt channels so you can easily secure your greenhouse to a wood platform Screw S 4 screw into hole in base through wood until screw is flush with base profile Continue process around outside and inside of greenhouse until it is evenly secured NOTE The S 4 screw is designed to be used with wood When securing base to foundations made of materials other than wood use an appropriate fastener
2. Profile QTY Profile QTY lt 230 gt Steps F 1 17 2 3 4 Step 3 5 8 lt 31 gt F 2 1 Step 6 Steps 2 4 jek 15 gt DSS F 3 4 Steps Steps 5 6 2 4 kk 202 gt F 4 1 Step 5 Step 1 k 47a gt F 5 1 Step 5 Step 1 lt 4934 gt F 6 4 Steps K R 1 2 Step 7 Steps F 7 8 2 3 4 WARNING Profiles with cut edges and or drilled holes 5 6 are sharp Use extreme caution when handling 4 of 44 WWW RSIWW COM List of Parts continued WARNING Use extreme caution when handling panels with cut edges The corners are sharp Panels QTY Steps 2 3 4 8 24 x 32 Step 8 Steps 4 5 24 x 15 W 4 2 Step 5 il 24 x 3114 W 5 2 Step 4 24 x 2134 Assembled Doors and Vents QTY 24 x 65 il il D 2L 1 Step 10 Eze eas D 2R 1 Step 10 All il lll V 2 1 Step 9 24 x 2434 WWW RSIWW COM Connectors QTY Steps B 1 6 46 B 2 6 Step 5 Steps Bea S 5345 16 B 4 9 Step 8 Steps Bes 7 1 2 4 7 Steps B 7 6 567 B 8 4 Step 1 QTY B 9 1 Step 8 5 of 44 List of Parts continued
3. 2 7A The gutters are secured together using B 5 connectors and attached to side profiles using B 3 connectors on the outside of the greenhouse The B 3 connector uses the set screw in the center hole of B 5 connectors at seams Loosen and slide set screws to line up with connectors making sure the seams line up and the gutters remain straight 2 7B Begin at the three seams and arrange set screws so middle screw is centered Fit B 5 connector onto gutter and hold in place using the two end bolts NOTE VIEWS FROM OUTSIDE UNDER GUTTER 2 7C Loosen set screws on side profiles and slide down Fit wide part of B 3 connector onto set screw Slide up into place fitting gutter set screw at other end Tighten set screws and secure with bolts NOTE The bottom of B 3 connector extends past the edges of side and corner profiles B 3 connector sits over B 5 connector Secure all with bolts NOTE VIEWS FROM OUTSIDE UNDER GUTTER Connector QTY Connector B 3 13 of 44 WWW RSIWW COM Assemble Back Wall Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Prepare needed set screws as shown in step 1 1A NOTE H
4. Connectors QTY Hardware QTY i S 1 4 Step 9 S roe c 1 4 Ses S 2A 239 J 5 6 EY i Steps D S 2B 239 1 2 3 4 5 6 7 810 11 Q S 20 239 mm s 3 4 Step 10 Steps S 4 50 1 A 1 Omm S5A 4 sp7 S 5B 1 Step 8 Q Soe 1 Steps Qu S 6 2 Step 9 Included Tools QTY LE 2 Steps gt o gt T 1 T 8940 11 Phillips Screwdriver Door Parts QTY Steps i 37 2 T 2 1 1 2 3 4 5 76 Wrench 6 7 8 10 wa Da m 7 7 Step 10 Step 10 D 3 2 Step 10 im i HAN D 4 12 Step 10 S S b D 5 2 Step 10 Gutter Drain QTY Step 8 6 of 44 a Steps T 3 1 23 4 23 Spacer CN re T 4 1 Step 8 5 Bungee Cord Vent Opener QTY Ground Anchors QTY a A 1 4 Step 11 J A 2 4 Step 11 WWW RSIWW COM Assemble Base Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles 1 1A We use a set screw and nut assembly system for ease of installation With the hex shaped indent facing up screw S 2B threaded part into S 2A nut until it is flush with bottom of nut When the assembly is flush it will slide easily in the bolt tracks slides easily NOTE The two pieces together is referre
5. WWW RSIWW COM 9 of 44 Assemble Right Wall Make certain the pieces are in the correct positions before assembling 7 Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Prepare needed set screws as shown in step 1 1A NOTE Have the hex shaped indent facing up Screw in until it is flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 2 1A Prepare two F 7 corner profiles Slide set screws into all three bolt g tracks on one end and into two side bolt tracks on other end of corner profiles Hand tighten each set screw to hold in place ea NOTE Set screw in center bolt channel is used when installing optional shelving units Install F 7 profile with set screw near base until needed 2 1B Prepare three F 1 wall profiles Slide set screws into both bolt tracks on one end of profile and one bolt track on the other end The single set screw will sit on the inside of the greenhouse near the base when installed ag ley A To 2 1C Hand tighten each set screw to hold in place O Qoe Qe Profile WWW RSIWW COM 10 of 44 2 2A Begin at front right corner Remove plastic film from both sides of one W 1 panel Fit panel into chann
6. NOTE Have the hex shaped indent facing up Screw in until it is flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 7 1 Prepare the two R 1 roof profiles They will line up in a row and joined using one B 5 connector with a total of four set screws and one long hex bolt Arrange profile so i bolt track is facing up 3 7 1A Slide set screws into bolt track on each end of profile as shown abo 7 1B Line up profiles in a straight line Hand tighten set screw on each end to hold in place 7 1C Adjust position of set screws and long hex bolt to fit holes in B 5 connector Position the B 5 connector with the long hex bolt in center hole and center to the seam where the profiles join 7 1D Secure B 5 connector by attaching bolts to the set screws NOTE Long hex bolt is secured after installation WWW RSIWW COM 30 of 44 7 2A Use two people and a step ladder Place step ladder inside greenhouse Have one person inside greenhouse supporting ridge as you slide it into position Avoid touching top of front and back of greenhouse until each end is flush with ends of front and back profiles WARNING Use two people to install roof ridge Place ladder in inside of greenhouse One person will stand on the ladder holding the ridge until it is in the proper position and secur
7. 11 2 Use four A 1 ground anchors with four A 2 anchor brackets on the inside of the greenhouse to secure it to the ground Place one Basak cine natant nek 11 2B Screw each A 1 ground anchor through hole in center of bracket Use a screw driver adi through the top of A 1 anchor to screw Pi 11 2A Attach each anchor bracket with two completely into soil T set screws in the inside bolt channels in Make certain it is base profile Secure each with two bolts secured in ground LT gt Ground Anchor WWW RSIWW COM 44 of 44
8. Low if l Monticello Monticello Gr il Made in the USA 8 x 8 Greenhouse Assembly Instructions 071812 WARRANTY Riverstone Green Products for a Brighter Future Customer Service 877 373 3078 Email customerservice risww com 65 Fleetwood Drive Rockaway NJ 07866 Introduction Thank you for purchasing your MonticelloTM 8x8 Greenhouse The Monticello line is proudly made in the USA by a leading commercial greenhouse maker using the same professional grade materials and design The frame is constructed with the highest quality extruded aluminum with lead free powder coated paint The panels are professional grade mm twin wall polycarbonate selected for their insulation and durability The Monticello line is a modular system which uses an amp x8 greenhouse that can be easily expanded in four foot sections up to 24 feet by 8 feet at any time The 8x6 greenhouse include one roof vent with it s own automatic vent opener to ensure proper ventilation and maintain optimal temperature When properly assembled and maintained this greenhouse will provide years of enjoyment It can be expanded with four foot extension kits as your needs expand Our greenhouse has been designed to be easily assembled Although all but one step can be completed by one person we recommend using a helper for the entire assembly You will need assistance from another person to assemble the roof Allow six to eight hours to comp
9. u NOTE VIEWS FROM INSIDE A 40 of 44 WWW RSIWW COM Install Doors Make sure the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles diagrams before installing to ensure you have the parts correctly placed IMPORTANT The door and door track are different for the left and right sides Study the 10 1A From outside prepare to install right and left door tracks The door tracks are secured with the set screws in F 7 profiles on each side and the two set screws in F 5 profile Remove two bolts from center SS B 2 connector on F 5 profile Slide set B 2 gt screws to inside edge of hole 3 uy SS B2 han 9 oO le Tel es p NOTE VIEW FROM OUTSIDE a NOTE ALL VIEWS FROM OUTSIDE 10 1B Loosen set screw in left F 7 profile and position to line up holes in D 1L as shown Loosely secure with bolts IMPORTANT Position D 1L and
10. 5 3G Install B 6 trim plate and secure with three bolts 3 om O L U cD al Sa 8s LI E x r wO E NOTE VIEWS FROM INSIDE NOTE VIEWS FROM INSIDE Panel QTY Connector QTY B Plate a of 44 B 3 B 2 x 57 WWW RSIWW COM 5 4A Working from inside front right corner install F 1 profile next to W 1 panel Place 23 inch spacer on base next to F 7 corner profile and slide F 1 profile against spacer to ensure proper placement IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools W 1 spacer tool 5 4B Fit B 3 connector and secure with two S 2C bolts g U NOTE Panels will not fit completely to end of channels There will be some space to allow for temperature changes 5 4C Continue working from inside right corner place F G profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F G profile fits snugly between f F 7 corner profile and F 1 wall profiles ff W 1 5 4D From inside line up F 3 profile as EA 3 shown Make sure B 2 connector is i pointing towards door opening q NOTE VIEW FROM INSIDE NOTE V
11. and F 1 wall profiles E 4 f r aR 3 4B Continue along back wall Place first F 10 profile on next W 1 panel Make sure profile fits snugly between the two F 11 wall profiles W 1 3 4C Place second F 10 profile on next W 1 and ensure it fits snugly o 3 4D Place second F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F 6 profile fits snugly between F 7 corner profile and F 1 wall profiles NOTE ALL VIEWS FROM INSIDE 3 5A From inside loosen set screws on profiles and adjust position to fit holes in B 1 connectors Fit B 1 connector to profiles as shown zia ne ys ia oe 0 a ol RII g Ei a 3 5B Secure each B 1 connector with three bolts 0 Lae NOTE ALL VIEWS FROM INSIDE A WWW RSIWW COM 16 of 44 Assemble Back Wall Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Prepare needed set screws as shown in step 1 1A NOTE Have the hex shaped indent facing up Screw in until it is flush with bottom of nut so it slides easily into bolt tracks After inse
12. of G 4 and G 1 only Trim Plate NOTE VIEWS FROM OUTSIDE NOTE VIEWS FROM OUTSIDE WWW RSIWW COM 38 of 44 Install Roof Vents Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Make certain the pieces are in the correct positions before assembling 9 1A Unpack contents of Automatic Window Opener Screw adjusting knob partially into threaded end of cylinder Do NOT tighten cae cylin er aad ine 7 Hate a 9 1B Fit piston rod connected to arm B into a end of cylinder Turn cylinder so holes kuki E next to adjusting knob are visible G ae 9 1C Continue pushing cylinder onto piston rod until holes in end of cylinder line up with holes in arm A Push arms apart if necessary Secure with 9 1D Turn adjusting screw clockwise a threaded stud on each side until arms are aproximately 6 apart J NOTE You will use the Gripping Channels in next steps You do not need the other included parts in Window Opener package 9 1E Repeat steps 9 1A through 9 1D to prepare the second Automatic Window Opener Handle 9 2A Remove plastic film from both sides of V 2 9 2B Place opener with arm A on bottom factory assembled ve
13. NOTE VIEWS FROM INSIDE 35 of 44 WWW RSIWW COM 8 5A Remove plastic film from both sides of one W 1 8 5B From inside fit one F 1 profile with three set screws 8 5C Remove plastic film from both sides of Remove bungee cord and continue working from back to install section four You will be installing one panel on the right with the F 1 profile next to it Then you will install the two remaining panels on the left The final F 1 profile slides up from the outside at the gutter to the ridge You will need extra help to hold the two panels in position Use dish soap with water to help lubricate the panel edges panel With side marked UV Resistant facing outside install the next panel on the right at the back Push panel into roof ridge channel until the other end rests on G 2 gutter ledge and then slide towards F 1 profile at back Do not install opposite panel until step 8 5C NOTE VIEWS FROM OUTSIDE facing inside next to panel on the right Hold in place with one B 4 connector on right side Secure with two bolts NOTE You will install the opposite F 1 profile in step 8 5D after installing both panels T Vg E og am o p W 1 panel With side marked UV Resistant facing outside install the next panel on the left at the back Push panel into roof ridge channel
14. and F 5 profiles Repeat step 5 5C OJO to place and secure B 2 connector NOTE The inside has two extra set fB 2 screws on the ends of F 5 profile 9 OD c Profile Connector S 2A 10 B 2 AHAA 24 of 44 WWW RSIWW COM 5 6A Working from inside remove plastic film from both sides of two W 3 panels Fit each panel into channels in profiles placing side marked UV Resistant facing outside WARNING The corners of W 3 panels are sharp Use extreme caution when handling 5 6C Secure with two bolts Ensure height to base 5 6B Continue working from intside install door frame Loosen is 65 set screws on ends of F 5 profile i and adjust position to fit holes in B 2 connector Connector 2 W 3 2 s 2c 24 x 15 5 7 Remove plastic film from both sides of two W 5 panels Fit each panel into channels in profiles placing side marked UV Resistant facing outside W 5 WARNING The corners of W 5 panels are sharp Use extreme caution when handling NOTE VIEWS FROM INSIDE 5 8 From inside ad
15. away from structures that could cause snow to drift on or around the greenhouse Locate underground pipes or cables before preparing the site or anchoring the greenhouse 4 Prepare a Foundation After choosing a location proper preparation of the site is essential The site must be level The greenhouse must be mounted to a base Construct the base first so the greenhouse can be securely mounted We recommend constructing a wood platform base using a perimeter of two by fours filled with either soil sod or gravel Instructions for constructing a wood platform can be found on page 3 in this manual Other suitable base options include wood decks and concrete slabs Wood screws are included to secure the greenhouse to a wood base The greenhouse is secured to the ground from the inside with ground anchors See step111 for details If you are using a concrete base get appropriate mounting screws before beginning Make sure the corners are square by measuring the inside diagonals from both sides and making sure they are equal Use a spirit level to make sure the base is level Contact your local authorities regarding any required building permits or restrictions WWW RSIWW COM 1 of 44 Safety Advice e The greenhouse must be positioned and fixed on a flat level surface e Dispose of all plastic bags safely Keep them out of the reach of small children e Keep children and pets away from the assembly area until the work is completed e Alwa
16. contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 3 2B Place 23 inch spacer on base next to F 7 corner profile Fit panel into channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement Position F 1 profiles so single set screw is next to base on inside I NOTE Panels will not fit completely to end of channels W 1 There will be some space to allow for temperature changes W 1 spacer tool x 3 2C Fit B 3 connector and secure with two S 2C bolts na NOTE VIEWS ARE FROM INSIDE 3 2D Continue building the end wall from the inside Use the Spacer with each panel and the two remaining F 1 profiles Repeat steps 3 2A through 3 2C QTY Connector 3 3 Add the last W 1 panel to complete the back From the outside fit F 7 corner profile into place and secure QTY Connector NOTE VIEWS ARE FROM OUTSIDE 15 of 44 WWW RSIWW COM 3 4 The two sets of F 6 and F 10 profiles fit on top of W 1 panels Line up bottom bolt channels with top edge of F 1 and F 7 vertical profiles Profiles will fit snugly 3 4A Working from inside right corner place F 6 profile with mitered end next 4 to corner and angled edge 4 facing up onto corner W 1 W 1 panel F 6 profile fits snugly between F 7 corner profile
17. ledge profile at outside top Install panel at slight angle sliding all the way into F 1 profile Fit other end into opposite F 1 profile When necessary loosen B 4 connector holding F 1 profiles at sides to move each profile away from opening to create space to slide W 2 panel into channels NOTE Return all parts to previous position when finished NOTE VIEWS FROM OUTSIDE W 2 1 24 x 32 WWW RSIWW COM Have one person stand outside the greenhouse to observe the position of the roof ridge while the other person installs the B 9 brace The set screws should be in the correct position but if the roof is not completely straight loosen the set screws and adjust the brace to raise or lower the roof line Secure with two bolts NOTE VIEWS FROM INSIDE The G 4 trim plates snap into G 1 and G 2 gutter profiles to hold roof panels in place Working from outside begin at front corner Position G 4 trim plate over gutter and use handle of screw driver to tap into place Use two trim plates on each side Make sure the seams of the trim plates are flush with each other and to the C 1 connectors at the front There may be a slight gap at the rear C 1 connector depending on weather conditions n a ee ren C i J NOTE View shows alignment
18. of 44 WWW RSIWW COM 4 4A Prepare two G 11 gutter profiles by sliding four set screws into bottom bolt track Tighten each end set screw to hold in place aver 4 4B Prepare one G 2 gutter profile with five set screws Slide set screws into bottom bolt track Tighten end set screw to hold in place ererr Profile 252 QTY S 2A 13 D S 2B 13 Working from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile at each end and the longer G 2 gutter profile in the center Seams are centered to bolt tracks in F 1 profiles 4 I I ed a O NOTE At front and back edge of G 1 gutter profile lines up flush with edge of F 7 corner profile M 4 5B Place one set screw on the inside bolt track of the gutter at each end Hand tighten both set screws to hold in place NOTE VIEW FROM INSIDE Connector NOTE VIEWS FROM INSIDE WWW RSIWW COM 19 of 44 4 6A The gutters are secured together using B 5 connectors and attached to side profiles using B 3 connectors on the outside of the greenhouse The B 3 connector uses the set screw in the center hole of B 5 co
19. the base To avoid adjusting the placement after assembly prepare door frame using the exact measurements listed in these steps 5 1A Prepare two F 3 profiles 5 1B Fit B 2 connector onto profile and position so bottom Slide three set screws of connector measures 8 from bottom of profile into bolt track and Secure each with two bolts position as shown al fe E 3 E Em i F x 203mm 203mm gt WARNING The cut edge of F 3 profile is sharp Use extreme caution when handling 4 b 5 2A Prepare two F 1 wall profiles Slide set screws into same bolt track one on each end of profile Position profile so set screw near base is on the inside when installed Hand tighten each set screw to hold in place ow To 5 2B Prepare two F 6 profiles Slide M screws into both bolt tracks on mitered end of profile and one bolt track on the other end The single set screw will sit on the inside when installed Hand tighten each set screw to hold in place 4s amp q eo amp Gem 9 Profile WWW RSIWW COM 21 of 44 5 3A Working from inside front left corner remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing side marked UV Resis
20. tool There will be some space to allow for temperature changes A 4 2C Fit B 3 connector and secure with two S 2C bolts NOTE VIEW FROM INSIDE 4 2D Continue building the side wall from the inside Use the spacer with each panel and the three remaining F 1 profiles Repeat steps 4 2A through 4 2C 4 3 Addthe last W 1 panel to complete the side From the outside fit F 7 corner profile into place and secure Connector NOTE VIEW FROM OUTSIDE 18 of 44 WWW RSIWW COM 4 4A Prepare two G 11 gutter profiles by sliding four set screws into bottom bolt track Tighten each end set screw to hold in place aver 4 4B Prepare one G 2 gutter profile with five set screws Slide set screws into bottom bolt track Tighten end set screw to hold in place ererr Profile 252 QTY S 2A 13 D S 2B 13 Working from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile at each end and the longer G 2 gutter profile in the center Seams are centered to bolt tracks in F 1 profiles 4 I I ed a O NOTE At front and back edge of G 1 gutter profile lines up flush with
21. 44 WWW RSIWW COM 1 4A Make certain side profiles are straight and flush Adjust position of set screws in inner bolt track at front of profile to fit holes in B 5 connector Center connector over seam for maximum hold Secure using five bolts Repeat on outer bolt track to install three remaining B 5 connectors at a back and sides Ki AT IMPORTANT One B 5 connector is installed on inside front Remaining B 5 connectors are installed on outside back and sides B 8 corner connectors are installed on inside FRONT NOTE Connector size is not shown proportionally in this drawing WA and are flush Adjust position of set screws in inner bolt track to fit holes in B connector Secure with four bolts Repeat until each corner is secure IMPORTANT Double check the position and amount of unused set screws in the base You should have 29 available for later assembly Connector Connector Z Ze B5 4 B 8 4 ZL s 2c 20 s 2c 16 1 5A Measure base diagonally from inside corner Equal measurements ensure the base is square Use a spirit level to make sure the base is level 1 5B Locate predrilled holes in base profiles Use six S 4 screws one at each corner and one in the center of each side to secure to wood platform You will secure the greenhouse completely to the platform in step 11 1 when assembly is finished Connector
22. D 1R door tracks with lip on the bottom when installed A 10 1C Loosen set screw in right F 7 profile and position to line up holes in D 1R as shown Loosely secure with bolts Profile QTY NOTE ALL VIEWS FROM OUTSIDE WWW RSIWW COM 41 of 44 10 2 From the inside position set screw three inches from right and left F 1 door frame profiles Install B 3 connector as shown and secure each with a bolt NOTE These connectors act as door guides and NOTE VIEW FROM INSIDE will be wrapped in sealant tape in step 10 3B 10 3A Working from the outside apply the D 4 door sealant tape to the outside of F 1 profiles that make up the door frame This tape acts as insulation Beginning directly below D 1L and D 1R door tracks smooth tape down to P 1A and P 1B base profile make sure the tape is even Cut each strip at the bottom 10 3B Wrap the top part of each of the B 3 door guides with the D 4 door sealant tape NOTE VIEW FROM INSIDE 10 3C Wrap the bottom part of each of the D 5 door guides with the D 4 door sealant tape NOTE VIEW FROM OUTSIDE S in S S 42 of 44 WWW RSIWW COM 10 4A To install D 2L fa
23. IEW FROM INSIDE 5 4F Install B 6 trim plate and secure with three bolts 5 4E Adjust set screws and place B 2 connector on prones as shown Slide pee screws in VETERA B lie openings to center of opening so B 6 trim a JA Fe plate will fit properly S gD 1o a m 8 o L KO 3 NOTE VIEW FROM INSIDE Connector Trim Plate B 2 1 NOTE VIEW FROM INSIDE s 2c Br feeds WWW RSIWW COM 23 of 44 5 5 The door frame is 65 high from the base To avoid adjusting the placement after assembly prepare door frame using the exact measurements listed in these steps 5 5A Prepare one F 4 profile Slide two set screws into bolt track and position as shown 5 5B Prepare one F 5 profile Slide four set screws into bolt tracks and position as shown g 5 5C Place one end of F 4 profile against F 5 profile on flat level surface Center F 4 profile to F 5 profile and adjust set screws to fit B 2 connector Secure with three bolts 22 R P 22 e 560mm 560mm IMPORTANT F 4 profile is centered to F 5 profile and secured on both sides with B 2 connector 5 5D Turn profiles over and place on flat surface Slide two set screws into bolt tracks of F 4
24. If it needs adjusting repeat steps 5 8 and 5 9C through 5 9D until each corner is set NOTE VIEW FROM INSIDE Profile WWW RSIWW COM Assemble Back Wall Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Prepare needed set screws as shown in step 1 1A NOTE Have the hex shaped indent facing up Screw in until it is flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 6 1A Prepare two F 7 corner profiles Slide set screws into the same bolt track one on each end of profile Tighten each set screw to hold in place B 8 6 1B Prepare one F 2 profile Slide set screws into both bolt tracks on each end of profile Tighten each set screw to hold in place e ap T 6 1C Prepare two F 3 profiles Slide set screws into both bolt tracks on straight end of F 3 profiles Tighten each set screw to hold in place Oe T l gt WARNING The cut edge of F 3 profile is sharp Use extreme caution when handling Profile WWW RSIWW COM 27 of 44 6 2 From inside add connector B 7 to each corner Secure each with
25. OUTSIDE NOTE VIEWS FROM INSIDE 8 3D Repeat step 8 3B through 8 3C to secure install and secure F 1 profile on left side 8 3E Hold two profiles together at ridge using one B 4 connector Secure with two bolts NOTE VIEWS FROM INSIDE Panel WWW RSIWW COM 34 of 44 8 4A Continue installing roof working from front right corner remove plastic film from both sides of one W 1 panel With side marked UV Resistant facing outside fit top end of panel into channel in R 1 roof ridge near corner Push panel into roof ridge channel until the other end rests on gutter ledge and then slide towards F 7 corner profile __ Repeat to install W 1 a panel in front left corner 8 4B From inside fit one F 1 profile with two set screws facing inside next to panel Hold in place with one B 4 connector on right side Secure with two bolts F Repeat to install F 1 profile fe l lt on opposite side EO NOTE VIEWS FROM INSIDE 8 4C Hold two profiles together at ridge using one B 4 connector Secure with two bolts
26. ave the hex shaped indent facing up Screw in until it is flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 3 1A Prepare one F 7 corner profile Slide set screws into both bolt tracks on each end of corner profile Hand tighten each set screw to hold in place 3 1B Prepare three F 1 wall profiles Slide set screws into both bolt tracks on one end of profile and one bolt track on the other end The single set screw will sit on the inside near the base when installed Hand tighten each set screw to hold in place Cag Qo am ue To las BY a 3 1C Prepare two F G profiles Slide set screws 34D Pr into both bolt tracks on each end of two F 6 mitered profiles Hand tighten each set screw to hold in place e epare two F 10 profiles Slide set screws into both bolt tracks on each end of two F 10 profiles Hand tighten each set screw to hold in place ef ea LO ug e R o amp Connector To Profile Profile WWW RSIWW COM 14 of 44 3 2A Working from inside remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing side marked UV Resitant facing outside ie Bat n ary a POP he vaunenpanuns IMPORTANT The panels expand and
27. bling the roof Remove in step 8 5A 8 2A Working from the inside install B 4 connector on middle profile on both sides of greenhouse Secure each with one bolt Se F ie 1 SEK NOTE VIEWS FROM INSIDE 8 2B Hook one end of bungee cord into top hole in B 4 connector on each side 4 S 9 NOTE VIEWS FROM OUTSIDE Connector TY gt P B 4 2 NOTE VIEWS FROM INSIDE een 1 il s 2c 2 33 of 44 WWW RSIWW COM 8 3A Working from back right corner remove plastic film from both sides of one W 1 panel With side marked UV Resistant facing outside fit top end of panel into channel in R 1 roof ridge near corner Push panel into roof ridge channel until the other end rests on gutter ledge and then slide towards F 7 corner profile Repeat to install W 1 panel in back left corner 8 3B With two set screws facing inside fit one F 1 profile next to right panel F 1 profile rests against widest part of roof ridge and lines up with top of gutter 8 3C From inside hold profile in place with one B 4 connector Secure with two bolts B84 Bs al An 0 NOTE VIEWS FROM
28. ctory assembled door remove the bolt attaching left door track D 1L to F 7 profile With the wheels facing inside line up so they roll into the left door track As you roll the door along the track make certain it slides inside the B 3 door guide installed in step10 2 Continue to roll door until it stops next to the bolt at the center Secure using the bolt you removed gt sH D 2L D 2R z ZA D 2L NOTE VIEWS FROM OUTSIDE 10 4B Repeat step 10 4A to install the right door C 7 gt D 2R D 2R NOTE VIEWS FROM OUTSIDE 10 4C Make sure the doors hang fe m properly slide easily and look D straight If you need to adjust either one or both loosen J the center bolts to either 10 5A Lining up holes in door install the D 3 door knobs using the included screws NOTE VIEW FROM OUTSIDE e raise or lower each door as needed Secure the center bolts when finished
29. d connector B 7 to each corner Secure each with two bolts IMPORTANT Bolt track of F 6 front profile is lower than bolt track of G 1 gutter profile NOTE VIEWS FROM INSIDE WWW RSIWW COM 25 of 44 5 9A Prepare two F 7 corner profiles Slide three set screws into the same bolt track two on one end and one on other end 6 6 a cE of profile Position one set screw in center of 5 9B From outside fit F 7 profiles into each side of front eed with either side Arrange F 7 profile profile It will be used in a later step Tighten each set screw to hold in place so channel lines up with tops of panels and the set screws are facing out The side of the profile rests against cut angle of F 3 profile The top end touches edge of F 4 center profile and bottom end touches top of G 1 gutter Position both F 7 profiles NOTE VIEW FROM OUTSIDE 5 9C Use C 1 connector to secure each outside corner Loosen set screws on profiles and adjust position to fit holes in C 1 connectors Make sure all profiles line up flush against each other Secure with bolts Repeat on other side 7 7 0 NOTE VIEW FROM OUTSIDE A 5 9D Check inside corners to ensure B 7 connector is still in proper position
30. d to in this manual as a set screw Shown sliding into F 1 bolt track IMPORTANT One end of the S 2B threaded set screw has a hex shaped indent The other end forms a soft point Make sure indented hex is always facing up when screwed into the S 2A nut This way if the set screw is installed too tightly to loosen by hand you can use a hex key 1 1B After sliding into bolt track screw threaded part LE farther into nut so end touches the edge of the profile and holds in place Do not over tighten tie It will be difficult to loosen again to adjust position to fit holes in connectors set screw Shown hand tightened in F 1 bolt track NOTE Screwing S 2B threaded part farther into nut so it holds is referred to in this manual as hand tighten Loosen set screw refers to unscrewing the S 2B threaded part enough so set screw easily slides NOTE We recommend assembling all set screws before beginning Each step shows quantity needed separately Connectors are secured with S 2C bolt using set screws in later steps 1 2 The base is made up of four P 1A and four P 1B profiles Arrange profiles in a square as shown WARNING Use extreme caution when handling profiles P 1A and P 1B The bottoms may have sharp edges near the drilled holes The cut edges on the corners of these profiles are sharp IMPORTANT Make sure the base fit
31. ed in place 7 2B Make sure end of roof ridge is flush to profiles on front and back 7 3A Working from inside secure roof ridge to front end wall Loosen set screws and adjust position to fit holes in B 7 connector Secure with two bolts 7 3B Repeat step 7 3A to secure back Connector 7 4A Working from outside ensure all pieces are still flush and secure roof ridge to front Loosen set screws and adjust position to fit holes in C 2 connector Secure with three bolts NOTE VIEWS FROM OUTSIDE 31 of 44 WWW RSIWW COM Assemble Roof Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Prepare needed set screws as shown in step 1 1A NOTE Have the hex shaped indent facing up Screw in until it is flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 8 1A_ Prepare all profiles for roof Prepare four F 1 profiles Slide one set screw into bolt track on each end of profile Tighten to hold in place e 8 1B Prepare two F 1 profiles
32. edge of F 7 corner profile M 4 5B Place one set screw on the inside bolt track of the gutter at each end Hand tighten both set screws to hold in place NOTE VIEW FROM INSIDE Connector NOTE VIEWS FROM INSIDE WWW RSIWW COM 19 of 44 4 6A The gutters are secured together using B 5 connectors and attached to side profiles using B 3 connectors on the outside of the greenhouse The B 3 connector uses the set screw in the center hole of B 5 connectors at seams Loosen and slide set screws to line up with connectors making sure the seams line up and the gutters remain straight 4 6B Begin at the three seams and arrange set screws so middle screw is centered Fit B 5 connector onto gutter and hold in place using the two end bolts NOTE VIEWS FROM OUTSIDE UNDER GUTTER 4 6C Loosen set screws on side profiles and slide down Fit wide part of B 3 connector onto set screw Slide up into place fitting gutter set screw at other end Tighten set screws and secure with bolts NOTE The bottom of B 3 connector extends past the edges of side and corner profiles B 3 connector sits over B 5 connector Secure all with bolts NOTE VIEWS FROM OUTSIDE UNDER GUTTER Connector QTY Connector B 3 20
33. el in base placing side marked UV Resitant facing outside The panels will help hold the profiles up during assembly 7 aan 2 2B Place F 7 corner profile on base fitting panel into channel Slide set screws into base so they line up Fit B 3 connector on each side 2 2C Secure with four S 2C bolts NOTE VIEWS ARE FROM OUTSIDE 2 3A Continue working from inside Remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing side marked UV Resitant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 2 3B Place 23 inch spacer on base next to F 7 corner profile Fit panel into channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement Position F 1 profiles so single set screw is next to base on inside NOTE Panels will not fit completely to end of channels There will be some space to allow for temperature changes W 1 W 1 2 3C Fit B 3 connector and secure with two S 2C bolts ENA paji Z 2 3D Continue building the side wall from the inside Use the spacer with each panel and the four remaining F 1 profiles Repeat steps 2 3A through 2 3C NOTE VIEW FROM INSIDE 2 4 Add the last W 1 pan
34. el to complete the side From the outside fit F 7 corner profile into place and secure I NOTE VIEW FROM OUTSIDE Connector 11 of 44 WWW RSIWW COM 2 5A Prepare two G 11 gutter profiles by sliding four set screws into bottom bolt track Hand tighten each end set screw to hold in place A A oA oQ ere a gat gree 2 5B Prepare one G 2 gutter profile with five set screws Slide set screws into bottom bolt track Hand tighten end set screw to hold in place ae gent eg geet Profile 252 Connector S 2A 13 D S 2B 13 Working from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile at each end and the two longer G 2 gutter profiles in the center Seams sy are centered to bolt tracks in F 1 profiles S JZ O NOTE At front and back edge of G 1 gutter profile lines up flush with edge of F 7 corner profile L NOTE VIEW FROM INSIDE 2 6B Place one set screw on the inside bolt track of the gutter at each end Hand tighten both set screws to hold in place Connector iia Iu NOTE VIEWS FROM INSIDE WWW RSIWW COM 12 of 44
35. es Slide set screws into all three bolt tracks on one end and into two side bolt tracks on other end of corner 8 a profile Hand tighten each set screw to hold in place wo E oF 8 en NOTE Set screw in center bolt channel is used when installing optional shelving units Install F 7 profile with set screw near base until needed 4 1B Prepare three F 1 wall profiles Slide set screws into both bolt tracks on one end of profile and one bolt track on the other end The single set screw will sit on the inside near the base when installed eo amp e To ak To 4 1C Hand tighten each set screw to hold in place Oy Qoe ao Profile WWW RSIWW COM 17 of 44 4 2A Continue working from inside back left corner Remove plastic film x from both sides of one W 1 panel Fit panel into channel in base and corner profile placing side marked UV Resistant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 4 2B Place 23 inch spacer on base next to F 7 corner profile Fit panel into channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement Position F 1 profiles so single set Mi screw is next to base on inside W 1 W 1 NOTE Panels will not fit completely to end of channels spacer
36. h spacer on base next to F 7 corner profile Fit panel into channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement Position F 1 profiles so single set screw is next to base on inside I NOTE Panels will not fit completely to end of channels W 1 There will be some space to allow for temperature changes W 1 spacer tool x 3 2C Fit B 3 connector and secure with two S 2C bolts na NOTE VIEWS ARE FROM INSIDE 3 2D Continue building the end wall from the inside Use the Spacer with each panel and the two remaining F 1 profiles Repeat steps 3 2A through 3 2C 3 3 Add the last W 1 panel to complete the back From the outside fit F 7 corner profile into place and secure with two B 3 connectors NOTE VIEWS ARE FROM OUTSIDE 15 of 44 WWW RSIWW COM Assemble Left Wall Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Prepare needed set screws as shown in step 1 1A NOTE Have the hex shaped indent facing up Screw in until it is flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 4 1A Prepare one F 7 corner profil
37. lete If you have never assembled a greenhouse before make it a weekend project We recommend you take your time and read these instructions carefully to avoid mistakes NOTE These instructions include helpful hints and important information needed to safely assemble and properly maintain the greenhouse Please read these instructions completely before you begin Before Starting Assembly 1 Make sure you have all the necessary parts Compare the contents of the four cartons with the List of Parts If any parts are missing or damaged or if you have any questions please contact Customer Service by phone at 877 373 3078 or by email at customerservice risww com before beginning assembly 2 Lay the parts out in one staging area The List of Parts has the corresponding step number referenced to each part so you can easily prepare for each step We recommend placing all parts in one staging area Lay out parts by size and shape Use the List of Parts to identify the part numbers for profiles and panels We have not labeled the parts with stickers to avoid removing them during assembly 3 Select a Location When selecting a site for your greenhouse a flat level surface is essential and if possible with proper water drainage and easy access to power and water necessary for greenhouse gardening Choose a sunny level position away from overhanging trees and power lines and protected from the wind as much as possible The location should be
38. nnectors at seams Loosen and slide set screws to line up with connectors making sure the seams line up and the gutters remain straight 4 6B Begin at the three seams and arrange set screws so middle screw is centered Fit B 5 connector onto gutter and hold in place using the two end bolts secure with bolts NOTE VIEWS FROM OUTSIDE UNDER GUTTER 4 6C Loosen set screws on side profiles and slide down Fit wide part of B 3 connector onto set screw Slide up into place fitting gutter set screw at other end Tighten set screws and NOTE The bottom of B 3 connector extends past the edges of side and corner profiles B 3 connector sits on top of B 5 connector Secure all with bolts NOTE VIEWS FROM OUTSIDE UNDER GUTTER Connector QTY Connector B 3 20 of 44 WWW RSIWW COM Assemble Front Wall and Gable Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Prepare needed set screws as shown in step 1 1A 1 Make certain the pieces are in the correct positions before assembling NOTE Have the hex shaped indent facing up Screw in until it is flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 5 1 The door frame is 6514 high from
39. nts With side labled inside vent Mark screw placement Face inside facing up lay panel Using S 1 screw apply pressure to on flat clean surface puncture the panel and predrill Measure and holes for next step mark center of vent V 2 El il 1 WWW RSIWW COM 39 of 44 9 2C Screw two S 1 screws through V 2 panel Line up gripping channel on other side Continue to screw until secure Do not over tighten as it may damage the vent Connector Gripping Channel NOTE VIEW FROM OUTSIDE NOTE VIEW FROM INSIDE 9 3A From inside hold Window Opener closed against vent Slide vent at an angle through opening in roof panels Hook top lip of vent onto curve in ridge profile R 1 NOTE VIEWS FROM FRONT NOTE VIEW FROM OUTSIDE 9 3B Outside of vent rests on top of ledge on W 2 profile Open vent so you can attach the other arm of opener to top of inside W 2 profile Screw two S 1 screws through panel and into gripping channel on other side to secure Do not over tighten as it may damage the vent NOTE VIEW FROM OUTSIDE Connector Gripping Channel 9 4A From inside screw S G screw and spacer into the holes on each end of the top of the vent This will secure the vent to the greenhouse in very windy conditions n Connector
40. rials Tools Eight 10 pressure treated 2x4 lumber cut to 9712 Spirit Level Fifty 8 3 wood screws Corner Square Phillips Screwdiver Power Drill recommended Make sure each corner is square and then secure one corner with wood screws Move to the diagonal corner make sure it is square and then secure with wood screws As you continue to secure the 2x4 wood platform continue to make certain the corners are square and the frame is level w BS A Secure wood platform every two feet with wood screws Make certain to tighten screws into the wood platform until they are flush with the surface NOTE The illustrations throughout the manual are shown without a foundation WWW RSIWW COM 3 of 44 List of Parts The greenhouse is shipped in four cartons These cartons are heavy Use care when lifting them Some parts have sharp edges Use extreme caution when handling Wear proper safety gear including work shoes gloves and safety goggles Keep children and pets away until assembly is complete Finish assembling the roof in one session Do not leave the roof unattended until it is completely assembled Place all like parts together in a staging area Prepare for each step according to instructions in this manual If any parts are missing or damaged contact Riverstone Customer Service before beginning assembly Customer Service 877 373 3078 or email customerservice risww com
41. rting into bolt track screw in until it holds in place on one end and into two side bolt tracks on other end of corner profile Hand tighten each set screw to hold in place KO 3 1B Prepare three F 1 wall profiles Slide set screws into both bolt tracks on one end of profile and one bolt track on the other end The single set screw will sit on the inside near the base when installed Hand tighten each set screw to hold in place woe leg ag gt To To 3 1C Prepare two F 6 profiles Slide set screws 34D Pr into both bolt tracks on each end of two F 6 mitered profiles Hand tighten each set screw to hold in place epare two F 10 profiles Slide set screws into both bolt tracks on each end of two F 10 profiles Hand tighten each set screw to hold in place oe amp ea Lo ug e e wg o es Connector ed Profile Profile WWW RSIWW COM 14 of 44 3 2A Working from inside remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing side marked UV Resitant facing outside dna ira S 4uny varan x ary a LEETETTETE Pannnnpannn IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 3 2B Place 23 inc
42. s There will be some space to allow for temperature changes 6 6A_ From outside fit F 7 profiles into each side of back Arrange the profile so channel lines up with tops of panels and the set screws on each end are visible Begin with either right or left side Profile side fits against cut angle of F 3 profile One end touches top of gutter and the top end A touches edge of F 2 center profile v Position both F 7 profiles NOTE VIEW FROM OUTSIDE 6 6B Use C 1 connector to secure each outside corner Loosen set screws on profiles and adjust position to fit holes in C 1 connectors Make sure all profiles line up flush against each other Secure with three bolts Repeat on other side SY Je E v j NOTE VIEW FROM OUTSIDE H st d 1 P 6 6C Check inside corners to ensure B 7 connector is still in proper position If it needs adjusting repeat steps 6 6B and 6 G6C until each corner is set A NOTE VIEW FROM INSIDE WWW RSIWW COM 29 of 44 Assemble Roof Ridge Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes gloves and goggles Prepare needed set screws as shown in step 1 1A
43. s properly on your foundation If not stop and fix your foundation Profile kc 50v LEE eee lg P 1B 4 WWW RSIWW COM 7 of 44 1 3 Separate profiles to install set screws into inside and outside bolt tracks Some of the set screws will be secured in this step Most are secured in later steps They are difficult to install after the base is assembled Pay careful attention to ensure you have the correct number of set screws in the correct bolt track in each profile The profiles have different amounts of screws on the inside and outside bolt tracks The chart and illustration below show the set screw placement The squares represent screws that are used in steps 1 4A and 1 4B the circles represent screws used in steps 2 through 10 and the crosses represent screws used in step 11 NOTE Instructions identify twelve set screws necessary for securing to ground in step 11 IMPORTANT When assembling base make sure the profiles are straight and flush against each other Secure profiles together and ensure corners are square The diagonal measurements on inside corners should be equal Secure corners to desired foundation until assembly is completed We recommend using a two by four platform BACK Set Screw Placement Code M Set screws used in steps 1 4A and 1 4B Set screws used in steps 2 through 10 a Set screws used in step 11 Connector 8 of
44. seees 14 Assemble Left Wall ccesssscseeseeesees 17 Assemble Front Wall and Gable 21 Assemble Back Gable nssssssssssssesesesese 27 Assemble Roof Ridge sesser 30 Assemble Roof sssssssssssssssssssssssssssssessssee 32 TEER CO VENS aonn 39 MEEDE eR 41 Sec reto PAGONIMA a eaen 44 O e Work Gloves e Tape Measure Tools Needed Safety Goggles e Spirit Level e Step Ladder e 746 Wrench included e 5 foot bungee cord included e Phillips Screwdriver included e 23 inch spacer included 2 of 44 WWW RSIWW COM Constructing a Wood Platform IMPORTANT It is very important to begin with a level surface Check your foundation to ensure it is level at every point If you are not building on a wood deck we recommend constructing a wood platform so you can properly secure the greenhouse You must assure your foundation is square and level before beginning assembly After choosing a location proper preparation of the site is essential The site must be level Create a wood platform using a perimeter of pressure treated two by fours filled with either soil sod or gravel NOTE When constructing the greenhouse on a wood deck make certain the surface is level Creating an additional wood platform is not necessary Buy pressure treated 2x4 lumber You will use two layers with the corner positions staggered for maximum strength The finished dimensions will be 101 by 101 Mate
45. tant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 5 3B Place 23 inch spacer on base next to F 7 corner profile Fit panel into channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement NOTE Panels will not fit completely to end of channels There will be some space to allow for temperature changes 5 3C Fit B 3 connector and secure with two S 2C bolts tal LU W 1 W 1 spacer tool NOTE VIEW FROM INSIDE 5 3D Continue working from inside left corner place F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F 6 profile fits snugly between F 7 corner profile and F 1 wall profiles 5 3E From inside line up F 3 profile as shown Make sure B 2 connectoris B 2 pointing towards door opening NOTE VIEWS FROM INSIDE 5 3F Adjust set screws and place B 2 connector on profiles as shown Slide set screws in vertical openings to center of opening so B 6 trim NOTE VIEWS FROM INSIDE plate will fit properly
46. to be used with braces Slide two set screws into bolt track on one end and one set screw on the other end of profile 8 1C Measure 195 8 inches from one side of profile Slide middle set screw to that point and tighten to hold in place Tighten the other two set screws on each end of profile 19 498mm Profile Connector WWW RSIWW COM 32 of 44 8 2 Theroof panels are installed in the sections shown below Use two people and a step ladder to assemble the roof Place step ladder inside greenhouse Have one person stand on ladder inside and guide panel into channels in roof ridge and corner profiles The other person supports the end of the panel from the outside Section 1 Back two W 1 panels Section 2 Front two W 1 panels Section 3 Middle three W 1 panels Section 4 W 2 panel WARNING Use two people to install roof Allow enough time to complete this step and install and secure roof Do not leave roof unattended until it is completely assembled IMPORTANT The panels expand and contract depending on the temperature Under some conditions the panels may require slight force to install Do not use excessive force or you may move profiles out of position When you are having dificulty sliding the panels use dish soap with water on the edges as a lubricant NOTE Use included five foot bungee cord for added support It will help hold the sides in position while assem
47. two bolts IMPORTANT Bolt track of F 6 front profile is UL lower than bolt track of G 1 gutter profile NOTE VIEWS FROM INSIDE 6 3A Continue working from inside Line up F 2 and F 3 profiles with F 1 profiles as shown Loosen set screws and adjust position to fit holes in B 1 connectors Make sure profiles are straight 6 3B Secure with bolt in each B 1 connector NOTE VIEW FROM INSIDE 6 4A Work from outside to add B 1 connectors in the same position Loosen set screws on profiles and adjust position to fit holes in B 1 connectors Fit B 1 connector to profiles as shown 6 4B Secure each B 1 connector with four bolts Connector B 1 3 NOTE VIEW FROM OUTSIDE 12 28 of 44 WWW RSIWW COM 6 5 Continue working from outside to install panels a shown Remove plastic film from both sides of two W 3 and two W 4 panels Fit each panel into channel in profiles placing side marked UV Resistant facing outside W 3 NOTE VIEW FROM OUTSIDE WARNING The corners of W 3 and W 4 panels are sharp Use extreme caution when handling NOTE Panels will not fit completely to end of channel
48. until the other end rests on G 2 gutter ledge and then slide towards F 1 profile at back Repeat to install W 1 panel next to it on left Push panel towards front NOTE VIEWS FROM OUTSIDE WWW RSIWW COM 36 of 44 8 5D From the inside have one person lift the bottom corners of the two panels where they meet From the outside have the other person hold and position F 1 profile so both panels fit in channels on sides of F 1 profile Slide the F 1 profile up towards the roof ridge As the profile moves up have the person on the inside guide it into place NOTE Use dish soap with water on edges of panels to help slide F 1 profile into place NOTE VIEWS FROM OUTSIDE 8 5E Hold in place on left side with one B 4 connector Secure with two bolts NOTE VIEWS FROM INSIDE F 1 0 Lil 8 5F Hold two profiles together in place at ridge using one B 4 connector Line up center hole with long hex bolt in roof ridge Place washer on long bolt and secure all screws with three bolts NOTE VIEWS FROM INSIDE Connector Connector B 10 1 S 2C 3 S 5B 1 8 6 Remove plastic film from both sides of one W 2 panel It will be installed opposite the W 1 panel installed in 8 5C From outside position panel with extended
49. ys wear work shoes gloves and safety goggles when working e Some of the parts have sharp edges and burs Use extreme caution when handling e Do not lean against or push the greenhouse during assembly e Take special care not to touch overhead power lines with the aluminum profiles e Do not attempt to assemble the greenhouse in windy or wet conditions e Do not position your greenhouse in an area exposed to excessive wind e If using power tools or a step ladder always follow the manufacturer s safety instructions e Hot items such as recently used grills blow torches etc must not be stored in the greenhouse e Store the polycarbonate panels in a cool dark place such as a garage until you are ready to use them e Make sure the greenhouse complies with local building codes General Order of Assembly Step 1 Assemble Base Step 2 Assemble Right Wall Step 3 Assemble Back Wall oa Step 4 Assemble Left Wall Step 5 Assemble Front Wall and Gable Step 6 Assemble Back Gable Step 7 Assemble Roof Ridge Step 8 Assemble Roof Step 9 Install Roof Vents OWA Step 10 Install Doors Step 11 Secure to Platform Table of Contents TOCNO aoo 1 Satety Advice 2 oer 2 General Order of Assembly 2 Construct Wood Platform 4 3 EEI EN E AA 4 Prepare Set SCrOWS ssssessssccssseseseess 7 AssempleiBas eman 7 Assemble Right Wall cscssesseeesees 10 Assemble Back Wall cscscscssescsee

Download Pdf Manuals

image

Related Search

Related Contents

SCU07, SCU08, SCU09, SCU10L Hardware Manual, Ver  Bedienungsanleitung  Manuel d`installation et d`utilisation CASIER DE STOCKAGE D  User`s Manual  page 64 - A & A Hydraulic for the best in Lincoln Lube Parts.  取扱説明書 TCー4664  User Manual  Cellular Line BTDONGLEMICRO2    

Copyright © All rights reserved.
Failed to retrieve file