Home
Monticello Mont-24-BK Instructions / Assembly
Contents
1. A 7 il I Monticello Made in the USA 8 x 24 Greenhouse Assembly Instructions 71812 PRPS Riverstone amp Customer Service 877 373 3078 Email customerservice amp risew com amp 5 Fleetwood Drive Rockaway MJ O07885 Introduction Thank you for purchasing your Monticello 8x24 Greenhouse The Monticello lineis proudly made in the USA Py a leading commercial greenhouse maker using the same professional grade materials and design The frame is constructed with the ee Pe aluminum with lead free powder coated paint The panels are professional grade Smm twin polycarbonate selected for their insulation and durability The Monticello line is a modular system which uses an xP greenhouse that can be easily expanded in four foot sections up te 24 feet by 8 feet at any time This model consiste of an 8x8 greenhouse nnn extension It includes five roof vents each with it s own automatic vent opener to Se nali eser and maintain optimal temperature When properly assembled and maintained this greenhouse soe pesto of enjoyment Our greenhouse has been designed to be easily assembled Although all but one step can be completed by one person we recommend using a helper for the entire assembly You will need assistance from another person to assemble the roof Allow six to eight hours to complete IF you have never assembled a greenhouse before make ita weekend project We recommend you take your time and read these instructions care
2. 5 90 until each corner is set NOTE VIEW FROM INSIDE uL m Assemble Back Wall MOTE Have the hex shaped indent facing up Screw in until itis lush with bottom of mut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place Make certaln the pleces are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 14 61A Prepare two F 7 corner profiles Slide set screws into the same bolt track one on each end of profile Tighten each set screw to hold in place 6 16 Prepare one F 2 profile Slide set screws into both bolt tracks on each end of profile Tighten each set screw to hold in place 86 1C Prepare two F 3 profiles Slide set screws into both bolt tracks on straight end of F 3 profiles Tighten each set screw to hold in place WARNING The cut edge of F 3 profile is sharp Use extreme caution when handling 6 2 From insidas add connector B T te each corner Secure each with two belts ii IMPORTANT Bolt track of F 6 front profile is lower than bolt track of G 1 gutter profile NOTE VIEWS FROM INSIDE 6 3 4 Continue working from inside Line up F 2 and F 3 profiles with F 1 profiles as shown Loosen set screws and adjust position to fit holes in B 1 connecto
3. Fush arms apart a if necessary Secure with a threaded 9 10 Turn adjusting screw clockwise stud on each side until arms are aproxmately 6 apart lt r NA a i I NC um i a n m n Me M cni NT x m 4 E o p E 1 xl d p 8 1E Repeat steps 9 1A through 9 1D to prepare four more NOTE You will use the Gripping Channels in next steps You do Automatic Window Openers nat need the other included parts in Window Opener package Handla OTY Cylinder Jory Adjusting Knob gry Threaded Stud O 9 24 Kemave plastic film from both sides of V 2 9 28 Place opener with arm A on bottom factory assembled vents With side labled inside vert Mark screw placement Face Inside facing up lay panel Using 5 1 screw apply pressure to on flat clean surface E puncture the panel and predrill Measure and m holes for next step mark center of vant Wey BS TWW CON 31 of 46 9 2C Serew two 5 1 screws through V 2 panel Line up gripping channel on other side Continue to screw until secure Do net over tighten as It may damage the vent Ji NE Foz 9 2D Repeat steps 9 2A through Qo B 2C to prepare four more vents ax Hp e Vf s M Connactor rv Gripping channa C a 9 3 From inside hold a ee E opening in roof panels Hook E R top lip of vent onto curve in ridge prole R 1 v2 NOTE VIEW FROM OUTSIDE NOTE VIEWS FROM FRONT 9 3B Outside of vent res
4. Secure with three bolts Repeat on other sida B 6C Check inside corners to ensure B 7 connector is still in proper position IF it needs adjusting repeat steps 6 68 and 6 60 until each corner is set NOTE VIEW FROM INSIDE Assemble Roof Ridge MOTE Have the hex shaped indent facing up Screw in until itis lush with bottom of mut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place Make certaln the pleces are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 74 7 1 Prepare the two R 1 and three K 1E roof profiles They will line up ina row and joined using five B 5 connectors using a total of twenty two set screws and five long hex bolts Arrange profile so bolt track is facing up TOA Slide set screws Inte bolt track on each end of profile as shown profiles in the middle Hand tighten set screw m ee 71B Lins up five profiles in a straight line with R 1E eet gent on each end of K 1 profile to hold in place L TAC Adjust position of set screws and long hex bolt to fit holes in B 5 connector Position each B 5 connector with the long hex bolt in center hole and center to the seam where the profiles join TAO Secure B 5 connector by attaching bolts te the set scr
5. Steps 8 2 34 5 4 4 of 46 List of Parts continued WARNING Use extreme caution when handling panels with cut edges The corners are sharp WWW BETA COM Sof46 List of Parts continued amp 7 810 11 Cm Included Tools e UE LE Philips Scrawdrivar amp of 46 WW RS TARN CEP Assemble Base Make certaln the places are In the correct positions before assembling ye A Carefully follow the order of assembly to ensure an easy Installation d A Wear proper safety gear Including work shoes gloves and goggles p 1 1 amp We use a set screw and nut assembly EU system for ease of installation With ap the hex shaped indent facing up screw 5 26 threaded part into S 2A WE 2X nut until it is flush with bottom e E of nut When the assembly is flush ee it will slide easily in the bolt tracks MOTE The two pieces together is referred to in this manual as a set screw Shown sliding into F 1 bolt track As IMPORTANT One end of the 5 28 threaded set screw has a hex shaped indent The other end forms a soft point Make sure indented hex is always facing up when screwed into the 5 24 nut This way if the set screw is installed too tightly to loosen by hand you can use a hex key ral b JA lt 1 1B After sliding inte bolt track screw threaded part 5 farther inte nut so end touches the edge of the Vv profile and holds in place Do not over tighten Ht wi
6. along back wall Place first F 10 profile on next W 1 panel Make sure profile fits snugly between the two F 1 wall profiles 3 40 Place second F 10 profile on next W and ensure it fits snugly Gil bal 3 40 Place second F 6 profile with mitered end next to corner and angled edge facing up onte corner W 1 panel F 6 profile fits snugly between F 7 corner profile and F 1 wall profiles NOTE ALL VIEWS FROM INSIDE 3 5A From inside loosen set screws on profiles and adjust position to fit holes in B 1 connectors Fit B 1 connector to profiles as shown 3 58 Secure each B 1 connector with three belts NOTE ALL VIEWS FROM INSIDE PSI COM 16 of 46 Assemble Left Wall Fr MOTE Have the hex shaped indent facing up Screw in until itis flush with bottom of mut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place Make certaln the places are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 74 4 1A Prepare one F 7 corner profiles Slide set screws inte all three bolt tracks on one end and into two side bolt tracks on other end of corner profile Hand tighten each set screw to hold in place MOTE Set screw in center bolt channel is used when installing optio
7. as A shown Make sure B 2 connector is pointing towards door opening NOTE VIEW FROM INSIDE NOTE VIEW FROM INSIDE 5AF Install B 6 trim plate and secure with three bolts 5 46 Adjust set screws and place B 2 connector on n profiles as shown Slide set screws In vertical m openings to center of opening so B 6 trim plate will fit properly Wey RSW CON 23 of 46 5 5 The door frame is 654 high from the base To avoid adjusting the placement after assembly prepare door frame using the exact measurements listed in these steps 5 54 Prepare one F 4 profile Slide two set screws into bolt track and position as shown 5 5G Place one end of F 4 profile against F 5 profile on flat level surface Center F 4 profile to F 5 profile and adjust set screws to fit B 2 connector Secure with three bolts a Smm LJ 1 5 amp 0mmil 22 IMPORTANT F 4 profile is centered to F 5 profile and secured on both sides with B 2 connector 5 5D Turn profiles over and place on flat surface Slide two set screws into bolt tracks of F 4 and F 5 profiles Repeat step 5 5C to place and secure B 2 connector NOTE The inside has two extra set screws on the ends of F 5 profile 5 64 Working from inside remove plastic film from both sides of two W 3 panels Fit each panel inte channels in profiles placing side marked UV Resistant facing outside 1 T Doe The comers of W 3
8. at each end and the five longer G 2 gutter profiles in the center Seams are centered to bolt tracks in F 1 profiles NOTE At front and back edge of G 1 gutter profile lines up flush with edge of F 7 comer profile 2 5B Place one set screw on the inside bolt track of the gutter at each end Hand tighten both set screws to hold in place NOTE VIEW FROM INSIDE WWW RETWW COM 12 of 46 27A The gutters are secured together using B 5 connectors and attached to side profiles using B 3 connectors on the outside of the greenhouse The B 53 connector uses the set screw in the center hele of B 5 connectors at seams Loosen and slide set screws to line up with connectors making sure the seams line up and the gutters remain straight 2 TB Begin at the six seams and arrange set screws so middle screw is d centered Fit B 5 connector onto gutter and hold in place using the twe end bolts 27C Loosenset screws on side profiles and slide down Fit wide part of B 3 connector onto set screw slide up inte place fitting gutter set screw at other end Tighten set screws and secure with bolts MOTE The bottom of B 3 connector extends past the edges of side and comer profiles B 3 connector sits over B 5 connector Secure all with bolts am army D B 3 13 5 20 50 WY LSI OR 13 of 46 Assemble Back Wall MOTE Have the hex shaped indent facing up Screw in until itis flush with bottom of mu
9. of 46 4 BAA Continue working from front right comer Remove plastic 4 film from beth sides of one W 1 panel With side Fal marked UY Resistant facing outside fit top end of panel into channel in roof ridge near corner Push panel inte roof ridge channel until the other end rests on gutter ledge and then slide towards F 7 corner profile Repeat to install W 1 panel in front left corner wI NOTE VIEWS FROM OUTSIDE d d i BAC Hold two profiles together at ridge using 6 46 From inside fit one F 1 profile with two set ong Bd aonnactak Saura with twa bata screws facing inside next to panel Hold in place with one B 4 connector on right side a E ie Secure with two bolts Repeat to install F 1 Pps p RSS ES p NOTE VIEWS FROM INSIDE 5 54 Return te back to install section three and remove bungee cord nearest to back Remove plastic film from both sides of one W 1 panal With side marked UY Resistant facing outside install the next panel on the left at the back Push panel inte roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back NOTE W 2 panels are installed in step 8 9 6 568 From Inside fit one F 1 profile with 8 50 Hold two profiles together in place at ridge three set screws next to panel Position using one B 4 connector Line up center hole profile so set screws face inside and with long hex bolt in roof r
10. profile into place and secure 4 44 Prepare two G 1 gutter profiles by sliding four set screws Inte bottom bolt track Hand tighten each end set screw to hold in place eave Prepare four G 2 gutter profile with six set screws and one G 2 gutter 4 4B profile with five set screws Slide set screws into bettom bolt track Hand tighten Em end set screw to e hold in place mae SSS eme eee ee ee 5 on m F m rz 4 5A Working from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile at each end and the five longer G 2 gutter profiles in the center Seams are centered to bolt tracks in F 1 profiles NOTE At front and back edge of G 1 gutter profile lines up flush with edge of F 7 comer profile 4 58 Place one set screw on the inside bolt track of the gutter at each end Hand tighten both set screws to hold in place NOTE VIEW FROM INSIDE NOTE VIEWS FROM INSIDE WAW Sw oe 19 of 46 The gutters are secured together using B 5 connectors and attached te side profiles using B 3 connectors on the outside of the greenhouse The B 53 connector uses the set screw in the center hele of B 5 connectors at seams Loosen and slide set screws to line up with connectors making
11. proper safety gear Including werk shoes gloves and goggles Prepare needed set screws as shown In step 1 74 8 1 Prepare all profiles for roof Prepare twelve F 1 profiles Slide one set screw into bolt track on each end of profile Tighten to hold in place 6 16 PreparetenF 1 profiles to be used with braces Slide two set screws into bolt track on one end and one set screw on the other end of profile 5 1C Measure 199b inches from one side of profile Slide middle set screw to that point and tighten to hold in place Tighten the other two set screws on each end of profile B 2 The roof panels are installed In the sections shown below Use two people and a step ladder to assemble the roof Place step ladder Inside greenhouse Have one person stand on ladder Inside and guide panel Inte channels In roof ridge and corner profiles The other person the end of the panel from the outslde Section 1 Back two W 1 panels Section 2 Front two W panels Section 2 Next three W 1 panel from back Section 4 Next three W 1 panels Section 5 Next three W 1 panels Section amp Nest five W 1 panels Section 7 Final W 1 panel and five W 2 panels IMPORTANT The panels expand and contract depending on the temperature Under some conditions the panels may require slight force to install Do not use excessive force or you diei move profiles out of position When you are having dificulty sliding the panels use d
12. sure the seams line up and the gutters remain straight ABB Beginat the six seams and arrange set screws so middle screw is centered Fit B 5 connector onto gutter and hold in place using the twe end bolts AGC Loosen set screws on side profiles and slide down Fit wide part of B 3 connector onto set screw slide up inte place fitting gutter set screw at other end Tighten set screws and secure with belts MOTE The bottom of B 3 connector extends past the edges of side and corner profiles B 3 connector sits over B 5 connector Secure all with bolts NOTE VIEWS FROM OUTSIDE UNDER GUTTER am ary D B 3 13 ze 2C 50 BY FUE VV OR 20 0f 46 Assemble Front Wall and Gable NOTE Have the hex shaped indent facing up Screw in until itis flush with bottom of mut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place Di Make certaln the pleces are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 14 5 1 The door frame is 6544 high from the base To avoid adjusting the placement after assembly prepare door frame using the exact measurements listed in these steps 5 1A Prepare two F 5 profiles 5 16 Fit B 2 connector onto profile and position so bottom WI
13. 4B Make certain corners line up and are flush Adjust position of set screws in inner bolt track to fit holes in B amp connector Secure with four bolts Repeat until each corner is secure Ece M IMPORTANT Double check the position and amount of unused set screws in the base You should have 57 available for later assembly Connector CTY Connector CITY B 5 12 gea B 8 VAESHEZESB 1 5 Measure base diagonally from inside corner Equal measurements ensure the base is square Use a spirit level to make sure the base is level im 1 5B Leeate predrilled holes in base profiles and use six 5 4 screws one at each corner and one in the center of each side to secure to wood platform You will secure the greenhouse completely to the platform instep 11 1 when assembly is finished Wey RSW COM Sof 46 Assemble Right Wall MOTE Have the hex shaped indent facing up Screw in until itis flush with bottom of mut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place Make certaln the pleces are in the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear including werk shoes gloves and goggles Prepare needed set screws as shown In step 1 74 2 14 Prepare two F 7 corner profiles Slide set screws into al
14. D through amp 5F to install next two W 1 panels and F 1 profiles Wey BS TWW CON 38 of 46 Femove plastic film from both sides of one W 1 panel With side marked UY Resistant facing outside install next panel at slight angle on left If necessary loosen the previous B 4 connector and profile and move them towards the back of the greenhouse te make mere room to fit panel in place NOTE VIEW FROM OUTSIDE 5 898 Remove plastic film from both sides of one W 2 panel It will be installed opposite the W 1 panel installed in amp 9A From outside position panel with extended ledge profile at outside top Install panel at slight angle sliding all the way into profile Fit other end into opposite profile IF necessary apply slight pressure to bend panel and snap into place 6 9C Remove plastic film from both sides of second W 2 panel and NOTE VIEWS FROM OUTSIDE repeat step amp 9B to install in second section from back right NOTE VIEWS FROM OUTSIDE 8 9D Remove plastic film from both sides of second W 2 panel and repeat step 8 9B to install in fouth section from back left repeat step amp 9B to install in sixth section from back right B SF Femove plastic film from both sides of second W 2 panel and repeat step amp 9B to install in fifth section from front left NOTE VIEWS FROM OUTSIDE 39 of 46 WWW USI CODI 85 10 Have one person stand outside the green
15. de of greenhouse until It is evenly secured MOTE The 54 screw is designed to be used with wood When securing base to foundations made of materials other than wood use an appropriate fastener 11 2 Use twelve A 1 ground anchors with twelve A 2 anchor brackets on the inside of the greenhouse m tha ATER E Mach 44 DS crawl T ansundansherthesugh i i D hola in center of bracket Usea screw driver through the top of 11 2 Attach each anchor bracket with two A 1 anchor to screw set screws In the Inside bolt channels in completely inte soil base profile Secure each with two bolts Make certain It is secured in ground
16. e greenhouse during assembly Take special care not to touch overhead power lines with the aluminum profiles Do not attempt to assemble the greenhouse in windy or wet conditions Do not position your greenhouse in an area exposed to excessive wind f using power tools or a step ladder always follow the manufacturer s safety instructions Hot items such as recently used grills blow torches etc must not be stored in the greenhouse Store the polycarbonate panels in a cool dark place such as a garage until you are ready to use them Make sure the greenhouse complies with local building codes General Order of Assembly Step 1 Assemble Base Step 2 Assemble Right Wall 9 Step 3 Assemble Back Wall Step 4 Assemble Left Wall Step 5 Assemble Front Wall and Gable Step amp Assemble Back Gable Step 7 Assemble Roof Ridge F Q Step amp Assemble Roof Step amp Install Roof Vents Step 10 Install Doors Step 11 Secure to Platform o M E o q Work Gloves Tape Measure Tools Needed Safety Goggles Spirit Level Table of Contents Introduction 1 TEES 3 General Order of pe by 2 Construct Wood Platform 3 lismPuna llcl 4 Prepare 5et 5SCrews sussssasssses F Assemble Base sususssssenusnnns F Assemble Right Wall suse 1 Assemble Back Wall emen T Assemble Left Wall ea irj Assemble Front Wall EH Ga bis 21 Assemble Back Gable 1 2 2 2 27 Assemble Roof Rid
17. ews MOTE Long hex bolt Sis COM 3o of 46 T 2A Use two people and a step ladder Place step ladder inside greenhouse Have one person Inside greenhouse supporting ridge as you slide it into position Avoid touching top of front and back of greenhouse until each end is flush with ends of front and back profiles WARNING Use two people to install roof ridge Place ladderin inside of greenhouse One person will stand on the ladder holding the ridge until itis in the proper position and secured in place T 2B Make sure end of roof ridge is flush to profiles on front and back 7 34 Working from Inside secure roof ridge to front end wall Loosen set screws and adjust position to fit holes in B 7 connector Secure with two bolts T 3B Fepeat step 7 54 to secure back TAA Working from outside ensure all pieces are still flush and secure roof ridge to front Loosen set screws and adjust position to fit holes in C 2 connector Secure with three bolts 7 46 Repeat step 7 44 to secure back NOTE VIEWS FROM OUTSIDE 31 of 46 Wey B ewe Con Assemble Roof MOTE Have the hex shaped indent facing up Screw in until itis flush with bottom of mut so itslides easily into bolt tracks After inserting into bolt track screw in until it holds in place Make certaln the pleces are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear
18. fully to avold mistakes MOTE These instructions include helpful hints and important information needed to safely assemble and properly maintain the greenhouse Please read these instructions completely before you begin Before Starting Assembly 1 Make sure you have all the necessary parte Compare the contents of the seven cartons with the List of Parts f any parts are missing or damaged or if you have any questions please contact Customer Service by phone at B77 573 5076 or by email at customerservioagirisww com before beginning assembly 2 Lay the parte out In one staging area The List of Parts has the corresponding step number referenced to each part so you can easily prepare for each step We recommend placing all parts in one staging area Lay out parte by size and shape Use the List of Farts to identify the part numbers for profiles and panels We have not labled the parte with stickers to avoid removing them during assembly 5 Select a Location When selecting a site for your greenhouse a flat level surface i5 essential and if possible with proper water drainage and easy access to power and water necessary for greenhouse gardening Choose a sunny level position away from overhanging trees and power lines and protected from the wind as much as possible Tha location should be away from structures that could cause snow to drift on or around the greenhouse Locate underground pipes or cables before preparing the site or anchori
19. ge 1 2 2 30 Assemble Roof iiususussssseuuass 37 Install Roof Vents uus a4 Install Doors Lo 43 Secure to Platform cscs AB Phillips Screwdriver include 23 inch spacer include Step Ladder Me Wrench included 5 foot bungee cord finduded 2 of 46 RY FUSE VV CORR Constructing a Wood Platform IMPORTANT It is very important to begin with a level surface Check your foundation to ensure it is level at every point If you are not building on a wood deck we recommend constructing a wood platform so you can properly secure the greenhouse You must assure your foundation is square and level before beginning assembly After choosing a location proper preparation of the site is essential The site must be level Create a wood platform using a perimeter of pressure treated two by fours filled with either soll sod or gravel NOTE When constructing the greenhouse on a wood deck make certain the surface is level Creating an additional wood platform is not necessary Buy pressure treated 2x4 lumber You will use two layers with the corner positions staggered for maximum strength The finished dimensions will be 101 by 29554 Materials Tools Four 10 pressure treated 2x4 lumber cut to 9712 Spirit Level Four 14 pressure treated 2x4 lumber uncut at 168 Corner Square Four 14 pressure treated 2x4 lumber cut to 12434 Phillips Screwdiver One hundred and ten 8 3 wood screws Power Drill recommended Make su
20. hannel in F 1 profile and slide F 1 profile against spacer to ensure proper placement Position F 1 profiles so single set screw is next to base on inside NOTE Panels will not fit completely to end of channels There will be same space to allow for temperature changes 2 30 Fit B 3 connector and secure with two S 2C bolts NOTE VIEW FROM INSIDE 2 3D Continue building the side wall from the inside Use the spacer with each panel and the ten remaining F 1 profiles Fepeat steps 2 5A through 2 5C 24 Add the last W 1 panel to complete the side From the outside fit F 7 corner profile into place and secure oor m 2 54 Prepare two G 1 gutter profiles by sliding four set screws into bottom bolt track Hand tighten each end set screw to hold in place eae 2 56 Prepare four G Z gutter profile with six set screws and one G 2 gutter profile with five set screws Slide set screws into EE _ E bettom belt track Hand tighten FER rm l Lcd end set screw to ae a hold in place mi _ _ ppi p mm ee I m oe L prist a CG E 4 NT mt _ CC _ _ BS UT 7 e get a a diat 2 64 Working from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile
21. house to observe the position of the roof ridge while the other person Installs the five B 9 braces The set screws should be in the correct position but if the roof is not completely straight loosen the set screws and adjust the brace to raise or lower the roofline 8 11 The G 4 and G 4 trim plates snap into G 1 and G 2 gutter profiles to hold roof panels in place Working from outside begin at front corner Position G 4 trim plate over gutter and use handle of screw driver to tap into place Use two G 4 and four G 4E trim plates on each side Make sure the seams of the trim plates are flush with each other and to the C 1 connectors at the front NOTE There may be a slight gap at the rear C 1 connector depending on weather conditions NOTE VIEWS FROM OUTSIDE 40 of 46 Install Roof Vents Make cartaln the places are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear Including work shoes gloves and goggles 941A Unpack contents of Automatic Window Opener Screw adjusting knob partially into threaded end of cylinder Do HOT tighten Co cie Se 9 16 Fit piston rod connected to arm B inte amen end of cylinder Turn cylinder so holes ey next to adjusting knob are visible In V t 8 1C Continue pushing cylinder onto piston Wo H m rod until holes in end of cylinder line up mo O with holes in arm A
22. idge Place washer on middle set screw is closer to top Fit ether end into B 4 connector and secure with one bolt Repeat to install F 1 profile on opposite side long belt and secure all screws with three bolts al uk bo B 6 50 Continue working from back to finish section three Femove plastic film from beth sides of one W 1 panel With side marked UV Fesistant facing outside install the next panel on the right at the back Push panel inte roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back Fepeat to install W 1 panel on left NOTE VIEW FROM OUTSIDE 8 5E From inside fit one F 1 profile aT with two set screws facing inside next to panel Hold in place with one B 4 8 5F Held twe profiles together at ridge using nsn Lor on right side Secure wit one B 4 connector Secure with two bolts two bolts Repeat to install F 1 profile on opposite side NOTE VIEWS FROM INSIDE 6 04 Remove next bungee cord and continue working from back to install section four Remove plastic film from both sides of one W 1 panel With side marked UY Resistant facing outside install the next panel on the left at the back Push panal inte roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back NOTE VIEW FROM OUTSIDE 6 66 From inside fit one F 1 profile with three set screws next to panel Positio
23. ish soap with water on the edges as a lubricant MOTE Use the induded five foot bungee cords for added support They will hel hold the sides in position while assembling the roof Remove as you install profiles 6 2 4 Working from the inside install B 4 connector on every other side profile on beth sides of greenhouse Secure each with one bolt NOTE VIEWS FROM INSIDE 8 2B Hook oie and of bungee cord inte top hole in B 4 connector on each side NOTE VIEWS FROM INSIDE 8 3 Working from back right corner remove plastic film from both sides of one W 1 panel With side marked UV Resistant facing outelde fit top end of panel inte channel in F 1 roof ridge near corner Push panel into roof ridge channel until the other end rests on gutter ledge and then slide towards F 7 corner profile Fepeat to install W 1 panel in back left corner NOTE VIEWS FROM OUTSIDE 6 38 With two set screws facing inside fit one F 1 profile next to right panel F 1 profile rests against widest part of roof ridge and lines up with top of gutter 6 30 From inside hold profile in place with one B 4 connector Secure E NOTE VIEWS FROM OUTSIDE NOTE VIEWS FROM INSIDE 6 50 Fepeat step 6 26 through amp 2Cto secure Install and secure F 1 profile on left sida B 3E Hold two profiles together at ridge using one B 4 connector Secure with two bolts A A V AB Ty NOTE VIEWS FROM INSIDE 34
24. ked UV Resistant facing outside install the next panel on the right at the back Push panel into roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back NOTE VIEW FROM OUTSIDE 6 86 From inside fit one F 1 profile with three set screws next to panel Position profile so set screws face inside and middle set screw is closer to top Fit other end inte B 4 connector and secure with one bolt Repeat to install F 1 profile on opposite side lt x gt ss FF P LI Ez 8 80 Hold two profiles together in place at ridge using one B 4 connector Line up center hole with long hex bolt in roof ridge Place washer on long bolt and secure all screws with three belts 8 8D Faemeve plastic film from both sides of one W 1 panel With side marked UV Resistant facing outside install the next panel on the right at the back Push panel inte roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back Repeat to install W 1 panel on left B BE From inside fit one F 1 profile with two B 4 connector Secure with two bolts Hold in place with one B 4 connector on LEES right side Secure with two bolts Repeat to install F 1 profile on opposite side BUE Heke Sere preti Fopethac erage ling ona F P x tf i NOTE VIEWS FROM INSIDE b ul NOTE VIEWS FROM INSIDE 6 86 KEamove final bungee cord and repeat steps amp B
25. l three bolt tracks on one end and inte two side bolt tracks on other end of corner profiles Hand tighten each eet screw to hold in place Hm NOTE Set screw in center bolt channel is used when installing optional shelving units Install F 7 profile with set screw near base until needed 2 1B Prepare eleven F 1 wall profiles Slide set screws into both bolt tracks on one end of profile and one bolt track on the other end The single set screw will sit on the inside of the greenhouse near the base when installed se _ hi Se 24C Hand tighten each set screw to hold in place 2 24 Begin at front right corner Remove plastic film from both sides of one W 1 panel Fit panel inte channel in base placing side marked UV Resistant facing outside The panels will help hold the profiles up during assembly 2 98 Place F 7 corner profile on base fitting panel into channel Slide set screws into base so they line up Fit B 3 connector on each side S NOTE VIEWS ARE FROM OUTSIDE 2 34 Continue working from inside Remove plastic film from both sides of one W 1 panel Fit panel inte channel in base and corner profile placing side marked UV Fesist ant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included withthe tools 2 3B Place Z3 inch spacer on base next to F 7 corner profile Fit panel into c
26. ll be difficult to loosen again to adjust hand tighisnad e Qt dO ULLLLL LL C EEL LGLLPULLLL position to fit holes in connectors TITRE Shown hand tightened in F 1 bolt track NOTE Screwing 5 28 threaded part farther into nut so it holds is referred to in this manual as hand tighten Loosen set screw refers to unscrewing the 5 28 threaded part enough so set screw easily slides MOTE We recommend assembling all set screws before beginning Each step shows quantity needed separately Connectors are secured with 5 2C bolt using set screws in later steps 1 2 The base is made up of four P 1 four P 1B four P ZA and four P ZB profiles Arrange profiles in a rectangle as shown Position P 2A and P 26B profiles at back sides of the greenhouse IMPORTANT Position F 2A and P 2B profiles at back of greenhouse WARNING Use extreme caution when handling profiles P 1A P 1B P 2A and P 2B The bottoms may have sharp edges near the drilled holes The cut edges on the comers of these profiles are sharp IMPORTANT Make sure the base fits properly on your foundation If not stop and fix your foundation Wey BSTWW COM 7 of 46 1 3 Separate profiles to install set screws inte inside and outside bolt tracks Some of the set screws will be secured in this step Most are used in later steps They are difficult to install after the base is assembled Pay careful attention to ensure you have the correct numbe
27. n profile so set screws face inside and middle set screw is closer to top Fit other end into B 4 connector and secure with one belt Repeat to install F 1 profile EE on opposite side W CNN NOTE VIEW FROM INSIDE We ASI OR B 5C Hold two profiles together in place at ridge using one B 4 connector Line up center hole with long hex bolt in roof ridge Place washer on long bolt and secure all screws with three bolts NOTE VIEWS FROM INSIDE 6 60 Femove plastic film from both sides of one W 1 panel With side marked UV Resistant facing outside install the next panel on the right at the back Push panel Inte roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back Repeat to install W 1 panel on left NOTE VIEW FROM OUTSIDE 5 6E From inside fitone F 1 profile withtwo set BBF Hold two profiles together at ridge using screws facing inside next to panel Hold in one B 4 connector Secure with two bolts place with one B 4 connector on right sida Secure with two bolts Fepeat to install F 1 profile on opposite side c arr uu 2 W 1 i ii 1 amp s c 6 7 Continue working from back Remove next bungee cord and repeat steps 6 5A through amp 5F to install section five 5 64 Remove next bungee cord and continue working from back to install section six Remove plastic film from both sides of one W 1 panel With side mar
28. nal shelving units Install F 7 profile with set screw near base until needed 4 1B Prepare eleven F 1 wall profiles Slide set screws into both bolt tracks on one end of profile and one bolt track on the other end The single set screw will sit on the inside of the greenhouse near the base when installed i SSS DIE m _ A S M M 4 1C Hand tighten each set screw to hold in place 4 2A Continue working from inside back left corner Remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing side marked UV Resistant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 4 968 Place 25 inch spacer on base next to F 7 corner profile Fit panel inte channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement Position F 1 profiles so single set screw ls next to base on Inside MOTE Panels will not fit completely to end of channels There will be some space to allow for temperature changes NOTE VIEW FROM INSIDE 4 20 Continue building the side wall from the inside Use the spacer with each panel and the ten remaining F 1 profiles Repeat steps 4 2A through 4 2C 4 3 Add the last W 1 panel te complete the side From the outside fit F 7 corner
29. ng the greenhouse 4 Prepare a Foundation After choosing a location proper preparation of the site is essential The site must be level The greenhouse must be mounted to a bass Construct the base first so the greenhouse can be securely mounted We recommend constructing a wood platform base using a perimeter of two by fours filled with either soil sod or gravel Instructions for constructing a wood platform can be found on page 3 in this manual Other suitable base options include wood decks and concrete slabs Wood screws are included to secure the greenhouse to a wood base The greenhouse le secured to the ground from the Inside with ground anchors See step 11 for details If you are using a concrete base get appropriate mounting screws before beginning Make sure the corners are square by measuring the inside diagonals from both sides and making sure they are equal Use a spirit level ta make sure the base is level Contact your local authorities regarding iu c permite or restrictions WY ASO OOP Safety Advice The greenhouse must be positioned and fixed on a flat level surface Dispose of all plastic bags safely Keep them out of the reach of small children Keep children and pets away from the assembly area until the work is completed Always wear work shoes gloves and safety goggles when working Some of the parts have sharp edges and burs Use extreme caution when handling Do not lean against or push th
30. of connector measures E from bottom of profile Secure each with two bolts 5 25 Prepare two F 1 wall profiles Slide set screws into same bolt track one on each end of profile Position profile so set screw near base is on the inside when installed Hand tighten each set screw to hold in place diy 6 98 Prepare two F 6 profiles Slide set screws inte both bolt tracks on mitered end of profile and ona bolt track on the other end The single set screw will sit on the Inside when Installed Hand tighten each set screw to hold in place 6 3 4 Working from inside front left corner remove plastic film from both sides of one W 1 panel Fit panel inte channel in base and corner profile placing side marked UV Fesistant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 6 368 Place 28 inch spacer on base next to F 7 corner profile Fit panel into channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement MOTE Panels will not fit completely to end of channels There will be some space to allow for temperature changes 5 30 Fit B 3 connector and secure with two 5 20 bolts lt NOTE VIEW FROM INSIDE 5 3D Continue working from inside left corner place F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F 6 profile fits sn
31. osen set screw in left F 7 profile and position to line up holes in D 1L as shown z IMPORTANT Position D 1L and D 1R door a tracks with lip on the bottom when installed 10 1C Loosen set screw in right F 7 profile and position to line up holes in D 1F as shown Loosely secure with bolts EJ WWW BETA COM 33 of 46 10 2 From the inside position set screw three inches from right and left F 1 door frame profiles Install B 3 connector as shown and secure each with a bolt 10 9 Working from the outside apply the D 4 door sealant tape to the outside of F 1 profiles that make up the door frame This tape acts as insulation Beginning directly below D 1L and D 1F door tracks smooth tape down to P 1A and P 1B base profile make sure the tape is even Cut each strip at the bottom 10 368 Wrapthe top part of each of the B 3 door guides with the D 4 door sealant tape NOTE VIEW FROM INSIDE LaL 10 3C Wrap the bottom part of each of the D 5 a door guides with the D 4 door sealant tape NOTE VIEW FROM OUTSIDE 10 44 Te install D 2L factory assembled door remove the bolt attaching left door track D 1L to F 7 profile With the wheels facing the inside line up so they rell inte the left door track As you roll the door along the track make certain it slides inside the B 35 door guide installed in step 10 2 Continue to roll door until it stops next to the bolt at the center Secure
32. panel inte channel in base and corner profile placing side marked UV Festtant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer induded with the tools 3 2B Place 23 inch spacer on base next to F 7 corner profile Fit panel inte channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement Position F 1 profiles so single set screw is next to base on inside MOTE Panels will nat fit completely to end of channels There will be some space to allow for temperature changes 3 20 Fe B 3 connector and secure with two S 2C bolts NOTE VIEWS ARE FROM INSIDE 3 2D Gontinue building the end wall from the inside Use the spacer with each panel and the two remaining F 1 profiles Kspeat steps 5 2A through 3 2C 3 3 Add the last W 1 panel to complete the back From the outside fit F 7 corner profile into place and secure with two B 5 connectors SE NOTE VIEWS ARE FROM OUTSIDE 3 4 The two sets of F 6 and F 10 profiles fit on tep of W 1 panels lining up f bottom bolt channels with top edge of F 1 and F 7 vertical profiles Profiles will fit snugly 3 44 Working from inside right corner place F 6 profile with mitered end next te corner and angled edge facing up onto corner W 1 panel F amp profile fits snugly between F 7 corner profile and F 1 wall profiles 3 46 Continue
33. panels are sharp Use extreme caution when 5 66 ait sie ett nsure helght te base 6 68 Continue working from intside install door frame Loosen is 654 set screws on ends of F 5 profile and adjust position to fit holes in B 2 channels in vitii placing side marked UY Resistant facing outside a WARNING The comers of W 5 panels are WS sharp Use extreme caution when handling NOTE VIEWS FROM INSIDE 25 of 46 5 9A Prepare two F 7 corner profiles Slide three set screws Into the same bolt track two on one end and one on other end of profile Position one set screw in center of profile It will be used in a later step Tighten each set screw to 5 96 From outside fit F 7 profiles inte each side of front PD IERI TEM Arrange F 7 profile so channel lines up with tops of panels and the set screws are facing out The side of the profile rests against cut angle of F 3 profile The top end touches edge of F 4 center profile and bottom end touches top of G 1 gutter Position both F 7 profiles NOTE VIEW FROM OUTSIDE 5 90 Use C 1 connector to secure each outside corner Loosen set screws on profiles and adjust position to fit holes in C 1 connectors Make sure all profiles line up flush against each other Secure with bolts Repeat on other side 5 9D Check inside corners to ensure B 7 connector is still in proper position Hit needs adjusting repeat steps 5 6 and 5 9C through
34. r of set screws in the correct bolt track in each profile The profiles have different amounts of screws on the inside and outside bolt tracks The chart and illustration show the set screw placement IMPORTANT When assembling base make certain the profiles are straight and flush against uli other Secure profiles together and ensure comers are square The diagonal measurements on inside comers should be equal Secure comers to desired foundation until assembly is completed We recommend using a two by four platform MOTE Instructions include inen set screws necessary for securing to ground in step 11 parv 24 133 S 2B 133 IMPORT ANT Position P 2A and P 2B profiles at back of greenhouse Set Screw Placement Code Set sorews used In steps 1 44 and 1 48 Set screws used In steps 2 through 10 a Set sorews used instep 11 RY PST CORR 1 44 Make certain side profiles are straight and flush Adjust position of set screws in inner bolt track at front of profile to fit holes in B 5 connector Center connector over seam for maximum hold Secure using five bolts Repeat on outer bolt red track te install eleven remaining B 5 connectors at back and sides a IMPORTANT One B 5 connector is installed on inside front Remaining B 5 connectors are installed on outside back and sides B 8 corner connectors are installed an inside NOTE Connector size is not shown proportionally in this drawing 1
35. re each corner le square and then secure one corner with wood screws Move to the diagonal corner make sure It is square and then secure with wood screws As you continue to secure the 2x4 wood platform continue to make certain the corners are square and the frame is level Secure wood platform every two feet with wood screws Make certain to tighten screws into the wood platform until they are flush with the surface NOTE The illustrations throughout the manual are shown without a foundation Wey BSTWW CON 3of46 List of Parts WARNING Profiles with cut edges and or drilled holes are sharp Use extreme caution when handling The greenhouse ls shipped in eight cartons These cartons are heavy Use care when lifting them Some parte have sharp edges Usa extreme caution when handling Wear proper safety gear Including work shoes gloves and safety goggles Keep children and pete away until assembly ls complete Finish assembling the roof In one sesslon Do not leave the roof unattended until it ls completely assembled Place all like parts together Ina staging area Prepare for each step according to Instructions In this manual If any parts are missing or damaged contact Riverstone Customer Service before beginning assembly Customer Service 877 373 3078 or email customerserviceerisww com QTY Profile QTY I zx 4 Pace Steps 49 234 58 1 Step amp 4 Steps 5 4 1 Step 5 1 Step 5 4 Steps 5 4
36. rs Make sure profiles are straight 6 38 Secure with bolt in each B 1 connector NOTE VIEW FROM INSIDE BAA Work from outside to add B 41 connectors in the same position Loosen set screws on profiles and adjust position to fit holes in B 1 connectors Fit B 1 connector to profiles as shown BAB Secure each B 1 NOTE VIEW FROM OUTSIDE 28 of 46 56 5 Continue working from outside to install panels a shown Remove plastic film from beth sides oFtwo W Band p two W 4 panels Fit each uet panel into channel in WM profiles placing side Bagas marked UV Resistant facing outside NOTE VIEW FROM OUTSIDE WARNING The comers of W 3 and W 4 panels are sharp Use extreme caution when handling NOTE Panels will mot fit completely to end of channels There will be some space to allow for temperature changes 6 64 From outside fit F 7 profiles into each side of back Arrange the profile so channel lines up with tops of panels and the set screws on each end are visible Begin with either right or left sida Profile side fits against cut angle of F 3 profile One end touches top of gutter and the top end touches edge of F 2 center profile Position both F 7 profiles NOTE VIEW FROM OUTSIDE 6 68 Use C 1 connector to secure each outelde corner Loosen set screws on profiles and adjust position to fit holes in C 1 connectors Make sure all profiles line up flush against each other
37. t so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place Make certaln the pleces are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 1 on one end and inte two side bolt tracks on other end of corner I m profile Hand tighten each set screw to hold in place um e LM NOTE Set screw in center bolt channel is used when installing optional shelving units Install F 7 profile with set screw near base until needed 3 1B Prepare three F 1 wall profiles Slide set screws into both bolt tracks on one end of profile and one bolt track on the other end The single set screw wil sit on the Inside near the base when installed Hand tighten each set screw to hold in place MH i h i p 4 um m DIRE p EA he ee SS ho albo dis 3 1C Prepare two F 6 profiles Slide set screws 3 10 Prepare two F 10 profiles Slide set screws inte both bolt tracks on each end of two inte beth bolt tracks on each end of two F 6 mitered profiles Hand tighten F 10 profiles Hand tighten each set screw each set screw to hold in place to hold in place OM dE 3 24 Working from inside remove plastic film from both sides of one W 1 panel Fit
38. ts on top of ledge on W 2 profile Open vent so you can attach the other arm of opener to top of inside W 2 profile Screw two 5 1 screws through panel and into gripping channel on other side to secure Do not over tighten as It may damage the vent 9 30 Rapeat steps 8 54 through 8 38 to install Four more vente NOTE VIEW FROM OUTSIDE Connector 8 4 From inside screw 5 6 screw and spacer into the holes on each end of the top of the vent This will secure the vent to the greenhouse in very windy Sarkoma 9 46 Repeat steps 9 44 to secure four remaining vents 42 of 46 Install Doors NOTE Have the hex shaped indent facing up Screw in until itis flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place f Make certaln the pleces are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 14 10 1 From outside prepare to install right and left door tracks The door tracks are secured with the set screws in i F 7 profiles on each side and the two set screws in F 5 profile Remove two bolts from center B 2 connector on F 5 profile Slide set screws to Inside edge of hole NOTE VIEW FROM OUTSIDE p 5 nes NOTE ALL VIEWS FROM OUTSIDE 1016 Lo
39. ugly between F 7 corner profile and F 1 wall profiles L3 Eem 4 N aa BP NOTE VIEWS FROM INSIDE 5 3E From inside line up F 5 profile as shown Make sure B 2 connector is pointing towards door opening 5 3F Adjust set screws and place B 2 connector on profiles as shown Slide set screws in vertical openings to center of opening so B 6 trim z Lt plate will fit properly NOTE VIEWS FROM INSIDE VIEWS FROM INSIDE 6 36 Install B 6 trim plate and secure with three bolts sA T NOTE VIEWS FROM INSIDE MOTE VIEWS FROM INSIDE ud Fam udi Paral 54A Working from inside front right corner install F 1 profile next to W 1 panel Place 23 inch spacer on base next to F 7 corner profile and slide F 1 profile against spacer to ensure proper placement IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools fl 54H Pit 8 3 connector and secure with two S 2C bolts E pea a e OU p P Ee MOTE Panels will not fit completely to end of channels mE There will be some space to allow for temperature changes 5 46 Continue working from inside right corner place F 6 profile with mitered end next to corner and angled edge facing up onto EJ corner W 1 panel F 6 profile fits snugly between figo il F 7 corner profile and F 1 wall profiles E From inside line up F 5 profile
40. using the bolt you removed NOTE VIEWS FROM OUTSIDE 10 46 Repeat step 10 4A to install the right door 10 40 Make sure the doors hana properly slide easily and look straight F you need to adjust either one or both loosen the center bolts to either ralse or lower each door as needed Secure the center bolts when finished 10 54 Lining up holes in door install the D 3 door knobs using the Included screws NOTE VIEW FROM OUTSIDE 10 56 From the inside place the D 5 door guide bracket gt inte the channel in the base profile lining holes in bracket with holes in buikuns door Use two 5 3 screws to secure ee bracket on each door 45 OF 46 Secure to Flatform NOTE Have the hex shaped indent facing up Screw in until itis flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place Make certaln the pleces are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 14 11 1 The base has predrilled holes in the inside and outside bolt channels so um you can easily secure your greenhouse to a wood platform Screw os 6 4 screw Inte hole in base through wood until screw le flush 2 P with base profile Continue process around outside and Insi
Download Pdf Manuals
Related Search
Related Contents
La Balise de - Mairie de Barbâtre TNC 128 - Heidenhain Trinitron Color Computer Display - Manuals, Specs & Warranty Istruzioni per l`uso Frigo Manual de instrucciones Frigorífico 取扱説明書 - 6.02 MB Durchfluss- / Druckregelung und -überwachung Kenmore 2.4 cu. ft. Compact Refrigerator - Black Owner's Manual Severin ES3561 Copyright © All rights reserved.
Failed to retrieve file