Home

Exaco RIGA XL Kit Use and Care Manual

image

Contents

1. e Accessories bag for divided revolving door to Quan Length see page 19 20 150 Door sets 8 piece Assembly see page 18 Dese 112 Phillips head screws 4 2 60 door 966 973 VO 43 white spacers 30 x 16 x 4 esfe SSS Phillips head screws 4 8 x 25 hinges P A 0 Phillips head screws 4 8 x 16 hinges 6 Sash Lock 1 Phillips head screws 3 5 x 22 Sash Lock Door holder black 2 parts Co 1 0 9 Phillips head screws 3 5 x 16 door holder 127 Plastic corner connectors Note The rubber seal is bundled in one hank for all doors and windows Cut accordingly please 7 Attaching the foundation frame special accessories Profile and accessoiries for foundation frame Type VI for gable 4100 4100 4100 for sides 3869 4864 5858 40 40 2 135 135 135 nut M6 Assembly of foundation frame 1 1 The foundation frame individu ally in the floor profiles rotate and align the center Note Foundation frame profiles are shorter than the floor profiles 2 For each profile 2 self drilling 9 screws 3 5 x 13 pos 118 fixati 7 3 Both sides fill up with soil n profile For stabilization purpo ses of the house some plates pos 6 4 wi
2. outer edge of greenhouse 20 Then fasten the greenhouse by the supplied angles with dowels 8 10 mm 2 pc per side minimum into the concrete top edge of earth Screws and dowels is not part of the delivery foundation greenhouse 20 E to found free of frost Assembly course gable Warning you have bought the foundation frame it has to be attached to the base profiles FIRST Page 8 Attention Before assembly inserting required M6 x 16 pos 107 in groove In ad dition per vertical pro file pushing 2 screws M6 x 12 pos 117 for mounting brackets XL pos 6 7 inside vertical profile middle left pos 6 vertical profile middle right pos 7 floor profile pos 1 After the insertion of the screws the plastic corner con nectors pos 100 are laterally placed Crossbar pos 8 Crossbar pos 8 pA LESSEN View from inside X verticale profile middle pos 5 Attention Introduce necessary screws M6 x 16 pos 107 in profile groove before assembly verticale profile middle pos 4 Phillip head screw 4 2 x 13 pos 111 Attention Step 4 Introduce necessary View from inside screws M6 x 16 pos 107 in profile groove before assembly 980 x 944 pos 103 With inserted screw m6 x 16 and nut M6 the t connector pos 103 assembled Attention Step 6 Introduce necessary
3. pos 112 insert glazing and fix fourth profile Recommendation It is useful to seal the panes all around and the corner con nectors to avoid any penetration of humidity window profile pos 35 window profile pos 35 Attention Insert 2 screws in the cross section at the bottom for window opener Phillips head screw 4 2 x 60 pos 112 window profile pos 34 Automatic window opener mounting roof window false right The roof window is to push from the lateral into the roof beam Mounting of the automatic window opener Components window openers Operation of a window opener Assembling instructions 1 Check that the window of the greenhouse can open and close freely and without hindrance For other brands please dismantle the existing handopener in advance 2 At first you mount the window openers with the mounting plate 4 on the window profile 5 3 Choose mounting plate 5 when you ask the average hole and attach it to the crossbar below window 4 Please secure the pressure cylinder in the threaded device at the upper end with a splint pin in the t coupling upper hole Justification The window opener needed for the assembly approximately 3 to 4 hours to adapted the tem perature in the greenhouse The more you screw in the pressure cylinder into the threaded device the further open the roof window Do you want earlier higher opening turn the pressu re cylinder clockwise For l
4. 7 Screw floor profile corner connector pos 116 in with screw 4 8 x 16 pos 113 For a better detail the panes are shown being cut Die Stabilisierungs Bortenwinkel Pos 20 21 22 werden beidseitig innen an Mittelsprossen mit Schraube M6 x 16 und Mutter M6 Pos 107 und Unterlegscheibe Pos 108 angeschraubt Die Winkel sind auch r ckw rtige Profile f r Tische und Regale Siehe separate Montageanleitung Build in doors and windows mounting roof window false hen you should look for Press sealing 6 8 mm in front between floor profile and glazing between floor profile and lateral glazing all inside of greenhouse Attention Please compress the seals because it contracts in cold weather Hexangon bolts can be inserted later into most of profiles through a special hole in the channel If there is no hole you can drill one yourself T sealings pos 126 138 153 for all doors and windows altogether ca 26 m I Attention The t seal goes only on 3 F sides of the roof window not the top bar profile Attention The t seal must be inserted first in the top profile of the bottom doo before assemble the rectangular tube Assembly roof window plastic corner connector pos 127 window profile pos 34 No sealing to insert in this profile EUM Screw down three profiles first with screw 4 2 x 60
5. corner con nector covers Co 117 Self drilling screws 3 5 x 13 t connector 102 104 plus substitute screws Heavy insulation seal 6 8 mm in pre cut section Profiles for each roof window E 34 Window profile roof 35 Window profile roof D Profiles for each divided revolving door to 42 Door profile right with hinge borings 1 949 ES Profiles for each divided revolving door at the bottom 4 Door profile left with borings for Sash lock m EE oor profile right with hinge borings 8 oor profile bottom D 47 Rectangular tube with cross holes FEN 41 Door profile left db 43 Door profile bottom with large hole for door handle 864 Accessories and hardware for each roof window Length Part design Description mm 974 x left 127 Plastic corner connector PAREN 112 Phillips head screws 4 2 x 60 3 Hexagon head screws M6 x 16 nut M6 Note The rubber seal is bundled in one hank for all doors and windows Cut accordingly please 6 Accessories bag for divided revolving door at the bottom 936 973 5 3 S Phillips head screw 4 2 x 50 attach square tube oc 143 Glazing block 30 x 16 x 4 127 Plastic corner connector fig RY 1
6. screws pos 107 Se View from inside in profile groove before assembly crossbar pos 8 _ 4 1x Q 1 crossbar pos 8 crossbar pos 8 4x crossbar pos 4X 8 screwed with Phillips t connector head screw r 4 2 x 50 pos pos 103 o 7 gt Crossbar with t connector pos 103 and inserted screw M6 x 16 and nut M6 pos 107 connectect View from inside Crossbar pos 8 with straight connector plate pos 101 and screws inserted M6 x 16 pos 107 and Nut M6 connect 4 V gt Straight con nector plate pos 101 View from inside Attention Introduce necessary screws M6 x 16 pos 107 in profile groove before assembly 2x in vertical profile middle pos 4 5 2x in crossbar pos 8 Here are connected with self drilling View from inside screws 3 5 x 13 pos 117 T connector slanted pos 102 a gt EN t connector slanted pos 104 Edge stay bar pos 2 3 with t connectors slanted pos 102 und 4 pos 104 and e screws M6 x 16 inserted scre wed with nut M6 pos 107 on the crossbar The t connectors are connec ted with self drilling screws pos 117 on the edge stay bar Assembly course gable Warning you have bought the foundation frame it has to be attached to the base profiles FIRST Page 8 Introduce necessary Step 11 screws M6 x 16 pos 107 in profile groove before assembly At
7. 2 EN Vertical profile middle right with 50 angle at top Vertical door profile left with 30 angle at top 2 2 ertical profile middle left with 50 angle at top 2 2 2 Profiles for side walls Pos itv L h Description Type IV TypeV VI Floor profile side 3914 4909 5903 19 Curved center profiles pe 0 2 2 2 1 21 22 Lateral supports wind braces 3970 4965 5960 2 4 4 25 Cross bar under window 952 26 127 28 Roof beam 4013 5008 6002 Re enforcement bar 1 1 1 roof beam 3971 4966 5960 Accessories bag basic construction Quantity vertical profile middle cross bar 4 T connector slanted 5 Floor profile connectors inside Hexagon head screw M6 x 16 nuts M6 to be used in the later support ashers f pos 8 connections Insulation seal 6 8 thick used on the inside See table below for cross bar roof beam end cap 111 Phillips head screws 4 2 x 13 Sover plats 142 Phillips head screws 4 2 x 50 for cross bars in front and back walls 11 Phillips head screws 4 8 x 16 for floor profile corner connectors Roof beam end cap cover plate ojo e e SA LAN Il N screws for feeding w o PY AIO onnector plate for cross bars under windows 4 8 8 depends on type Floor profile
8. ALUMINIUM HOKLRRTHERM Greenhouse Riga XL ASSEMDIY Instructions Dear Garding Friend thank you for buying a top quality greenhouse from HOKLARTHERM in Germany Please read these Assembly Instructions and helpful suggestions carefully If you follow them step by step you should not have any difficulty assembling your EXTRA LARGE RIGA Greenhouse Good Luck What to do First Check all the boxes you have received Make sure you have received the correct number as shown on the Bill of Lading from the freight carrier If you are missing a box or if any of the boxes are damage please write this down on the Bill of Lading before the driver leaves Note Please do not refuse any of the boxes or the whole shipment because of any dama ge We will gladly replace any damaged items Sending replacement parts is much simpler quicker and less costly for all involded In the case of damage Please if possible make digital pictures and contact our USA distributor ASAP Excaco Trading Austin TX Customer Service 877 760 8500 or by email at marian exaco com Placing your greenhouse When possible place your greenhouse in a location with as much sun as possible We do not recommend putting it directly under trees since branches might damage the glazing Protection from heavy winds If your area is subject to very strong wind gusts we strongly recommend against putting your greenhouse up without some kind of protection a row
9. This is most common silicon sealent being available with any DIY superstore or with your HOKLAR THERM expert dealer priced at 4 6 310 mm cartridge Cleansing and maintenance Clean the greenhouse with much water only for ex with a car wash brush or a HP cleaning ap paratus You can additionally use any purifiers We wish alle the buyers and users of this HOKLAR THERM greenhouse much fun with their hob by of gardening and have much success with growth All our statements are based upon many years of experience and are drawn up to the best of our knowledge and belief and they do not cover any legal entitlements in case of any possibly arising events of claim 24
10. ater lower opening counter clockwise One rotation corresponds to approximately 0 5 C Please keep the mind that can vary the temperature in your greenhouse and different windows opener have small tolerances Winter storage If you are not the greenhouse frost free hold we recommend the entire window opener or just the pressure cylinder dismantle Please keep the window opener in a dry and frost free place Before remounting in the spring particularly check the cylinder rod and the cylinder threads are greased The cylinder rod please look for ease of movement Mounting divided revolving door at the bottom View from outside Place the profiles according to the figure on a flat surface possibly on a cardboard or similar retangular tube and door profile top scre wed with 4 2 x 50 pos 142 plastic corner connector pos 127 Attention Earlier move seal See scetch end cap for rectangular tube pos 137 rectangular tube pos 47 door profile top pos 46 Attach the Sash Lock pos 136 pos 141 lt t o o a 1 wx O O door profile right pos 45 door profile bottom Pos 48 P hillips head screw 4 2 x 60 pos 112 Note The rubber seal is bundled in one hank for all doors and windows Cut accordingly please Mounting revolving divided door to View from outside Place the
11. ce into the existing nuts slots of the gable that the profile is flush in front Now screw together with the roof beam end cap by means self drilling screws 4 2 x 13 pos 111 A lateral glazing is to push into the floor profile and the edge profile It is best if at both sides Thus the gable stad safely The next to push in a pane of the roof glazing into the grooved profile and into the verge flashing profile Introduce roof stay bars into the grooved profiles and eaves profile and push up until the glazing thread up glazing The remaining pnes are to complete Please determine the position of the window in time Here put in the short pane of the roof glazing and close with the window crossbeam pos 25 The connection plates pos 115 have to be used to screw Attention You have to put in each one screw in the both sides of the floor profile Push the grooved profile and roof beam into the nuts slots of the gable profiles Screw down as well with the grooved with roof beam end caps Now a small angle pos 105 can be screwed with bolts M6 x 16 with nuts to secure the floor profiles The stabilizing edge angles pos 20 21 22 are to fix at the edge stay bars and lateral stay bars by means of screws M6 x 16 and plain washers These have a stabilihing effect and give a protection of the greenhouse against stormy weather All the same time these angles are the back wall profi les for the tables and shelves see separate mounting instru
12. ction Now the skeletal structure is finished topping out ceremony is the order of the day Please open now the accessories box Here you find 2 pc roof window by type IV incl automatic window opener 4 pc roof window by type V VI incl automatic window opener 2 pc divided revolving door These parts are to mount according to the instructions The roof window is to push from the lateral into the roof beam This system is generally very simp le and explains itself 23 Question Is it necessary to seal the greenhouse or greenhouse glazing respectively Principally not However we recommend to seal the horizontal transitions from the glazing to the profile see Sketch broken lines with neutrally linking transparent silicon in order to have the most possib le small amount of water and thus little dirt in the glazing reception Advantage In the long term the greenhouse has a better appearance The tendency to the algae formation just in this area decreases tremendously Humidity water can also appear within the glazing celluar sheets according to the weather situati on because te PVC sheets are not steam diffusion tight that means that humidity in the form of steam penetrates into the sheet This is a purely optical disadvantage which cannot be avoided The sheets cannot suffer any damage even not with frosty days Attention Use ony neutrally linking sllicon due to possible stress cracks in the PVC glazing
13. ctor plate 1 pos 1 the crossbars in the verticale profile left and right with previously collected screws The lower crossbar already mounted in step 3 attached on the verticale profiles left and right with the t connector 3 pos 103 and bolts In addition the crossbars are laterally screwed with Phillips head screw 4 2 x 50 pos 112 from the inside Now the large rounded glass sides merge into the floor profile The small rounded glazing have to be thread into the upper crossbar and verticale profile A 5 angular slice centered to pushing up between the verticale profile direction crossbar The edge stay bar must to connected on the corner connector Attention You have to put in the vertical profiles pos 6 and 7 and vertical profiles middle left and right pos 4 and 5 each 2 screws The edge stay bar are screwed to the connecting plates 2 pos 102 and 4 pos 104 on the ver tical profiles and the vertical profiles middle Note Hexagon bolts can be inserted later into most profiles through a special hole in the channel Look page 14 22 Assembly of the lateral and roof segments Now you need some more assistance or corresponding aids Set the gable upright hold it or support it safely Attention You have to put in each one screw in the both sides of the floor profile At first the lateral floor profile are to detach on the corner connector of the gable The roof beam is now to introdu
14. ll be screwed on the founda tion frame and lateral stay bars or door profiles by means of pulled in screws M6 Insert one screw M6 x 12 into each of the cor ners of the foundation frame profile detach angles and screw down with nut M6 Establishment greenhouse Mounting brackets for the basis profile to doweling on customer requires a foundation Part design Pos Description Sanity HERI 9 i P Type IV Type V Type VI Hexagon head screw M6 x 12 In the floor profiles gable side each with 2 screws M6 x 12 per rung by means of mounting brackets XL Lateral stay bar pos 4 5 6 7 19 Mounting bracket XL Hexagon head screw x 12 nut M6 pos 107 We recommend to use hexagon head cap wood screws and pegs included for pegging These are not within the scope of delivery 01 Foundation plan Riga XL All the dimensions in mm HOKLA RTHERM Establishment of your greenhouse with stripe foudation If you did not buy a foundation frame the greenhouse has to be erected safely by means of a stripe foundation Please arrange then such a foundation according to the dimension presets given below You also have the possibility to found your greenhouse on flash kerb edge beams for ex 50 x 25 x 8 cm or better 50 x 30 x 10 cm outer edge of foundation Please pay attention to the foundation being even and horizontal
15. o go on mounting it alone you have to look for a secure suitable mounting course by means of stay bars ladder or other fixings Unlike the most usual greenhouses the mounting of the aluminium profiles is done together with the glazing This results into an absolutely secure glazing and the biggest possible stability of the greenhouse You obtained 9 to 10 boxes depending on the greenhouse ix roowindowdoor jpage6and7 ____ 2x bundles curved center profiles 4 page 4 pos 2 19 x glazing page 20 Please stay all the boxes in a dry place and protected against sunlight see note below Please frist open und unpack only the main box with the basic construction to avoid a mixing of the many different parts Assembly course gable Start with the assembly of the greenhouse gables Door wall gable and back wall gable are nearly the same Push the profile of the vertical profile middle pos 6 left and pos 7 right profile with 8 bo rings with a slope of 30 up to the smaller borings in the centre of the fbor profile The slopes there have to point to the outside direction Then detach the plastic corner connector Attention Move in both ends of the floor profile 1 each screw Already now you need the lateral glazing Measurement 980 x 944 mm Push it with the web direction vertical into the floor profile and push laterally into the verticale profiles Important note The ISO celluar sheet
16. of small trees large shrubs of a wooden fence Please contact our distributor to discuss additional anchoring options Direction If you intend to primarily grow vegetables north south for flowers east west Warning Do not try to assemble this greenhouse in windy conditions as your glazing panels might blow away and become damaged Damages during assembly process due to bad weather are not covered by our warrantly What you will need Patience do not rush 2 people 3 will make it easier when inserting the glazing panels Gloves the ends of the aluminium profiles can be Measuring tape 2 A frame step ladders 10 and 8 preferable 2 Rubber mallet Adjustable wrench 10 mm socket wrench 10 mm wrench Philips head screwdriver manual and electric Level Permanent Marker to mark glazing panels Depending on the greenhouse you have received 9 to 10 boxes Gables Long parts with floor profile gable special accessories Special accessories Table shelf Shelf for pots ever a box extra Contents of main box basic construction Please check out the tables the completeness of the components Profiles for both gables Quan Length Front Back floor profiles MEN p 7 Vertical door profile right with 30 angle attop dge stay bar curved right side E Edge stay bar curved left side ER 2 _2_ _6_ E EX
17. profiles according to the figure on a flat surface possibly on a cardboard or similar plastic corner connec tor pos 127 phillips head screw 4 2 x 60 pos door profile top pos 48 o I 1 door profile right pos 42 Attach the Sash Lock pos 136 with Phil lips head screw 3 5 x 22 pos 141 Note The rubber seal ist bundled in one hank for all doors and windows Cut accordingly please Assembly instructions for lockable handle Polycarbonate Glazing Panels 16mm triple wall e Panel Curved Panel Square panel 5 sided panel Side Wall Side wall panels Gables f Gables for Gables Gables Door Panels Side Large nd Windows Se wd gn ae jd i A y Size Size Size Size Size Size Size Size Riga g 602 1922 980 727 980 x 944 280 21605 aaa aes 980 x 3893 888 2043 980 x 2830 Riga XLN ases 57 m 50 nde x 3893 Hus omar aa Riga XLA easy 080 x 727 980 x 944 Bio aa 3884 888 x 943 980 2830 Good advice for a quick and perfect assembly of the greenhouse from HOKLAR THERM Most of the assembly can be done by you alone It is best if you have further two persons being able to hold it for approximately half an hour when putting the greenhouse upright If you want t
18. s that is the glazing are always to build in with the UV coated side to the outside On the protection foil you find a corresponding note or a blue foil Loosen the protection foils only at the edge and the complete rest of the foil only after the finish assembly With some days of isolation the foil can burn tight on the plates and is to stripe off with difficulty Do not stripe it completely off when unpacking the goods because then you cannot see the side with the UV protection Now detach the crossbar pos 8 from the top of the glazing Then the beveled glazing is to put in the same way Joint the vertical profiles with the t connector pos 103 21 Attention In advance 4 screws have to be screwed in both vertical profiles and 4 screws into the crossbar Push the glazing Measurement 980 x 944 mm into the crossbar pos 8 and vertical profile pos 6 7 Push the verticale profile middle left pos 4 and right pos 5 from a page the floor profile up to the glass side The slope have to show to the outside Then attach the corner connector pos 100 Attention In advance 4 screws have to put in both verticale profiles Vertical profiles and crossbars with the t connector 3 pos 103 and collected screws connect The crossbars pos 8 put on the glazing Attention In all crossbars you put in 4 screws and in the verticale profile left and right pos 4 and 5 each one screw Connect the straight conne
19. tach roof beam to back gable with endcap cover plate pos 114 with Philips head screws 4 2 x 13 pos 111 pos 105 screw M6 x 16 4 nut M6 pos 107 We Move into each vertical profile middle 2 hexagon head screws pos 107 for the mounting brackets pos 6 7 support ends or Fron mbl left hold up ont gable to assemble the same way later Curved center profiles pos 19 enlarged Insert the glazing panel on each side they will bend Insert first into the floor profile then into roof beam Usually this will take 3 people Insert curved center profiles pos 19 top into roof beam and below into floor profile Push straight on up to glazing and thread pane Push in further lateral glazing and curved center profiles Roof window position important Screw down con SS P d s 1 p nector plate pos N Attention Introduce necessary screws M6 Attention x 16 pos 107 in profile groove Introduce necessar before assembly screws M6 x 16 pos In cross bar under window 107 in profile groove pos 25 3x M6 x 16 before assembly 115 from inside with screw M6 x 12 and nuts Glazing of eaves and roof win dow and curved center profiles to push in completely Roof window position important floor profile connector pos 105 screw M6 x 16 nut M6 pos 107 Place door gab le in front and NY screw down

Download Pdf Manuals

image

Related Search

Related Contents

WAV-5F2/-5F2-R仕様変更のお知らせ  NSI test script - meta  設置説明書  Merloni - Indesit Company    AURABOX 14-(110-53)-q.cdr  取扱い説明/注意事項  Asrock H81M-HDS  

Copyright © All rights reserved.
Failed to retrieve file