Home
Monticello Mont-8-BK Instructions / Assembly
Contents
1. 1 profile with three set screws facing inside next to panel on the right Hold In place with one B 4 connector on right slida Secure with two bolts You will Install the opposite 1 profile in step after Installing bath panels 8 50 Remove plastic film from both sides of W panel With slde marked UV Resistant facing outside Install the next panel on the left at the back Push panel Into roof channel until tha other end rests on G 2 gutter ledge and then slide towards F 1 profile at back Repeat to Install W panel next to on left Fush panal towards front NOTE VIEWS FROM OUTSIDE 36 af 44 8 50 From the inside have one person lift the bottom corners of the two panels where they meet From the outside have the other person hold and position 1 profile so both panels fit in channels on sides of 1 profile Slide tha 1 profile up towards the roof As the profile moves up have the person on the Inside guide it Into place NOTE Use dish soap with water an edges of panels ta help slide F 1 profile into placa Hold place on left side with one B 4 connector Secure with two bolts NOTE VIEWS FROM INSIDE B 5F Holdtwo profiles together In place at ridge using one B 4 connector Line up center hole with long hex bolt In roof ridge Place washer on long bolt and secure all so
2. NOTE Have the hex shaped indent facing up Screw until itis flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place sit on tha Inside near the base when Installed Hand tighten each set screw to ETE Imta both bolt tracks on each end of two Into bath bale traken h and of F 6 mitered profiles Hand tighten F 10 mises u each set screw to hold place profiles ghtene 5 28 30 3 24 Working from Inside remove plastic film from both sides of one W 1 panel P Fit panel into channel in base and corner profile placing side marked r UY EKasltant facing outside IMPORTANT The panels expand and contract depending the temperature To ensure proper placement use the 23 inch spacer included with the tools 3 28 Place 23 Inch spacer on base next to F 7 corner profile panel into channel in 1 profile and slide 1 profile agalnst spacer to ensure proper placement Position F 1 profiles so single set screw ls next to base on inside Jit NOTE Panels will nat fit completely to end of channels There will be some space to allow for temperature changes 1 3 20 connector and secure with two 5 2 bolts MOTE VIEWS ARE FROM INSIDE 3 20 Continue bullding the end wall fromthe Inside Use the spacer with each panel and the two
3. NOTE Connector size is not shown proportionally in this drawing 1 48 Make certain corners line up and are flush Adjust position of set screws In bris bolt track to fit holes In B 8 connector with four bolts Repeat until sach corner le secure IMPORTANT Double check the position and amount of unused set screws in the base You shauld have pr water arca co 1 5 Measure base diagonally from Inside corner Equal measurements ensure the base ls square Use a spirit level to make sure the level Z E 1 58 Locate predrilled holes base profiles Use six 5 4 sorews one ateach corner and ona In the center of each side to secure to wood platform You will secure tha greenhouse completely tothe platform step 11 1 when assembly ls finished WA Ba Sof 44 Assemble Kight Wall Carefully follow the orderof assembly to ensure an easy installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 1 ha Make certain the pleces are In the correct positions before assembling 2 1 Prepare two F 7 corner profiles Slide set screws Into all three bolt ae tracks on one end and Into two slde bolt tracks on othar and to hold placa NOTE Set screw in center bolt channel is used when installing optional shelving
4. a straight line Hand tighten set screw on each end to hold In placa 7 12 Adjust position of set screws and long hex bolt to fit holes B 5 connector Position the B 5 connector with the long hex bolt In center hole and center to the seam where the profiles 7 90 Secure B 5 connector by attaching bolts to the set screws Long hex bolt ls secured after Installation 7 2 Usetwo people and a step ladder Place step ladder Inside greenhouse Have one person inside greenhouse supporting as you slide it Into position Avold touching top of front and back of greenhouse until each end ls flush with ends of front and back profiles WARNING Use two people to install roof ridge Place ladder in inside of greenhouse One person will stand on the ladder holding the ridge until it is in the proper position and secured in place 7 28 Make sure end of roof ridge ls flush to profiles on front and back 7 34 Working from inside secure roof ridge to front end wall Loosen set screws and adjust position to fit holes B 7 connector Secure with two bolts 7 38 Repeat step 7 54 to secure back TAA Working from outside ensure placas are still flush and secure roof ridge to front Loosen set screws and adjust position to fit holes in C Z connector Secure with three bolts VIEWS FROM OUTSIDE 31 of 44 Assemble Koof Make
5. 22 F Seri IMPORTANT F 4 profile is centered to F 5 profile and secured on both sides with B 2 connector 5 50 Turn profiles over and place on flat surface Slide two set screws Into bolt tracks of F 4 and F 5 profiles Repeat step 5 5C to place and secure 2 connector a MOTE The has two extra set rH screws on the ends of F 5 profile L c D 5 6 4 Working from inside remove plastic film from both sides of two W 2 panels Fit sach panel Into channels in profiles placing sida marked UV Resistant facing outelde 5 6C Secure with two bolts Ensure helght to base 5 68 Continue working from Intelde Install door frame Loosen set screws on ands of F 5 profile adjust position to fit holes In B 2 channels profiles placing side marked UV Resistant facing outside WARNING The comers of W 5 panels are sharp Use extreme caution when handling NOTE VIEWS FROM INSIDE 5 94 Prepare two F 7 corner profiles Slide three set screws Into the same bolt track two on one end and one on other end of profile Position one set screw n center of profile will be used a later step Tighten each set serew to hold in place as 5 9B From outside fit F 7 profiles Into each slde of front Begin with elthar side Arrange F 7 profile so channel lin
6. A If i Monticello Made in the USA 8 x 8 Greenhouse Assembly Instructions 071812 Riverstone Customer Service 877 373 3078 Email coustomersenace rieww com 65 Fleetwood Rocks MJ 07855 Introduction Thank you for purchasing your hortlcslisTh 26 Greenhouse The Monticello line ls proudly made inthe USA by a leading commercial greenhouse maker using the same professional grade materials and design The frame le constructed with tha highest quality extruded aluminum with lead free powder coated The panels are professional grade Gmm twin wall polycarbonate selected for thelr Insulation and durability The Monticello ling ls a modular system which uses an 2 5 greenhouse that can be easily expanded four foot sections up to 24 feet by feet at amy time The greenhouse include one roof went with it s own automatic vent opener to ensure proper ventilation malntaln optimal temperature When properly assembled and malntained this greenhouse will provide years of enjoyment It can be expanded with four foot extension bite as your needs expand Our greenhouse has been designed to be easily assembled Although all but one step can be completed by one person we recommend using a helper for the entire assembly You will need assistance from another person to assemble the roof Allow six to eight hours to complete have never assembled a greenhouse
7. gloves and goggles 98 14 Unpack contents of Automatic Window Opener Screw adjusting knob partially into threaded end of cylinder Do NOT tighten cylin ing kmob 9 1B Fltplston rod connected toarm Blato 0 end of cylinder Turn cylinder so holes ig next to adjusting knob are visible am p d 9 12 Continue pushing cylinder onto piston rod until holes end of cylinder ling up with holes In arm A Push arms apart if necessary Secure with 9 10 Turn adjusting screw clockwise a threaded stud on each slde until arms are aproxmately apart 1 Repeat steps 8 1A through 9 10 NOTE You will use the Gripping Channels in next steps Youdo pin ise ne Window Deanar not need the other included parts in Window Opener package 9 24 Remove plastic film from both sides of V 2 9 28 Place opener with arm on bottom factory assembled vente With side labled inside vent Mark screw placement Face inside facing up lay panel Using 5 1 screw apply pressure to on flat clean surface puncture the panel and Measure and holes for next step mark center of vent Factory Assembled Wart 39 af 44 9 20 Serew two 5 1 screws through V 2 panel Line up gripping channel on other sida Continue to screw Until secure Do not over tighten as may damage the vent h n ti NOTE VIEW FRO
8. remaining 1 profiles Repeat steps 3 2 4 through 2 21 3 3 Addthelast W 1 panelto complete the back From the outside fit 7 corner profile Into place and secure with two connectors NOTE VIEWS ARE FROM OUTSIDE Assemble Left Wall Make certain the pleces are In the correct positions before assembling Carefully follow the arder of assembly to ensure an easy installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 14 NOTE Have the hex shaped indent facing up Screw in until itis flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 4 1 Prepare one F 7 corner profiles Slide set screws Into all three bolt tracks on one end and Into two slde bolt tracks on other and of corner m profile Hand tighten each set screw to hold In place NOTE Set screw in center bolt channel is used when installing optional shelving units Install 7 profile with set screw near base until needed 4 1B Prepare three 1 wall profiles Slide set screws Into both bolt tracks on one end of profile and one bolt track on the other end The single set screw will sit on the inside near the base when Installed to hold In placa 42 Continue working from Inside back left corner Remove plastic film from both slides
9. before make It a weekend project We recommend you take your time and read these Inetructions carefully to avold mistakes These Instructions Include helpful hints and important information needed to safely assemble and properly malntaln the greenhouse Please read these Instructions completely before you begin Before Starting Assembly 1 Make eure you have all the necessary parte Compare the contents of the four cartons with the List of Parte amy parts are missing or damaged or If you have any questions please contact Customer Service by phone at 77 3753 3076 or by emall at customerserice g risww com before beginning assembly 2 Lay the parts out one staging area The List of Parts has the corresponding step number referenced to each part you can easily prepare for each step Wa recommend placing all parts one staging area Lay out parte by size and shape Usa the List of Parts to identify the part numbers for profiles and panels We have not labeled the parts with stickers to avold removing them during assembly 3 Select a Location When selecting a site for your greenhouse a flat level surface ls essential and If possible with proper water drainage and easy access to power and water necessary for greenhouse gardening Choose a sunny level position away from overhanging trees and power lines and protected from the wind as much as possibla The location Should be away from structures that could cause snow
10. certain the pleces are Inthe correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 7A NOTE Have the hex shaped indent facing up Screw until itis flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place BAJA Prepare all profiles for roof Prepare four 1 profiles Slide one set screw Into bolt track on each end of profile Tighten to hold in place 8 18 Prepare two 1 proflesto be used with braces Slide two set Inte bolt track on one end and set screw on the other end of profile B 1C Measure 19 6 5 inches from one slde of profile Slide middle set screw to that polnt and tighten to hold place Tighten the other two set screws on each end of profile B 2 The roof panels are Installed In the sections shown below Use two people and a step ladderto assemble the roof Place step ladder Inside greenhouse Have one person stand on ladder inside and gulde panel Into channels In roof ridge and corner profiles The other person supports the end of the panel from the outside Section 1 Back two W 1 panels Sectlon 2 Front two W panels Section amp Middle three W 1 panels Section 4 W 2 panel WARNING Use two people to install roof Allow enough
11. of ona W 1 panel Fit panel into channel base and corner profile placing slde marked UV Resistant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 73 inch spacer included with the tools 4 2B Place 25 Inch spacer on base next to F 7 corner profile Fit panel Into channel in 1 profile and slide 1 profile agalnst spacer to ensure proper placement Position 1 profiles so single set screw ls next to base on Inside NOTE Panels will not fit completely to end of channels There will be some space to allow for temperature changes 4 20 connector and secure with two S 20 bolts NOTE VIEW FROM INSIDE 4 20 Continue bullding the slde wall from the inside Use the spacer with each panel and the three remaining F profiles Repeat steps 4 2 A through 4 2C 4 3 Add thelast W 1 panel to complete the side From the outside fit F 7 corner profile into 4 44 Prepare two G 1 gutter profiles sliding four set screws Into bottom bolt track Tighten each end set screw to hold In placa 4 4B Prepare one G 2 gutter profile with five set screws Slide set serews into bottom bolt track Tighten end set screw to hold place 4 5 Working from Inside place 5 1 and G 2 gutter profiles fitting top edge of W 1 panels Into channels of gutters Place one short G 1 gutter profile at each end and the longe
12. te drift on or around the greenhouse Locate underground pipes or cables before preparing the site or anchoring the greenhouse 4 Prepare a Foundation After choosing alocation proper preparation of the site ls essential The site must be level The greenhouse must be mounted to a base Construct the base first so the greenhouse can be securely mounted We recommend constructing a wood platform base using a perimeter of two by fours filled with alther soll Sod or gravel Instructions for constructing a wood platform can be found on page 3 inthis manual Other suitable base options Include wood decks and concrete slabs Wood screws are Included to secure the greenhouse to a wood base The greenhouse secured to the ground from the Inside with ground anchors See step 11 for detalls If you are using a concrete base get appropriate mounting screws before beginning hake sare the corners are square by measuring the Inside diagonals from both sides and making sure they are equal Use a spirit level to make sure the base ls level Contact your local authorities regarding any required bullding permits or restrictions lof 44 VW ESS Safety Advice Table of Contents Intrachuctinr 1 Safety Advice F General Order of Assembly susu 2 Construct Wood Platform sasu 3 List of Parts ee d Prepare Set Screws uos Y Assemble Base F Assemble Right Wall wou Assemble Back Wall 14
13. time to complete this step and install and secure roof Do not leave roof unattended until it is completely assembled NOTE Use included five foot bungee cord for added support It will help hold the sides in position while asembling the roof Remove in step 8 5 8 2 4 Working from the Inside Install B 4 connector on middle profile on both sides of greenhouse Secure each with one bolt 6 28 Hook one end of bungee cord Into top hole in B 4 connector on each side Working from back right corner remove plastic film from both sides of one W 1 panel With side marked UW Resistant facing outelde fit top end of panel into channel 1 roof ridge near corner Push panal into roof ridge channel until the other end reste on gutter ledge and then slide towards F 7 corner profile Repeat to Install W 7 panel In back left corner 6 38 With two set screws facing Inside fit one F 1 profile next to right panel F 1 profile rests against widest part of roof ridge and lines up with top of gutter 3 From inside hold profile place with one B 4 connector Secure with two bolts NOTE VIEWS FROM INSIDE B 3D Repeat step 6 36 through amp 5C to secure Install and secure 1 profile on left side B 3E Hold two profiles together at ridge using one B 4 connector Secure with bolts 6 44 Continue Installing roof working fram front right corner remove plastic film fram beth sides of o
14. units Install F 7 profile with set screw near base until needed 2 18 Prepare three 1 wall profiles Slide set screws Into both bolt tracks on one end of profile and one bolt track on the other end The single set screw will sit on the inside of the greenhouse near the base when Installed 2 2 at front right corner Remove plastic film from both sides of ons W 1 panel Fit panel Into channel in base placing slde marked LA Kasltant facing outside The panels will help hold the profiles up during assembly 2 28 Place F 7 corner profile on base fitting panel into channel Slide set screws Into base so thay ling up Fit B 3 connector on each side NOTE VIEWS ARE FROM OUTSIDE 23A Continue working from inside Remove plastic film from both sides of one 1 panel Fit panel Inte channel in base and corner profile placing slde marked UV Kesltant facing outelde IMPORTANT The panels expand and contract depending on the temperature ensure proper placement use the 23 inch spacer included with the tools 2 3B Place 23 Inch spacer on base next to F 7 corner profile panel into channel in F 1 profile and slide F profile against spacer to ensure proper placement Position F 1 profiles single set screw next to bass on Inside NOTE Panels will not frt completely ta end of channels There will be some space to allow for temperature changes 2 30 Fit B 3 connector and secure with two 5
15. 20 bolts 2 30 Continue bullding the side wall from the Inside Use the spacer with each panel and the four remaining F 1 profiles Repeat steps 2 3 4 through 2 50 2 4 Addthelast W panel to complete the side From the outside fit F 7 corner profile into place and secure 2 5 Prepare two 12 1 gutter profiles sliding four set screws Into bottom bolt track Hand tighten sach end set screw to hold In place 2 5B Prepare G Z gutter profile with five set screws Slide set screws Inte bottom bolt track Hand tighten end set screw to hold place 2 6 4 Working from Inside place 5 1 and G 2 gutter profiles fitting top edge of W 1 panels Into channels of gutters Place one short 2 1 at each and the two longer 5 2 gutter profiles In the center Seams are centered to bolt tracks In 1 profiles 2 6B Place one eet screw on the inside Folt track ofthe NOTE VIEW FROM INSIDE at each end Hand tighten both set screws to hold place NOTE VIEWS FROM INSIDE WAT DIM 12 af 44 2 7A gutters are secured together using B 5 connectors and attached to sida profiles using B 3 connectors onthe outelde of the greenhouse The B 3 connector usas the set screw the center hole of B 5 connectors at seams Loosen and slide set screws to line up with connectors making sure the seams line up and the gutters remain stralght 2 78 Begin at the three
16. Assemble Left Wall 17 Assemble Front Wall and Gable 21 Assemble Back Gable 1 27 Assemble Roof Ridge Wl Assemble Roof ss 332 Install Roof Vents assesses 30 Install Doors aae 41 Secure to Platform uu 44 General Order of Assembly 1 Assemble Base 9 Step 2 Assemble Right Wall Step 5 Assemble Back Wall e _ Step 4 Assemble Left Wall Step 5 Assemble Front Wall and Gable Step G Assemble Back Gable 0 Step 7 Assemble Roof Ridge B Assemble Roof Install Roof Vents Step 10 Install Poors Step 171 Secure to Platform Work Gloves Tape Measure Phillips Screwdriver included Tools Needed Safety Goggs Spirit Level 73 inch spacer included Step Ladder Wrench finduded gt 5 foot bungee cord included 2of 44 aa a COM Constructing a Wood Flatform IMPORTANT It is very important to begin with a level surface Check your foundation to ensure it is level at every point If you are not building an a woad deck we recommend constructing a wood platform so you can properly secure the greenhouse You must assure your foundation is square and level before beginning assembly After choosing a location proper preparation of the sita ls essential The site must ba level Create a wood platform using a perimeter of pressure treated two by fours filled with either soll sod or gravel When constructing Died esi ias wood deck make certain the surface is l
17. FROM OUTSIDE 7 inc e eje ESS OO 15 of 44 3 4 ThetwosstsofF G and F 10 profiles fit on top of W 1 panels Line up bottom bolt channels with top edge of F 1 and F 7 vertical profiles Tr Profiles welll fit snugly 3 448 Working from Inside right corner place F amp profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F amp profile fits snugly between F 7 corner profile and 1 wall profiles 3 48 Continue along back wall Place first F 10 profile on next W 1 panel sure profile fits snugly between the twoF wall profiles 3 40 Place second 10 profile on next W and ensure bt fits snugly 3 4D Place second F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F amp profile fits snugly between F 7 corner profile and 1 wall profiles NOTE ALL VIEWS FROM INSIDE 3 54 From Inside loosen set screws on profiles and adjust position to fit holes In B 1 connectors Fit 1 connector to profiles as shown 3 58 Secure each 71 connector with three bolts NOTE ALL VIEWS FROM INSIDE VADE COM Assemble Back Wall Make certain the places are In the correct positions before assembling Carefully fellow the order of assembly to ensure an easy Installation A Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1
18. M OUTSIDE NOTE VIEW FROM INSIDE 9 3 Fram inside hold Window Opener closed agalnet vent Slide vent at an angle through opening In roof panels Hook lip of vent onto curve 9 38 Outside of vent rests on top of ledge W 2 profile Open vent so you can attach the other arm of opener to top of Inside W Z profile Screw two 5 1 screws through panel and Into gripping channel on ether slde to secure Do not over tighten as may damage the vent a 9 4 From inside screw 5 5 screw and spacer into tha holes each end of the top of the vent This will secure the vent to the greenhouse very of 44 Install Doors Make sure the peces are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles The door tracks are secured with tha set screws F 7 profiles on sach sida and the two set sorews In F 5 profile Remove two bolts from center B 2 connector on F 5 profile Slide set screws to inside edge of hole NOTE WIEW FROM OUTSIDE NOTE ALL VIEWS FROM OUTSIDE 10 18 Loosen set screw In left F 7 profile and position to line up holes in D 1L as shown Loosely secure with bolts 1 IMPORTANT Position D 1L and D TR door tracks with lip on the bottom when installed 10 1G Loosen set screw in right 7 p
19. ber of set screws the correct bolt track in each profile The profiles have amounts of screws on tha inside and outside bolt tracks The chart and lllustration below show tha set screw placement The squares represent screws that are used steps 1 44 and 1 48 the circles represent used In steps 2 through 10 and the crosses represent screws used step 11 NOTE Instructions identify twelve set screws necessary for securing to ground in step 11 IMPORTANT When assembling base make sure the profiles are straight and flush against each other Secure profiles together and ensure comers are square The diagonal measurements on inside comers should be equal Secure comers to desired foundation until assembly is completed We recommend using a two four platform Set Screw Placement Code Setscrewsused In steps 14A and 1 48 Setscrews used In steps 2 through 10 Set screws used step 11 Bof 44 1 44 Make certaln side profiles are stralght and flush Adjust position of set screws Inner bolt track at front of profile to fit holes B 5 connector Canter connector over seam for maximum hold Secure using five bolts Repeat on outer bolt track to Install three remalning B 5 connectors at back and sides T IMPORTANT One B 5 connector is installed on inside front Remaining B 5 connectors are installed on outside back and sides corner connectors are installed on inside
20. dented hex is always facing up when screwed into the 5 2 nut This way if the set screw is installed too tightly to loosen by hand you can use a hex key farther Into nut so end touches the edge of the profile and holds place Do not over tighten ae He will be dificult to loosen agaln to adjust set soraw position to fit holes In connectors 1 18 After sliding Into bolt track screw threaded part shown hand tightened In F 1 bolt track NOTE Screwing 5 2 threaded part farther into nut so it holds is referred to in this manual as hand tighten Locsen set screw refers to unscrewing the 5 28 threaded part enough so set screw easily slides NOTE We recommend assembling all set screws before beginning Each step shows quantity needed separately Connectors are secured with 5 2 bolt using set screws in later steps WARNING Use extreme caution when handling profiles and 1 The bottoms may have sharp edges near the drilled holes The cut edges on the corners of these profiles are sharp IMPORTANT Make sure the base fits properly on your foundation If not stop and fix your foundation 13 Separate profiles to Install set screws Into Inside and outside bolt tracks Soma of the set screws will be secured In this step Most are secured In later steps They are difficult to Install after the base ls assembled Fay careful attention to ensure you have the correct num
21. ear the base when Installed Hand tighten each set screw to held in place 3 10 Prepare two F 6 profiles Slide set screws 54 Prepare two F 10 profiles Slide set 4 both bolt tracks on each end of two Inte both bolt tracks on each end of two F 6 mitered profiles Hand tighten F 10 mises u each set screw to hold place profiles ghtena 3 24 Working from Inside remove plastic film from both sides of one W 1 panel P Fit panel into channel in base and corner profile placing side marked r UY EKasltant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 3 28 Place 23 Inch spacer on base next to F 7 corner profile panel into channel in 1 profile and slide 1 profile agalnst spacer to ensure proper placement Position F 1 profiles so single set screw ls next to base on inside NOTE Panels will nat fit completely to end of channels There will be some space to allow for temperature changes 3 20 Fit B 3 connector and secure with two 5 2 bolts MOTE VIEWS ARE FROM INSIDE 3 20 Continue bullding the end wall fromthe Inside Use the spacer with each panel and the two remaining 1 profiles Repeat steps 3 2 4 through 2 21 place and secure Panel QTY Connector QTY NOTE VIEWS ARE
22. end touches top of gutter and the top end touches edge of F Z center profile Position both F 7 profiles NOTE VIEW FROM OUTSIDE 6 68 Use C 1 connector to secure each outslds corner Loosen set screws on profiles and adjust position to fit holes In 1 connectors Make cure all profiles line up flush agalnet sach other Secure with three bolts on other slde NOTE VIEW FROM OUTSIDE 6 66 Check Inside corners to ensure 7 connector ls still in proper posltlon Fit needs adjusting repeat steps 6 6B and until sach corner ls sat NOTE VIEW FROM INSIDE COM Assemble Koof Kidge Make certain the places are In the correct positions before assembling Carefully fellow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 NOTE Have the hex shaped indent facing up Screw in until it is flush with bottom of nut sa it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 7 1 Prepare the two 1 roof profiles They will line up In a row and jolned using one B 5 connector with a total of four set screws and one long hex bolt Arrange profile bolt track le facing up TOA Slide set screws Into bolt track on each end of profile as shown 7 18 Ling up profiles
23. es up with tops of panels and the set are facing out The slde of the profile reste agalnst cut angle of F 3 profile The top end touches edge of F 4 center profile and bottom end touchestopofG 7 gutter Position both F 7 profiles NOTE VIEW FROM OUTSIDE 5 90 Use C 1 connector to secure each outside corner Loosen set screws on profiles and adjust position to fit holes In C 1 connectors Make sure all profiles line up flush agalnst each other Secure with bolts on other slde proper position Fit needs adjusting repeat steps 5 5 and 5 90 through 5 9D until gach corner ls set NOTE VIEW FROM INSIDE Assemble Back Wall Make certain the pleces are In the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 74 NOTE Have the shaped indent facing up Screw in until itis flush with bottom of nut it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 61 PreparetwoF 7 corner profiles Slide set screws Into the same bolt track ona on each end of profile Tighten each set screw to hold In place 6 18 Prepare one F 2 profile Slide set screws Into both bolt tracks each end of profile Tighten sach set screw to hold In placa 6 1C Prepare two F 3 p
24. evel treating an additional wood platform not necessary Buy pressure treated 2x4 lumber You will use two layers with the corner positions staggered for maximum strength The finished dimensions will bs 101 by 101 Materials Tools Elght 10 pressure treated 2x4 lumber out to Spirit Level Fifty 8 2 wood screws Comer Square Philips Screwdlver Power Drill recommended Make sure each comer ls square and then secure one corner with wood screws Mowe to the dlagenal corner make sure bt ls square and then secure with wood screws you continue to secure the 2x4 wood platform continue to make certain the comers are square and the frame ls level Secure wood platform every two feet with wood screws Make certain to tighten screws Into the wood platform until they are fush with the surface MOTE The illustrations throughout the manual are shown without a foundation WWW BS COM 3 of 44 List of Parts The greenhouse 15 shipped In four cartons These cartons are heavy Use care when lifting them Some parts have sharp edges Use extreme caution when handling Wear proper safety gear Including work shoes gloves and safety goggles Keep children and pets away until assembly Is completa Finish assembling the roof In one session Do not leave the roof unattended until t is completely assembled Place all ike parte together In a staging area Prepare foreach step accordi
25. ne W 1 panel With slde marked UY Resistant facing outside fit top end of panel Into channel In 71 roof ridge naar corner Push panel inte roof ridge channel until the other end rests on gutter ledge and then slide towards F 7 corner profile Repeat to install W 1 1 panal in front 8 48 From inside fit ons F 1 profile with two set screws facing Inside next to panel Hold place with one B 4 connecter on right side Secure with two bolts i to install F profile on opposite sida B 4C Hold two profiles together at ridge using one B 4 connector Secure with two bolts NOTE VIEWS FROM INSIDE 8 5 Remove bungee cord and continue working from back to install section four You will be Installing one panel on the right with tha F 1 profile next to It Then you will install the two remaining panels on tha left The final F 1 profile slides up from the outelde at the gutter to the You will need extra help to hold the two panels In position Use dish soap with water to help lubricate the panel edges 6 54 Remove plastic film from both sides of one W 1 panel With side marked UV Resistant facing outside Install the next panel on the right at the back Push panel Into roof ridge channel until the other end rests on 2 2 gutter ledge and then slide towards 1 profile at back Do not Install opposite panel until step amp 5C NOTE VIEWS FROM OUTSIDE 8 58 From Inside
26. ng to Instructions In this manual If any parts are missing or damaged contact Riverstone Customer Service before beginning assembly Customer Service 877 373 3078 or email custamerservicegirisww com QTY 2 Step 3 1 4 Steps 24 Profile Profile WARNING Profiles with cut edges and or drilled holes are sharp Use extreme caution when handling VADE Ee COM List of Parts continued 1 WARNING Use extreme caution when handling panels with cut edges The corners are sharp 24 x 154 24 x 21 W7 List of Parte continued Connectors QTY Hardware QTY 1 2 3 4 5 4 7 810 11 Assemble Base Make certain the pieces are In the correct positions before assembling Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles 1 1 Weuseasstscrew and nut assembly system for ease of Installation With the hex shaped indent facing up sot screw screw 5 262 threaded part into 5 24 a gt until ls Rush with bottom 48 of nut When the assembly ls flush it will slide easily inthe bolt tracks EJ con ut NOTE The two pieces together is referred to in this manual as a setscrew Shown sliding Into F 1 bolt track IMPORTANT One end of the 5 2B threaded set screw has a hex shaped indent The other end forms a soft point Make sure in
27. nside place 5 1 and G 2 gutter profiles fitting top edge of W 1 panels Into channels of gutters Place one short G 1 gutter profile at each end and the longer 5 2 gutter profile in the center Seams are centered to bolt tracks In 1 profiles 4 58 Place one set screw onthe Inside bolt track ofthe gutter NOTE VIEW FROM INSIDE at each end Hand tighten both set screws to hold place MOTE VIEWS FROM INSIDE ear CO 19 af 44 ABA The gutters are secured together using B 5 connectors and attached to sida profiles using B 3 connectors on the outside of the greenhouse B 35 connector uses the set screw Inthe center hole of B 5 connectors at seams Loosen and slide set screws to line up with connectors making eure the seams line up and the gutters remaln stralght 4 68 Begin at the three seams and arrange set screws so middle screw centered Fit B 5 connector onto gutter and hold in place using the two end bolts 4 60 Loosen set screws on slde profiles and slide down Fit wide part of B 5 connector onto set screw Slide up Into place fitting gutter set screw at other end Tighten set screws and secure with bolts NOTE The bottom of B 3 connector extends past the edges of side and corner profiles B 3 connector sits on tap of B 5 connector Secure all with bolts Assemble Front Wall and Gable Make certain the peces are In the correc
28. om both slides of one 1 panel Fit panel inte channel in base and corner profile placing side marked UV Resistant facing outside IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included withthe tools 5 36 Place 25 Inch spacer on base next to F 7 corner profile Fit panel into channel In 1 profile and slide 1 profile agalnet spacer to ensure proper placement NOTE Panels will not frt completely ta end of channels There will be some space to allow for temperature changes 5 30 connector and secure with two 5 26 bolts 5 3D Continue working from Inside left corner place F amp profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F amp profile fits snugly between F 7 corner profile and F 1 wall profiles E 5 From inside line up F 2 profile as shown Make sure B 2 connector is polnting towards door opening wA NOTE VIEWS FROM INSIDE 5 3F Adjust set screws and place B 2 connector on profiles as shown Slide set screws In vertical openings to center of opening D 6 trim E plata will 8t properly NOTE VIEWS FROM INSIDE 5 3G Install B G trim plate and secure with three bolts lL Working from Inside front right corner Install F 1 profile next to W 1 panel Place 23 Inch spacer on base next to F 7 corner
29. profile and slide 1 profile agalnet spacer to ensure proper placement IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 54B Fit B B connector and secure with two 5 26 bolts NOTE Panels will notfit completely to end of channels There will be some space to allow for temperature changes 5 40 Continue working from Inside right corner place F amp profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F G profile its snugly between F 7 corner profile and F 1 wall profiles 5 4D From inside line up F 3 profile as shown Make sure B 2 connector is pointing towards door opening NOTE VIEW FROM INSIDE NOTE VIEW FROM IMSIDE 5 4F Install B amp trim plate and secure with 5AE Adjust set screws and place B 2 connector on profiles as shown Slide set screws vertical openings to center of opening B 6 trim plate will fit properly 5 5 Thedoorframe ls 6514 high from the base To avold adjusting the placement after assembly prepare door frame using the exact measurements listed thase steps 5 54 Prepare one F 4 profile Slide two set screws Into bolt track and position as shown 5 50 Place one end of F 4 profile against F 5 profile on flat level surface Center F 4 profile to F 5 profile and adjust set screws to fit 2 connector Secure with three bolts
30. r 5 2 gutter profile in the center Seams are centered to bolt tracks In 1 profiles 4 58 Place one set screw onthe Inside bolt track ofthe gutter NOTE VIEW FROM INSIDE at each end Hand tighten both set screws to hold place MOTE VIEWS FROM INSIDE ear CO 19 af 44 ABA The gutters are secured together using B 5 connectors and attached to sida profiles using B 3 connectors on the outside of the greenhouse connector uses the set screw Inthe center hole of B 5 connectors at seams Loosen and slide set screws to line up with connectors making eure the seams line up and the gutters remaln stralght 4 68 Begin at the three seams and arrange set screws so middle screw ls centered Fit B 5 connector onto gutter and hold in place using the two end bolts 4 60 Loosen set screws on olde profiles and slide down Fit wide part of B 5 connector onto set screw Slide up Into place fitting gutter set screw at other end Tighten set screws and secure with bolts NOTE The bottom of B 3 connector extends past the edges of side and NOTE 4 44 Prepare two G 1 gutter profiles sliding four set screws Into bottom bolt track Tighten each end set screw to hold In placa 4 4B Prepare one G 2 gutter profile with five set screws Slide set serews into bottom bolt track Tighten end set screw to hold place 4 5 Working from I
31. rews with three bolts ledge profile at outside top Install 2 panel at slight angle sliding all the 2 EN way into 1 profile Fit otherend inte opposite F 1 profile When y necessary loosen D 4 connector holding F 1 profiles at sides to fs move sach profile away from Opening to create space to aide W 2 panel into channels Return all parts to previous position when finished Have person stand outside the greenhouse to observe the position of the roof while the other person installs the B 29 brace The set screws should be In the correct position but If the roof ls not completely straight loosen tha set screws and adjust the brace to ralee or lower the roof ling Secure with two bolts The G 4 trim plates snap Into G 7 and G Z gutter profiles to hold roof panels in place Working from outelde begin at front corner Position G 4 trim plate over gutter and use handle of screw driver to tap into place Use two trim plates on each slde Make sure the seams of the trim plates are flush with each other and to the 1 connectors at the front There may be a slight gap at the rear C 1 connector depending on weather conditions BS 38 of 44 Install Roof Vents Make certain the are In the correct positions before assembling Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes
32. rofile and position to line up holes D TF as shown Loosely secure with bolts From the inside position set screw three inches from right and left 1 door frame profiles Install B 3 connector as shown and secure each with a bolt 10 Working from the outside apply the D 4 door sealant tape to the outside of F 1 profiles that make up tha door frame This tape acts as Insulation Beginning directly below D 1L and D 1 E door tracks smooth tape down to F 1A and P 1E base profile make eure tha tapa ls even Cut each strip at the bottom 10 38 Wrapthetop part of sach of the B 35 door guides with the D 4 door sealant tapa NOTE VIEW FROM INSIDE 10 86 Wrapthe bottom part of each of the 0 5 door guides with the D 4 door sealant tape 10 44 Tolnstall D 2L factory assembled door remove the bolt attaching left door track D 1L o F 7 profile With the wheels facing Inside line up so thay roll inte tha left door track As you roll the door along the track make certain it slides inside the B 3 door guide Installed In step 10 2 Continua to roll door until It stops next to tha bolt at the center Secure using tha bolt you removed Eu 50 M A Lining up holes door Install the D 5 door knobs using the Included screws NOTE VIEW FROM OUTSIDE 10 5B From the inside place the D 5 door gulde bracke
33. rofiles Slide set screws Into both bolt tracks on straight end of F 3 profiles Tighten sach set screw to hold In placa J amp WARNING The cut edge of profiles sharp Use extreme caution when handling COM 6 2 From inside add connector 7 to sach corner Secure each with two bolts NOTE VIEWS FROM INSIDE 6 34 Continue working from Inside Line up 2 and F 3 profiles with 1 profiles as shown Loosen set screws and adjust position to fit holes In 1 connectors Make sure profiles are stralght 5 3B Secure with bolt each 1 connector NOTE VIEW FROM INSIDE 5 44 Work from outside to add 1 connectors In the same position Loosen set screws on profiles and adjust position te fit holes In 1 connectors Fit 8 71 connector to profiles as shown 6 48 Seoure each B 1 56 5 lt Continue working from outside to Install panels a shown Remove plastic film from both sides of two W 2 and two W 4 panels Fit each panel Inte channel in profiles placing sida marked UV Resistant facing outside WARMING The corners of W 3 and W 4 panels are sharp Use extreme caution when handling BBA From outelde fit F 7 profiles into each side of back Arrange the profile so channel lines up with tops of panels and the set screws on each end are visible Begin with either right or left slida Profile slde fits agalnst cut angle of F 5 profile One
34. se to secure to the d Place on each ds uiid and bui 11 28 5 aach A 1 ground r through hole in canter of bracket Use a screw driver through the top of 1 anchor to screw 11 24 Attach each anchor bracket with two completely Into soll set screws In the inside bolt channels In Make certain lt ls base profile Secure each with two bolts secured ground
35. seams and arrange set screws so middle scraw ls centered Fit B 5 connector onto gutter and hold in place using the two end bolts NOTE VIEWS FROM OUTSIDE UNDER GUTTER 2 7 Loosen set serews on side profiles and 51148 down Fit wide part of B 3 connector onto set screw Glide up Into place fitting gutter set screw at other end Tighten set screws and secure with bolts NOTE The bottom of B 3 connector extends past the edges of side and comer profiles B 3 connector sits over B 5 connector Secure all with bolts MOTE VIEWS FROM OUTSIDE UNDER GUTTER Assemble Back Wall Make certain the places are In the correct positione before assembling Carefully fellow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 1 NOTE Have the hex shaped indent facing up Screw in until itis flush with bottom of nut it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 3 14 Prepare one F 7 corner profile Slide set screws into both bolt tracks on each end of corner profile Hand tighten each set screw to hold place 5 P 3 1B Prepare three 1 wall profiles Slide set screws Into both bolt tracks on one and of profile and one bolt track on the other end The single set screw will sit on tha Inside n
36. t Into the channel the base profile lining holes bracket with holes in bottom door Use two 5 3 screws to secure Repeat to Install one bracket on each door 40 40 Make sure the doors hang properly slide easily and lack Straight If you need to adjust either one or both loosen the center bolts to elther raise or lower sach door as needed Secure the center bolts when finished Secure to Platform Make certain the peces are In the correct positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws shown In step 1 1 NOTE Have the hex shaped indent facing up Screw until itis flush with bottom of nut so it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 11 1 The base has pradrillad holes in the inside and outelde bolt channels so you can easily sacura your greenhouse to a wood platform Screw S 4 screw Into hole basa through wood until screw ls fush with base profile Continue process around outside and Inside of greenhouse until It ls evenly secured NOTE The 5 4 screw is designed to be used with wood When securing base to foundations made of materials other than wood use an appropriate fastener Use four 1 ground anchors with four 2 anchor brackets on the Inside of the greenhou
37. t positions before assembling A Carefully follow the order of assembly to ensure an easy Installation Wear proper safety gear Including work shoes gloves and goggles Prepare needed set screws as shown In step 7 14 NOTE Have the hex shaped indent facing Screw in until itis flush with bottom of nut sa it slides easily into bolt tracks After inserting into bolt track screw in until it holds in place 5 1 The door frame 6514 high from the base To avold adjusting the placement after assembly prepare door frame using the exact measurements listed In thase steps 5 14 Prepare two 5 profiles 5 18 Fit B 2 connector onto profile and position so bottom Slide three set screws of connector measures amp from bottom of profile Inte bolt track and Secure each with two bolts position as shown n WARNING The cut edge of F 3 profile is sharp Use extreme caution when handling 5 24 Prepare two 1 wall profiles Side set screws Into same bolt track one on each end of profile Position profile set screw near base ls on the Inside when Installad Hand tighten sach set screw to hold place 5 26 Prepare two F G profiles Slide set screws Into both bolt tracks on mitered end of profile and one bolt track onthe other end The single set screw will st on the lnsida when Installed Hand 5 34 Working from inside front left corner remove plastic film fr
Download Pdf Manuals
Related Search
Related Contents
IMPORTANT PRODUCT INFORMATION S Series Ultraschallsystem Assassinat virtuel : où s`arrête le jeu ? L`hommage au soldat Stealth Cam Prowler HD IMPORTANT SAFETY INSTRUCTIONS SAVE THESE Polycom VSX7000E User's Manual Whirlpool DU900PCDB0 User's Manual Price Computing Scale - AP インフラ再生委員会 - 日本建設情報総合センター Transform & Grow™ Bacterial Transformation Kit Copyright © All rights reserved.
Failed to retrieve file