Home

Veranda MKT DS BRDVC G 1FT Installation Guide

image

Contents

1. VERANDA ron VERANDA ARMORGUARD HORIZON Eranda Composite Decking and Fiberon Horizon Composite Decking Installation Instructions VerandaDeck com 800 566 3337 800 HomeDepot bed me ka fiberon HORIZON Decking Profiles Veranda ArmorGuard Decking 5 3 in x 93 in x 8 or 20 ft 13 cm x 2 3 cm x 3 66 4 88 amp 6 1 m Square Edge 93 in x 5 3 in x 12 16 or 20 ft 13 cm x 2 3 cm x 3 66 m Grooved Fascia 75 in x 11 25 in x 8 or 12 ft 2cm x 29 cm x 3 66 m Po Veranda Decking 5 3 in x 93 in x 8 or 20 ft 13 cm x 2 3 cm x 3 66 4 88 amp 6 1 m Square Edge Fascia 75 in x 11 25 in x 12 ft 2cm x 29 cm x 3 66 m Po Fiberon Horizon Decking 5 4 in x 94 in x 12 ft 14 cm x 2 4 cm x 610 cm Square Edge 5 4 in x 94 in x 16 ft 14 cm x 2 4 cm x 4 88 m For the most up to date instructions visit VerandaDeck com Getting Started Follow local approved building codes Careful planning of the finished deck layout will result in better looking finished projects Failure to follow installation guidelines could void warranty e Joist location plays an important role in the safety of the deck itself but may also affect the ease method and price of your railing system e Before starting read the instructions of both the decking and railing systems planned for the project e Dark colors will absorb more heat than lighter colors and as such will experience greater ra
2. non diluted DO NOT use ACL Staticide Concentrate non diluted For the most up to date instructions visit VerandaDeck com FIB 0098 LIT 3 14 CW IAHMOROUARD F a S ten er S Hidden Fastener Installation The ArmorGuard Hidden 2 Position the clip on the outside of the rim joist Securing it with a single screw inserted perpendicular to the joist After positioning the last deck board in place secure it by angling a screw through the clip and into the board at a 30 45 angle Be careful to make sure the screw inserts fully and pulls the board down 3 Space no more than 12 80 cm apart Fastener is a deck fastening system designed specifically for a fastener free surface around the perimeter of the deck to create a smooth deck surface uninterrupted by visible screws or nails CAUTION Contains parts with sharo edges Use proper care Use of gloves is recommended e Place End Clip a minimum of 1 4 6 mm from wall and secure with a single screw into joist Repeat no further than 12 80 cm on center e Position deck board and insert clips into edge groove It may be helpful to angle the board slightly to start the clips e With the deck board fully inserted into the clips use ArmorGuard Hidden Deck Fasteners to secure the board along the other side 1 Using Two Deck Boards As Fascia approximately 11 a 28 cm of fascia coverage 1 Secure the outermost deck board using the End Clip with the longer le
3. D FOR USE WITH VERANDA OR FIBERON GV DECKING include ArmorGuard Hidden Fasteners Wood Grain Patterns Note that the wood grain patterns on Veranda and Fiberon deck boards are directional Different looks can be achieved by laying the decking in the same or alternating directions There are several different wood grain patterns See Figure 10 below for one of these patterns The graining pattern repeats approximately every 44 1 12 m feet along the board length To ensure you orient the boards to achieve the desired effect a directional label is noted on the side of each board showing grain direction During the planning phase of any deck project arrange decking before installation to achieve the desired pattern and color effect Figure 11 This is also important if different lengths bundles of material are used as different wood grain patterns and color tones may need to be mixed to achieve the desired look Ventilation Do not install decking directly to a solid surface Make sure there is adequate and unobstructed air flow under the deck to prevent excessive water absorption Improve drainage Wood Grain Orientation During Installation y CELE SS a a DD YP 2D DDD DD DD N A A A A Ce C C C D gt gt A A A A A A A oD AA A aN Decking Installation or grade flat areas where standing water may gather Allow a minimum of 6 15 cm between the bottom of the deck substructure jois
4. I i i Note For locations with extreme temperture swings double joisting and surface fastening may be required to minimize Shifting of material Adhering to these spacing parameters will e Promote proper drainage and ventilation e Aid in the removal of organic debris e Meet board spacing requirements for Fiberon warranty coverage Surface Fasteners The use of stainless steel composite deck screws is strongly recommended Composite surface fasteners may be used check with manufacturer for coating warranty Pre drilling is recommended Plain galvanized surface fasteners are not recommended DA Screw heads must be flush with board surface Use caution to avoid over tightening fasteners Excess tightening may cause immediate or eventual cracking of the fastener locations Do not surface fasten within 1 4 cm of the end of a board or 1 3 cm from the side of the board a4 RARER fiberon HORIZON Decking Installation Do Not Toe Nail Proper Installation 1 1 2 4 cm 90 Degrees Deck Board Deck Board Joist Joist Blocking Blocking Pre drilling e t is necessary to pre drill end of board screw holes to prevent immediate or eventual end splitting Figure 6 e Pre drilling all holes will result in better looking finished projects DO NOT over tighten fasteners Over tightening will induce cracking at board ends e Surface fasteners should always be driven in at a 90 a
5. e first deck Sar board with a 1 8 3 mm drill bit along the outside edge of the board at every support joist To First Board prevent cracking of the board the holes at the end of the board should be a minimum of 11 2 4 cm from the board Structural Joist Permanent Structure Rim Joist Ledger Board end The holes along 8 the grooved edge of 1 6 mm the board should be aminimum of 1 3 emn cm from the board JTE side Fastener Permanent Structure Hidden Fastener Installation Secure the first deck board by face fastening with a stainless steel or high quality composite decking screw in each pre drilled hole Do not over tighten screws On opposite side of first deck board insert a ArmorGuard Hidden Fastener into the side groove of the board at every support joist single tab first The single tab should engage the deck board by a minimum of 5 16 1 cm 8 10 Center the screw hole on the joist To secure the ends of two boards use the Butt Joint fastener as shown below 7B Install a screw provided with the fasteners through the hole in the ArmorGuard Hidden Fastener into the center of each support joist Angle the fastener toward the first deck board 8 Do not over tighten screws Position the next deck board against the fastener tabs and slide the board onto the tabs If necessary slightly lift the out
6. er edge of the board to ease the assembly of the board onto the fastener tabs 8 9 When installed properly the fastener will ensure a 3 16 5 mm gap 10 Line Fastener Installation 9 Repeat steps 6 8 for each deck board 10 Position the final deck board onto the last set of ArmorGuard Hidden Fasteners For face fastening to ensure a consistent gap between boards predrill the final deck board with a 1 8 8 mm drill bit along the outside edge of the board at every support joist The holes at the end of the board should be a minimum of 11 2 4 cm from the board end The holes along the grooved edge of the board should be a minimum of 1 8 cm from the board side See ArmorGuard for installing hidden fastener end clips around the perimeter of the deck for a fastener free surface Secure the final deck board by fastening a minimum 8 x 2 1 2 6 cm minimum long stainless steel or composite deck screw in each pre drilled hole Do not over tighten screws For the most up to date instructions visit VerandaDeck com VER 0036 LIT 3 14 k WY he N mi h SN iW NWN hi Ky Hi I RAHN AY ae SW is i A 3 VERANDA o fiber ARMORGUARD A VERANDA HORIZON VerandaDeck com 800 566 3337 800 HomeDepot
7. g more difficult For best results when blocking is required it should be installed ladder style Figure 3 Stringers or Joists Board Spacing All decking materials whether wood composite or metal undergo some degree of linear expansion with the changes of weather and the season To compensate for the effects of contraction and expansion the following installation standards must be maintained End Gapping Side To Side Spacing Beria Temperature Note Special consideration should be taken when working with dark colors as they will experience larger temperature swings during normal use To help control end to end spacing dark color decking should be kept at ambient temperature and shaded from direct sun prior to cutting and immediate securing The following procedures will result in less visible gapping e Keep boards out of direct sun during storage and cutting processes and through to installation if possible Never cut and install boards in direct sun assuming them to be at ambient temperature e Use lighter colored boards in the field of the deck with darker colored boards as design accents e Use short boards where possible e Use splitter divider boards between each continuous run of boards e Surface fasten using heavy gauge 9 or 10 quality composite deck screws For the most up to date instructions visit VerandaDeck com Gapping End To End Spacing by Temperature Under Veranda I i
8. g once the plywood sheet is removed Be sure to always follow the ladder manufacturer s instructions and safety tips ensure required 6 15 cm of un obstructived net free ventilation is achieved for Veranda and Fiberon decking If already installed seek methods to achieve the ventilation requirement Fire Features Fire Pits Fire features and fire pits are increasingly popular in outdoor living environments Fire can damage many building products including Veranda and Fiberon decking Improperly installed fire features and fire pits can cause damage to the surface of Veranda and Fiberon decking via direct exposure to the flame or excessive radiated heat Proper caution should be taken when designing installing and using these features to ensure damage does not result Static Dry or windy environments may create a temporary condition of static electricity which will vary depending on climate and site conditions In the case of excessive static buildup on an installed HDPE capped deck Fiberon recommends to use the following procedure 1 Remove loose debris from the deck surface 2 Dilute ACL Staticide Concentrate 1 part to 39 parts water 1 39 3 Spray or mop entire surface of the deck 4 Allow to air dry do not attempt to wipe the surface dry as wiping will reduce the effectiveness of the anti static coating Although very safe in diluted form ACL Staticide Concentrate is considered a hazardous chemical
9. g secured into the rim joist and spaced no more than 12 80 cm apart 3 2 Size and cut the first fascia deck board allowing for 1 4 6 mm clearance from the wall or other permanent structures 3 Insert the fascia deck board over the upper half of the rim joist and into the End Clips 4 Secure the lower edge of the deck board with ArmorGuard Hidden Deck Fasteners spaced no more than 12 80 cm apart Tip Use a field made jig or clamp To Secure the Final Deck Board There Us u DE Are Two Options Using the End Clip 5 Attach End Clips to the underside of the rim joist spaced no more than 12 80 cm apart 4 1 Position the clip on the inside of the rim joist securing it with a single screw inserted perpendicular to the joist After positioning the last deck board in place secure the board by angling a screw through the clip and into the board at a 30 45 angle Be careful to make sure the screw inserts fully and pulls the board down 2 When thickness of rim joist exceeds 11 2 4 cm End Clips should be secured to the outer edge of the joist Space no more than 12 80 cm 6 Insert the lower deck board into the ArmorGuard Hidden apart Deck Fasteners and secure the board by fully inserting a screw at an angle through the End Clip and into the board making sure to draw the board tight Figure 5 7 Continue around entire fascia surface For the most up to date instructions visit VerandaDeck com Mims Faste
10. ners The ArmorGuard Hidden Fastener is a deck fastening system designed specifically for grooved GV deck boards and is a fast and simple way to create a smooth deck surface uninterrupted by visible screws or nails CAUTION Contains parts with sharp edges Use proper care Use of gloves is recommended Initial Installation of Deck Boards 1 Refer to figure 6 typical joist spacing is 16 41 cm o c Diagonal installations typically require 12 80 cm o c 1 4 6 mm spacing from any permanent structure wall or post is required Side board spacing 3 16 5 mm between board and any permanent structure or post 1 4 6 mm Between board ends at temperatures up to 30 F 1C space 1 4 6 mm at 50 F 10 C space 3 16 5 mm at 70 F 21 C space 1 8 8 mm at 90 F 82 C space 1 16 2 mm at temps over 110 F 48 C space 1 32 1 mm ArmorGuard Hidden Fasteners are not to be used on stair treads Stair treads require the use of Fiberon square edge boards and must be surface fastened screwed 2 Reauires 6 15 cm 6 Preparation of unobstructed Typical residential joist T airflow See spacing is 16 41 cm o c i For diagonal applications 12 deck ventillation 31 cm o c Always check local building codes before information page 9 construction 3 Position the first deck board on the support joists Leave a 1 4 6 mm gap from any permanent structure 7 4 Pre drill th
11. nges in expansion contraction e Thoroughly reading all instructions first will make for more profitable projects Failure to do so may result in more difficult installation and may void warranty e For decks using metal joisting specialized surface fasteners are required Do not use ArmorGuard Hidden Fasteners Fasteners for metal that install at a 90 degree angle only are required Joist Spacing Joists used in deck frame construction should be 2 x 8 5 cm x 20 cm or larger Figure 3 Joist Stringer Spacing Residential Commercial Veranda F Do 2 e e wae e 2 os 2 6 es Horn te 2 iz 2 o Secure Stair treads over and in contact with a treated pine 2x6 installed flat not on edge as under support and secured with Simpson A23 approved connectors and 10d x 1 1 2 hot galvanized nails When installing heavy loads on top of your decking project a hot tub for example it is important to also understand the requirements of the manufacturer as they may have specific framing and support requirements for their warranty coverage Residential Joist Spacing 12 o c 31 cm 16 o c 41 cm MARETE BARES f beron HORIZON Decking Installation Blocking When installing Blocking blocking for more intricate decking patterns remember bh that solid blocking blocking laid on the flat will inhibit water flow and result in buildup of organic materials over time which will make cleanin
12. ngle to the decking surface Toe nailing screws is not recommended Figure 7 Instead the placement of blocking sister joists when needed is recommended to allow perpendicular installation of surface fasteners at board ends Figure 8 e Pre drilling is required in cold temperatures Requirements e Clean straight lines of fasteners look better than wobbly lines Use white chalk straight boards or string lines as templates for straight lines e All brands of Fiberon decking may be surface fastened Annular thread ring shank and spiral shank nails of sufficient length have excellent holding power and produce good results e Screws have superior holding power Use only screws designed for composite decking DO NOT USE traditional bugle head screws e For a cleaner look stainless steel composite screws are recommended These screws are engineered specifically to work with composite decking and prevent mushrooming resulting in better looking finished projects Fastening Boards Veranda and Fiberon decking requires two fasteners at every joist location Figure 9 While surface fastening is allowed on all decking products the use of ArmorGuard Hidden Fasteners are highly recommended with grooved GV decking to create a smooth unblemished decking surface GV boards cannot be used as stair treads For the most up to date instructions visit VerandaDeck com ka EPP kap E beron HORIZON Hidden Fasteners FASTENERS RECOMMENDE
13. the sunlight is reflected and concentrated it can harm a range of building materials that include doors windows siding trim and decking Damage caused to these products can include melting sagging warping discoloration increased expansion and contraction and accelerated weathering If you have auestions on how to reduce this risk contact For the most up to date instructions visit VerandaDeck com kas fiberon HORIZON Decking Installation the manufacturer of the product which contains the Low E Important Ladder Usage glass for suggestions on how to reduce or eliminate the reflected heat Under deck waterproofing systems Under deck waterproofing systems properly installed can provide additional living or storage space Improper installations are those that restrict air flow and result in buildup of heat and or humidity which can result in unwanted consequences Contact the manufacturer of the specific under deck waterproofing system for installation instructions to Safety Instructions When using a ladder on composite decking it is mandatory to lay down a sheet of plywood over the deck surface to disperse the load of the ladder s feet to nearby underlying joists Drill fasteners downward through the top of the plywood sheet to keep it from slipping Position fasteners so they adequately protrude and rest firmly in the gaps between the deck boards and into the joists This will avoid leaving holes in your deckin
14. ts and the ground The deck design must allow unrestricted airflow under at least 50 of Its perimeter to permit adequate ventilation Fascia Installation Fascia is intended as a non structural covering for rim joists risers and stringers Screws should be installed at a maximum 12 80 cm interval with three screws across the face at each interval Figure 12 Do not over tighten screws as buckling and cracking may result Install with 1 8 8 mm spacing between the edges and ends in temperatures above 50 F 10 C Leave 3 16 5 mm space between edges and ends in temperatures below 50 F 10 O Fire and Unusual Heat Sources Composite decking will retain heat when exposed to direct or reflective sunlight Exercise caution if walking barefoot as footwear may be required Fire and unusual sources of heat and heat buildup can potentially damage Veranda and Fiberon decking surfaces Examples would include fire reflected light from different types of glass ex low e glass Proper Fascia Installation OS idol Fascia fire features and under deck waterproofing installations that do not provide the 6 15 cm of un obstructed net free ventilation e Low E Glass Reflected Heat Low emissivity glass is designed to prevent heat gain inside the house by reflecting sunlight outward This reflective property can result in excessive heat buildup on the surface of Veranda and Fiberon decking and on exterior Surfaces When

Download Pdf Manuals

image

Related Search

Related Contents

PIA-3410  Descargar trabajo completo ()  ANEXO III. MANUAL DE INSTALACION El manual que se presenta  Motorola 9601 Wireless Office Headset User Manual  Instrucciones de servicio  Sharp MX-4111N MSDS  - Media  FP-550 User`s Manual  Technical report - Rubicon Research Repository  Untitled - Universiti Teknologi Malaysia  

Copyright © All rights reserved.
Failed to retrieve file