Home
Utica Boilers CuB Series Operation and Installation Manual
Contents
1. operation 17 Verify proper operation by following START UP 18 PROCEDURE in Installation Operation amp Maintenance Manual Install front jacket casing following instructions found in Installation amp Maintenance Manual F F ure 4 Enter Configuration Menu igure 4 Enter Param r tS Men tSMenu CCB 150 CHB 100 CHB 130_ eae 0 Natural 0 Natural O Natural PO1 Type Gas 1 LP Gas 1 LP Gas 1 LP YP Gas Gas Gas Type F ure 6 Proper Size Settings Parameter Description Setting b01 Curve Default 2 Selection n CHB 100 0 CHB 130 CCB 150
2. CONTROL MODULE REPLACEMENT KIT 550002965 INSTRUCTIONS CHB 100 CHB 130 and CCB 150 Kit installation shall be completed by qualified agency Figure 1 Control Housin rew Fire explosion asphyxiation and electrical shock hazard Improper installation could result in death or serious injury Read this instruction and understand all requirements including requirements of authority having jurisdiction before beginning installation Installation not complete until appliance operation verified per Installation Operation amp Maintenance Manual provided with boiler 1 Follow instructions TO TURN OFF GAS TO APPLIANCE found in Installation Operation amp Maintenance Manual Verify all electrical power to boiler is turned off Control Housing q Screw Electrical shock hazard Turn OFF electrical power supply at Figure 2 Control H ing Fol Down on Hin service panel Back Cover Screws 2 Remove front jacket casing per instructions found in Installation Operation amp Maintenance Manual Burn hazard Verify heat exchanger has cooled or use appropriate personal protection equipment 3 Remove control housing screw on lower right of control housing See figure 1 4 Slide control housing forward it will fold down on its built in hinge See figure 2 Figure 3 Screws Holding Board 5 Remove two back cover screws Remove back cover See figure 2 6 Disconnect all wiring connectors on control board See
3. figure 3 7 Remove 2 screws holding board in place Slide board out See figure 3 8 Replace board with new board screw board in place Connect wiring connectors on control board See figure 3 9 Replace back cover 10 Fold control housing up and slide back into position Secure with control housing screw See figure 1 P N 240010533 Rev A 07 2014 11 12 13 14 15 16 CONTROL BOARD REPLACEMENT KIT Remove any call for heat or hot water Turn gas and electric power ON Power up boiler Configure control for proper boiler size and type To access the Parameter tS menu Press and hold Reset button for 10 seconds display will read tS release button Press the Reset button for 1 second display will read P0O1 Press Heating buttons to scroll the list of parameters Press DFHW buttons to view or change a parameter Two Parameters need to be set PO1 amp P02 as shown in figure 4 To access Configuration menu e Press DHW amp both buttons and hold for 10 seconds b01 will appear flashing e Press Heating buttons to scroll Configuration list Press DHW buttons to view or change a setting e Configuration b01 is only one to be changed per chart in Figure 6 e When proper size is selected press and hold DHW amp both buttons for 10 seconds to exit or turn power off then on or wait two minutes for auto exit e Boiler is now ready for
Download Pdf Manuals
Related Search
Related Contents
MANUAL DE INSTRUÇÕES TÉCNICAS TAFCO WINDOWS NU2-286V-W Installation Guide User Manual - lunatico.es Spin Master Air Hogs RC V-Wing Avenger User's Manual Procedimientos Interior Oficinas Salfacorp Punta Arenas "user manual" PDF format - ParaPhrase Enlarged On Demand Presentation Voir la notice Copyright © All rights reserved.
Failed to retrieve file