Home
Q-Logic Router 9120 User's Manual
Contents
1. 4 VIO cards and a maximum of 4 leaf modules NOTE Once the AC Redundancy threshold has been exceeded the SilverStorm 9120 must use a minimum of 4 power supplies and two power cords that must be plugged into a common switched power source e g a power strip U Additional parts ooo One 1 Hardware installation kit mounting rails etc One 1 Serial cable DB 9 female to RJ 11 connectors One 1 Catefogy RJ 11 Serial cable Power cords up to 2 total NOTE Be certain that the power cords are firmly seated into the SilverStorm 9120 power supplies AC power inlets U ACD ROM containing a a Technical Documentation Software U Release Notes Step 2 Unpack the equipment Step 3 Inspect the equipment for any shipping damage NOTE Any shipping damage should be reported to the shipping company Step 4 Verify that the equipment shipped matches the packing list Tools and Equipment Required A An ESD wrist strap 0 A 2 Phillips screwdriver QU Pen felt tip to mark the mounting holes on the rack Installation Tasks NOTE Before performing the installation tasks take a few minutes to review the figures below It is important to understand the slot numbering for the leaf modules and spine modules and the corresponding spine RJ 45 ports It is also important to understand the slot numbering for the fans and power supplies and the corresponding AC power inlets for the power supplies Figur
2. 8 Change the default system IP address 192 168 100 9 and gateway IP address 255 255 255 0 for the master spine Step 9 Add the equipment to the network Changing the IP Address and Default Gateway Using the RS232 Serial Port Step 1 Connect null modem crossover serial cables to the RS 232 port of the switch spine module If using a terminal emulation device the settings should be 8 data bits no parity bits 1 stop bit 56K baud Use VT100 emulation Ooooo 0 Flow control XON XOFF Step 2 Power up the switch Step 3 To change the switch default IP address enter setChassisIpAddr h ipaddress m netMask where h ipaddress is the new IP address in dotted decimal i e xxx xxx xxx xxx format and m netMask is the new subnet mask in dotted decimal i e xxx xxx xxx xxx format Step 4 To change the switch default gateway IP address enter setDefaultRoute h ipaddress where h ipaddress is the new default gateway IP address in dotted decimal i e xxx xxx xxx xxx format Using Telnet or SSH Step 1 Power up the switch Step 2 Connect a Category 5 or 6 Cat 5 6 Ethernet cable to the RJ 45 connector on the switch Connect the other end of the Cat 5 6 to a OOB LAN workstation Step 3 Access the switch with the following command telnet 192 168 100 9 Step 4 The system prompts for a user name In order to change the IP address and default gateway the user must be logged in as the administra
3. Apply Step 8 To change the switch default gateway from the main menu select OOB LAN IP then Set Default Gateway IP The following screen is displayed Figure 4 Set Default Gateway IP Window Set Default Gateway Ip Apply Refresh Close Step 9 Type in the correct switch default gateway IP address Step 10 Click Apply NOTE A reboot is required to activate the new gateway IP address Activating Deactivating the Embedded Fabric Manager If the embedded FM has been purchased it requires a license key to activate it via Chassis Viewer The license key information is contained in an envelope marked Fabric Manager License This envelope is packed in the box with the switch For detailed information on activating the Fabric Manager refer to the License Keys Key Administration and QuickSilver Fabric Manager Control sections of the SilverStorm 9000 Users Guide NOTE For systems with redundant management the user must add the License Key and start the Fabric Manager for each managed spine in the chassis each managed spine will have a separate license key The first spine in each hemisphere to be activated will be the master Fabric Manager the second will be the slave Fabric Manager Installing Documentation from a CD Installing Documentation on a Linux Host Step 1 Place the Documentation CD in the CD ROM drive Step 2 Check that the CD has been mounted Type 1s mnt cdrom The system returns a
4. list of files on the CD Step 3 Create a subdirectory on the drive where the documentation will reside Step 4 Typecp mnt cdrom lt SUBDIRECTORY NAME gt lt SUBDIRECTORY NAME gt to copy the documentation to the subdirectory created in Step 3 Step 5 Navigate to the Documentation directory and open the desired PDF file Declaration of Conformity QLogic Corporation 26650 Aliso Viejo Parkway Aliso Viejo CA 92656 Phone 949 389 6000 www qlogic com QLogic Corporation declares the following product is in compliance with the following standards Product identification Name 144 Port InfiniBand Switch Model Type SilverStorm 9120 Standards applied FCC Part 15 Subpart B Class A ICES 003 EMC EN55022 Class A EN61000 3 2 and EN61000 3 3 VCCI Class A and EN55024 Test House Test report is issued by Name Underwriters Laboratories Inc Address 1285 Walt Whitman Road Melville NY 11747 3081 USA Test dates 2004 10 27 to 11 05 File No E231432 Project No 04ME12243 A a u k pme Vladimir Tamarkin Director Mechanical Engineering 10 O 2007 OLogic Corporation OLogic the QLogic logo the Powered by OLogic logo SANbox SANsurfer and SANsurfer Management Suite are registered trademarks or trademarks of OLogic Corporation All other brands and product names are trademarks or registered trademarks of their respective owners Information supplied by OLogic is believed to be accura
5. SilverStorm 9120 INSTALLATION Purchasers of OEM products should consult with the OEM for support Support Headquarters QLogic Corporation 4601 Dean Lakes Blvd Shakopee MN 55379 QLogic Web Site www qlogic com Technical Support Web Site support glogic com Technical Support Email support qlogic com Technical Training Email tech training qlogic com North American Region Email support qlogic com Phone 1 952 932 4040 Fax 1 952 932 4018 All other regions of the world QLogic Web Site www glogic com SilverStorm 9120 Quick Start Guide Pre Installation Checklist Before beginning the actual installation the Site Implementation Engineer must perform the following tasks Step 1 Check the packing list to verify all ordered equipment has been received The box should contain ASilverStorm 9120 switch with the following pre installed Oooo Four 4 fan units Power supplies and blanks 6 total InfiniBand IB leaf modules up to 12 total Spine modules and blanks up to 3 total Virtual 1 0 hardware such as the SilverStorm FibreChannel Virtual 1 0 Card FVIC and the SilverStorm Ethernet Virtual I O Card EVIC up to 4 total Any leaf VIO hardware blanks up to 11 total NOTE If using VIO hardware in order to maintain AC redundancy use the following configurations 1 VIO card and 11 leaf modules 2 VIO cards and 10 leaf modules 3 VIO cards and a maximum of 7 leaf modules Oooo
6. e 1 SilverStorm 9120 Chassis Front View Figure 2 SilverStorm 9120 Chassis Back View ea DA 5 a A CIC ORSINI BONE sel DIO ac A CO Ho ON Nuo AC power inlet for power AC power inlet for power supplies 1 to 3 supplies 4 to 6 RJ 45 for Spine 1 RJ 45 for Spine 2 To perform the actual switch installation the site implementation engineer must perform the following tasks which are detailed in this section Step 1 Check the installation site to verify the installation of cabinet power feeds rails and grounding Step 2 Inspect the packaging and equipment for any shipping damage Any shipping damage should be reported to the shipping company Only unpack the the equipment if there is no shipping damage Step 3 Record the equipment serial numbers Step 4 Physically install the switch in the rack Step 5 Install InfiniBand IB or IB Fiber Optic cables between the SilverStorm 9120 and network devices Step 6 Install intra cabinet power and grounding cables for the switch Step 7 Power up the switch Step
7. te and reliable QLogic Corporation assumes no responsibility for any errors in this brochure QLogic Corporation reserves the right without notice to makes changes in product design or specifications XC QLogic Corporation 26650 Aliso Viejo Parkway Aliso Viejo CA 92656 949 389 6000 www qlogic com QLOGIC D000010 002 Rev A
8. tor At the prompt enter admin Step 5 The system prompts for a password At the prompt enter adminpass The system responds with Welcome to the SilverStorm 9120 CLI Type list for the list of commands Step 6 To change the switch default IP address enter setChassisIpAddr h ipaddress m netMask where h ipaddress is the new IP address in dotted decimal i e xxx xxx xxx000 format and m netMask is the new subnet mask in dotted decimal i e xxx xxx xxx xxx format Step 7 To change the switch default gateway IP address enter setDefaultRoute h ipaddress where h ipaddress is the new default gateway IP address in dotted decimal i e xxx xxx xxx xxx format Step 8 To to exit the CLI enter logout Using the Chassis Viewer Step 1 Power up the switch Step 2 Connect a Category 5 or 6 Cat 5 6 Ethernet cable to the RJ 45 connector on the switch Connect the other end of the Cat 5 6 to a OOB LAN workstation Step 3 To start Chassis Viewer open a web browser and enter the IP of the switch NOTE The browser must be on a workstation connected to the same Ethernet LAN and on the same TCP IP subnet as the switch RJ 45 OOB LAN port Step 4 From the main menu select OOB LAN IP then Set OOB LAN IP The following screen is displayed Figure 3 Set OOB LAN IP Window Set OOB LAN IP El 172 26 100 236 Step 5 Type in the new switch IP address Step 6 Type in the new net mask Step 7 Click
Download Pdf Manuals
Related Search
Related Contents
Scarica il catalogo prodotti Sacemi Relación de Bienes Muebles e Inmuebles que Componen el Xfce tips, tricks - The PCLinuxOS Magazine connecDIM – Product manual User Manual User Manual TouchSystems P4650D-U3 For Parts Call K&T 606-678-9623 or 606-561 User Manual - Sunshine Works Prescriptions à l`usage des entreprises extérieures Copyright © All rights reserved.
Failed to retrieve file