Home
NEC Express 5800/320Fd User's Manual
Contents
1. the cabinet pallet so that it has the clearances shown in Figure 4 Unpacking and Checking the Cabinet Unless you have a service agreement that includes installation of the system you need to unpack the cabinet To unpack the cabinet e Make sure you have the correct tools Remove the packing materials e Check the cabinet and system Verify the system serial numbers Remove the cabinet from its pallet Tools Needed to Unpack the Cabinet Use the following tools to unpack the cabinet Metal shears to cut pallet straps Pair of scissors or utility knife e One 3 8 inch drive ratchet with a 9 16 inch socket Removing the Packing Materials A WARNING To avoid personal injury or damage to the systems or cabinet two persons are required to perform the following procedures 1 Orient the cabinet package so that the package and the ramp have as a minimum the clearance shown in Figure 4 Also verify that you have enough clearance above the cabinet to remove the top cardboard cap 2 With one person holding the ramp in place use the metal shears to cut the exterior shipping straps To avoid injury while cutting each strap hold the strap firmly with one hand as you stand away from it See Figure 5 WARNING The shipping straps can snap with considerable force when they are cut To avoid eye or skin injuries use caution when cutting the shipping straps Figure 5 Cutting the Exterior Shipping Strap
2. EC Corporation of America ActiveService Network is a trademark of Stratus Technologies Bermuda Ltd All other trademarks and trade names are the property of their respective owners Manual Name Read Me First Unpacking Express5800 320Fd System Cabinets Part Number 465 01741 000 Revision Number 0 Publication Date July 2008 NEC Corporation of America 10850 Gold Center Drive Suite 200 Rancho Cordova CA 95670 2007NEC Corporation of America All rights reserved Contents Introduction 1 Packaged Cabinet 1 Before Unpacking the Cabinet 3 Moving the Cabinet to the Installation Site 6 Unpacking and Checking the Cabinet 7 Tools Needed to Unpack the Cabinet 8 Removing the Packing Materials 8 Removing the Cabinet from the Pallet 15 Checking the Cabinet and Systems 17 Verifying the Express5800 320Fd Serial Number 18 Stabilizing the Systems 19 Disposing of Shipping Materials 20 VVhat Happens Next 20 System Documentation 20 jV Introduction Read Me First Unpacking Express5800 320Fd Cabinets describes hovv to move cabinets that contain these systems to an installation site and hovv to unpack them VVarnings cautions and notes in this document convey the follovving special information A WARNING A warning indicates a situation where failure to take or avoid a specified action could cause bodily harm or loss of life N CAUTION A caution indicates a situation where failure to take or avoid a specified action
3. Read Me First Unpacking Express5800 320F d System Cabinets NEC Corporation of America 456 01741 000 Notice The information contained in this document is subject to change without notice UNLESS EXPRESSLY SET FORTH IN A WRITTEN AGREEMENT SIGNED BY AN AUTHORIZED REPRESENTATIVE OF NEC NEC MAKES NO WARRANTY OR REPRESENTATION OF ANY KIND WITH RESPECT TO THE INFORMATION CONTAINED HEREIN INCLUDING WARRANTY OF MERCHANTABILITY AND FITNESS FOR A PURPOSE NEC assumes no responsibility or obligation of any kind for any errors contained herein or in connection with the furnishing performance or use of this document Software described in NEC a is the property of NEC and or its licensees b is furnished only under license and c may be copied or used only as expressly permitted under the terms of the license NEC documentation describes all supported features of the user interfaces and the application programming interfaces API developed by NEC and or its licensees Any undocumented features of these interfaces are intended solely for use by NEC personnel and are subject to change without warning This document is protected by copyright All rights are reserved No part of this document may be copied reproduced or translated either mechanically or electronically without the prior written consent of NEC Corporation of America The NEC Corporation of America logo Express5800 320Fd and the Express5800 320Fd logo are trademarks of N
4. could damage a hardware device program system or data NOTE A note provides important information concerning the operation of your system Packaged Cabinet Figure 1 shows a shipping container for a 38U cabinet that contains one or more systems and optional components U for unit equals 1 75 inches in or 4 45 centimeters cm Figure 1 Cabinet Packaged for Shipping hsys032 The cardboard shipping container is secured to a shipping pallet by exterior shipping straps Inside the shipping container interior shipping straps secure the cabinet to the pallet A ramp for rolling the cabinet off the pallet is attached to one side of the shipping container at the rear of the cabinet Labels on the cardboard cap indicate the front and rear of the cabinet Before Unpacking the Cabinet 1 Check the packing list to verify that you have received the correct shipment 2 Verify that the Tip N Tell and Shockvvatch handling indicators on the outside of the shipping container have not been activated CAUTION f you received the wrong shipment or a handling indicator has been activated do not proceed with the unpacking Contact the vendor from which you purchased your system and the shipping carrier immediately 3 Verify that the area through which you must move the cabinet has adequate clearance as the follovving figures indicate Figure 2 shovvs the dimensions of a
5. heck that the Express5800 320Fd serial number not the Solectron serial number on the equipment label matches the Express5800 320Fd serial number on the packing list If the numbers are not identical contact NEC Technical Support before continuing to unpack the cabinet Stabilizing the Systems If temperature and humidity changes have been extreme during transit the cabinet and systems might develop condensation Therefore before you install and povver on the systems you must inspect them and the cabinet for condensation and if necessary stabilize the systems To stabilize the systems let the cabinet stand unpacked and vvithout its plastic wrap in the open air of an office environment 1 Inspect each cabinet and system for condensation Use the guidelines in Table 1 to determine if a system requires a stabilization period before you install it and povver it on Table 1 Stabilization Guidelines Condition Stabilization Period Desiccant is present None No condensation is on the plastic bag or system surfaces Desiccant is present 4 hours Condensation is on the plastic bag or on the cabinet or system surfaces Desiccant and plastic bag are missing 8 hours Condensation is on the cabinet or system surfaces 2 After the stabilization period if you still notice signs of condensation inside or outside the cabinet allovv an additional stabilization period of tvvo hours Repeat the tvvo hour period if necessary until
6. line resources first Online support from NEC Technical Support You can find the latest technical information about an Express5800 320Fd through online product support at the NEC Technical Support Web site http support necam com servers ft Online product support for Microsoft products Your primary source for support is the computer manufacturer who provided your software or an authorized Microsoft Support Provider You can also find the latest technical information about Microsoft Windows and other Microsoft products through online product support at the Microsoft Help and Support Web site http support microsoft com If you are unable to resolve your questions with the help available at these online sites and the Express5800 320Fd system is covered by a service agreement please contact NEC Technical Support 866 269 1239 21 22
7. packaged 38U cabinet Figure 3 shovvs the dimensions of a packaged 24U cabinet Figure 4 shows the clearances reguired at the installation site nclude the height of the pallet jack when you calculate the overall cabinet height Figure 2 Dimensions of a Packaged 38U Cabinet 80 in inet 2m 38U Cabine 5 in 7 2 12 7 cm 41 in 53 in bez Gi hsys033 Figure 3 Dimensions of a Packaged 24U Cabinet 1 435m 24U Cabinet 5 in 12 7 cm 41 in 104 14 cm 34 62 5034 Figure 4 Clearances Required at the Installation Site PanetRamnp ko l 42 in 107 cm pO Se ee a2 zo 5 150 in 22 Cabinet 42in _ slcm m on Pallet 107 cm 20 3 1 I f the corridor and door dimensions are large enough to accommodate the unpacked cabinet still tied to its pallet use a pallet jack to move it from the delivery site to the installation site as described in Moving the Cabinet to the Installation Site on page 6 f the corridor and door dimensions are too small to accommodate the unpacked cabinet still tied to its pallet unpack the cabinet and unload it from the pallet before you move it to the installation site n this case use the pallet jack to move the unpacked cabinet as close to the installation site as possible Then unpack the cabine
8. rom the Pallet 1 Position the pallet ramp under the pallet at the rear of the cabinet see Figure 12 Verify that it is secure Figure 12 Position the Pallet Ramp msys105 2 With the help of another person slowly and carefully roll the cabinet dovvn the ramp vvith one person on each side of the cabinet not in the front or back See Figure 13 Each person must hold the upper portion of the cabinet vvith both hands VVARNING The cabinet is top heavy Use extreme caution when rolling it down the ramp 16 Figure 13 Moving the Cabinet Down the Pallet Ramp msys104 3 Check the cabinet and systems for damage as the next section describes Checking the Cabinet and Systems Check the cabinet systems and optional components for damage 1 Open the rear door of the cabinet From the bottom of the cabinet remove and discard the desiccant bags 2 Check the cabinet and systems for damage Verify that the cabinets and panels have no dents scratches or scrapes If you notice damage contact the vendor from which you purchased your systems If you purchased your systems from NEC Corporation of America contact the NEC Technical Support 17 Verifying the Express5800 320Fd Serial Number Find the equipment label to check the Express5800 320Fd serial number To find the equipment label open the rear door of the cabinet The equipment label is attached to the rear of each system C
9. s hsys035 3 Remove the ramp The ramp is in two pieces that are held together by a bolt Unbolt the two pieces Behind the ramp is an accessory box which contains various components and documentation Remove the box and set it aside for later use 4 Construct the ramp by inserting the bevel in the smaller ramp piece into the larger ramp piece Set the ramp aside to use when you remove the cabinet from the pallet 5 Remove the cardboard pieces of packing material surrounding the cabinet see Figure 6 These pieces include two C fold sleeves around the sides of the cabinet and a cap at the top Figure 6 Removing the Packing Material hsys036 6 Remove the plastic wrap encasing the cabinet N caution If condensation exists inside the plastic wrap you must provide a stabilization period for the systems Stabilizing the Systems on page 19 10 provides complete information about the stabilization process 7 Use the strap buckles to loosen the interior shipping straps that secure the cabinet to the pallet See Figure 7 Figure 7 Removing the Interior Shipping Straps hsys037 8 Remove the two fiber protective sleeves at the top front and top rear of the cabinet 9 Loosen but do not remove the bolts that secure the vvooden restraint blocks to the pallet at the bottom sides of the cabinet See Figure 8 You do not need to loosen the bolts of the vvooden res
10. t remove it from its pallet and roll it carefully on its casters to the installation site Moving the Cabinet to the Installation Site A WARNING To avoid personal injury or damage to the systems or cabinet two persons are required to move unpack and install a cabinet that contains Express5800 320Fd systems Because of the size and weight of the systems in cabinets consider using professional movers to deliver and move the packaged units to the installation site N caution To prevent or minimize condensation on the systems internal and external surfaces avoid exposing the systems to extreme temperature or humidity changes when moving them to the installation site If the systems have been exposed to extreme temperature or humidity conditions during transit or if condensation is 6 present see the section Stabilizing the Systems on page 19 for stabilization guidelines VVhen shipped the system cabinet is tied to the pallet beneath it The pallet has a clearance for a pallet jack to move the unit When moving a system cabinet follow these guidelines 1 Verify thatthe unpacked cabinet is still secured to the pallet 2 Use apallet jack to move the cabinet on its pallet to the installation site A CAUTION Use a pallet jack to move the packaged cabinet not a forklift Using a forklift could damage the cabinet or a system Use the pallet iack at the front or rear of the cabinet 3 Position
11. there are no signs of condensation Then continue to the next step 3 Remove the desiccant bags and the cardboard tray in which they vvere shipped if these items are still present 19 4 Continue the installation and continue to inspect for signs of condensation f condensation appears allovv additional stabilization periods until there are no signs of condensation N Before you povver on the systems verify that the installation site environment meets the requirements specified in the Express5800 320Fd Site Planning Guide Disposing of Shipping Materials The shipping materials contain no hazardous materials Dispose of the shipping materials according to applicable procedures or local regulations Stratus recommends hovvever that you retain one or two undamaged containers and their shipping materials in case you need to repack the cabinet for later shipment VVhat Happens Next To install a system see the Express5800 320Fd Installation Guide System Documentation The Express5800 320Fd Help and Manuals are found on the ExpressBuilder CD shipped vvith your system You can view the documents in the Help system or open them in PDF format for vievving or printing 20 To gain access to the documents on the World Wide Web point your brovvser to http support necam com servers Getting Help If you have a technical question about Express5800 320Fd hardware or software try these on
12. traint blocks at the bottom rear of the cabinet To loosen the bolts use the 9 16 inch socket wrench You may need to hold the nut underneath the pallet that secures the bolt 11 Figure 8 Wooden Restraint Blocks hsys038 10 Loosen and remove the bolis that secure the vvooden restraint block at the front door of the cabinet Then remove the block 11 Locate the lever bar Insert it in the center slot of one of the sides See Figure 9 12 Figure 9 Inserting the Lever Bar hsys039 12 With the assistance of another person tilt the cabinet from one side As one person stands to brace the cabinet near the top a second person kneels on the floor and uses both arms to push down on the lever bar forcing the cabinet to tilt See Figure 10 13 msys101 the person who has been standing 14 Figure 10 Tilting the Cabinet ere fous lob vu ree Ce S n Ge Cie ovcucc ER L E o e S ISS must kneel on the floor to slide the vvooden restraint blocks away from the cabinet See Figure 11 13 After the cabinet is tilted Figure 11 Sliding Back the Wooden Restraint Blocks msys102 14 Move the lever bar to the opposite side of the cabinet Repeat the process of tilting the cabinet and sliding back the two wooden restraint blocks on the opposite side of the cabinet Removing the Cabinet f
Download Pdf Manuals
Related Search
Related Contents
取扱説明書 [PDF:1.150KB] Manuel d`instructions Toshiba Satellite C850-F0150 Dutch Français Deutsch English Svenska Suomi manual del usuario de servicios financieros - nuestra LMT057DNAFWU - Beyondinfinite.com Release Notes USFOS 8 PRL EN MAQ QUINARI A AGRÍC COLA Copyright © All rights reserved.
Failed to retrieve file