1. PANEL 01 PANEL 02 PANEL XX The dataline connects the relay panels switches and optional control modules Within the 4 wire dataline are two twisted pairs the red and black wires carrying data and the blue and white wires providing power to the dataline switches and control modules For simplicity we refer to a 4 wire dataline running between a relay panel and the dataline switches as a Local Dataline The relay panel provides the low voltage power to all of the intelligent devices on that section of the dataline The dataline running between relay panels is known as the Global Dataline and it uses only the red and black data wires The blue and white wires are not connected and should be trimmed Panel Addressing The two rotary switches on each relay panel set its address allowing the differentiation between relays in different panels NOTE The first panel address must be set at 01 and the others numbered sequentially 02 03 and so on between 02 and 30 as shown to the right If the panel address is set higher than 30 the channel LEDs in the panel will flash Setting the panel address to 30 or below will return the panel to normal operation If a panel is set to the same address as another panel then the two panels will not operate properly The ProSys LM panels can be setup in groups of 30 where the panels in a group can be numbered from 00 to 30 N
2. F 0 to 50 C 0 to 95 relative humidity stationary applications e Mounting The tub should be level plumb and rigidly installed with hardware sufficient to hold 100 Ibs 48kg For flush mount panels the front flange should be flush with the final finished surface For multiple panels allow 14 minimum between panels for showbox cover clearance o Pulling Wires Route line voltage wiring through the 212 knockouts in either the top or bottom of the tub Route Class 2 low voltage dataline from the remote switches or other controls through the 34 knockouts in either end Figure 2 RINTER2424PS shown POWER UP AND TEST RELAYS DEH40212 Installation Instructions Apply power to the power supply only As shown in Figure 3 to the right press the Relay Control Button next to each relay s yellow plug in termination to toggle it ON OFF The relay should click and the LED status indicator should change state Confirm the operation by measuring the continuity at the line voltage terminations of each relay Apply power to the relays Being careful not to touch any line voltage wiring toggle each relay ON OFF again and confirm that each relay controls the appropriate load N DOCUMENT RELAY WIRING LED INDICATOR Figure 3 O RELAY CONTROL TO RELAY 4 BUTTON RR7P RELAY SHOWN Record the circuit controlled by each relay on the RELAY SCHEDULE which was shipped with the inter
3. USA and Canada These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency that may be met in connection with installation operation or maintenance Should further information be desired or should particular problems arise that are not covered for the purchaser s purposes the matter should be referred to the GE Company DEH40212 Installation Instructions CAUTION Make sure all power is OFF before wiring Do not energize wiring until the unit is fully assembled Conform to all applicable codes RELAY PANEL INSTALLATION SWITCHED LIGHTING CIRCUITS Figure 1 ae 1 5 x 1 5 CROSSOVER WIRING CHANNEL TOP AND BOTTOM Dimensions A x B RINTER1212PS P 16 0 406mm x 16 5 419mm RINTER2424PS P 22 5 572mm x 24 0 610mm RINTER4848PS P 6 0 CLASS 2 36 0 914mm x 240 610mm LOWATOLTAGE Relay Capacities C WIRING SECTION RINTER1212PS 12 RR7 relays A RINTER1212PSP 12 RRQ relays DIN RAIL RINTER2424PS 24 RR7 relays RINTER2424PSP 24 RR relays RINTER4848PS 48 RR7 relays CIRCUIT BREAKER RANEI RINTER4848PSP 48 RR9 relays DIN Rail Capacities RINTER1212PS P One module 4 5 D LINE VOLTAGE WIRING SECTIONS RINTER2424PS P Two modules B ILLUSTRATION NOT TO SCALE RINTER4848PS P Two modules If you have purchased the ProSys II Lighting Control System Install Interior the stand alone system the devi
4. directly to a relay is an option in ProSys system panels For panels with relay inputs order interiors with catalog numbers ending in P Figure 7 Hardwired Switch Configurations Pe MAINTAINED ISOLATED CONTACT i 2 WIRE MOMENTARY PUSH BUTTON a STANDARD 3 WIRE MOMENTARY gt p STANDARD 3 WIRE MAINTAINED RED BLACK JUMPER 00O RBYW BLACK WHITE cies a l OOOO RBYW RBYW PANEL TESTING AND TROUBLESHOOTING Panel Testing The panel to panel dataline should be tested for continuity and isolation from ground To test for continuity remove the red and black dataline wires at panel 01 and wire nut together short the wires together Go to the last panel in the series and measure the resistance between the red and black terminals It should be less than 3 ohms Return to panel 01 and restore the red and black wires to their associated terminals For shorts test from red to white and black to white anywhere in the low voltage section of the panel You should see an open circuit DEH40212 Installation Instructions GE Total Lighting Control GE Total Lighting Control 41 Woodford Avenue Plainville CT 06062 DEH40212 BL 0700 R02 2000 General Electric Company 6
5. DEH40212 Installation Instructions GE Total Lighting Control ProSys Lighting Control System Relay Panels i m cm ode Di i ae TROT ey Ce ee er ls ri ProSys Lighting Control System Catalog Number RINTERxxxPS P DESCRIPTION The ProSys Lighting Control System is a small network of relay panels and occupant control switches linked by a 4 wire dataline Together these devices form a reconfigurable switching platform one that uses softwiring instead of hardwiring to link occupant switches to relays Scheduling capability can be readily added by simply mounting an RCLK amp PS Softwired Clock to the DIN rail in any relay panel The RINTERxxxxPS P is the interior for a ProSys Lighting Control System Relay Panel The complete relay panel assembly will include the following 1 Tub RTUBxx 2 Interior RINTERXxxxPS or RINTERxxxxPSP 3 Power Supply RPWRxxx 4 Cover RCOVxxxx This instruction sheet will show you how to 1 Install the Relay Panels 2 Install and Test the Dataline 3 Document the Relay Panels Full descriptions of the installation and operation of Softwired Switches and the Softwired Clock and other optional automation devices are located in other sections of this manual and are provided with each hardware unit Before starting read the following installation instructions If you have questions call GE Total Lighting Control Service at 1 877 584 2685 LTG CNTL in the
6. ces panels switches and e Power Supply clock will be in self install mode which means that as soon Attach the power supply to the frame bottom of 12 relay as they are connected to the network they are operational interior and left side of 24 or 48 relay interiors and plug and can communicate with each other the low voltage connector to the terminal marked POWER If you have purchased the ProSys LM Lighting Control System i a in Figure 1 above e Interior along with the ProSys LM software the devices will be in software install mode This means that in order for them to function on the network you must e assign network addresses to the devices and e bind network variables and message tags using your Wire Line Voltage Mount the interior in the tub and secure it to the studs with the hardware provided Make sure that all line and low voltage wiring is confined to the appropriate areas network management tool Before making any connections to the relays make sure that none of the load circuits are shorted Wire from the circuit breaker through each relays SPST output terminals and from there to the loads Confirm that each circuit is wired to the relay specified in the drawings Wire the power supply Addresses and binding are necessary for the devices to function on the network ProSys LM users please refer to the ProSys LM Software User Guide for instructions on installing devices Rough In Tub e Environment 32 to 131
7. ior The relays associated with automation channels A H are recorded later Figure 4 PROSYS RELAY SCHEDULE RELAY SUPPLY LOAD DESCRIPTION 01 LP1 1 OPEN OFFICE FIRST FLOOR NW 02 LP1 2 i 03 LPI 3 OPEN OFFICE FIRST FLOOR NE 04 LP1 4 i 05 LPS OPEN OFFICE FIRST FLOOR SW SOFTWIRING A RELAY GROUP TO A CHANNEL Figure 5 Softwiring a Relay Group H OO roio 1 Press and hold the al Channel Push Button paces for several seconds AND HOLD CHANNEL BUTTON 2 Select the relays to be controlled 3 Press the Channel Push Button again FLASHING a tk Test Press the H Channel Push Button to toggle the group im ON OFF ON Each ProSys panel includes eight channels A H which may be softwired to relays within the panel Channels are used to group relays for common control When a ProSys system includes an automation module RCLK8PS Softwired Clock we strongly recommend you turn to the installation instructions for that automation module and complete the documentation before softwiring any relays to channels However if automation is to be provided by an interface to another system or by using manual switches only the channels may be used simply for grouping relays Follow the instructions in Figure 5 to the left DEH40212 Installation Instructions DATALINE INSTALLATION i i E PANEL ADDANSS
8. ote To ensure good communications between panels the installer must comply with the dataline specification GE will not warrant a system using a dataline that does not meet our specification To avoid questions use GE RLONWIRE 4P plenum rated Do not run the dataline in conduit or wiring trays with power wires Do not connect the local datalines from two different panels NUMBER oN JEN T GE RLONWIREP S4 Dataline Wire Specifications e 18 AWG 7 strands x 26 AWG e 2 independent twisted pairs black red blue white e Unshielded copper conductors e 2 inch twist lay on pairs 6 inch twist lay on cable e Plenum rated copolymer jacket 0 230 0 D e FEP 0 010 insulation 0 060 0 D e 30 pF foot maximum capacitance e 20 C to 150 C operating temperature range e 17 Ibs per 500 foot reel e UL rated DEH40212 Installation Instructions HARDWIRE LOW VOLTAGE SWITCHES OPTIONAL Each of the ProSys panel s eight channels has a single switch input which will accept any of the dry contact configurations shown in Figures 6 and 7 and also provides status feedback for that channel ProSys panels whose catalog numbers end in P also include inputs for each relay Like the channel inputs these support all of the dry contact configurations shown Figure 6 Hardwired Switch Inputs LT HARDWIRED CHANNEL SWITCHES HARDWIRED RELAY SWITCHES The ability to hardwire a 2 or 3 wire switch