Home
Extreme Networks BlackDiamond 12804 User's Manual
Contents
1. Module status 10 Gbs ports LEDs 10 100 1000BASE T ports BD_167 The XM 2HR I O module has 10 SFP ports and 10 autosensing 10 100 1000BASE T ports that use standard RJ 45 connectors In addition it has one unpopulated XENPAK based 10 Gigabit Ethernet port The default configuration of the XM 2HR I O module is as follows All ports e Are added to the default VLAN as untagged e Inherit the properties of the default VLAN for example protocol type and VLANid In addition the 10 100 1000BASE T ports and SFP ports operate in autonegotiation mode XM 2HR LEDs The XM 2HR I O module has the following LEDs e Module status e Module diagnostics e Port status BlackDiamond 12800 Series Switches Hardware Installation Guide Extreme Networks Power Supply Units for BlackDiamond Switches This chapter includes the following sections Overview of BlackDiamond 12800 Series Power Supplies on page 29 Extreme Networks 1200 W DC PSU on page 30 Extreme Networks 700 1200 W AC PSU on page 32 Extreme Networks 325 W DC Power Supply on page 34 Extreme Networks 325 W AC Power Supply on page 36 oO dd note For central DC power connections the 1200 W DC PSU and 325 W DC PSU are intended to be installed only in restricted access locations dedicated equ
2. BD_141 Figure 4 shows the rear panel of the BlackDiamond 12802 chassis Figure 4 Rear Panel of the BlackDiamond 12802 Chassis PSU fan controller Fan tray module o s a e ol AO Grounding d point a s sar a F er Oje Power supplies BD_142A The rear panel of the BlackDiamond 12802 chassis provides e Access to the fan tray e Access to the PSU fan controller module e Four bays for installing power supplies e Attachment point for optional chassis ground The bottom of the chassis has a label showing safety certification symbols and the Ethernet MAC address of the switch The chassis serial number is on the side near the back of the chassis BlackDiamond 12800 Series Switches Hardware Installation Guide D BlackDiamond 12800 Series Modules This chapter includes the following sections e Overview of the BlackDiamond 12800 Series Modules on page 19 e BlackDiamond 12800 Series MSMs on page 20 e BlackDiamond 12800 Series I O Modules on page 23 For information about installing modules in a BlackDiamond 12800 series switch see Chapter 4 Installing Modules and Connecting Cables Overview of the BlackDiamond 12800 Series Modules Two sets of modules are available for the BlackDiamond 12800 series switch the 12800 series of modules and the 1280
3. chassis ok A o A o Open amp remove L 4 clip locks At 0 z to free box C 5 Unwrap the chassis BlackDiamond 12800 Series Switches Hardware Installation Guide 6 Ateach side of the chassis place one hand in the empty power supply bay and the other hand in the recessed hand hold on the back panel of the BlackDiamond 12804 chassis Carefully lift the chassis off the foam cushion and onto the floor see Figure 29 Figure 29 Correct Method for Lifting the BlackDiamond 12804 Chassis o 0 r 0 4 ra iG ooo _ gt amp EX_112 amp CAUTION Do not use the fan tray handle to lift or maneuver the BlackDiamond 12804 chassis This handle is not designed to support the weight of the chassis Verify that the following items are included in the crate e BlackDiamond 12804 chassis with four installed blank front panels e Power cord retaining bracket e 19 inch helper bracket installation tray e BlackDiamond documentation pack with ESD preventive wrist strap oO dd note Save all packaging clip locks and box pieces for future use in the event that the BlackDiamond 12804 chassis must be moved to another location or returned to Extreme Networks Inc Rack Mounting the BlackDiamond 12804 Chas
4. iii effi sc eff i augen Bene Sees mama 5 mm mm B C bs l I nnn nnn on D METT TETT TETT TETI BlackDiamond 12800 Series Switches Hardware Installation Guide BD_171 Rack Specifications and Recommendations Racks should conform to conventional standards In the United States use EIA Standard RS 310C Racks Panels and Associated Equipment In countries other than the United States use IEC Standard 297 In addition verify that your rack meets the basic mechanical space and earthquake requirements that are described in this section Mechanical Recommendations for the Rack Use equipment racks that meet the following mechanical recommendations Use an open style 19 inch rack to facilitate easy maintenance and to provide proper ventilation Use a rack made of steel or aluminum The rack should use the universal mounting rail hole pattern that is identified in IEC Standard 297 The rack should have designated earth grounding connections typically on the base The rack must meet earthquake safety requirements equal to that of the installed chassis The mounting holes should be flush with the rails to accommodate the chassis Install equipment into the lower half of the rack first to avoid making the rack top heavy The rack should support approximately 600 pounds 272 kilograms Protective Grounding for the Rack Use a rack grounding kit and a ground conductor that is carried back to earth
5. csscccssssseesssseeessssseeeessseeeeeesseaeeeeees 101 BlackDiamond 12800 Series Switches Hardware Installation Guide Module Slot ASSIGNMENHS ccccceccseceeeeeeceeceeceeee eee eee eeeeeee eee essen nnnnnn nen enennnnnnnnnnnnnnnennn nennen nenne 101 Distinguishing a BlackDiamond 12800 Series MSM from an I O Module zu044s0ss nennen 102 Installing a BlackDiamond 12800 Series Module u222002s002snnsnenenennnnnnnonenennnennnennnnennnn nennen 102 Making Network Interface Cable Connections 444ss0ssnnnnnnnnnnnnnnnnnnnnn anne nnn san nen nn 105 Installing a Backup MSM esse A a RE a LI ea ES Lee AEE 105 Verifying the Module Installation ccccccccecceceecceeceeeeeeseeeeeeseeeeeeeeceeeeeeeeeeeeseeseeeeeeeeeeeeeeeneeeeeegs 106 Displaying Slot Status Information ann na 106 Removing a BlackDiamond 12800 Series Module cccccceeceeeceececeeeeeeeseceeeeeeeeeeeeseeeeeaseeeeeaes 106 BlackDiamond Series Blank Front Panels u u ss044n0nennnnnnnnnnnnnnnnnnnnnnnnnnn namen nenn 108 Installing a Blank Front Panel ccccccccccseceeceeeeeeceeceeeeeeaeeseeseeeeeeeeseeseseeeeeeaeeseeseeeneeaeeges 108 Removing a Blank Front Panel ccccceccccceecce cence issn KAKS eeeeeeeee ee eeee ee eeeseeeeesee sees essa eeeaeeeeeaea 109 Installing or Removing an External Compact Flash Memory Card c cccccsecceceeeeeeeeeeeeeeeeeneeeeneees 111 Part 3
6. o 0 PSU CONTROL CARD ACCESS PANEL oO ee o o oO PSU fan controllers o fe jan oO Grounding point _2 0 0 o fe gt y oO EX_128A The rear panel of the BlackDiamond 12804 chassis provides Chassis serial number Ethernet MAC address of the switch Symbols of safety certification Access to the PSU fan controllers Attachment point for optional chassis ground BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12802 Switch Chassis The BlackDiamond 12802 chassis consists of the following components One 3 slot chassis with backplane Two dedicated I O module slots labeled 1 and 2 One MSM slot labeled MSM Up to three redundant AC or DC power supplies accessed from the back of the unit One fan tray accessed from the back left of the unit One connector for an ESD preventive wrist strap One PSU fan controller that collects and reports data from the power supply units and the fan tray Figure 3 shows a BlackDiamond 12802 chassis equipped with one MSM and two I O modules Figure 3 Front of the BlackDiamond 12802 Chassis ESD wrist strap connector i ela PEET PETE MERT we mpeg m IH MSM slot Ein I O module y 2 slots an rn m4 5 P a
7. _ Fan tray a _ captive ok screws x2 en i y o 4 s NN ja Fan tray m H handle ok A y it o va EX_115 3 Use a 2 Phillips screwdriver to tighten the screws Figure 80 Leave the ESD preventive wrist strap permanently connected to the switch so that it is always available when you need to touch ESD sensitive components Replacing the BlackDiamond 12802 Fan Tray The BlackDiamond 12802 switch has one fan tray which is accessible from the back of the switch amp CAUTION Removing the fan tray for more than a few minutes may result in overheating and possible damage to the system Thermal sensors shut down power if the internal temperature exceeds 60 C Make sure you have the replacement unit before starting this procedure BlackDiamond 12800 Series Switches Hardware Installation Guide Pre installation Requirements You must have access to the back of the BlackDiamond 12802 switch to replace the fan tray To replace a BlackDiamond 12802 fan tray you need the following tools and equipment e ESD preventive wrist strap e 2 Phillips screwdriver e Replacement BlackDiamond fan tray Removing the BlackDiamond 12802 Fan Tray To remove the BlackDiamond 12802 fan tray 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the top right corner of the switch 2 Locate the captive screws at the top and bottom of the fan tray Figure 79 3 Using a
8. The input DC cable has an input connector on one end and precut wire on the other end that goes to the DC power source The connector end has a locking mechanism that locks onto the DC PSU to prevent accidental removal of the input DC cable If necessary use appropriate termination lugs for 8 AWG 10 mm copper stranded wire on cable ends of the cable to connect to the DC power source The blue termination 48 V connects to a 50 A overcurrent protection circuit device and the black return termination connects directly to the RTN bus of the DC power source The green yellow termination ground must connect to the same earth ground point as the switch BlackDiamond 12800 Series Switches Hardware Installation Guide Installing an Extreme Networks 1200 W DC PSU To install an Extreme Networks 1200 W DC PSU 1 Attach an ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the top left corner of the switch front panel PIS CAUTION Be sure that the grounding point on the back of the switch is securely connected to earth ground For information about grounding the switch see Grounding the BlackDiamond 12800 Series Chassis on page 68 2 Verify that the 1200 W DC PSU is right side up and press the yellow locking lever to the left while lifting the handle see Figure 41 oO gt NOTE Do not connect the input DC cable to the DC PSU before inserting the DC PSU into the switch
9. Fuse The Extreme Networks 325 W AC PSU line is fused This is not a field operator replaceable fuse In the event of failure immediately return the Extreme Networks 325 W AC PSU for a complete replacement 9 WARNING Field operators must not attempt to configure or replace fuses in Extreme Networks 325 W AC PSUs In the event of failure immediately return the defective Extreme Networks 325 W AC PSU for a complete replacement BlackDiamond 12800 Series Switches Hardware Installation Guide Installing Modules and Connecting Cables This chapter provides important safety information and correct installation procedures for the MSMs and I O modules in the BlackDiamond 12800 series switches All module types are hot swappable The chapter includes the following sections Module Slot Assignments on page 101 Distinguishing a BlackDiamond 12800 Series MSM from an I O Module on page 102 Installing a BlackDiamond 12800 Series Module on page 102 Making Network Interface Cable Connections on page 105 Installing a Backup MSM on page 105 Verifying the Module Installation on page 106 Removing a BlackDiamond 12800 Series Module on page 106 BlackDiamond Series Blank Front Panels on page 108 Oo dd note Read the information in this chapter thoroughly before you attempt to install or remove BlackDiamond 12800 series MSM or I O module amp CAUTION Do not attempt to mix modules across Extreme Networks product lines Blackdiamond 128
10. Icon Notice Type o Note amp o Caution Warning Table 2 Text conventions Convention Screen displays The words enter and type Key names Words in italicized type Alerts you to Important features or instructions Risk of personal injury system damage or loss of data Risk of severe personal injury Description This typeface represents information as it appears on the screen or command syntax When you see the word enter in this guide you must type something and then press the Return or Enter key Do not press the Return or Enter key when an instruction simply says type Key names appear in text in one of two ways e Referenced by their labels such as the Return key or the Escape key e Written with brackets such as Return or Esc If you must press two or more keys simultaneously the key names are linked with a plus sign Example Press Ctrl Alt Del Italics emphasize a point of information or denote new terms at the place where they are defined in the text Related Publications The Extreme Networks ExtremeXOS switch documentation set includes ExtremeXOS 12 0 Concepts Guide ExtremeXOS 12 0 Command Reference Guide ExtremeXOS 12 0 Release Notes BlackDiamond 8800 Series Switches Hardware Installation Guide BlackDiamond 10808 Switch Hardware Installation Guide Summit Family Switches Hardware Installation Guide Extreme
11. 7 Slide the top of the BlackDiamond shipping carton down and over the BlackDiamond 12804 chassis see Figure 82 Figure 82 Replacing the Carton over the BlackDiamond 12804 Chassis Place box l over chassis SSS ZU DT Insert amp close 4 clip lock ar 0 to Lre bok EX_121 8 Insert the clip locks see Figure 83 a Place your thumb and index finger inside the clip lock touching the prongs b Squeeze the prongs inward applying equal pressure on each side c Push the prongs inward until the clip lock is secured onto the carton Repeat steps 8a through 8c to insert each of the remaining clip locks amp CAUTION Proper installation of the clip locks is critical for safe shipment of the BlackDiamond 12804 chassis Make sure that the clip locks are secure and accurately installed Figure 83 Clip Locks on the BlackDiamond 12804 Chassis Shipping Carton Squeeze prongs to unlock Clip lock EX_111A BlackDiamond 12800 Series Switches Hardware Installation Guide 9 Place the packing foam material on top of the chassis as shown in Figure 84 Figure 84 Placing Packing Foam into the BlackDiamond 12804 Chassis Shipping Carton EX_110B 10 Close the top flaps on the shipping carton
12. Country specific Telecom Standards IEEE 802 3 Media Access Standards Note These standards are module specific and may not apply to every module in the series Environmental Standards Environmental UL 60950 1 2003 1st Ed Listed Device US CSA 22 2 60950 1 03 1st Ed Canada Complies with FCC 21CFR 1040 10 US Laser Safety CDRH Letter of Approval US FDA Approval NOM NYCE Mexico IEEE 802 3af 6 2003 Environment A for PoE Applications EN 60950 1 2001 A11 EN 60825 1 A2 2001 Lasers Safety TUV R GS Mark by German Notified Body 73 23 EEC Low Voltage Directive CB Report amp Certificate per IEC 60950 1 2001 Country Deviations AS NZX 60950 1 Australia New Zealand FCC CFR 47 part 15 Class A USA ICES 003 Class A Canada EN 55022 1998 Class A EN 55024 1998 Class A includes IEC 61000 4 2 3 4 5 6 8 11 EN 61000 3 2 3 Harmonics amp Flicker ETSI EN 300 386 2001 EMC Telecommunications 89 336 EEC EMC Directive CISPR 22 1997 Class A International Emissions CISPR 24 1997 Class A International Immunity IEC EN 61000 4 2 Electrostatic Discharge 8kV Contact 15kV Air Criteria A IEC EN 61000 4 3 Radiated Immunity 10V m Criteria A IEC EN 61000 4 4 Transient Burst 1kV Criteria A IEC EN 61000 4 5 Surge 2kV 4kV Criteria A IEC EN 61000 4 6 Conducted Immunity 0 15 80MHz 10V m unmod RMS Criteria A IEC EN 61000 4 11 Power Dips amp Interruptions gt 30 25 periods Criteria C VCCI Class A
13. Figure 41 Locking Handle on the 1200 W DC PSU EX_130 BlackDiamond 12800 Series Switches Hardware Installation Guide 3 Carefully slide the 1200 W DC PSU all the way into the power supply bay see Figure 42 Be sure that the DC PSU is fully seated in the switch PIS CAUTION Do not slam the 1200 W DC PSU into the system switch backplane Figure 42 Inserting the 1200 W DC PSU into the Power Supply Bay iO OJ O L a Ol O OJ iO OJ O OJ fe fe o fe fo o o 0 2 q piel ie Taek beat nice ee MO A aa a ae iP Gen ane m r r m EX_131 4 Connect the input DC cable to the front of the 1200 W DC PSU as shown in Figure 43 oO dd note An AC power cord is not required for proper functioning of the DC PSU 5 Rotate the locking handle down to latch the input cable connector onto the DC PSU amp CAUTION Always verify that the DC circuit is not energized before you connect the input cable to the 1200 W DC PSU BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 43 Connecting the Cable to the 1200 W DC PSU Locking handle open Yellow lever Locking handle closed traps DC plug Remove insert DC plug EX_132 6 Secure the 1200 W DC PSU into the power supply bay by pushing down on the locking handle until it cl
14. Module status 10 100 1000BASE T ports LEDs EX_154h dd note Although the GM 20XT module and the GM 20XTR module are similar in appearance they have different functionality The GM 2OXTR is part of the R series and includes the rate limiting feature the GM 20XT module does not support rate limiting O00 FE D IB aD alle JD dg To use rate limiting you must install the MSM 5R plus the GM 20XTR I O module and or the XM 2XR I O module The GM 20XT module and GM 20XTR I O module have 20 autosensing 10 100 1000BASE T ports that use standard RJ 45 connectors and 20 SFP ports Each pair of ports operates as a combination port Either the copper port or the fiber port can be active but not both You can set up a redundant link by connecting both the copper and fiber ports in the pair The port that is connected first becomes the active port If that port fails the second port automatically becomes active For more information about redundant ports and automatic failover see the Extreme XOS Concepts Guide The default configuration of the GM 20XT and GM 20XTR I O module is as follows All ports e Are added to the default VLAN as untagged e Inherit the properties of the default VLAN for example protocol type and VLANid e Operate in autonegotiation mode GM 20XT and GM 20XTR LEDs The GM 20XT and GM 20XTR I O modules have the following LEDs e Module status e Module diag
15. amp CAUTION Provide proper connection and strain relief on the DC power cord in accordance with all local and national electrical codes PIS CAUTION Make sure that the Extreme Networks 325 W DC PSU circuit is not overloaded Use proper over current protection such as a circuit breaker to prevent over current conditions oO eb NOTE A minimum of two Extreme Networks 325 W DC PSUs are required to run a BlackDiamond 12802 switch BlackDiamond 12800 Series Switches Hardware Installation Guide To install an Extreme Networks 325 W DC PSU 1 Attach an ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the top right corner of the switch front panel 2 Make sure that the Extreme Networks 325 W DC PSU is right side up see Figure 52 Figure 52 Extreme Networks 325 W DC PSU 325W DC PSU Torino DC PSU_04A 3 Carefully slide the PSU all the way into an open power supply bay see Figure 53 until you hear a click Extreme Networks recommends that you populate the two left power supply bays before the two right power supply bays Refer to Table 19 for the recommended installation sequence Table 19 Recommended Installation Sequence View from Rear of Chassis Left Power Supply Bays Right Power Supply Bays Installation 1 Installation 3 If this bay is empty a cover plate is required Installation 2 Installation 4 If this bay is empty a cover plat
16. gt BD_143 2 Insert and tighten the provided flat head screws to secure the brackets to the chassis Slide the chassis into the equipment rack 4 Attach the chassis to the system rack using eight rack system mounting screws screws not provided Refer to Figure 37 for the screw locations BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 37 Securing the BlackDiamond 12802 Switch to the Rack Mid mount Position L Y Screws x4 joe oo 00 O00 o0 60 Rack Screws BD_152 Grounding the BlackDiamond 12800 Series Chassis Although grounding the BlackDiamond 12800 series chassis is optional it is recommended A grounding point with integrated pem nuts is provided on the back of the chassis You need the following materials to ground the chassis e Two 10 24 screws 1 inch or shorter e One copper standard barrel 2 hole compression grounding lug type LDC equivalent to Panduit part number LCD4 14A L or Thomas amp Betts part number LCN4 14 e Appropriate grounding wire for your system based on the available input current for the power supply m For AC systems using a 20A breaker per PSU SSI AC the chassis ground can be as small as 14 AWG m For DC systems using a 40A breaker per PSU SSI DC the chassis ground can be as small as 10 AWG BlackDiamond 12800 Series Switches Hardware Installation Guide To
17. Clean and free from airborne materials that can conduct electricity Well ventilated and away from sources of heat including direct sunlight Away from sources of vibration or physical shock Isolated from strong electromagnetic fields produced by electrical devices Secured enclosed and restricted access ensuring that only trained and qualified service personnel have access to the equipment e Establish at least 3 inches clearance on all sides for effective ventilation Do not obstruct the air intake vent on the front side or rear ventilation grills Locate the system away from heat sources e Make sure that your equipment is placed in an area that accommodates the power consumption and component heat dissipation specifications e Make sure that your power supplies meet the site power or AC power requirements of all network equipment BlackDiamond 12800 Series Switches Hardware Installation Guide Installing Power Supply Units For the ratings and power requirements of each power supply unit see Appendix B Technical Specifications or the data sheet for the power supply at http www extremenetworks com Lo WARNING Be sure that the requirements listed in this section are satisfied when installing all Extreme Networks power supplies When you install power supplies e Plug power supplies only into properly grounded electrical outlets to help prevent electrical shock and comply with international safety standards
18. Connecting the AC Power Cord Torino AC PSU_08 3 Connect the opposite end of the AC power cord to the wall outlet oO eb NOTE Leave the ESD strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components BlackDiamond 12800 Series Switches Hardware Installation Guide Removing an Extreme Networks 325 W AC PSU amp CAUTION An operating 325 W AC PSU may be hot to the touch use thermal protective gloves when handling the 325 W AC PSU during removal PIS CAUTION To disconnect the system power disconnect ALL power supply units Disconnect the power cord before you remove the PSU from the chassis To remove an Extreme Networks 325 W AC PSU 1 Attach an ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the top right corner of the switch front panel 2 Disconnect the AC power cord from the wall outlet 3 Loosen the middle screw on the power cord bracket to allow removal of the power cord After the screws are loosened disconnect the AC power cord from the AC input on the front of the PSU 4 Loosen the two captive screws that secure the PSU front panel to the chassis frame Use the handle to slide the PSU out of the chassis eb NOTE Leave the ESD strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components Front Panel LE
19. Japan Emissions AS NZS 3548 ACA Australia Emissions CNS 13438 1997 Class A BSMI Taiwan MIC Mark EMC Approval North Korea ETSI EN 300 386 2001 EMC Telecommunications ETSI EN 300 019 Environmental for Telecommunications IEEE 802 3 1OBASE T IEEE 802 3u 1OOBASE TX 100BASE FX IEEE 802 3z 1OOOBASE X IEEE 802 3ab 1000BASE T IEEE 802 3ac VLAN Tag IEEE 802 3ad Link Aggregation IEEE 802 3ae 1OGBASE X IEEE 802 3aef Power over Ethernet EN ETSI 300 019 2 1 v EN ETSI 300 019 2 2 v EN ETSI 300 019 2 3 v EN ETSI 300 753 199 2 Class 1 2 Storage 2 Class 2 3 Transportation 2 Class 3 1e Operational 0 Acoustic Noise NNN N maup BlackDiamond 12800 Series Switches Hardware Installation Guide Table 25 BlackDiamond 12802 Switch Technical Specifications Continued Operating conditions Operating temperature range O C to 40 C 32 F to 104 F Operating humidity 10 to 93 relative humidity non condensing Operating altitude O to 3000 meters O to 9 850 ft Operational shock 30 m s 3 g 11 ms 60 shocks Operational random vibration 5 to 500 Hz 1 5g rms Storage amp transportation Transportation temperature 40 C to 70 C 40 F to 158 F conditions packaged Storage and transportation humidity 10 to 93 relative humidity non condensing Packaged shock half sine lt 50 kg 180 m s2 10 g 6 ms 600 shocks modules gt 50 kg 100 m s 6 g 11 ms 600 shocks chassis Packaged rando
20. The front panel of the 700 1200 W AC PSU provides status LEDs Table 11 describes the LED activity Table 11 LEDs on the 700 1200 W AC PSU A Predictive Fail Fail PSU Condition Amber Amber Power supply AC outputs working normally On Off Off AC input power present standby output on Blinking Off Off Current limit on 48 VDC output On Off Blinking Predictive failure On Blinking Off No input power to this PSU only Off Off On No input power to any PSU Off Off Off Power supply failure Off Off On Power Supply Cords Extreme Networks 700 1200 W AC PSU s are shipped with both 110 V AC and 220 V AC power supply cords The 110 V AC power supply cord allows for a maximum DC output power of 700 W The 220V AC power supply cord allows for a maximum DC output power of 1200 W All power supply cords provided by Extreme Networks are designed for use in North America only Power supply cords for use outside of North America are typically provided by a third party distribution center and must meet the following requirements e Power supply cords must be agency certified for country of use e Power supply cords must contain an IEC 320 C13 connector on the end of the PSU e Power supply cords must contain an appropriately rated and approved wall plug applicable to the country of installation e Power supply cords must be less than 5 m long e Wire size must be a minimum of 16 AWG 1 0 mm copper stranded WARNING Always be sure that
21. WARNING Always be sure that the source outlet is properly grounded before plugging the AC power cord into the Extreme Networks 700 1200 W AC PSU BlackDiamond 12800 Series Switches Hardware Installation Guide Fuse The Extreme Networks 700 1200 W AC PSU line and neutral legs are both fused Power to the switch may still be live if the neutral fuse is open This is not a field operator replaceable fuse In the event of failure immediately return the Extreme Networks 700 1200 W AC PSU for a complete replacement B WARNING Field operators must not attempt to configure or replace fuses in Extreme Networks 700 1200 W AC PSUs In the event of failure immediately return the defective Extreme Networks 700 1200 W AC PSU for a complete replacement PIS CAUTION The 700 1200 W AC PSU does not have a switch for turning the unit on and off Remove the plug from the electrical outlet to disconnect power to the 700 1200 W AC PSU Make sure that this connection is easily accessible Make sure that the 700 1200 W AC PSU circuit is not overloaded Use proper over current protection such as a circuit breaker to prevent over current conditions Using the BlackDiamond12804 AC Power Cord Retainer Channel The AC power cord retaining channel for the BlackDiamond 12804 switch holds the power connectors in the power sockets and prevents accidental disconnection due to earthquakes vibration or other disturbances A power cord retaining c
22. a DEREN E E E E E NE A EE E E 37 Replacing AC Power Supply Cords zuesssesssensnensnenennnsnnnnnnennennnnennnennnnnnnnnnnnnnnnnnnnennnennnennnensnnn nenn 37 e T AAA T ATT ST 38 Part 2 Installing BlackDiamond Switches and Modules Chapter 4 Site Preparalion anne 41 Planning Your Site sssini aa iaai ea ee 41 Meeting Site Requirements eek sn Beeren 42 Operating Environment Requirements ccccccceeccsecceececeeceeeeeeeeeeeeeeeeeeeesseeeseeeseeesaeeeaeeeeeeenaes 42 Building and Electrical Godes i 42 5u een 42 Wiring Closet Considerations uuessessensenensnneenennnnennnnnennnennnnnnnnnnnnnnnnnnnnnennnnnnennnnnn nennen 43 Temperature irnir area ena e aa NEEE EE Ea Gendeeuwcosutediseneeedatcadidevancuweoss 43 Humidity oscine AT AA E E EEEE 44 BlackDiamond Family Chassis Spacing REquireMents cccccccseccceseceecececeseseaeeeaeeeeneeeanes 44 Airflow Requirements ucceessensesenesseenennnnnnnnnnnnennnnnnnnnneneenennnnnnnnnnennnnnnnnnnensnnnnennnnennen nenn 44 Electrostatic Discharge un ee ahnen 45 Rack Specifications and Recommendations ccceecsecceeceeceececeseeceececeeeeeeeseeeeeeeeeaeeseeseeseegs 46 Mechanical Recommendations for the Rack u 40s400snnennn nen nnnnnnnnnnnnnnnen san nnnnen 46 Protective Grounding for the RaCk cccccccccesccceeceeceseeeeeeeeeeeeeeeeee esse eeseeeseeeseeeeseeeaeeeaneeeags 46 Space Requirements for the Rack cccccccecceceeceeeeceeceeeseee
23. e Use only power cords that are certified for use within the country of use Do not attempt to modify AC power cords e Make sure the wall outlet is installed near the equipment and is easily accessible for quick disconnect e Make sure the voltage and frequency of your power outlet match the system electrical ratings for the equipment The building and or power source must provide overload protection e Use a surge suppressor line conditioner or uninterruptible power supply to protect the system from momentary increases or decreases in electrical power When inserting a hot swappable power supply into the bay do not use excessive force If multiple power supplies are used in a switch connect each power supply to a different independent power source If a single power source fails it will affect only that power supply to which it is connected If all the power supplies on a single switch are connected to the same power source the entire switch is vulnerable to a power failure La WARNING Extreme Networks 325 W DC PSUs do not have switches for turning the unit on and off Make sure that the DC circuit is de energized before connecting or disconnecting the DC power cord at the DC power socket on the Extreme Networks 325 W DC PSU Wiring the 325 W DC PSU DC power cord to your facility DC source voltage must be performed by a qualified licensed electrician Extreme Networks 325 W AC PSUs do not have switches for turning the unit
24. e Wire size must be a minimum of 18 AWG 0 82 mm copper stranded La WARNING Make sure that the source outlet is properly grounded before plugging the AC power cord into the Extreme Networks 325 WAC PSU BlackDiamond 12800 Series Switches Hardware Installation Guide Fuse The Extreme Networks 325 W AC PSU line is fused This is not a field operator replaceable fuse In the event of failure immediately return the Extreme Networks 325 W AC PSU for a complete replacement 9 WARNING Field operators must not attempt to configure or replace fuses in Extreme Networks 325 W AC PSUs In the event of failure immediately return the defective Extreme Networks 325 W AC PSU for a complete replacement BlackDiamond 12800 Series Switches Hardware Installation Guide installing BlackDiamond Switches and Modules Site Preparation This chapter includes the following sections Planning Your Site on page 41 Meeting Site Requirements on page 42 Evaluating and Meeting Cable Requirements on page 48 Meeting Power Requirements on page 53 Applicable Industry Standards on page 55 By carefully planning your site you can maximize the performance of your existing network and ensure that it is ready to migrate to future networking technologies The information in this chapter is intended for the system administrator network equipment technician network manager or facilities manager responsible for installing and managing the ne
25. minimum 3 conductor flexible cable Type SVT SJT HAR or equivalent no longer then 10ft Wall plug Suitable for use in country of installation amp approved by local regulatory authority Device connector IEC320 C13 90 degree angle rated at 15 A 250 VAC e Power cord assembly Must be rated at 10A by in country regulatory authority BlackDiamond 12800 Series Switches Hardware Installation Guide Black Diamond SSI DC PSU Model 60021 e Wire three conductor 8 AWG jacketed and marked 90C min oO dd note Tray Cable is a UL US only requirement Outside United States standard 8 AWG 8 35mm 90C wire is acceptable e Wall plug N A 3 conductor wires have been stripped and are ready for connection to DC power source mains Device connector Molex Shell Connector PN 42816 0312 Molex Pin Connectors PN 42815 0032 Assembly rating 75VDC 30A Do not disconnect under load Black Diamond 325 W AC PSU Model 65021 e Wire 18 AWG 0 82mm2 minimum 3 conductor flexible cable Type SVT SJT HAR or equivalent no longer then 10ft e Wall plug Suitable for use in country of installation amp approved by local regulatory authority Device connector IEC320 C13 90 degree angle rated at 15 A 250 VAC Power cord assembly Must be rated at 10A by in country regulatory authority Black Diamond 325 W DC PSU Model 60021 e Wire UL LISTED three conductor 14 AWG jacketed and marked UL FT2 90C min Oo dd note Tray Cable is
26. relative humidity non condensing Operational shock 30 m s2 3 g BlackDiamond 12800 Series Switches Hardware Installation Guide Table 27 DC SSI PS Model 60021 1200 W DC PSU For the BlackDiamond 12804 switch Typical configuration Full configuration Input Output Operating conditions 3 power supplies 6 power supplies Nominal input voltage 48 V Voltage input range 40 5 V to 72 V Input currents 40 V 35A 48 V 30 A 60 V 23 A Maximum in rush current Not more than 80 A for 5 ms Input circuit protection 50 A Wire harness provided by Extreme Networks with each power supply Extreme Part 4340 00028 Wire type 8 AWG 10 mm2 listed tray cable copper stranded rated 90 C minimum Connector Molex connector PN 42816 0312 Connector pins Molex connector pins PN 42815 0032 DC output 48 V 24A 12V 4A DC output power W 1200 W Operating temperature 0 C to 40 C 32 F to 104 F Operating humidity 10 to 90 relative humidity non condensing Operating altitude O m to 3 000 m 0 ft to 9 850 ft Operational shock 30 m s2 3 g 60 shocks Operational office vibration 5 to 100 5 Hz 2 10 G O to peak 1 oct min Operational random vibration 3 to 500 Hz 1 5 G rms Worst case operational condition not for continuous operation under this condition Table 28 AC PS Model 65021 325 W AC Power Supply For the BlackDiamond 12802 switch Minimum configuration Full configu
27. Fan Controller on page 118 Replacing a BlackDiamond 12804 Fan Tray on page 119 Replacing the BlackDiamond 12802 Fan Tray on page 121 Safety Information Service to all BlackDiamond equipment should be performed by trained service personnel only Read all important safety information before installation or removal See Appendix A for additional information regarding regulatory compliance certifications applicable to a BlackDiamond PSU fan controller Thoroughly review the information about power supplies in Chapter 4 before working with the PSU fan controller unit Replacing a BlackDiamond 12804 PSU Fan Controller The BlackDiamond 12804 switch has two PSU fan controllers behind an access panel on the rear of the switch chassis oO eb NOTE If your system is running ExtremeXOS version 11 2 1 3 or later you can hot swap the PSU fan controller unit Refer to the ExtremeXOS 12 0 Concepts Guide for complete information about upgrading software BlackDiamond 12800 Series Switches Hardware Installation Guide Pre Installation Requirements Make sure that you have access to the back of the switch You need the following tools and equipment to replace a BlackDiamond 12804 PSU fan controller ESD preventive wrist strap 1 Phillips screwdriver 2 Phillips screwdriver Replacement BlackDiamond 12804 PSU fan controller Removing a BlackDiamond 12804 PSU Fan Controller To remove a PSU fan controller from the BlackDiamond 12804 swi
28. Figure 49 Securing the BlackDiamond 12804 AC Power Cord Retainer Install and secure the channel bracket to the switch by tightening both captive screws Captive screw Captive screw EX_139 5 Starting from the left lay the first four power cords into the channel see Figure 50 6 Lay the last two power cords on top of the bottom four cords see Figure 50 Figure 50 Routing the Power Cords in the Channel From the left lay first four power cords into channel bracket Lay last two power cords onto others oO eb NOTE Leave the ESD preventive wrist strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components BlackDiamond 12800 Series Switches Hardware Installation Guide Removing the BlackDiamond 12804 AC Power Cord Retainer Channel To remove the BlackDiamond 12804 AC power cord retainer channel 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the switch front panel 2 Using a 2 Phillips screwdriver loosen the captive screw on each end of the power cord retainer channel 3 Remove the power cord retainer channel from the switch oO dd note Leave the ESD preventive wrist strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components Extreme Networks 325 W DC Power Supply This section describes how to
29. PC Terminal Cable connector 9 pin female Cable connector 25 pin male female Screen Shell e 1 Screen TxD 3 e _ 3 RxD RxD 2 e _ 2 TxD Ground 5 7 Ground RTS 7 4 RTS CTS 8 20 DTR DSR 6 5 CTS DCD 1 6 DSR DTR 4 a r 8 DCD er BlackDiamond 12800 Series Switches Hardware Installation Guide index Numerics 1200 W DC PSU description 30 74 installing 76 LEDs 31 80 removing 79 specifications 152 325 W AC PSU description 36 94 installing 95 LEDs 37 99 removing 99 specifications 152 325 W DC PSU description 34 88 installing 90 LEDs 35 94 removing 93 specifications 153 700 1200 W AC PSU description 32 81 installing 81 LEDs 33 84 removing 83 specifications 151 A AC power cord retainer channel installing 85 removing 88 AC power cord retaining bracket on 325 W AC PSU 97 airflow 44 airflow requirements 44 amperage calculating for UPS 55 ANSI standards 55 backup MSM 21 bend radius fiber optic cable 50 UTP cable 49 BICSI standards 48 BlackDiamond 12800 series switch features 15 BlackDiamond 12800 Series Switches Hardware Installation Guide MSM 20 BlackDiamond 12802 switch features 18 installing mid mount 67 installing front mount 66 MAC address 18 repacking 129 serial number 18 specifications 149 unpacking 64 BlackDiamond 12804 switch AC power cord retainer channel
30. W AC PSU 97 RF interference patch panel installation 49 preventing 53 problems caused by 53 RJ 45 cable 52 RJ 45 connector jackets 52 routing cable 49 S safety requirements See environmental requirements securing the rack 47 selecting a UPS 55 serial number BlackDiamond 12802 switch 18 BlackDiamond 12804 switch 17 service access to the rack 47 site planning process 41 slot information displaying 106 slots unoccupied 108 space requirements rack 47 specifications 1200 W DC PSU 152 325 W AC PSU 152 325 W DC PSU 153 700 1200 W AC PSU 151 BlackDiamond 12802 switch 149 BlackDiamond 12804 switch 147 power cable 54 standards cabling 48 55 commercial building 55 grounding 55 switch configuration saving 21 switch spacing requirements 44 switch initial login 71 T technical specifications 1200 W DC PSU 152 325 W AC PSU 152 325 W DC PSU 153 700 1200 W AC PSU 151 BlackDiamond 12802 switch 149 BlackDiamond 12804 switch 147 temperature wiring closet 43 text conventions 10 tools for installing equipment blank front panels 108 external memory card 111 fan tray BlackDiamond 12802 switch 122 fan tray BlackDiamond 12804 switch 119 transition time 55 BlackDiamond 12800 Series Switches Hardware Installation Guide transition time UPS 55 troubleshooting external memory card installing 111 over current conditions 34 36 85 94 power turning off 34 36 85 RF interfer
31. bitte an die Servicemitarbeiter von Extreme Sollte der Versuch eines Austausches unternommen werden sind zur Vermeidung einer Explosionsgefahr folgende Richtlinien zu beachten a Die Batterie nur durch eine identische oder eine gleichwertige vom Hersteller empfohlene Batterie ersetzen b Die Batterie gem den Empfehlungen des Herstellers entsorgen Lichtleiteranschl sse Optische Sicherheit 9 WARNUNG Beim Umgang mit Lichtleitermodulen sind folgende Vorsichtsma nahmen zu beachten e Niemals durch ein Vergr erungsger t auf die bertragende LED den Laser schauen wenn diese r eingeschaltet ist e Niemals direkt auf einen Lichtleiteranschluss am Switch oder auf die Enden eines Faserkabels schauen wenn diese eingeschaltet sind e Bei offenen Anschl ssen kann es zu unsichtbarer Laserstrahlung kommen Direkter Augenkontakt mit dem Strahl ist zu vermeiden e Ein optisches Ger t niemals auf andere Weise ver ndern oder modifizieren als in diesem Dokument angegeben BlackDiamond 12800 Series Switches Hardware Installation Guide Einhaltung beh rdlicher Vorschriften durch GBIC SFP Mini GBIC XENPAK und XFP e Laserprodukt der Klasse 1 EN60825 1 A2 2001 oder j nger Europ ische Richtlinie f r Lasersysteme Anwendung der CE Kennzeichnung gem der Richtlinien 89 336 EWG EMV und 73 23 EWG f r Niederspannungsger te BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12800 Series Swit
32. cable to avoid radio frequency RF interference Discharge the RJ 45 Ethernet cable before plugging it into a port on the switch When required for safety and fire rating requirements use plenum rated cable See your local building codes for determining when it is appropriate to use plenum rated cable or refer to IEC standard 850 Keep all ports and connectors free of dust Lod WARNING Unshielded twisted pair UTP cable can build up ESD charges when being pulled into a new installation Before connecting any category 5 UTP cable to the switch discharge ESD from the cable by plugging the RJ45 into a LAN Static Discharge device or use an equivalent method BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 23 Properly Installed and Bundled Cable Cable managers supporting and directing cables Proper bundling of cables Adequate slack and bend radius SPG_008 Fiber Optic Cable Fiber optic cable must be handled carefully during installation Every cable has a minimum bend radius for example and fibers will be damaged if the cables are bent too sharply It is also important not to stretch the cable during installation We recommend that the bend radius for fiber optic cable equal 2 inches 5 08 cm minimum for each 90 degree turn as shown in Figure 24 oO eb NOTE Kinks and sharp bends can destroy or impair the cable s abilit
33. connected to the switch so that the strap will always be available when you need to handle ESD sensitive components BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12800 Series Switches Hardware Installation Guide Repacking a BlackDiamond Chassis This chapter describes how to remove a BlackDiamond chassis from an equipment rack and repack the chassis for shipping back to Extreme Networks To repack a BlackDiamond chassis use the original shipping crate or box and packing materials This chapter includes the following sections e Safety Information on page 125 e Repacking the BlackDiamond 12804 Chassis on page 126 e Repacking the BlackDiamond 12802 Chassis on page 129 oO dd note Read the information in this chapter thoroughly before you attempt to remove a BlackDiamond chassis Safety Information amp CAUTION Correct lifting procedures for a BlackDiamond chassis require two or more people Only trained service personnel should perform service to Extreme Networks switches and their components Trained service personnel have read all related installation manuals have the technical training and experience necessary to be aware of the hazards to which they are exposed in performing a task and are aware of measures to minimize the danger to themselves or other persons oO dd note See Appendix A Safety Information for additional safety information and Appendix B Technical S
34. degrees and return to position 14 drops minimum on sides amp corners 39 4 lt 20 Ib 9 kg modules 19 7 lt 80 Ib 36 kg chassis Acoustic Sound BlackDiamond 12804 switch with AC Power Supplies Sound power in accordance with EN 300 753 10 1997 Sound pressure in accordance with NEBS GR 63 Issue 2 Sound power Normal 70 dBA per ISO 7779 High 73 dBA per ISO 7779 Declared sound power Normal 7 2 belsA per ISO 7779 amp ISO 9296 High 7 6 belsA per ISO 7779 amp ISO 9296 Bystander sound pressure Normal 64 dBA front side 0 6m High 66 dBA left side 0 6m BlackDiamond 12802 Switch Table 25 BlackDiamond 12802 Switch Technical Specifications Physical Dimensions BlackDiamond 12802 chassis Weight BlackDiamond 12802 chassis empty BlackDiamond 12802 chassis fully loaded BlackDiamond 12802 power supply BlackDiamond 12802 fan tray BlackDiamond 12802 PSU Fan Controller Height 5 25 inches 13 3 cm Width 17 25 inches 43 8 cm Depth 21 25 inches 54 0 cm 29 25 Ib 13 3 kg 63 Ib 28 6 kg 3 0 Ib 1 4 kg 3 25 Ib 1 5 kg 0 5 Ib 0 2 kg BlackDiamond 12800 Series Switches Hardware Installation Guide Table 25 BlackDiamond 12802 Switch Technical Specifications Continued Safety Standards North American Safety of ITE European Safety of ITE International Safety of ITE EMI EMC Standards North America EMC for ITE European EMC standards International EMC certifications
35. der Installation s mtlicher Netzteile von Extreme Networks muss sichergestellt werden dass die nachfolgend aufgef hrten Anforderungen erf llt sind Angaben zu Nennleistung und Leistungsbedarf finden sich in den Installationsanweisungen f r das jeweilige Netzteil Power Supply Unit PSU Folgende Anforderungen m ssen unbedingt erf llt sein e Wenn der mit Wechsel oder Gleichstrom betriebene Switch von Extreme Networks mit einem externen gr nen gelben Erdungskabel ausgestattet ist dann muss zun chst dieses Erdungskabel zwischen der Grundplatte und einem geeigneten Erdungspunkt angeschlossen werden bevor andere Verbindungen zum Ger t hergestellt werden dies gilt auch f r den Anschluss an das Wechsel bzw Gleichstromnetz Beim Ausbau des Ger ts aus dem Gestell muss das Erdungskabel als letztes getrennt werden e Netzteile nur an vorschriftsm ig geerdete Steckdosen anschlie en um die Gefahr elektrischer Schl ge zu vermeiden und die Konformit t mit internationalen Sicherheitsnormen zu gew hrleisten e Nur Stromkabel verwenden die f r den Einsatz in dem jeweiligen Land zugelassen sind Wechselstromkabel d rfen nicht manipuliert werden e Die Wandsteckdose muss in der N he der Anlage installiert und leicht zug nglich sein um eine schnelle Trennung vom Netz zu erm glichen e Spannung und Frequenz der Steckdose m ssen den elektrischen Nenndaten des Systems entsprechen Das Geb ude bzw die Stromquelle muss mit einem ber
36. dient zur Trennung von der Netzstromversorgung e Vor dem Entfernen der R ckwand eines Extreme Networks Switch muss die gesamte Stromzufuhr unterbrochen werden e Vor der Aufnahme von Arbeiten in der N he von Stromquellen alle Stromkabel abziehen sofern nicht im Rahmen eines Wartungsverfahrens anders vorgegeben e Beim Umgang mit Modulen optischen Ger ten Netzteilen oder anderen modularen Zubeh rteilen das ESD Schutzarmband anlegen um das Risiko einer Besch digung der Ger te durch elektrostatische Entladungen zu verringern Das Armband zum Schutz elektrostatisch gef hrdeter Bauteile ESB grunds tzlich an der Grundplatte befestigt lassen damit es beim Umgang mit diesen Bauteilen immer zur Hand ist e Alle Kabel so verlegen dass berm ige Belastungen vermieden werden Kabelbinder oder Zugentlastungsklemmen verwenden e Ein Stromkabel bei Anzeichen von Besch digungen unverz glich austauschen Allgemeine Sicherheitsvorkehrungen Folgende Richtlinien sind unbedingt zu befolgen e Keine Gegenst nde heben die m glicherweise zu schwer sind e Bei einer Installation in einem Gestell darauf achten dass schwere Ger te unten im Gestell eingebaut werden um Gefahren durch Umkippen zu vermeiden e Bei Summit Desktop Switches keinen Monitor oder andere Gegenst nde auf die Anlage stellen Die Abdeckung der Grundplatte ist nicht darauf ausgelegt Gewicht zu tragen BlackDiamond 12800 Series Switches Hardware Installation Guid
37. eb NOTE Extreme Networks recommends that you consult an electrical contractor for commercial building and wiring specifications Temperature Extreme Networks equipment generates a significant amount of heat It is essential that you provide a temperature controlled environment for both performance and safety Install the equipment only in a temperature and humidity controlled indoor area that is free of airborne materials that can conduct electricity Too much humidity can cause a fire Too little humidity can produce electrical shock and fire Follow these general thermal recommendations for your wiring closet e Be sure that the ventilation in the wiring closet is adequate to maintain a temperature below 104 F 40 C e Install a reliable air conditioning and ventilation system e Keep the ventilation in the wiring closet running during non business hours otherwise the equipment can overheat e Maintain an ambient operating temperature of 32 to 104 F 0 to 40 C e Maintain a storage temperature of 40 to 158 F 40 to 70 C BlackDiamond 12800 Series Switches Hardware Installation Guide oO dd note Like all electrical equipment product lifetimes degrade with increased temperature If possible temperatures should be kept at approximately 78 F 25 C or lower Humidity To maximize equipment life keep operating humidity between 50 and 70 relative humidity non condensing during typi
38. ham radio antenna e Routing UTP cable near equipment that could exhibit RF interference such as ARC welding equipment Routing UTP cable near electrical motors that contain coils Routing UTP cable near air conditioner units Routing UTP cable near electrical transformers In areas or applications where these situations cannot be avoided use fiber optic cabling or shielded twisted pair cabling STP Meeting Power Requirements This section describes power requirements including e Power Supply Requirements e AC Power Cable Requirements e Uninterruptible Power Supply Requirements Power Supply Requirements Adhere to the following requirements to operate your Extreme Networks equipment safely e Be sure that your equipment is placed in an area that accommodates the power consumption and component heat dissipation specifications e Be sure that your power supply meets the site power or AC power requirements of the network equipment e When connecting power to installed equipment avoid connecting through an extension cord or power strip e If your switch includes more than one power supply connect each power supply to a different independent power source If a power source fails it will affect only the switch power supply to which it is connected If all switch power supplies are connected to a single power source the entire switch is vulnerable to a power source failure BlackDiamond 12800 Series Switches Hardware Installat
39. in Chapter 3 Displaying Slot Status Information Assuming the module has no problems the command show slot lt slot gt where lt slot gt is the number of the slot where you installed the module displays information about the module including general information about the module name serial number part number the state of the module power down operational mismatch between the slot configuration and the module in the slot and the number of ports on the module For more information about slot status information see the ExtremeXOS 12 0 Concepts Guide and the ExtremeXOS 12 0 Command Reference Guide Removing a BlackDiamond 12800 Series Module amp CAUTION There are two styles of ejector injector handles on the BlackDiamond 12800 series modules Pay careful attention to the instructions in step 2 BlackDiamond 12800 Series Switches Hardware Installation Guide This section describes how to remove modules from a BlackDiamond 12800 series switch BlackDiamond modules are hot swappable You do not need to power the system off to remove a module You will need the following tools and equipment to remove a BlackDiamond MSM or I O module e ESD preventive wrist strap e 2 Phillips screwdriver To remove a BlackDiamond 12800 series module 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the chassis On a BlackDiamond 12804 series chassis the ground receptacl
40. install the Extreme Networks 325 W DC UL listed accessory power supply unit PSU Model 65022 in a BlackDiamond 12802 switch eb NOTE For centralized DC power connection this product is intended to be installed in restricted access locations dedicated equipment rooms equipment closets or the like in accordance with Articles 110 16 110 17 and 110 18 of the National Electric Code ANSI NFPA 70 a gt NOTE The Extreme Networks 325 W DC PSU cannot be used in combination with any other Extreme Networks PSU The 325 W DC PSU should be connected to a DC power source using the Extreme Networks DC power input cable Model 65025 This cable is shipped separately from the power supply Minimum Software Required You must be running ExtremeWare XOS version 12 0 or later for the system to recognize the DC PSU BlackDiamond 12800 Series Switches Hardware Installation Guide Pre Installation Requirements WARNING Extreme Networks 325 W DC PSUs do not have switches for turning the unit on and off Make sure that the DC circuit is de energized before connecting or disconnecting the DC power cord and socket on the Extreme Networks 325 W DC PSU Wiring the 325 W DC PSU DC power cord to your facility DC source voltage must be performed by a qualified licensed electrician Do not put your hand into an open power supply bay when a power supply is not present Empty power supply bays require a cover plate at all times Yo
41. installing 85 removing 88 attaching mid mount brackets 61 features 16 installing 60 PSU fan controller replacing 116 rack mounting 62 repacking 126 replacing fan tray 121 serial number 17 specifications 147 unpacking 58 blank front panels 108 building codes 42 Building Industry International See BICSI bundling cable 49 C cable connections making 105 cable identification records 48 cable labeling 48 cable types and distances 51 cable category 5 49 cable installing bend radius fiber optic 50 UTP 49 distances 51 fiber optic cable 50 recommendations 49 slack 49 cabling standards ANSI 55 Consulting Service BICSI 48 category 5 cable 49 chassis to chassis heating 44 commands eject memory card 111 show memorycard 111 show slot 106 synchronize 105 commercial building standards 55 compact flash See external memory card components installing backup MSM 105 BlackDiamond 12802 switch fan tray 123 PSU fan controller 119 BlackDiamond 12804 switch fan tray 121 PSU fan controller 117 blank front panel 108 external memory card 111 components removing BlackDiamond 12802 switch fan tray 122 PSU fan controller 118 BlackDiamond 12804 switch fan tray 120 PSU fan controller 116 external memory card 111 modules 107 console port on MSM 22 settings 70 conventions notice icons 10 text 10 DB 9 pinouts 153 DC wiring installing 75 89 design standards 55 E
42. modules Figure 65 Locking the Module into Place Oc a ml O e oo r EX_125 BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 66 Captive Screw with Red Line Ne de EX_162 9 Store the module packaging for future use dd note Leave the ESD preventive wrist strap permanently connected to the chassis so that the strap is always available when you need to handle ESD sensitive components Making Network Interface Cable Connections Use the appropriate type of cable to connect the ports of your switch to another switch or router Working carefully one port at a time 1 Verify that you have identified the correct cable for the port 2 Usean alcohol wipe or other appropriate cleaning agent to clean the cable connectors make sure they are free of dust oil and other contaminants 3 Ifyou are using optical fiber cable align the transmit Tx and receive Rx connectors with the correct corresponding connectors on the switch or the I O module 4 Press the cable connectors into their mating connectors on the switch or I O module until the cable connector is firmly seated Repeat steps 1 through 4 for the remaining cables on this or other switches or I O modules Dress and secure the cable bundle to provide appropriate strain relief and protection against bends and kinks Installing a Backup MSM If you install a backup MSM use the
43. or to another suitable building ground All Extreme Networks switches are designed with mounting brackets that provide solid metal to metal connection to the rack If you do not use equipment racks you can attach wiring terminals directly to the mounting brackets for appropriate grounding Extreme Networks switches have grounding terminals that are mounted on the back of the chassis At a minimum follow these guidelines to ground equipment racks to the earth ground e CAD weld appropriate wire terminals to building I beams or earth ground rods e Use the appropriate chassis grounding wire for your system which is dependent upon the available input current to the power supply m For AC systems using a 20A breaker per PSU SSI AC the chassis ground can be as small as 14 AWG The power cable ground should be the same size as the primary m For DC systems using a 40A breaker per PSU SSI DC the chassis ground can be as small as 10 AWG The power cable ground should be the same size as the primary oO dd note For complete details on power supplies and power supply cords refer to the following Chapter 4 Extreme Networks Power Supply Units for BlackDiamond Switches and Selecting Power Supply Cords on page 136 in Appendix A Safety Information Drill and tap wire terminals to equipment racks e Position the earth ground as close to the equipment rack as possible to maintain the shortest wiring distance possible
44. the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the BlackDiamond chassis On a BlackDiamond 12804 chassis the ground receptacle is at the top left corner On a BlackDiamond 12802 chassis the ground receptacle is at the top right corner 2 Align the blank front panel over the open slot on the chassis see Figure 69 Make sure that the EMI gasket is on the top of the panel and the stenciled part number is right side up BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 69 Blank Front Panels in BlackDiamond Series Chassis Te el oO a oO oO 2 3 en s B 5 6 oO aT ASPO18 3 Use a 2 Phillips screwdriver to tighten the captive screws at each end of the blank front panel oO dd note Tighten the screws of each installed blank front panel before inserting additional modules or blank front panels Otherwise you might unseat modules or blank front panels that you have not secured oO dd note Leave the ESD preventive wrist strap permanently connected to the chassis so that it is always available when you need to touch E
45. the field In the event of failure immediately return the Extreme Networks 325 W DC PSU for a complete replacement B WARNING Field operators must not attempt to configure or replace fuses inside Extreme Networks 325 W DC PSUs In the event of failure immediately return the defective Extreme Networks 325 W DC PSU for a complete replacement Specifications The 325 W DC PSU functions from 40 V to 72 V DC input The software determines the maximum available power required for the switch and enables the modules accordingly PIS CAUTION The 325 W DC PSU does not have a switch for turning the unit on and off Remove DC power by de energizing the DC power circuit amp CAUTION Make sure that the 325 W DC PSU circuit is not overloaded Use proper over current protection such as a circuit breaker to prevent over current conditions Extreme Networks 325 W AC Power Supply Figure 19 shows the Extreme Networks 325 W AC UL listed accessory power supply unit Model 65021 This power supply is compatible with the BlackDiamond 12802 switch Figure 19 Extreme Networks 325 W AC PSU 325W AC PSU Torino AC PSU_04 BlackDiamond 12800 Series Switches Hardware Installation Guide The power supply bay can accommodate up to three hot swappable Extreme Networks 325 W AC PSUs See the ExtremeXOS 12 0 Concepts Guide for information about configuring your Extreme Networks BlackDiamond switch dd note The Extreme Network
46. to Table 19 for the recommended installation sequence BlackDiamond 12800 Series Switches Hardware Installation Guide Table 21 Recommended Installation Sequence View from Rear of Chassis Left Power Supply Bays Right Power Supply Bays Installation 1 Installation 3 If empty cover plate is required Installation 2 Installation 4 If empty cover plate is required eb NOTE A minimum of two Extreme Networks 325 W AC PSUs are required to run a BlackDiamond 12802 switch WARNING Do not put your hand into an open power supply bay when a power supply is not present Empty power supply bays require a cover plate at all times amp CAUTION Do not slam the Extreme Networks 325 W AC PSU into the system backplane PIS CAUTION To prevent an electrical hazard make sure before you install the PSU in the power supply bay that the AC power cord is not connected to the PSU Figure 57 Installing a 325 W AC PSU Chassis Torino AC PSU_01 4 To secure the 325 W AC PSU in the power supply bay align and tightening the two captive screws on the PSU front panel As you tighten the screws work from left to right see Figure 58 BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 58 Securing the Extreme Networks 325 W AC PSU Torino AC PSU_02 Installing Retaining Brackets and Connecting Power A power cord retaining bracket is shipped with each 325 W AC PSU Thes
47. 0 R series of modules All BlackDiamond 12800 series I O modules and management system modules MSMs use the Extreme Networks 4th Generation ASICs that enable high availability advanced security and deterministic performance independent of traffic mix The BlackDiamond 12800 series R series modules further provide hierarchical QoS and larger MAC address IP route and ACL capacity for network designs that need the advanced QoS features and scale The R series modules support rate limiting which is the ability to control bandwidth throughout the network For complete details about rate limiting refer to the ExtremeXOS 12 0 Concepts Guide Table 3 lists the modules available in each series Table 3 Modules for the BlackDiamond 12800 Series Switches Module Type BlackDiamond 12800 Series BlackDiamond 12800 R Series MSM MSM 5 module MSM 5R module MSM 6R module O module XM 2X I O module XM 2XR I1 O module GM 20XT 1 0 module GM 20XTR 1 0 module GM 20T 1 0 module XM 2HR O module amp CAUTION Do not attempt to mix modules across Extreme Networks product lines BlackDiamond 12800 series modules are for use only in a BlackDiamond 12802 or 12804 switch When a BlackDiamond 12800 series switch is in use ExtremeXOS software will not recognize a module from a different product line a gt NOTE The BlackDiamond R series modules must be used together to take advantage of the higher feature set and scale The ExtremeXOS software reco
48. 00 Series Switches Hardware Installation Guide Figure 64 Injector Ejector Handles in the Latched Position EX_124 PIS CAUTION There are two styles of ejector injector handles on the BlackDiamond 12800 series modules Pay careful attention to the instructions in the next step 8 Using a 2 Phillips screwdriver lock the module into place in one of the following ways Figure 65 e Ifthe captive screw on each handle has a yellow band around the head of the screw turn the screw on each injector ejector handle clockwise and completely down When the screw is completely tightened the yellow band around the captive screw is completely hidden amp CAUTION Be careful to avoid over torquing and stripping the screw heads e If the captive screw on each handle has a red line on the head see Figure 66 turn each captive screw one quarter turn 90 degrees clockwise When the module is correctly locked the red line on the captive screw in each injector ejector handle is in a vertical position amp CAUTION Be sure to turn each captive screw only 90 degrees or one quarter turn clockwise Tightening the captive screws beyond 90 degrees will damage the injector ejector handles on the
49. 00 series modules are for use only in a BlackDiamond 12804 or 12802 switch When a BlackDiamond switch is in use ExtremeXOS software will not recognize a module from a different product line Module Slot Assignments The specific slot locations for 1 O modules and MSMs in the chassis are as follows e BlackDiamond 12804 switch m Slots 1 2 5 and 6 must have I O modules m slots 3 A and 4 B must have MSMs e BlackDiamond 12802 switch m Slots 1 and 2 top and bottom must have I O modules m Slot MSM middle must have an MSM Chassis slots will only operate their designated module type In the BlackDiamond 12802 switch the slot for the MSM is labeled MSM The ExtremeXOS software refers to this MSM as MSM A in all related displays and command output BlackDiamond 12800 Series Switches Hardware Installation Guide Distinguishing a BlackDiamond 12800 Series MSM from an 1 0 Module One quick way to distinguish a BlackDiamond 12800 MSM from an I O module is by the color of the release latch located on each injector ejector release latch Orange injector ejector latches indicate that the module is a BlackDiamond MSM and green injector ejector latches indicate that the module is a BlackDiamond I O module see Figure 62 Figure 62 Injector Ejector Release Latch Colors on 1 0 Modules and MSMs N 2 A w 1 0 module e amp release latches ji 4 are g
50. 12800 series MSMs Table 5 BlackDiamond 12800 Series MSM LEDs LED Color Meaning SYS Green blinking Normal operation Amber blinking Diagnostic tests are running on the module The LED resets if the diagnostics are terminated The LED returns to blinking amber if another diagnostic test is started Amber steady Diagnostic failure has occurred Off Switch is not receiving power MSTR Green steady Module is operating as primary MSM Amber Module is operating as secondary or backup MSM Green blinking Power on self test POST is running Off Normal operation for diagnostics ERR Amber A critical software error has been logged since power up Off Normal operation ENV Green Environment temperature fan power supply is operating properly Amber Environmental failure has occurred BlackDiamond 12800 Series Switches Hardware Installation Guide Features of the BlackDiamond 12800 MSMs Figure 5 shows the MSM 5 module Figure 6 shows the MSM 5R module and Figure 7 shows the MSM 6R module Figure 5 MSM 5 Module Module status LEDs MGMT port ERS Console Compact ENV port flash E i z O z O SYS Reset MSTR EX_150h Figure 6 MSM 5R Module Module status LEDs MGMT port ERR Console Compact ENV port flash SYS Reset MSTR EX_151h Figure 7 MSM 6R Module Module status LEDs MGMT port ERR Consol
51. 2 Phillips screwdriver loosen the screws until they are free of the switch back panel see Figure 79 Figure 79 Removing the Fan Tray from the BlackDiamond 12802 Switch BD_145 4 Use the fan tray handle to pull the fan tray half way out of the fan tray slot see Figure 79 This action disconnects the fan tray from the switch power Wait for the fan blades to stop turning before continuing with this procedure Vd WARNING Be sure that all fan blade motion has ceased before continuing to remove the fan tray 5 Support the bottom of the fan tray with your free hand as you use the handle to slide the fan tray completely out of the fan tray slot amp CAUTION Use both hands to support the weight of the fan tray during removal BlackDiamond 12800 Series Switches Hardware Installation Guide Installing the Replacement BlackDiamond 12802 Fan Tray To install the replacement BlackDiamond fan tray 1 Support the bottom of the fan tray with your free hand as you lift the fan tray by the handle 2 Align the fan tray with the fan tray slot on the switch and then slide the fan tray into place in the switch see Figure 80 amp CAUTION Use both hands to support the weight of the fan tray during installation Figure 80 Installing the Fan Tray in the BlackDiamond 12802 Switch BD_146 e Using a 2 Phillips screwdriver tighten the captive screws see Figure 80 Leave the ESD preventive wrist strap permanently
52. 22 MSM 5R module 22 MSM 6R module 22 network interface connections 105 null modem cable pinouts 154 0 operating environment requirements 42 over current conditions preventing 34 36 85 94 P PC AT serial null modem cable pinouts 154 pinouts DB 9 console connector 153 null modem cable 154 PC AT serial null modem cable 154 plenum rated cable 49 ports console 22 console port settings 70 management 16 22 power cable replacing 54 power requirements power cable 54 power supplies 53 power supplies 1200 W DC 76 325 W AC 95 325 W DC 90 700 1200 W AC 81 power requirements 53 power supply unit PSU 1200 W DC PSU 30 74 325 W AC PSU 36 325 W DC PSU 34 700 1200 W AC PSU 32 81 primary MSM 21 PSU fan controller BlackDiamond 12802 switch installing 119 removing 118 BlackDiamond 12804 switch installing 117 removing 116 installing BlackDiamond 12802 119 BlackDiamond 12804 117 removing 116 118 R rack installation BlackDiamond 12802 switch 66 67 BlackDiamond 12804 switch 62 rack specifications grounding 46 mechanical recommendations 46 mounting holes 46 securing to floor 47 space requirements 47 standards 46 radio frequency interference See RF interference redundant MSM 21 redundant MSM activity 21 related publications 10 removing spare PSU Fan controller 116 118 requirements spacing 44 reset button 23 resetting MSM 23 retaining bracket power cord on 325
53. BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12802 Switch BlackDiamond 12804 Switch Extreme Networks Inc 3585 Monroe Street Santa Clara California 95051 888 257 3000 408 579 2800 http www extremenetworks com Published June 2008 Part number 104002 00 Rev 03 AccessAdapt Alpine Altitude BlackDiamond EPICenter Essentials Ethernet Everywhere Extreme Enabled Extreme Ethernet Everywhere Extreme Networks Extreme Standby Router Protocol Extreme Turbodrive Extreme Velocity ExtremeWare ExtremeWorks ExtremeXOS Go Purple Extreme Solution ScreenPlay Sentriant ServiceWatch Summit SummitStack Triumph Unified Access Architecture Unified Access RF Manager UniStack the Extreme Networks logo the Alpine logo the BlackDiamond logo the Extreme Turbodrive logo the Summit logos the Powered by ExtremeXOS logo and the Color Purple among others are trademarks or registered trademarks of Extreme Networks Inc or its subsidiaries in the United States and or other countries Adobe Flash and Macromedia are registered trademarks of Adobe Systems Incorporated in the U S and or other countries AutoCell is a trademark of AutoCell Avaya is a trademark of Avaya Inc Internet Explorer is a registered trademark of Microsoft Corporation Mozilla Firefox is a registered trademark of the Mozilla Foundation sFlow is a registered trademark of sFlow org Solaris and Java are trademarks of Sun Microsy
54. BlackDiamond Maintenance Procedures Chapter 8 Replacing BlackDiamond 12800 Series Chassis Components 0cccsssecessseeeees 115 Safety IMOM atio 22 sarees coswe tsk ce esents casts dents tacsaeacenneaehce Sodere a Ea ange adabee KRONE ECEERESEE SP EREISLERTERERR 115 Replacing a BlackDiamond 12804 PSU Fan Controller cccccececeeeeeeeeeeeeeeeeeeeaeeseeeee namen nenn 115 Pre Installation Requirements ueesessenseesnennensenennennnnennnenennnnnnnnnnenennennnnnnnsnnnnennnnnen nennen nennen 116 Removing a BlackDiamond 12804 PSU Fan Controller cccceeeeeeeeeeeeeeeeeeeeeseeeee nese nennen 116 Installing a Replacement BlackDiamond 12804 PSU Fan Controller c cseeeeeeeeeeeeeee reed 117 Replacing a BlackDiamond 12802 PSU Fan Controller cccccececeeeeeeeeeeeeeeeeeeeeeesaeeea nese nennen 118 Pre installation REQUIFEMENTHS ccecccccsecceeeeeceeceeceeeeeeeeeseeeeeeeeeseeseeseeeeeeeeesesseeeeeeeeeaeeaeenaes 118 Removing a BlackDiamond 12802 PSU Fan Controller cccceeeeeeeeeceeeeeeeceeese esse eeeeeeeaeeees 118 Installing the Replacement PSU Fan Controller cccceceeeeeeeeeeeeeeeeeeeeee essa nese eeeae esa san nennen 119 Replacing a BlackDiamond 12804 Fan Tray cccccccccscceeceeeeeeeeeceeceeeeeeeeeseeseeseeeeeeneeseeeeeeeeeaeeges 119 Pre Installation Requirements Rama Ri 119 Removing the Fan Tray ecceensseesnnennnessnennnennnennnnnnnennnennnnnnnnnnnnennnennnnnsnennnenn
55. Ds The front panel of the Extreme Networks 325 W AC PSU provides status LEDs Table 22 describes the meanings of these LEDs Table 22 Extreme Networks 325 W AC PSU LEDs AC In DC Out PSU Condition LED Status LED Status No AC input power Off Off No AC input power receiving standby power from the chassis Amber Off AC input good main outputs disabled Green Off AC input good output fault Green Amber AC input good DC output good Green Green BlackDiamond 12800 Series Switches Hardware Installation Guide Power Supply Cords Each Extreme Networks 325 W AC PSU is shipped with a 110 V AC UL Listed power cord All power supply cords provided by Extreme Networks are designed for use in the United States and Canada only Power supply cords for use outside of North America are typically provided by a third party distribution center and must meet the following requirements e Power supply cords must be agency certified for country of use e Power supply cords must contain an IEC 320 C13 connector for insertion into the IEC 320 C14 receptacle on the PSU e Power supply cords must contain an appropriately rated and approved wall plug applicable to the country of installation Power supply cords must be less than 5 m long e Wire size must be a minimum of 18 AWG 0 82 mm copper stranded u WARNING Make sure that the source outlet is properly grounded before plugging the AC power cord into the Extreme Networks 325 WAC PSU
56. Hardware Installation Guide Unpacking the BlackDiamond 12804 Chassis a gt NOTE Do not remove the nylon straps until you are ready to open the chassis package To unpack the BlackDiamond 12804 chassis 1 Remove the nylon straps from around the shipping carton 2 Open the top flaps and remove the accessories and documentation pack from the shipping carton see Figure 26 Lift out the packing foam Figure 26 Removing Accessories from the BlackDiamond 12804 Chassis Shipping Carton 19 inch helper bracket m Power cord retaining bracket BlackDiamond documentation pack with ESD preventive wrist strap EX_110 3 Release the clip locks see Figure 27 a Place your thumb and index finger inside the clip lock to grasp the prongs b Squeeze the prongs inward applying equal pressure on each side c Pull the prongs outward until the clip lock is released from the carton Repeat these steps to release each of the remaining clip locks BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 27 Clip Locks on the BlackDiamond 12804 Chassis Shipping Carton Squeeze prongs to unlock m Clip lock EX_111A 4 Slide the shipping carton up over the BlackDiamond 12804 chassis see Figure 28 Figure 28 Removing the Carton from the BlackDiamond 12804 Chassis Lift box 0 off
57. IA EIA 607 discusses commercial building grounding and bonding requirements You can access these standards at http www ansi org or http www tiaonline org BlackDiamond 12800 Series Switches Hardware Installation Guide Installing the BlackDiamond 12800 Series Chassis This chapter includes the following sections Unpacking the BlackDiamond 12804 Chassis on page 58 Rack Mounting the BlackDiamond 12804 Chassis on page 62 Unpacking the BlackDiamond 12802 Chassis on page 64 Rack Mounting the BlackDiamond 12802 Chassis on page 66 Grounding the BlackDiamond 12800 Series Chassis on page 68 Initial Management Access on page 70 This chapter describes how to install the following BlackDiamond chassis models e BlackDiamond 12804 chassis e BlackDiamond 12802 chassis The BlackDiamond 12800 series chassis fits into a standard 19 inch 48 26 cm rack You can install the switch either flush against the back of the rack or in a mid mount position to give you more access behind the rack gt NOTE Read the information in this chapter thoroughly before you attempt to install the BlackDiamond 12800 series switch amp CAUTION Correct lifting of the BlackDiamond 12800 series chassis requires two people The BlackDiamond 12800 series chassis should be empty before being lifted This will also prevent damage to the system components due to possible system chassis flex when lifting BlackDiamond 12800 Series Switches
58. Korea ETSI EN 300 386 2001 EMC Telecommunications ETSI EN 300 019 Environmental for Telecommunications IEEE 802 3 1OBASE T IEEE 802 3u 1OOBASE TX 100BASE FX IEEE 802 3z 1000BASE X IEEE 802 3ab 1000BASE T IEEE 802 3ac VLAN Tag IEEE 802 3ad Link Aggregation IEEE 802 3ae 1OGBASE X IEEE 802 3aef Power over Ethernet EN ETSI 300 019 2 1 v2 1 2 Class 1 2 Storage EN ETSI 300 019 2 2 v2 1 2 Class 2 3 Transportation EN ETSI 300 019 2 3 v2 1 2 Class 3 1e Operational EN ETSI 300 753 1997 10 Acoustic Noise Operating temperature range O C to 40 C 32 F to 104 F Operating humidity 10 to 93 relative humidity non condensing Operating altitude O to 3000 meters O to 9 850 ft Operational shock 30 m s 3 g 11 ms 60 shocks Operational random vibration 5 to 500 Hz 1 5g rms BlackDiamond 12800 Series Switches Hardware Installation Guide Table 24 BlackDiamond 12804 Switch Technical Specifications Continued Storage amp Transportation Conditions Packaged Transportation temperature 40 C to 70 C 40 F to 158 F Storage and transportation humidity 10 to 93 relative humidity non condensing Packaged shock half sine lt 50 kg 180 m s 10 g 6 ms 600 shocks modules gt 50 kg 100 m s 6 g 11 ms 600 shocks chassis Packaged random vibration 5 to 20 Hz 1 0 ASD w 3 dB oct from 20 to 200 Hz Packaged sinusoidal vibration 5 to 62 Hz 5 mm s velocity 62 to 200 Hz 0 2 g Tilt 22 5
59. M 20T 1 0 Module Module status 10 100 1000BASE T RJ 45 ema 66030 AA TAT 10 100 1000BASE T EX_152h The GM 20T I O module has 20 autosensing 10 100 1000BASE T ports that use standard RJ 45 connectors The default configuration of the GM 20T I O module is as follows All ports e Are added to the default VLAN as untagged e Inherit the properties of the default VLAN for example protocol type and VLANid e Operate in autonegotiation mode GM 20T LEDs The GM 20T I O module has the following LEDs e Module status e Module diagnostics e Port status e Power status GM 20XT and GM 20XTR 1 0 Modules Figure 9 shows the GM 20XT I O module and Figure 10 shows the GM 20XTR I O module Figure 9 GM 20XT 1 0 Module Mini GBIC fiber ports jaja TE pw 0 BEE ee ol I ii I jam al Fe ae oy Hilo FF a ae AAAA AAAA A Sal Module status 10 100 1000BASE T ports LEDs EX_153h BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 10 GM 20XTR 1 0 Module Mini GBIC fiber ports BeBe ado seaaa oa aL _ TET supe
60. Networks Pluggable Interfaces Hardware Installation Guide Documentation for Extreme Networks products is available from the Extreme Networks website at the following location http www extremenetworks com services documentation BlackDiamond 12800 Series Switches Hardware Installation Guide You can select and download the following Extreme Networks documentation from the Documentation Overview page e Software User Guides e Hardware User Guides You can find archived user guides for software at http www extremenetworks com services documentation swuserguides asp You can also find archived installation guides for hardware at http www extremenetworks com services documentation hwuserguides asp BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12800 Series Switches Hardware Installation Guide D BlackDiamond 12800 Series Switches About the BlackDiamond 12800 Series Switches This chapter includes the following sections e Overview of the BlackDiamond 12800 Series Switches on page 15 e BlackDiamond 12804 Switch Chassis on page 16 e BlackDiamond 12802 Switch Chassis on page 18 For information about the I O modules and management modules MSMs for the BlackDiamond 12800 series switches see Chapter 3 BlackDiamond 12800 Series Modules For information about installing the BlackDiamond switches see Chapter 2 Installing the BlackDiamond 12800 Series Chassis Overview o
61. SD sensitive components Removing a Blank Front Panel To remove a BlackDiamond blank front panel 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the switch front panel On a BlackDiamond 12804 series chassis the ground receptacle is at the top left corner On a BlackDiamond 12802 chassis the ground receptacle is at the top right corner 2 Loosen the captive screw at each end of the blank front panel using a 2 Phillips screwdriver see Figure 70 BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 70 Captive Screw on a BlackDiamond 12800 Blank Front Panel 3 Remove the blank front panel from the intended slot on the BlackDiamond switch see Figure 71 Figure 71 Removing a Blank Front Panel from a BlackDiamond 12800 Series Switch To N oO oO a EI oO yA N oO oO 4 oO 5 6 oO O 1 ASP020 4 Install an I O module or MSM in the open slot as described in Installing a BlackDiamond 12800 Series Module on page 102 or Installing a Backup MSM on page 105 dd NOTE Leave the ESD preventive wrist strap perma
62. SU e ESD preventive wrist strap e Power supply cord 110 V AC 220 V AC or applicable to country of use e Thermal protective gloves required for removal Installing an Extreme Networks 700 1200 W AC PSU amp CAUTION Make sure that the Extreme Networks 700 1200 W AC PSU circuit is not overloaded Use proper over current protection such as a circuit breaker to prevent over current conditions To install an Extreme Networks 700 1200 W AC PSU 1 Attach an ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle which is located on the top left corner of the switch front panel 2 Verify that the Extreme Networks 700 1200 W AC PSU is right side up and the locking handle is open see Figure 45 BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 45 Extreme Networks 700 1200 W AC PSU with Locking Handle Open EX_015 3 Carefully slide the Extreme Networks 700 1200 W AC PSU all the way into the power supply bay see Figure 46 PIS CAUTION Do not slam the Extreme Networks 700 1200 W AC PSU into the system switch backplane Use the locking handle to secure the Extreme Networks 700 1200 W AC PSU into the system switch Figure 46 Inserting the 700 1200 W AC PSU into the Power Supply Bay EX_011 4 Secure the Extreme Networks 700 1200 W AC PSU in the power supply bay by pushing down on the locking handle unt
63. a UL US only requirement Outside United States standard 8 AWG 8 35mm 90C wire is acceptable e Wall plug N A 3 conductor wires have been stripped and are ready for connection to DC power source mains e Device connector Molex Shell Connector PN 42816 0312 Molex Pin Connectors PN 42815 0032 e Assembly rating 75VDC 30A Do not disconnect under load WARNING When using multiple power supplies make sure that each power supply is attached to independent circuits breakers See PS installation instructions of PS for proper sizing of circuit breaker Make sure that the source outlet is properly grounded according to the country s local electrical requirements before plugging the AC supply power cord into a PSU For specific product input power requirements refer to the data sheet of the product or modular PSU at http www extremenetworks com or to Appendix B of this guide The following countries have specific safety instructions concerning power connectors e Argentina The supply plug must comply with Argentinean standards Australia Use AS 3112 for 110 220 VAC power supplies Denmark The supply plug must comply with section 107 2 D1 standard DK2 1a or DK2 5a International Use CEE 7 7 for 110 220 VAC power supplies Japan BlackDiamond 12800 Series Switches Hardware Installation Guide Use JIS 8303 for 110 220 VAC power supplies The power cord provided with the power supply switch or chassis is for use onl
64. ack should be level within 3 16 inch 5 mm Use a floor leveling cement compound if necessary or bolt the racks to the floor as shown in Figure 22 Figure 22 Properly Secured Rack SPG_007A Brace open equipment racks if the channel thickness is less than 1 4 inch 6 4 mm BlackDiamond 12800 Series Switches Hardware Installation Guide Evaluating and Meeting Cable Requirements This section addresses requirements for the cable you should use when installing your network equipment It includes e Cabling Standards Cable Labeling and Record Keeping Installing Cable RJ 45 Connector Jackets Radio Frequency Interference Cabling Standards Extreme Networks recommends using the Building Industry Consulting Service International BICSI Registered Communications Distribution Designer RCDD which is globally recognized as a standard in site planning and cabling For information go to http www bicsi org Cable Labeling and Record Keeping A reliable cable labeling system is essential when planning and installing a network Maintaining accurate records helps you to e Relocate devices easily Make changes quickly Isolate faults in the distribution system Locate the opposite end of any cable Know the types of network devices that your cabling infrastructure can support Consider the following recommenda
65. ake sure that the 700 1200 W AC PSU circuit is not overloaded Use proper over current protection such as a circuit breaker to prevent over current conditions Extreme Networks 325 W DC Power Supply Figure 17 shows the Extreme Networks 325 W DC UL listed accessory power supply unit PSU Model 65022 This power supply is compatible with the BlackDiamond 12802 switch Up to three 325 W DC PSUs can be installed in the BlackDiamond 12802 switch Oo dd note A minimum of two Extreme Networks 325 W DC PSUs are required to run a BlackDiamond 12802 switch Figure 17 Extreme Networks 325 W DC PSU 325W DC PSU Torino DC PSU_04A oO d note For centralized DC power connection this product is intended to be installed in restricted access locations dedicated equipment rooms equipment closets or the like in accordance with Articles 110 16 110 17 and 110 18 of the National Electric Code ANSI NFPA 70 BlackDiamond 12800 Series Switches Hardware Installation Guide oO dd note The Extreme Networks 325 W DC PSU cannot be used in combination with any other Extreme Networks PSU The Extreme Networks 325 W DC PSU requires input DC cable Model 65025 see Figure 18 The input DC cable has an input connector on one end and precut wire on the other end that goes to the DC power source The connector end has a locking mechanism that locks onto the DC PSU to prevent accidental removal of the input DC cable This cable is ship
66. als 10 A oder m Nr 18 AWG 0 823 mm2 bis 2 m L nge f r Einheiten mit einem Bemessungsstrom von 10 A oder h her oder m Nr 16 AWG 1 0 mm2 bis 5 m L nge f r Einheiten mit einem Bemessungsstrom von 10 A oder h her e Bei allen Kabeln muss es sich um 3 adrige Kupferleiter vom Typ SVT oder SJT HAR oder einen quivalenten Typ handeln Verwenden Sie immer ein Wechselstromkabel das den Vorschriften Ihres Landes entspricht Erkundigen Sie sich ber die rtlichen Vorschriften f r Elektroinstallationen und fragen Sie bei den zust ndigen Aufsichtsbeh rden nach den Anforderungen an Stromkabel N here Angaben zu den Leistungsspezifikationen von Netzteilen finden sich unter http www extremenetworks com oder in Anhang B dieses Dokuments Lo WARNUNG Vor dem AnschlieBen des Wechselstromkabels an ein Netzteil muss sichergestellt werden dass die Steckdose vorschriftsgem geerdet ist F r die unten aufgef hrten Lander gelten zus tzlich folgende Anforderungen e Argentinien Der Netzstecker muss den argentinischen Standards entsprechen e Australien Versorgungssteckdose 15 A Minimum AS 3112 f r 110 220 VAC Netzteile e D nemark Der Netzstecker muss die in Abschnitt 107 2 D1 der Norm DK2 la oder DK2 5a aufgef hrten Bestimmungen erf llen e Japan m Versorgungssteckdose 15 A JIS 8303 f r 110 220 VAC Netzteile BlackDiamond 12800 Series Switches Hardware Installation Guide m Das mit dem Netzteil dem Switch o
67. and seal them with packing tape 11 Secure the shipping carton with nylon straps see Figure 85 a gt NOTE Nylon straps are optional but are recommended by Extreme Networks for extra security during shipment The installation of nylon straps requires a crimping tool If you do not have nylon straps and a crimping tool available to secure the carton the chassis can be shipped without the straps however it is critical that the clip locks be secure before shipment Figure 85 Sealed BlackDiamond 12804 Chassis Shipping Carton with Nylon Straps EX_113 BlackDiamond 12800 Series Switches Hardware Installation Guide Repacking the BlackDiamond 12802 Chassis To repack the BlackDiamond 12802 chassis for return to Extreme Networks 1 4 5 6 Prepare the shipping box Remove saved packing materials except the lower foam cushion which should be in the bottom of the box Remove all modules and power supplies from the chassis Follow correct Extreme Networks procedures for removing components from the BlackDiamond chassis Remove the chassis from the equipment rack as follows a Loosen and remove the eight mounting screws holding the chassis to the rack b Guide the chassis out of the rack and set it on a secure flat surface Remove the rack mounting brackets Place the chassis into the shipping bag Carefully set the chassis onto the foam cushion in the bottom of the shipping carton see Figure 86 Figure 86 Packing th
68. assis in an upright position on a secure flat surface amp CAUTION The BlackDiamond 12804 chassis weighs almost 65 pounds Proper lifting and moving of the chassis requires two people 2 Determine the locations for the mid mount brackets oO dd note Each side of the chassis has two sets of mounting holes to provide two positions for attaching the mid mount brackets 3 Identify the left and right brackets Each mid mount bracket is clearly marked for placement on either the right or left side as viewed from the front of the chassis 4 On each side of the chassis attach the appropriate mid mount bracket using the eight screws provided in the kit see Figure 30 BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 30 Attaching the Mid mount Brackets to the BlackDiamond 12804 Chassis Second mid mount location Sn m Mid mount bracket j il EX_136 Rack Mounting the BlackDiamond 12804 Chassis To mount the BlackDiamond 12804 chassis in a rack 1 Locate the 19 inch helper bracket that is shipped with the BlackDiamond 12804 chassis 2 Identify the rack location where the chassis will be installed 3 Using four rack mounting screws attach the helper bracket to the system rack immediately below the chassis location see Figure 31 You must provide the screws for attaching the helper bracket BlackDiamond 12800 Series Swi
69. cal operation The equipment can operate between 10 and 95 relative humidity non condensing for short intervals BlackDiamond Family Chassis Spacing Requirements Because of chassis to chassis heating Extreme Networks recommends placing no more than three chassis next to each other In addition Extreme Networks recommends the following general principles for equipment placement e Leave a minimum of one empty 19 inch rack between two sets of three adjacent BlackDiamond switches or e Place patch panels between two sets of three adjacent BlackDiamond switches A patch panel does not require any power and does not generate any heat Oo dd note Up to five adjacent switches will continue to function without safety concerns However product lifetime may degrade with continued exposure to high temperatures in close proximity and long term reliability may be compromised Airflow Requirements To ensure proper airflow through a BlackDiamond 12800 series switch refer to the following recommendations e BlackDiamond 12800 series switches require a minimum of 1 5 inches 4 cm around both the left and right sides of the chassis from any cabinet wall or other obstruction for proper airflow e Air temperature measured approximately 1 inch 2 5 cm from the fan inlet should be less than 104 F 40 C In the BlackDiamond 12800 series switches airflow through the power supplies is independent of the airflow through the modules as show
70. ceceeeceeceeeeeeeeeseeceesseeeeeseeceseseeeseeeeeeesseeeeeeeeeeeeeeneees 88 Pre Installation Requirements ccccccesccceecceecceeeceeeeeeeeeeeeeeeeee esse esse eseeesseeeaeeeseeesseeeaeeeneeenaes 89 Installing the DG Wiring u unae anne ea leisen 89 Installing an Extreme Networks 325 W DC PSU ueseesenssnsnensensensnnennnnnenennonnnnnnnnn nennen nnnnnn nenn 90 Removing an Extreme Networks 325 W DC PSU auuessessensnssnenneenensnnnnennennennnnennnnnnennennnnn nenn 93 EE DER Re EEE a a E E S 94 Extreme Networks 325 W AC Power Supply ccccccsccseceeeeeeeeeeeeeeee eee eeeeeeeeeeeeseeeeeeeeeeeeneeaeeseeneees 94 Pre Installation Requirements cccccceeccseecceeeceeeeeeeea cece eeeee esse esse sess eseeeseeeeaeeeseeeseeeeeeeeneeenaes 94 Installing an Extreme Networks 325 W AC PSU uaesessensennnessensonnnnnnnnnneneenonnnnnnnnn nennen nennen nenn 95 Installing Retaining Brackets and Connecting POWEL c ccccecsecceeceeeeeeeeeeeeceeeeeeeeeseeeeeeeeeneees 97 Removing an Extreme Networks 325 W AC PSU cccccccccececseceseceececeecceeeeseeeaeeeaeeeeeeeeeeeenees 99 Eront Panel LEDS 30 22 en dee gene 99 Power S pply CONUS PNBRUEHRERERE FEHPEREEDEERANREEHBEGERESEEEESPED IAENCEEE SER ERDLPEERIEUEHBREL TE SESBEEIEPTEREEERLEERTERSENER 100 EUER ee RR RE REES viudolsandisneaghe ya donsiusan oes nes vedevesdaeiwgacupnedanyedaphoseanbaeeeteeneta auras 100 Chapter 7 Installing Modules and Connecting Cables
71. ches Hardware Installation Guide Technical Specifications This appendix includes the following technical specifications oO dd note BlackDiamond 12804 Switch on page 147 BlackDiamond 12802 Switch on page 149 Power Supplies for the BlackDiamond 12800 Series Switches on page 151 Connector Pinouts on page 153 The power supply specifications for the BlackDiamond family of switches are consolidated into one table Table 26 BlackDiamond 12804 Switch Table 24 BlackDiamond 12804 Switch Technical Specifications Physical Dimensions BlackDiamond 12804 chassis Weight BlackDiamond 12804 chassis empty BlackDiamond 12804 chassis fully loaded BlackDiamond 12804 power supply BlackDiamond 12804 fan tray BlackDiamond 12804 PSU Fan Controller Safety Standards North American Safety of ITE European Safety of ITE International Safety of ITE Height 17 47 inches 44 4 cm Width 17 51 inches 44 5 cm Depth 18 12 inches 46 0 cm 63 75 Ib 29 0 kg 153 Ib 69 5 kg 7 Ib 3 2 kg 4 75 Ib 2 2 kg 1 75 Ib 79 kg UL 60950 1 2003 1st Ed Listed Device US CSA 22 2 60950 1 03 1st Ed Canada Complies with FCC 21CFR 1040 10 US Laser Safety CDRH Letter of Approval US FDA Approval NOM NYCE Mexico IEEE 802 3af 6 2003 Environment A for PoE Applications EN 60950 1 2001 A11 EN 60825 1 A2 2001 Lasers Safety TUV R GS Mark by German Notified Body 73 23 EEC Low Voltage Directive CB Report amp C
72. ctor pins PN 42815 0032 DC Output 48 V 6A 12V 2 5 A 7 VSB 0 75 A Output power W 325 W Operating temperature 0 C to 40 C Storage temperature 40 C to 70 C Operating humidity 10 to 90 relative humidity non condensing Operational shock 30 m s2 3 g Connector Pinouts Table 30 describes the pinouts for a DB 9 console plug connector Table 30 Pinouts for the DB 9 Console Connector Function DCD data carrier detect RXD receive data TXD transmit data DTR data terminal ready GND ground DSR data set ready RTS request to send CTS clear to send Pin Number Direction In In Out Out In Out In ON AD 0 A UNGE Figure 87 shows the pinouts for a 9 pin to 25 pin RS 232 null modem cable BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 87 Null modem Cable Pinouts Switch PC Terminal Cable connector 9 pin female Cable connector 25 pin male female Screen Shelll e _ 1 Screen TxD 3 e __ 3 RxD RxD 2 e _ 2 TxD Ground 5 7 Ground RTS 7 4 RTS CTS 8 20 DTR DSR 6 5 CTS DCD 1 6 DSR DTR 4 E Ge 8 DCD Ze Figure 88 shows the pinouts for a 9 pin to 9 pin PC AT null modem serial cable Figure 88 PC AT Serial Null modem Cable Pinouts Switch
73. der der Grundplatte gelieferte Verbindungskabel ist nur f r den Einsatz mit dem spezifischen Produkt von Extreme Networks vorgesehen und darf nicht mit anderen Ger ten von Extreme Networks oder anderen Anbietern verwendet werden Nordamerika Versorgungssteckdose 15 A NEMA 5 15 f r 110 VAC Netzteile und NEMA L6 15P f r 208 220 VAC Netzteile Schweiz Der Netzstecker muss der Richtlinie SEV ASE 1011 entsprechen Gro britannien Versorgungssteckdose 15 A BS 1363 f r 110 220 VAC Netzteile International Versorgungssteckdose 15 A CEE 7 7 f r 110 220 VAC Netzteile Nur Frankreich und Peru Diese Einheit kann nicht ber ITt Netzteile mit Strom versorgt werden Wenn Ihre Netzteile vom Typ IT sind muss dieses Ger t mit 230 V 2P T unter Verwendung eines Trenntrafos mit einem Verh ltnis von 1 1 versorgt werden Der zweite Anschlusspunkt muss als neutral definiert und direkt an die Erde angeschlossen werden Hinweis Die Bauvorschriften sind weltweit verschieden Extreme Networks empfiehlt daher ausdr cklich einen Elektroinstallateur zu beauftragen um die sachgem e Ger teerdung und Stromverteilung f r Ihre spezifische Installation sicherzustellen Austauschen und Entsorgen von Batterien Im Umgang mit Batterien sind folgende Hinweise zu beachten Austauschen der Lithium Batterie Die in diesem Ger t enthaltenen Batterien k nnen nicht vom Anwender ausgetauscht werden Wenden Sie sich f r einen Austausch des kompletten Ger tes
74. dress is EIA 2500 Wilson Boulevard Arlington Virginia 22201 USA http www eia org e Federal Communications Commission FCC USA only a commission that regulates all interstate and foreign electrical communication systems that originate in the United States according to the Communications Act of 1934 The FCC regulates all U S telephone and cable systems The address is FCC 445 12th Street S W Washington D C 20554 USA http www fec gov Wiring Closet Considerations Be aware of the following recommendations for your wiring closet e Be sure that your system is easily accessible for installation and service See Rack Specifications and Recommendations on page 46 for information Use appropriate AC or DC power power distribution and grounding for your specific installation Use a vinyl floor covering in your wiring closet Concrete floors accumulate dust and carpets can cause static electricity e Prevent unauthorized access to wiring closets by providing door locks Install the equipment in a secured enclosed and restricted access location ensuring that only qualified service personnel have access to the equipment Provide adequate overhead lighting for easy maintenance Be sure that each wiring closet has a suitable ground All equipment racks and equipment installed in the closet should be grounded e Be sure that all system environmental requirements are met such as ambient temperature and humidity
75. dules with model numbers ending in R These include the MSM 5R module or MSM 6R module and the GM 2OXTR I O module the XM 2XR I O module and the XM 2HR module The MSM 6R module provides the same functionality as the MSM 5R module with higher performance for CPU based activities such as BGP OSPF and MPLS BlackDiamond 12800 Series I O Modules No configuration information is stored on the I O modules all configuration information is stored on the MSMs When a BlackDiamond 12800 series switch is powered on the software generates a default configuration for any slots that contain I O modules The default configuration allows the I O module ports to participate in the VLAN named default The default configuration for the I O module is not preserved unless you explicitly save the configuration to NVRAM You can configure parameters of an I O module after it is installed or preconfigure a slot for a certain type of module and configuration The preconfigured information is applied to the module after it is inserted If you preconfigure a slot for a specific module type and then insert a different type of module the module reverts to its default configuration eb NOTE See the ExtremeXOS 12 0 Concepts Guide and the ExtremeXOS 12 0 Command Reference Guide for more information about configuring the modules BlackDiamond 12800 Series Switches Hardware Installation Guide O Module LEDs Table 6 describes the LED activity for the Blac
76. e e Nur Werkzeuge und Ausr stung verwenden die sich in einwandfreiem Zustand befinden Keine Ausr stung verwenden die sichtbare Besch digungen aufweist e Verlegen von Kabeln Kabel so verlegen dass keine Sch den entstehen oder Unf lle z B durch Stolpern verursacht werden k nnen Auswahl der Stromkabel Je nachdem welchen Switch Sie erworben haben werden die Wechselstromnetzteile von Extreme Networks entweder nur mit einem 110 VAC Kabel oder mit einem 110 VAC Kabel und einem 208 220 VAC Kabel geliefert Die von Extreme Networks gelieferten Stromkabel sind nur f r den Einsatz in den Vereinigten Staaten und Kanada ausgelegt und zugelassen Stromkabel f r den Einsatz au erhalb der Vereinigten Staaten und Kanada werden normalerweise von einem Drittanbieter geliefert und m ssen die folgenden Anforderungen erf llen e Die Stromkabel m ssen offiziell f r das Land zugelassen sein in dem sie verwendet werden sollen e Die Stromkabel m ssen mit einem f r das Einsatzland zugelassenen Wandsteckkontakt mit der geeigneten Nennleistung ausger stet sein e Die Konfiguration der Steckvorrichtung die Steckverbindung zur Einheit nicht zur Wandsteckdose muss f r eine Ger testeckdose gem EN60320 TEC320 C14 ausgef hrt sein Die L nge der Stromkabel muss weniger als 5 m 15 Fu betragen Die Mindestspezifikation f r das flexible Kabel lautet m Nr 18 AWG 0 823 mm2 f r Einheiten mit einem Bemessungsstrom von weniger
77. e BlackDiamond 12802 Chassis 7 8 4 BlackDiamond 12802 switch Wty 9 Ca Fes oon a aa 7 a BD_150 Set the top foam cushion in place over the chassis see Figure 86 Close the top flaps and seal them securely with packing tape BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12800 Series Switches Hardware Installation Guide CD Appendixes Safety Information 9 WARNING Read the following safety information thoroughly before installing Extreme Networks products Failure to follow this safety information can lead to personal injury or damage to the equipment Only trained service personnel should perform service to Extreme Networks switches and their components Trained service personnel have read all related installation manuals have the technical training and experience necessary to be aware of the hazards to which they are exposed in performing a task and are aware of measures to minimize the danger to themselves or other persons Considerations Before Installing 9 WARNING Consider the following items before installing equipment Be sure that the following conditions are met e The system is designed to operate in a typical Telco environmental controlled environment Choose an indoor area that has the following characteristics e Temperature and humidity controlled such that the maximum ambient room temperature shall not exceed 40 C 104 F
78. e Compact ENV port ai 65013 o SYS Reset MSTR EX 183 Each MSM consists of a printed circuit board mounted on a metal panel that acts as the insertion vehicle in the BlackDiamond 12800 series switch The module carrier also includes ejector injector levers and captive retaining screws at each end of the module front panel The MSMs have the following features on the front panel e Console port The DB 9 serial console port is used to connect a terminal allowing you to perform local management e Management port The 10 100 Mbps Ethernet management port allows you to connect an Ethernet cable directly from your laptop to the management port to view and locally manage the switch BlackDiamond 12800 Series Switches Hardware Installation Guide configurations This port can also be used to connect the system to a parallel management network for administration e Compact flash You can insert an external compact flash memory card into this slot See Chapter 2 for more information about Extreme Networks supported compact flash cards e Reset button Use the Reset button to reset the MSM without removing the module from the chassis oO dd note Although the BlackDiamond 12800 series MSMs are similar in appearance each MSM model has specific features The MSM 5R and MSM 6R modules belong to the R series and include the rate limiting feature which the MSM 5 module does not support To use rate limiting you must install mo
79. e MSM type installed in your BlackDiamond 12800 series switch and only allows use of a second MSM of the same type and compatible I O modules from the same series An error message is displayed if you attempt to mix module series Software Requirements Table 4 lists the minimum software revision required for MSMs in the BlackDiamond 12800 series switches Table 4 Required Software for BlackDiamond 12800 Series MSMs Switch Model MSM Model Required Software BlackDiamond 12804 MSM 5 MSM 5R ExtremeXOS 11 4 1 or later MSM 6R ExtremeXOS 12 0 2 or later BlackDiamond 12802 MSM 5 MSM 5R ExtremeXOS 12 0 1 or later MSM 6R ExtremeXOS 12 0 2 or later Make sure your BlackDiamond switches are running the required software version to support the switch model and MSM type The MSM 6R requires ExtremeXOS 12 0 2 or later A BlackDiamond 12802 switch running software earlier than version 12 0 1 will not be fully operational To upgrade the software in your BlackDiamond 12802 switch access the latest image at the Extreme Networks support website at http www extremenetworks com services services hub aspx Follow the upgrade instructions in the ExtremeXOS Release Notes Oo dd note The MSM slot in the BlackDiamond 12802 switch is labeled MSM on the front panel The ExtremeXOS software refers to this MSM as MSM A in all related displays and command output BlackDiamond 12800 Series Switches Hardware Installation Guide Redundant MSM Activi
80. e Use a ground impedance tester or micro ohm meter to test the quality of earth ground connection at the chassis This will insure good grounding between the chassis rack and earth ground BlackDiamond 12800 Series Switches Hardware Installation Guide oO d note Because building codes vary worldwide Extreme Networks strongly recommends that you consult an electrical contractor to ensure proper equipment grounding for your specific installation Space Requirements for the Rack Provide enough space in front of and behind the switch so that you can service it easily Allow a minimum of 48 inches 122 cm in front of the rack and 24 inches 61 cm behind the rack When using a relay two post rack provide a minimum of 24 inches 61 cm of space behind the mounted equipment Extra room on each side is optional la WARNING A BlackDiamond chassis does not have a switch for turning power to the unit on and off For systems using an AC power supply power to the chassis is disconnected by removing the wall plug from the electrical outlet For systems using a DC SSI power supply power to the chassis can be turned off by lifting the handle on the power supply or by de energizing the circuit that feeds the power supply which is usually accomplished by turning off a circuit breaker Securing the Rack The rack should be attached to the wiring closet floor with 3 8 inch 9 5 mm lag screws or equivalent hardware The floor under the r
81. e brackets hold the power connectors in the power sockets and prevent accidental disconnection due to earthquakes vibration or other disturbances Install the power cord retaining brackets before you connect the power cords To install the brackets and connect power to the switch 1 Attach a power cord retaining bracket to each installed PSU as follows a Remove the two screws from the AC input socket on the PSU see Figure 59 b Using the screws and spacers provided with the bracket attach the retaining bracket to the AC input socket as shown in Figure 59 c Tighten the screws to secure the power cord bracket Figure 59 Attaching the AC Power Cord Retaining Bracket Torino AC PSU_07 BlackDiamond 12800 Series Switches Hardware Installation Guide oO dd note On each two vertically adjacent PSUs attach the power cord bracket with the tightening screw on top and the lower power cord bracket with the tightening screw underneath as shown in Figure 60 Figure 60 Power Cord Brackets on Two Adjacent Power Supplies Torino AC PSU_09 2 Connect the AC power cord to the PSU as follows a Connect the AC power cord to the AC input on the front of the PSU see Figure 61 If needed loosen the middle screw of the power cord bracket to allow installation of the power cord b After the power cord is connected tighten the middle screw of the bracket to secure the power cord in place see Figure 61 Figure 61
82. e by the metal panel edges only Never touch the components on the PCB or the pins on any of the connectors Slide the module out of the chassis slot Place the module into the anti static bag to protect it from potential ESD damage The bag will also prevent dust from collecting on the module connectors 6 If you are not going to install a replacement module install a blank front panel To install a replacement module follow the installation procedure starting on page 102 oO dd note Leave the ESD preventive wrist strap permanently connected to the chassis so that it is always available when you need to touch ESD sensitive components BlackDiamond Series Blank Front Panels BlackDiamond switches are shipped with blank front panels installed over one or more chassis slots You can remove or install a blank front panel at any time without disrupting network services Complete the action of installing a blank front panel in a reasonable time frame to avoid disruption to adequate airflow amp CAUTION All unoccupied slots in a BlackDiamond 12800 series switch must have blank front panels correctly installed to ensure conformance to FCC requirements as well as to maintain adequate airflow through the switch You need the following tools and equipment to install or remove a blank front panel e ESD preventive wrist strap e 2 Phillips screwdriver Installing a Blank Front Panel To install the blank front panel 1 Attach
83. e capable of providing 50 A dedicated power to each of the 1200 W DC PSUs installed in the switch BlackDiamond 12800 Series Switches Hardware Installation Guide oO dd note Extreme Networks does not recommended installing the 1200 W DC PSU with any AC PSU in the same BlackDiamond 12804 system Extreme Networks recommends that DC and AC PSU units not be used together in the same BlackDiamond switch For central DC power connections the 1200 W DC PSU is intended to be installed only in restricted access locations dedicated equipment rooms equipment closets or the like in accordance with Articles 110 16 110 17 and 110 18 of the National Electric Code ANSI NFPA 70 Vd WARNING Field operators must not attempt to open the 1200 W DC PSU enclosure for any reason the PSU does not contain user serviceable parts In the event of failure return the defective 1200 W DC PSU to Extreme Networks for repair or replacement Minimum Software Required You must be running ExtremeWare XOS version 11 3 or later for the system to recognize the DC PSU LEDs The front panel of the 1200 W DC PSU provides status LEDs Table 10 identifies the symbols and describes the LED activity Table 10 LEDs on the 1200 W DC PSU AA Predictive Fail Fail PSU Condition Amber Amber Power supply DC outputs working normally Off Off DC input power present standby output on Blinking Off Off Current limit on 48 VDC output On Off Blinking Predicti
84. e components LEDs The front panel of the Extreme Networks 325 W DC PSU provides status LEDs Table 20 describes the meanings of these LEDs Table 20 Extreme Networks 325 W DC PSU LEDs DC In DC Out PSU Condition LED Status LED Status No DC input power Off Off No DC input power receiving standby power from the chassis Amber Off DC input good main outputs disabled Green Off DC input good output fault Green Amber DC input good DC output good Green Green PIS CAUTION Make sure that the 325 W DC PSU circuit is not overloaded Use proper over current protection such as a circuit breaker to prevent over current conditions Extreme Networks 325 W AC Power Supply This section describes how to install the Extreme Networks 325 W AC UL listed accessory power supply unit Model 65021 in the BlackDiamond 12802 switch oO db NOTE The Extreme Networks 325 W AC PSU cannot be used in combination with any other Extreme Networks PSU Pre Installation Requirements Vd WARNING Extreme Networks 325 W AC PSUs do not have switches for turning the unit on and off Remove the wall plug from the electrical outlet to disconnect the power to an Extreme Networks 325 W AC PSU Make sure that this connection is easily accessible Do not connect the power supply to an electrical outlet when the power supply is outside of the chassis doing so would expose a hazardous energy and poses a potential shock and fire hazard BlackDia
85. e end and precut wire on the other end that goes to the DC power source The connector end has a locking mechanism that locks onto the DC PSU to prevent accidental removal of the input DC cable If necessary use appropriate termination lugs for 14 AWG 1 3 mm copper stranded wire on the precut ends of the cable to connect to the DC power source The blue termination 48 V connects to a 15 A overcurrent protection circuit device and the brown return termination connects directly to the RTN bus of the DC power source The green yellow termination ground must connect to the same earth ground point as the switch Installing an Extreme Networks 325 W DC PSU B WARNING Make sure that the DC circuit is de energized before you connect the DC power cord to the 325 W DC PSU or disconnect the DC power cord from the 325 W DC PSU B WARNING Wiring the 325 W DC PSU DC power cord to your facility DC source voltage must be performed by a qualified licensed electrician After the DC power cord is connected to a permanent DC voltage source by a qualified licensed electrician you can remove replace and maintain the 325 W DC PSU without further electrician assistance However make sure that the DC circuit is de energized before connecting or disconnecting the DC power cord and socket on the Extreme Networks 325 W DC PSU PIS CAUTION The DC power cord must be properly connected to a DC main circuit breaker or fuse rated no greater than 15 A
86. e is at the top left corner On a BlackDiamond 12802 chassis the ground receptacle is at the top right corner 2 Unlock the module in one of the following ways e Ona module without red lines on the screwheads turn each captive screw counter clockwise Figure 67 Verify that the yellow band around the captive screw head of each injector ejector handle is completely visible Figure 67 This position ensures that the module is unlocked e Ona module with red lines on the screwheads turn each captive screw counter clockwise one quarter turn 90 degrees Figure 67 Verify that the red line on each captive screw is in a horizontal position Figure 68 This position ensures that the MSM or I O module is unlocked amp CAUTION Be sure to turn each captive screw only 90 degrees or one quarter turn counter clockwise Loosening the captive screws beyond 90 degrees will damage the injector ejector handles on the module Figure 67 Unlocking a Module 0090 EX_125a Figure 68 Indications that the Module is Unlocked Yellow Band on Captive Screw Head Handle J Release Latch EX_161 EX_173 BlackDiamond 12800 Series Switches Hardware Installation Guide 3 Squeeze the release latch on each injector ejector handle and rotate both handles outward to disconnect the module from the chassis backplane see Figure 68 amp CAUTION To prevent ESD damage hold the modul
87. e is required a gt NOTE A minimum of two Extreme Networks 325 W DC PSUs are required to run a BlackDiamond 12802 switch WARNING Do not put your hand into an open power supply bay when a power supply is not present Empty power supply bays require a cover plate at all times amp CAUTION Do not slam the Extreme Networks 325 W DC PSU into the system switch backplane PIS CAUTION To prevent an electrical hazard make sure before you install the PSU in the power supply bay that the DC power cord is not connected to the PSU BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 53 Installing the Extreme Networks 325 W DC PSU Sa Chassis ZO 6 lo Torino DC PSU_01A 4 To secure the 325 W DC PSU in the power supply bay align and tightening the two captive screws on the PSU front panel When you tighten the screws work from left to right see Figure 54 Figure 54 Securing the Extreme Networks 325 W DC PSU Torino DC PSU_02A 5 Verify that the DC input cord was connected to a permanent DC voltage source by a qualified licensed electrician Verify that the DC power is turned off at the source Plug the DC input cord into the DC input socket on the front of the 325 W DC PSU see Figure 55 Verify that the input connector latch locks onto the connector on the DC PSU The pins must align properly for the cable to connect Do not force the cable into th
88. e socket BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 55 Connecting the DC Power Cord Torino DC PSU_03A oO dd note Leave the ESD strap permanently connected to the switch so that it is always available when you need to handle ESD sensitive components Removing an Extreme Networks 325 W DC PSU PIS CAUTION An operating 325 W DC PSU may be hot to the touch Use thermal protective gloves when handling the 325 W DC PSU during removal amp CAUTION To disconnect system power disconnect ALL power supply units Disconnect the power cord before you remove the PSU from the chassis To remove an Extreme Networks 325 W DC PSU 1 Turn off the DC power at the source 2 Attach an ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the top right corner of the switch front panel 3 Press down the catch on the DC input connector and disconnect the DC power cord from the front of the PSU Loosen the captive retaining screws on the PSU front panel Use the handle to pull the PSU from the chassis oO eb NOTE Disconnection of the DC power cord from the DC source voltage must be performed by a qualified licensed electrician BlackDiamond 12800 Series Switches Hardware Installation Guide oO dd note Leave the ESD strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitiv
89. ecommended using OR the 325 W AC PSU in combination with the 325 W DC PSU Model 65022 325 W DC PSU BlackDiamond 12800 Series Switches Hardware Installation Guide Extreme Networks 1200 W DC PSU Figure 14 shows the Extreme Networks 1200 W DC UL listed accessory power supply unit Model 60021 PS 2350 This power supply is compatible with the BlackDiamond 12804 switch The power supply bay in the BlackDiamond 12804 switch can accommodate up to six hot swappable Extreme Networks 1200 W DC PSUs You cannot install a 1200 W DC PSU in the BlackDiamond 12802 switch Figure 14 1200 W DC PSU onm ft OFF 0 In an N N configuration each group of power supplies can provide A B feed redundancy for the system The input DC cable has an input connector on one end and precut wire on the other end that goes to the DC power source see Figure 15 The connector end has a locking mechanism that locks onto the DC PSU to prevent accidental removal of the input DC cable Figure 15 Input DC Power Cable for the 1200 W DC PSU Lock Return a Black Return 48Vdc Blue 48V Ground Green yellow Ground 10 ft gt gt EX_135 Airflow enters from the front vents on the 1200 W DC PSU and exits to the rear vents of the switch Airflow through the 1200 W DC PSU is independent of the airflow through the rest of the switch To use the 1200 W DC PSU you need a 48 V DC power sourc
90. eeeeeeneeees 54 selecting el Pes ite ren ee A are ae 55 Calculating Volt Amperage Requirements u2000220022nennnnennennnennnennnennnennnennnnnnn nennen 55 UPS Transition TIME essen aa dupes alias caves a a E rE altuna noses a DE 55 Applicable Industry Standards ccccccccccccceseceneceeeseeeseeeceeeeeeeee sees eeeeeeeee esse eeseeeseeesaeeeaeeeeeeegaeees 55 Chapter 5 Installing the BlackDiamond 12800 Series Chassis uunsunnnunnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 57 Unpacking the BlackDiamond 12804 ChassiS cccccccecceceeeececeeeeeeeeeseeeeeeeeeeeeseesseeeeeaeeeeeeeeeeas 58 Rack Mounting the BlackDiamond 12804 Chassis cccccccccceeecseceseeeeeeeeeeseesseeseeeeaeeeaeeeaeeeneeees 60 Pre installation REQUIFEMENHS cccccceeccc sees eeece sees eee eeeeeeeeeeeeee esse eeseeeseeesaeeeseeeaeeeseeesaeeeneeennes 61 ED BlackDiamond 12800 Series Switches Hardware Installation Guide Attaching the BlackDiamond 12804 Mid Mount Brackets ccccccecceceseeeeeeeeeeeeeeceeeseeeeeaeees 61 Rack Mounting the BlackDiamond 12804 Chassis c cccccsccceeceececeseceeeceeceaeeeseeeaeeeeeeeseeesnees 62 Unpacking the BlackDiamond 12802 ChasSiS ccccccccseceseeceeeceeeeee cece eeseeeceeesseceseeeseseeseeseeesgeeegs 64 Rack Mounting the BlackDiamond 12802 Chassis cccccsccecseeceeeeeeeeeeeeeaeeeeaaeeeeseeeesaeeeeaaeeeeaaes 66 Required Tools and Equipment anna nalen aan 66 Front Mounti
91. electrical codes 42 electrostatic discharge See ESD environmental requirements airflow 44 building codes 42 electrical codes 42 humidity 44 switch spacing 44 temperature 43 wiring closet 43 equipment rack grounding 46 mechanical recommendations 46 mounting holes 46 securing 47 service access 47 space requirements 47 ESD discharge from cable 49 system protection 45 ESD preventive wrist strap 45 external compact flash slot 23 external memory card installing 111 uses of 16 F fan tray BlackDiamond 12802 switch installing 123 removing 122 BlackDiamond 12804 switch installing 121 removing 120 fiber optic cable bend radius 50 care 50 connections making 105 first switch login 71 full duplex operation 15 fuse 325 W AC power supply 38 325 W DC power supply 36 700 1200 W AC power supply 33 G GM 20T module 25 GM 20XT module 25 GM 20XTR module 25 26 grounding chassis 68 racks 46 requirements 55 wiring closet 43 grounding terminals location 46 H heating chassis to chassis 44 helper bracket for BlackDiamond 12804 switch 62 high line power 34 BlackDiamond 12800 Series Switches Hardware Installation Guide hot swapping modules 107 humidity 44 1 0 modules GM 20T module 25 GM 20XT module 25 GM 20XTR module 26 hot swapping 107 LEDs 24 removing 107 verifying installation 106 XM 2HR module 28 XM 2X module 26 XM 2XR module 26 O p
92. ence 53 U unshielded twisted pair See UTP UPS uninterruptible power supply 54 UTP cable bend radius 49 category 5 49 discharge ESD 49 RF interference 53 W wiring closet airflow requirements 44 electrostatic discharge 45 floor coverings 43 grounding 43 humidity 44 rack securing 47 temperature 43 wiring terminals 46 X XM 2HR module 28 XM 2X module 26 XM 2XR module 26 BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12800 Series Switches Hardware Installation Guide
93. equipment should be performed by trained and qualified service personnel only Before installing or removing any components of the system or before carrying out any maintenance procedures you must thoroughly read the safety information provided in Appendix A of this guide Failure to follow this safety information can lead to personal injury or damage to the equipment Introduction This guide provides the required information to install Extreme Networks BlackDiamond 12800 series switches This guide also contains information about site preparation switch functionality and switch operation This guide is intended for use by network administrators responsible for installing and setting up network equipment It assumes a basic working knowledge of e Local area networks LANs Ethernet concepts Ethernet switching and bridging concepts Routing concepts Simple Network Management Protocol SNMP See the ExtremeXOS 12 0 Concepts Guide and the ExtremeXOS 12 0 Command Reference Guide for information about configuring Extreme Networks BlackDiamond 12800 series switches oO eb NOTE If the information in the installation note or release note shipped with your Extreme Networks switch differs from the information in this guide follow the installation or release note Conventions Table 1 and Table 2 list conventions used throughout this guide BlackDiamond 12800 Series Switches Hardware Installation Guide Table 1 Notice icons
94. ertificate per IEC 60950 1 2001 Country Deviations AS NZX 60950 1 Australia New Zealand BlackDiamond 12800 Series Switches Hardware Installation Guide Table 24 BlackDiamond 12804 Switch Technical Specifications Continued EMI EMC Standards North America EMC for ITE European EMC standards International EMC certifications Country specific Telecom Standards IEEE 802 3 Media Access Standards Note These standards are module specific and may not apply to every module in the series Environmental Standards Environmental Operating conditions FCC CFR 47 part 15 Class A USA ICES 003 Class A Canada EN 55022 1998 Class A EN 55024 1998 Class A includes IEC 61000 4 2 3 4 5 6 8 11 EN 61000 3 2 3 Harmonics amp Flicker ETSI EN 300 386 2001 EMC Telecommunications 89 336 EEC EMC Directive CISPR 22 1997 Class A International Emissions CISPR 24 1997 Class A International Immunity IEC EN 61000 4 2 Electrostatic Discharge 8kV Contact 15kV Air Criteria A IEC EN 61000 4 3 Radiated Immunity 10V m Criteria A IEC EN 61000 4 4 Transient Burst 1kV Criteria A IEC EN 61000 4 5 Surge 2kV 4kV Criteria A IEC EN 61000 4 6 Conducted Immunity 0 15 80MHz 10V m unmod RMS Criteria A IEC EN 61000 4 11 Power Dips amp Interruptions gt 30 25 periods Criteria C VCCI Class A Japan Emissions AS NZS 3548 ACA Australia Emissions CNS 13438 1997 Class A BSMI Taiwan MIC Mark EMC Approval North
95. ese batteries is attempted the following guidelines must be followed to avoid danger of explosion 1 Replace with same or equivalent battery type as recommended by the battery manufacturer 2 Dispose of battery in accordance with the battery manufacturer s recommendation Fiber Optic Ports Optical Safety The following safety warnings apply to all optical devices used in Extreme Networks equipment that are removable or directly installed in an I O module or chassis system Such devices include but are not limited to gigabit interface converters GBICs small form factor pluggable SFP modules or mini GBICs XENPAK transceivers and XFP laser optic modules u WARNING Laser optic modules become very hot after prolonged use Take care when removing a laser optic module from the chassis or option card If the laser optic module is too hot to touch disengage the laser optic module and allow it to cool before removing it completely BlackDiamond 12800 Series Switches Hardware Installation Guide 9 WARNING When working with laser optic modules always take the following precautions to avoid exposure to hazardous radiation e Never look at the transmit LED laser through a magnifying device while it is powered on e Never look directly at a fiber port on the switch or at the ends of a fiber cable when they are powered on e Invisible laser radiation can occur when the connectors are open Avoid direct eye exposure to the beam
96. eseeeseeseeeeeeaeeseeeeeeeeeaeeaueseeeeegs 47 Securing the RACK asincrona onair n a aE E aan daran ae nenne 47 Evaluating and Meeting Cable Requirements cccceceeeceeneeee eee eeeeeeeae esse esse eeseeesaeeeaeeeaeesaeeeaeeses 48 Cabling Standards s 6 cas 222er einander 48 Cable Labeling and Record Keeping ccccccccccescccecesececeeeee cess eeeeeeeeeeseeeeeeeeseeeseeesaeeaaeeeaeeenees 48 Installing Cables es 2a a sete E a Rn Baer E EEE D ETE Srania Sa 49 Fiber Optic Cable SOREPEFEEREFEERHERNEEEEFFHREFERHHEHEEPEFEEHEPERGEERFENBEEEEREREHEREEEERHEDEREEFHEHNEEEEHELREEEEEERIERERRE 50 Cable ISAM COS es ccc innattas eases E T E iy EEE Her eh Herr auneaiuunessanectabisiedets A E E 51 RJ 45 Connector Jackets is cosas vdensecettathvensoncevancigeas hen een nn nen nee he een vedere cna 52 Radio Frequency Interference ccccccccceececceeceeee ioiii arrr Erani iani ENTERT EEEn SEPELA RENEE 53 Meeting Power Requirements cccccccceceneee nsec nee eee cece eee ae eee ecaeeeaeeeaeesaaesaa essa essa seca esaeeaaeeeaeeeaes 53 Power Supply Requirements ccccccccececeecceeececeseeeseeece cess sees cess esse esse eeseeesseeeeeeeaeeeeeeeneeeaneees 53 AC Power Cable RequireMents ccccccccesccceeceeeeseeeseeeeeeeee sees eeeee esse cess eeseeeseeesaeeeseeeneeeaeeeeaess 54 Replacing the Power Cable ics 2 nie asien 54 Uninterruptible Power Supply Requirements cccccccecccseecseceeecee cece eeseeeseeeseeeeaeees
97. f the BlackDiamond 12800 Series Switches The BlackDiamond switches are chassis based Ethernet service core switches designed for core applications For more information about configuring a BlackDiamond switch see the ExtremeXOS 12 0 Concepts Guide and the ExtremeXOS 12 0 Command Reference Guide The features of these switches include e I O modules that are hot swappable and include Gigabit Ethernet copper ports 10 100 1000 and Gigabit Ethernet fiber ports SFP or 10 Gigabit Ethernet ports e Management Switch Fabric Modules MSMs that provide the active switching fabric and CPU control subsystem Redundant load sharing hot swappable power supplies Field replaceable hot swappable fan trays Auto negotiation for half duplex or full duplex operation on 10 100 1000 Mbps ports Load sharing on multiple ports The BlackDiamond 12800 series switches include two chassis models e BlackDiamond 12804 switch chassis see page 16 e BlackDiamond 12802 chassis see page 18 Full Duplex Support Extreme Networks switches provide full duplex support for all ports Full duplex support means that frames can be transmitted and received simultaneously which in effect doubles the bandwidth available on a link Most ports on an Extreme Networks switch will auto negotiate duplex in the default configuration Gigabit Ethernet fiber ports and 10 Gigabit Ethernet ports operate only in full duplex mode in accordance with technical standards BlackDiamo
98. geschlossen werden Extreme Networks 325 W AC Netzteile haben keinen An Aus Schalter Die Stromzufuhr zu einem Extreme Networks 325 W AC Netzteil wird durch das Ziehen des Netzkabels unterbrochen Es ist sicherzustellen das diese Verbindung leicht zug nglich ist Das Netzteil nicht ausserhalb von dem Geh use an das Netz anschliessen da hierdurch gef hrliche Spannungen zug nglich werden sowie die Gefahr von einem elektrischem Schlag und oder Feuergefahr besteht Nicht die Hand in den Netzteilschacht einf hren wenn das Netzteil entfernt ist Leere Netzteilsch chte m ssen immer mit eine Abdeckplatte bedeckt sein Wartungssicherheit Folgende Vorsichtsma nahmen m ssen getroffen werden e Nur f r den Einsatz mit diesem System zugelassene Originalzubeh rteile bzw komponenten verwenden Die Nichtbeachtung dieser Anweisungen kann zu Sch den an der Ausr stung oder sogar zu einem Versto gegen die erforderlichen Sicherheitsbestimmungen und EMV Vorschriften f hren e Die Abdeckung der Grundplatte darf nur durch Personal von Extreme Networks entfernt werden Das System enth lt keine vom Kunden zu wartenden Komponenten Reparaturen am System sind von einem Werkstechniker von Extreme Networks durchzuf hren e Der An Aus Schalter des Systems darf nicht die gesamte Stromversorgung zum System unterbrechen Zur Unterbrechung der Wechselstromversorgung zum System m ssen alle Stromkabel aus den Wandsteckdosen gezogen werden Das Stromkabel
99. gnizes the MSM type installed in your BlackDiamond 12800 series switch and only allows use of compatible I O modules from the same series An error message is displayed if you attempt to mix modules BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12800 Series MSMs The BlackDiamond 12800 series MSMs are the MSM 5 module MSM 5R module and MSM 6R module These MSMs provide the active switching fabric and CPU control subsystem for the switch The BlackDiamond 12802 chassis has one dedicated MSM slot the BlackDiamond 12804 chassis has two dedicated MSM slots One MSM is required for switch operation however adding a second MSM to a BlackDiamond 12804 chassis increases system availability through redundancy Each MSM provides 192 Gbps of switching throughput through three ASICs Each module also contains a temperature sensor nonvolatile random access memory NVRAM and a real time clock The MSM 5 and the MSM 5R and MSM 6R modules support different sizes of Ternary Content Addressable Memory TCAM The MSM 5R and MSM 6R modules have more memory available for routing tables learned MAC addresses and access control lists ACLs For specific details about memory allocation refer to the data sheet for each module amp CAUTION You must use compatible MSMs and I O modules from a single BlackDiamond 12800 module series Do not attempt to mix MSMs from the two different series The ExtremeXOS software recognizes th
100. ground the chassis 1 Locate the grounding point on the back of the chassis Figure 38 and figure Figure 38 Back of BlackDiamond 12804 Chassis TI o o o o o o o IN oO oO o oO o fe a oO o EJ PSU fan controllers o 0 O oO Grounding point 0 o oO o o oO oO o 0 oO oO fo fo o EX_128A Figure 39 Back of BlackDiamond 12802 Chassis PSU fan controller Fan tray module O Oss e 0141 1 Grounding by e B point Jo oO Oje O Power supplies BD_142A 2 Strip 0 5 inch 1 2 cm of insulation from the stranded copper wire cable 3 Insert the stripped wire into the cable lug amp CAUTION Be sure that no copper is visible between the lug and the cable insulation 4 Crimp the lug onto the cable according to the manufacturer s specifications 5 Insert the screws through the lug and into the grounding point on the back of the chassis 6 Connect the other end of the wire to a known reliable earth ground point at your site BlackDiamond 12800 Series Switches Hardware Installation Guide Initial Management Access After your switch has completed all power on self tests it is operational You can log in and configure an IP address for the default VLAN named default
101. h use thermal protective gloves when handling the 700 1200 W AC PSU during removal To remove an Extreme Networks 700 1200 W AC PSU 1 Attach an ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle that is located on the top left corner of the switch front panel if not already attached 2 For the AC power cord a If you are going to use the same AC power cord for the new unit you do not need to touch the power cord at all b If you are going to use a new AC power cord remove the power cord retaining bracket See Using the BlackDiamond12804 AC Power Cord Retainer Channel on page 85 for information on removing the power cord retaining bracket and re installing it Connect the AC power cord to the AC input on the front of the switch and to the wall outlet on the other end Then re install the power cord retaining bracket 3 Lift the handle up on the Extreme Networks 700 1200 W AC PSU 4 Pull on the handle of the Extreme Networks 700 1200 W AC PSU to remove it from the power supply bay 5 Place both hands underneath the Extreme Networks 700 1200 W AC PSU to support the weight after it is pulled out from the switch oO dd note Leave the ESD strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components BlackDiamond 12800 Series Switches Hardware Installation Guide Front Panel LEDs The front panel of the Extre
102. hannel is provided with the BlackDiamond 12804 switch Pre Installation Requirements Connect all AC power cords before you install the power cord retainer channel You need the following tools and equipment to install or remove the BlackDiamond 12804 AC power cord retainer channel e ESD preventive wrist strap e 2 Phillips screwdriver Installing the BlackDiamond 12804 AC Power Cord Retainer Channel To install the BlackDiamond 12804 AC power cord retainer channel 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the switch front panel 2 Starting at the left insert the plug of each AC power cord into the power connectors on the switch and lift each installed power cord over the previous plug see Figure 47 Verify that all installed AC power cords are firmly plugged into the power connectors BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 47 Installing and Routing the AC Power Cords Starting at the left insert each plug and lift power cord over previous plug EX_138 3 Hold the AC power cord retainer channel in the position shown in Figure 48 Figure 48 BlackDiamond 12804 AC Power Cord Retainer Captive screw Captive screw EX_141 4 Place the retainer channel against the switch as shown in Figure 49 Tighten the captive screw at each end of the channel BlackDiamond 12800 Series Switches Hardware Installation Guide
103. he chassis in a rack e 8rack system mounting screws The screw size will vary based on your organization s rack system screws are not provided e Screwdriver appropriate for the selected rack mounting screws Front Mounting a BlackDiamond 12802 Chassis To front mount the BlackDiamond 12802 chassis in a rack 1 Place each mounting bracket against the switch chassis with the mounting flange at the front edge of the chassis Figure 34 2 Insert and tighten the provided flat head screws to secure the brackets to the chassis Figure 34 Mounting Flanges at the Front Bracket Bracket BD_147 3 Slide the chassis into the system rack BlackDiamond 12800 Series Switches Hardware Installation Guide 4 Attach the chassis to the system rack using eight rack system mounting screws screws not provided Refer to Figure 35 for the screw locations Figure 35 Securing the BlackDiamond 12802 Chassis to the Rack Front mount Position LEE 3 g Me re o A GA D bm s oe g BD_151 Mid Mounting a BlackDiamond 12802 Chassis To mid mount the BlackDiamond 12802 chassis in a rack 1 Place each mounting bracket against the switch chassis with the mounting flange at the middle of the chassis side Figure 36 Figure 36 Mounting Flanges at the Middle Bracket
104. htung dieser Sicherheitshinweise kann zu Verletzungen oder Sch den an der Ausr stung f hren Installation Wartung und Ausbau eines Switch einer Grundplatte oder einer seiner Komponenten d rfen nur von geschultem und qualifiziertem Servicepersonal durchgef hrt werden Geschulte und qualifizierte Servicetechniker verf gen ber die erforderliche technische Ausbildung und Erfahrung um m gliche Gefahren bei der Durchf hrung von Servicearbeiten zu erkennen und Ma nahmen zur Minimierung der Gefahr f r sich bzw andere zu treffen Hinweise zur Installation 9 WARNUNG Beachten Sie vor der Installation der Ausr stung folgende Punkte Stellen Sie sicher dass die nachfolgend aufgef hrten Bedingungen erf llt sind e Das System ist f r den Einsatz in einer typischen Umgebung gem Telco Vorgaben vorgesehen W hlen Sie einen Aufstellort mit den folgenden Eigenschaften m Innenbereich mit Temperatur und Feuchtigkeitsregelung wobei die maximale Raumtemperatur 40 C 104 F nicht berschreiten darf Sauber und frei von elektrisch aufladbaren Teilchen in der Luft Ausreichende Bel ftung und Abstand zu W rmequellen einschlie lich direktem Sonnenlicht m Ausreichender Abstand zu Quellen die Ersch tterungen oder Schl ge St e hervorrufen k nnen m Isolierung von starken elektromagnetischen Feldern wie sie durch Elektroger te erzeugt werden m Sicherer abgeschlossener Arbeitsbereich mit beschr nktem Zugang sodass
105. iamond 12802 switch Power off the BlackDiamond 12802 switch before you begin to replace the PSU fan controller To replace a BlackDiamond PSU fan controller you need the following tools and equipment e ESD preventive wrist strap e 2 Phillips screwdriver e Replacement BlackDiamond 12802 PSU fan controller Removing a BlackDiamond 12802 PSU Fan Controller To remove a BlackDiamond 12802 PSU fan controller 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the front top right corner of the switch 2 Power off the switch 3 Using a 2 Phillips screwdriver loosen the captive retaining screws until they are free of the switch back panel 4 Use the handle to pull the controller out of the BlackDiamond 12802 chassis Figure 74 Set the controller on an ESD preventive surface Figure 75 Removing a BlackDiamond 12802 PSU Fan Controller PSU fan controller module BD_144 BlackDiamond 12800 Series Switches Hardware Installation Guide Installing the Replacement PSU Fan Controller To install the replacement controller 1 Remove the replacement PSU fan controller from its antistatic packaging 2 Insert the replacement controller into the controller slot on the BlackDiamond 12802 chassis Figure 76 3 Align and tighten the captive retaining screws Figure 76 Installing a PSU Fan Controller PSU fan controller module BD_148 4 Power on the switch Leave
106. icks into place oO dd note The DC PSU does not energize until the locking handle latches amp CAUTION Use caution when routing the cable harnesses to minimize stress on the cables It is recommended that the left most cable harness be routed across the switch and exit out the right side of the grate The right most cable harness should be routed across the switch and exit out the left side of the grate It is important to route each of the outer most cables out the opposite side of installation to maximize the bend radius and to avoid stress on the cables The four middle cables can route in either direction 7 Energize the DC circuit for the 1200 W DC PSU To install additional 1200 W DC PSUs repeat steps 2 through 6 oO eb NOTE Leave the ESD strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components BlackDiamond 12800 Series Switches Hardware Installation Guide Removing an Extreme Networks 1200 W DC PSU amp CAUTION The DC PSU may be hot to the touch use thermal protective gloves when handling the 1200 W DC PSU during removal To remove an Extreme Networks 1200 W DC PSU 1 Attach an ESD preventive wrist strap to your bare wrist and connect the metal end to the ground receptacle on the top left corner of the switch front panel if not already attached 2 De energize the DC circuit for the 1200 W DC PSU that will be removed Pres
107. il it clicks into place 5 Connect the AC power supply cord a Ifyou are just replacing a power supply you do not need to unplug the AC power cord BlackDiamond 12800 Series Switches Hardware Installation Guide b If you are installing a new power supply into a previously unused slot on a switch with a retaining bracket remove the power cord retaining bracket See Using the BlackDiamond12804 AC Power Cord Retainer Channel on page 85 for information on removing the power cord retaining bracket and re installing it Connect the AC power cord to the AC input on the front of the switch and to the wall outlet on the other end Then re install the power cord retaining bracket c If you are installing the power supply on a switch that does not have a power cord retaining bracket connect the AC power cord to the AC input on the front of the switch and to the wall outlet on the other end Then install the power cord retaining bracket See Using the BlackDiamond12804 AC Power Cord Retainer Channel on page 85 for information on removing the power cord retaining bracket and re installing it oO eb NOTE Leave the ESD strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components To install additional Extreme Networks 700 1200 W AC PSUs repeat steps 1 through 5 Removing an Extreme Networks 700 1200 W AC PSU PIS CAUTION The AC PSU may be hot to the touc
108. ilding installations that is cable runs between devices must be in the same building as the connected units This equipment can be connected between buildings if any one of the following conditions is true e Cable runs between buildings are less than 140 feet long e Cable runs between buildings are directly buried e Cable runs between buildings are in an underground conduit where a continuous metallic cable shield or a continuous metallic conduit containing the cable is bonded to each building grounding electrode system amp CAUTION Failure follow these requirements for cable routing conditions may expose the user to electrical shock and expose the unit to errors or damage PoE Devices When connecting power over Ethernet PoE devices to a PoE switch all connections between the PoE device and the switch must remain inside the same building and use a low voltage power distribution system per IEEE 802 3af Selecting Power Supply Cords Extreme Networks provides power input cords shipped in the product box for use in the US and Canada Power supply cords for use outside of the United States and Canada are typically provided separately by third party distribution centers Contact the Extreme Networks TAC for questions regarding the proper selection of a power input cord for your specific switch The following are power cord requirements for use on Extreme switches Black Diamond SSI AC PSU Model 60020 e Wire 16 AWG 1 31 mm
109. ion Guide For power specifications of the BlackDiamond 12800 series switches see Appendix B Technical Specifications AC Power Cable Requirements Use an AC power cable appropriate for your country Check your local electrical codes and regulatory agencies for power cable requirements The countries listed in Table 15 have additional requirements as listed in the table Table 15 AC Power Cable Requirements Country Requirements USA and Canada e The cable set must be UL approved and CSA certified e The minimum specification for the flexible cable is No 18 AWG 1 5 mm2 Type SVT or SJT 3 conductor e The cable set must have a rated current capacity of at least the amount rated for each specific product e The attachment plug must be either an Earth grounding type with a NEMA 5 15P 10 A 110 V configuration or a NEMA L6 15P 10 A 208 240 V Denmark The supply plug must comply with section 107 2 D1 standard DK2 1a or DK2 5a Switzerland The supply plug must comply with SEV ASE 1011 Argentina The supply plug must comply with Argentinian standards oO dd note When using dual power supplies make sure that each AC power supply attaches to an independent power source Replacing the Power Cable If the power cable plug is unsuitable and must be replaced connect the power supply wires for the switch according to the following scheme e Brown wire to the Live Line plug terminal which may be marked with the lette
110. ipment rooms equipment closets or the like in accordance with Articles 110 16 110 17 and 110 18 of the National Electric Code ANSI NFPA 70 All wiring methods involving the DC input cable assembly must be performed according to the relevant articles of the National Electrical Code WARNING Field operators must not attempt to open the PSU enclosure for any reason the PSU does not contain user serviceable parts In the event of failure return the defective PSU to Extreme Networks for repair or replacement Overview of BlackDiamond 12800 Series Power Supplies The BlackDiamond 12800 series switches can be powered by either AC or DC power supplies PSUs Power supplies in the BlackDiamond 12800 series switches are fully fault tolerant and load sharing in an N 1 configuration After the system is properly configured if one PSU fails the others will provide sufficient power to operate a fully loaded switch The BlackDiamond power supply units are intended for use in specific BlackDiamond switches only Table 9 lists the power supplies for use in the BlackDiamond 12800 series switches Table 9 PSUs for the BlackDiamond 12800 Series Switches BlackDiamond Switch Compatible PSU Compatibility Notes BlackDiamond 12804 700W 1200W AC PSU Extreme Networks does not recommended using OR the 700 1200 W AC PSU in combination with a 1200W DC PSU 1200W DC PSU BlackDiamond 12802 325 W AC PSU Model 65021 Extreme Networks does not r
111. ive wrist strap to your wrist and connect the metal end to the ground receptacle on the front top left corner of the switch Align the guide pins in the empty controller recess with the holes on the replacement PSU fan controller Push the replacement BlackDiamond 12804 PSU fan controller into the empty controller recess until the four captive screws on the replacement controller are in alignment Using a 1 Phillips screwdriver tighten all four captive screws on the replacement controller Align the guide pins on the access cover with the holes at the edges of the controller recess Push the access cover over the controller recess until the eight captive screws on the access cover are in alignment Using a 2 Phillips screwdriver tighten all eight captive screws on the access cover Leave the ESD preventive wrist strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components BlackDiamond 12800 Series Switches Hardware Installation Guide Replacing a BlackDiamond 12802 PSU Fan Controller The BlackDiamond 12802 switch has one PSU fan controller accessible from the back of the switch Removing the PSU fan controller causes the switch to stop operation until the controller is replaced Be sure to have the replacement controller available before you start the replacement process Pre installation Requirements Make sure that you have access to the back of the BlackD
112. junction with a 1200W DC PSU 1200W DC PSU BlackDiamond 12802 325 W AC PSU Model Extreme Networks does not recommended using the 65021 325 W AC PSU in conjunction with the 325 W DC PSU OR 325 W DC PSU Model 65022 Extreme Networks 1200 W DC PSU The Extreme Networks 1200 W DC UL listed accessory power supply unit Model 60021 PS 2350 is compatible with the BlackDiamond 12804 switch The power supply bay in the BlackDiamond 12804 switch can accommodate up to six hot swappable Extreme Networks 1200 W DC PSUs You cannot install the 1200W DC PSU in a BlackDiamond 12802 switch oO dd note Extreme Networks does not recommended installing the 1200 W DC PSU with any Extreme Networks AC PSU in the same BlackDiamond 12804 system Extreme Networks recommends that DC and AC PSU units not be used together in the same BlackDiamond switch oO dd NOTE For central DC power connections the 1200 W DC PSU is intended to be installed only in restricted access locations dedicated equipment rooms equipment closets or the like in accordance with Articles 110 16 110 17 and 110 18 of the National Electric Code ANSI NFPA 70 PIS CAUTION Building codes vary worldwide therefore Extreme Networks strongly recommends that you consult an electrical contractor to ensure proper equipment grounding and power distribution for your specific installation Lad WARNING Field operators must not attempt to open the 1200 W DC PSU enclosure for any reas
113. kDiamond switch or to the console port on the Summit switch At your terminal press Return one or more times until you see the login prompt At the login prompt enter the default user name admin to log on with administrator privileges For example login admin Administrator capabilities allow you to access all switch functions The system will ask a series of questions about the default management settings which allow all forms of management access for convenience in setting the initial configuration Answer each question based on the level of security needed for the particular management access type dd note For more information about logging in to the switch and configuring switch management access see the ExtremeXOS 12 0 Concepts Guide At the password prompt press Return The default user name admin has no password assigned to it When you have successfully logged on to the system the command line prompt displays the system name for example BlackDiamond12804 gt in its prompt oO dd note For more information about how to assign a specific system name see the ExtremeXOS 12 0 Concepts Guide Assign an IP address and subnetwork mask for VLAN default by typing configure vlan default ipaddress 123 45 67 8 255 255 255 0 Your changes take effect immediately Save your configuration changes so that they will be in effect after the next system reboot by typing save The configuration is saved to the configura
114. kDiamond 12800 series I O modules Table 6 BlackDiamond 12800 Series Switch I O Module LEDs LED Color Meaning Status Green blinking Normal operation Amber blinking Configuration error hardware failure diagnostic failure or other severe module error Off No power DIAG Off Normal operation Amber blinking Amber Diagnostics in progress Diagnostic failure Port LEDs on 1 0 Modules Table 7 describes the LED activity for each port on the GM 20XT GM 20XTR XM 2X XM 2XR and XM 2HR I O modules Table 7 Port LEDs for the BlackDiamond GM 20XT GM 20XTR XM 2X XM 2XR and XM 2HR 1 0 Modules Meaning Port Solid green Slow green blinking Amber blinking Off Link up Activity Link down Port disabled Table 8 describes the LED activity for each port on the BlackDiamond GM 20T I O module Table 8 Port LEDs for the BlackDiamond GM 20T Module LED Port with power enabled Color Solid amber Slow amber blinking Amber blinking Slow amber blinking Blinking amber green Meaning Link up Port disabled Activity Link down Power fault or insufficient power Port with power disabled Solid green Slow green blinking Green blinking Off Blinking amber green Link up Port disabled Activity Link down Power fault or insufficient power BlackDiamond 12800 Series Switches Hardware Installation Guide GM 20T 1 0 Module Figure 8 shows the GM 20T I O module Figure 8 G
115. lastschutz ausgestattet sein e Einen Spannungssto unterdr cker einen Netzfilter oder eine unterbrechungsfreie Stromversorgung verwenden um das System vor einer vor bergehenden Zu oder Abnahme der elektrischen Leistung zu sch tzen e Bei laufendem Betrieb austauschbare Netzteile Das Netzteil vorsichtig nicht mit Kraft in das Aufnahmefach einsetzen e Bei Einsatz mehrer Netzteile in einem Switch sind die Netzteile jeweils an unterschiedliche unabh ngige Stromquellen anzuschlie en Auf diese Weise ist bei einem Ausfall einer einzelnen Stromquelle nur das daran angeschlossene Netzteil betroffen Wenn alle Netzteile eines einzelnen Switch an dieselbe Stromquelle angeschlossen sind ist der gesamte Switch f r einen Ausfall der Stromversorgung anf llig Leistungsspezifikationen f r Netzteile von Extreme Networks finden sich in Anhang B dieses Dokuments oder im Netzteil Datenblatt unter http www extremenetworks com 9 WARNUNG Die 325 W DC Netzteile von Extreme Networks sind nicht mit Ein Ausschaltern ausgestattet Vor dem Einstecken des Gleichstromkabels in den Gleichstromanschluss des 325 W DC Netzteils von Extreme Networks sowie vor dem Abziehen des Kabels sicherstellen dass der Gleichstromkreis abgeschaltet ist BlackDiamond 12800 Series Switches Hardware Installation Guide Das Gleichstromkabel des 325 W DC Netzteils muss von einem qualifizierten zugelassenen Elektriker an die Gleichspannungsquelle in Ihrem Geb ude an
116. m vibration 5 to 20 Hz 1 0 ASD w 3dB oct from 20 to 200 Hz Packaged sinusoidal vibration 5 to 62 Hz 5 mm s velocity 62 to 200 Hz 0 2G Tilt 22 5 degrees and return to position 14 drops minimum on sides amp corners 39 4 lt 20 Ib 9 kg modules 19 7 lt 80 Ib 36 kg chassis Power Supplies for the BlackDiamond 12800 Series Switches This section lists specifications for the power supplies that are installed in the following BlackDiamond switches e BlackDiamond 12804 switch e BlackDiamond 12802 switch Table 26 AC SSI PS Model 60020 PS2336 700 1200 W AC PSU For the BlackDiamond 12804 switch Typical configuration 3 power supplies Full configuration 6 power supplies Input Nominal input 100 to 240 V 60 50 Hz 10 A max AC voltage input range 90 to 264 V Maximum input amperages 7 A 200 V high line 10 A 90 V low line AC line frequency 47 to 63 Hz PS input socket IEC 320 C14 Minimum wire size 16 AWG 1 31mm copper stranded Output DC output 48 V 24 A 12 V 4 A high line 48 V 13 5 A 12 V 4 A low line DC output power W 700 to 1200 W Power supply cord selection Refer to Selecting Power Supply Cords on page 136 AC power supply input socket IEC 320 C14 Minimum wire size 16 AWG 1 0mm2 copper stranded pre approved cord set for county of use Operating conditions Operating temperature O C to 40 C Storage temperature 40 C to 70 C Operating humidity 10 to 90
117. me Networks 700 1200 W AC PSU provides status LEDs Table 18 describes the LED behavior on the front panel Table 18 Extreme Networks 700 1200 W AC PSU LEDs A A Power Predictive Fail Fail PSU Condition Green Amber Amber Power supply AC outputs working normally On Off Off AC input power present standby output on Blinking Off Off Current limit on 48 VDC output On Off Blinking Predictive failure On Blinking Off No input power to this PSU only Off Off On No input power to any PSU Off Off Off Power supply failure Off Off On Power Supply Cords Extreme Networks 700 1200 W AC PSU s come with both 110 V AC and 220 V AC power supply cords The 110 V AC power supply cord allows for a maximum DC output power of 700 W The 220V AC power supply cord allows for a maximum DC output power of 1200 W amp CAUTION All power supply cords provided by Extreme Networks are designed for use in North America only Power supply cords for use outside of North America are typically provided by a third party distribution center and must meet the following requirements Power supply cords must be agency certified for country of use Power supply cords must contain an IEC 320 C13 connector on the end of the PSU Power supply cords must contain an appropriately rated and approved wall plug applicable to the country of installation e Power supply cords must be less than 5 m long e Wire size must be a minimum of 16 AWG 1 0 mm copper stranded
118. mond 12800 Series Switches Hardware Installation Guide Do not put your hand into an open power supply bay when a power supply is not present Empty power supply bays require a cover plate at all times You need the following tools and equipment to install or remove an Extreme Networks 325 W AC PSU e ESD preventive wrist strap e Power supply cord 110 V AC 220 V AC or applicable to country of use e 2 Phillips screwdriver e Thermal protective gloves required for removal dd NOTE A minimum of two Extreme Networks 325 W AC PSU are required to run a BlackDiamond 12802 switch Installing an Extreme Networks 325 W AC PSU PIS CAUTION Make sure that the Extreme Networks 325 W AC PSU circuit is not overloaded Use proper over current protection such as a circuit breaker to prevent over current conditions To install an Extreme Networks 325 W AC PSU 1 Attach an ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the top right corner of the switch front panel 2 Make sure that the Extreme Networks 325 W AC PSU is right side up see Figure 56 Figure 56 Extreme Networks 325 W AC PSU 325W AC PSU Torino AC PSU_04 3 Carefully slide the Extreme Networks 325 W AC PSU all the way into an open power supply bay see Figure 57 until you hear a click Extreme Networks recommends that you populate the two left power supply bays before the two right power supply bays Refer
119. move the module from the antistatic packaging as follows 2 Place the antistatic bag containing the module on a flat ESD surface that is clear of any debris b Break the quality seal the ESD warning seal and the Read Installation Note seal c Open the antistatic bag and firmly grasp the rail of the module d Pull the antistatic bag off while holding the rail of the module amp CAUTION To prevent ESD damage hold the module by the metal rail and front panel only Never touch the components on the PCB or pins on any of the connectors 5 Verify that the module injector ejector handles are open Figure 63 Figure 63 Injector Ejector Handles in an Open Position es eel oO AUT hh a a a a a a I ee ee a A A Serer NY Be non on nm 55 onan oan an en no non on om om oo eo ne on on oe on no om N v4 B 4 e EX 123 6 Keep the injector ejector handles in the open position as you slide the module into the chassis slot PIS CAUTION Do not slide the module into the open chassis slot if the injector ejector handles are in the latched position 7 Use both hands to latch the injector ejector handles by simultaneously pushing both handles toward the center of the module as shown in Figure 64 BlackDiamond 128
120. n in Figure 20 BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 20 Airflow Through the BlackDiamond 12804 Chassis Airflow at power supply level Electrostatic Discharge Your system must be protected from static electricity or electrostatic discharge ESD Take the fan tray following measures to ensure optimum system performance e Remove materials that can cause electrostatic generation such as synthetic resins from the wiring closet Check the appropriateness of floor mats and flooring Connect metal chassis conduit and other metals to ground using dedicated grounding lines Use electrostatically safe equipment and the ESD preventive wrist strap that is provided with your equipment All switches come with ESD preventive wrist strap connectors and an ESD preventive wrist strap as shown in Figure 21 Figure 21 Using an ESD Preventive Wrist Strap ESD wrist strap connector ESD strap Airflow through ASP051
121. nd 12800 Series Switches Hardware Installation Guide Management Ports Each BlackDiamond series Management Switch Fabric Module MSM has a 10 100BASE TX Ethernet management port This port allows you to communicate directly with the central processing unit CPU of the switch You can plug an Ethernet cable directly from your laptop into the management port for direct access into the switch This access allows you to view and locally manage the switch configurations External Compact Flash Memory Card All MSMs in the BlackDiamond family include a compact flash slot next to the console port on the MSM This slot accepts a compact flash memory card which can be used to download a new version of ExtremeXOS and for other functions including capturing debug information and core dump files See the ExtremeXOS 12 0 Concepts Guide for more information regarding the use of the external compact flash memory card The external compact flash slot supports third party compact flash cards dd note You must use an industrial grade compact flash card in the external compact flash slot of the MSM BlackDiamond 12804 Switch Chassis The BlackDiamond 12804 chassis consists of the following components One 6 slot chassis with backplane Four dedicated I O module slots labeled 1 2 5 and 6 Two MSM slots labeled 3 A and 4 B Up to six SSI redundant AC DC power supplies accessed from the front of the unit One fan tray accessed from the front
122. nennnennnnnnnnennnen nenn 120 Installing the Replacement BlackDiamond 12804 Fan Tray ueeseeessesnsennseennnennnennnennnennnnn nen 121 Replacing the BlackDiamond 12802 Fan Tray ccccccccecccceeceeeecesecseceeeseceseeeseeeseeeseeeeeeeeneeenaes 121 Pre installation REQUIreMeNts c cccecceeceseceeceeceeee ees aiani aiaa EEE E iiaii aa 122 Removing the BlackDiamond 12802 Fan Tray ccccccccececceceeeceeceeeeeeeeeeeeeeeeeeeeeeseeeeeeeeeeegs 122 Installing the Replacement BlackDiamond 12802 Fan Tray ueeseeseeseesnennennennenennnnennennennnnennnnn 123 Chapter 9 Repacking a BlackDiamond Chassis uuuuuunuunnennnnnnennnnnnnnnnnnnnnnnnnnnnnnnnennnnnnnnnnnnnnnnnnnn 125 Safety Information sdedebdessteeandasweldevde clecicnounlGecdeeusesvebwaivaswecgoiardesdendaccdssesses 125 Repacking the BlackDiamond 12804 ChaSSiS ccccccccceeccseceeeeeeeeeeeeeeeecseeeseeeseeeseeeseeeseeesaeeenaes 126 Repacking the BlackDiamond 12802 ChaSSiS ccccccccseecceeeeeeeeeeeeeeeeeceeceseeseseseeeseeeeeeeeaeeenaes 129 Part 4 Appendixes Appendix A Safety Informalion n een 133 Considerations Before Installing u02002002400s0 nennen nn ene nennen nn nennenennnnnn nennen nnn nennen nennen 133 Installing Power Supply Units cuseesseesseessnensnensnensnennnennnennnnennnnnnnennnnnnnnnnnennnennnennnnennnnnnnnn nenn 134 Maintenance Satetvar st ts ae ae en ee ee euren caste eacsstentecuxeats eat 135 General Safet
123. nently connected to the switch so that the strap is always available when you need to handle ESD sensitive components BlackDiamond 12800 Series Switches Hardware Installation Guide Installing or Removing an External Compact Flash Memory Card You do not need to power off the system or remove the MSM from the chassis to install or remove an external compact flash memory card You need an ESD preventive wrist strap to install a compact flash memory card To install the memory card 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the chassis front panel 2 Locate the compact flash slot on the MSM as shown in Figure 72 Figure 72 Typical Compact Flash Slot Location Module status LEDs MGMT port Console Compact port fash 65013 o SYS Reset MSTR EX_183 3 Hold the memory card between your thumb and forefinger with the ridge facing toward the bottom of the chassis 4 Slide the card into the compact flash slot until you feel resistance a portion of the card will protrude from the slot 5 Carefully push the card until it is seated into the slot The card should be fully inserted or seated inside the slot 6 To verify that the card is fully seated use the show memorycard command To remove the external compact flash memory card 1 Use the eject memorycard command to ensure that you will not lose any data when you rem
124. ng a BlackDiamond 12802 ChassiS ccccccccssccceeceececeseceeceeeeeaeeeaeeeeeseaeeeeeeeenees 66 Mid Mounting a BlackDiamond 12802 Chassis ueesssessnensnensnensnnnnnnnnnnnnnnennnennnennnen san nnnnenn 67 Grounding the BlackDiamond 12800 Series Chassis uusesssesssssennsennnnnnnnnnnnnnnnnnnnnnnnen nennen 68 Initial Management Access aan E a E AE aE EE E aii 70 Connecting Equipment to the Console Port cceceeeeeeee eee eee ee eee eee eeee esse eeseeeseeeaeeeeaeeeaeesaeeeees 70 Logging In for the First Time en llama 71 Chapter 6 Installing Power Supply Units ccccssssseessseeeeesseeeeeesseeeeeessnaaeeeesseeeeseseaeeeeeesseseenes 73 STEI eae E at RE ox cs hte E secnacuatenncie ct acea E E N E EEE E a 73 BlackDiamond PSU Competibility usesssseenssneenennennennensnnnenennennennennnnnennnnennennennennennnnnennnnnenennnnnn 74 Extreme Networks 1200 W DE PSU este nk 74 Minimum Software Required uzuuessessensensenennnnnenennennnnnnennennennnnnnnnenennennn nun enennnnnnrnn nenn 75 Pre Installation Requirements 22er 75 Installing the DC Wiring cccccccccccccceeceeee eee eee eeseeee eee eeeeseeeee eee nen ennnennennenennnennennennnnnn nennen 75 Installing an Extreme Networks 1200 W DC PSU cccceccceccceseceeecee cece eeseeceeceaeeeaeseseeeeeeesaees 76 Removing an Extreme Networks 1200 W DC PSU uuseesseesenssennnnnnnennnnnennnnnnnennnnne nennen nennen 79 Front Panel LEDS s
125. nnnnnnnnnnnnnn nenne nnennnnnn 26 XM 2X and XM 2XR LEDS uceeesseseessnssnessnnnnnnnnennnnnnennnnnnnnnnnnnnnnnnnnennsnnnnnnnnn sen ennnnnnnnn en 27 XM ZHR VO Module ann een EE EEEE 28 XM 2AHR WEDS coseta a e a a TOEA aE 28 Chapter 3 Extreme Networks Power Supply Units for BlackDiamond Switches cccccsssseeeeees 29 Overview of BlackDiamond 12800 Series Power Supplies ccccccccecccsscceeeceeceseeeseeeeeeeaeeeeeeeeneeenes 29 Extreme Networks 1200 W DC PSU cccccccecceeeeceeeeceeeneeeeeeeeceeaeeeeeeeseceeaeeneeeeeeeeeaeeneeseneseeaeaneges 30 Minimum Software Required cccccccececeecceeeceeeceeeece cess sees eeeee esse eeeeeeeeeeseeesseesaeeeaeeeaeeeeeeeeeeees 31 LEEDS a aa I ea wauissatisagnae Sunes a A nenne TEE 31 Extreme Networks 700 1200 W AC PSU c cccececcecceceeeeeeeeeeeeceeaeeeeeseeseeeeeneeeeeserseeeeeseseterseaeeees 32 LEDS su O I dal na DEE ee een Re 33 Power Supply CordSs uessensenssenseesenennennnnnenennnnnnnnnnenennnnnnnnn nenne nnennennennnnsnnnennesnensnnnnnnnennennnnnn 33 FUSE arire ta has cush nn aa I ne nern are 33 Specification Sey nern E ee Re A Taa 34 BlackDiamond 12800 Series Switches Hardware Installation Guide Minimum Software Required en ana aE an a NE EEE iE i 35 LEDS ea E O T N E S 35 TTE A E T 36 SPECI CAMONS r yraa E a aA AE a EA E REEE AERE RA 36 Extreme Networks 325 W AC Power Supply ussueessnessnessnnnnnnnsnnnnnnnnnnnnennnnnsnnnnnnnnnnnnnennnnnnn nennen 36
126. nnnnnnnnnnnnnnnnnnn nennen nnnnnennennnnnnnnsnen nenn 18 Chapter 2 BlackDiamond 12800 Series Modules 22222 2222222200020000000000n0nnnnnnnnnnnnnnnnannnnnnnnnn 19 Overview of the BlackDiamond 12800 Series MOUIES ccccecceccceeeeeeeceeeeeseeeeteeeeeeueeaeeeeeneeaneeaes 19 BlackDiamond 12800 Series MSMS ccccccccccecceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeegeeaeeeeeneees 20 Software Requirements uensesseesenenennennennennnnnnennennennenennnnennennennennnnnnnsnnsnensennnnnnnnnsnennnnsnn nenn 20 Redundant MSM Activity BlackDiamond 12804 Switch sesesssesesssnenssnnnnnnnnennennnnnnennnnn nn 21 MSM EE DS ee een ans aaa AET 21 Features of the BlackDiamond 12800 MSMS cccccccccceceeeeeeceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeateness 22 BlackDiamond 12800 Series I O Modules u2susseeseessennennnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnennen nen nnnnnnen nenn 23 VO Mod le LEEDS nee E E a E ENE A 24 Port LEDs on I O Modules cccccecceceeeeeeeteececeaeeeeceeseceeeneeeeetseceeeneeeeerseeeeseesenseseeeeesenerseaess 24 GM 20T VO Mod ler an a Kat EEN 25 GM 207 LEDS a an O aE a o en 25 GM 20XT and GM 20XTR I O Modules uussueseessenseesseennnnnnennnnnnnnnnnnnnnn nennen nennen nnn nennen nenn 25 GM 20XT and GM 2OXTR LEDS ecsessesseessessennnnnnnennnnnnnnnnnnnnnnnnnnnnnnnnnnen nen nnnnnnennennnnnn 26 XM 2X and XM 2XR VO Modules ucseessessesseeseesnennnnnsnnennnnnnnnnnnnnnennnnnnn
127. nostics e Port status XM 2X and XM 2XR 1 0 Modules Figure 11 shows the XM 2X I O module and Figure 12 shows the XM 2XR I O module BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 11 XM 2X 1 0 Module Module status 10 Gbs ports LEDs EX_155h Figure 12 XM 2XR 1 0 module Module status 10 Gbs ports LEDs EX_156h oO dd note Although the XM 2X module and the XM 2XR module are similar in appearance the functionality of each I O module varies The XM 2XR module is part of the R series and includes the rate limiting feature the XM 2X module does not support rate limiting To use rate limiting you must install the MSM 5R plus the GM 2OXTR I O module and or the XM 2XR I O module The XM 2X module and XM 2XR module have two unpopulated XENPAK based 10 Gigabit Ethernet ports The default configuration of the XM 2X and XM 2XR I O modules is as follows All ports e Are added to the default VLAN as untagged e Inherit the properties of the default VLAN for example protocol type and VLANid XM 2X and XM 2XR LEDs The XM 2X module and XM 2XR module have the following LEDs e Module status e Module diagnostics e Port status BlackDiamond 12800 Series Switches Hardware Installation Guide XM 2HR 1 0 Module Figure 13 shows the XM 2HR I O module Figure 13 XM 2HR 1 0 Module Mini GBIC fiber ports 10GBASE X
128. ntial time period that the UPS would be required to supply backup power e Where will the UPS be installed e What is the maximum transition time that your installation will allow oO dd note Extreme Networks recommends that you use a UPS that provides online protection Calculating Volt Amperage Requirements To determine the minimum volt amperage requirements for your UPS 1 Locate the voltage and amperage requirements for each piece of equipment These numbers are usually located on a sticker on the back or bottom of your equipment Then multiply the numbers together to get Volt Amperes VA VA Volts x Amperes 2 Add the VA from all the pieces of equipment together to find the total VA requirement To determine the minimum volt amperage requirements for your UPS we recommend that you add 30 to the total UPS Transition Time Transition time is the time that is necessary for the UPS to transfer from utility power to full load battery power For Extreme Networks products a transition time of less than 20 milliseconds is required for optimum performance Applicable Industry Standards For more information see the following ANSI TIA EIA standards e ANSI TIA EIA 568 A discusses the six subsystems of a structured cabling system BlackDiamond 12800 Series Switches Hardware Installation Guide e ANSI TIA EIA 569 A discusses design considerations e ANSI TIA EIA 606 discusses cabling system administration e ANSI T
129. nur geschultes und qualifiziertes Servicepersonal Zugriff auf das Ger t hat m In f r elektrische St rme anf lligen Gebieten wird empfohlen das System an einen Spannungssto unterdr cker anzuschlie en m Die Ausr stung im unteren Teil des Gestells installieren um zu vermeiden dass der obere Teil des Gestells zu schwer wird m Auf allen Seiten f r mindestens 7 5 cm 3 Abstand sorgen um eine ausreichende Bel ftung zu gew hrleisten Die Lufteinlass ffnung an den vorderen seitlichen und hinteren Entl ftungsgittern nicht blockieren Das System nicht in der N he von W rmequellen aufstellen e Sicherstellen dass die Ausr stung in einem Bereich aufgestellt wird der den Spezifikationen f r Leistungsaufnahme und W rmeabstrahlung der Komponenten entspricht e Sicherstellen dass Ihre Netzteile die Anforderungen an die Strom oder Wechselstromversorgung vor Ort f r alle Netzwerkger te erf llen BlackDiamond 12800 Series Switches Hardware Installation Guide e Bei den Extreme Produkten handelt es sich um digitale Ger te der Klasse A gem Teil 15 der FCC Richtlinien und anderen internationalen Richtlinien Der Ger tebetrieb unterliegt den folgenden Voraussetzungen 1 Das Ger t kann sch dliche Interferenzen verursachen und 2 das Ger t muss jede empfangene Interferenz zulassen einschlie lich einer Interferenz die einen unerw nschten Betrieb verursachen kann Installation von Netzteilen 9 WARNUNG Bei
130. oO db NOTE In BlackDiamond switches the management port on the MSM is part of the management VLAN by default Refer to Management Ports on page 16 for further details Connecting Equipment to the Console Port Connection to the console port is used for direct local management The console port settings are e Baud rate 9600 Data bits 8 Stop bit 1 Parity None Flow control XON XOFF The terminal or PC with terminal emulation software that you connect to an Extreme Networks switch must be configured with these settings This procedure is described in the documentation supplied with the terminal Appropriate cables are available from your local supplier or you can make your own To ensure the electromagnetic compatibility of the unit use only shielded serial cables For information about the DB 9 console plug connector see Connector Pinouts on page 153 BlackDiamond 12800 Series Switches Hardware Installation Guide Logging In for the First Time After your switch has completed all power on self tests it is operational You can log in and configure an IP address for the default VLAN named default oO dd note In BlackDiamond switches the management port on the MSM is part of the management VLAN by default Refer to Management Ports on page 16 for further details To manually configure the IP settings 1 Connect a terminal or PC with terminal emulation software to the MSM on the Blac
131. on the PSU does not contain user serviceable parts In the event of failure return the defective 1200 W DC PSU to Extreme Networks for repair or replacement BlackDiamond 12800 Series Switches Hardware Installation Guide Minimum Software Required You must be running ExtremeWare XOS version 11 3 or later for the system to recognize the DC PSU Pre Installation Requirements You need the following tools and equipment to install or remove a 1200 W DC PSU e ESD preventive wrist strap e Input DC power cable provided with the DC PSU e 48 V DC power source capable of providing 50 A dedicated power to each of the 1200 W DC PSUs installed in the switch e Thermal protective gloves required for removal Installing the DC Wiring The input DC cable for the DC PSU is supplied with the 1200 W DC PSU see Figure 40 you must use this cable with the DC PSU Figure 40 Input DC Power Cable for the 1200 W DC PSU Lock Return E Black Return 48Vdc Blue 48V Ground Green yellow Ground 10 ft gt EX_135 Each 1200 W DC PSU must be powered by a 50 A dedicated power source that delivers 40 to 72 VDC of constant power Power distribution to the 1200 W DC PSU shall be provided using the 48 VDC harness provided Power to the 1200 W DC PSU can be from either a 50 A UL approved overcurrent protection breaker or an SELV approved power source in accordance with IEC 60950 1 utilizing 50 A overcurrent protection
132. on and off Remove the wall plug from the electrical outlet to disconnect the power from an Extreme Networks 325 W AC PSU Make sure that this connection is easily accessible Do not connect the power supply to an electrical outlet when the power supply is outside the chassis doing so would expose a hazardous energy and poses a potential shock and fire hazard Do not put your hand into an open power supply bay when a power supply is not present Empty power supply bays require a cover plate at all times BlackDiamond 12800 Series Switches Hardware Installation Guide Maintenance Safety When you perform maintenance procedures on Extreme Networks equipment follow these recommendations Use only original accessories or components approved for use with this system Failure to follow these instructions may damage the equipment or violate required safety and EMC regulations The chassis cover should only be removed by Extreme Networks personnel There are no customer serviceable components in this system Repairs to the system must be performed by an Extreme Networks factory service technician In systems that have power on buttons the power on button may not turn off all system power To remove power from the system you must unplug all power cords from wall outlets The power cord is the disconnect device to the main power source Disconnect all power before removing the back panel of any Extreme Networks switch unless otherwise instruc
133. ort LEDs 24 industry standards 55 initial switch login 71 installation 1200 W DC power supply 76 325 W AC power supply 95 325 W DC power supply 90 700 100 W AC power supply 81 AC power cord retaining bracket 97 BlackDiamond 12802 chassis front mount 66 BlackDiamond 12804 chassis 60 blank front panels 108 DC wiring for 1200 W DC power supply 75 DC wiring for 325 W DC power supply 89 modules 102 installing modules 102 installing PSU fan controller BlackDiamond 12802 119 BlackDiamond 12804 117 IP settings configuring 71 L labeling system for cables 48 LEDs I O modules 24 MSM 21 ports 24 logging in to the switch 71 low line power 34 M MAC address BlackDiamond 12802 switch 18 BlackDiamond 12804 switch 17 management modules BlackDiamond 12800 Series Switches Hardware Installation Guide MSM 5 22 MSM 5R 22 MSM 6R 22 management port description 16 location 22 memory card See external memory card mid mount installation BlackDiamond 12802 switch 67 BlackDiamond 12804 switch 61 modules distinguishing MSM from 1 0 102 hot swapping 107 injector ejector handles 103 installing 101 102 overview 19 MSM booting 21 console port 22 dual MSMs 21 external compact flash slot 23 hot swapping 107 installation verification 106 LEDs 21 management port 22 primary backup functionality 21 redundant 21 removing 107 resetting 23 saving configurations 21 MSM 5 module
134. ove the card After you use the eject memorycard command you can physically remove the card from the external compact flash slot on the MSM For more information about the eject memorycard command see the ExtremeXOS 12 0 Concepts Guide 2 Attach the ESD preventive wrist strap to your wrist and connect the metal end of the strap to the ground receptacle on the chassis front panel 3 Locate the black release pin just above the compact flash slot 4 Press the release pin until the card releases from the slot The card releases to an intermediate position the card remains partially inserted but is no longer seated in the slot 5 Remove the card completely and place it in a safe location BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12800 Series Switches Hardware Installation Guide ED BlackDiamond Maintenance Procedures ED Replacing BlackDiamond 12800 Series Chassis Components This chapter provides important safety information and instructions on how to remove and replace the PSU fan controller and the fan tray in a BlackDiamond 12800 series switch BlackDiamond 12800 series switches have one fan tray The BlackDiamond 12804 switch contains two PSU fan controllers and the BlackDiamond 12802 switch has one PSU fan controller This chapter includes the following sections e Safety Information on page 115 Replacing a BlackDiamond 12804 PSU Fan Controller on page 115 Replacing a BlackDiamond 12802 PSU
135. pecifications for additional information regarding regulatory compliance certifications PIS CAUTION A BlackDiamond chassis should be empty before being lifted This will also prevent damage to the system components due to possible system chassis flex when lifting BlackDiamond 12800 Series Switches Hardware Installation Guide Repacking the BlackDiamond 12804 Chassis To repack the BlackDiamond 12804 chassis 1 Remove all modules and power supplies from the BlackDiamond 12804 chassis Follow correct Extreme Networks procedures for removing components 2 Using four rack mounting screws attach the 19 inch helper bracket to the system rack immediately below the chassis 3 Remove the eight rack mounting screws that secure the chassis to the system rack 4 On each side of the chassis place one hand in the empty power supply bay and the other hand in the rear slot on the back panel of the chassis amp CAUTION Do not use the fan tray handle to lift or maneuver the BlackDiamond 12804 chassis This handle is not designed to support the weight of the chassis 5 Slowly guide the chassis out of the system rack using the helper bracket for support 6 Carefully lift the chassis off the helper bracket and lower it onto the foam cushion in the shipping carton base see Figure 81 Figure 81 Setting the BlackDiamond 12804 Chassis onto the Foam Cushion BlackDiamond 12800 Series Switches Hardware Installation Guide
136. ped separately from the power supply unit You must use this cable with the Extreme Networks 325 W DC PSU Figure 18 Input DC Cable for the Extreme Networks 325 W DC PSU 4 1 N Brown Od RTN OO Blue Oa 48V u Green ellow 6 3 40 ft Ground DC_PSU_05 Each Extreme Networks 325 W DC PSU must be powered by a 15 A dedicated power source that delivers 40 to 72 VDC constant power to each 325 W DC PSU Power distribution to the 325 W DC PSU shall be provided using the Model 65025 48 V DC cable Power to the 325 W DC PSU can be from either a 15 A UL approved overcurrent protection breaker or an SELV approved power source in accordance with IEC 60950 1 utilizing 15 A overcurrent protection Minimum Software Required You must be running ExtremeWare XOS version 12 0 or later for the system to recognize the DC PSU LEDs The front panel of the Extreme Networks 325 W DC PSU provides status LEDs Table 12 describes the meanings of these LEDs Table 12 LEDs on the 325 W DC PSU DC In DC Out PSU Condition LED Status LED Status No DC input power Off Off No DC input power receiving standby power from the chassis Amber Off DC input good main outputs disabled Green Off DC input good output fault Green Amber DC input good DC output good Green Green BlackDiamond 12800 Series Switches Hardware Installation Guide Fuse The Extreme Networks 325 W DC PSU line is fused This fuse is not replaceable in
137. r L or colored red Blue wire to the Neutral plug terminal which may be marked with the letter N or colored black Yellow Green wire to the Ground plug terminal which may be marked with the letter E the Earth symbol or colored yellow green Uninterruptible Power Supply Requirements An uninterruptible power supply UPS is a device that sits between a power supply such as a wall outlet and a device such as a switch to prevent outages sags surges and bad harmonics from adversely affecting the performance of the device A UPS traditionally can perform the following functions e Absorb relatively small power surges e Smooth out noisy power sources e Continue to provide power to equipment during line sags BlackDiamond 12800 Series Switches Hardware Installation Guide e Provide power for a period of time after a blackout has occurred In addition some UPS devices or UPS plus software combinations provide the following functions Automatically shut down equipment during long power outages Monitor and log power supply status Display the voltage current draw of the equipment Restart equipment after a long power outage Display the voltage currently on the line Provide alarms on certain error conditions Provide short circuit protection Selecting a UPS To determine UPS requirements for your switch answer these questions e What are the amperage requirements e What is the longest pote
138. ration Input Output Operating conditions 2 power supplies 4 power supplies Nominal input ratings 100 to 240 V 60 50 Hz 4 A max Operational voltage range 90 to 264 V Maximum input amperages 3 5A 115 V low line 1 75 A 230 V high line AC line frequency 47 to 63 Hz AC power supply input socket IEC 320 C14 Minimum wire size 18 AWG 0 82mm2 copper stranded pre approved cord set for county of use DC Output 48 V 6 A 12 V 2 5 A 7 VSB 0 75 A Output power W 325 W Operating temperature 0 C to 40 C Storage temperature 40 C to 70 C Operating humidity 10 to 90 relative humidity non condensing Operational shock 30 m s2 3 g BlackDiamond 12800 Series Switches Hardware Installation Guide Table 29 DC PS Model 65022 325 W DC PSU For the BlackDiamond 12802 switch Minimum configuration Full configuration Input Output Operating conditions 2 power supplies 4 power supplies Nominal input voltage 48 V 60 V 15 A maximum Operational voltage range 40 V to 72 V Maximum input amperages 10 A 40 V low line 8 A 48 V 7 A 60V high line Maximum in rush current 8 A Input circuit protection 15 A Wire harness provided by Extreme Networks with each power supply Extreme part number 4340 00028 Minimum wire size 14 AWG 1 3 mm copper stranded pre approved cord set for county of use Connector Molex connector PN 42816 0312 Connector pins Molex conne
139. reen TIT LLLLLILLLLLLLILLLLLLIE Ga TETTEIT POSTER CTTI ES release latches I are orange amp 0000 N EX_122 Installing a BlackDiamond 12800 Series Module You need the following tools and equipment to install a BlackDiamond 12800 series MSM or I O module e ESD preventive wrist strap e 2 Phillips screwdriver e Appropriate type of cable for the module if you are installing an I O module amp CAUTION The module series number must be the same as the switch series number For example install BlackDiamond 1200 series modules only in a BlackDiamond 12800 series switch To install a module in a BlackDiamond 12800 series switch 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the chassis On a BlackDiamond 12804 chassis the ground receptacle is at the top left corner On a BlackDiamond 12802 chassis the ground receptacle is at the top right corner 2 Select a slot for the module See Module Slot Assignments on page 101 3 Remove a blank front panel from a chassis slot if applicable BlackDiamond 12800 Series Switches Hardware Installation Guide oO note Any unoccupied module slot in the chassis should have a blank faceplate installed to ensure satisfactory protection from EMI and to maintain adequate airflow through the chassis 4 Re
140. right of the unit One connector for an ESD preventive wrist strap Two PSU fan controllers that collect and report data from the installed power supply units and the BlackDiamond fan tray The PSU fan controllers intervene in the event of power inconsistencies and provide primary backup redundancy if a BlackDiamond 12804 PSU fan controller fails Figure 1 shows a BlackDiamond 12804 chassis equipped with one MSM and three optional I O modules BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 1 Front of the BlackDiamond 12804 Chassis ESD wrist strap Fan tray connector lt T IN PET IL I IE IT II EL IL MN gt a I O module a amp af slots Senn J MSM module slots E als m I O module ol de Io lot apg perpa Seem Sees pees Slots o amp lo Power supplies oO oO Power cord oll Se connectors Oo oe a tS wo a a EX 157 Figure 2 shows the rear view of the BlackDiamond 12804 chassis Figure 2 Rear Panel of the BlackDiamond 12804 Chassis I o o o o o o o IN oO oO fe Oo oO
141. rities on electrical codes are e National Electrical Code NEC Classification USA only a recognized authority on safe electrical wiring Federal state and local governments use NEC standards to establish their own laws ordinances and codes on wiring specifications The NEC classification is published by the National Fire Protection Association NFPA The address is NFPA 1 Batterymarch Park Quincy Massachusetts 02169 USA http www nfpa org e Underwriters Laboratory UL USA only an independent research and testing laboratory UL evaluates the performance and capability of electrical wiring and equipment to determine whether they meet certain safety standards when properly used Acceptance is usually indicated by the words UL Approved or UL Listed The address is UL 333 Pfingsten Road Northbrook Illinois 60062 2096 USA http www ul com e National Electrical Manufacturing Association NEMA USA only an organization of electrical product manufacturers Members develop consensus standards for cables wiring and electrical components The address is NEMA 1300 N 17th Street Rosslyn Virginia 22209 http www nema org e Electronics Industries Alliance EIA a trade association that develops technical standards disseminates marketing data and maintains contact with government agencies in matters relating to BlackDiamond 12800 Series Switches Hardware Installation Guide the electronics industry The ad
142. s 1OOOBASE LX interfaces that use 10 125 um single mode fiber can use a maximum distance of 10 000 meters BlackDiamond 12800 Series Switches Hardware Installation Guide RJ 45 Connector Jackets Use RJ 45 cable with connector jackets that are flush with the connector or that have connectors with a no snag feature Using cable with jackets that are wider than the connectors can cause e Connectors that are not properly aligned with the port e Crowded cable installation which can cause connectors to pop out of the port Figure 25 shows examples of connector jacket types that are not recommended as well as those that are recommended Figure 25 RJ 45 Connector Jacket Types Not recommended J Better Best SPG_001 BlackDiamond 12800 Series Switches Hardware Installation Guide Radio Frequency Interference If you use UTP cabling in an installation take precautions to avoid RF interference RF interference can cause degradation of signal quality and in an Ethernet network environment can cause excessive collisions loss of link status or other physical layer problems that can lead to poor performance or loss of communication To prevent RF interference avoid the following devices or situations e Attaching UTP cable to AC power cables e Routing UTP cable near antennas such as a
143. s 325 W AC PSU cannot be used in combination with any other Extreme Networks PSU The 325 W AC PSU functions from 90 V to 264 V and 47 Hz to 63 Hz AC Input The software determines the maximum available power required for the switch and enables the modules accordingly LEDs The front panel of the Extreme Networks 325 W AC PSU provides status LEDs Table 13 describes the meanings of these LEDs Table 13 LEDs on the 325 W AC PSU AC In DC Out PSU Condition LED Status LED Status No AC input power Off Off No AC input power receiving standby power from the chassis Amber Off AC input good main outputs disabled Green Off AC input good output fault Green Amber AC input good DC output good Green Green Replacing AC Power Supply Cords Each Extreme Networks 325 W AC PSU is shipped with a 110 V AC UL listed power cord All power supply cords provided by Extreme Networks are designed for use in the United States and Canada only Power supply cords for use outside of North America are typically provided by a third party distribution center and must meet the following requirements e Power supply cords must be agency certified for country of use e Power supply cords must contain an IEC 320 C13 connector for insertion into the IEC 320 C14 receptacle on the PSU e Power supply cords must contain an appropriately rated and approved wall plug applicable to the country of installation e Power supply cords must be less than 5 m long
144. s the yellow lever on the DC PSU to the left while lifting the handle up on the 1200 W DC PSU 4 Disconnect the cable from the front of the DC PSU by pressing down the catch see Figure 44 and pulling out the cable Figure 44 Disconnecting the Cable from the DC PSU Squeeze catch to release plug EX_133 WARNING Always be sure that the 1200 W DC PSU does not have the input cabled connected at any time when the DC PSU is not installed into the switch Do not remove the DC PSU from the switch before disconnecting the input DC cable from the PSU 5 Pull on the handle of the 1200 W DC PSU to slide it out of the power supply bay 6 Wearing thermal protection gloves place both hands underneath the 1200 W DC PSU to support the weight after it is pulled out from the switch To remove additional 1200 W DC PSUs repeat steps 2 through 6 oO eb NOTE Leave the ESD strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components BlackDiamond 12800 Series Switches Hardware Installation Guide Front Panel LEDs The front panel of the 1200 W DC PSU provides status LEDs Table 17 identifies the symbols and describes the LED behavior Table 17 Extreme Networks 1200 W DC PSU LEDs AA Power Predictive Fail Fail PSU Condition Green Amber Amber Power supply DC outputs working normally On Off Off DC input power present standby output on Blinking Off Off Curren
145. sis The BlackDiamond 12804 chassis has attached rack mounting flanges for a front mount rack installation To install the chassis in a mid mount position attach optional mid mount brackets as described in Attaching the BlackDiamond 12804 Mid Mount Brackets on page 61 BlackDiamond 12800 Series Switches Hardware Installation Guide Pre installation Requirements The following tools equipment and resources are required for installing the BlackDiamond 12804 chassis e ESD preventive wrist strap provided e 19 inch helper bracket provided e For installing the chassis in a mid mount position in the rack m Optional BlackDiamond 8806 12804 mid mount kit part number 65046 Order this kit separately from the chassis m 2 Phillips screwdriver e Rack mount screws appropriate for your organization s rack system as follows m 4 screws to attach the helper bracket m 12 screws to secure the BlackDiamond 12804 chassis in the rack The screw size will vary based on your organization s rack system screws are not provided e Screwdriver appropriate for the rack mounting screws you will use The screwdriver size will vary based on the requirements of your organization s rack system Attaching the BlackDiamond 12804 Mid Mount Brackets To install the BlackDiamond 12804 switch in a mid mount position in the rack attach the optional mid mount brackets To attach the mid mount brackets 1 Place the empty BlackDiamond 12804 ch
146. ssiasssevedsavnnsachs saes cx eek 80 Extreme Networks 700 1200 W AC PSU cceceec eee ee cece eee eee eee e cae ee eee eee ae ee ee esse esse eeseeeaaeeaaeeeaeeeaes 81 Pre Installation Requirements 2usssueessenssennnennnennnnennnnnnnennnennnnnennnnnnnnnennnnnnnnennnennnnnnnnn nen 8l Installing an Extreme Networks 700 1200 W AC PSU uessnessnensnnnssnnsnnnnnnnnnnnnnn eee nnnen nn 81 Removing an Extreme Networks 700 1200 W AC PSU cuenseensnensnennnennnnnnnennnennnennnnennnennnen nen 83 Front Panel LEEDS pearl a ara De ran be rer erregte 84 Power SUPDIV 610 do PIPERENPERREPEERENBENPEBEF n e DEEUHECHERTE FEEBEDEHENEEFEENERUECEDEREEDERELTRELERBBEEDEDBERER 84 FPUSC News sscuastiasiearinensau duupaxsuugi Abuse gcuy ee ant uasays de dome HERFESTFOREETECRHERNSERERETTSERRTTERCTERTEEER EUTERERUESRISELERES 85 Using the BlackDiamond12804 AC Power Cord Retainer Channel cccccccsccssccceeeseeeaeeeaeeeeeeeenes 85 Pre Installation Requirements ccccccccececeecceeeceeeeeeeee cece eeseeeeee esse eeseeeeeeceseeeseeeseeeseeeeneeeneeenaes 85 Installing the BlackDiamond 12804 AC Power Cord Retainer Channel ccscccseeeeeeeeeeeeeees 85 Removing the BlackDiamond 12804 AC Power Cord Retainer Channel cccscccseeeeeeeeeeeeeees 88 Extreme Networks 325 W DC Power Supply ccseccsecseceeceeeseeceeceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeseaeeeeeeaees 88 Minimum Software Required cccceccscccec
147. ssis see Figure 33 4 Atthe side of the chassis remove the package of mounting brackets and hardware see Figure 33 BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 33 Unpacking the BlackDiamond 12802 Chassis BlackDiamond documentation pack with ESD preventive wrist strap _ BlackDiamond A lt j 12802 switch Rack mount brackets and l hardware aalt as 2 kg BD_149 5 To lift the BlackDiamond chassis on each side have one person support the bottom of the chassis as you lift the chassis off the bottom foam cushion amp CAUTION Do not lift the chassis using the top of the front opening The weight of the chassis may cause the enclosure to deform Set the chassis on a secure flat work surface 6 Break the inspection seal on the packing bag and remove the chassis from the bag oO eb NOTE Save the box and all packaging for future use in case the BlackDiamond 12802 chassis must be returned to Extreme Networks Inc BlackDiamond 12800 Series Switches Hardware Installation Guide Rack Mounting the BlackDiamond 12802 Chassis The BlackDiamond 12802 chassis is shipped with mounting brackets that allow you to position the mounting flanges at either the front or the middle of the chassis sides Required Tools and Equipment In addition to the hardware shipped with the BlackDiamond 12802 chassis you need the following tools and equipment to install t
148. stems Inc in the U S and other countries Specifications are subject to change without notice All other registered trademarks trademarks and service marks are property of their respective owners 2007 2008 Extreme Networks Inc All Rights Reserved For safety compliance information see Appendix A Safety Information BlackDiamond 12800 Series Switches Hardware Installation Guide m Table of Contents PROTAG GC sis citowccscewastawsusdeuscscuacteewataeSuatuoustswuncacuwacidausieduacsuavcacevasadsuatecus ds oavcsdewasieussedusiaauucteewaraesuatenracd 9 mludoYe K ken 0 1 sce ce Seen oats tee cect aces Aad E E Shceeuesanuid aunts shames ah E cece cactenntevevecheecanss daea 9 EEO Lose ae eA ee ee A A ee 9 Related PUBCAtIONS senesini a aa aan aan din nee ee 10 Part 1 BlackDiamond 12800 Series Switches Chapter 1 About the BlackDiamond 12800 Series Switches ccccccsssssssssseeeeeseeesssssseeeeeees 15 Overview of the BlackDiamond 12800 Series SWItCh S cccccceceeeeseeeeeceeeeeeeeeeeeeeeeeeeeeeaneaneeass 15 FUllIEDUDIEK SU PPOM u a nee nina 15 Management Ports su ikinllebikkaikehiae 16 External Compact Flash Memory Card 2e2zussuesneesensenennnnnennenennnnnnnnnnnnnnnnnnnnnennenennnnennennennnnnn 16 BlackDiamond 12804 Switch Chassis sccccccsscosisesssscuccnuscesteeteraasscanascnssaussausceanesauiparspanssensnseries 16 BlackDiamond 12802 Switch Chassis usssssessessnennennennnnn
149. synchronize command to replicate all saved images and configurations from the primary MSM to the backup MSM You are not prompted to synchronize the images and the configurations from the primary to the backup If not synchronized the backup uses its image and the primary configuration This image configuration mismatch will likely cause the switch to operate differently after failover BlackDiamond 12800 Series Switches Hardware Installation Guide PIS CAUTION Depending on the size and complexity of your network you should install and configure a backup MSM when network disruption will be minimal You may need to reboot your switch after you use the synchronize command Verifying the Module Installation After you install a module verify that it is working correctly by checking the LEDs on the front panel of the module Table 23 shows normal LED operation for correctly installed MSMs and I O modules Use the command line interface CLI show slot lt slot number gt command to display slot specific information about the newly installed module Table 23 Module LED activity for normal operation MSM 1 0 Module State Meaning State Meaning SYS Green blinking STATUS Green blinking MSTR Green MSM is primary DIAG Off Amber MSM is backup ENV Green Port status per port Green Amber blinking Link Activity Green Link is up Amber Packet activity is occurring For more information about LED activity see the descriptions
150. t from the fan tray slot This action disconnects the fan tray from the switch power Wait for the fan blades to stop turning before continuing with this procedure WARNING Be sure that all fan blade motion has ceased before continuing to remove the fan tray Support the bottom of the fan tray with your free hand as you use the handle to slide the fan tray completely out from the fan tray slot amp CAUTION Be sure that both hands are used to support the weight of the fan tray during removal Leave the ESD preventive wrist strap permanently connected to the switch so that it is always available when you need to touch ESD sensitive components BlackDiamond 12800 Series Switches Hardware Installation Guide Installing the Replacement BlackDiamond 12804 Fan Tray To install a replacement fan tray into the BlackDiamond 12802 switch 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the top left corner of the switch 2 Support the bottom of the fan tray with one hand as you lift the fan tray by the handle using the other hand Align the spare fan tray with the fan tray slot on the switch and then slide the fan tray into place in the switch see Figure 78 amp CAUTION Be sure that both hands are used to support the weight of the fan tray during installation Figure 78 Installing the Fan Tray in the BlackDiamond 12804 Switch 0 r Ao
151. t limit on 48 V DC output On Off Blinking Predictive failure On Blinking Off No input power to this PSU only Off Off On No input power to any PSU Off Off Off Power supply failure Off Off On BlackDiamond 12800 Series Switches Hardware Installation Guide Extreme Networks 700 1200 W AC PSU This section describes how to install and remove the Extreme Networks 700 1200 W AC UL Listed Accessory power supply unit Model 60020 PS 2336 oO db NOTE Extreme Networks does not recommended using the 700 1200 W AC PSU in combination with an Extreme Networks 1200W DC PSU in the same BlackDiamond 12804 system WARNING Field operators must not attempt to open the 700 1200 W AC PSU enclosure for any reason the PSU does not contain user serviceable parts In the event of failure return the defective 700 1200 W AC PSU to Extreme Networks for repair or replacement Pre Installation Requirements la WARNING Extreme Networks 700 1200 W AC PSUs do not have switches for turning the unit on and off Remove the wall plug from the electrical outlet to disconnect the power to an Extreme Networks 700 1200 W AC PSU Make sure that this connection is always easily accessible Do not plug the power supply into an electrical outlet outside of the chassis doing so would expose a hazardous energy and poses a potential shock and or fire hazard You need the following tools and equipment to install or remove an Extreme Networks 700 1200 W AC P
152. tch 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the front top left corner of the switch Locate the eight captive screws on the PSU fan controller access cover at the back of the BlackDiamond 12804 switch see Figure 73 Figure 73 Removing the PSU Fan Controller Access Cover PSU Fan Controllers BD_169 Using a 2 Phillips screwdriver loosen all eight captive screws on the PSU fan controller access cover see Figure 73 Pull the access cover away from the back of the switch The PSU fan controllers are visible in the controller recess Locate the four captive screws on the PSU fan controller you are replacing see Figure 74 BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 74 Removing the BlackDiamond 12804 PSU Fan Controller BD_170 Using a 1 Phillips screwdriver loosen all four captive screws on the PSU fan controller see Figure 74 Pull equally on the upper and lower handles of the PSU fan controller to disconnect the controller connector Leave the ESD preventive wrist strap permanently connected to the switch so that the strap is always available when you need to handle ESD sensitive components Installing a Replacement BlackDiamond 12804 PSU Fan Controller To install a replacement PSU fan controller in the BlackDiamond 12804 switch 1 7 Attach the ESD prevent
153. tches Hardware Installation Guide Figure 31 Attaching the 19 inch Helper Bracket to the System Rack 71 Ds sess ve A EX_086A Lift the back of the empty BlackDiamond 12804 chassis onto the helper bracket Slowly guide the chassis into the system rack until the mounting brackets are flush against the rack uprights 6 Attach the chassis to the system rack using eight rack mounting screws Screws are not provided Be sure that the screws are secure Refer to Figure 32 for the screw locations oO dd note Figure 32 shows a standard rack mount For mid mount installation use the same mounting locations shown in the figure but insert the screws through the designated slot locations of the mid mount brackets BlackDiamond 12800 Series Switches Hardware Installation Guide Figure 32 Securing the BlackDiamond 12804 Chassis to a Rack oes Ss m EX_171A 7 Remove the helper bracket from the system rack after the chassis is secured Save the bracket for future use if you remove the chassis from the rack Unpacking the BlackDiamond 12802 Chassis amp CAUTION Proper lifting of the BlackDiamond 12802 chassis requires two people To unpack the BlackDiamond 12802 chassis 1 Break the inspection seal and cut the packing tape on the top of the shipping carton 2 Open the top of the carton and remove the documentation pack see Figure 33 3 Remove the packing foam on top of the cha
154. ted by a product specific maintenance procedure Disconnect all power cords before working near power supplies unless otherwise instructed by a maintenance procedure When handling modules optic devices power supplies or other modular accessories put on the ESD preventive wrist strap to reduce the risk of electronic damage to the equipment Connect the other end of the strap to the ESD connector on the front of the chassis Leave the ESD preventive wrist strap permanently attached to the chassis so that it is always available when you need to handle ESD sensitive components Install all cables in a manner that avoids strain Use tie wraps or other strain relief devices Replace a power cord immediately if it shows any signs of damage General Safety Precautions Follow these guidelines Do not try to lift objects that you think are too heavy for you When you install equipment in a rack load heavier devices in the lower half of the rack first to avoid making the rack top heavy Only use tools and equipment that are in perfect condition Do not use equipment with visible damage Routing cables Route cables in a manner that prevents possible damage to the cables and avoids causing accidents such as tripping BlackDiamond 12800 Series Switches Hardware Installation Guide Cable Routing for LAN Systems The BlackDiamond 12800 series switches meet the requirements for LAN system equipment LAN systems are designed for intra bu
155. the ESD preventive wrist strap permanently connected to the switch so that it will always be available when you need to handle ESD sensitive components Replacing a BlackDiamond 12804 Fan Tray The BlackDiamond 12804 switch has one fan tray that is accessible from the front of the switch amp CAUTION Removing the fan tray for more than a few minutes may result in overheating and possible damage to the system Thermal sensors shut down power if the internal temperature exceeds 60 C Make sure you have the replacement unit before starting this procedure Pre Installation Requirements You need the following tools and equipment to remove and replace a fan tray in a BlackDiamond 12804 switch e ESD preventive wrist strap e 2 Phillips screwdriver e Replacement BlackDiamond 12804 fan tray BlackDiamond 12800 Series Switches Hardware Installation Guide Removing the Fan Tray To remove a fan tray from the BlackDiamond 12804 switch 1 Attach the ESD preventive wrist strap to your wrist and connect the metal end to the ground receptacle on the top left corner of the switch chassis Locate the captive screws at the top and bottom of the fan tray Using a 2 Phillips screwdriver loosen each captive screw as shown in Figure 77 Figure 77 Removing the Fan Tray from the BlackDiamond 12804 Switch Fan tray captive screws x2 Fan tray handle EX_114 4 Use the fan tray handle to pull the fan tray half way ou
156. the source outlet is properly grounded before plugging the AC power cord into the Extreme Networks 700 1200 W AC PSU Fuse The Extreme Networks 700 1200 W AC PSU line and neutral legs are both fused Power to the switch may still be live if the neutral fuse is open This is not a field operator replaceable fuse In the event of failure immediately return the Extreme Networks 700 1200 W AC PSU for a complete replacement Vd WARNING Field operators must not attempt to configure or replace fuses in Extreme Networks 700 1200 W AC PSUs In the event of failure immediately return the defective 700 1200 W AC PSU for a complete replacement BlackDiamond 12800 Series Switches Hardware Installation Guide Specifications The 700 1200 W AC PSU functions from 90 V to 264 V and 47 Hz to 63 Hz AC Input Each PSU provides 700 W to the system if the AC input is in the 110 V low line output power range and 1200 W to the system if the AC input is in the 220 V high line output power range A greater number of PSUs are needed to support the load if the low line power range is used to power the switch The software determines the maximum available power required for the switch and enables the modules accordingly amp CAUTION The 700 1200 W AC PSU does not have a switch for turning the unit on and off Remove the plug from the electrical outlet to disconnect power to the 700 1200 W AC PSU Make sure that this connection is easily accessible M
157. tion database of the MSM modules in the switch oO dd note For more information about saving configuration changes see the ExtremeXOS 12 0 Concepts Guide When you are finished with these tasks log out of the switch by typing logout BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12800 Series Switches Hardware Installation Guide Installing Power Supply Units This chapter describes how to install power supply units in BlackDiamond 12800 series switches This chapter includes the following topics Safety on page 73 BlackDiamond PSU Compatibility on page 74 Extreme Networks 1200 W DC PSU on page 74 Extreme Networks 700 1200 W AC PSU on page 81 Extreme Networks 325 W DC Power Supply on page 88 Extreme Networks 325 W AC Power Supply on page 94 Safety Only trained service personnel should perform service to Extreme Networks switches and their components Trained service personnel have read all related installation manuals have the technical training and experience necessary to be aware of the hazards to which they are exposed in performing a task and are aware of measures to minimize the danger to themselves or other persons Before installing an Extreme Networks PSU into your network e Read the latest installation and safety information provided in this chapter and in Appendix A Safety Information e See Appendix A Safety Information for additional information regarding regula
158. tions when setting up a cable labeling system suitable for your installation e Identify cables by securely attaching a label to all cable ends e Assign a unique block of sequential numbers to the group of cables that run between each pair of wiring closets Assign a unique identification number to each equipment rack Identify all wiring closets by labeling the front panel of your Extreme Networks equipment and other hardware Keep accurate and current cable identification records Post records near each equipment rack Include the following cable drop information the cable source destination and jumper location BlackDiamond 12800 Series Switches Hardware Installation Guide Installing Cable Consider the following recommendations when you connect cable to your network equipment Examine cable for cuts bends and nicks Support cable using a cable manager that is mounted above connectors to avoid unnecessary weight on the cable bundles Use cable managers to route cable bundles to the left and right of the network equipment to maximize accessibility to the connectors Provide enough slack approximately 2 to 3 inches 5 08 to 7 62 cm to provide proper strain relief as shown in Figure 23 Bundle cable using velcro straps to avoid injuring cables If you build your own cable be sure that cable is properly crimped When installing a patch panel using twisted pair wiring untwist no more than 1 inch 2 54 cm of the
159. tory compliance certifications oO dd note For central DC power connections the 1200 W DC PSU and 325 W DC PSU are intended to be installed only in restricted access locations dedicated equipment rooms equipment closets or the like in accordance with Articles 110 16 110 17 and 110 18 of the National Electric Code ANSI NFPA 70 All wiring methods involving the DC input cable assembly must be performed according to the relevant articles of the National Electrical Code amp CAUTION Building codes vary worldwide therefore Extreme Networks strongly recommends that you consult an electrical contractor to ensure proper equipment grounding and power distribution for your specific installation Vd WARNING Field operators must not attempt to open the PSU enclosure for any reason the PSU does not contain user serviceable parts In the event of failure return the defective PSU to Extreme Networks for repair or replacement BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond PSU Compatibility The BlackDiamond power supply units are intended for use in specific BlackDiamond switches only Table 16 lists the power supplies for use in the BlackDiamond 12800 series switches Table 16 PSUs for the BlackDiamond 12800 Series Switches BlackDiamond Switch Compatible PSU Compatibility Notes BlackDiamond 12804 700W 1200W AC PSU Extreme Networks does not recommended using the OR 700 1200 W AC PSU in con
160. twork hardware The chapter assumes a working knowledge of local area network LAN operations and a familiarity with communications protocols that are used on interconnected LANs Installation maintenance and removal of a switch chassis or its components must be done by qualified service personnel only Qualified service personnel have had appropriate technical training and experience that is necessary to be aware of the hazards to which they are exposed when performing a task and of measures to minimize the danger to themselves or other people oO dd note Before installing or removing any components of the system or before carrying out any maintenance procedures you must read the safety information provided in Appendix A of this guide Planning Your Site To install your equipment successfully you should plan your site carefully The site planning process has three major parts e Meeting site requirements The physical installation site must meet the following requirements for a safe and successful installation m Building and electrical code requirements m Environmental safety and thermal requirements for the equipment you plan to install m Equipment rack requirements e Evaluating and meeting cable requirements After examining your physical site and verifying that all environment requirements are met evaluate and compare your existing cable plant with the requirements of the Extreme Networks equipment to determine if yo
161. ty BlackDiamond 12804 Switch The BlackDiamond 12804 switch can operate with a single MSM installed providing full bandwidth with this single MSM When you install a second MSM one of the MSMs operates as the primary and the other becomes the secondary or backup The primary MSM is responsible for upper layer protocol processing and system management functions The MSMs in the BlackDiamond 12804 switch are not load sharing MSM A or MSM B handles packets while the other MSM is idle When you save the switch configuration it is saved to all MSMs Selection of the primary MSM occurs automatically The following examples describe the selection process e When a BlackDiamond 12804 switch boots with two MSMs installed the MSM in slot 3 A becomes the primary If a switch is operating with one MSM and a second MSM is added to the switch after it has been powered up the added MSM becomes the secondary MSMs that operate as secondary or backup MSMs can be inserted and removed without disrupting network services e If you remove the primary MSM while the switch is operating the secondary MSM performs a soft reset and then becomes the primary MSM For example if you have a BlackDiamond 12804 switch with a primary MSM in slot 3 A and a secondary MSM in slot 4 B and you remove the primary MSM from slot 3 A the secondary or backup MSM in slot 4 B becomes the primary MSM LEDs Table 5 describes the LED activity on the BlackDiamond
162. u need the following tools and equipment before installing or removing an Extreme Networks 325 W DC PSU e ESD preventive wrist strap e 2 Phillips screwdriver e DC power supply cord Model 65052 shipped separately from the PSU Thermal protective gloves required for removal Installing the DC Wiring dd NOTE All wiring methods involving the DC input cable assembly must be performed according to the relevant articles of the National Electrical Code The Extreme Networks 325 W DC PSU requires input DC cable Model 65025 see Figure 51 This cable is shipped separately from the power supply unit You must use this cable with the Extreme Networks 325 W DC PSU Figure 51 Input DC Cable for the Extreme Networks 325 W DC PSU y 1 Brown RTN OO s Blue QQ 48V u Green ellow 6 3 Ground 10 __ _ _ _ _ _ __ gt DC_PSU_05 Each Extreme Networks 325 W DC PSU must be powered by a 15 A dedicated power source that delivers 40 to 72 VDC constant power to each 325 W DC PSU Power distribution to the 325 W DC PSU shall be provided using the Model 65025 48 V DC cable Power to the 325 W DC PSU can be from either a 15 A UL approved overcurrent protection breaker or an SELV approved power source in accordance with IEC 60950 1 utilizing 15 A overcurrent protection BlackDiamond 12800 Series Switches Hardware Installation Guide The input DC cable has an input connector on on
163. u need to install new cables BlackDiamond 12800 Series Switches Hardware Installation Guide e Meeting power requirements m To run your equipment safely you must meet the specific power requirements for each power supply unit installed in the system For power supply specifications see Power Supplies for the BlackDiamond 12800 Series Switches on page 151 Meeting Site Requirements This section addresses the various requirements to consider when preparing your installation site including e Operating Environment Requirements e Rack Specifications and Recommendations Operating Environment Requirements Verify that your site meets all environmental and safety requirements Virtually all areas of the United States are regulated by building codes and standards During the early planning stages of installing or modifying your LAN it is important that you develop a thorough understanding of the regulations that pertain to your location and industry Building and Electrical Codes Building and electrical codes vary depending on your location Comply with all code specifications when planning your site and installing cable The following sections are provided as a resource to obtain additional information Information about major building codes is located at the following websites e International Code Council ICC 5203 Leesburg Pike Falls Church Virginia 22041 USA http www iccsafe org http www sbcci org Five autho
164. ve failure On Blinking Off No input power to this PSU only Off Off On No input power to any PSU Off Off Off Power supply failure Off Off On BlackDiamond 12800 Series Switches Hardware Installation Guide Extreme Networks 700 1200 W AC PSU Figure 16 shows the Extreme Networks 700 1200 W AC UL listed accessory power supply unit Model 60020 PS 2336 This power supply is compatible with the BlackDiamond 12804 switch The power supply bay in the BlackDiamond 12804 switch can accommodate up to six hot swappable Extreme Networks 700 1200 W AC PSUs WARNING Field operators must not attempt to open the 700 1200 W AC PSU enclosure for any reason the PSU does not contain user serviceable parts In the event of failure return the defective 700 1200 W AC PSU to Extreme Networks for repair or replacement Figure 16 Extreme Networks 700 1200 W AC PSU EX_015 Airflow enters from the front vents on the Extreme Networks 700 1200 W AC PSU and exits to the rear vents of the switch Airflow through the Extreme Networks 700 1200 W AC PSU AC is independent from the airflow through the rest of the switch The AC input is located on the switch chassis directly in back of each power supply bay The front of the Extreme Networks 700 1200 W AC PSU has a handle with a lever mechanism for both insertion and removal as shown in Figure 16 BlackDiamond 12800 Series Switches Hardware Installation Guide LEDs
165. when optical connections are unplugged e Never alter modify or change an optical device in any way other than suggested in this document GBIC SFP Mini GBIC XENPAK and XFP Regulatory Compliance Extreme Networks pluggable optical modules meet the following regulatory requirements oO dd note Class 1 Laser Product EN60825 1 A2 2001 or later European laser standard FCC 21 CFR Chapter 1 Subchapter J in accordance with FDA amp CDRH requirements Application of CE Mark in accordance with 89 336 EEC EMC and 73 23 EEC Low Voltage Directives UL and or CSA registered component for North America 47 CFR Part 15 Class A when installed into Extreme products Extreme Networks optical modules are tested to work in all supported Extreme Networks switches We recommend that all customers use Extreme Networks optical modules in their Extreme Networks switches Extreme Networks assumes no liability for third party optical modules Although Extreme Networks does not block third party optical modules we cannot ensure that all third party optical modules operate properly in all Extreme Networks switches The customer assumes all risks associated with using third party optical modules in Extreme Networks switches BlackDiamond 12800 Series Switches Hardware Installation Guide Sicherheitshinweise WARNUNG Vor der Installation der Produkte von Extreme Networks sind die nachfolgenden Sicherheitshinweise aufmerksam zu lesen Die Nichtbeac
166. y Precautions u are in a RR EESE EEE E 135 Cable Routing for LAN Systems cccccccecceeceeee eee eeseeseee eee eee eeeeeeeeee eee eeeeeeeeeeeeeeseeseeeeeeaeeneeeenes 136 POE Devices nr ee 136 BlackDiamond 12800 Series Switches Hardware Installation Guide BlackDiamond 12800 Series Switches Hardware Installation Guide Selecting Power Supply Cords uuensenesnssnennennenneneensnnennennennenennsnnennsnnennnnnensnnnnsnnnsnnnnsennnsnn nen 136 Battery Replacement and Disposal uussssessssseensssnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnssnnnsnnn nenn 138 Fiber Optie Ports Optical Safety rauen sr nie 138 GBIC SFP Mini GBIC XENPAK and XFP Regulatory Compliance ccccceceeeeceneeeeeeeeeees 139 Appendix B Technical Specifications uuuuuunnnnsunnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnennnunnnnnnnnnnnnnnnnnennannnnnn 147 BlackDiamond 12804 Switch mens 147 BlackDiamond 12802 Switch eusesssssessssennssnennennennnnennnnennnnnennnnnensnnennsnnnnnsnnennnnennsnnennsnnennnnnnn 149 Power Supplies for the BlackDiamond 12800 Series Switches usssssessssennssnennennennnnen nennen nennen 151 Connector PINOUlSsc nseas sen ann nah EASE nn ann an ann nahen ernennen 153 BlackDiamond 12800 Series Switches Hardware Installation Guide Preface This preface provides an overview of this guide describes guide conventions and lists other publications that might be useful fad WARNING Service to all
167. y to convey light pulses accurately from one end of the cable to the other Use care in dressing the optical fiber cables provide satisfactory strain relief to support the BlackDiamond 12800 Series Switches Hardware Installation Guide cable and maintain an adequate bend radius at all cable turns particularly where the cable connects to the I O module Figure 24 Bend Radius for Fiber Optic Cable Minimum 2 in 5 08 cm radius in 90 bend Optical fiber cable Cable Distances SPG_002 Table 14 shows cable media types and maximum distances that support reliable transmission in accordance with international standards except where noted Table 14 Media Types and Maximum Distances Standard Media Type 1000BASE SX 50 125 um multimode fiber N Sal 50 125 um multimode fiber 62 5 125 um multimode fiber 62 5 125 um multimode fiber 1000BASE LX 50 125 um multimode fiber a opica 50 125 um multimode fiber 62 5 125 um multimode fiber 10 125 um single mode fiber 10 125 um single mode fiber 1000BASE LX70 10 125 um single mode fiber 1550 nm optical window 1000BASE T Category 5 and higher UTP cable 100BASE TX Category 5 and higher UTP cable 10BASE T Category 3 and higher UTP cable MhzeKm Rating 400 500 160 200 400 500 500 Maximum Distance Meters 500 550 220 275 550 550 550 5 000 10 000 70 000 100 100 100 Proprietary to Extreme Networks Connections between two Extreme Network
168. y with that specific product from Extreme Networks it is not for use with any other product from Extreme Networks or any other vendors equipment e North America The cord set must be cULus listed or cCSAus listed e Switzerland The supply plug must comply with SEV ASE 1011 e United Kingdom Use BS 1363 for 110 220 VAC power supplies eb NOTE This equipment is not intended to be directly powered by power distribution systems where phase phase voltages exceed 240V AC 2P PE such as those used in Norway France and other countries For these applications it is recommended that a transformer be used to step down the voltage to lt 240V AC from phase phase or that you make a connection to a P N PE power distribution where voltages do not exceed 240V AC All installations should confirm that the product is reliably grounded according to the country s local electrical codes oO dd note Building codes vary worldwide therefore Extreme Networks strongly recommends that you consult an electrical contractor to ensure proper equipment grounding and power distribution for your specific installation amp country Battery Replacement and Disposal Batteries included with Extreme products are encapsulated and must be replaced by qualified Extreme Service personnel only Contact your Extreme Service personnel for product replacement Do not attempt to replace the battery If these instructions are disregarded and replacement of th
Download Pdf Manuals
Related Search
Related Contents
Radio Shack 26-447 User's Manual NW-MS7 Keystone KSTAP12B Use and Care Manual APPRET A LA CASEINE Samsung Mono Multi-function Printer SCX-4521F دليل المستخدم Accepte-Toi - Joyce Meyer FR the all-new 2013 - Hyundai Auto Canada DEHUMIDIFIER User Manual Copyright © All rights reserved.
Failed to retrieve file