Home

Crown Boiler SERIES 24 User's Manual

image

Contents

1. w Target Wall in place Target Wall in place FIGURE Cut off 2 ae side lugs Apply silastic to rear surface Target Wall rear view FIGURE 2 C ae IN T NW an OD __ T n i 4 PH ig If Installation of Target Wall FIGURE 3 Crown Boiler Co 3633 I Street Philadelphia PA 19134 PN 980405 01 06 Important Product Safety Information Refractory Ceramic Fiber Product WARNING This product contains refractory ceramic fibers RCF RCF has been classified as a possible human carcinogen After this product is fired RCF may when exposed to extremely high temperature gt 1800 F change into a known human carcinogen When disturbed as a result of servicing or repair RCF becomes airborne and if inhaled may be hazardous to your health AVOID Breathing Fiber Particulates and Dust PRECAUTIONARY MEASURES Do not remove or replace previously fired RCF combustion chamber insulation target walls canopy gasket flue cover gasket etc nor attempt any service or repair work involving RCF without wearing the following protective gear 1 A National Institute for Occupational Safety and Health NIOSH approved respirator 2 Long sleeved loose fitting clothing 3 Gloves 4 Eye protection e Take steps to assure adequate ventilation e Wash all exposed body areas gently with soap and water after contact e Wash work
2. Target Wall Installation Instructions Series 24 Boiler eee ee ee eee ee ee we mee ee eee eee ew eee ew eee ew Re eee eB eee ee ee ew ew we ee ee eee ew ew ew e e ew ew ew eee ewe 1 Apply a 1 4 dia bead of 732 RTV silicone adhesive to the flat surface on the rear of the target wall Apply the bead as illustrated in Figure 2 i 2 Install the target wall immediately before adhesive sets up Position target wall on rear section prior to section assembly Gently press the target wall with the flat palm of your hand to set adhesive Draw up sections in manner described in Section II of the Series 24 Instal lation Instructions Retainer lugs on target wall will engage between the rear and intermediate sections during assembly securely locating wall in position See Figure 1 1 REMOVE BURNER MOUNTING PLATE FOR ACCESS TO COMBUSTION CHAMBER a Turn off service switch or disconnect electrical power supply to boiler b Shut off main fuel supply to boiler C e Disconnect oil and or gas lines and remove burner from mounting plate d Loosen bottom burner mounting plate cap screw and remove remaining seven 7 5 16 18 x 1 lg cap screws that secure burner mounting plate Lift and remove burner mounting plate and set aside 2 REMOVE OLD TARGET WALL a Remove target wall from the combustion chamber The target wall is mechanically locked in place You can expect to severely damage or destroy the old target wall during removal b Use a pu
3. clothes separately from other laundry and rinse washing machine after use to avoid contaminating other clothes e Discard used RCF components by sealing in an airtight plastic bag FIRST AID PROCEDURES e If contact_with eyes Flush with water for at least 15 minutes Seek immediate medical attention if irritation persists e f contact with _ skin Wash affected area gently with soap and water Seek immediate medical attention if irritation persists e f breathing difficulty develops Leave the area and move to a location with clean fresh air Seek immediate medical attention if breathing difficulties persist e Ingestion Do not induce vomiting Drink plenty of water Seek immediate medical attention Product Distributed By Crown Boiler Co Philadelphia PA 19134 Phone 215 535 8900 Consult Material Safety Data Sheets supplied by the manufacturer of this product for additional information and handling instructions PN 980405 01 06
4. tty knife to scrape and remove the silicone adhesive used to retain the target wall ec Using a wire brush clean cast iron surfaces on the back wall of the rear section in preparation for the new target wall d Vacuum all debris from combustion chamber 3 INSTALL NEW TARGET WALL a Using a hacksaw blade carefully saw off both upper retainer lugs located on the sides of the target wall See Figure 2 for details b Apply a 1 4 dia bead of 732 RTV silicone adhesive to the flat surface on the rear of the target wall Apply the bead as illust rated in Figure 2 C e Install the target wall immediately before adhesive sets up Slide target wall horizontally under the front section insulation retaining lugs and up into place on rear section See Figure 3 d Gently press the target wall with the flat palm of your hand to set adhesive 4 RE INSTALL BURNER MOUNTING PLATE AND BURNER ON BOILER a Engage slot at bottom of burner mounting plate onto cap screw Align holes install seven 7 remaining cap screws and tighten burner mounting plate securely b Attach burner and re connect fuel lines Ce Open main fuel supply to boiler d Turn on service switch or re connect electrical power supply to boiler e Bleed air from fuel lines f Operate burner and check for proper start up operation and cut off Over for illustrations PN 980405 01 06 SIDE 2 T J Target i Wal T D 4 Rear Section w Section Assembly

Download Pdf Manuals

image

Related Search

Related Contents

ISO 9001:2000  Stampante a colori HP Photosmart 1215/1218  Projecta Ultra Velour Drapery Panels 122x396 cm    EDY型 - オルゴ株式会社 ALLGO  Worldwide Lighting W83123C10-CL Instructions / Assembly  Makita RP2301FC Use and Care Manual  EUROSTER 11B  Samsung CY-MIVSSTS  CPA 2000 - Dynacord  

Copyright © All rights reserved.
Failed to retrieve file