Home

Cisco Systems LightStream 100 Installation Manual

image

Contents

1. The LINF card box contains the LINF card set a LINF card and front panel with window STS 3c STM 1 LINF card P 8X79 P 8X0K Transparent Asynchronous Transmitter Receiver Interface TAXI LINF card P 8X31 P 8X85 Note The quantity and type of cards depend on your system configuration LightStream 100 ATM Switch Components References throughout this publication refer to the LightStream 100 ATM switch front and rear panel layouts Figure 2 1 shows the front panel layout and Figure 2 2 shows the rear panel layout Figure 2 3 and Figure 2 4 show LightStream 100 switch internal views Preparing for Installation 2 5 LightStream 100 ATM Switch Components Figure 2 1 LightStream 100 ATM Switch Front Panel UU SS ZNR Sa A AN 600s ay 9 o o L S o cL O L 5 6 5 E 3 l i C l L a 2 S S E L L iE S S IC R eF S J Operator J E J w L rae a POWER READY ALARM eo O O FAIL STAT RUN RESET ENET CONSOLE E lt c 1 oO A o 2 bo I Ethernet connection EIA TIA 232 Reset button Run LED Status LED Failure LED 2 6 Cisco LightStream 100 User Guide LightStream 100 ATM Switch Componen
2. appendix Maintaining Safety with Electricity A A Follow these guidelines when working on equipment powered by electricity Warning Before working on a chassis or working near power supplies unplug the power cord on AC units disconnect the power at the circuit breaker on DC units To see this warning in multiple languages refer to the Power Supply Disconnection Warning section in the Translated Safety Warnings appendix Warning The device is designed to work with TN power systems To see this warning in multiple languages refer to the TN Power Warning section in the Translated Safety Warnings appendix Locate the emergency power off switch for the room in which you are working Then if an electrical accident occurs you can act quickly to turn OFF the power Before working on the system turn OFF the power and unplug the power cord Disconnect all power before doing the following Installing or removing a chassis Working near power supplies Performing a software upgrade S Do not work alone if potentially hazardous conditions exist Never assume that power is disconnected from a circuit Always check 2 2 Cisco LightStream 100 User Guide Safety Recommendations Look carefully for possible hazards in your work area such as moist floors ungrounded power extension cables and missing safety grounds S If an electrical accident occurs proceed as follows Use cau
3. CHAPTER 2 Preparing for Installation This chapter provides safety information and describes the tasks you must perform before you install the LightStream 100 ATM switch This chapter contains the following sections Safety Recommendations Installation Environmental Conditions Confirming the Contents of the Shipping Container LightStream 100 ATM Switch Components Safety Recommendations The following guidelines will help to ensure your general safety and protect the equipment Keep the chassis area clear and dust free during and after installation Put the removed chassis cover in a safe place Keep tools away from walk areas where you and others could fall over them Do not wear loose clothing that could get caught in the chassis Fasten your tie or scarf and roll up your sleeves Wear safety glasses if you are working under any conditions that might be hazardous to your eyes Do not perform any action that creates a potential hazard to people or makes the equipment unsafe Preparing for Installation 2 1 Safety Recommendations A A Warning Class 1 laser product To see this warning in multiple languages refer to the Class 1 Laser Product Warning section in the Translated Safety Warnings appendix Warning Do not stare into the beam or view it directly with optical instruments To see this warning in multiple languages refer to the Laser Beam Warning section in the Translated Safety Warnings
4. ch remains operational within the temperature and humidity limits shown in Table 1 3 2 Allow the following minimum vacant space surrounding the LightStream 100 switch to ensure proper heat radiation 10cm approximately 4 inches or more sides 10cm approximately 4 inches or more front and rear 10cm approximately 4 inches or more top 3 Make sure the installation site meets the following criteria Protected from water and chemicals Free of shock and vibration Horizontal Free of excessive dust Away from direct sunlight Away from devices that generate strong magnetism for example a TV or speakers Confirming the Contents of the Shipping Container This section provides information about the contents of containers used to transport the LightStream 100 ATM switch The LightStream 100 switch comes in two containers the LightStream 100 main unit container and the LINF card container Ensure that the containers are labeled with each type of equipment before opening them The LightStream 100 main unit includes the following parts Motherboard P 8X84 Bus converter BCONV card P 8X54 2 4 Cisco LightStream 100 User Guide LightStream 100 ATM Switch Components Center card P 8X55 A Processor PROC card FSB3523GX P 8X0R Gateway Packet Assembler Disassembler GWPAD card P 8X86 002 Fans three units Power supply Slot covers 16 units Shielded power cable one unit
5. tion do not become a victim yourself Turn off power to the system If possible send another person to get medical aid Otherwise assess the condition of the victim and then call for help Determine if the person needs rescue breathing or external cardiac compressions then take appropriate action Preventing Electrostatic Discharge Damage Electrostatic discharge ESD can damage equipment and impair electrical circuitry It occurs when electronic components are improperly handled and can result in complete or intermittent failures Always follow ESD prevention procedures when removing and replacing components Ensure that the chassis is electrically connected to earth ground Wear an ESD preventive wrist strap ensuring that it makes good skin contact Connect the clip to an unpainted chassis frame surface to safely channel unwanted ESD voltages to ground To properly guard against ESD damage and shocks the wrist strap and cord must operate effectively If no wrist strap is available ground yourself by touching the metal part of the chassis Caution For safety periodically check the resistance value of the antistatic strap which should be within the range of 1 and 10 megohms Mohms Preparing for Installation 2 3 Installation Environmental Conditions Installation Environmental Conditions Install the LightStream 100 ATM switch in an area that meets the following conditions 1 Make sure the LightStream 100 swit
6. ts LightStream 100 ATM Switch Rear Panel Figure 2 2 Power switch Cooling fans AC power connector Preparing for Installation 2 7 LightStream 100 ATM Switch Components Figure 2 3 LightStream 100 ATM Switch Internal View Motherboard Power supply LINF card PROC card VME GWPAD Gateway Packet Assembler Disassembler LINF Line Interface BCONV Bus Converter PROC Processor D VME Versa Module Eurocard 9 2 8 Cisco LightStream 100 User Guide LightStream 100 ATM Switch Components Figure 2 4 Expanded Internal View Motherboard Subboard ATOM switch CLKGEN LINE card gt ames GWPAD card Motherboard ATOM SW Asynchronous Transfer Mode Output Buffer Modular Switch CLKGEN Clock Generator DMUX Demultiplexer GWPAD Gateway Packet Assembler Disassembler LINF Line Interface E MUX Multiplexer a Preparing for Installation 2 9 LightStream 100 ATM Switch Components 2 10 Cisco LightStream 100 User Guide

Download Pdf Manuals

image

Related Search

Related Contents

Tripp Lite 1.6/3.8kW Single-Phase Basic PDU, 100-240V (12-C13 & 2-C19), C20, C14/L6-20P/L5-20P/5-20P/5-15P, 1U  Samsung HT-Z120 Manual de utilizare    IG9071MX IG9071MT handleiding notice d'utilisation anleitung    Sprint Nextel Unbundled Dark Fiber User's Manual  CADVRWD1 series Manu..  Manual del Usuario EasyAccess - CT Automatismos y Procesos SL  SCOTT DJX 10i  Kompernass KH 6504 Operating Instructions  

Copyright © All rights reserved.
Failed to retrieve file