1. Rest room Facilities Contractor may use existing Rest room facilities designated by OWNER d Parking OWNER reserves the right to limit or restrict Contractor parking based upon the daily requirements of the other contractors on site e Dust Control Make provisions to control all dust dirt and foreign material caused by the performance of the Work f Use of explosive type fastening equipment is prohibited Notify OWNER immediately of any damage or possible damage to any other equipment Clean Up a Contractor shall clean up on a daily basis as the Work progresses all dirt dust and debris caused by Contractor s operations Clean up shall be completed by the end of each workday to the satisfaction of OWNER s on site representative b kh the event that Contractor fails to clean up OWNER may elect to have clean up performed by others with the costs of such clean up being charged to the Contractor Construction Aids a Definition Construction Aids are facilities and equipment required by personnel to facilitate the execution of the Work Construction Aids include scaffolds staging ladders platforms hoists cranes lifts trenchers core drillers protective equipment and other such facilities and equipment b Contractor shall provide all Construction Aids required in the execution of the Work Construction Aids that are the property of OWNER or other contractors shall not be used without permission Storage of Const
2. optical cables The network shall support three hard workstations two in the security control center and one at the security desk in the main lobby near the Fourth Avenue entrance 1 05 CONTRACTOR DESIGN REQUIREMENTS A The Project Drawings represent the level of system design to be provided by OWNER Contractor shall provide all additional system design work required including Conduit layout and sizing Wire and cable layout and sizing Point to point wiring and equipment hook up information Equipment mounting details Design of equipment cabinets Other detailed design work required ONY ea Contractor s design shall conform to all applicable codes and ordinances All electrical design including the sizing and placement of conduit raceways and conductors shall be in accordance with the current version of NFPA 70 National Electrical Code unless local codes establish more stringent requirements Contractor s design work is subject to review and approval by OWNER s Project Manager Miscellaneous 1 The addition of all wire cable conduit connectors and junction boxes required for system operation 2 Complete as built documentation of all security systems including documentation of existing equipment wiring conduits and raceways 1 06 SUBMITTALS A Product Data Product Data submittal shall only be required if the Contractor requests a substitution or a particular brand product is not specified
3. within walls ceilings and door frames All wire and cable passing through metalwork shall be sleeved by an approved grommet or bushing Avoid Ownericing conductors All Ownerices shall be made in junction boxes except at equipment Ownerices shall be made with an approved crimp connection Wire nuts shall not be used on any low voltage wiring Identify all wire and cable at terminations and at every junction box Identification shall be made with an approved permanent label Brady or equal E Wire And Cable Terminations Identify all inputs and outputs on terminal strips with permanent marking labels Neatly dress and tie all wiring The length of conductors within enclosures shall be sufficient to neatly train the conductor to the terminal point with no excess Run all wire and cable parallel or normal to walls floors and ground Install connectors as required by equipment manufacturers Terminations shall be made so that there is no bare conductor at the terminal The conductor insulation shall bear against the terminal or connector shoulder OWNER May 16 2013 28 23 00 16 Video Surveillance System Canon model VB H610VE A amp E Specifications 5 Do not obstruct equipment controls or indicators with wire or cable Route wire and cable away from heat producing components such as resistors regulators and the like F Conduit And Raceway Installation 1 Design lay out size and plan new conduit and raceway systems as req
4. 16 2013 28 23 00 12 Video Surveillance System lt a gt x X Canon model VB H610VE A amp E Specifications AutoIP Available Audio Compression Method G 711 u law 64 kbps Audio Communication Method Full duplex two way Echo cancellation function compliant Sound Transfer Protocol by Canon Audio File Playback Available audio files can be played back when an event is triggered by the intelligent function or external device input A third party amplifier speaker is necessary Privacy Mask Number of registration Max 8 places Number of mask colors 1 select from 9 colors Preset Max 20 positions Digital Preset Tour capable Intelligent Function 1 Video a Detection Types moving object detection abandoned object detection removed object detection camera tampering detection and passing detection b Detection Settings Max 15 2 Volume Volume Detection Event Trigger Type External Device Input Intelligent Function Video Intelligent Function Volume Timer Image Upload FTP HTTP SMTP e mail Temporary storage memory in camera Max approx 5 MB Frame Rate Max 10 fps Event Notification HTTP SMTP e mail Image Cropping Function Digital PTZ Cropping Sizes 640 x 360 512 x 288 384 x 216 256 x 144 128 x 72 On Screen Display Available Daylight Saving Time Available 2 04 CAMERA APPLICATIONS A B E F Viewer Camera side Admin Viewer VB Viewer Client side RM Lite Vie
5. ENCLOSURE A B PART3 Aluminum Alloy Dome Polycarbonate Capsule IP66 Rated Weather Resistant Enclosure EXECUTION 3 01 PREPARATION A The Contractor shall order all required parts and equipment upon notification of award of the Work The Contractor shall bench test all equipment prior to delivery to the job site The Contractor shall verify the availability of power where required If a new source of power is required a licensed electrician shall be used to install it The Contractor shall arrange for obtaining all programming information including access times free access times door groups operator levels etc 3 02 INSTALLATION A General 1 The Contractor shall coordinate with the OWNER s Project Manager for storage of the equipment in a secured location prior to installation 2 The Contractor shall carefully follow the instructions in the manufacturers Installation Manual to insure all steps have been taken to provide a reliable easy to operate system OWNER May 16 2013 28 23 00 15 Video Surveillance System Canon model VB H610VE A amp E Specifications The Contractor shall coordinate with the OWNER s facilities coordinator to insure the proper location to tap into electrical power Perform all Work as indicated in the Drawings and Specifications The Contractor shall install the appropriate cables from the cameras to the network equipment The Contractor shall coordinate with the OWNER
6. Final Acceptance Contractor shall prepare and submit to OWNER Project Manager a final record set of Project Record Drawings This set shall consist of all data transferred from the working set supplemented by Riser Diagrams and other information The final record set of Project Record Drawings shall be drafted by a skilled draftsperson under the supervision of Contractor All final Project Record Drawings shall be provided to OWNER I lS F System Documentation 1 Definition System Documentation is a complete collection of all installation programming operation and maintenance manuals and work sheets relating to the equipment provided as part of the Work Contractor shall maintain a file of System Documentation at the project site throughout the course of the Work Such file shall be updated with new information as equipment is OWNER May 16 2013 28 23 00 4 Video Surveillance System Canon model VB H610VE A amp E Specifications received and installed System Documentation shall be available for inspection by OWNER Project Manager on a daily basis Upon completion of Work and prior to final Acceptance Contractor shall prepare and submit to OWNER Project Manager two 2 sets of System Documentation G Closeout Submittals 1 Provide a set of as built drawings and manuals to the OWNER Project Manager a As Built Drawings b Mounting Details c Product Data d Installation Manuals e Operating Manuals f
7. Maintenance Service Manuals with scheduled times for service maintenance Provide the OWNER Project Manager with all programming sheets keys to the equipment cabinets as built drawings operating manuals maintenance repair manuals spare fuses all programming sheets and keys to the equipment cabinets tools for tamper resistant enclosures and tools for manual resetting devices 1 07 QUALITY ASSURANCE A Qualifications 1 4 Qualifications of Contractor a Contractor shall be an installation and service contractor regularly engaged in the sale installation maintenance and service of video surveillance systems b Contractor shall have five 5 years experience with the installation start up and programming of systems of a similar size and complexity to the one proposed c Contractor shall be a factory authorized dealer of the system proposed for at least two 2 years d Contractor shall submit the names and phone numbers of customers for at least three 3 other projects of similar size and complexity using similar technologies Supervision of Work a Contractor shall employ a competent Foreman to be in responsible charge of the Work Foreman shall be on the project site daily during the execution of the Work b Contractor s Foreman shall be a regular employee principle or officer of Contractor who is thoroughly experienced in projects of a similar size and type Contractor shall not use contract employees or Subcontr
8. Output Terminal LINE OUT 3 5mm P0 14 in mini jack connector monaural LINE OUT x 1 connect to an amplifier speaker External Device I O Terminal Input x 2 Output x 2 Memory Card 1 SD Memory Card SDHC Memory Card SDXC Memory Card Compatible Frame Rate Max fps 2 06 CAMERA ENVIRONMENT A Operating Environment Temperature 1 Without Heater 10 C 50 C 14 F 122 F Humidity 5 85 without condensation 2 With Heater 30 C 50 C 22 F 122 F Humidity 5 85 without condensation 2 07 CAMERA POWER A Power Supply PoE PoE power supply via LAN connector IEEE802 3af compliant OWNER May 16 2013 28 23 00 14 Video Surveillance System B C D Canon model VB H610VE A amp E Specifications AC Adapter PA V17 100 240 V AC sold separately External power source 24 V AC 12 V DC Optional Heater Unit sold separately 24 VAC 2 08 CAMERA POWER E F Power Supply PoE PoE power supply via LAN connector IEEE802 3af compliant AC Adapter PA V17 100 240 V AC sold separately External power source 24 V AC 12 V DC Power Consumption When using PoE Max approx 8 4 W 1 When using AC Adapter PA V 17 Max approx 10 72 W 2 When using DC Max approx 9 0 W 3 When using AC Max approx 8 1 W Max approx 18 7W When using optional HU600 VB Heater 2 08 CAMERA DIMENSIONS 7 09 x 5 79 in 2 09 CAMERA WEIGHT 4 24 Ib 2 10 CAMERA
9. UL listed and have a UL label on them 1 03 DEFINITIONS A Words that are in common use are used throughout the Drawings and Specifications except Words which have well known technical or trade meanings are used in accordance with such recognized meanings B Whenever the following listed words and phrases are used they shall be mutually understood to have the following respective meanings 1 2 gt a 9 The words as indicated means as shown on the Drawings and in accordance with the Specifications The words as required means as required to provide a complete and satisfactory Work in full conformance with the Drawings and Specifications The word New means new Work to be provided by Contractor The word Provide means furnish install connect test and make ready for use The words Relocate Existing means remove existing item from present location Reinstall re connect and test existing item and make ready for use at new location as shown on the Drawings The words Remove Existing means remove existing item and return item to OWNER The word Replace means remove existing item and return item to OWNER Provide new item as indicated The word Work The Work is the completed construction required by the Drawings and Specifications and includes all labor necessary to produce such construction and all materials and equipment incorporated or to be incorporated
10. authorized dealers and distributors Contractor shall verify his ability to procure the products specified prior to submitting a proposal Wire And Cable 3 General Provide all wire and cable required to install all systems and components Wire and cable shall be sized to provide minimum voltage drop and minimum resistance to the devices being supplied 4 All cables shall be specifically designed for their intended use direct burial aerial etc 5 Comply with equipment manufacturers recommendations for wire and cable 6 Color codes shall be consistent in cables used for the same purpose 7 Comply with all applicable codes and ordinances Conduit And Raceway Systems 1 General OWNER shall approve The placing of surface mounted conduit on the exterior of any building prior to its installation 2 Interior Conduit a Electrical Metallic Tubing EMT b Flexible Metal Conduit c Provide fittings and connectors as required for installation of EMT or flexible conduit 3 Surface Raceways a Sheet metal channel with fitted cover suitable for use as surface metal raceway WIREMOLD or approved equal b Provide fittings elbows connectors and covers designed for use with each raceway system 4 Exterior Conduit any of the following as determined by local code requirements Rigid Steel Conduit Rigid Aluminum Conduit Rigid Nonmetallic Conduit only if buried 18 below ground surface Intermediate Metal Conduit Provide rain
11. or recommended Procedures 1 Provide submittals to OWNER s Project Manager 2 Submit two 2 copies of each submittal Shop Drawings 1 General Shop Drawings for the project as described elsewhere 2 Provide other Shop Drawings only if specifically requested by OWNER s Project Manager OWNER May 16 2013 28 2300 3 Video Surveillance System Canon model VB H610VE A amp E Specifications D Manufacturers Installation And Programming Instructions Provide Manufacturers Installation and Programming Instructions as requested in the various Specification Sections E Project Record Drawings 1 2 10 Definition Project Record Drawings are drawings that completely record and document all aspects and features of the Work Also known as as built drawings The purpose of Project Record Drawings is to provide factual information regarding all aspects of the Work to enable future service modifications and additions to the Work Project Record Drawings are an important element of this Work Contractor shall accurately maintain Project Record Drawings throughout the course of this project Project Record Drawings shall include documentation of all Work including the documentation of existing equipment wiring conduits and raceways that are to be reused in the Work OWNER Project Manager shall furnish Contractor with two 2 sets of site plans for Contractor s use in preparing Project Record Drawings One set sha
12. s ITC Department for interface with the network All communications cables shall be kept away from power circuits The Contractor shall also execute adequate testing of the system to insure proper operation The Contractor shall provide adequate training of the system users to insure adequate understanding to prevent operating errors B Workmanship lis 2 3 4 Comply with highest industry standards except when specified requirements indicate more rigid standards or more precise workmanship Perform Work with persons experienced and qualified to produce workmanship specified Maintain quality control over suppliers and Subcontractors Quality of workmanship is considered important OWNER Project Manager shall have the authority to reject Work that does not conform to the Drawings and Specifications C Equipment Pre Test All equipment shall be bench tested prior to delivery to job site and prior to installation Bench test per manufacturers installation instructions D Wire And Cable 1 2 Design layout size and plan new wire and cable runs as required All wire and cable from the processors to all devices at each door shall be home run unless otherwise specified All wire and cable including any wire and cable that is existing and will be reused in the Work shall be installed in conduit or surface metal raceway except as follows Wire or cable in lengths of less than ten 10 feet that is fished
13. wall or parapet without prior approval from OWNER s designated Construction Project representative I Grounding Provide earth grounding of equipment as required by equipment manufacturer Earth ground shall be connected to ground rod or approved cold water pipe Electrical or telephone ground connections shall not be used as earth grounds Connections to mounting posts or building structural steel shall not be used as earth grounds J Power To Security Equipment 1 Power all equipment from 120 VAC circuit dedicated for security use except as noted Mark all panel circuit breakers with labels worded Security Equipment Do Not Operate or equivalent 2 All plug in transformers shall be located at the security control panels Secure all low voltage plug in transformers to outlet with screw or strap Clearly label all transformers to identify purpose and use K Cutting And Patching The Contractor shall be responsible for all cutting fitting or patching that may be required to complete the Work OWNER May 16 2013 28 23 00 17 Video Surveillance System Canon model VB H610VE A amp E Specifications L Painting All conduit fittings and junction boxes shall be painted to match the existing surfaces they are mounted on This work may be performed after the system is fully operational 3 03 FIELD QUALITY CONTROL A Final Tests amp Inspection The Contractor shall coordinate with the OWNER s Project Manager for fi
14. Canon model VB H610VE A amp E Specifications SECTION 28 23 00 VIDEO SURVEILLANCE SYSTEM DISCLAIMER FOR VIDEO SURVEILLANCE SPECIFICATIONS The following is a recommended form of disclaimer with respect to the illustrative specifications for the Video System Surveillance System using the Canon NVS camera systems The disclaimer presumes that the technical details in each of the illustrations as set forth under Section 2 02 System Specifications have been reviewed and confirmed by Canon as meeting the technical specifications for each of the relative product models as of the date hereof Further it is recommended that the examples to be delivered include an embedded watermark or other reference on each page indicating that they are For Illustration Only DISCLAIMER These Section 28 23 00 Video Surveillance System specifications the Form Specifications are general in nature and solely for illustration The Form Specifications are not intended for any specific application or use and project specific considerations must be taken into account in the architect s or engineer s preparation of actual system specifications Canon makes no representation or warranty with respect to these Form Specifications and nothing contained herein shall create or be inferred to create any express or implied warranty by Canon These Form Specifications are intended solely to for the purpose of reflecting general guidelines for video surveill
15. actors as Foremen Qualifications of Technicians a All electronic systems Work shall be performed by electronic technicians thoroughly trained in the installation and service of specialty low voltage electronic systems b Journeyman Wireman electrical workers may be used to install conduit raceways wiring and the like provided that final termination hook up programming and testing is performed by a qualified electronic technician and that all such Work is supervised by the Contractor s Foreman c All incidental Work such as cutting and patching lock hardware installation painting carpentry and the like shall be accomplished by skilled craftspersons regularly engaged in such type of work All such Work shall comply with the highest standards applicable to that respective industry or craft d All 120 VAC power wiring and connections are to be performed by a qualified Journeyman Wireman licensed to perform such Work in the local of OWNER Qualifications of Subcontractors OWNER May 16 2013 28 2300 5 Video Surveillance System Canon model VB H610VE A amp E Specifications a Definition A Subcontractor is a person or entity who has a direct contract with the Contractor to perform any of the Work at the site b Use of any Subcontractor is subject to the approval of OWNER The Contractor shall identify all Subcontractors on the Bid Form The Contractor shall make no substitution for any Subcontractor previously selected withou
16. ance system specifications taking into account the features of the Canon model VB H610VE in production as of the date hereof as set forth under Sections 2 02 B through 2 02 P herein Canon reserves the right to change the features or specifications of the aforementioned model at any time without notice The architect or engineer preparing the actual video surveillance specifications should therefore refer to and confirm specifications for such model as of the date of use Canon makes nor representation or warranty about fitness of purpose of the above referenced model for any intended application which determination shall be the sole responsibility of others Canon assumes no liability with respect to arising from or arising out of the Form Specifications or any use thereof PART1 GENERAL 1 01 SUMMARY A Section Includes 1 Camera Assembly camera lens housing mount etc B Contractor s Responsibility The Contractor shall provide and pay for all labor materials equipment tools utilities construction equipment and machinery transportation and other facilities and services necessary for the proper execution operation and completion of the Work C Specification Language Specifications and notes are written in imperative and abbreviated form Imperative language of the technical specifications is directed at the Contractor unless specifically noted otherwise Incomplete sentences shall be completed by inserting shall s
17. eded and notify any subcontractors to schedule their participation 2 Perform all system layout work 3 Insure there are an adequate number of power receptacles available to operate all security equipment and coordinate with OWNER as to where power is available 4 Provide shop drawings to verify location of all equipment conduit runs power connections etc Submit shop drawings to OWNER Project Manager 5 Coordinate with OWNER to provide space for the placement of all monitoring control and recording equipment 6 Prepare and pre test all equipment to the greatest extent possible 7 Install all equipment 8 Test and inspect all systems 9 Perform all other Work as required 10 Provide as built drawings 11 Perform the Acceptance Test 12 Provide training 1 10 SCHEDULING The Contractor within five 5 days after being awarded the contract shall prepare and submit for OWNER s information an estimated progress schedule for the Work The progress schedule shall be related to the entire project and shall indicate start and completion dates 1 11 WARRANTY A Contractor warrants that all Work furnished material and labor under this Contract will be of good quality free from faults and defects and in conformance with the Project Drawings and Specifications B Contractor shall provide parts and labor guarantee on all Work Unless otherwise specified herein Contractor s guarantee shall be for a period of one 1
18. erved during the Acceptance Test amp Inspection Contractor shall promptly correct all deficiencies Upon correction of deficiencies Contractor shall submit a request in writing to OWNER Project Manager for another Acceptance Test amp Inspection If at the conclusion of the Acceptance Test amp Inspection all Work is found to be acceptable and in compliance with the Project Drawings and Specifications OWNER Project Manager will issue a letter of Acceptance to Contractor and OWNER PART 2 PRODUCTS OWNER May 16 2013 28 23 00 9 Video Surveillance System Canon model VB H610VE A amp E Specifications 2 01 GENERAL A Contractor Responsibility 1 All products not provided by OWNER shall be new and unused and shall be of manufacturer s current and standard production 2 Where two or more equipment items of the same kind are provided all shall be identical and provided by the same manufacturer 3 Drawings and Specifications indicate major system components and may not show every component connector module or accessory that may be required to support the operation specified Contractor shall provide all components needed for complete and satisfactory operation Product Availability 1 Contractor prior to submitting a proposal shall determine product availability and delivery time and shall include such considerations into his proposed Contract Time 2 Certain products specified may only be available through factory
19. hall be the Contractor shall and similar mandatory phrases by inference The words shall be shall be supplied by inference where a colon is used within product specifications D Drawings And Specifications 1 Contractor shall be provided three 3 sets of the Drawings and Specifications for his use Additional sets if requested by Contractor shall be furnished to the Contractor for the actual cost of reproduction 2 Contractor shall carefully study the Drawings and Specifications and shall at once report any error unforeseen circumstances inconsistency or omission he may discover OWNER May 16 2013 28 23 00 1 Video Surveillance System 3 Canon model VB H610VE A amp E Specifications The OWNER Project Manager shall be the interpreter of the requirements of the Drawings and Specifications subject to the final approval of OWNER All interpretations and opinions of the Security Consultant shall be made in writing or in the form of drawings E Intent And Correlation 1 2 The intent of the Project Drawings and Specifications is to include all items necessary for the proper execution and completion of the Work The Project Drawings and Specifications are complementary and what is required by any one shall be as binding as if required by both 1 02 REFERENCES A NFPA 70 Current version B NFPA 731 Security System Installation C IEEE Standards on Networks D All power supplies shall be
20. in such construction The word Furnish means supply item as specified Item to be installed by others 1 04 SYSTEM DESCRIPTION A General Description The video surveillance system shall consist of only four types of cameras existing analog fixed positioned domed cameras existing analog domed PTZ cameras new IP fixed position domed cameras with varifocal lenses with views as shown on the drawings and new IP PTZ domed OWNER May 16 2013 28 23 00 2 Video Surveillance System Canon model VB H610VE A amp E Specifications cameras Existing analog cameras shall use their existing coaxial cables which home run to the security control room on the second level The analog camera viewing the parking ramp in the basement shall continue to loop through the analog monitor in the Cashier s Office Where analog cameras are being replaced with IP cameras the IP cameras shall use the existing coaxial cables via IP over Coax media converters at both ends of the coaxial cables Up to four IP cameras may share a single coaxial cable IP cameras remote from the converters shall use CAT 5e or better for interconnection Signals from analog cameras shall be converted to digital via encoders The encoders shall also include an RS 485 connector for controlling PTZ cameras IP signals from all cameras shall be connected to a patch panels in the security control room then connected to network switches then connected to the video servers in the MDF room via
21. ll be used as a working set the other shall be used to prepare the final record set Contractor shall maintain the working set of Project Record Drawings at the project site throughout the course of the Work The working set shall be updated on a daily basis as the Work progresses Project Record Drawings shall accurately show the physical placement of the following Equipment and devices Conduit wiring and raceways Junction splice and pull box locations Interfaces to external equipment Connections to power networks and other communications circuits Project Record Drawings shall show the physical placement of each device and conduit or aerial centerline to be accurate to within one foot 1 of the nearest landmark Where the site plan furnished by Puyallup School District conflicts with actual conditions Contractor shall amend site plan as required Indicate exact description of conduit runs above ground two foot trench along outside wall of building etc Project Record Drawings shall show wire and cable runs zone numbers tamper circuit configuration panel circuit breaker numbers from which equipment is powered and splice points This information shall be shown on the floor and site plans Project Record Drawings shall be available for inspection by OWNER Project Manager on a daily basis Incomplete or inaccurate Project Record Drawings may be cause for delay of Contractor s payment Upon completion of Work and prior to
22. nal tests and inspections in the presence of the Project Manager System Designer Consultant and a factory support person from the manufacturer B Training 1 The training of all personnel shall be performed on site by the Contractor and a factory trainer provided by the manufacturers 2 The manufacturer shall provide a training tutorial and all handout material 3 The manufacturer shall also supply video recording of either the actual on site training or a copy of in house training at the manufacturer s office END OF SECTION OWNER May 16 2013 28 23 00 18 Video Surveillance System
23. ol 7 levels increases the brightness of shaded subjects in a video AGC Limit 5 levels Pan Angle Range 350 175 Tilt Angle Range 150 475 Rotation Angle Range 350 175 Moving Speed Pan 19 2 sec Tilt 14 2 sec Rotation 43 7 sec when the camera angle setting tool is used 2 03 CAMERA SERVER REQUIREMENTS A moo 8 T Q Video Compression Method JPEG H 264 Video Size JPEG 1920 x 1080 960 x 540 480 x 270 320 x 240 H 264 1920 x 1080 960 x 540 480 x 270 Video Quality JPEG H 264 5 levels Frame Rate JPEG 0 1 30 fps H 264 1 2 3 5 6 10 15 30 fps Max Frame Rate 1920 x 1080 30 fps I Frame Interval 0 5 1 1 5 2 3 4 5 sec Simultaneous Client Access Max 30 Clients 1 Admin Client H 264 Max 10 Clients Camera Control Administrator Authorized user Guest user level of control varies depending on user Max 50 user names and passwords registered for authorized users Access Control User authority user name and password Host Access Restrictions IPv4 IPv6 Encrypted Communications SSL TLS IPsec Auto Key Exchange Manual Protocol IPv4 TCP IP UDP HTTP FTP SNMP MIB2 SMTP Client DHCP Client DNS Client ARP ICMP POP3 NTP SMTP authentication RTSP WV HTTP Canon proprietary ONVIF IPv6 TCP IP UDP HTTP FTP SMTP Client DHCPv6 Client DNS Client ICMPv6 POP3 NTP SMTP authentication RTSP WV HTTP Canon proprietary ONVIF OWNER May
24. ordination With Manufacturer 1 Contractor shall perform Work in accordance with manufacturer s instructions Do no omit any preparatory step or installation procedure unless specifically modified or exempted by Contract Documents 2 Contractor shall maintain one set of complete instructions at the job site during installation and until completion 1 14 COMMISSIONING A After all Work is completed and prior to requesting the Acceptance Testing amp Inspection Contractor shall conduct a final inspection and pre test all equipment and system features Contractor shall correct any deficiencies discovered as the result of the inspection and pre test Contractor shall submit a request for the Acceptance Test amp Inspection in writing to the OWNER Project Manager no less than fourteen days prior to the requested test date The request for Acceptance test shall be accompanied by a certification from Contractor that all Work is complete and has been pre tested and that all corrections have been made During Acceptance Test amp Inspection Contractor shall demonstrate all equipment and system features to OWNER Contractor shall remove covers open wiring connections operate equipment and perform other reasonable work as requested by OWNER Any portions of the Work found to be deficient or not in compliance with the Project Drawing and Specifications will be rejected OWNER Project Manager will prepare a list of any such deficiencies obs
25. orizontal 111 0 Wide 36 5 Tele Vertical 60 1 W 20 5 T Day Night Switch Auto Manual Min Subject Illumination 1 Day Mode color 0 3 lux F1 2 shutter speed 1 30 sec when smart shade control is off SOIRE 0 02 lux F1 2 shutter speed 1 2 sec when smart shade control is off SOIRE 0 008 lux F1 2 shutter speed 1 2 sec when smart shade control is on 50IRE 2 Night Mode monochrome 0 015 lux F1 2 shutter speed 1 30 sec when smart shade control is off SOIRE 0 001 lux F1 2 shutter speed 1 2 sec when smart shade control is off SOIRE 0 0005 lux F1 2 shutter speed 1 2 sec when smart shade control is on SOIRE Focus One shot AF Manual Fixed at infinity Shooting Distance from front of lens 1 Day Mode 0 3m 12 in infinity W 2 Night Mode 1 0m 3 3 ft infinity W Shutter Speed 1 1 2 1 4 1 8 1 15 1 30 1 60 1 100 1 120 1 250 1 500 1 1000 1 2000 1 4000 1 8000 1 16000 sec OWNER May 16 2013 28 23 00 11 Video Surveillance System Y a y o Aa y Canon model VB H610VE A amp E Specifications Exposure Auto Auto Flickerless Auto Shutter priority AE Manual Shutter Speed Aperture Gain White Balance Auto Light Source Daylight Fluorescent White Fluorescent Warm Fluorescent Mercury Lamp Sodium Lamp Halogen Lamp Lock One shot WB Manual Metering Mode Center Weighted Average Spot Exposure Compensation 9 levels Smart Shade Contr
26. permits plan reviews engineering certifications and inspections required by regulatory agencies Contractor shall prepare at Contractor s expense any documents including drawings that may be required by regulatory agencies Permits The Contractor shall make application for and obtain any and all permits required by federal state county city or other authority having jurisdiction over the work Certifications The system shall use U L Listed power supplies and lightning protection 1 08 DELIVERY STORAGE AND HANDLING A Delivery To Job Site Contractor shall have total responsibility for safe and secure delivery of security equipment and tools to the job site Arrange deliveries of Products in accord with construction schedules to avoid conflict Storage And Protection OWNER is not responsible for the care storage or security of any of the Contractor s tools or equipment OWNER May 16 2013 28 23 00 6 Video Surveillance System Canon model VB H610VE A amp E Specifications 1 08 PROJECT SITE CONDITIONS A Environmental Conditions 1 Facilities a Power Electrical power will be supplied by OWNER to the extent that the usage is compatible with available facilities in the vicinity of the work b Telephone Contractor may use a telephone designated by OWNER for local and toll free calls The costs of long distance calls are the responsibility of the Contractor and shall not be charged to OWNER c
27. ruction Aids shall be coordinated with OWNER s on site representative Safety a The Contractor shall be responsible for initiating maintaining and supervising all safety precautions and programs in connection with the Work b Contractor shall comply with all local state and federal regulations and laws for the safety of the work place Accident Reports Serious or fatal accidents shall be reported immediately by telephone or radio to the OWNER s Project Manager B Existing Conditions Existing Wiring Conduits and Raceways 1 OWNER does not warrant the condition of any portion of the existing wiring conduit or raceway systems Prior to submitting his proposal Contractor shall examine all existing conditions and determine to what extent the existing wiring conduit and raceway systems may be reused OWNER May 16 2013 28 23 00 7 Video Surveillance System Canon model VB H610VE A amp E Specifications 2 Contractor s proposal price shall include the cost of replacing existing wiring conduit and raceways as required 1 09 SEQUENCING A Description This implementation plan describes the general approach that shall be followed in order to minimize the time for the access control systems to be operational B Approach Contractor shall plan and schedule all work in such a sequence as to minimize the time before the system is operational The following is a suggested work sequence 1 Order all equipment ne
28. t approval from OWNER c Contractor s Foreman shall be on the project site daily during all periods when Subcontractors are performing any of the Work Contractor s Foreman shall be in responsible charge of all Work including any Work being performed by Subcontractors d By an appropriate written agreement the Contractor shall require each Subcontractor to the extent of the Work to be performed by the Subcontractor to be bound to the Contractor by the terms of the Drawings and Specifications and to assume toward the Contractor all the obligations and responsibilities which the Contractor by these documents assumes toward OWNER Supervision And Construction Procedures 1 The Contractor shall supervise and direct the Work using his best skill and attention Contractor is solely responsible for all construction means methods and techniques 2 The Contractor shall employ a competent foreman who shall be in attendance at the project site during the progress of the Work The foreman shall represent the Contractor and all communications given to the foreman shall be as binding as if given to the Contractor Regulatory Requirements 1 All Work is to conform to all building fire and electrical codes and ordinances applicable in the OWNER In case of conflict between the Drawings Specifications and codes the codes shall govern Notify OWNER Project Manager of any such conflicts 2 Contractor shall secure and pay for all licenses
29. tight fittings and connectors as required for installation of exterior conduit 5 Exterior Flexible Conduit a Liquidtight Flexible Conduit Flexible metal conduit with PVC jacket fo Ao Ff OWNER May 16 2013 28 23 00 10 Video Surveillance System F F G Canon model VB H610VE A amp E Specifications b Provide rain tight fittings and connectors as required for installation of Liquidtight Flexible Conduit Junctions And Pull Boxes 1 Interior Boxes Sheet Metal Outlet Boxes Sizes to be determined in accordance with code requirements for conductor fill No box shall be smaller than a single gang 1 1 2 deep Provide box covers 2 Exterior Boxes All exterior boxes shall NEMA 4 or NEMA 3R watertight and dust tight 3 All interior and exterior boxes shall have their covers fastened using security screws Lightning Protection i The Contractor shall provide adequate lightning protection for all cameras 2 All lightning protection equipment shall be UL listed Surge Protection The Contractor shall provide suitable surge protection for all cameras 2 02 CAMERA REQUIREMENTS A mH go A W T z7 Q _ Image Sensor 1 3 type CMOS primary color filter Number of Effective Pixels Approximately 2 1 million pixels Scanning Method Progressive Lens 3x optical 4x digital zoom lens with electric drive Focal Length 2 8 Wide 8 4mm Tele F number F1 2 Wide F2 0 Tele Viewing Angle H
30. uired 2 Indoor Requirements a Route exposed conduit and raceway parallel and perpendicular to walls and adjacent piping Maintain minimum a six 6 inch clearance between conduit and piping c Group conduit in parallel runs where practical and use conduit rack constructed of steel channel with conduit straps or clamps d Use conduit bodies to make sharp changes in direction as around beams Fasten conduits and raceways to structural steel using approved spring clips or clamps e Where conduit penetrates fire rated walls and floors seal opening with UL listed fire rated sealer or other methods as approved by codes f No exposed conduit raceway or junction box shall be installed within any office area g Install all boxes straight and plumb h Do not support conduit from mechanical plumbing or fire sprinkler systems i Drill or core drill all holes in walls ceilings or floors where required for new conduits Do not cause damage to any structural steel or other structural support member by drilling or cutting j Do not use flexible conduit in lengths longer than six 6 feet 1 Outdoor Requirements a Where conduit penetrates exterior walls seal opening around conduit in an approved manner to make watertight b Use galvanized straps and fasteners on all exterior conduit c All exterior boxes will only be used to aid in pulling the cable between points G Penetrations Do not penetrate any roof flashing exterior
31. wer Admin Tools Privacy Mask Setting Tool Preset Setting Tool Intelligent Function Setting Tool Log Viewer Recorded Video Utility Included Software VB Initial Setting Tool RM Lite Proxy Authentication Admin Viewer Admin Tools Camera Angle Setting Tool Language English German French Italian Spanish Japanese Operating Environment PC specifications and OS CPU Intel Core 17 2600 OWNER May 16 2013 28 23 00 13 Video Surveillance System Canon model VB H610VE A amp E Specifications Graphics Board Not Specified Memory 2GB or more Viewer Display 1920 x 1080 or more OS 1 Windows XP Home Professional SP3 32 bit 2 Windows Server 2003 Standard SP2 32 bit 3 Windows Server 2003 R2 Standard SP2 32 bit 4 Windows Vista Ultimate Business Enterprise Home Premium SP2 32 64 bit 5 Windows 7 Ultimate Professional Enterprise Home Premium SP1 32 64 bit 6 Windows Server 2008 Standard SP2 32 64 bit 7 Windows Server 2008 R2 Standard SP1 64 bit 8 Web Browser Internet Explorer 7 0 8 0 9 0 32 bit 9 Runtime Libraries NET Framework 3 5 SP1 2 05 CAMERA INTERFACE A B Network Terminal LAN x 1 RJ45 100Base TX auto full duplex half duplex Audio Input Terminal common for LINE IN amp MIC IN 1 3 5mm 00 14 in mini jack connector monaural 2 Switch LINE IN MIC IN in the setting page 3 LINE IN x 1 connect to an amplifier microphone or MIC IN x 1 connect to a microphone w o amplifier Audio
32. year from date of Acceptance except where any specific guarantees from a supplier or equipment manufacturer extends for a longer time C Contractor s guarantee shall cover all costs associated with troubleshooting repair and replacement of defective Work including costs of labor transportation lodging materials and equipment D Guarantee shall not cover any damage to material or equipment caused by accident misuse unauthorized modification or repair by OWNER or acts of god OWNER May 16 2013 28 23 00 8 Video Surveillance System E Canon model VB H610VE A amp E Specifications Contractor shall promptly respond to OWNER s requests for service during the guarantee period Contractor shall provide repair service as soon as reasonably possible upon request from OWNER but in no case shall service response exceed 8 hours from time of request 1 12 SYSTEM STARTUP Power shall only be applied to the system after re checking for proper grounding of the system and measuring all loops for lack of shorts grounds and open circuits 1 13 OWNER S INSTRUCTIONS A B Coordination With OWNER 1 Contractor shall closely schedule and coordinate his activities with designated OWNER representatives 2 Contractor shall provide OWNER s Project Manager with a work plan on a weekly basis Such work plan will describe locations of intended activities types of activities and potential conflicts to facility operations Co
Download Pdf Manuals
Related Search
Related Contents
mmOne Benutzerhandbuch 14-Language Speaking Global Translator Hawking Technologies Wireless Appliance Module Yes - CMS-CSC-Alignment Site PCL-818 Series User Manual Samsung GT-B5722 Benutzerhandbuch GsmAlarm 220 V302 En T'nB SLB10GB Mod:G65/4F7T Instruction Manual for Ultrasonic Level Meter Model: NUS-4 Copyright © All rights reserved.
Failed to retrieve file