Home

Chief NAF33QBA rack accessory

image

Contents

1. 4099 852 2145 4477 Pi cO A CONSUMES
2. INSTALLATION INSTRUCTIONS 3U Fan Panel Accessories NAF31 32 33QBA G CHIEF raXess series NAF31 32 33QBA DISCLAIMER Milestone AV Technologies and its affiliated corporations and subsidiaries collectively Milestone intend to make this manual accurate and complete However Milestone makes no claim that the information contained herein covers all details conditions or variations nor does it provide for every possible contingency in connection with the installation or use of this product The information contained in this document is subject to change without notice or obligation of any kind Milestone makes no representation of warranty expressed or implied regarding the information contained herein Milestone assumes no responsibility for accuracy completeness or sufficiency of the information contained in this document Chief is a registered trademark of Milestone AV Technologies All rights reserved DIMENSIONS Installation Instructions A IMPORTANT WARNINGS AND CAUTIONS WARNING A WARNING alerts you to the possibility of serious injury or death if you do not follow the instructions CAUTION A CAUTION alerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions WARNING Failure to read thoroughly understand and follow all instructions can result in serious personal injury damage to equipment or voiding
3. SEMBLY AND INSTALLATION NOTE The NAF31 32 33QBA fan panels are designed for use with 19 wide equipment racks See the specific Cable tie installation instructions provided with the rack for lt gt mount additional installation information 1 Attach the fan panel A within the rack using four 10 32 x 3 4 header point Phillips screws not included See Figure 1 E A rear view Z Z Z Z A ANN Figure 2 UEL NNN MAY 5 Plug the power supply into an available outlet 6 Complete the installation following the rack installation instructions Figure 1 2 Plug the adapter C into the DC power supply B 3 Plug power supply into back of fan panel A See Figure 2 4 Secure power supply plug using a cable tie not included through the cable tie mount See Figure 2 NAF31 32 33QBA SG CHIEF Our Mounts Your Vision Chief Manufacturing a products division of Milestone AV Technologies 8821 002001 Rev00 2010 Milestone AV Technologies a Duchossois Group Company www chiefmfg com 09 10 USA International Europe Asia Pacific TUDD tT U D Tl U Installation Instructions 8401 Eagle Creek Parkway Savage MN 55378 800 582 6480 952 894 6280 877 894 6918 952 894 6918 Fellenoord 130 5611 ZB EINDHOVEN The Netherlands 31 0 40 2668620 31 0 40 2668615 Office No 1 on 12 F Shatin Galleria 18 24 Shan Mei Street Fotan Shatin Hong Kong 852 2145
4. of factory warranty It is the installer s responsibility to make sure all components are properly assembled and installed using the instructions provided DIMENSIONS MILLIMETERS INCHES Installation Instructions NAF31 32 33QBA TOOLS HARDWARE PARTS 2 Hardware required not included A 1 4 10 32 x 3 4 header Fan panel point Phillips screws 1 4 cable tie 2AE B 1 A DC power supply AS

Download Pdf Manuals

image

Related Search

Related Contents

Spring 2012  1856D Frequency Counter User Manual  Cre-X-Mice Database User guide  Netgear LG2200D Quick Start Guide    Add-On Computer Peripherals (ACP) 44W4408-AO network transceiver module  Samsung 540N Užívateľská príručka  Tucano SARM47-RC mobile phone case  Reglamento del Usuario  

Copyright © All rights reserved.
Failed to retrieve file