Home
        Atdec VF-AT-D flat panel desk mount
         Contents
1.    Allen Ke  Pole       Assembly  Step 3     ADUSTMENT AN6    Suits 12mm         to 38mm  1     thick work  surfaces    NOTE  It is recommended that the Pole  Assembly be clamped to the rear or side  edge of the work surface    Step 2  Install the M8 Desk Clamp  Screw and Pressure Plate as shown     Pressure  Plate    M8 Desk  Clamp Screw    5mm  Allen Key    Adjust the height of the Pressure Plate to suit the  Work Surface and tighten firmly in the desired location     Assembly    Work Surface    5mm Allen Key  lt     Tighten Firmly          C Assemble the Double Arm Assembly onto the Pole Assembly    Handgrip    Step 1   KI  Unlock the K     handgrip    Handgrip Tab    Step 2    Lift the handgrip to  the top of the pole  so that the Handgrip  Tab protrudes    Slide the Double       Arm Assembly   and the Handgrip   down the Pole     For Displays with 75mm x 75mm   3    x 3     mounting hole patterns    M4 Display Mounting Screws    For Displays with 100mm x 100mm   4    x 4     mounting hole patterns    Lock the  Handgrip    a A  Step 2  Insert  a Secondary Arm  Cable Cover     Step 1  Connect cables    NOTE  If Visidec Focus  Articulated Arm Double is  to be used in a multi user  evironment  do not install  the Cable Balls and only  use the Cable Clips     Double Arm  Assembly    Step 3    Slip the Double Arm Assembly  over the Handgrip Tab and  then onto the Pole    Step 6  Step 7   Insert the Pole Insert the 5mm Allen    Top Cap into      Key into the slot in    Pole Top
2.  Cap    the Pole the Pole Top Cap    NOTE  Leave enough slack in the  cables to allow for movement    Step 3  Insert  Primary Arm  Cable Cover     Step 4  Insert cables into  slot  using cable balls to hold  them in place  single user only       and then u    see note  p    Cable   gt   Balls  x2         Step 5  Attach remaining  cables that do not fit into the  slot with the two supplied  cable clips     F Leave the    User Operating Card    with Visidec Focus Articulated Arm Double    Leave the    User O perating Card    secured to the base of Visidec Focus Articulated Arm Double with the    atdec       logo facing upwards     La  atdec       No portion of this document or any artwork contained herein should be reproduced in any way without the express written consent of Atdec Pty Ltd   Due to continuing product development  the manufacturer reserves the right to alter specifications without notice  Published  13 02 08       
3. IM PO RANT   The    User O perating Card     must be left  with Visidec Focus Articulated  Arm Double once installed    User O perating Card   see note at top of page     B1 Bolt Through    Drill a 9mm          hole in the  work surface at the desired  position and assemble as  shown below     Slot    Pole Assembly    Bolt Through Base    9mm          Hole    Steel washer    M8 Desk Clamp Scre   found in the Desk  Clamp Box     5mm Allen  Key  Tighten Firmly    NO TE    Ensure the slot in the Pole Assembly faces away  from the user    It is recommended that the Pole Assembly be  mounted towards the rear edge of the work surface    Installation       Primary Arm    Cable Cover  x2  M8x30mm    Screw    Pole Top  Cap      SS a g   Tea  tsk     ps    Bolt Through  Base    Secondary Arm    Cabl  Cable Cover  x2  saa    Balls  x2     B2 Desk Clamp    Instructions    Pressure Plate Clamp Screw    Display Mounting  Screws    i    M4x10mm    Cable Clip  x2   x8       M4x1l2mm   x8      pea M4xl6mm    Steel  x8      Washer    NOTE  When using the Desk Clamp mounting option   the displays can only be used in side by side  configuration as shown  Failure to do so may result in  serious damage to product and displays     Step 1  Attach the Desk Clamp Bracket to the bottom   of the Pole Assembly using the M8x30mm Screw    Tighten firmly using the 5mm Allen Key    Ensure the Visidec logo is facing the front as shown   Desk    Clamp    Bracket Tighten    M8x30mm  Screw    Bolt Thru  Base    
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
ficha técnica: fijador piedra calizas strong 2l  la tribune_fr  IMF907-A V350-PRO (CE) .qxp_ IM907 V350-PRO  HQ RC UNIVERS47 remote control  Implementing QoS for VoIP in a Local Area Network (LAN)  CT 22 E CT 33 E  Keysight Model 66000A MPS Mainframe  農作業における安全の確保(PDF:418KB)  Using PSpice Schematics  Guía del usuario de la impresora a color Phaser 7400    Copyright © All rights reserved. 
   Failed to retrieve file