Home
        Strebel Ca6s Installation Manual
         Contents
1.                                  Je iog                             AIN  JOSU9S WOOY 0L SM               UJOOJ pue JOSU9S LUOO JOY snq ejeq                        jUeA9 9J ay  JOJ SIOSUBS MOJJ  9 G p     JA                                           Zd 1S             BUIXILU                  ay  10             Hugen  9                        9 9 0   LAM Josues Je log   1M    002    Josuas apismo         2            BUIXILU JO  ZOZ JA JOSUSS                                                 ZOZ IA Josues MOJJ LAA       9 8 0Z LAM Josues Jeylo Je   LAS       20151891 49     OOZAV Josues episino LAV                         1314110 269  e z 415        9 9 0   LAA Josues           L  A                               Z                                                                                   LdMIN            BUIXILU jueA9 9J OU  JOJ SSAJLA J9XI A  9 G p                y            jeuuud J9yuoJeo Ld1s            Bunejnoum Jalog          2             JeuBis uns saung 779                           ay  JO L 6X        ex            jpauuo                   Ajddns              oBejs      eubis uns jeuung 129                       919UM             prouajos Ajddns   any AW 1                   Uogeieiqav Z              UOISUSIXY     9     3A TVA            5     3A TVA                              BUIXILU                  ay  JOJ SIOSUSS MOJ  9 S r E JA    ynoJro BUIXILU jueA9 eJ ay  JO                                 9 G g                                             eui JO  OLX UM 
2.    BOILERS    RADIATORS    Ca 6s and BCa 6s  33 64 kW          INSTALLATION AND  OPERATING  INSTRUCTIONS    CONTENTS  PAGE     General specification 3  Dimensions for Ca6s and BCa6s boilers  4  Boiler room clearance requirements 5  Boiler block assembly 6  Boiler connections and jacket assembly 7  Diagram 8             assembly 9  BCa6s electrical connections and jacket assembly 10  Diagram 11  Instrument control panel description 12  Continued 13  Control module options 14  Control module diagrams 15  Installation of electronic control modules 16  Terminal wiring diagram 17  Schematic wiring diagram 18  Important notes  amp  burner connection information  19  Page 2    31 07 00    ASSEMBLY INSTRUCTIONS FOR     Ca 6s  BCa 6s       General Specifications    The STREBEL Camino 6s 1s a special boiler for oil or  gas fired pressure jet burner     In the BICALOR construction a calorifier for the  supply of hot water is built onto the boiler     CSH S type calorifier are manufactured from 1 4571  high tensile steel with an incorporated heating coil of  galvanised copper ribbed pipe     Triple pass block of cast iron sections    The first pass 1s the combustion chamber  From there  the flue gases pass between the rear section and the last  intermediate section through the second pass to the  front of the boiler  They are then diverted into the third  pass and flow back to the rear through the flue spigot  into the chimney     Flue baffles of cast iron can be introduced into the flue
3.    eration for one heating circuit  two mixing valves  and HWS control     illustration on page 7     Gamma 33B   Weather compensated control for two heating cir   cuits both with mixing valves  This is an addi   tional control module  suitable only in addition to  a basic electronic control module     Mounting and operating instructions are sup   plied with the electronic controls     Page 14    31 07 00    ASSEMBLY INSTRUCTIONS FOR       6s   BCa 6s       Gamma B1 Control Module        STAGE 1 STAGE 4       X    G22K Control Module        Gamma 223B control module        Gamma 2233B Control  Module        Page 15    31 07 00    ASSEMBLY INSTRUCTIONS FOR     Ca 6s BCa 6s       Installation of an electronic control module  Gamma Bl    First the blank cover on the boiler needs to be  removed  Use a screwdriver with light  pressure turning anti clockwise the screws on  the left and the right side of the blank cover   Then remove the blank cover carefully as there  is wiring connected to the back    Remove the plugs X3 and X4 from the back of  the blank cover  Connect the plugs X1  X2   X3  and X4 from the boiler instrument panel to  the back of the control module  Insert the  electronic control module into the opening  and fix it by turning the two screws under light  pressure clockwise by 90    The electronic  control module unit is now fixed to the boiler  instrument panel     Page 16    If a further control module is to be added  open  the top metal cover of the boiler instr
4.   passes in order to influence the flue gas temperature    depending on chimney conditions     The boiler can be used with an oil or gas burner     Brief description    e Corrosion resistant block of cast iron sections    e Triple pass boiler with optimised use of energy    e High efficiency    e Built in instrument panel with multiple control    possibilities and retro fit control options   Easy erection and cleaning      Modern design     Operating conditions    Boiler    Maximum operating temperature up to 110  C  Maximum operating pressure 4 0 bar  Maximum test pressure 5 2 bar    Page 3       Calorifier   Maximum operating pressure 10 bar  Maximum test pressure 13 bar    The boiler can be delived in individual sections  or as a boiler block  The accessories are packed  seperately  There are different orders of  assembly depending on the condition of supply   when assembling and connecting the boiler  all  relevant instructions should be observed     The boiler is to be erected on a base  or a level  floor which is capable of supporting the weight  of the boiler  water content and any ancillary  equipment  Refer to base details opposite     Assembly  connections and the initial set up    operation should be carried out by a qualified  heating engineer     Min thickness   60mm    Dimensions    EA A jo Bo y    31 07 00    Ca 6s   BCa 65    ASSEMBLY INSTRUCTIONS FOR     Boiler Dimensions       Combustion chamber depth    LK    C5H 5    ES    n           Lal                  
5.   until the clearance is even again     Page 6    Once assembled  the boiler block is to be secured with  the tie bars  2 at the top  and 2 at the bottom   Prior to  screwing nuts up ensure the two disc springs  5  amp  6   are slotted on with concave sides facing each other   The nuts can now be tightened until the disc springs  flatten     The burner door hinges should now be fitted on the  left or right hand side of the front section depending  on requirements  Ensure the eyelet screws  door  hinge  are at the same depth and when the door 1s  closed it should press flat with the front section                    Diagram showing nipple  amp  borin    31 07 00    ASSEMBLY INSTRUCTIONS FOR     Ca 6s BCa 6s       Connections and jacket assembly    The diagram over the page shows the assembly of the           connections and jackets     The order of assembly from  1  to  24  must be  observed     Key to components     Left hand lower insulation    Right hand lower insulation    Left hand jacket with insulation    Right hand jacket with insulation    Front bottom bracing angle    Lower door jacket bracing    Upper front insulation    Upper front jacket panelling    Calorifier blanking flange    Top jacket insulation    Inner rear insulation    Burner connection    Capillaries    Top Jacket    Flow header and flange     Fitted eccentrically upwards     17  Return header and flange    Fitted eccentrically upwards     18   Calorifier blanking flange    19  Drain cock connection    2
6. 0    Rear jacket angle     joe d d M cM 3                            pu  Nm hh Y     O    21  Outer rear insulation   22  Rear insulation retainer   23  Rear insulation retainer     24  Flue gas spigot   25  Front Jacket  amp  front shroud     Page 7    Important points     The burner door can be fitted to swing from either the  left or right  Fit hinge bolts accordingly and ensure  there is even pressure around door seal by adjusting  the depth of the eye holes for the hinge     Note  The burner plug must be mounted on the  opposite side     When assembling the floor insulation  1   amp   2  as  well as the side jackets  3   amp   4  care should be taken  to ensure they are in the correct position  with burner  cable holes facing the front      The water temperature sensors  14  must be pushed  with the pressure spring into the immersion sleeves   max  3 per sleeve  and then secured with the  protective guard     Note  The sensor leads  capillary tubes  should not  be kinked     Cold water pressure test     The assembled boiler is to be subjected to a cold  water pressure test of 1 5 times the operating pressure     The maximum test pressure of the boiler is 5 2 bar     In addition  at the time of testing for water pressure   no pressure control fittings or safety fittings may be  assembled which cannot be separated from the water  area of the boiler    Only fill  slowly from the bottom via the filling and  draining cock     Ventilate during the filling procedure from time t
7. CSH 3055    CSH 2355    U   LO     I  U            Page 4    31 07 00    ASSEMBLY INSTRUCTIONS FOR  Ca 6s   BCa 6s       min  450      A     o  D min  150    min  400    Diagram showing clearances required in boiler room     The clearance details shown above are required for access to the boilers for maintenance purposes  Slight  variations may apply  depending on the specific installation        Page 5  31 07 00    ASSEMBLY INSTRUCTIONS FOR     Ca 6s   BCa 65       Boiler Block Assembly    The boiler block is assembled by    pulling up    each  section in turn starting from the rear section  1   All  other sections  2  3  4  are mounted individually  using the pulling up tools     One face of the adjoining sections must have a length  of mastic sealing strand placed into the mastic groove     Each of the boiler nipples must be inspected to ensure  there is no damage apparent  The nipples and nipple  ports should then be kept free from dirt and checked  at each stage of assembly  Particles of dirt which are  not removed lead to leakage    The accompanying nipple jointing oil serves as a  lubricant as well as a waterproof seal and must be  used    Boiler nipples and nipple ports must align exactly at  all stages of assembly  An inclined  retracted nipple  leads to leakage    The clearance between the sections throughout the  pulling up stages should always be even  If the  clearance 1s uneven  a flat chisel should be inserted  into the narrower point and the sections pulled up
8. OLX                           UOISU91X9 eje                      ANE   HOLLOJHHO   A 19905                              A Idd  1 gt  1414          P    A     49715   49Y15    JHNIHOLIMAS               3101474         HOISIA Ctd    11915 Y3IH 4N4    THD  LOO 1                    JA Iv A                        Te A                   INV9D VIG        IVNINA AL       31 07 00    Page 17    KFG INSTRUMENT CONTROL PANEL    WIRING DIAGRAM IN TOTALCAD FILE    INSERT HERE    Page 18  31 07 00    ASSEMBLY INSTRUCTIONS FOR       6s   BCa 6s       IMPORTANT     Flue gas temperatures of below 160  C can lead to  sooting of the flue  when entering a stone or brick  chimney  Where flue gas temperatures are below  160  C gross  specially adapted chimneys must be  available  If after the burner has been set  the flue gas  temperature is too low  the baffles from the 3rd flue  pass can be taken out  If necessary  the 2nd flue pass  baffles can also be removed    NB  Every change made to the flue baffles requires  re commissioning of the burner settings     Electrical connections must be carried out by qualified  personnel in accordance with instructions supplied     Electrical leads and oil pipes should never be fastened to  the boiler casing     In the interest of technical progress  we reserve the right  to undertake changes and improvements in production  without notification     Please refer to    Operating and Maintenance    information  for details on baffles and control panel informatio
9. d  A Summer Winter  switch 1s fitted here     Page 13  31 07 00    ASSEMBLY INSTRUCTIONS FOR     Ca 6s BCa 6s       Control module options    Single stage burner operation    Gamma 1B   HWS control  temperature range 20     80  C   HWS priority  pump overrun of calorifier pri   mary pump  boiler control thermostat    illustration on page 7     Gamma 2B  Weather compensated control for one heating  circuit and HWS control     Gamma 23B  Weather compensated control for one heating  circuit  one mixing valve and HWS control     Gamma 233B  Weather compensated control for one heating  circuit  two mixing valves and HWS control     Gamma 233BS   Weather compensated control for one heating   circuit  two mixing valves  HWS control  tem   perature difference control for solar units and   combination with solid fuel boilers     Gamma 33B   Weather compensated control for two heating  circuits both with mixing valves  This is an addi   tional control module  suitable only in addition to  a basic electronic control module     Two stage burner operation    G22K  Electronic two stage thermostat for constant tem   perature boiler operation   illustration on page 7     Gamma 22B  Weather compensated control for two stage op   eration for one heating circuit and HWS control     Gamma 223B   Weather compensated control for two stage op   eration for one heating circuit  one mixing valve  and HWS control     illustration on page 7     Gamma 2233B   Weather compensated control for two stage op
10. e carried out by  trol  a competent person   If any works are carried out the mains supply to  E     Burner lock out lamp  red  the boiler must be isolated and secured against ac   cidental switching on   The red lamp will illuminate when the burner has The proper function of the boiler instrument panel  gone out  burner fault   the red lamp will go off   is only guaranteed according to our general guar   once the burner reset button has been pressed  antee conditions and only if the installation and  operation 1s carried out in accordance with these  F     high limit lamp  orange  instructions     If the boiler safety limit thermostat  STB  1s acti   vated  the orange control lamp will be illumi   nated  The orange lamp will go off once the STB  button has been pressed and reset     G   Instrument panel  On  lamp  green     This will be illuminated when the instrument  panel 1s switched on  the main On     Off switch   A  turned from    0    to 717     H     Blank cover    The standard version of the boiler instrument  panels are supplied with blank covers  Terminal  blocks X3 and X4 connect to dummy connection  pins on the rear side to prevent short circuits   When using an additional electronic control  module  this blank cover should be removed   Terminal blocks X3 and X4 should then be con   nected to the replacement module along with X1  and X2  in the designated positions      I     Blank cover  When a Gamma 1B control module 1s used  this    blank cover must be remove
11. n     When connecting the burner  make sure the length of the burner cable is  such that when the burner door is opened it becomes disconnected        Page 19  31 07 00    ASSEMBLY INSTRUCTIONS FOR  Ca 6s   BCa 6s          THE COMPANY RESERVES THE RIGHT TO CHANGE SPECIFICATIONS AND DIMENSIONS WITHOUT NOTICE  STREBEL LTD       1F Albany Park Industrial Estate   Frimley Road  Camberley  Surrey  GU16 7PB  Telephone  01276 685422 Fax  01276 685405  E mail address  info strebel co uk   Website  www strebel co uk       E   amp  O E Page 20    31 07 00    
12. o  time  until the water emerges     If a nipple connection is leaking then drain off the  water via the filling and draining cock  Separate by  driving flat wedges around the perimeter of the join  between sections  New nipples MUST be used for re   assembly    Assemble and repeat test     31 07 00    ASSEMBLY INSTRUCTIONS FOR  Ca 6s   BCa 6s          Fa     ON      E    a me     21        0              Page 8    31 07 00    ASSEMBLY INSTRUCTIONS FOR       6s   BCa 6s       BCa7s Assembly    Follow the steps below for completion of the assembly  The  diagram shows the calorifier connections and mounting    brackets    Key   1 Flow connections   2 Return connections   3  Mounting bracket   4  Calorifier primary flow connection  5 7 4 Calorifier primary return connections  6 Non return valve and charging pump   9 Drain cock connection       Page 9    31 07 00    ASSEMBLY INSTRUCTIONS FOR       6s   BCa 6s       BCa  6s electrical connections and jacket assembly     The diagram over the page shows the assembly for the             including electrical connection and final jacket assembly     Angled bracket with pipework slots   Jacket alignment bracket    Left hand side jacket    Right hand side jacket   Calorifier top insulation    Top jacket    Jacket mounting bracket   Instrument control panel   Calorifier door    Sensor capillaries    Boiler sensors    Thermostat sensor    Calorifier thermometer    Burner cable outlet    Alternative burner cable outlet  depending on hinge  
13. placement    16      Rear boiler insulation    17  Insulation retaining brackets   18  Lower rear calorifier insulation   19  Rear calorifier insulation    20    Rear insulation retainers    21  Flue gas spigot    22  Front calorifier insulation    23  Boiler front jacket     pee A Es         Ad     om xvm     VD  A AO    Note     Mains connection should be  made via the rear of the boiler  through to the control panel  It  must not be connected directly  to the front of the boiler via  the calorifier jacket door        Page 10  31 07 00    Ca 6s BCa 6s    ASSEMBLY INSTRUCTIONS FOR           di                   Page 11    31 07 00    ASSEMBLY INSTRUCTIONS FOR     Ca 6s BCa 6s       ELECTRICAL CONNECIION       Description of Controls and Operation   A     On   Off and Operation mode switch    Switch position    07 of  With the switch in this position  the operation of  the boiler and burner 1s off     Switch position    1    manual   The instrument panel 1s 1n operation  The burner  and any boiler control pumps are operated with  out any influence of any other built in control  modules  The dial controls the boiler operating  temperature within the limits of the decreasing  arrow  Mixing valves must be manually adjusted   The instrument panel On lamp  G  is illuminated     Switch position a   automatic     In this position  any built in electronic modules  are in operation  The boiler temperature and any  other equipment connected back to the boiler 1 e   pumps and mixing val
14. ument  panel by removing the 6 screws    Screw the terminal block X11 that 1s supplied  with the additional control module onto the red  marked part of the terminal rail inside the  boiler instrument panel  and likewise the X12  onto the blue marked part  2 9 x 19mm screws  are supplied with the additional control  module   Connect the plugs X9 1 and X10 1  that are on the leads to the boiler instrument  panel with X9 2 and X10 2 plugs and leads  from the additional control module  If a second  extension module is used  connect the clips of  the second one  Remove the central blank  cover and connect the plugs X1  X2  X3 and  X4 to the module  Install the module as  described above     31 07 00     eoe d    sy ui                         10 SIS9J suyo y 9   e eu pinoys       JV  Josuas CCTS89  9 710       TA4IH ALS                   ou yng              Og ZZ 9        peny                                 eDejs Z                       9  jeuruuJe             GL   euro    415                                       GG  pG                L 48  LAM  Josuas          Bunejnour                           89 L9                  247  LAM  Josuas        19 10g 16            2  EL  ZA L    02       aaa   e z S c       LS 0G sjeuiuuJel    2M  LAM  Josuas        19 10g  sJequinu 9 qeo                    9      ee sjeuiuuey 2          o qeo uonoeuuoo Jeuung   ze   ZZ                             9 qeo                    Jeuung sna vivi               JOUING   JOW  J JOJ UOISIAOJd MS    p         
15. ves are controlled auto   matically     Attention  The switch marked    0     off  can only  be reached by rotating the switch anti clockwise  through the position marked    1        Switch position   STB  a    This function is used to check the boiler safety  limit thermostat  This is activated by rotating the  dial and holding the switch in position until the  boiler safety limit thermostat functions     B     Boiler safety limit thermostat  STB     The boiler safety thermostat  STB  turns the boiler  off 1f the boiler water temperature overheats  Once  the boiler water has cooled down to about 80  C   the STB must be manually re set  This is done by  unscrewing the cover cap  B  and pressing the  small button    Once reset refit the cover cap again  If the STB  functions repeatedly  check the water circulation  through the boiler or call a heating engineer     C     Fuse  6 3A     A fuse in the front of the instrument panel protects  all the controls and any other equipment con   nected back to the boiler  A defective fuse must be  replaced by an identical one     Attention  Before the fuse is replaced  the in   strument panel must be isolated from the elec   trical power supply     Page 12    31 07 00    ASSEMBLY INSTRUCTIONS FOR  Ca 6s   BCa 6s       D     Boiler thermometer Safety instructions  It shows the actual boiler water temperature and Any servicing on the boiler instrument panel  has no influence on the boiler temperature con   wiring  repairs  changes  should b
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
ESL-401ACST/402ACST  Gebrauchsanweisung Instructions for Use aeroplus 5  Q5K-YSK-047-Y09  9094 48960MEE Multitool ib ml  Par-Kan FSC550 Fuel Service Cart Manual      MANUAL DE USUARIO :: PEDIDOS ON-LINE  消防専用電話装置仕様書  Metrohm    Copyright © All rights reserved. 
   Failed to retrieve file