Home
        INSTALLATION & MAINTENANCE MANUAL
         Contents
1.     2  All wiring must be in accordance with all local  state  or federal codes    3  Provide proper overload protection for the system s circulating pump    NOTE  Use only copper wire of proper sizing for incoming service  The warranty on this unit does not cover damage   resulting from the use of aluminum wiring    Utiliser du fil de cuivre de la taille appropri  e pour le service   lectrique entrant  Les dommages r  sultant de   l utilisation de fil d aluminium seront exclus du champ d application de la garantie de cet appareil    3 4 Location   1  Locate the unit in a clean and dry area as close as possible to the greatest hot water usage and as near to boiler  water and or electrical power as practical    2  Install the unit on a firm  level foundation    3  Locate the foundation on a pitched floor near a suitable drain  or make other provisions to prevent contact to  areas of the building subject to water damage should a boiler water or a water connection leak  The drain must be  sufficient to contain water in excess of 210  F    3 5 Installation    WARNING  Use industry standard safe rigging methods  such as including the use straps and spreader bars  and lifting from the water heater base skid assembly  when attempting to lift or move this product  Failure to  follow industry safe rigging methods could result in property damage  serious injury or death     1  Check the data decal on the heater  Be sure the electrical supply is adequate for the installation   2  Carefu
2.   Boiler Water Pressure Gauge     5  Intra tank Circulator   14  Tank Purge Valve     6  Relief Valve   7  Isolation Shutoff Valve     Optional  8  Tank Drain Valve    Supplied by Others  9  Boiler Water Inlet  shown with dashed lines     NOTE  Components  controls and connection locations may vary     4 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater                                                                                                                                                                  ox                                   2 22   cee                                                                                                                                                                                                              Typical QuickDraw   Semi Instantaneous Construction    U tube Heat Exchanger  Control Enclosure  Potable Water Inlet  Potable Water Outlet  Intra tank Circulator    Relief Valve   Isolation Shutoff Valve    Tank Drain Valve   Boiler Water Inlet      Boiler Water Outlet     Electronic Operating Control       Boiler Water Temperature Gauge      Boiler Water Pressure Gauge       Tank Purge Valve       Tank Pressure Gauge        Optional     Supplied by Others     shown with dashed lines     NOTE  Components  controls and connection locations may vary     PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    3 WATER HEATER INSTALLATION  3 1 Checking Equipment Bef
3.   Pipe the drain valve to a suitable open drain       Thermal Expansion Tank     If the water heater is installed in a closed water supply system  such as one having a    back flow preventer in the cold water line  provide thermal expansion control  Contact the water supplier or local  plumbing inspector for additional information     3 6 Service Clearances and Clearance to Combustibles    4 1    The appliance must not be installed on a combustible floor  or on a non combustible floor covering combustible  material  A minimum clearance of 6  must be provided from any combustible material  However  the recommended  clearance is 24  at the top and front  18  at left and right sides of the appliance  Optional equipment may increase  the clearance requirements  Allow sufficient space for installing and servicing connections such as water  electrical   pump and other auxiliary equipment     Distance minimale aux mat  riaux combustibles est de 15 cm sur le dessus et les c  t  s et ne doit pas   tre install    sur un plancher combustible     GENERAL GUIDELINES    Water Inlet   Outlet Connections    1     Make inlet and outlet water connections directly to the threaded bolt on bronze tank flanges  Over tightening  connections to the flanges may cause damage to the flange or tank and are not covered by warranty       For ease of service  install unions on inlet and outlet piping to the unit       Piping and components connected to the water heater must be suitable for potable water  f
4.  3    7 4    7 5    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    MAINTENANCE    WARNING  Turn off all electrical service to the appliance when accessing the remote connections located  inside the control cabinet  These terminals are high voltage  If the electrical service is not turned off and  these terminals are touched  a dangerous shock causing personal injury or loss of life could occur  Close  and fasten the control cabinet cover before restoring electrical service to the appliance     Temperature and Pressure Relief Valve    Operate the temperature and pressure relief valve at least once a year by lifting the lever briefly  If the valve does not  open and close properly when testing  it must be replaced with a like relief valve     Thermostats and Temperature Limiting Device    The temperature limiting device and thermostat temperature sensors extend into the water in the tank  Depending on  the water conditions in your area  scale may coat the sensors  This coating will affect accuracy of sensors and can  allow water temperature to exceed the desired limits  Remove and inspect these controls at necessary intervals   Remove scale if present     Control Valve Actuator    The boiler water control valve actuator is sealed and requires no maintenance  Durability of valve stems and packing  is dependent upon maintaining non damaging water conditions  Inadequate water treatment or filtration can result in  corrosion  scale  and abrasive particle formati
5.  elderly are  at highest risk of being scalded      See instruction manual before  setting temperature at water  heater      Feel water before bathing  or showering       if this appliance is used to  produce water that could scald  if too hot  such as domestic hot  water use  adjust the outlet control   limit  or use temperature limiting  valves to obtain a maximum water       temperature of 125 F        Thermostatically controlled mixing valves  must be used in the design of the potable hot water system     Potable hot water should be tempered to no more than 110  F  when used for bathing or other personal uses     Good engineering practice mandates the use of thermostatically  controlled mixing valves set at 120 F or less to keep the delivered water  temperature below scalding temperatures              3 PV500 26 05 13    QuickDraw  Storage and Semi instantaneous  Boiler Water Heater    2 PRODUCT DESCRIPTIONS                                             16  3                                                                            or          gE    MU rS Ney Wrap oa                                                                                                                                                                      Typical QuickDraw   Storage Construction    1  U tube Heat Exchanger 10  Boiler Water Outlet   2  Control Enclosure 11  Tank Temperature and Pressure Gauges    3  Potable Water Inlet 12  Boiler Water Temperature Gauge     4  Potable Water Outlet 13
6. INSTALLATION  amp  MAINTENANCE MANUAL    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater   p    m       I LEAD  COMPLIANT     Intertek       Installation and service must be performed by a qualified service installer  service agency or qualified plumbing  contractor     IMPORTANT  THIS MANUAL CONTAINS INFORMATION REQUIRED FOR INSTALLATION  OPERATION AND  MAINTENANCE OF THIS EQUIPMENT  READ AND FOLLOW THE INFORMATION IN THIS MANUAL AND ALL OTHER  PROVIDED INSTRUCTIONS  LABELS AND MARKINGS BEFORE INSTALLING  OPERATING OR SERVICING THIS UNIT        TO THE INSTALLER  After installation  these instructions must be given to the equipment user or left near the appliance     SPECIAL INSTRUCTIONS TO THE OWNER  Retain this manual for future reference  These instructions contain  important information that will help you in maintaining and operating this appliance        VE i PVI INDUSTRIES  LLC     3209 Galvez Ave    Fort Worth  Texas 76111   1 800 433 5654    PV500 26 05 13       QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    TABLE OF CONTENTS    Safety Considerations   Product Descriptions   Water Heater Installation   3 4 Checking Equipment Before You Install   3 2 Codes   3 3 Electrical   3 4 Location   3 5 Installation   3 6 Service Clearances and Clearance to Combustibles  General Guidelines   4 1 Water Inlet   Outlet Connections   4 2 Boiler Water Piping   4 3 Relief Valve Piping   4 4 Filling the Unit   Operating and Safety Controls   5 1 Oper
7. NG WELD  GAUGE  TEMPERATURE   TEE  BLACK WELD   FLANGE  RFWN                                     o  o   o o   G v             o  9        SUPPLIED                                                                                                         o               6  REF      TT        Eg     REF      ARTIS                         IN Du i      NY         VTL 9d EL      4 Same  4    l  59   MIN  3 x d            HEAT TRAP                 ON      FARSIDE                   NoTE  3  A               NOTE  1 EE                pes   P E224 d  6     Qo    w 7   td   6      a poy od I   GEN    x Ill       Nel   Se      Fe Sf ALY   ISS ams  9 8 Ne  9       9  G 9 9    A NOTES   1  CUSTOMER SUPPLIED FIELD PIPING   DASHED LINES    FRONT VIEW SIDE        2  ALL WELDS FREE OF SLAG INSIDE PIPE       D     3  DRILL AND TAP HOLE OF APPROPRIATE  SIZE INTO CENTER OF TEE FOR    TYPICAL FLANGED BOILER WATER PIPING INSTALLATION INSTALLATION OF  GAUGES    A system bypass from supply to return is required when using two way valves to avoid  deadhead  operation of the  boiler water loop  Flow through the bypass must be adjusted to provide sufficient flow to enable the water heater to  operate at maximum capacity     When two or more heaters are piped in parallel it is important that the piping systems are balanced to assure the full  combined capacity is realized  Reverse return piping is recommended for multiple unit installations     Relief Valve Piping    The water heater is supplied with a pres
8. ater temperatures and flows to which  it is connected  To obtain the desired performance  it must be installed to operate with the temperature and flow  conditions specified when selecting the appliance  The boiler water piping must be appropriately sized and include a  strainer  isolation valves  pressure gauges  drain valve  and over pressure protection where required  The domestic  water piping must also be appropriately sized and include isolation valves  drain valve  temperature and pressure  relief valve and expansion tank or other means of expansion control     Boiler water supply piping should be sized to deliver sufficient hot water to the appliance without excessive pressure  drop  A heat trap of at least 3x pipe diameters must be used for the boiler water supply piping as depicted in the  above typical piping arrangement     When larger sized boiler water supply and return piping is not furnished by PVI  the installation must comply with the    typical piping installation diagram shown below  It is important that a minimum of 3x pipe diameters heat trap be  installed on the boiler water supply line to achieve proper performance of the heat exchanger     8 PV500 26 05 13    4 3    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    LIST OF MATERIALS  DESCRIP TION   B amp G HEAT EXCHANGER   3 WAY MIXING  VALVE     FLANGED  FLANGE  REDUCING SLIP ON BLACK  ELL  BLACK WELD 90DEG                            PIPE  BLACK   FLANGE  COMPANION BLACK  RING  BACKI
9. ating Temperature Control   5 2 Thermostat Settings     for QuickDraw Semi Instantaneous Heaters only  5 3 High Water Temperature Limit Control   5 4 Electronic Low Water Cut Off  optional    5 5 Sequence of Operation   Start up Procedure   Maintenance   7 1 Temperature and Pressure Relief Valve   7 2 Thermostats and Temperature Limiting Device  7 3 Control Valve Actuator   7 4 Tank   7 5 Cleaning the Heat Exchanger   7 6 Checking and Adjusting 3 way Valve Operation  7 7 Recommended Maintenance Schedule  Troubleshooting Notes    Warranty forms ship separately with each product     2 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    1 SAFETY CONSIDERATIONS    IMPORTANT SAFETY NOTE       It takes only 5 seconds of skin contact with 140 F water to cause a    second degree burn  You must protect against high water temperatures at all  lavatories  tubs  showers and other points of hot water contact        Accidental scalding from high water temperatures is a greater  risk in some types of installations  Some examples are     HOMES FOR THE MENTALLY HANDICAPPED  HOMES FOR THE PHYSICALLY HANDICAPPED  HOSPITALS AND NURSING HOMES  ELDER CARE FACILITIES AND REST HOMES  ORPHANAGES AND CHILD CARE FACILITIES    OTHER INSTALLATIONS   WHERE RESPONSE TO CONTACT WITH HOT WATER  MAY BE SLOWER OR WHERE THE DANGER OF HOT WATER CONTACT IS GREATER      Water temperature over 125  F  can cause severe burns instantly  or death from scalds      Children  disabled and
10. e is a three second time delay on decreasing level  Water level must be below  tank probe location for full three seconds before control de energizes     Sequence of Operation   Refer to figure below     1  When power is supplied through the unit   s On Off switch  if the stored water temperature is below the operating  thermostat set point  the limit operating circuit closes creating a call for heat demand  which energizes the  actuator on the three way mixing valve     2  The three way mixing valve returns circulating boiler water to the boiler supply loop through its bypass ports  On a  call for heat  the actuator motor runs and the actuator shaft extends causing the valve to divert the boiler water  through the heat exchanger before it is returned to the boiler supply loop                                                       VALVE    COIL           a B   5 SE       I I     Gia  RETURN                   BYPASS    STEM DOWN FLOW THROUGH          STEM UP FLOW THROUGH COIL BYPASS        SUPPLY    3  When the demand is satisfied  the limit operating circuit opens and the valve actuator is de energized  The  actuator motor stops running and the actuator shaft spring returns to the retracted position causing the boiler  water to divert through the bypass ports and return to the boiler water supply loop     11 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    START UP PROCEDURE    1  When placing the unit into operation  open relief valve to pu
11. e the valve open  until a steady flow of water is observed  Close valve and complete filling the system     2  In hard water areas  potable water treatment should be used to reduce introduction of minerals into the system   Minerals in the water can collect on the tubes and heat exchanger surfaces reducing the life of the product  Heat  exchanger failure due to scale accumulation is not covered by the product warranty     3  Make sure there are no system leaks  DO NOT use petroleum based stop leak products  All system leaks must  be repaired     OPERATING AND SAFETY CONTROLS    WARNING  Turn off all electrical service to the appliance when accessing the remote connections located  inside the control cabinet and close and fasten the control cabinet cover before restoring electrical service  to the appliance  Terminals and components in the control cabinet are high voltage  If the electrical service  is not turned off and these terminals or components are touched  a dangerous shock can result in property  damage  personal injury or loss of life     Coupez l alimentation avant intervention sur l appareil     Operating Temperature Control   The adjustable Operating Thermostat is located in the front control panel  The thermostat is factory pre set at  approximately 120  F  Adjust the operating thermostat to the desired water temperature    Thermostat Settings     For QuickDraw Semi Instantaneous Heaters    The adjustable operating temperature control is located just above the fro
12. ey Combinations    1  TO UNLOCK THE KEYBOARD  Press and hold the    UP         DOWN    keys for 3 seconds  When the  PON   flashing message is displayed  the keys are unlocked     2  TO LOCK THE KEYBOARD  Press and hold the    UP        DOWN    keys for    seconds  When the    POF    flashing  message is displayed  the keys are locked     3  TO RETURN TO TEMPERATURE DISPLAY  Press the  SET      UP    keys     10 PV500 26 05 13    5 3    5 4    5 5    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    High Water Temperature Limit Control    The appliance is equipped with an adjustable temperature limit control and a non adjustable high temperature limit  control  These controls are located inside the control cabinet and are accessed by removing the bottom cover     The adjustable limit control is an auto reset type and should be adjusted at least 10 degrees above the set point of  the Operating Thermostat     The high limit is an auto reset type with a fixed set point  but is optionally available as a manual reset type  If the high  limit is a manual reset type  it cannot be reset until the water temperature has dropped below its reset point     Electronic Low Water Cut Off  Optional     When the water level is above the electrode position in the tank  the reset pushbutton will energize the control  LED  will be lit   The control remains energized until the water level recedes below the electrode position  LED will not be  lit   Unless otherwise specified  ther
13. fied design pressure and temperature may  result in damage to the heat exchanger  property damage  personal injury or loss of life     4  Open nearby hot water tap to maintain a flow of water through the tank when starting up units  Regulate flow of  water through the tank to allow the control valve to cycle off and on  and check operation of all safety and  operating controls     5  In all installations  there should be no pulsation or water hammer since this causes vibration and strain with  resulting leaks     6  Retighten bolting on all gasketed joints after the heat exchanger has reached temperature to prevent leaks and  gasket failures  Retightening should be done uniformly and in a diametrically staggered pattern  see     Maintenance    for proper torque specs      a  On high pressure and high temperature applications or any application where spiral wound gaskets are  required  it is recommended that the gasketed joints of the heat exchanger be retightened to the required  torque  see  Maintenance   after 24 hours at operating pressures and temperatures to compensate for         relaxation or creep that may have occurred     b  In shutting down  remove all power from the system  Close all boiler water and cold water supply valves to the  unit     c  If the unit is removed from service for an extended period of time  it must be drain completely to eliminate the  possibility of freezing and corrosion from stagnant water conditions     12 PV500 26 05 13    7 1    7 2    7
14. lly remove all shipping supports and bracing     3  Do not attempt to move or lift heater by the plumbing connections or heat exchanger  Lift only by the skid using  industry standard safe rigging methods     4  Provide sufficient clearance in front of heat exchanger to facilitate maintenance and removal  See  Service  Clearances  below     5  Install shut off valves and unions on the inlet and outlet water piping for servicing  Use caution when threading  pipe nipples into tank connections to prevent cross threading  or over tightening  Always use a back up wrench  on tank nipples when tightening unions  valves  etc     6 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    Use only non ferrous water piping and fittings for potable water plumbing and connections  Do not use galvanized  pipe or fittings  Use of ferrous or galvanized pipe or fittings can cause rust to form       Insulate hot water and return circulation lines  Also  if subject to freezing during shutdown or during operation     insulate all water piping and take whatever steps are necessary to keep the appliance and all water containing  pipes and components from freezing  IMPORTANT  Do not use the plumbing connected to the appliance as a  ground for welding or any other purpose       This appliance is equipped with a temperature and pressure relief valve s  rated for the input  The relief valve    must be pipe to and attached to a suitable open drain  Relief Valve Piping      9
15. move actuator mounting screws  3       Slide actuator back on mounting bracket and remove cam from actuator shaft     Lift valve stem and plunger assembly to full upward position       Install the cam onto the actuator shaft with the cam lobe facing up      gt  o a    0       Reposition actuator and install the mounting screws   g  Apply power to actuator   Should drive CW rotation and stem down    h  Install cover and screws   i  Install indicator  with screw  pointing toward open   3  Adjust Valve Stem   a  Loosen stem locknut   b  Screw valve stem into stem extension until valve has contacted at top of valve stroke   c  Screw valve stem into extension and additional 11   2 turns     d  Cycle heater with thermostats to confirm proper operation     Actuator  Nylon Bushing A            Plunger Assembly       Ring    Front Cover Plunger Cam          Mounting Screws  3     By e Mounting Bracket  N 29 z N  Indicator Screw Tm Aen V    C  amp          E Stem ESSI  a    Cover Screws  2     r     Stem Locknut    Packing Nut    A    Mounting ez AX Not included in AV Kits     Valve Body AA Used with 1 2  through 2  valve bodies    VB 7XXX Shown     Typical Components for Valve Installation of Standard Actuator    16 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    7 7 Recommended Maintenance Schedule    1     Annual Maintenance   a  Check all joints and pipe connections for tightness  corrosion or deterioration    b  Check all safety controls and de
16. nt control panel cover  This control utilizes  a temperature sensing thermistor located in the control flange on top of the tank  Follow the safety instructions and  warnings included in this manual and with the product  when adjusting the set point of the operating temperature  control to deliver the desired water temperature     The setpoint  SET  determines the desired stored water temperature in the tank and is factory set at approximately  120 F  If the tank temperature decreases below the set point a call for heat sequence is activated  The heating  sequence is turned off when the tank temperature again reaches the set point value     Le thermostat est r  gl      environ 49 degr  s Celsius  Temp  ratures de l eau sup  rieures    52 degr  s Celsius peut  causer instantan  ment de graves br  lures ou la mort de br  lures  Suivez les instructions dans le manuel  d installation et de maintenance pour modifier la temp  rature de l eau     To View the Setpoint   1  Press and quickly release the    SET    key  This will display the setpoint for 5 seconds   To Change the Set Point   1  Press and hold the  SET  key for at least 2 seconds to enter the setpoint change mode   2  The setpoint is displayed and the LEDs of the first and third digits blink    3  To change the value  use the    UP    and  DOWN  keys   4     The new value can be stored either by pressing the  SET  key  the control restores temperature display  or by  waiting the exit time out to expire  15 seconds      K
17. on     NOTICE  Since PVI cannot control the use of the appliance  water conditions  or maintenance  the warranty on the  appliance does not cover poor performance  structural failure  or leaking due to an excessive accumulation of scale     a  If the unit requires shut down  remove all power from the system  Close all boiler water and cold water supply  valves to the unit     b  If the unit is removed from service for an extended period of time  it must be drained completely to reduce the  risk of freezing  biologic growth and corrosion from stagnant water conditions  When the appliance is returned to  service  conduct a thorough inspection of all utilities and general appliance condition     Cleaning the Heat Exchanger    1  Do not open until all pressure is removed  the unit is drained and the equipment surfaces cooled to ambient  temperature     2  Heat exchangers subject to fouling or scaling should be cleaned periodically  A light sludge or scale coating on  the tube greatly reduces its effectiveness  A marked increase in pressure drop and or reduction in performance  usually indicate cleaning is necessary     13 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    3  Tube bundle removal     a  When practical and if the heat exchanger is connected to a collar assembly  leave tube bundle attached to  collar assembly and remove by unbolting collar assembly from tank     b  During bundle removal  the dead weight of the bundle should never be 
18. on  Scale and particulates can result in stem and packing scratches  and can adversely affect packing life and other parts of the hydronic system  Contact the manufacturer for  replacement packing and stem  amp  plug assembly     Tank    Depending on water quality and operating temperature  scale can form during operation and will accumulate on the  bottom of the tank  Natural minerals in water forms scale  which precipitates out during the heating cycles   Some water supplies contain more of these minerals than others  so scale buildup will occur more rapidly   Other factors affecting the scale buildup are the amount of hot water used and the temperature of the water   The more hot water used the more fresh water containing the scale forming minerals come into the tank  As the  temperature of the water increases  the rate of scale deposited also increases  The frequency of inspections will be  determined by the rate of scale buildup  Until the appropriate inspection and cleaning frequency is established   inspect the tank every six months or more frequently if higher scaling conditions are present     Flush the tank at the appropriate interval  based on water conditions in your location  to help prevent the  accumulation of scale  To flush  turn off the electrical disconnect switch to remove power and prevent the unit  from operating  Open the drain valve and allow water to flow through the tank until it runs clear  Close the drain  valve and turn the electrical switch back 
19. or the water    temperatures they will experience and for their application       After plumbing the unit and checking for leaks  the heat exchanger and boiler water and hot water piping    should be insulated  Insulation will reduce wasteful heat loss and will help protect operators from contacting  hot surfaces     WARNING  Insulate or guard and hot water surfaces  Uninsulated or unguarded steam and hot water  surfaces can cause burns instantly     7 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater                                                                                                                                                                               GERENS ee   Po Cass Crs  HOT WATER L    f  HOUSE CIRCULATION         BS    eS E ee Bi  RELIEF VALVE Ty     tb HI UMIT  TO DRAI 45 S e ro TO DRAIN    iri wit i   OPTIONAL   BOILER WATER OUT      i  MN HW  BOILER WATER IN   SEI     Il RB   3xdMN    deg es  HEAT TRAP 3 COLD WATER  P E     EXPANSION    TANK  i TI TI  XX  FLOOR  DRAIN    TYPICAL PIPING ARRANGEMENT       4 2 Boiler Water Piping    WARNING  All system piping to the heat exchanger plumbing must be adequately supported  Failure to  provide adequate support will result in excessive loads on the heat exchanger connections that can cause  hot water or steam discharge resulting in property damage  scalding and personal injury or loss of life     This appliance will perform in accordance with the boiler water and domestic w
20. ore You Install   Inspect the unit completely upon receipt from the freight carrier before signing the bill of lading  Inspect the appliance   and all accompanying parts for signs of impact or mishandling  Verify the total number of pieces shown on packing   slips with those actually received  Contact the freight carrier immediately if any damage or shortage is detected   3 2 Codes   The equipment shall be installed in accordance with the instructions in this manual  appliance markings and   supplemental instructions and in compliance with those installation regulations in force in the local area where the   installation is to be made  These shall be carefully followed in all cases  Authorities having jurisdiction shall be  consulted before installation is made  All appliances conform to the latest edition of the ASME Boiler and Pressure   Vessel Code  Section IV  Part HLW or Section VIII    3 3 Electrical Requirements   The heater is wired for 120VAC 1ph 60Hz volts and must be electrically grounded in accordance with local codes  or   in the absence of local codes  with the latest edition of the National Electrical Code NFPA 70  When unit is installed   in Canada  it must conform to the Canadian Electrical Code  CEC   CSA C22 1  and or local electrical codes    1  Branch circuit protection and disconnecting means must be furnished by the installer  Refer to the wiring diagram  provided with this unit when installing or troubleshooting the electrical components of this heater
21. rge air from top of tank and begin to fill the tank with  cold water  Check for plumbing leaks  Be sure the tank is completely filled before closing the relief valve     CAUTION  Do not energize the heater or circulating pump until the tank is full of water  Serious damage may result     2  Push control switch  located on the control box  to    ON    to activate the three way valve and thermostats  Check  the valve for operation  the valve actuator motor should    run    to open the valve when operating switch is pushed     ON     Check operating thermostat settings     Temperature Setting  The operating thermostat is set at the factory at approximately 120  F and the upper  operating thermostat  if supplied  is set at approximately 130  F  Adjustment may be made by turning the  thermostat   s dial to the desired temperature  The temperature limiting device is factory set at 200  F     CAUTION  Gradually introduce fluids to the unit  Failure to do so can cause damage to the heat exchanger     3  Push the operating switch to    OFF    before opening manual main boiler water supply valve  Do not admit boiler  water to the unit suddenly when empty or cold to prevent thermal shock  Gradually open boiler water supply valve  until all passages of the heat exchanger are filled  Slowly bring the unit up to temperature     WARNING  Do not operate unit under conditions in excess of those specified on nameplate and ASME data  plate  Failure to operate the heat exchanger within the speci
22. supported on individual tubes or  contact any lined interior tank surface  Following removal  rest the bundle on the tube sheet  support plates   or wood blocks cut to fit periphery of the bundle     c  Tube bundles may be raised using slings formed by bending light sheet metal into a  U  form and attaching  lifting lugs to the ends of the sheets  Baffles can be easily bent and damaged if dragged over rough  surfaces     d  Before reinserting the tube bundle into the unit place the ring tank gasket over the end of the tube bundle  and bring forward to the backside of the tube sheet     CAUTION  When cleaning a tube bundle  tubes should not be hammered on with any metallic tool and  in case it is  necessary to use scrapers  care should be exercised that the scraper is not sharp enough to cut the metal of the  tubes          COLLAR    TUBE BUNDLE   PARTIALLY REMOVED     HEAD GASKET    TANK GASKET    HEAD    4  The COLLAR assembly  if equipped  is connected to the tank nozzle flange using 9 16  grade 8 bolts  To  reinstall the collar assembly use a calibrated torque wrench and  in an alternating star pattern  tighten the bolts  in two increments  95 ft lbs and 145 ft lbs  collar assembly threads and nut bearing surfaces must be clean  rust  free and NOT lubricated      5  When replacing the heat exchanger HEAD  use a calibrated torque wrench to tighten the bolts studs and  nuts in an alternating star pattern  Use the following chart as a guide  All heat exchanger head torque val
23. sure and temperature relief valve  sized in accordance with ASME  requirements  Each relief valve must be piped and secured to a suitable floor drain  No reducing coupling or other  restriction can be installed in the discharge line  It is strongly recommended that this valve should be manually  operated at least once a year   See Maintenance      WARNING  Do not install a reducing coupling  valve or other restriction between the relief valve discharge  and a suitable floor drain  Such restriction could prevent the valve from fully relieving if the pressure  settings are exceeded  which could result in property damage  personal injury or death     WARNING  The relief valve discharge must be piped to a suitable floor drain to avoid exposure to hot  discharge water during relief valve operation  Exposure to hot discharge water can cause water damage  and or burns resulting in property damage  personal injury or death     WARNING  Secure the relief valve pipe to a suitable floor drain such that very hot water does not openly  splash during a significant relief valve discharge  If the relief valve pipe is not routed and secured to a  suitable drain  hot water discharge can result in property damage  scalding and personal injury or loss of  life     9 PV500 26 05 13    4 4    5 1    5 2    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    Filling the Unit    1  Fill the system with water  To be sure that the unit is not    air bound     open the relief valve  Leav
24. sure the tank temperature near the thermostat and compare to  setpoint  The thermostat should turn on and off within 5  F of setpoint  Replace if necessary    Cause  The control valve is not closing properly     Solution  See the adjustment instructions in this manual or for the specific temperature control valve  assembly installed  Replace worn components as required     Problem 5  Heat exchanger visibly leaking     Cause  Plumbing connection loose   Solution  Check and tighten plumbing connection       Cause  Double wall heat exchanger tube leak     Solution  If one of the tube walls is breached  a double wall heat exchanger will leak at the joint between  the tubesheets  Isolate the heater and replace the heat exchanger     18 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater       Since PVI cannot control the use of the appliance  water conditions  or maintenance  the warranty on  the heat exchanger does not cover poor performance  structural failure  or leaking due to an excessive  accumulation of scale    MODEL NUMBER   SERIAL NUMBER     INSTALLATION DATE     19 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    PVI Industries  LLC     3209 Galvez Ave  e Fort Worth  TX 76111 e 1 800 433 5654 e www pvi com    20 PV500 26 05 13    
25. ues  apply to well lubricated nut bearing surfaces     14 PV500 26 05 13    QuickDraw   Storage and Semi instantaneous    Boiler Water Heater    HEAT EXCHANGER HEAD LUBRICATED TIGHTENING                                                                   TORQUES  COMPRESSED FIBER GASKETS  Recommended  Bolt Torque Torque Max   Dia  ft lbs Increment Torque  1 2  40 5 60  5 8  80 5 120  SPIRAL WOUND GASKETS  Recommended  Bolt Stud Torque Torque Max   Dia  ft lbs Increment Torque  1 2  40 5 60  5 8  80 5 120  3 4  120 5 200  7 8  200 10 320  1  300 10 490  1 1 8  450 10 710  11 4  600 10 1000       6  Tighten uniformly and in a diametrically staggered pattern  alternating star pattern  as illustrated below     WARNING  Follow the proper tightening sequence   torque increments and maximum torque values   Failure to follow these requirements can cause non   repairable damage to gaskets or heat exchangers  and can result in leaking  property damage   personal injury or loss of life     15             PV500 26 05 13    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    7 6 Checking and Adjusting 3 Way Valve Operation  1  Check Operation   a  Remove indicator screw and indicator   b  Remove cover screws  2   Remove cover   c  Apply power to actuator drive motor   d      Notice actuator rotation  valve stem direction and linkage cam direction   Should drive CW and valve stem  down      2  To Reverse Operation      Turn off power supply   Actuator should drive CCW       Re
26. ution  Reconfigure water return piping and check valve to allow for proper drainage  Check for  restriction in the water drain line    Cause  Heat exchanger is breached    Solution  Shut off the boiler water supply  Residual flow should stop after a short period of time  If the flow  continues  water is leaking from the tank into the coil  Disassemble  inspect  repair or replace as required  following the instructions in this manual    Cause  Heat exchanger is fouled    Solution  Inspect the heat exchanger for excessive scaling or fouling on the water side     Cause  Abnormal operating conditions    Solution  The water temperature has a significant effect on the efficiency of the heat exchanger  Check if  the setpoint is higher than specified  Confirm the measured flow rate with meters or by volume and rate   Check that there are no other loads on the heater     Problem 3  No hot water even at low flow     h     Cause  Control valve not opening     Solution  Check that electrical coils are energized  If not  trace wiring problem  If so  the valve may be  faulty  the boiler water flow and temperature is inadequate  or the linkage  if applicable  is out of  adjustment     Cause  The high temperature limit is open     Solution  Check the individual components of the system and repair or replace the failed component s  as  necessary     Problem 4  Outlet temperature is too high     j     Cause  Malfunctioning or misadjusted thermostat s     Solution  Check thermostat setting  Mea
27. vices including thermostats for proper operation   c  Check safety shut off valves for operation and tightness    d  Test high limit and operating temperature controls       Semi Annually    a  Recalibrate all indicating and recording gauges   b  Check piping and wiring of all interlocks and shutoff valves       Monthly Maintenance    a  Test low water cutoff device and alarm  if equipped    b  Check gauges  monitors  and indicators   c  Check instrument and equipment settings       As Required    a  Tank flush and cleanout     17    PV500 26 05 13    8    QuickDraw   Storage and Semi instantaneous  Boiler Water Heater    TROUBLESHOOTING NOTES    Problem 1  Outlet water temperature not constant    a     Cause  Insufficient recovery   Solution  Check and be sure heater design rating is not being exceeded     Cause  Malfunctioning or misadjusted thermostat s     Solution  If the thermostat or controller is always open  then the outlet temperature will vary with load   Measure the tank temperature near the thermostat and compare to setpoint  The thermostat should turn on  and off within 5  F of setpoint  Replace if necessary     Problem 2  Heater recovery is slow or outlet temperature is below setpoint     C     Cause  The temperature control valve is not opening properly   Solution  Check for proper operation of valve actuator and linkage  Replace if necessary     Cause  Return water not draining  water drain line is restricted  water check valve is leaking or have failed   Sol
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
一眼型セ・フティグラス  NEC Express5800/120Ed User's Guide    【別記様式02-004】排水処理部性能試験結果報告書  Peerless SPK811 speaker mount  Samsung S19A300N Užívateľská príručka  Hitachi CP-X267 User's Manual  Miele GT5242 S freezer  Sony PSS-600 User's Manual    Copyright © All rights reserved. 
   Failed to retrieve file