Home
Transition Networks CBFTF10XX-15X Network Router User Manual
Contents
1. The CPSMC0800 100 also comes equipped with an AC or DC power supply An optional AC or DC power supply with Instant Fail Over operation is also available The primary power supply is accessed through the Power Inlet on the front panel while auxilliary power is accessed through the Auxilliary Power Inlet located on the back panel Auxilliary Power Inlet O eO Four fans two for the power supplies and two for the Slide In Modules help remove heat from the chassis With installed PointSystem Management Module s TN part number CPSMM 120 200 or 210 the CPSMC0800 100 can be managed and monitored via An SNMP application such as Transition Networks FocalPoint management software installed at a remote Network Management Station NMS A remote Web browser A command line interface CLl at an attached terminal A command line interface CLI at a remote Telnet connection The management features include Power control slot on slot off in rush limit for each individual slot Internal temperature monitor Fan failure monitor Chassis power consumption monitor Power supply type identification Power supply condition monitor Fail over power detection The Management Modules also make it possible to control up to eight 8 cascaded CPSMCO800 100 chassis which can accomodate up to 55 installed Media Converter Slide in Modules Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 Internati
2. top installation is desired remove the rubber feet from the card and place one at each of the four corners on the bottom of the chassis Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 15 yo SISSU CPSMC0800 100 PointSystem Chassis 4 2 Cascade Option The CPSMM 200 Management Module is The Management Module cascade option allows the network administrator to con nect up to eight 8 CPSMC0800 100 8 Slot chassis into one manageable stack pro viding a single management source for up to 55 installed Media Converter devices To create the cascade option the CPSMM 200 Dual Slot Master Management Module is installed in the first chassis in the series The CPSMM 210 Single Slot Expansion Management Module is installed in each subseguent chassis e 2o6 le Bie eeu me installed in the first i e505 00 le co I z chassis in the series The CPSMM 210 Management Module is installed in each subsequent chassis The CPSMM 200 Management Module is installed in the first chassis in the series Another CPSMM 200 Managment Module is installed in the next chassis as a backup a 9 Bh works networks o An alternative setup involves installing two CPSMC 200 Dual Slot Master Management Modules into two adjacent chassis chassis for redundant management me 7 0 0009 fe 00 F Be e co N jo
3. 1 Remove the Media Converter Slide in Module protective plate from the instal lation slot by removing the one 1 screw that secures the plate to the front of the chassis NOTE If the Slide in Module requires two slots remove the protective plates from two 2 adjacent installation slots 2 Align the Media Converter Slide in Module with the chassis installation slot so that the panel fastener screw is at the left of the Media Converter Slide in Module OOOO fe 00 Mie wean 8 BZ ile co p amp oe ee Panel Fastener Screw 3 Carefully slide the Media Converter Slide in Module into the installation slot NOTE Ensure that the Media Converter Slide in Module is firmly seated against the back of the chassis 4 Install the Media Converter Slide in Module by carefully rotating the attached panel fastener screw clockwise to secure the Media Converter Slide in Module to the chassis 5 Repeat steps 1 through 4 for additional Media Converter Slide in Module s Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 7 sojnpoui ul opiJjs CPSMC0800 100 PointSystem Chassis 2 2 3 Replacing the Media Converter Slide in Modules CAUTION Wear a grounding device and observe electrostatic discharge precau tions when replacing Media Converter Slide in Module s Failure to observe this caution could result in damage to and subsequent failure of the Media Converter Sli
4. CPSMM0800 100 8 Slot chassis through the Auxilliary Power Supply 1 Connect the female end of the External Power Converter to the Auxilliary Power Inlet on the back of the 8 Slot chassis 2 Connect the female end of the power cord to the male end of the External Power Converter 3 Plug the male end of the power cord into the correct voltage AC rack or wall socket 4 Verify that the chassis is powered by observing the illuminated Power LEDs on the Slide in Modules and by the fan operation Auxilliary Power Inlet External Power Power Cord Converter Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 13 Ajddns 4amod CPSMC0800 100 PointSystem Chassis 4 4 1 Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 14 CPSMC0800 100 Chassis Installing the CPSMC0800 100 Chassis 4 1 1 at front Flush Alignment Recessed Alignment The CPSMC0800 100 can be installed in a standard 19 inch rack or on a table shelf or other stable surface Standard 19 inch Rack Installation NOTE The maximum recommended ambient temperature Tmra for the 8 Slot chassis is 40 C If the 8 Slot chassis is installed in a closed or mult unit rack assem bly the operating ambient temperature of the the rack environment may be greater than room ambient Consideration should be given to installing the 8 Slot chassis in an environment compatible wit
5. details INIT TERM Refer to the CPSMM 200 210 User Guide for more information on the CPSMM 210 Single Slot Expansion Management Module FE 1204 12C CPSMM210 Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 9 sojnpoui ul opiJjs CPSMC0800 100 PointSystem Chassis 2 2 2 Installing the Managment Modules CAUTION Wear a grounding device and observe electrostatic discharge precau tions when installing the Management Module s in the 8 Slot chassis Failure to observe this caution could result in damage to and subsequent failure of the Management Module Install one 1 Master Management Module CPSMM 120 or CPSMM 200 in the primary managed CPSMC0800 100 8 Slot chassis If several PointSystem chassis are to be connected in a cascade fashion see sec tion 4 3 Cascade Option e Install one 1 Master Management Module CPSMM 120 or CPSMM 200 into the primary managed CPSMC0800 100 8 Slot chassis e Install one 1 Master Management Module CPSMM 200 or one 1 Expansion Management Module CPSMM 210 in any secondary managed CPSMC0800 100 8 Slot chassis NOTE Though the Management Module s can be installed in any PointSystem chassis slot use of the left most installation slot s for installing the Management Module s is recommended in order to keep the cascading cables separate from the network cables connected to the installed on Media Converter Slide In
6. 2 GasCAde ODO errea woe u ene he Red och Wa een DOG 16 4 3 Connecting the Slide in Modules to the Network 17 AA Operation sieer ere PeeWee ehhh Hee SEER E E he 18 5 SNMP Agent in the Management Module 19 5 1 SNMP Hardware Connections sss i ia cedar ee 19 52 SNMP Software s S75 phd Mitte 70 owt ACA ale ts Mn 20 6 Fault Isolation and Correction 21 Tech lS Pec Wi CAllOns a 4 oe a A rele eae vee heey Ope ee eee oa 22 Cable Specifications 4 Aven pn wea iow neni ee Ra NWN FYNN 23 COMA nade paseas ga cyfod Gun ww ped dd ae dd An y 24 WaT ANY a ae E ate E te ae oe ain Y 25 Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 3 CPSMC0800 100 PointSystem Chassis 1 Introduction 1 1 Description The Transition Networks PointSystem CPSMC0800 100 is a 19 inch rack mount able chassis for selected Transition Networks Media Converter Slide In Modules The CPSMC0800 100 allows the network administrator to connect various copper uononpopui and fiber optic network media over protocols that include Ethernet Fast Ethernet DS3 E3 and OC 12 The CPSMC0800 100 provides installation space for up to eight 8 single slot or four 4 dual slot Media Converter Slide in Modules in the front of the unit Management Module Installed Slide In Module Open Slot Power Inlet siw e 02e0 e co MW jo o eo an um 0 OO CO e oc iW
7. Modules To install a Management Module 1a CPSMM 200 Dual Slot Master Management Module Remove two 2 Management Module protective plates from two 2 installation slots at the far left position by removing the one 1 screw that secures each pro tective plate to the PointSystem chassis 1b CPSMM 120 Single Slot Master Management Module OR CPSMM 210 Single Slot Expansion Management Module Remove one 1 Management Module protective plate from one 1 installation slot at the far left position by removing the one 1 screw that secures the pro tective plate to the PointSystem chassis 2 Align the Management Module with the PointSystem chassis installation slot so that the panel fastener screw is to the left of the Management Module Panel Fastener Screw 3 Carefully slide the Management Module into the installation slot aligning the Management Module with the installation guides NOTE Ensure that Management Module is firmly seated against backplane 4 Rotate the attached panel fastener screw clockwise to secure the Management Module to the PointSystem chassis Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 10 sojnpoui ul opiJjs CPSMC0800 100 PointSystem Chassis 2 2 3 Replacing the Mangement Modules CAUTION Wear a grounding device and observe electrostatic discharge precau tions when replacing Media Converter Sl
8. PointSystem Chassis 6 Fault Isolation and Correction 1 Are ANY of the POWER LEDs on any of the Slide in Modules illuminated AND OR are the fans operating YES e The chassis is receiving power Proceed to the next step NO e Ensure all power supply cables for proper connection e Ensure the AC receptacle on the wall is supplying power e If the fuse for the AC receptacle on the wall blows repeatedly have the AC receptacle inspected by a gualified electrician e Contact Tech Support 1 800 260 1312 Intl 00 1 952 941 7600 2 Are ANY of the POWER LEDs on any of the Slide in Modules illuminated but are the fans NOT operating YES e The chassis is receiving power Proceed to the next step NO e Contact Tech Support 1 800 260 1312 Intl 00 1 952 941 7600 3 For the Management Modules CPSMM120 CPSMM200 CPSMM210 are ANY of the POWER LEDs NOT illuminated NO e All Managment Modules are receiving power Proceed to the next step YES For those Management Modules where the POWER LED is NOT illuminated e Ensure the Management Module is firmly seated in the slot e Press the RESET button on the Managment Module e Contact Tech Support 1 800 260 1312 Intl 00 1 952 941 7600 4 For the remaining Slide in Modules are ANY of the POWER LEDs NOT illumi nated NO e All Slide in Modules are receiving power Proceed to the next step YES For those Slide in Modules where the POWER LED is NOT illuminated e Ensure the Slide in Modu
9. S DEPT CRA RMA 7 Failure to properly protect the product during shipping may void this warranty The return authorization number must be written on the outside of the carton to ensure its acceptance We cannot accept delivery of any equipment that is sent to us with out a CRA or RMA number The customer must pay for the non compliant product s return transportation costs to Transition Networks for evaluation of said product s for repair or replacement Transition Networks will pay for the shipping of the repaired or replaced in warran 25 CPSMC0800 100 PointSystem Chassis ty product s back to the customer any and all customs charges tariffs or and taxes are the customer s responsibility Before making any non warranty repair Transition Networks requires a 200 00 charge plus actual shipping costs to and from the customer If the repair is greater than 200 00 an estimate is issued to the customer for authorization of repair If no authorization is obtained or the product is deemed not repairable Transition Networks will retain the 200 00 service charge and return the product to the cus tomer not repaired Non warranted products that are repaired by Transition Networks for a fee will carry a 180 day limited warranty All warranty claims are subject to the restrictions and conventions set forth by this document Transition Networks reserves the right to charge for all testing and shipping incurred if after testing a retu
10. Sw 0 0000 fe co F I Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 16 CPSMC0800 100 PointSystem Chassis To cascade two or more CPSMC0800 100 8 Slot chassis 1 Locate one 1 Transition Networks CPSMC0800 100 Management Module cas cade cable with RJ 45 connectors installed at both ends for each set of two 2 chassis to be cascaded NOTE Transition Networks Management Module cascade cables are one 1 meter long Ensure that the chassis are installed within one 1 meter of each other 2 At the first chassis in the series Plug the RJ 45 connector at one end of the cas cade cable into the Management Module s RJ 45 port labeled OUTPUT 3 At the next chassis in the series Plug the RJ 45 connector at the other end of the cascade cable into the Management Module s RJ 45 port labeled INPUT 4 At the same chassis as in step 3 Plug the RJ 45 connector at one end of the cascade cable into the Management Module s RJ 45 port labeled OUTPUT 5 At the next chassis in the series Plug the RJ 45 connector at the other end of the cascade cable into the Management Module s RJ 45 port labeled INPUT 6 Repeat steps 4 and 5 until all chassis have been connected 4 3 Connecting the Slide in Modules to the Network Once the CPSMC0800 100 chassis has been installed the Media Converter Slide in Modules may be connected to the network CAUTION Connect inp
11. de in Module s NOTE The Media Converter Slide in Modules are hot swappable To replace a Media Converter Slide in Module 1 Remove the Media Converter Slide in Module to be replaced by loosening the one 1 screw that secures the Slide in Module to the CPSMC0800 100 chassis front Slide the Media Converter Slide In Module from the CPSMC0800 100 chassis 2 Align the replacement Media Converter Slide in Module with the chassis instal lation slot so that the panel fastener screw is to the left Panel Fastener Screw 3 Carefully slide the replacement Media Converter Slide in Module into the installation slot NOTE Ensure that the Media Converter Slide in Module is firmly seated against the back of the chassis 4 Install the replacement Media Converter Slide in Module by carefully rotating the attached panel fastener screw clockwise to secure the Media Converter Slide in Module to the chassis Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 8 sojnpoui ul opiJjs CPSMC0800 100 PointSystem Chassis 2 2 Management Modules Optional network management is provided by SNMP software embedded in Transition Networks PointSystem Management Module s that can be installed in the CPSMC0800 100 8 Slot chassis Transition Networks provides two such modules e CPSMM 120 Single Slot Master Management Module e CPSMM 200 Dual Slot Master Management Module Along with a
12. e 3 fans 22 972 61 715 Environment Tmra O to 40 C 32 to 1049F Storage Temperature 40 to 80 C 40 to 1769F Humidity 5 to 95 non condensing Altitude O to 10 000 feet Manufacturer s rated ambient temperature Refer to the power consumption data for EACH model Media Converter Slide in Module provided in User s Guide shipped with Media Converter Slide in Module to determine optimum site configuration Compliance EN 55022 Class A EN 55024 FCC Class A UL Listed CE Mark Warranty Lifetime CAUTION Visible and Invisible Laser Radiation When Open Do Not Stare Into Beam Or View Directly With Optical Instruments CAUTION Use of controls adjustments or the performance of procedures other than those specified herein may result in hazardous radiation exposure TRANSITION DECLARATION OF CONFORMITY Name of Mfg Transition Networks 6475 City West Parkway Minneapolis MN 55344 USA Model PointSystem Chassis Part Number CPSMC0800 100 CPSMC0810 100 Regulation EMC Directive 89 336 EEC Purpose To declare that the PointSystem Chassis to which this declaration refers is in conformity with the following standards EN 55022 1994 EN 55024 1998 FCC Part 15 Class A UL 1950 21 CFR subpart J I the undersigned hereby declare that the equipment specified above conforms to the above Directive s and Standard s AS bn FWD April 1 2003 Stephen Anderson Vice President of Engineering Date Tec
13. e as shown C Attached terminal or terminal emulator connected to the DB 9 serial port i via null modem cable co e foe OOOO fo 00 Mle we ok MM o Aje 2222 fe ad Tech Support M F 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 19 dWNS CPSMC0800 100 PointSystem Chassis RJ 45 Ethernet Port The RJ 45 Ethernet Port allows the network administrator to manage the CPSMC1800 100 8 Slot chassis via a remote Network Management Station NMS in one of two ways 1 Using the Transition Networks Foca Point graphical user interface 2 Using a remote Telnet connection Use an RJ 45 network cable to attach a terminal via a network hub or switch to the RJ 45 Ethernet port on the Management Module as shown a gt Je O00 fe 00 E fo w eon Uu fe OS 00 e co F a o Network hub or switch connected Remote Telnet connection OR to the RJ 45 Ethernet port Remote NMS with an SNMP application NOTE To manage the PointSystem chassis via a remote NMS both the RJ 45 Ethernet port and the NMS must be connected to a network with Internet accesi bility 5 2 SNMP Software The SNMP software is described in a separate manual available from Transition Networks Tech Support M F 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 20 dWNS CPSMC0800 100
14. h Support M F 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 22 CPSMC0800 100 PointSystem Chassis Cable Specifications Null Modem Cable The Null Modem Cable is used for connecting a terminal or terminal emulator to the Management Module s DB 9 connecdtor to access the command line interface The table below shows the pin assignments for the DB9 cable Function Mnemonic Pin Carrier Detect CD 1 Receive Data RXD 2 Transmit Data TXD 3 Data Terminal Ready DTR 4 Signal Ground GND 5 Data Set Ready DSR 6 Request To Send RTS 7 Clear To Send CTS 8 25 Pin Rs 252 Null Modem Cable Chassis Ground Chassis Ground 1 1 Transmit Data 2 3 Receive Data Receive Data 3 2 Transmit Data Request To Send 4 7 L 4 Request To Send Clear To Send 5 5 Clear To Send Data Set Ready 6 20 Data Terminal Ready Carrier Detect 6 a E 6 Data Set Ready Data Terminal Ready 20 5 Carrier Detect Signal Ground 7 7 Signal Ground RJ 45 Cable Category 5 Gauge 24 to 22 AWG Attenuation 22 0 dB 100m 100 MHz Maximum Cable Distance 100 meters Straight Through OR Crossover cable may be used Shielded Twisted Pair STP OR Unshielded Twisted Pair UTP may be used All pin pairs 1 amp 2 3 amp 6 4 amp 5 7 amp 8 are active in a Gigabit Ethernet network Use only dedicated wire pairs for the active pins e g blue white amp white blue orange white amp white orange etc Do not use flat or silver satin wire Tech Su
15. h the Tmra CAUTION Installation of the chassis in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised The 8 Slot chassis is designed so that the installation brackets can be installed to align the chassis either flush against the front or back edge of the rack or recessed from the front or back edge of the rack at front Flush Alignment j Recessed Alignment 25 c at back f at back WARNING SELECT MOUNTING BRACKET LOCATIONS ON THE CHASSIS THAT WILL KEEP THE CHASSIS BALANCED WHEN MOUNTED IN THE RACK FAILURE TO OBSERVE THIS WARNING COULD ALLOW THE CHASSIS TO FALL RESULT ING IN EQUIPMENT DAMAGE AND OR POSSIBLE INJURY TO PERSONNEL CAUTION Consideration should be given to the connection of the chassis to the supply circuit and the effect that overloading of the circuits might have on over current protection and supply wiring Appropriate consideration of equipment nameplates should be used when addressing this concern CAUTION Reliable earthing of rack mounted equipment should be maintained Particular attention should be given to supply connections other than direct con nections to the branch circuit e g use of power strips yo SISSU CPSMC0800 100 PointSystem Chassis To install the CPSMCO800 100 8 Slot chassis into a standard 19 inch rack 1 Determine the preferred alignment of the 8 Slot chassis in the rack NOTE Installation bracket m
16. icator information specific to that Media Converter Slide in Module Calculating the Power Consumption CAUTION Before installing the Media Converter Slide in Modules refer to the power consumption data for each individual Media Converter Slide in Module provided in the User s Guide shipped with each Media Converter Slide in Module The combined power consumption of all devices must not exceed the available power supply Failure to observe this caution could result in diminishing system reliability In other words the combined wattage of the CPSMC0800 100 8 Slot chassis plus all Slide In Modules must be less than the available power Contact Transition Networks Tech Support to ensure the power requirements for your specific application do not exceed the available power Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 6 sojnpouu ur opijs CPSMC0800 100 PointSystem Chassis 2 1 2 Installing the Media Converter Slide in Modules CAUTION Wear a grounding device and observe electrostatic discharge precau tions when installing the Media Converter Slide in Module s into the chassis Failure to observe this caution could result in damage to and subsequent failure of the Media Converter Slide in Module s NOTE Media Converter Slide in Modules can be installed in any installation slot in any order To install the Media Converter Slide in Module into the CPSMC0800 100 8 Slot chassis
17. ide in Module s Failure to observe this caution could result in damage to and subsequent failure of the Management Module s NOTE The Managment Modules are NOT hot swappable To replace a Managment Module 1 Remove the Managment Module to be replaced by loosening the one 1 screw that secures the Managment Module to the CPSMC0800 100 chassis front Slide the Management Module from the CPSMC0800 100 chassis 2 Align the replacement Mangement Module with the installation slot so that the panel fastener screw is at the top o 00 e Panel Fastener Screw 3 Carefully slide the replacement Managment Module into the installation slot NOTE Ensure that the Managment Module is firmly seated against the back of the chassis 4 Install the replacement Managment Module by carefully rotating the attached panel fastener screw clockwise to secure the Managment Module to the chassis Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 11 sojnpoui ul opiJjs CPSMC0800 100 PointSystem Chassis 3 3 1 Primary Power Supply Powering the CPSMC0800 100 The CPSMC0800 100 chassis can be powered through an AC or DC Power Supply An optional auxilliary power supply with Instant Fail Over protections is also avail able NOTE The CPSMCO0800 100 8 Slot chassis does not have an ON OFF switch e Power up the chassis by connecting the power suppl
18. le is firmly seated in the slot e Contact Tech Support 1 800 260 1312 Intl 00 1 952 941 7600 5 To determine if a fault is due to a software problem consult the Fault Isolation and Correction section of the SNMP software manual available from Transition Networks 6 To determine if a fault is due to an individual Managment Module or Slide in Module consult the Fault Isolation and Correction section of the User Guide for that particular Module 7 If none of the solutions listed in this section resolves the problem contact Technical Support 1 800 260 1312 International 00 1 952 941 7600 Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 21 suljooysajqno CPSMC0800 100 PointSystem Chassis Technical Specifications For use with Transition Networks Model CPSMC0800 100 or equivalent Product is certified by the manufacturer to comply with DHHS Rule 21 CFR Subchapter J applicable at the date of manufacture Dimensions 17 x 10 4 x 1 8 inches 432 x 264 x 46 mm Shipping Weight 8 Ibs 3 6 kg Power Input 100 240VAC 50 60Hz 18 72VDC Power Consumption 60 Watts Refer to the power consumption data for each individual Media Converter Slide in Module provided in the User s Guide shipped with the Media Converter to determine optimum site configuration MTBF Mean Time Before Failure MIL217F2 V5 0 hrs Bellcore7 V5 0 hrs without fans 43 277 114 896 with thre
19. n additional expansion module e CPSMM 210 Single Slot Expansion Management Module 2 2 1 Three Types of Managment Modules o CPSMM 120 Single Slot Master Managment Module es The optional CPSMM 120 Single Slot Master Managment Module can reser be installed to enable network managment of a single CPSMC0800 100 8 Slot chassis sd o i CPSMM120 4 3svg0l Refer to the CPSMM 120 User Guide for more information on the CPSMM 120 Single Slot Master Management Module Wwidas CPSMM 200 Dual Slot Master Management Module The optional CPSMM 200 Dual Slot Master Managment Module can also be installed in the CPSMC0800 100 8 Slot chassis to enable network managment TX PWR oo RX LNK 1 3sv90 RESET This module has all of the features of the CPSMM 120 plus a pair of cascade ports which allow multiple PointSystem chassis to be connected See section 4 3 Cascade Option for details on connecting multiple chassis IMOdInO 1YOdNI OZ LIN WNBL 68a Note also that this module reguires two adjacent slots in the CPSMC0800 100 8 Slot chassis for installation Refer to the CPSMM 200 210 User Guide for more information on the CPSMM 200 Dual Slot Master Management Module CPSMM 210 Single Slot Expansion Management Module The CPSMM 210 is used with the CPSMM 200 to connect up to eight 8 PointSystem chassis into one managable stack See section 4 3 Cascade e reser Option for
20. oe etworks Transition Networks CPSMC0800 100 8 Slot PointSystem Chassis User s Guide revision A Ca Uk O e I Y Caen mi CPSMC0800 100 PointSystem Chassis Compliance Information UL Listed C UL Listed Canada CISPR22 EN55022 Class A EN55024 CE Mark FCC Regulations This equipment has been tested and found to comply with the limits for a class A digital device pursuant to part 15 of the FCC rules These limits are designed to provide reasonable protection against harmful interference when the equip ment is operated in a commercial environment This equipment generates uses and can radiate radio frequency ener gy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at the user s own expense Canadian Regulations This digital apparatus does not exceed the Class A limits for radio noise for digital apparatus set out on the radio inter ference regulations of the Canadian Department of Communications Le pr sent appareil num rique n met pas de bruits radio lectriques d passant les limites applicables aux appareils num riques de la class A amp B prescrites dans le R glement sur le brouillage radio lectrique dict par le minist re des Communication
21. onal 00 1 952 941 7600 4 CPSMC0800 100 PointSystem Chassis 2 1 Unpacking the CPSMC0800 100 Equipment Use the following list to verify the shipment Item Part Number 8 Slot chassis with AC power supply CPSMC0800 100 8 Slot chassis with DC power supply CPSMC0810 100 Power Cord varies by country External AC Power Supply CPSMP 180 optional External DC Power Supply CPSMP 190 optional 1 slot Master Management Module CPSMM 100 optional 2 slot Master Management Module CPSMM 200 optional FocalPoint Software Disk FPS provided with CPSMM 200 Expansion Management Module CPSMM 210 optional Management Module Cascade Connector 6026 optional Rack Mount Ears CPSRE 238 optional Selectable Media Converter Slide in Module s various P N optional User s Guide 33270 Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 5 uoponpozui CPSMC0800 100 PointSystem Chassis 2 Slide in Modules 2 1 Media Converter Slide in Modules 2 1 1 Transition Networks Media Converter Slide in Modules installed in slots at the front of the chassis allow the network administrator to connect various copper and fiber optic network media over protocols that include Ethernet Fast Ethernet DS3 E3 and OC 12 as well as many others see www transition com for a complete listing NOTE Refer to the documentation that comes with each Media Converter Slide in Module for cable connector and LED ind
22. ounting screws are provided Rackmount screws and clip nuts are NOT provided 2 Locate six 6 installation bracket mounting screws provided for each chassis to be installed WARNING Mount the chassis evenly and securely onto the rack Failure to observe this warning could allow the chassis to fall resulting in equipment damage and or possible injury to personnel 3 Align the universal mounting bracket in the selected position against the side of the chassis so that the chassis installation holes are visible through the univer sal bracket installation holes 4 Using a Phillips screwdriver install the three 3 screws through the mounting bracket into the installation holes on side of the chassis 5 Repeat steps 3 and 4 for the second mounting bracket 6 Locate four 4 screws not provided and optional clip nuts not provided for each chassis to be installed 7 Carefully align the chassis at a secure and level position between the 19 inch site rack mounting rails 8 Install two 2 screws through the right bracket into the right mounting rail and two 2 screws through the left bracket into the left mounting rail using the clip nuts to secure if necessary a 10000000 10800008 4 1 2 Table Top Installation The CPSMC0800 100 8 slot chassis is shipped with four 4 rubber feet for optional installation on a table or other flat stable surface in a well ventilated area If table
23. pport M F 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 23 CPSMC0800 100 PointSystem Chassis Contact Us Technical Support Technical support is avialable 7 00 AM 6 00 PM CST GMT 6 00 United States 1 800 260 1312 International 00 1 952 941 7600 Transition Now Chat live wia the Web with a Transition Networks Technical Support Specialist Log onto www transition com and click the Transition Now link Web Based Seminars Transition Networks provides 12 16 seminars per month via live web based train ing Log onto www transition com and click the Learning Center link E Mail Ask a question anytime by sending an e mail message to our technical support staff techsupport transition com Address Transition Networks 6475 City West Parkway Minneapolis MN 55344 USA telephone 952 941 7600 toll free 800 526 9267 fax 952 941 2322 24 CPSMC0800 100 PointSystem Chassis Warranty Limited Lifetime Warranty Effective for Products Shipped May 1 1999 and After Every Transition Networks labeled product purchased after May 1 1999 will be free from defects in material and workmanship for its lifetime This warranty covers the original user only and is not transferable This warranty does not cover damage from accident acts of God neglect contam ination misuse or abnormal conditions of operation or handling including over voltage failures caused by use outside of the
24. product s specified rating or normal wear and tear of mechanical components If the user is unsure about the proper means of installing or using the equipment contact Transition Networks free tech nical support services To establish original ownership and provide date of purchase please complete and return the registration card accompanying the product or register the product on line on our product registration page Transition Networks will at its option e Repair the defective product to functional specification at no charge e Replace the product with an equivalent functional product or e Refund the purchase price of a defective product To return a defective product for warranty coverage contact Transition Networks technical support department for a return authorization number Transition s techni cal support department can be reached through any of the following means During regular business hours Monday Friday 7 AM 6 PM CST 6 00 GMT Contact Tech Support via e tel 800 260 1312 x 200 or 952 941 7600 x 200 e fax 952 941 2322 e email techsupport transition com e live web chat Transition NOW Any Other Time voice mail 800 260 1312 x 579 or 952 941 7600 x 579 e All messages will be answered within one hour Send the defective product postage and insurance prepaid to the following address CSI Material Management Center c o Transition Networks 508 Industrial Drive Waconia MN 55387 USA Attn RETURN
25. reproduced or used in any form or by any means graphic electron ic or mechanical without written permission from Transition Networks Printed in the U S A 33270 A Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 2 CPSMC0800 100 PointSystem Chassis Table of Contents 1 Introduction RA GAA I WG hes 4 TA IOGSCHDIOD a Md Yw Y A ae O DU SF 4 1 2 Unpacking the CPSMC0800 100 Equipment 5 2 Slide in Modules ce GCR LG RG Y 6 2 1 Media Converter Slide in Modules V eee 6 2 1 1 Calculating Power Consumption YYY Y Y Y eee ee 6 2 1 2 Installing Media Converter Slide in Modules 7 2 1 3 Replacing Media Converter Slide in Modules 8 2 2 Managment Modules 24c nce YNO GY Sek areas 9 2 2 1 Three Types of Management Modules VY YY uu 9 2 2 2 Installing the Management Modules 00000 Y ee eee 10 2 2 3 Replacing the Management Modules 0 00000 ee 11 3 Powering the CPSMC0800 100 eee wees 12 3 1 Primary Power Supply GR id GAR aha eer 12 3 2 Auxilliary Power Supply 9 Ake VER eOh a RT 13 4 CPSMC0800 100 Chassis 2 cece eee eee eens 14 4 1 Installing the CPSMC0800 100 Chassis 14 4 1 1 Standard 19 Inch Rack Installation VYY Y eee 14 4 1 2 Table Top Installation 0 0 nananana anran 15 4
26. rn is classified as No Problem Found THIS WARRANTY IS YOUR ONLY REMEDY NO OTHER WARRANTIES SUCH AS FITNESS FOR A PARTICULAR PURPOSE ARE EXPRESSED OR IMPLIED Transition NETWORKS IS NOT LIABLE FOR ANY SPECIAL INDIRECT INCIDENTAL OR CONSEQUENTIAL DAMAGES OR LOSSES INCLUDING LOSS OF DATA ARISING FROM ANY CAUSE OR THEORY AUTHORIZED RESELLERS ARE NOT AUTHO RIZED TO EXTEND ANY DIFFERENT WARRANTY ON TRANSITION NETWORKS BEHALF 26
27. ros yo SISSU Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 18 CPSMC0800 100 PointSystem Chassis 5 SNMP Agent in the Management Module Both Management Modules CPSMM 120 and CPSMM 200 have an SNMP Simple Network Managment Protocol Agent installed in the module that allows remote managment of networked devices The SNMP agent includes the Transition Networks PointSystem Command Line Interface CLI and an embedded Telnet server These tools allow the network adminsitrator to configure and manage the CPSMC0800 100 8 Slot from an attached terminal or from a remote networked computer In addition Transition Networks FocalPoint software can be installed in the net worked computer to provide a graphical user interface to monitor the Conversion Center 5 1 SNMP Hardware Connections The SNMP software can be accessed either through the Management Module s DB 9 serial port or through the RJ 45 Ethernet port e RJ 45 Ethernet Port o A Ss oo i Reser O a i DB 9 Serial Port g 3 o 5 E B E OGD CPSMM 200 CPSMM 120 DB 9 Serial Port The DB 9 serial port allows the network administrator to configure and manage the CPSMC0800 100 8 Slot chassis using the SNMP Command Line Interface CLI at an attached terminal or terminal emulator Use a null modem cable to attach a terminal to the DB 9 serial port on the Management Modul
28. s du Canada European Regulations Warning This is a Class A product In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures Achtung Dieses ist ein Ger t der Funkst rgrenzwertklasse A In Wohnbereichen k nnen bei Betrieb dieses Ger tes Rundfunkst rungen auftreten in weichen Fallen der Benutzer fiir entsprechende Gegenma nahmen werantwortlich ist Attention Ceci est un produit de Classe A Dans un environment domestique ce produit risque de cr er des interf rences radio lectriques il appartiendra alors a utilsateur de prende les measures sp cifiques appropri es CAUTION THE RJ CONNECTORS ON THE INDIVIDUAL MEDIA CONVERTER SLIDE IN MODULES ARE NOT INTENDED FOR CONNECTION TO THE PUBLIC TELEPHONE NETWORK Failure to observe this caution could result in damage to the public telephone network Der Anschluss dieses Ger tes an ein 6ffentlickes Telekommunikationsnetz in den EG Mitgliedstaaten verst sst gegen die jeweligen einzelstaatlichen Gesetze zur Anwendung der Richtlinie 91 263 EWG zur Angleichung der Rechtsvorschriften der Mitgliedstaaten iiber Telekommunikationsendeinrichtungen einschliesslich der gegenseitigen Anerkennung ihrer Konformit t Trademark Notice All trademarks and registered trademarks are the property of their respective owners Copyright Restrictions 2003 Transition Networks All rights reserved No part of this work may be
29. ut output network cables ONLY to Media Converter Slide In Module connectors within the same network protocol such as Ethernet to g Ethernet Fast Ethernet to Fast Ethernet ATM to ATM Failure to observe this cau tion will cause data transfer to fail Refer to User s Guides included with the Media Converter Slide In Modules for cabling specifications and instructions so am J OOOO fe 00 F le a om HM le A eo222e e cc WN Check the individual User s Guides for specific information on how to connect each Slide in Module to the network UY Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 17 CPSMC0800 100 PointSystem Chassis 4 4 Operation Daily operation of the CPSMC0800 100 8 Slot chassis requires no network admin istrator activity except for the occasional monitoring of the status LED indicators on the installed Media Converter Slide In Modules Each Media Converter Slide in Module and each Management Slide in Module has one or more LED indicators to help monitor the CPSMC0800 100 PointSystem chassis network Refer to the User s Guide included with each Transition Networks Slide in Module to interpret the LED indicators on the Managment and Media Converter modules LED Indicators on the Management Module and Slide in Modules pr asst t E o meee Q OS ee 5 oo L EL a 5 6 PO OO awe Yee
30. y e Power down the chassis by disconnecting power supply WARNING THE AC AND DC POWER SUPPLIES CONTAIN NO USER SERVICA BLE PARTS DO NOT ATTEMPT TO SERVICE EITHER POWER SUPPLY FAILURE TO OBSERVE THIS CAUTION COULD RESULT IN EOUIPMENT DAMAGE AND OR PERSONAL INJURY OR DEATH NOTE Contact Technical Support for any guestions concerning power supply The CPSMC0800 100 includes an internal power supply which is accessed through a power inlet on the front panel The power cord is included Ajddns 4omod To power the CPSMM0800 100 8 Slot chassis through the Primary Power Supply 1 Connect the female end of the power cord to the Power Inlet on the front panel of the chassis 2 Plug the male end of the power cord into the correct voltage rack or wall sock et 3 Verify that the 8 Slot chassis is powered by observing the illuminated Power LEDs on the Slide in Modules and by the fan operation Power Inlet ge 0905 fe 00 Ble cc roo s oo ooo O mm cr on O86 e o TRAN TION 6 6 oe GERRARA cedd o D_ Tech Support 7am 6pm CST GMT 6 00 1 800 260 1312 International 00 1 952 941 7600 12 CPSMC0800 100 PointSystem Chassis 3 2 Auxilliary Power Supply The CPSMC0800 100 can also be supplied with auxilliary power through the Auxilliary Power Inlet located on the back panel The External Power Converter and additional power cord are sold separately To power the
Download Pdf Manuals
Related Search
Related Contents
Samsung 710V Kullanıcı Klavuzu projet tuoré v6_final - Des engins électriques à l`IUT GEII de らくラッシュ2取扱説明書 VAIO International Repair Service Program (IRSP) GNU Guix Reference Manual A-26-7 - Régie de l`énergie BM - Mars 2007 / Interieur XP4 ICC IC110CB3PR wire connector En PDF - Me My Elos Asiento elevado “booster” Copyright © All rights reserved.
Failed to retrieve file