Home
User-Manual - GF-SOL-AIR
Contents
1. room lt temperature D4 5 length of exchange working area of fresh air Special stamped and welded A A gt exit air P s counter current foils form in alternating sequence air chambers for both flow directions gt gt Due to a special reverse flow heat exchanger the CVrobuste is responsible that more than 85 95 of the warmth or coolness of the used air will be transmitted to the incoming fresh air With the help of this equipment you must not open the windows in the summer and in the winter in order to air so you will never loss warmth in the winter and coolness in the summer In the summer you will join long coolness with out dedicate energy for cooling For the reason you will have for 24 hours daily fresh air by closed windows this air ing systems assures a regular air exchange and so the fresh air in your house will as sure you a durable well being Page 15 of 32 Advantages and characteristics of the CVSrobusto Fresh clean air at every time High air flow up to 20m3 h Agreeable temperatures at every time Heat recovery with a high efficiency 88 90 Saves a great part of heating costs Keeps off the heat in the summer Transports rapidly surplus humidity Supports the fast drying of new buildings Dust and pollen filter option at the heat exchanger Simple filter exchange Quiet table page 6 High damp
2. provides 90 permanent well being a 10 uncomfortably dry 0 12 14 16 18 20 22 24 2 28 30 Temperature C With its airflow the CVS transports continuously the waste humidity outside You can say exactly that the dry fresh air is mixed with the room air so that there is an ideal value of the rest humidity and that there is no condensation at cooler wall surfaces There is no living basis for mould so that it disappears after a short time The CVS offers not only advantages for rooms in which your are often but also for rooms in which you stay not so often where you air not so often With its strong air flow the CVS circulates the air all over note less so that there is a regular warming of all wall parts after a short time Assumption is for a consistent warming is that air cir culation is not prevented by furniture which is standing too closed by the air Page 11 of 32 During the airing in the winter the warm and humid air will be replaced immediately by very dry cold air Cold air 0 degree contents approx 2 5 g water per kg air Af ter the heating to 20 degree there is a relative humidity of approx 15 Each hour plants and people will bring additional 1 3 g water per kg air of the walls this is an increase of approx 3 10 each hour After 3 4 hours you have to air The game begins again In the night the relative humidity can increase to more than 100 due to the l
3. 35 2 52 kg 25 2 kg 0 252 kg Condensation 10 pre sumed 0 252 2 52 kg at cooler places more 0 025 kg occurs more in WT Condensation warmth 158 up to 1580 Wh will be transferred to waste air Resulting humidity gt 95 50 65 Determined fort he liv Weather Construction capacity ing climate CVS Window airing brings the heat and the closeness of the outside air in the rooms If a part of the air cools down at the cubic capacity a part of the surplus humidity will condensate it can be some litres It will be absorbed by the base the walls and the furniture and by the textiles parquet will swell and peel of by the ground If they are sated there will be wetness which is the basis for mould and everything smells musty The bad Due to the cooling of the air rest humidity of 60 increases to more than 90 or 95 It is getting unsupportable because there are no reserves for the transpiration of the sweat in order to absorb the sweat It does not cool down be cause nothing can evaporate You sweat more and there is the risk of a circulatory collapse because the body overheats Page 13 of 32 How does cooling works in the summer without a cooling machine and without any costs In the case of controlled airing with the CVS the air exchange will be made slowly There is only limited air quantity enough to breath but only with some water only some gram and no kgs in the air
4. icicles create outside of the house below the outside blind Icicles fall down at any time you must consider during the montage that persons are not in danger In order to secure the water drain you have to work carefully during the montage and we advise you to block the groove between the edge of the pipe and the hole of the equipment with silicon In the case of a strong inhabitation of a room the humidity entry is very high for this reason it is possible that there is a lot of condense water The outgoing air in the duct pipe should be controlled and it should be in the plus area In rooms with lower inhabitation it could be a problem that the air is too dry if it is very cold outside This is not healthy Some rivals offer a wetting Due to our consid erations it makes no sense If it is too dry there is no condensate which can evaporate Another limiting is that the quality of the condensate can suffer by the applied load of smoke or kitchen damp For this reason the subject brings some problems Page 17 of 32 For the warm seasons Also during the warmer seasons particularly during very hot summer days we rec ommend you to use the control mode up to including 3 appropriate for the particu lar room in order to have a constant temperature in closed rooms for the whole day This can be made without any particularly measures thanks to the high efficient heat exchanger in the CVS together with the construction dimension of the
5. V Nominal consumption ca 2 up to max 4 W 1 up to 1 8 W pacity Volume grades 3 and out 3 and out Air flow max m h gt 20 14 Air flow medium m8 h 14 10 Air flow minimal m h 8 6 Effectiveness of the heat 88 at max 90 at min 89 90 exchanger air flow af Warmth attendance de 94 97 95 98 gree Antifreeze manual manual Ventilation noise dBa 38 34 26 31 25 22 max med min Lds max med min Lds Damping ration of the ex gt 48 gt 48 ternal noise dB Measure cm 44x28 5x11 44x28 5x11 Weight kg circa 2 5 circa 2 5 Protection class 2 2 Page 5 of 32 Status displays LED display Functions Meaning Off none Equipment plugged off power supply is missing Orange yellow active Equipment works Switch step 1 2 or 3 Green ready Ventilator off Switch step 0 Air exchange Energy values Losses Adjust ments Switch setting Al A2 A3 Bl B2 B3 Air vol ume Air flow at continuous operation in m3 h 8 14 20 6 10 14 Energy exchanges per hour in the circulated air Sample calculation at a temperature difference of 21 inside outside Energy con Energy de tent kJ h 0 236 0 414 0 591 0 177 0 296 0 414 mand in kWh 0 066 0 115 0 164 0 049 0 082 0 115 Page 6 of 32 Controlled ventila tion with CVS Ventilator Residual energy us losses in ageinkWh kWh 0 002 0 0066 0 004 0 0115 0 006 0 0164 0 001 0 0049 0 002 0 0082 0
6. be fixed at the end of the horizontal profile at the drill model The fine adjustment in the high will be made by the movable centre part of the pedestal The movable drill machine slide will be pushed on the horizontal ar bour The drill will be fixed on the slide The slide stays locked in the outer end posi tion during the adjustment of the machine and the construction of the draft tube After the collaring of the core you have to unlatch the adjustment and you have to control if the core drill applies exactly under the opening of the drill mould Otherwise you have to adjust again Connect secure the extracting hose before you have to cover the working place against dirt You have to prepare buckets for builders waste and than you have to begin If you have routine you will feel if the drilling machine breaks bricks The core bit is getting unbalanced and the dust obstructs the aspiration which is also cooling for the core Page 29 of 32 drill diamond does not work correctly You have to stop the drilling You pull out the drilling machine and you have to empty the core bit By beating at the pipe of the core bit the rubbish dissolves and comes out After you have to place the machine with the slide on the binding piece and you can drill For the second drilling the binding piece will be placed and fixed at the other side If necessary you have to adjust the correct high execute the drilling as befor
7. clean and smooth Place the gasket 1 at the pipe so that there 7 5 mm pipe length overlaps push the pipe through the wall opening The second gasket must be placed at the end of the pipe and must be pushed with the outside walled into the drilling hole 7 5 mm of the pipe should be overlapped inside and outside In order to foam use the normal fitting foam glue we Ee advice to wear protective gloves 3 and to be prepared with a lot of paper towels Shake the fitting foam glue Consider the instruction of the product Place the tube between the gasket and A the drilling edge as deep as possible in the blank and press the blast pipe for foaming Before their end passes the gasket close the blast pile and wait for some seconds up to the moment where the pressure fails Now you have to draw the small tube if there is further foam you have to catch it with paper D A towels Clean the small tube Please consider pa 1 that the small tube will not be ripped off by the blast pipe Foam the second room correspondingly In the case of wall thickness of more than 24 cm foam also from outside Attention Secure against accidents Use the foam eco nomically but consider the total enclosure of the plastic pipe with the foam Consider holes in bricks After the foaming please adjust the gaskets The outside gaskets must be places 1 cm deeper into the opening Page 26 of 32 4 Fixing of the
8. execution A 0901 000023 Fan motor 12 V for execution B 0901 000024 Outside blend 0901 000013 Power supplies filters see price list The mentioned prices are net plus purchase tax and necessary delivery costs and they are unbinding The prices are only valid in Germany The other prices and construction drill tools on enquiry or can be seen at or web page We demand you to order at the place where you have buy the CVS In the case of an order directly at the producer the minimum order quantity net must be more than 25 00 Delivery will be made after receipt of money 24 55 99 90 22 50 25 50 9 50 GF SOL AIR Please note your source of supply if you Gerhard Feustle bought your equipment not directly from the Raistinger Str 3 producer We advise to let execute the main 86911 DieBen tenance or repairing by this merchant Phone 49 0 8807 92 40 8 0 Fax 8 9 Email gf sol air t online de Homepage www gf sol air de Please store this guide at a secure place like other manuals in order to have it to your disposal at any time If you remove please give this manual to the new user Page 32 of 32
9. ratio of the external noise gt 48dB Lowest energy demand lt 6 watt security extra low voltage Anti freeze by room air mixing and condensate drain Outside cover plate with rain protection and fly screen Easy to clean Little construction size 45 x 28 5 x 11 cm3 immersible up to 6 m Lowest room loss Mode of operation In operation it is possible to adjust 3 steps Corresponding to the printed figures on the equipment the equipment is switched off 0 it runs on the lowest level 1 on the centre position 2 or on the highest level 3 For the cold seasons In the cold season you can see that the CVSrobusto is very economic concerning the heating costs The used air until now it was lost unused by airing is also useful and heated the cold fresh air to room temperature This is the reason why the equip ment helps in order to save energy and it amortized itself after a few years which is only know from some equipment in the house In the case of freezing temperatures you have to recon that a part of the humid outgo ing air condensates in the heat exchanger and in the case of temperatures of less than 5 degree it will be happen that it freezes partially The condensations warmth and also the released warmth air during the freezing are also advantageous during the heat recovery A counter action against the freezing of the condense water would be the Page 16 of 32 exit of the outgoing air of the WT and
10. tion will be made pole correct at the screw type terminals Page 28 of 32 Drill template drill rig pipe adjuster For craftsmen there are tools which simplify the installation of the CVS The most craftsmen have routine with the work of core drills and their drive so an accurate drill in two direction exactly trough the wall needs a high demand of force and con centration which often can not be executed alone For this reason GF SOL AIR worked out an aid which allows one craftsman to execute the work rapidly and pre cise Drill template First it will be screwed at the place at the wall where the CVS will be fixed later The measures of the holes of the dowels are of Ai identical with the measures of the base plate of the CVS With the spirit level you have to buy s it in a building centre it will be easy to adjust the moulding tool First you have to drill the holes of the dowels with a little stone drill than you must bring it to the basic size of the dowel g The vertical alum angle profile is the fixing place for the horizontal distance capping of the drill rig e Drill rig Prime benefit of the rig is the release of the i craftsmen from the weight of the machine and also the guarantee to receive an accurateness of the drill In order to transport the equipment it is possible to fold it The bind rail has a downgrade to the wall 2 cm at the moulding tool less it will be brought in position and it will
11. 003 0 0115 Equipment elements Used air entry Door open eS Exhaustfilter y Antifreeze mixing valye ie air x ook wy al rae V a Exhaustfan lt i L operational LED Volume Control switch Low voltage plug Page 7 of 32 Security advices General protective measures You have to keep open the airing holes and you have to consider the creation of icicles in the winter Do not expose the equipment to exorbitant heat humidity of dust Do not expose the equipment to direct solar radiation Do not expose the equipment to electronic static discharges possible charges due to walking on carpets must be discharged on the wall before you touch the CVS supplying the CVS with Low voltage power first connect with jack into the female plug on pcb second connect PS with wallplug If you want to disconnect you have to do the contrary sequence In the case of use of power packs without low voltage jacks it is very important to consider the correct polarity and to use a terminal strip DC voltage If you want to clean or to maintain the equipment you must adjust the volume switch to 0 It is recommended to pull the plug of the power supply or to switch off the CVS in the case of a thunder storm For your own security you should only use accessories or original components of GF SOL AIR GF SOL AIR is not responsible for arising damages our consequences in the cas
12. CVSrobusto Before you fix the equipment at the wall you have to determine the connection method of the supply of power Depending if you ordered the standart nt the plug ger Nt or a floating nt or a centre supply unit the grommet of the cables will be made by a hole at the backside of the equipment Directly behind them you will find the l adjustment of the inwall and by a nut to the equipment edge This nut must be completed if the supply will be delivered via the flexible power supplies This must be made if the supply will be made of the Under ceiling can Please consider the advises in the chapter power supply A Now you can fix the CVSrobusto at the wall a 7 Here it must be considered that the foamed pipes 5s 53 are laying on arrester on the appropriate openings on the base plate It is also possible to push with a long bit hock which will be carried through the pipe to the deepening of the equipment bottom It is important to execute this working during the curing process of the fitting foam glue after it is not possible to adjust We advise an additional seal with silicon between the end of the pipe and the lower opening After a sufficient curing time you can eliminate the provisory fixing of the plastic tubes In the case of low wall thickness up to 24 cm it could be advantageous to fix and after to foam After you have fixed the CVS stick the plugs into the jack in the near of the cons
13. Comfort Ventilation System CVS robusto Execution A and B Utilization guidance and construction guidance 1 1 Comfort Ventilation System robusto 5 Utilization and construction guidance Version 1 5 July 2010 GF SOL AIR All rights reserved It is not allowed to reproduce or to transfer ulterior a part of this manual without the written authorisation of GF SOL AIR Gerhard Feustle Logo GF SOL AIR and Comfort Ventilation System CVS are registered trademarks of GF SOL AIR Gerhard Feustle CE Compliance declaration The described product agrees with the regulations of the following European guide lines 89 336 EWG and 73 23 EWG EMV and low voltage regulation Regulation of the council of the 3 may 1989 in order to adapt the legal regulations of the member states about the electromagnetic compatibility EN 50081 1 limited values and measurement methods for functional disorders EN 50082 1 1992 Electromagnetic compability EMV generic standard stability part 1 living area business area and trade area as well as small business EN 60335 1 1994 A11 1995 and VDE 0700 82 part 207 Security of electronic equipment for the domestic use and similar functions Labelling of the CE marker a power supply label b CVS case This declaration of the company GF Sol Air Gerhard Feustle Raistinger Str 3 D 86911 Diessen certify the agree ment with the mentioned regulations The security advice of this delivered prod
14. The incoming air cools down in the WT to room temperature the used air takes out their warmth The humidity increases if it enters into the room but it will be mixed with the existing air This has a stable humidity of only 60 65 Why Because the plaster at the wall and at the ceiling can store the surplus humid ity but slowly The saving process needs sufficient time which it gets from the con trolled airing In the case of uncontrolled airing plaster can not rapidly react it would be too much water Now there is the reserve in order to let evaporate the plas ter and it cools fantastically It feels agreeable also if the room temperature is 25 and more By controlled airing with the CVS the quantity of the incoming water will be strongly limited so that the lower quantity of water can be dry in the cooler nights For this reason you should use little air flow at the day in order to work in the night with a higher flow because the outside temperature is mostly lower as the room tempera tures For this reason you must consider the different airing demands in the winter and in the summer This kind of cooling costs no additional cent because the controlled airing should run everywhere at every time A cooling machine is not necessary energy devourer and climate killer but only the assumption A good insulated house leak proof and all air exchange will be made via the heat exchanger Function of the CVSrobusto The Comfort
15. Ventilation System CVSrobusto has not the function and of an air con ditioner a heater or a cooling machine in the normal sense The Comfort Ventilation System CVS robusto is an airing system for a controlled air exchange with a high effective heat recovery and operates with the lowest energy in put and passively working methods a stabilization of the internal temperature in the winter and in the summer Page 14 of 32 What does it mean Two ventilators with a step of your choice of different volume flows assure with a capacity of 8 up to_20 m h or 6 14 m h for a room air exchange of 0 15 up to 0 35 point Version B or the 0 3 up to 0 7 point Version A each hour in rooms up to 16 m at a height of 2 50 m With an own ventilator the used air will be blown from inside to the outside and the fresh air will be blown from the outside to the inside by the heat exchanger Functionality ofCounter Current Heat Exchanger produced from plastic foils A special foil profile offers big contact areas to the air and enforces permanent turbulences of air flow causing excellence in heat energy exchange of both separated air streams The stale air is doing usefull features before it exits It warms up cold fresh air in winter and cools down warm summer air to mostly room temperature This way saving big amounts of primary energy and hot house gases side view of fond A op view 7 HE staple Temperature course of heat exchange
16. advantage against other equipment that you do not have to dissipate this equipment By opining of the trap door you can reach the interior of the equipment Before you clean or maintain the equipment switch it off The equipment and the ventilation slots must be clean at any time Depending of the dirt in the room you have to clean the CVSrobusto 4times a year or more with a hoofer If necessary you have to clean some places with a soft brush The heat exchanger with condensate tank can be taken out horizontal you have to hover the 4 opening ranges and if necessary please clean it with compressed air carefully Fatty rests can be cleaned with flush water but you must dry it ripely Do not give the equipment into the dish washer After you have to build together the heat exchanger If you use a filter you have to lay it on the WT or on the filter net on the left side and push it Look into the pipes in the wall holes and control the blinds concerning fluffs if nec essary open the window and take the blinds for cleaning Consider the correct ad justment after the cleaning see manual If the equipment do not work despite an accurate production and control process you have to contact a client service of GF SOL AIR Gerhard Feustle in order to let re pair the equipment Guarantee Page 20 of 32 We guarantee you a correct running CVS equipment and a complete packing note of the packet regarding the list at the beginning of this book
17. at the delivery Please con trol at the receipt of the equipment the completeness and intactness If there are transport damages at the packing and at the content you have to show them immediately to the transport company and to the sender or you can refuse the receipt of the shipment otherwise the security protection and the guarantee can de cline Assumed that a professional construction of the CVS is made GF Sol Air Gerhard Feustle warrant a guarantee of 2 years under the condition that there are no bratty or careless false applications damages or not specified voltages which are ex pected to the equipment The guarantee is limited on the exchange of faulty functions elements Transport costs and call out charges won t be repaid Excluded of the guarantee are the filter the heat exchanger packet condensate tank and other components which are damaged due to false and failed cleaning and maintenance circles Installation instruction Contents Page Recommended tools and support 20 Security instructions 21 Selection of the kind of construction 21 Selection of the place of construction 21 Short description of the montage 22 1 Mark of the boreholes 22 2 Bore of the wall openings 23 3 Foaming of the pipes 24 4 Fixing of the CVSrobusto 25 Options for the power supply 26 Recommended tools and support Boring machine with rig for the Hoover for core drills Core drill 62mm diamond studded Length wall thick 5
18. ate tools there are companies which rent the necessary products If the holes are correctly marked correctly place on the core drill or at another visible mark the size of the wall with chalk This mark serves for the estimation of the cen timetres which must be drilled in the end Now you can begin with the drilling For this a model as described or a changeable drill application will be helpful If appli cable you have to use implements for the adjustment because it is very important that the perforation should be very exact due to the optic and the leakiness During the drilling you have to control permanently the guide of the drill Draw off the pollution or empty the core drill Breaking stonework is the reason of imbalances and blockages in the boring bit which eliminates the cooling of the drilling segments with the diamonds You have to drill very careful and with low pressure the last centimetres otherwise it could happen that plaster of the outside wall will crumble Before the drilling please control the quality of the outside plaster You have to consider particularly the fine outside plaster in the case of outside insula tion If there is cladding with wood outside the drilling should be stopped if the wood is reached The core drill is not appropriate for the cut through the wood In such cases please stop the cut through the boarding with an appropriate tool of outside The same is valid in the case of breaks through wo
19. be balanced The heating of external walls without insulation by the sun at a global so larisation of approx 1 kW m is naturally very faster 1h 4h C depending of the material and fortitude In crass cases we advise to use a jalousie and a blind in order to shadow Page 18 of 32 The picture shows the air flow in the room Given that the air flows vertical at the equipment the whole room is achieved and the conse quence is a com plete ventila tion of the room Dust and pollen Controlled Ventilation filter within Rooms Filter are optional and must be placed on the right side or on the left side on the net of the WY WT Please consider m the manual at the end of the booklet With delivery there are 2 L x A CVS filter to your 7 Yy disposal Filters slow down the air flow and change the effec tiveness of the heat exchan gers If you Pa lt x only use one filter the out ideair air exit A volume flows changes LN and the efficiency of the WRT isn t still exhafstair income air clean optional is blown and draft free In a lot of cases the f r away M 7 cold winter air and also _ 4 5 d the dust exposure of outside decreases and you can use the WRT without the filter This must be considered in individual cases But without a filter the WT must be cleaned very faster The filters are selected that they can catch m
20. cm Alternative drill bit for socket outlets 65 Dm with extension 320mm Drill template 0901 000016 you can buy it at GF Sol Air Impact drill rock drill 4 and 6 mm Drip cup bucket Page 21 of 32 Hoover replacement filter hose connection Protection foil 3 4 m2 floor cloths adhesive strip Protective gloves protective glasses Screwdriver Mounting Foam Handsaw finely serrated saw guide Spray chalk pencil Cable finder bubble level Measuring tape or yardstick Security advice Before you begin to install please read carefully the construction advice You have to assure that the construction area is saved in the interior but also external That means nobody should be injured during the assembly work Consider the secu rity advice and instruction sheet of the equipment tools and accessories you use for the construction of the CVSrobusto Make sure that there are no gas pipes water pipes heating pipes power lines or other pipes at the wall at the construction place Please consider that the construction place is not situated above personal entries foot walks because in the winter you have to anticipate with the formation of icicles It is not allowed to soften supporting construction elements for this reason you should avoid them as construction place If necessary please contact an architect or structural engineer You have also to avoid wall parts of concrete because it is very difficult to drill there and borin
21. e After the end of the workings you have to separate the column of the drilling mould and you must bring it into transport appointment In the case of harder wall material you have T T 1 i 1 i Bahnmaschinan l to count with amp chitten Halterung g i Elnh ngepashon AE maraki longer drilling NI Bohrschablona times In order to disburden the craftsmen of the difficult and long pressure work there is a cable pull above the roll on which it is possible to hang a weight of 15 15 kg The plug screws 2 of the drill mould should be so long in order to catch the trailing load of the mould It must be considered that there is not only a loading of the screws and plugs but also by shaking of the machine For this you have to consider during the drill that the drill mould will not be dissolve from the wall Corresponding to the max length of the drill thickness of the wall the total break t has to be discharged if the length of the drill is received Risk of damaging the out side insulation Adapt the length of rope The last 2 cm should be executed by hand Page 30 of 32 Standteil Fufteil Pipe adapter First you have to cut the delivered plastic tube with a fine chain to a length wall thickness 15 mm After the foaming and adaption to the base plate it will be foamed from outside and the outer gaskets will be impressed if n
22. e installation should be made factory made Choice of the construction place Depending of the size of the room and arrangement of the furniture the CVSrobusto should be constructed at eye level not a must but comfortable 0 2 up to 0 7 points is also ok beside a window Avoid the construction of the CVSrobusto at tight room corners The closeness of big furniture can handicap the air flow High cupboard should be moved away for some centimetres from the wall in order to guarantee ventilation at any place Cur tains should not cover the equipment If you consider this information the CVSrobusto has the best air exchange effect Nev E it is i NG la ke es 2 NS ji N Fils N e 62 mm 6mm y X simple to construct and it is also easy to change the pollution filter Please consider that an electrical socket should not be so far away the equipment has a power pack for the energy supply At the construction in the room the air flow should be executed in the centre Page 23 of 32 If you install multiple CVSrobusto you should distribute them that they ventilate constantly the appropriate room Construction instruction in short form If the construction of the CVS will be made by a company or by a craftsman with the appropriate equipment it is not necessary to consider the points 1 5 It costs some money to let drill but it is a guarantee f
23. e of nonadherence Energy dissipation comparison of different housetypes airing by window ref controlled airing w heat regain at equal sized exchange rates Zero Energy House voluntary Passive Energy House Energy casualties voluntary building E Lowest Energy House EnEV 2002 JI airing by window energy saving rule contr arg w heat regain J Low Ha House WSVO95 Wi heating guard rule WSV084 constructions before Page 8 of 32 Correct airing The flats of today are thanks to the legal pressure and modern construction material extremely sealed and for this reason there are often very economical concerning en ergy consumption But the consequence of the density is rapidly used room air with an accumulation of carbon dioxide and different toxic elements so that there is a bad atmosphere in the room Disagreeable feelings are coming you can not concentrate you are getting tired and the well being suffers Fresh air is needed it is necessary to open the windows But airing by open windows isn t always responsible for your well being Outside it can be very hot or very cold traffic noise and dust reduce the fun of fresh air It is very difficult to adapt the ratio of fresh air to the given environ ment Statistics show in more than 85 people air false they air too less or
24. ecessary With the help of the pipe adapter which should be operated with a drilling machine and a dis tance ring the length of the pipe will be grinded exactly up to the touch of the contact bridge at the distance ring After this activity you can clip on the outer blend If there is bur formation at the pipe edge you have to eliminate it before The sandpaper at the grinding wheel is a a wear part and must be exchanged if ireren necessary For this you have to remove N the forward ae j Untereging part than you Lp have to Vy l lt _ N change the A l T disc and after you have to f Tr gerplatte Change or insertion of the dust and pollen filter A filter mat will be applied on the right upper inclined place of the WT the second filter mat will find place above the ventilator at the grid It is important that the filter edges seal all air ways The cleaning is very simple If the white colour is covered with dust it is possible to remove it with a Hoover For this you have to take out the filter in order to clean It is advisable to wash them if the filters are getting very dirty During the cleaning you should also disinfect the filter Naturally you can buy new filters from your suppliers the filters are not very expensive Page 31 of 32 Spare parts list Front door 0901 000031 Electronic board A or B 0901 000032 Heat exchanger 88 mm with condense tub 0901 000022 Fan motor 12 V for
25. g bits has shorter durability s as in the case of other construction materials Selection of the kind of construction It is possible to construct the CVSrobusto directly on the wall but also counterbored in the wall In already existing buildings people mostly choose the finery construc tion In the case of our products the room loss is vey low but by a party counter bore in the wall it can be reduced In this case there are only some centimetres out of the wall which are absolutely necessary for the ventilation of the air The construction will be made after the work of the plasterer and the painter If the equipment will be sun the deepening can be made during the structural work Here the construction will be also made after the plasterer work At the deepening should be always a power supply by an accessible under ceiling plug socket The laying of the cable and the installation pipes will be naturally made before the plasterer work Page 22 of 32 At the deepened construction it is also recommended to use plug screws in order to fix exactly the equipment Use economically the foam during the foaming in pack of the holes behind and alongside the equipment During the hardening are a lot of pres sure which are able to adjust an unfixed equipment additionally there must be enough place to fill the seams or for skim between the equipment and the top of the plaster At the construction in prefabricated houses or post and beam structure th
26. nsist on performance User Manual guidance Page 3 of 32 Contents Scope of delivery Equipment specific value Status display Air conversions energy value loss Equipment elements Security advise Correct airing Function of the CVSrobusto Advantages and characteristics of the CVSrobusto Operation modes For the cold season For the warm season Dust collector and pollen collector Noise emission and pollution Attendance and cleaning Guarantee Assembly instruction CVSrobusto Power supply options Boring template drill rig pipe accommodator Change Cleaning of the filter Replacement list Page 4 of 32 Included in delivery Each CVSrobusto packet should include the following construction groups or rather components Please control with the help of this packing note the completeness of the shipment The component parts are nearly stored in the equipment remove these and store them at a safe place 1 Comfort Ventilation System CVSrobusto 1 Power supply with connecting cable according order if necessary other options 2 plastic tubes with 2 foam sealing rings each 2 Face plates 4 dowels 4 dowel screws 2 dust filter fine G3 1 Instruction manual and construction instruction type approval 1 drilling pattern on hard paper Equipment parameters Comfort Ventilation Performance A Performance B for relaxa System CVSrobusto Hon Tooms Supply voltage 12 V 12
27. oden walls For this you have to use only appropriate drilling cutting tools Better would be the execution of the work by a professional handicraftsman because the walls are containing often nails and screws or the walls are filled with fluffily insulating material which can fall out There is also the risk to damage the insulation 2a Alternative drilling methods In lieu of a core driller it is also possible to work with a drill bit for socket outlets with extension flagpole In order to get straight openings you have to use a long stone drill for the drilling which also shows a fall to outside The drilling serves as guid ance for the centring drill of the drill bit for socket outlets dm up to 68 mm which only allows a limited drill depth Consequently you have to clear out more often the cuttings You have to use appropriate moil chisel pinch bares and a steel ring as bearing in order not to damage the bricks too much 3 Foaming of the pipes Page 25 of 32 This is very important in order to avoid thermal bridges and that there is no condense water in the winter near of the pipes which will wet and damage the walls Please clean carefully the drilling holes Than you have to inject the drilling holes in side with water in order to improve the grip and the increase of the hardening of the fitting foam glue Please saw the delivered plastic pipes on the measure of the wall opening plus 15 cm Use a saw with fine teeth Edges must be
28. ong airing break The result is condensation at the windows and at cold walls If the windows are continuously open or if the LWZ is adjusted too 100 high this brings a relative t 1 condensation humidity of less than 35 go stale air gf mouldiness or even less than 20 Ta this is to dry Due to ideal area comfortability field researches it is known that respiratory disorders bacterium virus and also allergen symptoms i z Er strongly increase in the 20 Pad os D veh air humidity translated See case of dryness a onto inroom temperature Extending of humidity at uncontrolled airing by window wintertime pushed airing at 0 flatarea 120 m __ pushed airings 2 S controlled airing wNheatregain Ss rel humidity T T If the air exchange 0 2 4 6 8 10 12 14 16 18 2 22 24h 7 daytime volume is adjusted see heatenergy loss per money throw diagram page 10 that the ushed airing 3 KWH lout by window 0 and 120 m fa charge and discharge by the inhabitants are balanced than you obtain seo HR ideal humidity fora long ae eh as OO on time without the demand of additional moisturization equipment which are often the basis for mould due to missing regularly cleaning Stale air is used and polluted air the longer the invalls of airing the more intensive i
29. or an exactly alignment of the drills 1 Mark of the drill holes In order to mark the drill holes please use the delivered hole pattern of carton as model please consider that the holes for the outgoing and incoming air are on the right side and use a water level for an exactly alignment of the CVS You have only to use one step in order to mark the holes for the pins and for drilling Control again if the marked holes are aligned correctly with the water level and with the model GF Sol Air also offers a boring template made of steel panel you can use for all drillings After you have made the pin holes and the delivered pins you have to fix the steel plate with the screws at the wall The big holes in the steel panel are a guid ance for the core drill Together with the simple support in order to adjust vertically and plum of the drilling equipment you are able to make precise openings You can remove the model after you drilled some centimetres of both openings With this you extent their reuse duration 2 Drilling of the drilling lead through 8 Please consider the security advices re po Consider during the drilling a down grade i of 2 5 outwards In order to drill you use a core drill with a diameter of 62 mm and a appropriate drilling aes PA machine most suitable one with a Hoover this befestigung save much cleaning work l Bohrschablone If you do 7 y ie not pos UUL sess the appropri
30. ore than 70 or 85 of the usual external air It is only possible to filter partially ex tremely fine grit sizes Here we have chosen a compromise in favour of a big air flow With a simple method it is also possible to catch big parts of fine dust PM10 For this you have to wet economically and steadily the filter mattes with veg oil You have to eliminate surplus oil with compressed air Naturally this method func tions timely limited and you have to clean the filter mats before reuse and to disin fect or to replace them You have also to consider that the oil can dry up or to gum in the case of higher temperatures Page 19 of 32 Noise emission The CVS makes also noise because the air flow is made by fast rapid running venti lators Dependent of the room equipment there are some dB more if you measure the acous tic noise measure pressure values in acoustic death rooms see table on p 6 There is much more in bathrooms due to the strongly reflecting tiles Noise immission of outside The small wall openings in low transversal sections are responsible that the noise of outside is immeasurable small damping lower than 48 dB Inhabitants who suffer under noise pollution flight pollution can close their windows because ventilation is made with the help of the CVSrobusto equipment If necessary inhabitants can get government aid at the purchase of this equipment Maintenance and cleaning It is an important
31. r Clocked wall power supply Against a corresponding surcharge you can choose this NT which will be delivered by a famous producer It worked clocked at a high working frequency and possesses a good effectiveness of approx 85 additionally it is equipped with an electronic short circuit fuse The connection of the plug will be made as described at the Std Nt Clocked in wall NT Against surcharge same technology has place under the base plat in an in wall tin There must be a 2 landline circuit of 230 V to the tin The low voltage side has only 15 20 cm The Under ceiling tin should be adjusted midsymetric to the lower wall hole besides the power supply opening In the case of the sank construction of the CVS the Under ceiling din should be adjusted on the left side in order to allow repairing exchange Before the montage of the equipment the Under ceiling Nt will be constructed and connected with the net The low voltage ends of the Nt will be fixed after the construction of the equipment at the correspond ing screw type terminals at the plate For this you can draw the plate for a simple handling Central supply All CVS equipment are connected at a combined 12V supply Logically it has to be stored in a cut out box The clocked equipment should have the dimension for the max sum power The supply of low voltage to the equipment will be made via the under ceiling tin which must be installed as for the Under ceiling Nt The connec
32. rooms which can be considered as a heat storage tank particularly if there is an exterior insulation The heat exchanger of the CVS does not receive 100 but 85 90 of the heat ex change rate so that temperature in the house increases only a little bit This increase is not due to imperfectness of the CVS but by the direct entry of sun energy via the windows and walls or by often opening of the windows and doors Inhabitants of houses which dispose about a good outside isolation and with windows with lower thermal conductibility are in advantage The entry of sun energy of outside is lower A simple example invoice should show you these coherencies Room with enclosed room of 40 qm Internal temperature of 22 and external temperature of 32 gt Difference 10 Effectiveness of the CVS 90 gt Fresh air temperature after CVS 23 Air flow rate with CVS each hour 20m3 Mixture with room air 20m3 40m3 0 5 leads to an increase of the internal tempera ture of 0 5 h but you have to disregard the cooler walls Energy supply by 10m fresh airs 10m x 1 29kg m3 x 1 09kJ kg x 1 14 kJ 3 9 Wh Heat reservoir walls ceilings pro rata 15 24 t depending of the construction ma terial Heat capacity walls ceilings 3000 12000 kJ The heating of the walls of 1 with energy by the fresh air would have duration of a lot of weeks Given that it is cooler in the night the heating by cooling down will
33. s it Air exchange with the CVS helps not only to save heating energy it is also responsi ble for a consistent humidity value for a long time and practically you are in the well being field at every time s page 11 In the case of humidity values of less than 40 you should select a program with a lower air exchange ratio acr in the case of values of more than 65 you should select a program with a higher acr The presented diagram shows the humidity development in the case of uncontrolled airing with a window in presence of 2 persons and of a controlled airing with a CVS Here you can also reach a humidity value of up to 80 with a low condensa tion if the air flow value is adjusted to low Page 12 of 32 Warm seasons During hot an muggy summer days there is the risk in the case of uncontrolled air ing that the humidity values increases too high in closed rooms if the air outside contains a humidity of more than 60 The table shows the difference between un controlled airing with door and windows and controlled airing via heat exchanger Comparison uncontrolled controlled airing during muggy weather e g a room of 16 m2 Parameter Open windows Controlled with CVS Air quantity in m h 100 1000 with light 10 wind Warmth at 10 Over temperature in side outside 390 3900 Wh only dry air part 3 9 Wh air has only 1 more WRG 90 than room air Water content at 60 r F
34. taches spores in the air for this reason you can find a high concentration of them in the interior room and they are the reason for different ill nesses The rooms smell unventilated and unhealthy The insufficient airing aggra vates the situation because the exterior walls cool down more and more and the con densation will be preferred charge discharge humidity 5 outer 20 innerte mp Transpiration 10 Pers x h from crosspoints of both curvetypes we get stable humidity LWZ acr air change ratio 120 5 condensation area 100 Transpir 1P xe A 1P Transpir 2P Ea 80 FS Transpir 3P 3 LWZO0 1 5 LWZ 0 25 lt LWZ0 5 J LWZ 1 0 Sa ee l ae LWZ 8 window 0 r r r r r i 0 2 4 6 8 10 12 Page 10 of 32 Coherency well being to temperature and humidity Morbid substances in living rooms and working rooms Relationship of comfortability in dependency of temperature and humidity Illmaking substances in living working rooms 100 bakterias viruse mildew go uncomfortably humide mouldiness 7 The comfortability 80 7 i field is like an island surrounded by many 70 fs illmaking conditions gt O gt A mites 60 R ATX 2 comfortable 2 50 1 Just controlled airing 2 with heat regain achieves 40 I the comfortability field 90 Y ry OU The Comfort Ventilation N System CVS
35. th the CVS the biggest part of the heat energy which is part of the waste air even 85 in the case of little air flows even 90 because the air flow warms the incoming fresh air to room temperature Page 9 of 32 That means you save at least 1 O kWH heating energy per hour a non unimportant value for which CVS turns to account Window airing makes no sense Heat energy saving regulations and improved thermal resistance at construction mate rials windows and doors are leading to a very lower energy effort during the heating period But due to the thickness of the construction technique surplus humidity val ues store in the inhabited rooms because it is not possible to conduct the humidity by the masonry and leaky window scores Per day and per inhabitant there are per aver age 1 5 2 1 evaporated water transpiration water consumption of cooking shower ing which must be deleted If there are also animals and plants the consumption of humidity in the air augmented By an insufficient air exchange condensation arises at the windows and outside walls particularly behind furniture or in the corners of the ceilings also at cold places on which the air has no chance to circulate Omni presented mould settle at this places additionally there are ideal living condi tions in order to spawn Very fast you will find ugly places with dark mould which can be the reason for considerable construction damages The spawning mould de
36. that ice will block it at the same time the func tion would be stopped The consequence would be that only cold air would come in side By mixing of warm room air to fresh air the risk can be deleted Depending of the mix ratio the incoming air is boosted on a level at the entry on the WT on which there is no freezing risk For this purpose stands the manual method you can bring the butterfly in a position which corresponds to the outside temperature These positions are marked and de scribed at the internal side of the upper air entry hole In the case of a weather change it is necessary to adapt the appointment If there is ice on the right upper side of the geometry of the WT of more than 1 cm you have to use temporarily the manual method It is not advisable to let open the butterfly in advance because the air ex change suffers and the equipment will not bring the expected work The WT is con structed that condensate can drip off during the emission or that it can leak out by the horizontal coin profiles because they are not weld but plugged into each other The lower support of the WT is light horizontal and formed that the condense water will be conducted to the lower pipe emission In the case of freezing temperatures a daily control of the butterfly is sufficient For this you has the guarantee that the condense water emission does not freeze and that the temperature of the outlet air stays in the positive area During cold temperatures
37. too much Opened windows let the warm air of inside go out and often people forget that the windows are open The results are big energy losses in the winter because the air in the room must be heated again and again due to the cold incoming air Here a little numeric example Flat with a living space of 120 m2 construction height of 2 50m Half air exchange per hours 0 5 point air change per hour after DIN 1946 Part 2 Room air technique healthy demands Outside temperature of 0 C and inside temperature of 21 C this is a temperature difference of 21 C Additional energy effort for the heating of the fresh air in the case of airing 0 5 x 120 x 2 5 x 1 29 x 1 09 x 21 4 43 MJ h Air exchange x surface x height x air mass x energy kg C x temperature difference This corresponds a heating loss of 1 23 kWh per hour due to airing by the win dow This is lost energy and the biggest part of the necessary heating energy amount of 7200 kWh year statistical mean for a flat of 120 m after low energy standard See for this the graphic of the previous page The airing losses are absolutely equal presumption the same WE and the same airing behaviour but dependent of the house type the consequences are different Right at a NEH low energy house the character of the next With the help of the Comfort Ventilation Systems you must not open the windows and you gain back under the presumption that each room is equipped wi
38. truction place The free cables must be bind together in order to avoid trip ping points i The external blinds will be plugged on if the fitting A foam glue will be hard It would be impossible that jj the plastic tubes must be shortened that only 7 8 o F mm jut out For this work we recommend our pipe ye adjuster which can be fixed in a drilling machine in ye order to fret the pipe up to the distance ring i Page 27 of 32 REE J Use protection goggles if you execute this kind of work Secure yourself and the tools against dropping down After you have eliminated the distance ring and the dust fix the blinds as shown Please consider that the execution with the weather groove at one of the blinds comes to use at the lower pipe After the choice of one of the three volume adjustments and at the close of the door butterfly the well being with the Comfort Ventilation System CVSrobusto begins for you and the other inhabitants Power supply Standard power supply A plug which contains at the end of the cable a phone jack adapter of the size 5 5 2 5mm will be delivered Positive pole inside In the case of the finery construction the connection of the low voltage plug will be made through the hole in the backboard to the jack plug at the plate which is fixed sidewise In the nut the cable will be lead through the lateral edge The non milled bar at the edge will be made free with a cutte
39. uct documentation must be considered Gerhard Feustle company leader date 01 08 2010 Page 2 of 32 Dear client We are happy that you have decided for a quality product of our house Products like this which amortise within a few years are rare After this time thanks to our product you will have money for other expenditures It would be difficult to find another equipment in your house which can be compared with CVS In a little while you will learn to esteem all other use which is not lying in the measureable but in the subjective area The CVSrobusto creates a durable well being The handling and the use is simple We recommend reading carefully this manual before the first use of the Comfort Ventilation System CVSrobusto In this man ual you will find our advice for the correct installation handling use and attendance We thank you for your attention and wish you a lot of fun with your new CVSro busto Advantages for you and your environment Type certification A type certification for this version of the CVS is in work But it is deplorable for the customers who call upon the public appropriations and they do not get it for a long time But the conditions are given rarely and at this time there is unfortunately less money in the treasury in order to keep alive the market incentive programmes In comparison to the attainable savings the advantages of the subsides are clearly lower so that it is not necessary to i
Download Pdf Manuals
Related Search
Related Contents
Sunbeam FPSBFCM40 Instruction Manual Manuel de cuisson solaire User Manual OSO Accu 50R Manuel d`utilisation Moffat GE56B User's Manual AEG MRC 4105 P User's Manual Craftsman Chrome/Vinyl Hydraulic Hydraulic Stool Owner's Manual Copyright © All rights reserved.
Failed to retrieve file