1. Frame 4 End T N Figure 10 Figure 1B Munters Corporation 4215 Legion Dr Mason MI 48854 1036 USA 517 676 7070 Fax 517 676 7078 leakage ite Critical Door Height a e 7 8 Ot eal EOS 9 L 235 _ Critical Door Height Less 7 8 p iia Frame Middle Frame Top ga J Wall Stud or Post Framed Opening Height T Framed Opening Height T Figure 1A FORM QM1043 Rev 4 July 2007 Page 4 of 20 It is required that the tunnel door frame is taller and longer than the wall opening The tunnel door frame 2 Qn Standard Tunnel Door 1 Begin the frame by fastening 2x4 frame bottom material to wall studs Start the 2x4 even with the wall opening Continue until the FRAME OPENING LENGTH is achieved The tunnel door frame should completely enclose the wall opening See Figures 1A amp 1B 2 Using a level to set the 2x2 fasten it along the 2x4 frame bottom material It is important the 2x2 be level as this is where the door mounts The 2x2 should overhang the ends of the 2x4 frame bottom by 2 See Figure 1B 3 Using the proper FRAME OPENING HEIGHT DIMENSION from below measure from top surface of the level 2x2 and mark the wall studs accordingly Fasten 2x6 frame middle material to wall studs Bottom of 2x6 should be even with the markings on the wall studs
2. Always start with a right or left end door 48 long door from a completer kit The end door seal should overlap the frame end 2x4 by 1 0 to provide a good seal See Figure 11C To get the proper overlap trim 1 off of the rigid hinge on the end of the door you started with Apply a bead of sealant under the hinge See Figure 11A 11B This will prevent leaks between the 2x4 and the hinge 9 Place the door on the 2x4 in the closed position overlapping the frame end by 1 0 and fasten in place with screws every 374 not too tight along indented line in rigid hinge piece Attach lift line to lift bracket using the Azuma nut to hold the door in the open position Use the same procedure for top and bottom end doors See Figures 11A 11C Right Door Frame Middle Support Se 7 7 7 7 i 7 7 7 7 4 Tunnel S Door N Right DAN Door Steel siding i J screws Main A Cable Hinge Door 3 2 ee rame To es ee cable clamp Bead of S go Caulk Frame Middle Support Screw hook bitni FO Lift Bracket 3 5 3 4 z e Pulley ge ae 7 Figure 11A Required for Single Cable System er eet Azuma nut amp bolt Lift door brace bracket Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 16 of 20 Screw hook an Door ae Lift Bracket Brace aN 2x6 ZAN e A aes o
3. Screw Hook Weather ee Weather Strip a7 Weather Strip 2x4 a Strip x De x Ss Bottom Bottom Top Door Door f Bottom Lift Door Bracket Se Lift Brace x Lift Brace Lift Brace Bracket Bracket Bracket Top Door Bottom Door Bottom Door Double Cable System Single Cable System Figure 7 Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 11 of 20 INSTALLATION INSTRUCTIONS REVERSED HINGE R Note It is required that the tunnel door frame is taller and longer than the wall opening The tunnel door frame height and length outside dimensions should be slightly bigger than the tunnel door height and length as noted below to assure proper seal See Figures 8A 8E for more details 1 Using a level begin the frame by fastening 2x4 frame bottom material to wall studs Start the 2x4 even with the wall opening It is important the 2x4 be level as this is where the door mounts Continue until the FRAME OPENING LENGTH is achieved The tunnel door frame should completely enclose the wall opening See Figure 8B 2 Using the proper FRAME OPENING HEIGHT DIMENSION from below measure from top surface of the level 2x4 and mark the wall studs accordingly Fasten 2x4 frame middle material to wall studs Bottom of 2x4 should be even with the markings on the wall studs Start the 2x4 even with the wall opening See Figure 8C 3 Using the proper FRAME OPENING HEIGHT DIMENSIO
4. Start the 2x6 even with the wall opening See Figure 1C 4 Using a level to set the 2x2 fasten it along the 2x6 frame middle material as close to the top as possible keeping the 2x2 level The 2x2 should overhang the ends of the 2x6 by 2 5 Using the proper FRAME OPENING HEIGHT DIMENSION from below measure from top surface of the level 2x2 and mark the wall studs wall accordingly Fasten 2x4 frame top material to wall studs wall Start the 2x 4 even with the wall opening Bottom of the 2x4 should be even with the markings on the wall studs wall See Figure 1D 6 Close in the frame by adding 2x4 frame end pieces to both ends of the frame IMPORTANT Seal tunnel door frame with caulk or sealant Failure to seal gaps will result in air leakage FRAME MIDDLE Critical Door 2x6 required for double cable system Heo eS 2x4 required for single cable system Critical Door Height Less 7 8 Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 5 of 20 INSTALLING HARDWARE 8 Attach the main cable to the actuator and pull it from actuator end of the tunnel door frame to opposite end of frame it may be necessary to install some screw hooks temporarily to hold the cable in place along the frame top See Figure 2A amp 2C 9 Actuator should be in the open door position Install screw hooks along the frame and 174
5. 3 Right Door AC3162 AC3160 AC3163 AC3164 AC3165 4 3 16 Cable Clamp AC1039 5 Pulley Swivel 7 s AC1239 6 Screw Hook KS2601 7 Lift Line coated cable AC1245 8 Azuma Nut amp Bolt AC1210 9 Bottom Lift Bracket AC2122 10 Lift Brace Bracket AC2416 AC2424 AC2428 AC2430 AC2436 11 Elevator Bolt KS1205 12 1 4 20 x 5 s Bolt KS1027 13 10 x 1 2 TEK screw KS2301 14 1 4 20 Keps Nut KN1558 15 31 2 Lag Screw KS2465 16 Locking Arm AC2412 17 1 Spacer KX1256 18 4 Spacer KX1257 Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 3 of 20 INSTALLATION INSTRUCTIONS Frame Wall Opening Dimensions I D e Height is equal to tunnel door height less 7 s with a tolerance of s example a 24 door height 23 s opening b 30 door height 29 s opening e Length is equal to tunnel door length less 2 example a 32 long door 31 10 opening b 56 long door 55 10 opening Note height and length outside dimensions should be slightly bigger than the tunnel door height and length as noted above to assure proper seal For Standard Tunnel Door models See Figures 1A 1E for more details IMPORTANT Seal tunnel door frame with caulk or sealant Failure to seal gaps will result in air If using a Tunnel Door models with R or Reversed Hinged proceed to page 12 2x4 Frame End i a Figure ot Se 2 a Pag 2x4
6. SES ry N A Lift Bracket Figure 11B p Hinge Door Screw hook N RSA amp Required for Double Cable System 10 Mid section doors apply a bead of sealant under hinge as shown Figure 11A this will prevent leaks between the 2x6 and the hinge Allow for thermal expansion when installing the doors in a temperature less than 40 F Leaving a s to 1 4 gap between the doors will allow for the necessary expansion Munters Corporation 4215 Legion Dr Mason MI 48854 1036 USA 517 676 7070 Fax 517 676 7078 ett F Figure 11C FORM QM1043 Rev 4 July 2007 Page 17 of 20 11 With the installed door s in the open position slide doors together from the top as shown in Figure 12 The Beam can be spread apart to fit around the other door IMPORTANT It is necessary to position doors in the open position while sliding them together and in the closed position for attachment to the frame Placing the doors in the open position allows for viewing on both sides of the door to verify Beam enclosed mating door Close the doors and fasten in place with screws every 3 not too tight along indented line in rigid hinge piece Important Placing the door in its closed position for attachment it to the frame will ensure proper seating on the level 2x4 an
7. a I beam Top door lift bracket hardware consists of a lift brace bracket two each of bolts 4 x2 washers and nuts Two lift brackets per 96 door and 1 bracket per 48 door For doors 36 high and 96 long use 3 lift brackets e Bottom door lift bracket hardware is the same as the top door with the addition of a bottom lift bracket 2 bolts 4 X 5 8 and nuts Optional Installation Kit FA1502 provides 2 each of lift lines screw hooks pulleys 3 16 cable clamps and 4 Azuma nuts Optional Latch Kit FA1560 provides 2 each of locking arms 1 spacers 7 4 spacers and 31 2 lag screws e Customer supplied materials consists of sealant weather stripping and mounting screws Recommendations for customer supplied materials Weather resistant sealant weather stripping at least 1 2 W x 5 s H mounting screws 8 x 3 4 Kwikseal Woodbinder screws common for attaching sheet metal to wood structures See Exploded view for more details Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 2 of 20 Tunnel Doors Top Seal N l Beam N Left Seal N Hinge EN ae Neen es KAG 16 o y CEP Ore fea Cat No Cat No Cat No Cat No Cat No Cat No No Part Name Description all 16 24 28 30 36 1 Left door AC3172 AC3170 AC3173 AC3174 AC3175 2 Mid section Door e AC3148 AC3150 AC3149 AC3151 AC3155
8. door 31 10 opening b 56 long door 55 10 opening FRAME MIDDLE 2x4 required for double cable system 2x4 required for single cable system Critical Door Height Less 7 8 Ji Critical Door Height Less 7 8 Figure 8E Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 13 of 20 INSTALLING HARDWARE R 5 Attach the main cable to the actuator and pull it from actuator end of the tunnel door frame to opposite end of frame it may be necessary to install some screw hooks temporarily to hold the cable in place along the frame top See Figure 9A amp 9C 6 Actuator should be in the open door position Install screw hooks along the frame and 17 off center of the lift brackets on the top doors as the doors are installed The 172 offset should be twords the actuator machine If two main cables are used place the screw hooks above the bottom doors also Attach pulleys to screw hooks route lift lines to the main cable and attach with cable clamps See Figure 9B After doors are completely installed the cable clamps will need to be repositioned to act as safety stops es Frame Top Frame Middle Support Frame Bottom Figure 9A Screw Hook Main Cable 3 16 Cable Clamp Figure 9B 2x4 Lift Line to Lift Pulle y Bracket Munters Corporation 4215 Legion Dr Ma
9. Figure 3A NOTE Tunnel doors 36 high and 96 long require 3 lift brackets all others 96 long require 2 lift brackets Bottom Door Lift Bracket 1 4 x 2 Bolt Se Lift Door Brace Bracket Use 9 s2 drill bit making 2 holes Center lift brace bracket for use on 36 tunnel doors only e Figure 3A Use Lift Line Bracket for Drill Template _ Drill for optional Locking Bracket Figure 3B Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 7 of 20 11 Always start with a right or left end door 48 long door from a completer kit The end door seal should overlap the frame end 2x4 by 1 0 to provide a good seal See Figure 4C Apply a bead of sealant to the 2x2 See Figure 4A 4B This will prevent leaks between the 2x2 and the hinge 12 Place the door on the 2x2 in the closed position overlapping the frame end by 1 0 and fasten in place with screws every 3 7 not too tight along indented line in rigid hinge piece Attach lift line to lift bracket using the Azuma nut to hold the door in the open position Use the same procedure for top and bottom end doors See Figures 4A 4B 4C Frame Top N Right Door i S SS Frame l Middle Support l l l l l 4 7 l 7 l 7 Main l vA Cable 7 a 3 16 ca
10. N from below measure from top surface of the level 2x4 and mark the wall studs wall accordingly Fasten 2x4 frame top material to wall studs wall Start the 2x4 even with the wall opening Bottom of the 2x4 should be even with the markings on the wall studs wall See Figure 8D 4 Close in the frame by adding 2x4 frame end pieces to both ends of the frame IMPORTANT Seal tunnel door frame with caulk or sealant Failure to seal gaps will result in air leakage Wall Stud or Post 2x4 m Frame End LA 1 fy Ae Framed Opening Height ye Figure 8D ko Ke I fa Frame Top os ryt Framed A TS di yy Opening Height N SEN i Sto ni 2x4 ol ZA 2x4 6 5 Frame a rae Oe st End k EA N oe z Y P a DA hr Frame ie Middle NIL Le a ms T Do Nis lal 0 ON DES oO 8 bij ON Q ii es eA an 2 oat en ET oo or Frame Bottom S ove 2x4 2x4 wy era X a H SE il ay ie Figure 8A ae a End a w od Ne Figure 8B Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 12 of 20 Frame Wall Opening Dimensions I D e Height is equal to tunnel door height less s with a tolerance of s example a 24 door height 23 s opening b 30 door height 29 s opening e Length is equal to tunnel door length less 2 example a 32 long
11. TIONAL LATCH KIT BOTH MODELS 1 Install optional latch kit as necessary Locking arms should be positioned close to lift brackets See Figure 15 1 Spacer 3 4 Spacer De Locking Arm Ke we 31 2 Lag Screw Figure 15 Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 20 of 20
12. aerotech AeroBaffle Tunnel Doors Ventilation Systems TDxx96T TDxx96B TDxx00T TDxx00B Reversed Hinge TDxx96T R TDxx96B R TDxx00T R TDxx00B R USER S MANUAL and INSTALLATION GUIDE TABLE OF CONTENTS Section Page Unpacking the Equipment ccccccccceeececeecceeaee cece eee eeeee se ceaaaaeaeeeeeeeeeeeseeseceasaaeeeeeeeeeeeeeeeeeeeea 1 Components List amp Exploded View ccecececceecceeceeeeeeeeeee cence eaaecaeeeeeeeeeeeeeseccenceeaeeeeeeenenes 2 3 Standard Tunnel Doors Installation Instructions eect ee eeeee eee eeette eee eeeeaeeeeeeeaaeeeeeeeaaees 4 5 ET Installing Hardware ccccccececeeeeeeeeecececeeeeeeeeeeeeeseeeecccaaeeeeeeeeeeeeetietstsseeteeereee ET Installing Lift Brackets secseoriiennincneia ne ana a aa L710 secehiiees ACJUSUIME ME i355 cntccceteeFectetis saz eateddestetdiersagued a aa a a E aa dl Reversed Hinge R Installation Instructions 0 cece cece eeeeeeeeeeeeeeeeeeeeeeeeeeaeeeeeeeaaees 12 13 asinen Installing Hardware esssnneneeeseeseeeesrrnnrnnssnssterrrrnnrrnrsrnssrrnnrnnnrnnnnnssensrrnnnrnnnnnnseresrerrree 14 sacadevaten Installing Lift Brackets ccccccccceceeeeeeeeeeeeceecaeceeeeeeeeesesenceeaecaeeesesereteseteetsestteeteees 15 18 E ACJUSUIMG INE ccncscreiiai iaa e E ER EE O EOE ieee 19 Optional Latch Kit both models j essisinoia niaii A E ANAE 20 THANK YOU Thank you for purchasing Aerotech A Munters Company AeroBaffle Tu
13. ble a Hinge Door Frame 10 gt gt clamp Z AN Right Door Bead of Sealant Steel siding Screw hook Lift Line to a screws QD Lift Bracket Pulley Front Door Frame Middle Support Lift door brace Figure 4A piace Required for Single Cable System Munters Corporation FORM QM1043 Rev 4 July 2007 4215 Legion Dr Mason MI 48854 1036 USA 517 676 7070 Fax 517 676 7078 Page 8 of 20 Screw hook KS Lift Bracket Brace 2x6 N N tr Wat D ha 7 g Lift Bracket g a ee S Bead of SS a Sealant ealan S a Hinge Door Oe Screw hook 2x6 Bad O o 7 lt a Figure 4B Required for Double Cable System 13 Mid section doors apply a bead of sealant to the 2x2 as shown Figure 4B 4C this will prevent leaks between the 2x2 and the hinge Allow for thermal expansion when installing the doors in a temperature less than 40 F Leaving a s to 1 4 gap between the doors will allow for the necessary expansion a 4 ran Munters Corporation 4215 Legion Dr Mason MI 48854 1036 USA 517 676 7070 Fax 517 676 7078 Figure 4C FORM QM1043 Rev 4 July 2007 Page 9 of 20 14 With the installed door s in the open position slide doors together from the top as shown in Figure 5 The Beam can be spread apar
14. d with the other doors Attach lift line to lift bracket using the Azuma nut to hold the door in the open position 12 IMPORTANT Reopen doors and install Tek self tapping screws two on front and two on back where the I Beam overlaps the bare edge of the mating door The Tek screw should go through the Beam and corrugated plastic cover sheet The screws will mechanically fasten the two doors together See Figure 13 13 Continue installing midsection doors using same method outlined above Attach lift lines to lift brackets as you proceed using the Azuma nuts to hold the doors in the open position At about four feet from the end of the frame opening add the other end door 48 long door from a Completer Kit 14 The end door seal should overlap the frame end 2x4 by 1 0 trim 1 off the rigid hinged apply a bead of sealant to the 2x4 See Figure 11 slide doors together and fasten in place This end door completes the run Beam Hinge NX La Trim 1 off rigid hinge Top Seal Re Munters Corporation 4215 Legion Dr Mason MI 48854 1036 USA 517 676 7070 Fax 517 676 7078 Middle section 4 door 4 TEK screws ES Figure 12 Top Seal Te Figure 13 FORM QM1043 Rev 4 July 2007 Page 18 of 20 ADJUSTMENT IMPORTANT this process must be completed to ensure proper seal of the doors to the frame other wise there will be unnecessary ai
15. nnel Doors Aerotech equipment is designed to be the highest performing highest quality equipment you can buy With the proper installation and maintenance it will provide many years of service PLEASE NOTE To achieve maximum performance and insure long life from your AeroBaffle Tunnel Doors it is essential that it be installed and maintained properly Please read all instructions carefully before beginning installation UNPACKING THE EQUIPMENT Before beginning installation check the overall condition of the equipment Remove packing materials and examine all components for signs of shipping damage Any shipping damage is the customer s responsibility and should be reported immediately to the freight carrier Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 1 of 20 UNPACKING THE EQUIPMENT Tunnel Door Series Components The shipment contains 96 midsection doors along with boxed hardware Also the completer kits contains 48 right and left doors along with boxed hardware Optional installation kits and latch kits will be in the hardware boxes Optional cable will be on a spool Component descriptions e Midsection doors are 96 long doors with a hinge a top seal an l beam and a bare side e Right doors are 48 long doors with a hinge a top seal a right seal and bare side e Left doors are 48 long doors with a hinge a top seal a left seal and
16. off center of the lift brackets on the top doors as the doors are installed The 11 2 offset should be tword the actuator machine If two main cables are used place the screw hooks above the bottom doors also Attach pulleys to screw hooks route lift lines to the main cable and attach with cable clamps see Figure 2B After doors are completely installed the cable clamps will need to be repositioned to act as safety stops 2 Main Cable required Main Cable required for double cable system Frame Top Frame Middle Support he Frame Top a 27 Figure 2A B 4 Required for Double Cable System 2x2 ra 2x2 Frame Bottom Screw Hook Main Cable 2 x 6 Frame as Middle Support 4 3 16 Cable Clamp 2x6 Zn Lift Line to Lift Pulley Bracket O Figure 2C E Figure 2B FORM QM1043 Rev 4 July 2007 Page 6 of 20 Munters Corporation 4215 Legion Dr Mason MI 48854 1036 USA 517 676 7070 Fax 517 676 7078 INSTALLING LIFT BRACKETS 10 Install lifting brackets on the doors before hanging the doors the bolt head and washer should be on the opposite side of the door than the lift bracket and nut See Figure 3A Use a 9 32 0 281 drill bit to make two holes Use the lift brace bracket for a drill template See Figure 3B The holes should penetrate the top seal and the bottom hinge The brackets should be positioned 24 from the ends of the doors See
17. r leakage 15 Safety Stop Adjustment With the doors in the open position move all the lift line cable clamps 16 clamps until they touch the screw hooks and pulleys This will prevent damage to the door if the main cable happens to break 16 Door Adjustment Move the doors toward the closed position until the first door makes contact with the frame Adjust the other doors to closed position using the Azuma nut and lift lines 17 The actuator closed limit switch should be set at this position 18 Seal Adjustment With the doors in the closed position mark the frame where the seal makes contact Open the doors and apply weather stripping 16 H x 3 4 W along the mark on the frame The weather stripping should be on the wall opening side of the mark This will ensure a tight seal to prevent air leakage See Figure 14 19 Run the doors open to satisfy the static pressure with all fans on The actuator open limit switch should be set at this position Screw Hook Weather Strip Screw Hook Weather Strip 2x4 2x6 NI Weather 2x4 7 Strip Bottom Bottom Door Bottom Lift Door Bracket Top Door Kal Lift Brace Lift Brace Bracket Lift Brace Bracket Bracket Top Door Bottom Door Bottom Door Double Cable System Single Cable System Figure 14 Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 19 of 20 OP
18. son MI 48854 1036 USA 517 676 7070 Fax 517 676 7078 Main Cable required e Main Cable required for double cable system Frame Top S 2y E 2 Required for Double Cable System 2 x 4 Frame Middle Support NG 2 4 i Figure 9C oy FORM QM1043 Rev 4 July 2007 Page 14 of 20 INSTALLING LIFT BRACKETS R 7 Install lifting brackets on the doors before hanging the doors the bolt head and washer should be on the opposite side of the door than the lift bracket and nut See Figure 10A Use a 9 32 0 281 drill bit to make two holes Use the lift brace bracket for a drill template See Figure 10B The holes should penetrate the top seal and the bottom hinge The brackets should be positioned 24 from the ends of the doors See Figure 10A NOTE Tunnel doors 36 high and 96 long require 3 lift brackets all others 96 long require 2 lift brackets Bottom Door Lift Bracket 1 4 x 2 Bolt 1 4 Keps Nut Pes Lift Door Brace Bracket Center lift brace bracket for use on 36 tunnel doors only Figure 10A Use Lift Line Bracket for Drill Template Drill for optional Locking Bracket Figure 10B Munters Corporation 4215 Legion Dr Mason MI 48854 1036 USA 517 676 7070 Fax 517 676 7078 FORM QM1043 Rev 4 July 2007 Page 15 of 20 8
19. t to fit around the other door IMPORTANT It is necessary to position doors in the open position while sliding them together and in the closed position for attachment to the frame Placing the doors in the open position allows for viewing on both sides of the door to verify Beam enclosed mating l beam door Close the doors and fasten in place with P screws every 3 not too tight along indented line in rigid hinge piece Important Placing Middle section the door in its closed position for attachment door it to the frame will ensure proper seating on the level 2x2 and with the other doors ii Attach lift line to lift bracket using the Azuma nut to hold the door in the open position 15 IMPORTANT Reopen doors and install Tek self tapping screws two on front and two on back where the I Beam overlaps the bare edge of the mating door The Tek screw should go through the Beam and corrugated plastic cover sheet The screws will mechanically fasten the two doors together See Figure 6 Figure 5 16 Continue installing midsection doors using same method outlined above Attach lift lines to lift brackets as you proceed using the Azuma nuts to hold the doors in the open position At about four feet from the end of the frame opening add the other end door 48 long door from a Completer Kit 17 The end door seal should overlap the frame end 2x4 by 1 0 apply a bead of sealant
20. to the 2x2 See Figure 4 slide doors together and fasten in place This end door completes the run Top Seal N Top Seal NS 4 TEK screws NG l Beam NI Lift Hinge Lee Fh S s ae Top Seal p a a S N A aa 9 Figure 6 Munters Corporation FORM QM1043 4215 Legion Dr Mason MI 48854 1036 USA Rev 4 July 2007 517 676 7070 Fax 517 676 7078 Page 10 of 20 ADJUSTMENT IMPORTANT this process must be completed to ensure proper seal of the doors to the frame other wise there will be unnecessary air leakage 18 Safety Stop Adjustment With the doors in the open position move all the lift line cable clamps 9 16 clamps until they touch the screw hooks and pulleys This will prevent damage to the door if the main cable happens to break 19 Door Adjustment Move the doors toward the closed position until the first door makes contact with the frame Adjust the other doors to closed position using the Azuma nut and lift lines 20 The actuator closed limit switch should be set at this position 21 Seal Adjustment With the doors in the closed position mark the frame where the seal makes contact Open the doors and apply weather stripping 16 H x 3 4 W along the mark on the frame The weather stripping should be on the wall opening side of the mark This will ensure a tight seal to prevent air leakage See Figure 7 22 Screw Hook

Download Pdf Manuals

image

Related Search

Related Contents

(Mentions légales) - produit hygiene soin pour chien chat médicament    MANUALE USO E MANUTENZIONE Vasca di lavaggio su carrello  Kaltura MediaSpace™ User Manual  English User manual .........................................................  Samsung Samsung Star 3  Tripp Lite WEXT3-SU16-20K    

Copyright © All rights reserved.
Failed to retrieve file