Home

ASSAULT WAKEBOARD TOWER - Aerial Wakeboard Towers

image

Contents

1. ASSAULT WAKEBOARD TOWER INSTALLATION GUIDE INSTALLATION SUPPORT i GUIDE PWB ASSAULT 001 HOLLY l WAKEBOARDING PRODUCTS IMPORTANT INFORMATION This Aerial wakeboard tower fits motor boats with 76 108 inch wide beam widths This measurement is taken from the Port to Starboard mounting points Do not fold the tower without having the top section securely fastened to the side sections with the fasteners provided e Do notfoldthe tower by yourself e Do not assemble tower on the ground and then try to install it on the boat e Do not use impact drivers to install any hardware e Torque set screws to 35ft Ibs e Torque shoulder bolts 50 ft Ibs e Torque tower foot all thread to 65 ft Ibs e Check the top section for burr s before installing side sections to prevent the scratching and marking of tubes Aerial does not cover damage caused by burr s during installation e lf the area of the deck where the tower will be mounted has a fiberglass thickness of less than inch a backing plate kit must be purchased and installed to provide adequate sup port e Please leave the foam wrap on the tower until the installing is complete e Please note that when towing your boat you may notice what appears to be movement in your tower It is important to understand that the boat is also moving on the trailer and that this movemeni can be visually deceiving e Frequently wash your tower with soap and water e Asr
2. INSTALLING THE NAVIGATION LIGHT NAVIGATION LIGHT SHIPPED SEPARATELY The navigation light is shipped separately It is designed to be installed on the top of the tow point For a clean wiring installation the wires supplied can be passeq through the center of the tow point along the inside of the top section and down inside the front leg tube The wires will need to exit the front leg tube just above the fittings and then be passed over the fittings before entering back into the side rail front tube Finally the wires will exit the side rail front tube just above the mounting foot and then enter the deck of the boat through a hole that will need to be drilled so that they can be connected to a switch and power source Note The tower is not supplied with pre drilled wiring holes as each customer may have a different wiring requirement de pending on how they fold their tower or the accessories that they will mount to the tower gt www aerialwakeboarding com GUIDE PWB ASSAULT 001
3. mark the drilling positions on the front leg tubes We then recomend drilling the holes with a smaller drill bit smaller than the 3 8 drill bit to make a pilot hole d STEP 16 Following the pilot holes you just drilled use a 3 8 drill bit to create the clearance hole for the joining bolts As each hole is drilled we recommend inserting each bolt so that it keeps the parts aligned while drilling the next hole IL GUIDE PWB ASSAULT 001 GLY l WAKEBOARDING PRODUCTS STEP 17 Once all the holes are drilled and all the fasteners are inserted the nuts can be installed and all of the fasteners and nuts can be firmly tightened You may need to vacuum up the debris and aluminum shavings Note We recommend using Red Loctite Threadlocker when installing these fasteners and any other fasteners that will not require loosening once installed STEP 18 To install the board rack fingers use the socket head cap screws provided and attach the fingers to the diamond shaped plate This diamond plate will then be installed to the rear switch blade legs STEP 19 LOWERING THE TOWER Lowering the tower requires at least 2 people Never trailer your boat with the tower in the lowered position Always check to make sure all fasteners are tight and secure before using the tower again OPTION A OPTION B DISCONNECT DISCONNECT LOOSEN 11 GUIDE PWB ASSAULT 001 HOLLY l WAKEBOARDING PRODUCTS STEP 20
4. PWB ASSAULT 001 OLD l WAKEBOARDING PRODUCTS STEP 4 Once the desired position is achieved place one of the backing plates over the piece of tape and trace around it with a permanent marker Transferring marks from the other side This step is very important After taping the second side of the boat in approximately the same areas as the first side you will need to measure the distance that you marked on the first side of the boat It is best to take measurements from the back of the boat and mark with blue tape Be sure to measure from the same point on both sides 9 GUIDE PWB ASSAULT 001 WAKEBOARDING PRODUCTS Drilling Once you have marked your 4 holes check the underside of the deck for wires If necessary you should move the wires out of the way while you drill We recommend drilling a small pilot hole which will keep the 5 8 drill bit from walking moving A small rat tail file can be used to ease the edge and keep the gel coat from chipping Be careful of wires Attaching the side rails Insert the four all thread screws into the side rail feet GUIDE PWB ASSAULT 001 HOLL i WAKEBOARDING PRODUCTS STEP 7 CONTINUTED Install the tower mounts to the boat deck in the order shown in the diagram lt ____ MOUNT mg NYLON WASHER Note in fhe case where the deck RUBBER of your boat is less than 1 4 thick TT a reinforcing kit is required to ae BOA
5. T DECK L b thicken and reinforce the deck in e REINFORCEMENT o the mounting locations BACKING PLATE WASHER NYLON LOCK NUT Remove just enough blue tape for your tower feet to snugged up to your boat STEP 8 ie PRO Measuring from your windshield check the distance to the side rail to make sure both sides are symmetric GUIDE PWB ASSAULT 001 OLD l WAKEBOARDING PRODUCTS STEP 8 CONTINUED The side rails need to be mounted straight up and down If they are leaning in or out this will cause a problem with the tower when you want to fold it STEP 9 Assembling the Switch Blade Rear Leg Parts needed 2 x Threaded Lap Joints 2 x Trim Washers 2 x Shoulder Bolts The longer bolts supplied 1 x Clamps 1 x Socket Cap Head Screw 1 x Lower Base Start at the top of the switch blade and attach the trim washer shoulder bolt and threaded lap joint STEP 10 You will then need to attach the lower base to the threaded lap joint This is then followed by attaching the clamp to the lower base using the stainless steel socket head cap screw 8 GUIDE PWB ASSAULT 001 HOLL i WAKEBOARDING PRODUCTS STEP 11 The lower section of the switch blade can now be assembled to the lower fittings and clamp using the trim washer shoulder bolt and threaded lap joint Insert the front leg hinge joint into the lower section of the front arm repeat for the other side Its importa
6. equired use Mothers Mag amp Aluminum polish to restore your tower to its original finish e BE CAREFUL when assembling this product We CANNOT be liable for any burring or scratch ing that may occur when sliding sections in and out of each other e NEVER modify this product in any way e NEVER climb stand or ride on this product e NEVER tow watersport tubes or inflatable s with this or any other Aerial Wakeboard Tower e ALWAYS use caution with approaching bridges or overpasses e ALWAYS inspect this product for loose bolts fittings or damage before each use e Always carefully CONSULT the user manual for proper installation maintenance and usage Aerial is not liable for personal injury or property damage from the use of this or any other Aerial product GUIDE PWB ASSAULT 001 OLA l WAKEBOARDING PRODUCTS TOOLS REQUIRED L RT 3 GUIDE PWB ASSAULT 001 HOLLY i WAKEBOARDING PRODUCTS STEP 1 The mounting feet will need to be assembled to the side rail fittings followed by attaching them to the SiDERAIL side rails D 4 b a FITTING EI woo STEP 2 U A Tape off all the areas that may potentially come into contact with the side rails Once the feet are connected to the side rails hold the side rail up to your boat Once the rail is aligned with your windshield use a small piece of tape to mark the position of the mounting feet a N SI 4 WAKEBOARD a GUIDE
7. nt not to _ completely tighten the fittings as some adjustment will necessary before the installation is complete Before inserting the top section make sure there are no burrs in the top section Some soap or grease will allow the arms to slide in easier Someone will need to hold the top section for you as you insert the front right arm into the top section and fit the hinge into the side rail Once the sides and top section are assembled the fittings that connect to the ends of the front legs can now be firmly tightened so that they do not rotate The rear switch blades can now be installed by attaching the top switch blade fitting to the fitting located on the upper section of the front leg The clamp located on the base of the switch blade will be connected to the lower side rail We recommend making sure that the clamps on both sides of the tower are located the same distance from the end of the side rail so that your tower looks symmetrical a GUIDE PWB ASSAULT 001 HOLL i WAKEBOARDING PRODUCTS STEP 14 Drilling the H section The X measurement is a great way to make sure that your tow point is in the center of your boat To do this measure from the tow point to your rear foot then to your other foot Cover your boat with an old sheet or old cover to make removing the metal shavings easy Someone should hold the H section while you drill STEP 15 Using the pre drilled holes in the top section tube

Download Pdf Manuals

image

Related Search

Related Contents

Desa 10BY150ECB Electric Heater User Manual    C - Medical Care Services  セ マックスシリーズ  InsectSelect System - Thermo Fisher Scientific  Samsung 9 Series NP-RV413I  Digitus USB / SATA  Warranty  BEDIENUNGSANLEITUNG  

Copyright © All rights reserved.
Failed to retrieve file