Home
Installation Instructions
Contents
1. Support the manifold and remove the 4 screws that secure the manifold assembly to the burner box and set aside Note the location of the green and yellow ground wire for reassembly later 6 Support the burner box assembly and remove the screws that attach the burner box to the heat exchanger cell panel 7 Set the burner box assembly aside Pressure Switch Removal NOTE There are two types of pressure switches The modulating pressure switch assembly has three pressure switches Two are 2 side by side with the third switch mounted to the back of one of the switches All other furnaces have two pressure switches mounted back to back The tube for the front pressure switch connects the switch to the port on the collector box For PSC inducers only the tube for the switch mounted on the back connects the switch to the port on the inducer assembly 1 Remove the front pressure switch tube from the port on the collector box See Fig 3 2 Disconnect the pressure switch harness modulating only from the main wiring harness or remove the individual wires from the front pressure switch non modulating Not the location of the wires for reassembly A CAUTION UNIT OPERATION HAZARD Failure to follow this caution may result in improper furnace operation or failure of furnace Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation 3 Remove the screws that a
2. FINGER BAFFLE TO BE CENTERED ON HEAT EXCHANGER HEAT EXCHANGER ATTACHMENT F PLATE FRONT PANEL INSULATION DETAIL F DETAIL G A13103 Fig 5 Condensing Heat Exchanger Removal Installation Heat Exchanger Baffle Side RH Heat Exchanger Baffle Side LH SLOT IN SIDE BAFFLE TO ENGAGE TAB ON FRONT PANEL BOTH SIDES SLOT IN SIDE BAFFLE TO ENGAGE SCREW THROUGH REAR TUBE SHEET BOTH SIDES DETAIL E DETAIL D A11438 Fig 6 Heat Exchanger Panel Assembly PANEL REF GASKET REF PLATE CONTAINMENT REF LINER REF amp i SHEET TUBE a REF SEALER SILICONE SILICONE SEALER LOW ADHESION 5 o o o THIS SIDE __ _ ie O O is L Q ie H N I O e O O O SEALER SILICONE ON THE FRONT SEALER SILICONE OF COUPLING BOX SILICONE SEALER HIGH ADHESION THIS SIDE he Ph o 0 is SEALER SILICONE ON THE FRONT CONTAINMENT PLATE A11416 Fig 7 Containment Plate and Collector Box Sealant Application Copyright 2014 CAC BDP 7310 W Morris St Indianapolis IN 46231 Edition Date 04 14 Catalog No IIK 336774 06 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations Replaces IIK 336774 05 10
3. box gasket and discard 3 Flush out the Collector Box with warm water including the tube ports Clean tube ports on Collector Box with a thin wire or paper clip rinse with warm water and set aside Heat Exchanger Assembly Removal 4A CAUTION CUT HAZARD Failure to follow this caution may result in personal injury Sheet metal parts may have sharp edges or burrs Use care and wear appropriate protective clothing and gloves when handling parts and servicing furnaces 1 Remove the screws that attach the filler plate to the bottom edge of the condensing heat exchanger assembly and cas ing 2 Remove screws that secure the heat exchanger assembly to the furnace casing Do not remove the screws around the burner inlets that attaches the primary inlet panel to the inlet plate of the primary heat exchanger 3 Pull assembly out of casing until the back edge of the heat exchanger is resting on the front edge of the blower shelf 4 Lift the heat exchanger assembly out of the casing and set aside Remove Coupling Box 1 Remove the screws that secure the finger baffle from the Coupling Box Cover See Fig 5 2 Remove the screws that secure the Coupling Box Cover to the rear of the Heat Exchanger Assembly 3 Starting at the upper beveled edge of the coupling box use a putty knife or gasket scraper to get between the coupling box cover and the Primary Cell Outlet panel to break the silicone seal between the parts 4 Pry upwar
4. result in personal injury death and or property damage Never purge a gas line into a combustion chamber Never test for gas leaks with an open flame Use a commercially available soap solution made specifically for the detection of leaks to check all connections A fire or explosion may result causing property damage personal injury or loss of life 1 Set thermostat to OFF 2 Turn on power at external disconnect fuse or circuit break er 3 Turn on gas at external shut off or gas meter 4 Check for gas leaks with a commercially available soap solution made specifically for the detection of leaks 5 Manually close blower door switch 6 Initiate component test through circuit board by referring to Component Test on status code label on blower access door for complete test sequence information 7 If any status codes are flashed refer to status code label on unit blower door 8 Turn thermostat fan switch to ON Continuous or jump er R to G terminals at furnace control board 9 Check for air leakage around cell panel It may be necessary to remove heat exchanger assembly and top gasket between cell panel and furnace casing top plate Re install and re check for blower air leaks 10 Remove jumper s or set thermostat fan to Auto or OFF 11 Release blower door switch 12 Install blower access door 13 Set thermostat to call for heat 14 Allow unit to initiate a compl
5. 336774 752 CBP thru 336774 759 CBP 336774 762 CBP thru 336774 770 CBP 336774 772 CBP thru 336774 778 CBP CONDENSING HEAT EXCHANGER KIT FOR USE WITH 35 IN TALL HIGH EFFICIENCY CONDENSING GAS FURNACE Installation Instructions NOTE Read the entire instruction manual before starting the installation SAFETY CONSIDERATIONS Improper installation adjustment alteration service maintenance or use can cause explosion fire electrical shock or other conditions which may cause death personal injury or property damage Consult a qualified installer service agency or your distributor or branch for information or assistance The qualified installer or agency must use factory authorized kits or accessories when modifying this product Refer to the individual instructions packaged with the kits or accessories when installing Follow all safety codes Wear safety glasses protective clothing and work gloves Have a fire extinguisher available Read these instructions thoroughly and follow all warnings or cautions included in literature and attached to the unit Consult local building codes the current editions of the National Fuel Gas Code NFGC NFPA 54 ANSI Z223 1 and the National Electrical Code NEC NFPA 70 In Canada refer to the current editions of the National Standards of Canada CAN CSA B149 1 and 2 Natural Gas and Propane Installation Codes and Canadian Electrical Code CSA C22 1 Recognize safety i
6. Primary and Condensing Heat Exchangers 1 Align the bottom edge primary cell outlet panel with the top edge of the condensing heat exchanger assembly and align the top edge of the condensing heat exchanger outlet panel with the bottom edge of the primary cell inlet panel 2 The orange foam gasket must be between the primary cell outlet panel and the containment plate that is temporarily at tached to the condensing heat exchanger The white fiber gasket or equivalent must be between the primary cell inlet panel and the condensing heat exchanger outlet panel 3 Insert all the screws except the outboard screws in the primary outlet panel to secure the primary heat exchanger panels to the condensing heat exchanger panels front and back See Fig 5 4 Remove the screws used to temporarily hold the Contain ment Plate in place Install Coupling Box Cover Finger Baffles 1 Apply a 1 4 bead of low adhesion silicone white to the coupling box cover in the pattern shown in Fig 7 2 Align the Coupling Box Cover over the rear of the Heat Ex changer Assembly See Fig 5 and Fig 4 3 Install the screws that secure the bottom edge and sides of the Coupling Box to the Heat Exchanger Assembly 4 Align the Finger Baffles along the top edge of the Coupling Box Cover See Fig 5 5 Install the screws for the Finger Baffles and the remaining screws for the top edge of the Coupling Box Cover 6 Align the sidewall baffles to the heat exc
7. bly and are needed before starting the assembly The low adhesion sealant used on the Coupling Box cover is Novaguard RTV 400 900 P N 680002 The high adhesion sealant is Novaguard 400 303 RTV P N 680001 G E 162 G E 6702 or Dow Corning 738 DO NOT substitute any other type of RTV sealant 1 DESCRIPTION AND USAGE Use this Condensing Heat Exchanger kit to replace a failed condensing heat exchanger This Condensing Heat Exchanger Kit contains the following items See Table 1 for kit contents and Table 2 for where used Table 1 Kit Contents Kit No 336774 752 758 762 772 Table 2 Where Used Con t Description Quantity HX amp Panel Assy 1 Containment Plate 1 Screw 43 Gasket 2 Coll Box Gasket 1 Screw 8 Instructions 1 Kit No 336774 753 754 755 763 764 765 773 774 775 776 Description Quantity HX amp Panel Assy 1 Containment Plate 1 Screw 49 Gasket 2 Coll Box Gasket 1 Screw 10 Instructions 1 Kit No 336774 756 766 767 769 777 Description Quantity HX amp Panel Assy 1 Containment Plate 1 Screw 51 Gasket 2 Coll Box Gasket 1 Screw 12 Instructions 1 Kit No 336774 757 759 768 770 778 Descript
8. d on the back connects the switch to the port on the inducer assembly 1 Connect the wires to the back pressure switch 2 Connect the tube for the back pressure switch to the inducer assembly 3 Connect the tube for the front pressure switch to the port on the collector box 4 Attach the pressure switch assembly to the inducer 5 Connect the pressure switch harness modulating only to the main wiring harness or attach the individual wires to the pressure switch non modulating 6 If necessary route the pressure switch tubing for the front pressure switch through the stand off on the inducer as sembly 7 If necessary rout the condensate trap relief tubing through the stand off on the inducer assembly Reconnect tubing to the ports on the condensate trap and collector box Burner Box Manifold Installation 1 Support the burner box assembly and install the screws that attach the burner box to the heat exchanger cell panel 2 Align the orifices in the manifold assembly with the support rings on the end of the burner 3 Insert the orifices in the support rings of the burners Mani fold mounting tabs should fit flush against the burner box NOTE If manifold does not fit flush against the burner box the burners are not fully seated forward Remove the manifold and check burner positioning in the burner box assembly 4 Attach the green yellow wire and ground terminal to one of the manifold mounting screws 5 Install the remain
9. d the top flange of the cell panel NOTE Be sure the cell panel insulation is visible on both sides of the heat exchanger cell panel so that when the heat exchanger is fully installed the insulation seals between the cell panel and the mounting brackets If any insulation is not visible pull the heat exchanger forward adjust the insulation and reinstall so that the cell panel is properly sealed to the top plate and to the mounting brackets 5 Continue to slide the heat exchanger assembly backward in to the casing until the primary cell panel is flush with the mounting brackets on the side of the casing 6 Align the primary cell panel with the mounting brackets 7 Insert the screws that attach the primary cell panel to mount ing brackets on the casing 8 Align the filler plate to the bottom edge of the condensing heat exchanger assembly 9 Secure the filler plate to the condensing heat exchanger and casing Collector Box Installation 1 Verify old collector box gasket has been removed from heat exchanger 2 Remove adhesive backing from collector box gasket and align gasket on the collector box 3 Attach the gasket to the collector box 4 Remove the adhesive backing from the condensate trap gas ket 5 Attach the gasket over the drain outlets on the collector box 6 Repeat the procedure for the drain outlet NOTE There is a slot on each side of the front panel of the condensing heat exchanger The collector box has a
10. ds with the putty knife as you move around the Coupling Box cover 5 Once the Coupling Box cover is sufficiently loosened re move the coupling box cover from the rear of the Heat Ex changer Assembly See Fig 4 Separate Primary and Condensing Heat Ex changers 1 Remove the screws that attach the condensing heat ex changer assembly to the primary cell outlet panel and re move the screws that attach the condensing heat exchanger outlet panel to the primary inlet panel 2 Gently use a putty knife or gasket scraper to get between the primary cell inlet panel and condensing heat exchanger if it is needed to break the seal between the parts 3 Repeat the procedure at the primary cell outlet panel and containment plate attached to the inlet of the secondary heat exchanger Remove Primary and Condensing Heat Exchanger NOTE The primary heat exchanger assembly is factory assembled at primary cell attachment plate and the primary rear cell outlet panel The individual heat exchanger cells cannot be removed in the field and are replaced as one assembly 1 Remove screws that attach the sidewall baffles to the heat exchanger cell panel See Fig 6 NOTE The front edge of the sidewall baffle has a slot that engages a tab on the primary cell panel See Fig 6 2 Avoid damaging the cell panel insulation by pulling the sidewall baffle outward from the rear of coupling box then pull the baffle backward to slide the baffle off of the
11. e of furnace operation refer to furnace Installation Start Up and Operating Instructions 16 After System Check out is complete set thermostat below room temperature 17 Verify that burner shuts down and blower completes selec ted off delay time 18 Verify furnace operates properly and set thermostat to de sired room temperature 19 Re install outer door CONDENSATE TRAP N APPLY NEW GASKET TO COLLEC TOR BOX BEFORE RE INSTALLING CONDENSATE TRAP REMOVE OLD GASKET A11442 Fig 1 Collector Box Gasket Condensate Trap Inducer Mounting Screw Remove Tube s from o Inducer Mounting Screw Standoffs Vent Elbow Clamp loj D D Pea r A nd 4 Remove Vent Elbow Inducer Mounting Screw o ag Y vr 7 Dp m hale 1 No Spe we E 7 i j Inducer Mounting Screw J le i le ej le SJ ZO a 8 A Pressure Switch J BOX a Pressure Switch LOCATI ONS Mounting Screw A11361 Fig 3 Loosen Vent Pipe Clamp A11299 A11414 Fig 2 J Box Removal Installation Fig 4 Sidewall Baffle Removal Installation Rear View INSULATION SEE DETAIL G Fa CELL PANEL T meg Tr SWITCH LIMIT GASKET MAIN LIMIT BAFFLE FINGER SEE DETAIL F HEAT EXCHANGER PANEL ASSY PLATE CONTAINMENT HEAT EXCHANGER COUPLING BOX COVER SLOT OF
12. e outer doors and set aside 5 Turn electric switch on gas valve to OFF Vent Pipe Removal NOTE It will be necessary to remove the vent pipe from the furnace in order to remove the heat exchanger 1 Support the vent pipe as close to the furnace as possible to prevent damage to the vent system 2 Cut vent pipe with a hacksaw and move the remaining vent pipe out of the way Secure the vent pipe if necessary 3 Loosen both clamps at the vent pipe support attached to fur nace casing 4 Loosen clamp for the vent pipe at vent elbow on the inducer assembly 5 Remove remaining vent pipe through the top of the furnace casing and set aside Manifold Removal Burner Box Removal NOTE Use a back up wrench on the gas valve to prevent the valve from rotating on the manifold or damaging the mounting to the burner box See Fig 3 1 Disconnect the gas pipe from gas valve and remove pipe from the furnace casing 2 Disconnect the connector harness from gas valve Modulat ing only or remove individual wires from terminals on gas valve All other models 3 Disconnect the wires from gas valve flame sensor and hot surface igniter 4 Remove wires from both rollout switches A CAUTION UNIT OPERATION HAZARD Failure to follow this caution may result in improper furnace operation or failure of furnace Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation 5
13. ete call for heat cycle 15 Check for air leakage around collector box A whistling noise may indicate air leak in collector box seal NOTE If there is a severe air leak in the collector box seal pressure switch may not close or will re open resulting in no ignition or erratic burner operation NOTE Heat Exchanger failure may have been caused by one or more of the following conditions As part of the system check out verify that the following conditions are not affecting the operation of the furnace e Short Cycling Defective thermostat Incorrect thermostat anticipator setting dirty filter or over sized furnace Under firing low Btu input Set manifold pressure and verify firing rate as shown on rating plate by clocking the gas meter Over firing high Btu input Set manifold pressure and verify firing rate as shown on rating plate by clocking the gas meter Low temperature rise Set unit for correct temperature rise range as shown on unit rating plate Contaminated combustion air Remove contaminates or provide ample fresh air for combustion Excessive amounts of outside ventilation air Return air temperature cannot be below 60 degrees F for extended periods of time Incorrect venting or termination Recirculation of products of combustion into the combustion air pipe can damage the furnace Verify proper venting and vent termination per installation instructions For additional information and a complete sequenc
14. hanger cell panel See Fig 4 and Fig 6 NOTE The front edge of the sidewall baffle has a slot that engages a tab on the primary cell panel 7 Avoid damaging the cell panel insulation by inserting the sidewall baffle inward from the rear of coupling box to the indexing tab on the Primary Cell Panel then align the baffle with the Coupling Box Cover 8 Secure the Sidewall Baffles with the screws Install Sidewall Baffles 1 Insert the slot on the sidewall baffle over the tab on the primary cell panel See Fig 6 2 Insert the screws that attach the sidewall baffle to the primary cell panel 3 Align the rear edge of the baffle with the screw holes in the coupling box cover 4 Insert the screws that attach the sidewall baffles to the coup ling box Heat Exchanger Assembly Installation 1 Lift the heat exchanger assembly and set the rear of the as sembly on the blower deck 2 Slide the heat exchanger onto the support rails in the fur nace casing 3 Raise the rear of the heat exchanger and set the bottom of the sidewall baffles on top of the support rails in the blower deck 4 Slide the heat exchanger assembly into the casing making sure the bottom edge of the sidewall baffle slides into the engagement tab on the support rails NOTE Be sure cell panel insulation is folded over the top flange of the primary cell inlet panel so that when the heat exchanger is fully installed the insulation seals between the top plate an
15. ing manifold mounting screws Connect the wires to both rollout switches on 7 Connect the wires to the flame sensor and hot surface ig niter 8 Connect the connector harness from gas valve Modulating only or attach the individual wires to the terminals on gas valve All other models NOTE Use only propane resistant pipe dope Do not use Teflon tape 9 Insert the gas pipe through the grommet in the casing Ap ply a thin layer of pipe dope to the threads of the pipe and thread the pipe by into the gas valve NOTE Use a back up wrench on the gas valve to prevent the valve from rotating on the manifold or damaging the mounting to the burner box 10 With a back up wrench on the inlet boss of the gas valve finish tightening the gas pipe to the gas valve 11 Turn gas on at electric switch on gas valve 12 Turn power on at external disconnect fuse or circuit break er Vent Pipe Installation 1 Insert the vent pipe through the intended vent opening of the furnace casing and insert into the outlet of the inducer vent elbow 2 Tighten the clamp for the vent pipe at vent elbow on the inducer assembly 3 Align the remaining vent pipe system to the vent pipe in the furnace casing 4 Solvent cement the pipes as required for the type of material used 5 Tighten both clamps at the vent pipe support attached to furnace casing Unit Checkout A WARNING FIRE OR EXPLOSION HAZARD Failure to follow this warning could
16. ion Quantity HX amp Panel Assy 1 Containment Plate 1 Screw 59 Gasket 2 Coll Box Gasket 1 Screw 12 Instructions 1 Table 2 Where Used CASING KIT NUMBER SERIES INPUT WIDTH IN BTUH MM 336774 752 CBP A 40 000 14 3 16 360 336774 753 CBP A 40 000 17 1 2 445 A 60 000 336774 754 CBP A 80 000 17 1 2 445 336774 755 CBP A 80 000 21 533 A 60 600 336774 756 CBP A 100 000 21 633 336774 757 CBP A 120 000 24 1 2 622 336774 758 CBP A 60 000 14 3 16 360 336774 759 CBP A 140 000 24 1 2 622 336774 769 CBP A 100 000 21 533 BP 120 000 336774 770 C 140 000 24 1 2 622 B 40 000 336774 762 CBP B 60 000 24 1 2 622 336774 763 CBP B 40 000 17 1 2 445 336774 764 CBP B 60 000 17 1 2 445 336774 765 CBP B 80 000 17 1 2 445 336774 766 CBP B 80 000 21 533 336774 767 CBP B 100 000 21 533 336774 768 CBP B 120 000 24 1 2 622 CASING KIT NUMBER SERIES BTU WIDTH IN MM C 40 000 14 3 16 386774 772 CBP z 5900 ERA 386774 773 CBP C 40 000 17 1 2 445 386774 774 CBP C 60 000 17 1 2 445 386774 775 CBP C 80 000 17 1 2 445 386774 776 CBP C 80 000 21 533 386774 777 CBP C 100 000 21 533 386774 778 CBP C 120 000 24 1 2 622 INSTALLATION Unit Shut Down 1 Set room thermostat to lowest setting or OFF 2 Disconnect power at external disconnect fuse or circuit breaker 3 Turn off gas at external shut off or gas meter 4 Remov
17. lief hose from collector box port and the molded retainer clips on the inducer hous ing NOTE If condensate has a heat pad attached to the trap trace the wires for the pad back to the connection point and disconnect the wires for the heat pad 3 Remove the screw that secures the condensate trap to the collector box remove the trap and set aside 4 Remove the trap gasket from the Collector Box if it did not come off when the trap was removed 5 Discard the old trap gasket 6 Rinse condensate trap in warm water until trap is clean 7 Clean relief port on Condensate Trap with a thin wire or paper clip rinse with warm water and set aside 8 Flush condensate lines with warm water 9 Shake trap dry Remove J box and Main Harness 1 Remove the screw that secures the J box cover to the J box bracket See Fig 2 2 Disconnect the field wiring from the factory wiring and re move the ground wire from the green ground screw on the J box bracket 3 Remove factory wiring from the J box 4 Disconnect the factory wires from the main limit switch 5 Remove the screw that secures the door switch to the blower shelf and the blower shelf door bracket Remove the screws from the blower shelf door bracket and set the bracket aside 6 Remove main harness from the slot in the blower shelf Collector Box Removal 1 Remove the screws that secure the collector box to the heat exchanger cell panel and set aside 2 Remove collector
18. lignment tabs on the back that fit into the slots on the condensing heat exchanger panel 7 Align the tabs on the collector box to the slots on the condensing heat exchanger panel 8 With the collector box fully seated against the condensing heat exchanger cell panel install the screws through the collector box 9 Tighten the screws in an alternating pattern around the collector box Do not over tighten Install J box and Main Harness 1 Insert grommet for main harness in the slot in the blower shelf 2 Align the door switch to the blower shelf 3 Align and install door bracket to the front edge of the blower shelf and secure the door switch during upper door bracket installation 4 Connect the field wiring from the factory wiring and attach the ground wire to the green ground screw on the J box bracket 5 Attach the J box cover to the J box bracket 6 Install the screw to secure the J box cover to the bracket 7 Connect the factory wires to the main limit switch Install the Condensate Trap and Drain NOTE If the condensate trap is removed a new gasket between the trap and collector box is required Verify a condensate trap gasket is included in the service kit or obtain one from your local distributor 1 Align the trap with the drain outlet on the collector box 2 Secure the trap to the collector box with the screw 3 Connect the condensate trap relief tube from collector box port and insert the tube into the m
19. locator tab on the cell panel 3 Repeat the procedure for the opposite side baffle 4 Separate the Primary Heat Exchanger from the Condensing Heat Exchanger 5 Discard failed Condensing Heat Exchanger assembly Turbulator Removal NOTE The turbulators are factory installed in a replacement condensing heat exchanger It is not necessary to remove them to replace a condensing Heat Exchanger Assembly If it is necessary to remove the turbulators perform the following steps 1 Bend the end of turbulator strip that holds it inside the sec ondary heat exchanger tube straight NOTE Use caution when removing the turbulator strips Do not bend twist kink or flatten the turbulator strip A damaged turbulator strip must be replaced with the identical type of turbulator strip used with the furnace Do not use a turbulator strip from a different model family of furnaces Efficiency reliability or unit operation may be affected 2 Pull the turbulator strip outward from the tube 3 Repeat the step for each turbulator 4 Wipe each turbulator off with a clean soft cloth BEGIN RE ASSEMBLY Turbulator Installation NOTE The turbulators are factory installed in a replacement condensing heat exchanger If the turbulators were removed for cleaning re install the turbulators as follows 1 Make sure that one end to the turbulator strip is bent 90 de grees NOTE Use caution when installing the turbulator strips Do not bend twist kink
20. nformation This is the safety alert symbol Ay When you see this symbol on the unit and in instructions or manuals be alert to the potential for personal injury Understand the signal words DANGER WARNING and CAUTION These words are used with the safety alert symbol DANGER identifies the most serious hazards which will result in severe personal injury or death WARNING signifies hazards which could result in personal injury or death CAUTION is used to identify unsafe practices which may result in minor personal injury or product and property damage NOTE is used to highlight suggestions which will result in enhanced installation reliability or operation A WARNING FIRE EXPLOSION ELECTRICAL SHOCK HAZARD Failure to follow this warning could result in personal injury death and or property damage The ability to properly perform maintenance on this equipment requires certain knowledge mechanical skills tools and equipment If you do not possess these do not attempt to perform any maintenance on this equipment other than those procedures recommended in the User s Manual A WARNING FIRE EXPLOSION ELECTRICAL SHOCK AND CARBON MONOXIDE POISONING HAZARD Failure to follow this warning could result in personal injury death and or property damage Improper installation adjustment alteration service maintenance or use can cause carbon monoxide poisoning explosion fire electrical shock other conditions which c
21. olded retainer clips on the inducer housing 4 Insert the condensate drain elbow through the casing until it is properly seated Or connect the drain elbow to the drain extension pipe and route the pipe behind the inducer 5 Connect the drain elbow to the condensate trap NOTE If condensate has a heat pad attached to the trap trace the wires for the pad back to the connection point and connect the wires for the heat pad Inducer Assembly Installation 1 Verify any remaining gaskets on the collector box are re moved and discarded 2 Verify the inducer assembly has gaskets on the drain stubs and at the inducer inlet 3 Verify the choke plate is installed on the inlet opening of the inducer 4 Align the tabs on inducer assembly to the brass inserts on the collector box 5 Insert the mounting screws through the tabs to secure the inducer to the collector box Remember there is a mounting tab located under the vent elbow 6 Connect the inducer leads from the main wiring harness to the inducer motor harness Pressure Switch Installation NOTE There are two types of pressure switches The modulating pressure switch assembly has three pressure switches Two are side by side with the third switch mounted to the back of one of the switches All other furnaces have two pressure switches mounted back to back The tube for the front pressure switch connects the switch to the port on the collector box The tube for the switch mounte
22. or flatten the turbulator strip A damaged turbulator strip must be replaced with the identical type of turbulator strip used with the furnace Do not use a turbulator strip from a different model family of furnaces Efficiency reliability or unit operation may be affected 2 Push the straight end of turbulator strip forward into the sec ondary heat exchanger tube until the angled end is against the edge of the tube 3 Repeat the step for each turbulator 4 Bend the straight end of the turbulator strip over 90 degrees to hold the turbulator in the secondary heat exchanger tube Install Containment Plate NOTE Both the containment plate and secondary heat exchanger panel surfaces must be clean and dry All loose or residual sealant must be removed from the mating surfaces NOTE Do not use a releasing agent on the Containment Plate or Heat Exchanger Assembly 1 Apply a 3 16 wide bead of high adhesion grey silicone Novaguard 400 303 RTV or equivalent as noted on page 1 around the Containment Plate as shown in Fig 7 Note the orientation of the plate in Fig 7 2 Align the containment plate as shown in Fig 7 3 Temporarily hold the containment plate in place by in stalling one screw through the hole on each side of the con tainment plate NOTE After the primary heat exchanger assembly is attached to the secondary heat exchanger these screws will be removed to allow the coupling box cover to be installed Attaching
23. ould result in personal injury or death Consult your distributor or branch for information or assistance The qualified installer or agency must use only factory authorized kits or accessories when servicing this product 4 amp WARNING ELECTRICAL SHOCK FIRE OR EXPLOSION HAZARD Failure to follow this warning could result in personal injury or death or property damage Before installing modifying or servicing system main electrical disconnect switch must be in the OFF position and install a lockout tag Check accessories and cooling unit for additional electrical supplies that must be shut off during the furnace servicing There may be more than one disconnect switch Lock out and tag switch with a suitable warning label Verify proper operation after servicing A CAUTION CUT HAZARD Failure to follow this caution may result in personal injury Sheet metal parts may have sharp edges or burrs Use care and wear appropriate protective clothing and gloves when handling parts INTRODUCTION This instruction covers installation of the Condensing Heat Exchanger Kit Part No 336774 752 thru 759 336774 762 thru 770 and 336774 772 thru 778 in 35 in 889 mm tall condensing gas furnaces See Table 2 for kit usage NOTE DO NOT use a releasing agent on parts that will be sealed with RTV NOTE DO NOT substitute any other type of RTV sealant for those listed below There are two different RTV sealants used on this assem
24. ttach the pressure switch assembly to the inducer 4 Remove the back pressure switch tube that connects to the inducer assembly 5 Remove the wires from the back pressure switch Note the location of the wires for reassembly PSC only 6 If the relief tube for the condensate trap is routed across the inducer assembly remove the tube from the port on the collector box and from the stand offs on the inducer and move the tube aside 7 Set the pressure switches aside Inducer Assembly Removal 1 Remove the wires that connect the main wiring harness to the inducer motor harness 2 Remove the screws from the tabs on inducer assembly that secures the inducer to the collector box Note there is one mounting tab directly under the vent elbow 3 Remove the inducer assembly and set aside 4 To avoid double gasketing and leakage check to make sure the drain gaskets for the inducer and the inducer outlet gas ket are not still attached to the collector box 5 Remove any remaining gaskets from the collector box and discard Condensate Drain and Trap Removal NOTE If the condensate trap is removed a new gasket between the trap and collector box is required Verify a condensate trap gasket is included in the service kit or obtain one from your local distributor See Fig 1 and Fig 3 1 Disconnect external drain from condensate drain elbow or drain extension pipe inside the furnace and set aside 2 Disconnect the condensate trap re
Download Pdf Manuals
Related Search
Related Contents
Submatix 100 ST SCR Manual de Expand existing, leased line, polled networks without libretto - Joannes GBC ClickBind 34 Ring Clicks (PDF) 取扱説明書 Olympus VH487701 User's Manual 印刷R063238-100000008.tif (8 ページ) DRAMINSKI SCANNER Samsung Samsung SM-T230NT Manual de Usuario(open) Copyright © All rights reserved.
Failed to retrieve file