Home
Fracino Cybercino version 2
Contents
1. during start up press this button to rinse machine Function when prompted Emergency Stop press this button during machine cycle to halt the machine and drop it into safe mode 8 Large Press button immediately after choosing drink to make a large drink 9 Foamed Milk Press this button once to deliver foamed milk at the milk outlet 10 Steamed Milk Press this button once to deliver foamed steamed at the milk outlet 11 Hot Water Press button once to deliver a measured amount of water from the outlet Press during delivery to cancel Cybercino Users Manual Draft Edition 7th January 2009 SECTION 01 Start Up Installation and First Start Connections to establish 1 Water connection to cold water inlet with shut off valve 2 Electricity power socket connection fused with at socket shut off 3 Waste pipe outlet for waste liquids from drip tray 4 Milk inlet the tube needs to be connected between the milk foamer through the pinch valve and into a milk container counter top refrigerator or similar 5 Grinds OPTIONAL if not using the grinds bin but employing a general through fall bin ensure that the counter top has a clear path through from the machine to the bin Once connections have been established attach the bean hopper With the bean flap shut Fill the hopper with beans and attach the hopper lid Open the bean flap Switch on the water Switch on the power Swit
2. on drip tray 5 1 x Single Espresso 03 Place one single espresso cup on drip tray 6 2 x Single Espresso 03 03 Place two single espresso cups on drip tray 7 1 x Double Espresso 03 03 Place one double espresso cup on drip tray 8 1 x Decaf Single Espresso 02 03 Open decaf flap after pressing buttons insert one pre ground decaf shot of coffee close flap place one single espresso cup on drip tray 9 1 x Regular Latte 05 Place one regular latte cup on drip tray 10 2x Regular Latte 05 05 Place two regular latte cups on drip tray 11 1x Large Latte 10 05 Place one large latte cup on drip tray Cybercino Users Manual Draft Edition 7th January 2009 12 1x Decaf Regular Latte 02 05 Open decaf flap after pressing buttons insert one pre ground decaf shot of coffee close flap place one regular latte glass on drip tray 13 1x Regular Black Coffee 04 Place one regular coffee mug on drip tray 14 2x Regular Black Coffee 04 04 Place two regular coffee mugs on drip tray 15 1x Large Black Coffee 08 04 Place one large coffee mug on drip tray 16 1x Decaf Regular Black Coffee 02 04 Open decaf flap after pressing buttons insert one pre ground decaf shot of coffee close flap place one regular coffee mug on drip tray 17 1x Regular Tea 11 Place tea bag in cup and place on drip tray under hot water outlet 18 1x Hot Chocolate Smooth 10 Place chocolate syrup in cup and place
3. the machine is ready for use Cybercino Users Manual Draft Edition 7th January 2009 SECTION 02 General Use Beans Ensure that the hopper contains whole roasted beans If the level appears to be low top up the hopper with fresh whole beans Do not put ground coffee into the hopper only whole beans Water The machine should be plumbed in when it is installed If water is not passing through the machine check to see if the plumbing connections are in place and the valves are open Are there any blockages Milk For automatic steamed and foamed milk production in drinks the milk inlet needs to submerged into the milk container in the neighbouring refrigerator unit Ensure that the milk is fresh cold and that there is enough in the container Drink Selection A variety of drinks can be made using the Cybercino these are listed below These are achieved by simply pressing a series of buttons The drinks produced will therefore be consistent Drink Button Sequence Further Actions 1 1 x Regular Cappuccino 06 Place one regular cappuccino cup on drip tray 2 2 x Regular Cappuccino 06 06 Place two regular cappuccino cups on drip tray 3 1 x Large Cappuccino 08 06 Place one large cappuccino cup on drip tray 4 1 x Decaf Regular Cappuccino 02 06 Open decaf flap after pressing buttons insert one pre ground decaf shot of coffee close flap place one regular cappuccino cup
4. MACHINE WITH RESPECT IN CASE OF DOUBT RING YOUR SUPPLIER OR FRACINO DIRECT 0121 328 5757 DO NOT ALLOW UNQUALIFIED PERSONNEL TO TAMPER WITH YOUR MACHINE YOUR MACHINE SHOULD HAVE A REGULAR SERVICE THE USAGE AND HARDNESS OF WATER IN YOUR AREA WILL DETERMINE THE TIME BETWEEN SERVICES AT LEAST ONCE A YEAR IT IS ESSENTIAL THAT A WATER TREATMENT UNIT BE FITTED IN HARD WATER AREAS TO MINIMISE THE BUILD UP OF SCALE CARE SHOULD BE TAKEN WHEN MAKING DRINKS WATER IS HOT AND CAN SCALD DO NOT OPERATE THE MACHINE WITHOUT ADEQUATE TRAINING 19
5. When the correct volume of steamed milk has been reached press button 05 again h The settings will be stored To confirm that this is acceptable press button 02 to produce a test latte i Press button 07 to exit latte configuration mode SEQUENCE 05 to enter latte configuration 05 step 1 grind time 11 Cybercino Users Manual Draft Edition 7th January 2009 05 step 2 water time start 05 step 2 water time stop 05 step 3 milk time start 05 step 3 milk time stop 02 test latte 07 exit latte configuration 5 configure a cappuccino a In general configuration mode press button 06 This will enter the cappuccino configuration mode b Press button 06 again to step through the cappuccino configuration The first stage is the grind preset by the grinder configuration mode c Ifthis is acceptable press button 06 again d The next stage is the water volume To start the brew press button 06 and allow the counter to cycle up e When the correct volume has been reached press button 06 again f The next stage is the milk volume To start the milk flow press button 06 and allow the counter to cycle up g When the correct volume of foamed milk has been reached press button 06 again h The settings will be stored To confirm that this is acceptable press button 02 to produce a test cappuccino i Press button 07 to exit cappuccino configuration mode SEQUENC
6. configuration mode c Ifthis is acceptable press button 06 again d The next stage is the water volume To start the brew press button 06 and allow the counter to cycle up e When the correct volume has been reached press button 06 again f The next stage is the milk volume To start the milk flow press button 06 and allow the counter to cycle up g When the correct volume of foamed milk has been reached press button 06 again 14 Cybercino Users Manual Draft Edition 7th January 2009 h The settings will be stored To confirm that this is acceptable press button 02 to produce a test large cappuccino i Press button 07 to exit large cappuccino configuration mode SEQUENCE 08 to prefix the configuration for large 06 to enter large cappuccino configuration 06 step 1 grind time 06 step 2 water time start 06 step 2 water time stop 06 step 3 milk time start 06 step 3 milk time stop 02 test large cappuccino 07 exit large cappuccino configuration 9 To configure the hot water dispensed a In general configuration mode press button 11 This will enter the hot water configuration mode b Press button 11 to start the water The counter will begin to cycle up c When an acceptable volume has been reached press button 11 to stop the water d The settings will be stored To confirm that this is acceptable press button 02 to produce a test hot water e Press button 07 to
7. cup on drip tray Top up with steamed milk 19 1x Hot Chocolate Foamy 09 Place chocolate syrup in cup and place cup on drip tray Top up with foamed milk Cybercino Users Manual Draft Edition 7th January 2009 SECTION 03 Configuration Mode To enter the configuration mode press the following buttons A If the machine is already powered Press button 01 to power the machine off Press and hold button 07 and then simultaneously press button 01 As the machine starts up it will enter into configuration mode with CYBERCINO CONFIGURATION displayed on the LCD The machine can now be configured SEQUENCE 01 power the machine off 07 hold 01 continue to hold until display confirms configuration mode selected If the machine is powered off a Press and hold button 07 and then simultaneously press button 01 b Asthe machine starts up it will enter into configuration mode with CYBERCINO CONFIGURATION displayed on the LCD machine can now be configured SEQUENCE 07 hold 01 continue to hold until display confirms configuration mode selected To configure the grinds volume for a regular shot puck size for a single shot a In general configuration mode press and hold button 02 and then press button 03 This will enter the grinder configuration mode b Adjust the grind time using buttons 11 and 10 Press button 02 to test the grinde
8. exit the hot water configuration mode SEQUENCE 11 to enter hot water configuration 11 water start 11 water stop 02 test hot water 07 exit hot water configuration 10 To configure the steamed milk dispensed 15 Cybercino Users Manual Draft Edition 7th January 2009 a In general configuration mode press button 10 This will enter the steamed milk configuration mode b Press button 10 to start the milk flow The counter will begin to cycle up c When an acceptable volume has been reached press button 10 to stop the milk d The settings will be stored To confirm that this is acceptable press button 02 to produce a test steamed milk e Press button 07 to exit the steamed milk configuration mode SEQUENCE 10 to enter steamed milk configuration 10 milk start 10 milk stop 02 test steamed milk 07 exit steamed milk configuration 11 To configure the foamed milk dispensed a In general configuration mode press button 09 This will enter the foamed milk configuration mode b Press button 09 to start the milk flow The counter will begin to cycle up c When an acceptable volume has been reached press button 09 to stop the milk d The settings will be stored To confirm that this is acceptable press button 02 to produce a test foamed milk e Press button 07 to exit the foamed milk configuration mode SEQUENCE 09 to enter foamed milk configuration 09 m
9. Cybercino Users Manual Draft Edition 2009 OooooooOoooOooOoOooOoOooOoOOoo Cybercino User Manual Cybercino Users Manual Draft Edition 2009 Cybercino Features Diagram Cybercino Users Manual Draft Edition 7th January 2009 Features No Description 1 Mains on off switch 2 Top Tray 3 Beans Hopper 4 Decaf Chute 5 Display 6 Control Buttons 7 Steam Knob 8 Hot Water Nozzle 9 Steam Pipe 10 Sight Gauge 11 Milk Supply Pinch Valve 12 Pressure Gauge 13 Milk Dispense Beak 14 Coffee Dispense Beak 15 Dispense Beak Cowling 16 Grinds Bin 17 Air Valve for Autofrother ILU Li 11 Cybercino Users Manual Draft Edition 7th January 2009 Buttons 10 09 08 07 06 05 04 03 02 No Function Operations 1 On Off Use button to power machine on amp off 2 Decaffeinated Press button once to open flap of decaf chute Cybercino will make coffee automatically when flap is closed Coffee 3 Espresso Press button once for a single espresso twice for two espressos 4 Black Coffee Press button once for a single black coffee twice for two black coffees 5 Latte Press button once for a single latte twice for two lattes 6 Cappuccino Press button once for a single cappuccino twice for two cappuccinos 7 Star Button Multi Cleaning
10. E 06 to enter cappuccino configuration 06 step 1 grind time 06 step 2 water time start 06 step 2 water time stop 06 step 3 milk time start 06 step 3 milk time stop 02 test cappuccino 12 Cybercino Users Manual Draft Edition 7th January 2009 07 exit cappuccino configuration 6 To configure a large black coffee g In general configuration mode press button 08 followed by button 04 This will enter the large black coffee configuration mode Press button 04 again to step through the large black coffee configuration The first stage is the grind preset by the grinder configuration mode If this is acceptable press button 04 again The next stage is the water volume To start the brew press button 04 and allow the counter to cycle up When the correct volume has been reached press button 04 again The setting will be stored To confirm that this is acceptable press button 02 to produce a test large black coffee Press button 07 to exit black coffee configuration mode SEQUENCE 08 to prefix the configuration for large 04 to enter large black coffee configuration 04 step 1 grind time 04 step 2 water time start 04 step 2 water time stop 02 test large black coffee 07 exit large black coffee configuration 7 To configure a large latte In general configuration mode press button 07 followed by button 05 This will enter t
11. ch on the machine using button 01 see button definitions The machine will then start to warm up The LCD display will display WARMING during this period and the all of the function buttons will flash Once the machine is warm the buttons will stop flashing and it will prompt the operator to PRESS RINSE Press button 11 to complete the start up cycle and rinse the machine When the LCD displays CHOOSE DRINK the machine is ready for use To configure the machine follow the procedure as outlined in Section 03 Configuration Mode NOTES Ensure that the Cybercino is installed and maintained by a Fracino Ltd approved engineer For more information contact Fracino Ltd on 0121 328 7575 Cybercino Users Manual Draft Edition 7th January 2009 Ensure that the Cybercino is installed on a counter top that is able to accommodate the machine s size and weight Ensure that there is suitable space surrounding the machine for a counter top refrigerator If installing a Cybercino with a drop through grinds configuration ensure that the counter top accommodates such a method Subsequent Start Ups Press button 01 to power up the machine e The machine will then start to warm up e The LCD display will display WARMING during this period e Once the machine is warm it will prompt the operator to PRESS RINSE Press button 11 to complete rinse cycle of the machine When the LCD displays CHOOSE DRINK
12. d place one of the tablets in the machine o machine will then conduct a cleaning cycle This will take approximately 3 minutes o The machine will not be able to be used when it is in cleaning mode The machine will return to its normal operating state once cleaning is completed Drip tray cleaning o drip tray is in two sections upper and lower Both can be removed from the machine for cleaning These should be regularly removed and washed with soap and water to ensure no blockages are caused by stray coffee grinds milk residue or other substances 17 Cybercino Users Manual Draft Edition 7th January 2009 Hopper o Ensure that the bean hopper is kept clean coffee dust will cause blockages and will reduce the quality of the coffees produced Make sure nothing other than coffee goes into the hopper If it does switch off the machine and then remove the offending article from the hopper before it reaches the grinder Steam Pipe o steam pipe should be cleaned with warm soapy water 18 Cybercino Users Manual Draft Edition 7th January 2009 WARNING THIS MACHINE CONTAINS MOVING PARTS AND PRESENTS A RISK OF INJURY DO NOT INSERT FINGERS INTO THE BEAN HOPPER OR THE DECAF CHUTE WITHOUT FIRST DISCONNECTING THE POWER SUPPLY AT NO TIME SHOULD ANY PANELS BE REMOVED TO EXPOSE WIRING REMEMBER TO TURN OFF POWER AND WATER SUPPLIES BEFORE REMOVING THE TRAYS ALWAYS TREAT THE
13. he large latte configuration mode Press button 05 again to step through the large latte configuration The first stage is the grind preset by the grinder configuration mode If this is acceptable press button 05 again The next stage is the water volume To start the brew press button 05 and allow the counter to cycle up 13 Cybercino Users Manual Draft Edition 7th January 2009 e When the correct volume has been reached press button 05 again f The next stage is the milk volume To start the milk flow press button 05 and allow the counter to cycle up g When the correct volume of steamed milk has been reached press button 05 again h The settings will be stored To confirm that this is acceptable press button 02 to produce a test large latte i Press button 07 to exit large latte configuration mode SEQUENCE 08 to prefix the configuration for large 05 to enter large latte configuration 05 step 1 grind time 05 step 2 water time start 05 step 2 water time stop 05 step 3 milk time start 05 step 3 milk time stop 02 test large latte 07 exit large latte configuration 8 To configure a large cappuccino a In general configuration mode press button 08 followed by button 06 This will enter the large cappuccino configuration mode b Press button 06 again to step through the large cappuccino configuration The first stage is the grind preset by the grinder
14. ilk start 09 milk stop 02 test foamed milk 07 exit foamed milk configuration 16 Cybercino Users Manual Draft Edition 7th January 2009 SECTION 04 Cleaning It is recommended that basic cleaning is done on a daily basis Cleaning the coffee machine o Wipe the outer casing of the machine with a soft damp cloth DO NOT USE A SCOURING PAD Clearing the grinds bin o Ensure that the grinds bin is regularly emptied the machine will remind you to do so However ensure that the bin has the used grinds removed from it and the container is washed to remove residue and build up for old grinds Milk frothing unit tube unit and beak o At the end of a day s use ensure that the milk tube and beak are cleaned using the supplied milk cleaner A small dose of this mixed with water should be placed in a cup and the milk tube placed inside Then steamed milk should be selected and the cleaning solution be allowed to pass through the milk frothing unit This should be repeated until all residue is removed from the unit If this is not done then milk residue will build up inside and cause blockages Coffee beak cleaning o The machine will automatically initiate a cleaning cycle after a set number of cups The procedure should be followed as per the instructions o Ingeneral use press button 11 to start a cleaning cycle The machine will ask you to open the decaf flap and insert a cleaning tablet Do this an
15. onfiguration mode Press button 04 again to step through the black coffee configuration The first stage is the grind preset by the grinder configuration mode If this is acceptable press button 04 again 10 Cybercino Users Manual Draft Edition 7th January 2009 d The next stage is the water volume To start the brew press button 04 and allow the counter to cycle up e When the correct volume has been reached press button 04 again f The setting will be stored To confirm that this is acceptable press button 02 to produce a test black coffee g Press button 07 to exit black coffee configuration mode SEQUENCE 04 to enter black coffee configuration 04 step 1 grind time 04 step 2 water time start 04 step 2 water time stop 02 test black coffee 07 exit black coffee configuration 4 To configure a latte a In general configuration mode press button 05 This will enter the latte configuration mode b Press button 05 again to step through the latte configuration The first stage is the grind preset by the grinder configuration mode If this is acceptable press button 05 again d The next stage is the water volume To start the brew press button 05 and allow the counter to cycle up e When the correct volume has been reached press button 05 again f The next stage is the milk volume To start the milk flow press button 05 and allow the counter to cycle up g
16. r at the newly adjusted setting i Thisgrinder setting will be applied to all drinks employing a single shot grind in drink production d Press button 07 to store the settings and exit the grinder configuration mode SEQUENCE 02 hold 03 enter grinder configuration mode Cybercino Users Manual Draft Edition 7th January 2009 11 to increase grind time 10 to reduce grind time 02 to test 07 exit grinder configuration mode 2 To configure an espresso g In general configuration mode press button 03 This will enter the espresso configuration mode Press button 03 again to step through the espresso configuration The first stage is the grind preset by the grinder configuration mode If this is acceptable press button 03 again The next stage is the water volume To start the brew press button 03 and allow the counter to cycle up When the correct volume has been reached press button 03 again The setting will be stored To confirm that this is acceptable press button 02 to produce a test espresso Press button 07 to exit espresso configuration mode SEQUENCE 03 to enter espresso configuration 03 step 1 grind time 03 step 2 water time start 03 step 2 water time stop 02 test espresso 07 exit espresso configuration 3 configure a black coffee In general configuration mode press button 04 This will enter the black coffee c
Download Pdf Manuals
Related Search
Related Contents
User Manual (Windows) サイクルトレーラ一丁ー取扱説明書 Click on the Image above & current Panasonic FP7 Analog Input Unit User`s Manual Mode d`emploi des éponges de mer DlGITAL PIANO SITRANS TH400 - Service, Support INTELLIGENT THINKING - Regale Microwave Ovens のpdf 850kb C 7/24, C 7/36-ACS Copyright © All rights reserved.
Failed to retrieve file