MAN-097 De-Airing Unit with Manual Pumps
Contents
1. 2 Figure 2 De Aired Water Boiler Heater gt Cable to Supply
2. operate the foot vacuum pump until the desired vacuum is reached as indicated by the vacuum gauge 4 2 Open valves N P and V and appropriate valves on the terminal panel for the selected piezometer to be de aired and circulate de aired water at the calculated pressure through the piezometer tubing measuring the amount sent on the graduated scale of the pressure cylinder A Circulate water until no more air bubbles are seen to be returning through the water in cylinder C finally checking that the volume of water returning to cylinder C corresponds to the volume leaving the de airing unit Volume from cylinder A As the de airing operation proceeds the pressure and vacuum will drop slowly and it will be necessary from time to time to re adjust these to the original calculated values by operating the foot pumps During operation of the unit the bladder in cylinder B should not be allowed to distend to more than 90 of the volume of the cylinder Cylinder A level is not lower than 10 full At this point it is necessary to recharge with de aired water as follows 4 3 Close all valves 4 4 Disconnect the pressure and vacuum pumps Open valves F to release the pressure and vacuum from the cylinders then close the valves 4 5 Drain water from cylinder through valve Do not return it to the de airing water boiler 4 6 Connect valve S on the boiler to valve M using the red rubber hose Attach the vacuum pump to valve I open v
3. airing unit User Manual 3 Section 2 Installation of the De Airing Unit The unit is mounted vertically and level on anchor bolts fixed to the instrument house wall at a convenient height for the operation of all the valves or stood on a level working surface Connect the manifolds on the piezometer terminal panels to the busbar tee piece connections on the de airing unit Blank off the other side of the tee pieces with the stop end fittings provided WARNING External high pressure gas cylinders must not be connected to this de airing unit User Manual 4 Section Preparation And Setting Up The valves must be operated in the order given commencing with all the valves in the closed position Please refer to figure 1 of this manual for valve positions 3 1 3 2 3 3 3 4 3 5 Attach the vacuum pump with the black hose supplied to valve F Open valves F G and N and apply vacuum until the bladder in cylinder B is completely evacuated on solid cylinders this is indicated by an increase in resistance when operating the vacuum pump Close valves F G and N Immerse one end of the red rubber tube into a container of clean water and attach the other end to valve K Open valves K and F and operate the vacuum pump drawing the water into cylinder A When the tank is 90 full close valves K and F Remove the vacuum pump from valve F open valve F to release the vacuum and then close Prepare de aired water in the d
4. alves I and M and release the vacuum from the boiler by opening valve V on the boiler Open valve S on the boiler and by operating the vacuum pump slowly draw the de aired water into cylinder C until it is 90 full Close all valves 4 7 Attach the vacuum pump to valve Open valves F L and I and apply vacuum to cylinder A Water is drawn from inside the bladder in cylinder B to cylinder A thus drawing de aired water from cylinder C into cylinder B When the bladder is fully deflated the cylinder A will again be 90 full of water Close valves F N Land I Remove the vacuum pump from valve F Open valve F to release vacuum in cylinder A 4 8 Open valves I and M and drain any remaining water back into the de airing water boiler Close all valves Attach the pressure pump to valve E and the vacuum pump to valve I The unit is now fully charged with de aired water and ready for operation User Manual 6 Section 5 Calculation of De Airing Pressures for Piezometers It is important that pressures used to de air hydraulic piezometers are carefully controlled If too little pressure is applied the de airing process will take a long time If too much pressure is applied there may be a risk of hydro fracturing the soil around the piezometer tip The following calculations are used to determine a balanced condition from which the send pressure is increased to generate a steady flow observed in the tubing and in cylinder A Consider a piezometer ti
5. ant that cylinder B is completely filled with de aired water and all air excluded Close all valves and release pressure from cylinder A by removing the pressure pump and opening valve F 3 6 3 7 3 8 Repeat 3 3 to refill cylinder C Attach the vacuum pump to valve F Open valves F L N and I and apply vacuum to cylinder A Water is drawn from inside the bladder in cylinder B to cylinder A thus drawing de aired water from cylinder C into cylinder B When the bladder is fully deflated the cylinder A will again be 90 full of water Close valves F L N and I Remove the vacuum pump from valve F Open valve F to release vacuum in cylinder A Open valves I and M and drain any remaining water back to the de aired water boiler Close all valves The de airing unit is now fully charged with de aired water and ready for operation WARNING If an anti freeze solution is used the system must be flushed with clean water to prevent the bladder from perishing over time User Manual 5 Section 4 Operating and Recharging The valves must be operated in the order given commencing with all valves in the closed position 4 1 Calculate the optimum de airing pressures see Section 5 attach the pressure pump to Valve E and the vacuum pump to valve I Open valve E Operate the pressure pump until the desired pressure is reached in cylinder A as indicated by the pressure gauge If a vacuum is required on the return cylinder C open valve I and
6. ater condense thus creating a partial vacuum inside the boiler This prevents further solution of air or gases 7 1 Open valves and 5 Remove the filler cap 7 2 Fill with clean water to within 100mm of the top 7 3 Connect to a suitable electricity mains supply either 110V 230V as indicated the heater coil cover Switch on Bring to the boil and allow to boil for fifteen minutes Switch off 7 4 Close valves V S replace the central filler cap Allow to cool WARNING Although the filler cap is fitted with a pressure relief valve NEVER boil with the filler cap on NOTE With a partial vacuum inside the boiler NEVER open valve S before opening valve V as this will draw air into the de aired water SAFETY REQUIREMENTS The 4 psi Pressure Relief Valve in the centre of the filler cap must be checked by a competent person at intervals not exceeding 12 months Soil INSTRUMENTS Bell Lane Uckfield East Sussex t 44 0 1825 765044 e info itmsoil com TN22 1QL United Kingdom f 44 0 1825 744398 w www itmsoil com Soil Instruments Ltd Registered in England Number 07960087 Registered Office 5th Floor 24 Old Bond Street London W1S 4AW User Manual ji Figure 1 De Airing Unit Schematic Tubing from lt Piezometer 4 4 Panel Tubing to gt Piezometer Panel Footpump Boiler P L V M Vacuum Pump User Manual User Manual 97
7. e aired water boiler allowing it to cool See Section 5 and Figure 1 Connect valve S on the boiler to valve M using the red rubber hose Attach the vacuum pump to valve I open valves I and M and release the vacuum from the boiler by opening valve V on the boiler Open valve S on the boiler and by operating the vacuum pump slowly draw the de aired water into cylinder C until it is 90 full Close all valves Remove the vacuum pump and open valve I to release the vacuum Open valves G and L attach the vacuum pump to valve G and draw the de aired water from cylinder C into cylinder B by operating the vacuum pump until cylinder C is only 10 full Close all valves To fill cylinder B completely it is necessary to repeat the operation but this time only half filling cylinder C with de aired water When cylinder B is almost full close all valves Remove the vacuum hose from valve G open valve G to release the vacuum and then close Attach the pressure pump to valve E open valve E and N then operate the pressure pump to bring the pressure in cylinder A to approximately 10mH20 Gently open valve thereby inflating the bladder displacing the de aired water in cylinder B and forcing out any remaining air Any bubbles of air that cling to the rubber bladder and walls of the cylinder B should be dislodged by slapping the sides of the cylinder until they rise and accumulate under valve G They are then removed by momentarily opening valve G It is import
8. ion of de aired water through Hydraulic Piezometers These components are mounted on a frame complete with valves and connecting pipe work Foot pressure and vacuum pumps are used to operate the equipment Pressure is applied to the de aired water in supply tank B by forcing water from the pressure tank A into the bladder in B Water from the supply tank is then circulated through the piezometer tubes back to the return tank C The volume changes measured in both the pressure and return tanks A and C indicate the quantity of water circulated through the system The object is to completely replace the water in the piezometer tubes with freshly de aired water The equipment is fully tested before despatch However it is possible that movements during transit may disturb the cylinders pipework or valves sufficiently to cause small leaks when the equipment is operated If any leaks are observed during operation they should be eliminated by gently tightening the appropriate component NEVER modify the arrangement without the full written approval of itmsoil as unauthorised modifications may bypass the safety system It is advisable to drain water from the equipment during cold weather to prevent damage to the cylinders due to freezing WARNING If an anti freeze solution is used the system must be flushed with clean water to prevent the bladder from perishing over time WARNING External high pressure gas cylinders must not be connected to this de
9. ough the piezometer tip from the surrounding fill User Manual 8 Example 2 vi PIEZOMETRIC LEVEL 7m h 4 U 4mH 0 af TIP Where 2 htu v p 2 7 4 V p 6 v for 0 6 mH20 for 5 p 1 mH 0 for 10 mH 0 4 mH 20 User Manual Section 6 Calculating De Airing Water Volumes It is important to determine the volume of de airing water to be circulated through each hydraulic piezometer The amount of de aired water required depends on the length of piezometer tubing between the installed piezometer tip and the de airing unit Tubing with 2 8mm or 3 8mm internal diameter is usually used 6 1 Calculate from installation layout drawings or physically measure the distance in metres from the installed piezometer tip to the de airing unit 6 2 Multiply installed length by the appropriate cross sectional area 0 013 for tubing with 2 8mm internal diameter or 0 023 for tubing with 3 8mm internal diameter to give de airing water volume in litres Add at least 10 to the calculated volume to allow for tubing snaking etc User Manual 10 Section 7 The De Aired Water Boiler Refer to Figure 2 Up to 50 litres of de aired water is prepared in the boiler at one filling A heater coil heats the water to boiling thus expelling any air or gases in solution By sealing the boiler and allowing it to cool the steam and water vapour above the w
10. p in the soil during the de airing process as follows u pore pressure in the fill at the tip p pressure on the pressure side of the de airing unit pressure on the vacuum side of the de airing unit h difference in head between the piezometer tip and the pressure and vacuum gauges on the de airing unit fAB and fBC friction losses in the piezometer tubing All pressures are measured with respect to atmospheric pressure For Equilibrium h u fAB h u fBC p v Since AB BC and if no water flows in or out of the piezometer tip the velocity will be the same throughout the system then fAB fBC p 2 h u v Ad A _ User Manual 7 In a piezometer installation is known v is maintained at a known value for each piezometer tip is estimated using previous pore pressure readings In this way p is calculated for each piezometer and de airing carried out at the appropriate pressure If the piezometer lies below the readout point the term h the difference in head between the piezometer tip and pressure and vacuum gauges on the de airing unit changes sign and becomes negative When a piezometer tip has accumulated a lot of air care should be taken to apply sufficient pressure to drive water at least as far as the tip before applying a vacuum to the other tube since friction loss in the return tube carrying air is much less than in one carrying water and air will be drawn in thr
11. soil De Airing Unit With Manual Pumps User Manual Man 097 5 0 1 04 08 2014 C Spalton Andy Small Chris Rasmussen Manual No Revision Date Originator Checked Authorised for Issue User Manual Contents Section 1 General 3 Section 2 Installation Of The De Airing Unit 4 Section Preparation And Setting 5 Section 4 Operating And 9 6 Section 5 Calculation Of De Airing Pressures For 20 7 Section 6 Calculating De Airing Water 10 Section 7 De Aired Water 11 Figure 1 De Airing Unit Schematic 12 Figure 2 De Aired Water Boiler 13 User Manual 2 Section 1 General Information Refer to Figure 1 The de airing unit consists essentially of pressure supply and return tanks A B and C and gauges to measure water pressure and vacuum during circulat
Download Pdf Manuals
Related Search
Related Contents
DELCOP_MFP2122_GDI_ESP 2382KB Aug Rapports au travail et pratiques militantes Hoover U5256-900 Bagged Upright Vacuum Manual del Propietario S - 4 - Ташев Галвинг ООД LaCie Core4 Audiovox 1187001PL User's Manual Convocation conseil communautaire 9/04/2013 - Noisy-le-Sec Relatório - Universidade do Porto Copyright © All rights reserved.