Home

BJ192U Voltage Panel Meter User Manual

image

Contents

1. 0 8 x 91 0 8 mm All connections keep inside the cabinet Note that with the instrument powered on the terminals could be dangerous to touching and cover opening actions or elements removal may allow accessing dangerous parts Therefore the instrument must not be used until this is completely installed Notes 2 Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 5 lt Blue Jay Technology Co Ltd Product Manual Auxiliary power BJ192X Series Digital Meter with universal AC DC power input if not for a special statement we provide the 220VAC DC or 110VAC DC power interface for standard products Instruments limit work power supply AC DC 80 270V please ensure that the auxiliary power can match for BJ192 X series meter to prevent damage to the product A Suggest install 1A fuse in the fire line side B For the areas with poor power quality suggest install lightning surge suppressor and rapid burst suppressor to prevent lightning strikes 3 2 Connection terminal and drawing for BJ192U 9X4 see label on the rear part Terminal description 1 Supply voltage input 0 V 2 Supply voltage input 220 Va c 11 Voltage A phase input 12 Voltage B phase input 13 Voltage C phase input 14 Neutral Voltage input 58 RS 485 59 RS 485 60 RS 485 GND zou gt N
2. lt Blue Jay Technology Co Ltd Product Manual BJ192U Voltage Panel Meter User Manual Version 1 2 Tel 0086 023 67636974 Email tech cqbluejay com Fax 0086 023 67636974 Add Redstone Road 2 17 3 Jiangbei District 400020 Chongqing P R China lt Blue Jay Technology Co Ltd Product Manual Read me When you use BJ192 X series Digital Meter be sure to carefully read this user manual and be able to fully understand the implications the correct guidance of operations in accordance with user manual which will help you make better use BJ192 series Digital Meter and help to solve the various problems at the scene 1 Before the meter turning on the power supply be sure that the power supply within the provisions of the instrument 2 When installation the current input terminal must non open voltage input terminals must Non short circuit 3 Communication terminal RS232 or RS485 is strictly prohibited to impose high pressure 4 Be sure the instrument wiring consistent with the internal system settings 5 When communicating with the PC instrument communication parameters must be consistent with the PC Please read carefully before using this user manual Please save this document Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 1 lt Blue Jay Technology Co Ltd Product Manual Dire
3. operators must perform them Before any adjustment replacement maintenance or repairing operation is carried out the instrument must be disconnected from any power supply source When any protection failure is suspected to exist the instrument must be immediately put our of service The instrument s design allows a quick replacement in case of any failure 9 TECHNICAL SERVICE For any inquiry about the instrument performance or whether any failure happens contact to Blue Jay s technical service Blue Jay After sales service Building 13 2 8 Jialing third village Pioneer Park Jiangbei District 400020 Chongqing Tel 0086 023 86850812 Fax 0086 023 67636974 E mail tech cqbluejay com Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 10
4. series Digital Meter is used for power quality monitoring factory automation and building automation These series can measure the power parameters in power grid Current Reactive power Voltage Apparent power Frequency Energy Active power Power factor It can replace many of a traditional analog measurement instruments improve system accuracy and reliability 2 SPECIFICATIONS 1 Reference standard Basic electricity GB T 13850 1998 IEC688 1992 Active power GB T17215 2002 IEC61036 2000 Reactive power GB T17882 1999 IEC61268 1995 2 Accuracy standards 3 Input Voltage Rated 100 220 380V Current Rated 5A optional 1A Frequency 45 65Hz 4 Load Voltage lt 0 5VA phase rated 220V Current lt 0 5VA phase rated 5A 5 Overload Current 1 2 times rated continuous 10 seconds for 10 times the rated Voltage 1 2 times the rated continuous 10 seconds for 800V Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 3 lt Blue Jay Technology Co Ltd Product Manual 6 Dielectric strength IEC 688 IEC 255 3 1989 2kV AC RMS 1 minute between input output case power supply 7 EMC Test standard Test voltage Electrostatic discharge immunity IEC 61000 4 2 test level 4 SRy IEC61000 4 4 Electrical fast transient burst level 3 Input 1kV Powe
5. ctory CONTENTS Page 1 Summarize 1 2 SpecificationS 1 3 Installation and Start up 5 3 1 Installation 5 3 2 Connection terminal 6 4 Screen Display 7 4 1 Panel diagram _ 7 4 2 Display Summary 7 5 Operating Mode 8 6 Setup Procedure 9 7 Safety Considerations 10 8 Maintenance 10 9 Technical Service 10 Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 2 lt Blue Jay Technology Co Ltd Product Manual 1 SUMMARIZE BJ192 X
6. ma cay singnal TAPT o RPT o OGP Sct USel Set voltage gg E range InP UaPT o Laff 7 r H Uj Set PT ratio amp Set slave al address gogi 0002 communication Conn an Conan ov Conn v Coan F onn A A A A VY A Z Lanal boon set dat ee a a E e A Q Note The procedure above is for reference not all series have the step 3 communication preference only the K series have this step If you want the X series and D series have this function please contact the Technical Service Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 9 lt Blue Jay Technology Co Ltd Product Manual 7 SAFETY CONSIDERATIONS All installation specification described at the previous chapters named INSTALLATION AND STARTUP OPERATION MODE and SPECIFICATIONS Note that with the instrument powered on the terminals could be dangerous to touching and cover opening actions or elements removal may allow accessing dangerous parts This instrument is factory shipped at proper operation condition 8 MAINTENANCE The 192 X does not require any special maintenance No adjustment maintenance or repairing action should be done when the instrument open and powered on should those actions are essential high qualified
7. ote This connection drawing is for reference only the actual connecting terminal please refer to the label on the rear part IMPORTANT REMARK If power 0 01 is shown for any of the phases and voltage and current are not zero for this phase check out following points Assure that A B C phases coincide in voltage and current Correct polarity Reverse the current transformer placed at this phase Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 6 lt Blue Jay Technology Co Ltd Product Manual 4 Screen display 4 1 Panel diagram 4 2 Display Summary No Display Explanation Digital display module Three lines 4 digital LED show voltage Indicator of the data Unit K means thousand Enter key For menu selection and confirmation Used to open the menu and return to previous menu Up and Down key Set the programming value Note Please see detail instructions of items at OPERATION MODE Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 7 lt Blue Jay Technology Co Ltd Product Manual 5 OPERATION MODE The instrument has three line displays Every led will be on according to the
8. parameter presently shown in screen When the 192 X is powered up all the LED indicator will on and meter start self test after some seconds the meter is ready for operation and shows one of the available screens Parameters on display can be switch by pressing the key or A LED on the right indicate the parameters shown on screen at any moment At programming display mode press and to increase or decrease the value pressing the key and Manu or and Manu the instantaneous at the same time value can increase or decrease number x10 Pressing the Manu key the can open the programming menu and return to previous menu Pressing the Enter key you exit it with saving any modification that you might have done in menu operation press Enter key user can go to the next menu Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 8 lt Blue Jay Technology Co Ltd Product Manual 6 SETUP PROCEDURE The SETUP procedure of the BJ192 X is performed by means of several SETUP options Once into the SETUP use the keyboard to select different options and enter required variables 1 Password enter 2 Input signal selection 3 Communication preferences Cod Cad UaPh amp Laff InPf a oe n 9999 RBE CO
9. r supply 2kV immunity test IEC61000 4 5 common mode test voltage Surge Shock immunity test level 4 AkV 8 Work environment Temperature 20 C 60 C Humidity RH 20 95 No condensation 9 Protection Panel IP40 10 Storage Conditions Temperature 25 C 70 C Humidity RH 20 95 11 Power Supply AC DC 80 270V Maximum power consumption 3W 12 Dimensions L x W x H 96X96X128mm 13 Installation hole size L x W 91 0 8 mmx 91 0 8 mm Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing P R China 4 lt Blue Jay Technology Co Ltd Product Manual 3 INSTALLATION AND START UP The manual you hold in your hands contains information and warnings that the user should respect in order to guarantee a proper operation of all the instrument functions and keep its safety conditions The instrument must not be powered and used until its definitive assembly on the cabinet s door Whether the instrument is not used as manufacturer s specifications the protection of the instrument can be damaged When any protection failure is suspected to exist for example it presents external visible damages the instrument must be immediately powered off In this case contact a qualified service representative 3 1 Installation Mounting Instrument is to be mounted on panel cut out 91

Download Pdf Manuals

image

Related Search

Related Contents

User manual MODULE  Honeywell CHRONOTHERM CT1957 User's Manual  I Installazione, uso e manutenzione pag. 2 UK Installation, use and  VERSAT-2D User Manual  INSTALLATION & OPERATING INSTRUCTIONS  Densitomètre Détecteur de turbidité en suspension  Fiche animateur : module écriture collaborative  ONKYO DS-A4  RC 1  Sanyo PLC-WM5500L  

Copyright © All rights reserved.
Failed to retrieve file