        ekspert™ ultraLC Systems Site Planning Guide
         Contents
1.     19 inches     20 inches   151 5 Ib   ekspert ultraLC 110 system 475 mm 500 mm 67 kg  147 Ib  69 kg  with a cooled column oven  19 inches     20 inches   151 5 Ib   ekspert ultraLC 110 HTC Configurations  ekspert ultraLC 110 HTC 855 mm 500 mm N A 48 85 kg  system  37 5 inches     20 inches   107 7 lb   ekspert ultraLC 110 XL system 1030 mm 500 mm N A 61 35 kg  with an uncooled column oven    46 5 inches     20 inches   135 3 Ib   ekspert ultraLC 110 XL system 1030 mm 500 mm N A 64 85 kg  with an cooled column oven  46 5 inches     20 inches   143 Ib   ekspert ultraLC 110 HTS Configurations  ekspert ultraLC 110 HTC 1138 mm 500 mm N A 50 85 kg  system  48 6 inches     20 inches   112 1 Ib   ekspert ultraLC 110 XL system 1313 mm 500 mm N A 63 35 kg  with an uncooled column oven    57 6 inches     20 inches   139 7 Ib   ekspert ultraLC 110 XL system 1313 mm 500 mm N A 66 85 kg  with an cooled column oven  57 6 inches     20 inches   147 4 Ib   ekspert ultraLC 110 XL Configurations  ekspert ultraLC 110 XL system 330 mm 500 mm 58 kg  155 Ib    62 kg  136 Ib    13 inches     20 inches   ekspert ultraLC 110 XL system 505 mm 500 mm 70 5 kg  155 Ib  74 5 kg  with an uncooled column oven    20 inches     20 inches   163 5 Ib        Site Planning Guide    ekspert    ultraLC Systems    13 of 18    Site Requirements    Table A 1    System Footprint and Weight  Continued        System            ekspert ultraLC 110 XL system  with an cooled column oven    Width        505 mm        20 in
2.    PAL HTX xt User Manual  Installation and Operation    7 Note  For regulatory and safety information for the ekspert ultraLC 110 and 110 XL          a Note  Ifthe site preparation tasks are not complete when the AB SCIEX Field Service  Employee  FSE  arrives  the scheduled installation will be postponed        Customer Site Planner Responsibilities      Select the desired configuration  and verify that adequate space is available  Refer  to Site Layout Requirements on page 13       Provide all required electrical receptacles  Refer to Electrical Requirements on  page 15       Provide the required laboratory ventilation  Refer to Ventilation Requirements on  page 16       Provide a printer and the required software  Refer to Computer and Software  Requirements on page 16     e Verify that the requirements for the operating environment are met  Refer to  Environmental Requirements on page 17     e Provide the required solutions and laboratory equipment required to complete the  installation  Refer to Customer Supplied Reagents and Equipment on page 17       Complete the checklist in Site Planning Checklist on page 9 and return it to the Field  Service Employee  FSE         scheduled installation date        4 Note  The FSE will follow up         the checklist is not received prior to the    Site Planning Guide ekspert    ultraLC Systems    7 of 18    Customer and FSE Responsibilities    FSE Responsibilities    e Review the checklist and discuss outstanding issues with the sit
3.   and provided when the Cliquid  software is purchased with an AB SCIEX mass spectrometer        Triazine Standard Mixture  AB SCIEX PN 4376887   Shipped separately from the  system     ekspert    ultraLC Systems Site Planning Guide    18 of 18    
4.  ad 8   Chapter 2 Site Planning Checklist               0000 eee 9  Customer Information             0  0000 aaa 9             7 9  Comments    7 10               0  28  ka AZ and 1  clu M Te  7 11   Appendix A Site Requirements                            llllllll     13  Site Layout Requirements      2 6 0 0 cee ee RR n 13  Electrical Requirements                    15   Protective Earth Conductor            000s 15  System Electrical Specifications                  ccc eens 15  Ventilation Requirements             n eee 16  Computer and Software Requirements 0000 16  Environmental Requirements             17  Customer Supplied Reagents and Equipment                     2 2055 17  Laboratory Supplied Requirements 00 17  AB SCIEX Supplied Requirements       18  Site Planning Guide ekspert    ultraLC Systems  RUO IDV 05 0862 A   D5031371 C 5 of 18    Contents    eksigent    part of AB SCIEX    ekspert    ultraLC Systems Site Planning Guide    6 of 18    Customer and FSE Responsibilities       This guide is for the site planner  the individual responsible for preparing the facility for the  installation of the ekspert    ultraLC system        systems  refer to the ekspert    ultraLC Systems Hardware User Guide  For regulatory  and safety information for ekspert ultraLC 110 HTC systems  refer to the HTC PAL   PAL  HTC xt User Manual  Installation and Operation  For regulatory and safety information  for ekspert ultraLC 110 HTS systems  refer to the HTS PAL   HTX PAL  PAL HTS xt 
5. 80  To 2000 m 70 db   autosampler  50  F to 104  F    ultraLC 110 HTC 4  C to 40  C 75   maximum  To 3000 m 62 db   autosampler  39  F to 104  F    ultraLC 110 HTS 4  C to 40  C 75   maximum  To 3000 m 62 db   autosampler  39  F to 104  F    ultraLC 110 XL 10  C to 40  C 20  to 80  To 2000 m 70 db   autosampler  50  F to 104  F    Pump 5  C to 40  C 20  to 80  To 2000 m 70 db   41  F to 104  F    Column oven 5  C to 40  C 30  to 80  To 2000 m N A   41  F to 104  F           Customer Supplied Reagents and Equipment    Return to checklist     Laboratory Supplied Requirements    General equipment and consumables      Disposable gloves        Pipetting accessories  pipettors and tips     PEEK tubing  0 005 inch i d   1 16 inch o d   red   4 meters or more  and cutter    Glassware      Measuring cylinders  100 mL  1000 mL    HPLC bottles  1000 mL  e Glass autosampler vials  1 mL  1 5 mL  or 2 mL      Caps for all autosampler vials    Consumables and Reagents      Ammonium formate  minimum 10 g        MS grade methanol       HPLC grade water    Site Planning Guide    ekspert    ultraLC Systems    17 of 18    Site Requirements      MS grade isopropanol     MS grade acetonitrile    AB SCIEX Supplied Requirements    The following consumables are required for the HPLC MS system test and the Cliquid9 System  Suitability Test  They are supplied with Cliquid       Phenomenex 00B 4424 B0  Synergi 4 um Fusion RP 80A 50 x 2 mm columns  PN  4376878   Required for use with the Cliquid software
6. ches     Length    500 mm   20 inches                Weight    Without  Cooling    74 kg  162 5 Ib         Table A 2 Weights and Dimensions of Individual Components              With  Cooling    78 kg  171 Ib                    cooled sample    Equipment Height Width Length Weight   ultraLC 110 autosampler 510 mm 300 mm 360 mm 19 kg  42 Ib    20 inches   12 inches   14 inches    ultraLC 110 autosampler 575 mm 300 mm 360 mm 21 kg  46 5 Ib    with cooling option  27 inches   12 inches   14 inches    ultraLC 110 HTC 648 mm 545 mm 385 mm 16 85 kg   autosampler with the  25 5 inches   21 5 inches   15 2 inches   37 1 Ib    cooled sample   compartment   ultraLC 110 HTS 648 mm 828 mm 385 mm 18 85 kg   autosampler with the  25 5 inches   32 6 inches   15 2 inches   41 6 Ib                             compartment   ultraLC 110 XL 540 mm 330 mm 480 mm 26 kg  57 5 Ib    autosampler  21 inches   13 inches   19 inches    ultraLC 110 XL 620 mm 330 mm 480 mm 30 kg  66 Ib    autosampler with  24 5 inches   13 inches   19 inches    cooling option   LC pump 120 mm 300 mm 500 mm 16 kg  35 Ib    5 inches   12 inches   20 inches    Column oven  optional  600 mm 170 mm 345 mm Without cooling    24 inches   7 inches   13 5 inches    12 5 kg  27 5 Ib     With cooling   16 kg  35 Ib                    d   Note  Specifications for individual components does not include optional accessories        Table A 3 Distances  From To Maximum Distance  Computer  Auosampler       Jl    Note  For optimum performa
7. e planner       Supply all fittings  plugs  and cables required to connect the LC system to the  electrical receptacles       Setup ekspert    ultraLC equipment sold and supported by AB SCIEX   e Test the system to the specifications in the Data Log     During Installation    The FSE unpacks the system  sets up the system  and then confirms its operation  After the  system is set up  the FSE performs installation tests     Technical Support  AB SCIEX and its representatives maintain a staff of fully trained service and technical    specialists located throughout the world  They can answer questions about the system or any  technical issues that may arise  For more information  visit the web site at www absciex com     ekspert    ultraLC Systems Site Planning Guide    8 of 18    Site Planning Checklist       Customer Information       Organization  Address          City  Country  Telephone                  Site planner  contact name    E mail address             Requirements    Table 2 1 Site Planning Checklist       Requirements Complete  The site is not designated as BioSafety Level 3  BSL 3  or BSL 4     Site Layout Requirements                           Refer to Site Layout Requirements on page 13        The installation location can accommodate the equipment dimensions   If the requirements cannot be met  contact the FSE        Electrical Requirements  Refer to Electrical Requirements on page 15        An electrical outlet is provided for each component of the system  aut
8. ekspert    ultraLC Systems    Site Planning Guide       RUO IDV 05 0862 A  December 2013    This document is provided to customers who have purchased AB SCIEX equipment to use in the  operation of such AB SCIEX equipment  This document is copyright protected and any  reproduction of this document or any part of this document is strictly prohibited  except as   AB SCIEX may authorize in writing     Software that may be described in this document is furnished under a license agreement  It is  against the law to copy  modify  or distribute the software on any medium  except as specifically  allowed in the license agreement  Furthermore  the license agreement may prohibit the software  from being disassembled  reverse engineered  or decompiled for any purpose  Warranties are as  stated therein     Portions of this document may make reference to other manufacturers and or their products   which may contain parts whose names are registered as trademarks and or function as  trademarks of their respective owners  Any such use is intended only to designate those  manufacturers    products as supplied by AB SCIEX for incorporation into its equipment and does  not imply any right and or license to use or permit others to use such manufacturers    and or their  product names as trademarks     AB SCIEX warranties are limited to those express warranties provided at the time of sale or  license of its products and are AB SCIEX   s sole and exclusive representations  warranties  and  obligat
9. for the Functional Tests are available        Product Familiarization       Obtain and review system documentation  Go to www eksigent com        Comments             ekspert    ultraLC Systems Site Planning Guide    10 of 18    Site Planning Checklist    Exceptions             Signoff    Complete the checklist and return it to the FSE email specified below on or before the Return  date        Completion  date   yyyy mm dd       acknowledge that all installation requirements  as specified in this    document  have been met   Return date   yyyy mm dd     Site Planner  contact name                         FSE name  7         i O  SE ema 7           Site Planning Guide ekspert    ultraLC Systems    11 of 18    Site Planning Checklist    eksigent    part of AB SCIEX    ekspert    ultraLC Systems Site Planning Guide    12 of 18    Site Requirements             Site Layout Requirements    Return to checklist            Note  The site must not be designated BioSafety Level 3  BSL 3  or BSL 4  AB SCIEX  does not install  service  or repair equipment in areas designated BSL 3 or BSL 4                                                                             Table A 1 System Footprint and Weight  System Width Length Weight  Without With  Cooling Cooling  ekspert ultraLC 110 Configurations  ekspert ultraLC 110 system 300 mm 500 mm 51 kg  112 Ib  53 kg   12 inches     20 inches   116 5 Ib   ekspert ultraLC 110 system 475 mm 500 mm 163 5 kg  139 5 Ib  69 kg  with an uncooled column oven
10. ions  AB SCIEX makes no other warranty of any kind whatsoever  expressed or implied   including without limitation  warranties of merchantability or fitness for a particular purpose   whether arising from a statute or otherwise in law or from a course of dealing or usage of trade   all of which are expressly disclaimed  and assumes no responsibility or contingent liability   including indirect or consequential damages  for any use by the purchaser or for any adverse  circumstances arising therefrom     For research use only  Not for use in diagnostic procedures     The trademarks mentioned herein are the property of AB Sciex Pte  Ltd  or their respective  owners  Eksigent is a division of AB Sciex  LLC     AB SCIEX    is being used under license      2013 AB Sciex Pte  Ltd   Printed in Canada     AB Sciex LLC  1201 Radio Road  Redwood City CA  94065   USA       ekspert    ultraLC Systems Site Planning Guide    2 of 18    Revision History          Revision Reason for Change Date    December 2073       Site Planning Guide ekspert    ultraLC Systems    RUO IDV 05 0862 A   D5031371 C 3 of 18    Revision History    eksigent    part of AB SCIEX    ekspert    ultraLC Systems Site Planning Guide    4 of 18    Contents       Chapter 1 Customer and FSE Responsibilities                 0 0202 00  7  Customer Site Planner Responsibilities 0 7  FSE Responsibilities                         8   Du  nng Installati  n      PPS 8  Technical SUDO       dodo dde icol Re Rie debeo doe e d RU eere
11. nce  make sure that the column outlet is as close to the  ion source as possible        ekspert    ultraLC Systems    14 of 18    Site Planning Guide    Site Requirements    Electrical Requirements    Return to checklist        installation of all electrical supplies and fixtures  and make sure that all    A WARNING  Electrical Shock Hazard  Use only qualified personnel for the  installations adhere to local bylaws        Power surges  line spikes  and transient energy sources can impede instrument operation   Ensure that the instrument s electrical supply is adequately protected from these conditions and  includes a correctly installed protective earth conductor  A qualified electrician must install or  inspect the earth conductor before the system components are connected     The system requires four electrical outlets  one each for      Autosampler  e PumpA  e PumpB    Column oven  optional     The ultraLC 110 HTC and HTS autosamplers require an additional outlet for the cooled sample  compartment           a Note  The AC mains supply cables provided with the ultraLC 110 HTC and HTC  An autosamplers and their cooled sample compartment are 3 m  118 inches  in length  The      cables provided with the other system modules are 2 5 m  99 inches  in length  If the  power cables are too far from the AC mains supply outlet  the customer must supply  extension cords        Protective Earth Conductor    Return to checklist     The mains supply must include a correctly installed pro
12. osampler   pump A  pump B  and  optionally  the column oven        The mains supply includes a correctly installed protective earth conductor        Ventilation and Waste Collection Requirements  Refer to Ventilation Requirements on page 16        Installation of plumbing and ventilation fixtures complies with local biohazard  regulations and safety standards     Ventilation of the laboratory environment in which the mass spectrometer will be  used complies with local regulations  and the air exchange rate is appropriate for  the work performed              Site Planning Guide ekspert    ultraLC Systems    9 of 18    Site Planning Checklist    Table 2 1 Site Planning Checklist  Continued               Requirements Complete       Computer and Software Requirements                    Refer to Computer and Software Requirements on page 16        A network printer or a dedicated printer and necessary print drivers are available        The Analyst   1 6 software  or a later version  is installed on the acquisition  computer        An account with Administrator privileges is available for the FSE        Environmental Requirements    Refer to Environmental Requirements on page 17        The ambient temperature and relative humidity meet the requirements for the  individual components        Materials Required for Routine Operation  Refer to Customer Supplied Reagents and Equipment on page 17        All required LC equipment and supplies are available        Consumables and reagents 
13. por in excess of  occupational exposure limits        WARNING  Potential Radiation Hazard  Biohazard  or Toxic Chemical Hazard   Use only qualified personnel for the installation of plumbing and ventilation  fixtures  and make sure that all installations follow local bylaws and biohazard  regulations        The venting of fumes and disposal of waste must be in accordance with all federal  state   provincial  and local health and safety regulations  and that the air exchange rate is appropriate  for the work performed          per hour in laboratories       Note  Inthe United States  OSHA 29 CFR Part 1910 1450 requires 4 to 12 air changes       Computer and Software Requirements    Return to checklist     A network or dedicated printer  including any necessary print drivers       The ekspert    ultraLC software requires the Analyst   1 6 software  or a later  version  to be installed on the acquisition computer     For requirements for the acquisition computer  see the  nstallation Guide for the  Analyst software       The FSE must be logged in to the acquisition computer with Administrator privileges  to install the ekspert ultraLC software     ekspert    ultraLC Systems Site Planning Guide    16 of 18       Environmental Requirements    Return to checklist     Table A 5 Requirements and Specifications    Site Requirements                                  System Ambient Relative Humidity Altitude Noise  Temperature    non condensing  Level   ultraLC 110 10  C to 40  C 20  to 
14. tective earth conductor that must be  installed or checked by a qualified electrician before connecting the LC system components        conductor  Any interruption of the protective conductor is likely to make the    A WARNING  Electrical Shock Hazard  Do not intentionally interrupt the protective  installation dangerous        System Electrical Specifications    Table A 4 contains the electrical specifications for the HPLC system components          s Note  Specifications are subject to change without notice  Contact your FSE for the  Al latest specifications        Site Planning Guide ekspert    ultraLC Systems    15 of 18    Site Requirements    Table A 4 Electrical Specifications                               System Power Nominal Input Frequency  Consumption Voltage   ultraLC 110 autosampler        200VA   950700240   50Hzor60Hz    ultraLC 110 HTC autosampler 150 W 100 V to 240 V 50 Hz or 60 Hz  ultraLC 110 HTS autosampler 150 W 100 V to 240 V 50 Hz or 60 Hz  ultraLC 110 XL autosampler 450 VA 100 4  V 50 Hz or 60 Hz  t 0   Pump 150 VA 100 V to 240 V 50 Hz or 60 Hz  Column oven 550 VA  maximum  115 V to 230 V 50 Hz or 60 Hz       Ventilation Requirements    Return to checklist        WARNING  Potential Radiation Hazard  Biohazard  or Toxic Chemical Hazard   Make sure that the laboratory is equipped with adequate ventilation to maintain  solvent vapor within local occupational exposure limits  The use of an organic  solvent as part of a rinse protocol may release solvent va
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  Operating Instructions  DT-300取扱説明書(2007年7月10日)  L` IMPENSE INFORMATIQUE  scheda impianto - Lamborghini Calor  Le manuel d`astro- nomie attribué à Stéphanos (VIIe s.)  Manual de Instrucciones y Mantenimiento Cilindro neumático  30155 Stryker.indb  Naïm Kattan, Pierre Gélinas, Francis Malka    Copyright © All rights reserved. 