Home

Astra2Connect Point&Play® Setup

image

Contents

1. page 4 Material provided in the box page 6 Material you need to provide yourself page 8 Follow the entire procedure When installing the antenna it is important that you follow the entire procedure step by step When pointing the antenna you may need to repeat the steps from the section Rough pointing horizontal azimuth page 36 onwards to obtain optimal signal reception and transmission Related documentation When installing the satellite dish you will need to refer to the following documents The Antenna Pointing Information document which contains the geographical pointing data booklet included in the box Terminal User Manual available on the CD included in the box Copyright Copyright Newtec Cy NV 2009 Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 3 ETETA A ASTRA 2Connect Safety precautions This section lists the safety precautions to follow when installing the antenna Safety precautions are grouped into warnings and cautions Local regulations Always install the Astra2Connect antenna in accordance with applicable local regulations Consult with a licensed electrician if in any doubt Warnings A A warning refers to an action or situation that could result in injury long term j health hazard or death if you do not follow the instructions Antenna RF radiation hazard Hazardous electromagnetic field levels are generated in the area between the antenna
2. reflector and the iLNB feed horn during transmission Do not A e IPmodem place any part of your body in that zone while the system is on Take the necessary precautions to prevent access to the antenna by children or unauthorised persons There are no user serviceable parts in the IPmodem Do not attempt to open the system There is a risk of electrical shock that may result in injury and death The IPmodem should only be opened by a technician trained and certified to service the product rain liquids or moisture Do not place any objects containing liquids e g glasses To prevent the risk of fire or electrical shock do not expose the indoor equipment to A vases on the system Do not install the antenna and IPmodem when there is a risk of thunderstorm or lightning activity in the area Do not use the in line power supply power cord when damaged in any way Astra2Connect Point amp Play Setup Manual page 4 Version 2 3 January 2009 A ASTRA 2Connect Introduction Uy Cautions lj A caution refers to an action or situation that could result in equipment damage or destruction if you do not follow the instructions IPmodem Always use the in line power supply included with the IPmodem Using a different power supply may cause equipment damage To ensure regulatory and safety compliance use only the provided power and interface cables or cables conform to the specifications within this manual Do not open the
3. unit Do not perform any servicing other than described in the installation instructions Refer all other servicing to qualified service professionals Static electricity can damage the Astra2Connect modem To avoid damaging the IPmodem with static electricity always touch the grounded coaxial cable connector prior to touching any other part of the system To clean the outside of the unit use a clean dry cloth To avoid equipment damage never clean the system using fluids detergents or chemicals Do not use pressurised air to remove dust from the unit Install an AC surge arrestor in the AC outlet to which the IPmodem is connected to avoid damage to the equipment from lightning strikes and other electrical surges To prevent overheating do not block the ventilation holes on the sides and top of the unit Point amp Play tool To avoid damage to your hearing ensure that the volume of the Point amp Play tool is not set too loudly Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 5 ETA A ASTRA 2Connect Material provided in the box A x 2 GROUNDING KIT 4mm 5mm 23 24 G 1x 2X Astra2Connect Point amp Play Setup Manual page 6 Version 2 3 January 2009 A ASTRA 2Connect Introduction Material provided in the box list Number Number gt on figure Item Quantity on figure Item Quantity 1 Masthead 1 15 Nut M8 4 2 Brackets 2 16 Nut M
4. 6 7 3 Pole clamps 2 17 Headphone 1 4 iLNB clamp 1 18 Point amp Play Tool 1 iLNB Interactive Low 5 Noise 1 19 IPmodem 1 Block downconverter 6 ee mm 2 20 Coax cable 1 7 IN mm 1 21 Network ethernet cable 1 8 aa mm 4 22 Power adapter 1 9 Parker Screw 1 23 iLNB grounding nut 1 10 Hex key 1 24 Masthead grounding nut 2 11 Cap 1 25 Grounding screw 16 mm 1 M5 12 F connectors 4 26 Grounding wire 1 13 Satellite dish 1 CD and documentation 14 Feed arm 1 Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 7 ee A ASTRA 2Connect Material you need to provide yourself A solid base for the antenna An antenna pole A Phillips head screwdriver PZ2 Open end spanners of 10 11 and 13mm Tie wraps A cutter Areliable compass Aspirit level Geographical pointing data available in the Antenna Pointing Information document Antenna pole requirements The antenna pole must be installed on a solid base and made of galvanised steel Minimum diameter 40 mm Maximum diameter 70 mm Astra2Connect Point amp Play Setup Manual page 8 Version 2 3 January 2009 A ASTRA 2Connect Introduction Installation overview The image below shows the results of a typical installation as described in the following pages Please read these pages carefully to execute the installation Satellite RA Power supply with
5. A ASTRA 2Connect Astra2Connect Point amp Play Setup Version 2 3 January 2009 ref nr 26042 A ASTRA 2Connect Contents Contents 1 Introduction sccanacecssnaassencsnncdicsasendeasespancsasusasacensnnensnouaeesans 3 Abo t this CLG ssori iona aa a a a 3 Safety preca tionS isiin Ea 4 Material provided in the bOX sssssssssssssssrsessrrrsernrnsrrnrnnrrrrerresernne 6 Material you need to provide yourself cccccecesseeesseeeseeeseeeeeeeees 8 Installation overview e ssssssssssrssrrrsrrsnrrnnrrerrnrnnrnrnnnrrerrennnrnnnnnenn 9 2 Setting up the antenna ssssssssssnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnna 10 Step 1 Choosing a suitable location ssssssssessseesesssrseserresrrrensrene 11 Step 2 Mounting the antenna pole ccccsccseeeeeeeeeeeeseeeeeeeees 12 Step 3 Mounting the ANtenna ccccccececseeeeeseeeeeeeeeeeeenaeeeeanaeeees 13 Step 4 Fixing the antenna Cabling c cssecesssseeesessseesessserenes 20 Step 5 Pointing the ANtenna cccscseccsssseressereessseeesssseeesesssenes 29 Version 2 3 January 2009 Astra2Connect Point amp Play Manual page 2 A ASTRA 2Connect Introduction 1 Introduction About this guide This guide provides a step by step procedure to install the Astra2Connect terminal consisting of the antenna and the IPmodem Before installing Before starting to install the antenna it is important to read the following sections Safety precautions
6. adapter iLNB IPmodem Antenna Rx cable Tx cable Ethernet cable Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 9 Setting up the antenna A ASTRA 2Connect 2 Setting up the antenna Assuming you already have a solid base made of concrete or firmly attached to a wall installing the antenna includes the following steps Step 1 Choosing a suitable location page 11 Step 2 Mounting the antenna pole page 12 Step 3 Mounting the antenna page 13 Step 4 Fixing the antenna cabling page 20 Step 5 Pointing the antenna page 29 Astra2Connect Point amp Play Setup Manual page 10 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Step 1 Choosing a suitable location Outdoors antenna When setting up the antenna base take account of the orientation the antenna must have Orientation data are available in the Antenna Pointing Information document The antenna needs a clear view towards the satellite without any buildings trees that may hinder the signal To connect the antenna to the IPmodem you will use a coax cable You can use the provided coax cable or a coax cable with the same specifications as described in the Terminal User Manual on the CD The coax cable connecting the antenna to the IPmodem must not exceed 30 meters The coax cable included in the box is 30 meters long About your Astra2Connect Terminal For more information on the A
7. be waterproof 3 Put the indoor TX and RX connectors in the appropriate TX and RX jacks on the IPmodem The TX cable will have to be disconnected again later during the installation Use an 11 mm spanner to fasten the connectors on the IPmodem Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 27 Staion A ASTRA 2Connect Connecting the IPmodem to your computer 1 Plug the network cable in the IPmodem s and your computer s ethernet ports You can use the network cable provided in the box or a cable of your choice 2 Connect the power adapter provided in the box gently to the IPmodem and a wall outlet The result should look like the figure below Astra2Connect Point amp Play Setup Manual page 28 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Step 5 Pointing the antenna Pointing the antenna includes the following steps Setting the IPmodem software to pointing mode page 30 Using the Point amp Play Tool page 32 Setting up the Point amp Play Tool page 33 Rough pointing vertical elevation page 34 Rough pointing horizontal azimuth page 36 Fine pointing the antenna page 39 Checking the antenna pointing page 42 Finishing installation page 43 Confirming antenna pointing in the software page 44 Attention Do not stand in front of the iLNB or the antenna dish during poi
8. een the antenna and the satellite Select a place with clear line of sight to set up the antenna Also check if your compass is functioning correctly The pointing carrier selected in the IPmodem status page is not correct If so on the IPmodem status page on your computer Click Pointing completed Select Antenna Pointing in the menu bar Click Restart Pointing Select the other pointing carrier in the list and restart the entire pointing procedure Itis indicated on the status page when you are pointed to the correct satellite The antenna might be pointing to the wrong satellite If so you need to repoint the antenna until you receive a signal perform the horizontal and vertical steps above until the antenna is pointing correctly towards the satellite Astra2Connect Point amp Play Setup Manual page 38 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Fine pointing the antenna If you do not hear a continuous high pitch tone after securing the bolts the antenna will probably have moved slightly You then need to fine point the antenna Important note The procedures relating to vertical and horizontal fine pointing are described below in a sequential way In reality you will have to perform these procedures simultaneously Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 39 domana A ASTRA 2Connect Fine pointing vertical 1 Loosen bolt 1 2 R
9. etup Manual page 21 maena A ASTRA 2Connect 5 Screw the F connector to the wire by hand Repeat this procedure for all F connectors not yet attached Astra2Connect Point amp Play Setup Manual page 22 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Grounding the iLNB You need to ground the iLNB To ground the iLNB 1 Connect the grounding wire to the stud on the iLNB by using the iLNB grounding nut 2 Connect the wire to the grounding screw on the masthead and fix it using the second masthead grounding nut Grounding wire To local grounding 3 The masthead needs to be grounded according to local regulations Consult with a licensed electrician if in any doubt 1 Grounding wire with minimum specifications UL style 1007 1569 PVC insulated 300V 80 C C S A Type TR 64 18AWG Yellow Green attached to 5 mm insulation supported ring terminals Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 23 damien A ASTRA 2Connect Adjusting iLNB polarisation Polarisation of the iLNB allows correct data reception and transmission To adjust iLNB Interactive Low Noise Block downconverter polarisation 1 Identify the angle marker on the iLNB clamp as pointed out in picture below angle mar 130 120110100 90 80 70 60 504 Astra2Connect Point amp Play Setup Manual page 24 Version 2 3 January 2009 A ASTRA 2Connect Setting up the an
10. f the IPmodem click the Pointing Completed button Pointing Click the Pointing Completed button when your antenna is properly pointed Pointing Completed Wait for ten minutes You are now ready to surf the internet Astra2Connect Point amp Play Setup Manual page 44 Version 2 3 January 2009
11. iLNB clamp into the feed arm Astra2Connect Point amp Play Setup Manual page 18 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna The antenna is mounted The result should look like the figure below Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 19 EEA A ASTRA 2Connect Step 4 Fixing the antenna cabling Fixing the antenna cabling includes the following steps Connecting the F connectors on the coax cable page 21 Grounding the iLNB page 23 Adjusting iLNB polarisation page 24 Fixing the iLNB page 26 Connecting the iLNB to the IPmodem page 27 Connecting the IPmodem to your computer page 28 Astra2Connect Point amp Play Setup Manual page 20 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Connecting the F connectors on the coax cable If the connectors are not yet attached to your cable execute following steps to attach them yourself You will need a cutter and possibly pliers to connect the F connectors To connect an F connector to a cable 1 For the outdoor end of the cable first slide the rubber boots over the coax cable outside use 2 Strip the coax cable as shown below Do not remove the aluminium foil or fold it back 4 Cut away the plastic shield The result should look like the following figure example showing the indoor end of the cable Version 2 3 January 2009 Astra2Connect Point amp Play S
12. imuth To start horizontal pointing 1 Loosen the lock bolts 1 and 2 of the eccentric A 3 2 O 2 Rotate the eccentric 3 with the hex key until the letters A on the eccentric and the masthead point towards each other as shown in the figure above 3 Secure the lock bolts 1 and 2 4 Loosen the bracket nuts 4 You can now move the antenna horizontally Set the antenna to the average azimuth for your country as shown in the Antenna Pointing Information document Use a compass if required Attention For correct functioning of the compass do not use it closer than 1 5 meter from metal parts Astra2Connect Point amp Play Setup Manual page 36 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna 5 Slowly move the dish horizontally until you hear the highest possible continuous pitch tone Make sure to position the antenna in the middle of this highest tone range 6 Assoon as you hear this continuous high pitch tone secure the bracket nuts 4 Do not secure the eccentric A as you may damage it by doing so Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 37 Setting up the antenna A AST RA 2 Connect No Tone Check if your battery is not dead Persistent low pitch If you keep hearing a low pitch tone this might indicate one of the following issues Check if you have a clear line of sight and no building tree or other obstruction is blocking the path betw
13. n the screen of your PC as shown in the following picture Status Overview Modem State a pointing Correct satellite pointed optimally 0 0 dB below maximum measured level Demodulator 29 3 dBm EJ N 14 9 dB ASTRA 23 5 Sat 1E Software Version 1 7 12 0 Troubleshooting If the content of the IPmodem status page does not change anymore refresh the page manually Internet Explorer menu File gt Refresh Mozilla Firefox menu View gt Reload Chrome gt Refresh arrow If the status page does not reload reboot your IPmodem as described in the Terminal User Manual If you keep having problems with the installation refer to the Terminal User Manual on the CD Appendix Troubleshooting Guide Astra2Connect Point amp Play Setup Manual page 42 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Finishing installation 1 When pointing is completed you can turn off the Point amp Play Tool 2 Remove the TX cable from the Point amp Play Tool and connect it to the iLNB 3 Slide the rubber boots over the connectors 4 Use tie wraps to attach the cables to the feed arm Make sure to leave some slack on the cables The result should look like the figure below Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 43 Setting up the antenna A AST RA 2 Connect Confirming antenna pointing in the software 1 Back to your computer in the status page o
14. ning described below You will thus need to put on the headphone whenever needed during the pointing procedure A Ensure that the volume of the Point amp Play tool is not set too loudly otherwise damage to your hearing may occur Possible tones are Correct tone High uninterrupted tone correct tone The antenna points to the correct satellite and is receiving the strongest signal you have the optimal pointing position Higher interrupted tone The antenna points to the correct satellite but does not receive the strongest signal so far As soon as you hear this tone you are sure that the antenna points to the correct satellite Low uninterrupted tone The antenna points to a wrong satellite and receives the strongest signal so far Very low uninterrupted tone The antenna is not pointing to a satellite and has not been pointing to the correct satellite yet Astra2Connect Point amp Play Setup Manual page 32 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Setting up the Point amp Play Tool To set up the Point amp Play Tool 1 Remove the TX connector from the iLNB and connect it to the Point amp Play Tool 2 Connect the headphone to the appropriate port of the Point amp Play Tool 3 Make sure the Point amp Play Tool is turned on and the volume is high enough Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 33 nomenan A ASTRA 2Connec
15. nna pole If the pole is too high or does not have an open ending you will have to fix the masthead around the pole Do not attach the clamp too tightly as you will need to adjust it later on but make sure the clamp is attached tightly enough to prevent it from sliding down the pole Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 13 dunan A ASTRA 2Connect Make sure the masthead is already pointing in the general direction of the satellite To do so use the pointing data available in the Antenna Pointing Information document Make sure to attach the masthead upright to the pole Astra2Connect Point amp Play Setup Manual page 14 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna 4 Attach the dish to the masthead with the appropriate screws and nuts Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 15 Sige isaneans A ASTRA 2Connect 5 Insert the feed arm in the cut away at the bottom of the dish and fix the arm with the appropriate bolts Astra2Connect Point amp Play Setup Manual page 16 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna 6 Attach the clamp around the iLNB using the appropriate nut and bolt Do not to attach the clamp too tightly as you will need to adjust it later on Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 17 dga A ASTRA 2Connect 7 Slide and click the
16. nting Keep the space between the iLNB and the antenna dish clear Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 29 nom enan A ASTRA 2Connect Setting the IPmodem software to pointing mode Before you start The procedure below assumes that your computer is DHCP enabled that you will connect a single computer to the IPmodem If this is not the case or if you have another configuration you will find more information in the Terminal User manual on the CD in Appendixes Local Network Configuration and Changing your IP settings Before fine pointing the antenna you need to access the status page of the IPmodem 1 Make sure the IPmodem is turned on and properly connected to your computer with a network cable 2 On your computer start your internet browser for example Internet Explorer Chrome Mozilla Firefox Opera Safari The status page is located on the IPmodem itself You do not need an internet connection to access this page 3 Type 192 168 1 1 in the address bar of the browser and press Enter The status page opens 4 Depending on your situation If the status page contains a list with more than one pointing carrier keep the preselected carrier If pointing fails during the procedure you will need to select the other pointing carrier in the list and restart the entire procedure Pointing Click the Start Pointing button to Click the Skip Pointing button to start the p
17. ointing procedure skip the pointing procedure Do not start pointing without pointing documentation When asked by your service provider change the pointing carrier below Astra2Connect Point amp Play Setup Manual page 30 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna If the satellite has only one pointing carrier you will see the page below SHAPING THE FUTURE OF SATELLITE COMMUNICATIONS Ethernet Satellite Software ae Overview Modem state Awaiting installer action Software Version 1 7 12 0 Pointing Antenna Pointing Test Click the Start Pointing button to start the pointing _ Start Pointing Click the Skip Pointing button to skip the poit procedure procedure Do not start pointing without pointing documentation Interface Statistics e feee eens re omer Ethemet Interface 5 Click the Start Pointing button You can now start pointing the antenna Note Whenever you redo the pointing procedure select Antenna Pointing in the menu bar The button will be labelled Restart Pointing instead of Start pointing Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 31 Setting up the antenna A AST RA 2 Connect Using the Point amp Play Tool The Point amp Play Tool will help you point the antenna correctly During the pointing procedure the Point amp Play Tool can produce various sounds each having a specific mea
18. otate the eccentric 3 until the Point amp Play Tool produces a continuous high pitch tone 3 Secure bolt 1 4 Place the cap 4 on bolt 2 and secure it with the appropriate nut Astra2Connect Point amp Play Setup Manual page 40 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Fine pointing horizontal 1 Loosen the horizontal lock bolt 1 and 2 2 2 Rotate the eccentric 3 until the Point amp Play Tool produces a continuous high pitch tone 3 Secure the horizontal lock bolts 1 and 2 Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 41 Setting up the antenna A AST RA 2 Connect Checking the antenna pointing Perform the following checks to make sure the antenna will resist external movements wind 1 Make sure all bolts are tightly secured 2 Shortly place your hand between the iLNB and the dish As soon as you remove your hand you should hear the continuous high pitch tone again 3 Apply some pressure on the antenna to make the edges move about 3 cm on the left hand side right hand side and at the top then release it If the antenna is still pointing correctly you will hear the continuous high pitch tone again If not repeat the pointing procedure from the section Rough pointing horizontal azimuth page 36 until you obtain optimal signal 4 When the antenna is pointing correctly the message Correct satellite pointed optimallly is displayed o
19. stra2Connect Terminal refer to the section Getting to know your Astra2Connect Terminal in the Manual for Astra2Connect terminal available on the CD included in the box Indoors IPmodem and computer Put the IPmodem in a dry room Indoors you will need to connect the IPmodem To the antenna with the coax cable To your computer with a network cable You can use the network cable provided in the box or a cable of your choice for example if you need a longer cable to connect the IPmodem to your computer Toa wall outlet with the power adapter provided in the box Power adapter specifications universal input range 100 240 Volt 50 60Hz These steps are described further in this document Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 11 n A ASTRA 2Connect Step 2 Mounting the antenna pole When fixing the antenna pole on the base use a spirit level to make sure the antenna pole stands upright Astra2Connect Point amp Play Setup Manual page 12 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Step 3 Mounting the antenna 1 Fix the grounding screw with a masthead grounding nut to the masthead as shown 2 Insert the 2 brackets in the masthead as shown 3 Use the 2 pole clamps and nuts to attach the masthead to the pole Ifthe pole is low enough you can first assemble the masthead brackets and clamps and slide the assembly over the ante
20. t Rough pointing vertical elevation Important notes The procedures relating to rough horizontal and vertical pointing are described below in a sequential way In reality you will have to perform these two procedures simultaneously Whenever the procedure tells you to loosen a securing bolt or nut slacken it just enough to allow the corresponding element to move freely While performing this vertical rough pointing you will need to hold the antenna to prevent it from inadvertently losing its position In the Antenna Pointing Information document first check the elevation for the city closest to your location Elevation Astra2Connect Point amp Play Setup Manual page 34 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna 2 Loosen securing bolts 1 and 2 3 Use the hex key to rotate the eccentric E 3 until the letters E on the eccentric and the masthead point towards each other as shown in the figure above 4 While keeping the eccentric E in this position with the hex key set the dish to the elevation you found in the document Bolt 2 indicates the elevation In the figure above the elevation is set to 50 You can now remove the hex key from the eccentric E 5 Secure bolts 1 and 2 Do not secure the eccentric E as you may damage it by doing so Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 35 aiea A ASTRA 2Connect Rough pointing horizontal az
21. tenna 2 Inthe Antenna Pointing Information document look up the value that applies to the city closest to your position An example for three cities is shown in the table below 3 Set the iLNB to the angle you have found in the document In the picture below you can see the different iLNB positions for the three different cities 4 Lock the iLNB in the clamp by securing the bolt available on the iLNB Feed Scale ke Ku c gt O Your Country Satellite City 3o LETITI aa pet 20 m 0 50 40 30 20 10 g 706 Version 2 3 January 2009 Astra2Connect Point amp Play Setup Manual page 25 dngn A ASTRA 2Connect Fixing the iLNB Fix the iLNB in the iLNB clamp using the Parker screw as shown below Y If you need to change the position of the iLNB later first remove the Parker screw J Not doing so may result in damaging of the iLNB Astra2Connect Point amp Play Setup Manual page 26 Version 2 3 January 2009 A ASTRA 2Connect Setting up the antenna Connecting the iLNB to the IPmodem To connect the iLNB Interactive Low Noise Block downconverter to the IPmodem 1 Identify the cables marked TX and RX on the coax cables these marks are printed on the cables every 50 cm 2 Put the TX and RX connectors in the appropriate TX and RX jacks on the iLNB Make sure to use the outdoor connectors with rubber boots for the iLNB The outdoor connections need to

Download Pdf Manuals

image

Related Search

Related Contents

libretto uso e manutenzione caldaia ferroli bluhelix - schede  Kombi-Freezer - Taylor Company  Bedienungsanleitung  Bijsluiter  Samsung T220P Priručnik za korisnike    Operating instructions AVM – system remote control RC3  Zebra® TLP 2844 Desktop Printer  IBM FAStT200 (19k1121) Fibre Channel Controller  

Copyright © All rights reserved.
Failed to retrieve file