Home
        Untitled - PONAST spol. s r.o.
         Contents
1.                                                                92  Hydraulic scheme   1 x        SWH                                      ne nnn n nn i in 93  Electric connection of hydraulic scheme 1 x HC   SWH                                              1  09  31    94  Hydraulic scheme   1 x HC  SWH                                        nennen nennen nnnm nnn nnne nnne n nn n 95  Electric connection of hydraulic scheme 1 x HC  SWH Tank                                                  96  Hydraulic scheme   1 x HC  SWH Tank aa ann 97  Hydraulic scheme   1 x HC  SWH                                           nennen rine nnn n n in 98  Hydraulic scheme 2    HC   SWH Tank                                    99  Electric connection of hydraulic scheme 2 x HC   SWH Tank                             1 2 2 mnm 100  Hydraulic scheme Cascade   2    HC  SWH                                   1 1 21    4 nennen                       101  Electric connector  OLI BIS culos is cune aider Uere E Eb PE REY                                     102  Recommended installations of the boiler connection   combine heating                                    103  Block scheme of boiler el  connection Kpx2   clips                                                                      104  Block scheme of EXPANDER connection Kpx2   clips description                                              105  Electrical installation version for input 3 PE N  50 Hz  400 230 V      5                       106  Electri
2.                                                  89  10 9 FLUE GASES TEMPERATURE SENSOR ERROR                                            e nn 90       STOFPAGE  NOT        S dac imis a                         dU                          90  10 11  TUELSOGHORTAGEJN THE TANK                a aul delis E INI ne USE DM UNES 90       CLEAN TAE         t mE 91  1l GUARANTEE AND LIABILITY FOR DE EG DOE anne 91    Automatic boiler for biomass     Service manual    LIST OF FIGURES     Picture 1   Picture 2   Picture 3   Picture 4   Picture 5   Picture 6   Picture 7   Picture 8   Picture 9   Picture 10  Picture 11  Picture 12  Picture 13  Picture 14  Picture 15  Picture 16  Picture 17  Picture 18  Picture 19  Picture 20  Picture 21  Picture 22  Picture 23  Picture 24  Picture 26  Picture 27  Picture 28  Picture 29  Picture 30  Picture 31  Picture 32  Picture 33  Picture 34  Picture 35  Picture 36  Picture 37  Picture 38  Picture 39  Picture 40  Picture 41  Picture 42  Picture 43  Picture 44  Picture 45  Picture 46  Picture 47  Picture 48  Picture 49  Picture 50  Picture 51  Picture 52  Picture 53  Picture 54  Picture 55  Picture 56    Diagram of the products and description of the main parts                                    1        1                               9              decer HP Em 10  E2008 Control             x oss erat                                                    11  RJIE2008 CONTO                                                    SETTE 13  RJE2008 Control unit    
3.             JL JL            Automatic boiler for biomass  KP 12  KP 12    KP 22  KP 22E  KP 62  KP 62E  ay             PONAST s spol  s    Service manual         CZECH REPUBLIC  tel    420 571 688 188  fax   420 571 688 115  e mail  ponast ponast cz                                      Automatic boiler for biomass     Service manual    Manufacturer   tel   420 571 688 188   fax  420 571 688 115  e mail  ponast ponast cz    We would like to focus your attention mainly on the following chapters     number 1     Important notes  number 6     Putting the product into operation  number 7     Maintenance and attendance of the boiler during operation    The boiler has been approved for operation in the Czech Republic and in 27 EU countries by the State Testing  Institute  state testing plant number 202     TABLE OF CONTENTS      i i a Eat  Ip  ko me rrr erc 1   IST           nn sav MEM UAE RI DU MEE E MU M aM          etna MUN OL MM                             3                    mere Tc mr 4  MEN L8 401  WEITE rcc                      5  4          THE BOILER AND ITS ADVANTAGE en ee ae 6  3                          INE BJILER KP                                                   7  5 STRUCTURAL DER OF PRODUC                          AV GERE FR Dua        8  4 1 BOILER BODY  SCHEMA OF THE PRODUCTS AND DESCRIPTION OF THE MAIN PARTS                         10         DONTBOLGISTEM OF THE BOIER eee er er                   ee 11  4 2 1 COTO AE 20  gt     r   E                          
4.            12  4 2 2 TE ZOOS Te                                      ITI 16  4 2 3 Epad 2 DR M 17   4 3 BURNER HEATING CHAMBER INCL  FEEDER F1 WITH INDEPENDENT DRIVE                        eene 19  0          Je err 22  49 F1 FEEDER WITH INDEPENDENT DRIVE  FROM FUEL STORAGE nn a a TAa         EA AE        23  4 6 BOILER SHEATHING INCLUDING HEAT INSULATION                               23       ZLEITING 1      HER 26  4 7 1        Fe MOV all seen S 26  4 7 2 Heat exchanger Cleaning    an 26  4 7 3               CONAM OT      t TODO r 27      FLORE N                                        28  qo STANDARD ALU CES ORIEC                                  Mu Miam ipM Ed uM EDAM MU 28  4 10                 LE        een een ee 29  4 11        gt     a ee er                  29   5 PLACEMENT OF THE PRODUCT IN BOILER ROOMS  PRINCIPLES OF INSTALLATION                                   31  Sd PLACEMENT OF PRODDGTS IN DOLLER ROOMS                                                             nt FP o PHAR                   IE SUP TER      31  5 2 SAFE DISTANCE FROM COMBUSTIBLE MATERIAL 2    ee 31  5                             rnc 31  5 3 1 Heating System ana  DOE            EO Ot E 31  5 3 2          er                                                               31  5 3 3                            saccis        oui ende          32  5 3 4 csi                                                                            32  5 3 5 Protection against                                  er        
5.        UN INS DTERUUR DEN INT UE E OD UO I MIN IVSUE           32                              nC ENT 32       BOILER ROOM VENTILA po  32      PULING THE PRODUCTS INTO OPERA                                  ei ee 33  DI CONNECTION TO THE Eee AE 33       NT IN OF THE BURNER nee 34  6 3 INSTALLATION OF THE CERAMIC CATALYTIC REFLECTOR 2    u ea 35  6 4 INSTALLATION OF SECONDARY CERAMIC ERATE ee    ee 35  on E Apo SE TION            NEL een 36     CONNECHON OF ELECTRICAL PARTS een 37  5 7    CHECKING TASKS BEFORE BOILER FIRST OPERATION    ee 37   7 BOILER SERVICE AND MAINTANANCE DURING OPERATION                            2   2 1  1   1     6 6                           nnns 38              18                                                                            90           38  7 1 1 Molise es                                                                    38  7 1 2 Emptying the external ash CONCAINCIS a 9                 38  7 1 3 Flue gases exchanger cleaning                                                                                                                                                                       39   Je MAINTENAN Rt et 39  7 2 1 Burnt gases exchariger                                             en 39  7 2 2 Burner grate ClOAMING 2559  x denset cnet eI nr ae nem nee 39  7 2 3 Ceramic Grane Cleaning                     S LI IUE 39  7 2 4 ANNUAL QUIGIG ETE OO EET 40    Automatic boiler for biomass     Service manual    7 3 OPERATING CONDITIONS  
6.     Papst  Type5  RG14S  Manufacturer ZIEL ABEGG  Type6  RG12S  Manufacturer ZIEL ABEGG    The selected mode in which the fan will be used by the control unit will be confirmed by pushing the key         ENTER  The following script will appear shortly on the display unit    Control unit will than return to menu  gt  1          main fan  lt     Important  Selection of the correct type of fan is important for harmony of the adjusted air quantity on the  display unit with the real rotations of the fan  If a wrong type has been selected  this dependence is not linear  and may result in incorrect aeration and thus in wrong operation of the boiler in course of burning    Note  Check of the correct selection of fan can also be done by listening  Change the rotations of fan by 10  9o  see chapter 5  in the manual operation and check whether the adjustment of the control unit is changed  linearly  If the type of fan has been adjusted incorrectly  step change of rotations appears at certain adjustment     9 4 9 2 Menu 11 9 2        fan type    In this menu the manufacturer or the service technician will set the flue fan type being used     MENU 11 9 2     Flue fan type will show on the display by using the    f    U arrows  We enter the menu by    pushing the         ENTER button    gt  1  Select FI       lt     After pushing the        ENTER button the display will show the currently selected flue fan type        We can switch to different type by pushing           U arrows     The ma
7.     Temperature lower limit lower limit of the temperature for the parameter Temperature ue DO DO 55  Temperature upper limit upper limit of the temperature fot the parameter Temperature AG 80 80 80  Number of samples Set up number of samples for reading and followed by temperature display  Feeder 1 limits time limits for running of the boiler in needed output levels  Feeder on low limit lower limit of the parameter F1 turn on Sec 5 5 5  Feeder on upper limit upper limit of parameter F1 turn on sec 5 9 8  Feeder off low limit lower limit of parameter F1 turn off sec 24 25 20  Feeder off upper limit upper limit of parameter F1 turn off Sec 90 60 61  Pump limits temperature limits for start of circulation pump of the system    Lower limit lower limit for temperature range for parameter Pump on Temp   C DO 55  Upper limit upper limit for temperature range for parameter Pump on Temp       70 70  Absolut limit temperature  in which the pump is allways in running aside from other conditions of the boiler running   C 85 85  Pump run   out time period  in which is pump in running after changeover of the boiler into STANDBY state min 4 6  SWTank pump limits   Temperature limits for starting SWTank pump of the system  Lower limit lower limit of the temperature range for SWTank pump on      55 DO  Upper limit upper limit of the temperature range for parameter SWTank pump on      70 70  Absolut limit temperature  during which is allways circulation pump in running aside from other condit
8.    Automatic boiler for biomass     Service manual  If the key      ESC is depressed before the first or second confirmation of PIN  this PIN will not be accepted         return back to the main menu will be performed  The original PIN will remain in force    Note  The service PIN is set by manufacturer   Note       the PIN has been changed by the user  this code has to be stored well  If the PIN is lost  an  intervention of the producer s employee is necessary     Note  The PIN may contain digits 0 9  lower case letters from the a z alphabet and upper case letters from  the A Z alphabet  It is not possible to break through via the trial and error method a PIN entered by means of  this combination     9 4 9 Menu 11 9 Setup Fans    The producer or the service engineer will adjust in this menu the type of the fan used  The user does not work  with this parameter     MENU 11 9 Select Fan will appear on the display unit after the PIN for the Producer menu has been correctly  entered    By pushing key       ENTER we will got to menu  9 4 9 1 Menu 11 9 1 SELECT FAN    The following script will appear on dispay    By pressing key       ENTER the following script will shortly appear    This menu may be changed into a different type with cursor arrows    10     The producer may deliver one of the following types of fans                ES 30 98  Manufacturer REGULUS  Type2  ES   108  Manufacturer REGULUS  Type3  RGL     97  Manufacturer EBM     Papst    Type4  G2E120  Manufacturer EBM 
9.    ENTER button we turn the function ON     The previous function will be turned off automatically     Note  If this function is selected  the name of the output in Menu 1 7  Direct control  will be changed  It will  say TO1 ON OFF     Note  If this function is selected  the output function XV9B will changed  The output will perform the room  thermostat PO2 function     Return to MANUAL mode by repeatedly pushing         AESC button or you can continue in your menu selection  with the           U arrows     We switch functions by pushing the    ff   U arrows     By pushing the        ENTER button we turn the output function ON     The previous function will be turned off automatically     Note  If this function is selected  the name of the output in Menu 1 7  Direct control  will be changed  It will  read switching pump ON OFF     Note  for configutation of K17 2 follow same instruction as for K15 1 output configuration     9 4 14 2 Menu 11 14 2 Configuration K17 2    There are the same instruction for configuration of output K 17 2 flue fan as are for K15 1    74    Automatic boiler for biomass     Service manual    9 4 14 3 Menu 11 14 3 Diference of return    If there is a configuration of any outputs KP 15 od KP 17 2 as a shorting pump  tenperature diference set up  between water output from the boiler and temperature of return affects switching of the pump  If the  temperature difference will higher than the set up difference the pump will be operating     Note  The boile
10.    It is prohibited to notify the user or unqualified operator of the PIN  Unskilled intervention in  adjusted parameters may result in operation of the boiler outside the permitted operating  conditions     MENU 11   The service will show on the display after a short note   MAIN MENU  The setting can be changed by    the  f       arrows    gt  11  Service lt     By pushing the       ENTER button display will show     Use the cursor arrows    f   gt    to determine the user s PIN number  code combination  or the value of a  particular parameter      ff   increases the number value in steps of  1       reduces the number value in steps of  1        gt    moves to the neighbouring digit to the right        moves to the neighbouring digit to the left   Confirm the adjusted number by pushing the key       ENTER    The adjusted value is not accepted by pushing the key     ESC or we will return back to the previous menu  It is possible to change a blinking value or digit    A parameter value confirmed by the key       ENTER  will stop blinking and is accepted for operation of the  control unit     If the PIN value entered is correct  the following script will appear shortly on the alphanumeric display unit       If the PIN value has been entered incorrectly  the following script will shortly appear on the alphanumeric display  unit       Access to the menu for SERVICE is not allowed     Note  The service PIN is set by a manufacturer   Note  If the PIN has been changed by the servic
11.    Operation of Feeder 1 is turned off by pushing the key         ENTER    Note  Because of operation reliability and safety Feeder1 can be turn on only if Feeder2 is running   9 3 1 2 Menu 1 2 Control of feeder F2    The following will be displayed on the display unit    Turn the Feeder 2 on by pushing the key    gt  ENTER The following will be displayed on the display unit    Operation of Feeder 2 is turned off by pushing the key       ENTER     Note   Manual control of the feeder has to be used if you run out of fuel and all transportation ways are  empty  see chapter 7 10  LACK OF PELLETS IN THE BIN      48    Automatic boiler for biomass     Service manual    9 3 1 3 Menu 1 3 Control of fan    The following will be displayed on the display unit    The value of revolutions may be changes by cursor arrows        gt    increases revolutions of the fan by   1           reduced revolutions of the fan by  1    Keys         has a autorepeat function        in  after a longer pressing automatic repeating of pressing     The fan will be turned on after the key    gt  gt  ENTER is depressed  The following will be displayed on the display  unit    The value of revolutions of the fan may be increased     gt  or reduced      during operation   Operation of fan is turned off by pushing the key         ENTER     9 3 1 4 Menu1 4 _ Flue fan control  The display will show       vv     currently selected fan revolutions   We can change the revolution value with the cursor arrows       2   
12.    We enter the menu by pushing the         0U arrows     By pushing        ENTER button to enter the time lag in minutes after which the control unit will carry out  comparison between the boiler water temperature and that of burnt gas      Range  TT 0 99   The time lag is adjusted in the same procedure as mentioned above in this chapter     Note  When the boiler is leaving the STADBY state    The value of At   Reference temperature is always assessed after the boiler leaves the STANDBY state for the  mode AUTO  AUTOx under the working modes of MODULATION or SW Tank at the previously programmed  instant of time    If the At   Reference temperature is exceeded  the boiler resumes its operation  if the value is lower than or  equal to At   Reference temperature  the control unit will stop operation of the boiler and the script STOP no  ignition will appear on the display unit     Note  Measurement of burnt gas temperature is only in operation  if the reference temperature is adjusted to   gt  0  MENU 11 5 8   If the reference temperature is adjusted to 0  the check programs are put out of operation   switched off     Important  Neither the user not the operator are allowed to have access to this menu and they may not  change the parameters adjusted     64    Automatic boiler for biomass     Service manual    9 4 6 Menu 11 6 Pump on temp    Will determine the boiler water temperature at which the circulation pump of the system will start working     MENU 11 6 Pump on temp will 
13.    Wi  Wi     wi wi                         lt                                                       number of WL  identification  P 1  cross section 5Cx2 5 4  5    2 5  junction box  cross section    schematic  symbol  equipment  identification  name of  equipment    location of  equipment    NOTE   type of version      closed protection  IP55       switchboard Boiler KP xxE switchboard central grouding    boiler    2 4  3 0  kW    protective                                                   r   bod    2 4  3 0  kW    connecting  switchboard    min  3 2 kW    switchboard    bonding  2 4  3 0  kW  as per possibilities     5 per location  and location in the building            boiler room  as per possibilities  of the building    as per possibilities  and location  in the building    as per the  customer s  requirement       in the building       open protection  1  20 Voltage system    dimensions    3 PE N  50Hz  400 250 V  TN S   division    Protection against dangerous contact voltage    supply  from the top via automatic disconnection from the source  outlets  down Increased protection    operation  by electrically instructed persons via additional bonding    Picture 53 Electrical installation version for input 3 PE N  50 Hz  400 230 V  TNS    90T    3 PE N  50Hz  400 250 V  TN C S           EP1C2510           FA 1  L7 25 3 B                m                                                        0            p  number of WL WL  identification  P 1 2  CYKY CSSS CSSS  cros
14.    message        FLUE SENSOR ERROR    The boiler operation will not be stopped     Faulty temperature sensor Replace sensor     Reactivation   After faulty temperature sensor replacement by authorized service  the error indication will automatically  disappear        10 10 STOPPAGE     NOT IGNITED    This is an error message informing that during the electric ignition process the needed flue gases temperature  increase did not occur  This situation is evaluated as if the boiler was not working   This situation is indicated by a display message     Insufficient fuel volume in the burner Check fuel supply in the tank  Check feeders functioning    Check setting of the parameter Period of adding fuel      extend it    Fuel not ignited in the burner Time period in parameter Heating period too short      extend it    Fan output too high     lower it  Faulty ignition spirals     replace    Error indication even when boiler is   Lower the parameter value Control temperature  burning    10 11 FUEL SHORTAGE IN THE TANK       This will cause boiler fire extinction  This is not a dangerous occurrence  This state is not indicated in any way on  the boiler control panel  The boiler will assess the fuel shortage with a certain delay  If the water temperature  drops because of boiler fire extinction  this situation is assessed as    If the boiler runs out of fuel before switching to the stand by mode and the boiler fire becomes extinct in this  mode  this is assessed as     Insufficient amo
15.   FlueF100  on6 off38 F035  FlueF070      7 off35 F045 FlueF080        off29 F055 FlueF080  on8 off28 F070 FlueF080  on8 off26 F085 FlueF090  0  8 off24 F090 FlueF090  on8 off22 F095 FlueF100  on8 off20 F100 FlueF100       on5 off28 F051 FlueFO  onb off24 F055 FlueF0    on9 off29 F051 FlueFO  on9 off25 F057 FlueFO    on8 off24 F090 FlueF090  on8 off20 F100 FlueF100    SWT Tank program  Program chimneyer    settings parameters   F1 off  F1 on  FAN  settings parameters   F1 off  F1 off  FAN    Advance set time period  in which F2 starts before F1    113       Ruin                   set time period  in which F2 stops later than F1  Standby time time period  in which automatic boiler is not actively burning      for 90  of nominal boiler output for heating HUW    for 100  of nominal boiler output for temp  of exhaust gas          Sec  Sec  min    11 5  Firing parameters parameters for automatic mode of el  Ignitions   11 5 1  Red   hot time time  when heating spirals are working min 15 15 15 15   11 5 2  Feed time support overthrust of optimal quantity of fuel into burning area for ignition Sec 180 200 200 200   11 5 3  Fan turning on or off of the fan while in ignition 1 1 1 0    11 54  Fan revolution set up of quantity of air which is needed for ignition and flare of the boiler   40 40  11 5 5  Flue fan turning on or off of the fan while in ignition 0 0 1 1    11 5 6  Fan revolution turning on or off of the fan while in ignition and flare of the boiler   XXX XXX 60 50   11 97  
16.  13 3     We enter the menu by pushing the         0U arrows        Here we set the number of Nr  1 feeder cycles  after which exchanger cleaning will commence  The outfeed spiral  screw will operate for a period defined in the following menu     Select this menu by pushing the         ENTER button and this message will appear     11    By pushing the    gt  ENTER button again we switch to the time period setting of the outfeed spiral screw          time is set in minutes    cc is the current value  CC is the new desired value and it is flashing    The current time period of the ash outfeed spiral screw can by adjusted by the    ff    arrows    Set value confirm by pushing key     gt  ENTER    Return to Menu 11 13 3 by pushing the     ESC button  We enter the menu by pushing the           U arrows     Here we set a time window  in which we allow regular flue sweeping  It is not recommended to perform flue  cleaning at night because of possible noise     Enter the time period setting function by pushing the        ENTER button     The desired time parameter can be set by pushing the         gU arrows       1   increases the desired time parameter by  1 min          decreases the desired time parameter by   1 min          switches to previous time value      2   switches to following time value   Confirm the newly set value by pushing             ENTER button  The time value will stop flashing and will be  saved in the boiler memory for automatic mode operation     Return to Me
17.  15    Automatic boiler for biomass     Service manual    OPENTHERM  connector XV3B  is a standard physical layer linking elements supporting the HVAC  Heating  Ventilation Air Condition  interface     4 2 1 4 Description of programming interfaces  Programming of the control unit can be done either by the ISP interface  service connector XV10  or by JTAG    interface  connector XV14   For programming and monitoring from a PC it is necessary to use the PROG3  programmer     4 2 2 TE2008 terminal    The TE2008 terminal in the E2008 system is equipment programmable by a customer designated as a  man      machine  interface  It is designed for placement on the front of the equipment for communication with the boiler  operator or the service technician     4 2 2 1 Technical data    Supply DC 24V   Input from source max 1A  type 0 5A  Dimensions 182 x 142 x 25  Weight   0 9kg   Protection class pursuant to norm CSN 33 2000 4 41    ed  2 2007 II     voltage SELV    Shielding pursuant to CSN 60529 IP31     independent unit  IP65     after integration      Basic characteristics setting pursuant to norm CSN 33 2000 3   AA5 temperature  5    40   C  AB5 temperature  5    40   C  humidity 15     100   BA5 people skills   knowledgeable  BC3 contact with ground     frequent     Described in detail in E2008 documentation       This equipment is designed in accordance to norms CSN EN 60335 1 and CSN EN 60335 2     Classification in accordance to CSN EN 55014 2  Category II     4 2 2 2 Descri
18.  2  K18 1               SIFH 3Gx1       MODEM EXPANDER    MC 35i EEX2008 230 V  40 90 VA       EEX X4  X9    Picture 49 Electric connection   others    COT    Picture 50                 Sol  rn    stanice  u  ab              m    Regulace       sol  rn  ho  syst  mu       Recommended installations of the boiler connection   combine heating                            2       gt     C2  lt     C CO      C CO         C3            C3 C2 CO    C2                          SCHEMATIC DIAGRAM INSULATING BARRIER 1     os      4 s    FRONTSIDE OF THE BOILER    2 Ir     gt 2        222222222   INSULATING BARRIER 2 Y 3   lt  24 0    2211  5         2  XV13B      ES 1 ge    T           ed 1  38 zt T  gt  POWER SUPPLY  24    BUHL Bg IN x   nn    Ps        0      5    2 2 COMMUNICATION LINE RS485    0  ki      S               le 4 LAMBDA PROBE 0            gt   MEATSENSORWATERINPUT     4      1 i    24     _                                 EM E    1        HEAT SENSOR AFTER MIX      i JURNER HEAT SENSOR        HEAT SENSOR FOR CONBUSTION 525                     JTAG      MAIN SWITCH   i                   0    j     PROGRAMMING LINE  1    ETHERNET 7        1         1 0   0                  i      1 1  lt   i i                    AQDAO  ZPD       E Ela   4                l 0    0      t EIL 2 K28 i    1 I      DS2Y S DC24V                             ris    B PE              13    0  I   K28   0  en i       4       05232        MODEM  ul      RUM    BETES    ZEN    i    yyqqu 37 IHE SENSOR OF
19.  50Hz  The core of the system is the  RJE20068 unit  Control is possible either by specialized terminal TE2008 or by a touch screen terminal MTSO6TV   Communication with the RJE2008 control unit is provided by the  MODBUS  communication protocol and it can  use the physical layer RS485 for its communication     The terminal is power supplied from the control unit  which contains    DC 20 24V max1A supply source  If we  use a different terminal from the one supplied by the manufacturer  the terminal may have different electrical  supply  Tf the supply voltage or the maximum terminal demand is outside the listed range  special supply must be  provided  The number of inputs and outputs  control of remote units  reading data from a distance  can be  increased by using the EEX2008 expanders  The communication between the expander and the control unit is  provided by the RS485 bus     The E2008 algorithms can operate in real time  A remote control and incorporation to a higher up system are  possible with the help of a standard communication interface  Even mobile phone service is implemented  The  option of recording all activities by    BLACKBOX    is built into the system     4 2 1 Control Unit RJE 2008    The mechanical construction of the control unit is based on a standard 19  case  terminals have a  panel type  design  and are encased in the equipment covering with a high degree of shielding     To communicate with outside units  the E2008 control unit is equipped with the f
20.  7 2 FUEL No  2    12 7 3 FUEL No  3  12 7 4 FUEL No  4    12 7 5 FUEL No  5    12 8 RROTARY SENSORS  12 9 GSM MASTER 12 8 1   51   TIME    12 10 CANCEL SERVICE PIN 12 8 2 RS1   PULSES    12 8 1 RS2   TIME    12 8 2 RS2   PULSES    Picture 38 Operational block diagram   Producer    76    Automatic boiler for biomass     Service manual    The producer or an authorized service engineer adjust in this Menu types of connection equipment  limits of  individual parameters so that they correspond to a particular product and prevent the operator from setting  parameters which might damage the product  for example  by output overload     MENU 12 Producer will appear on the display unit after a short notification   MAIN MENU  and adjustment to this  menu with the cursor arrows       U   The following script will appear when the key     gt  ENTER is pushed    A script in the following format will appear by pushing the key         ENTER     The PIN producer s number  code combination  which enables access to the user menu is determined by the  cursor arrows             U The adjusted        value is confirmed by pushing the key     gt  ENTER     If the entered PIN value is wrong  the following script will shortly appear on the alphanumeric display unit    The program will get back to the level    The PIN entering procedure has to be repeated        If the entered PIN value is correct  the following script will shortly appear on the alphanumeric display unit    Note  The PIN may contain d
21.  BASIC DISPLAY en 42  8 DISPOSAL OF PRODUCT AFTER THE END      ITS SERVICE LIFE  anne 43                      p MER                                                                   43        LCS zs PRA dU 43                                         DUREE GE TEEN Ru      Era ERE 00 44  91  USER SETTINGS   MAIN MEN  iecotitrkcxnaunndxtvad ae ea nena ERA AER E DH RA cvi 44  92 OPERATION MODE SELECTION                                  ee                 dva REI DNO d tuU EQ dT ME Ya GR            46    2               ret                         48  9 3 1 Menu I TT ACN                  48  9 3 2 Menu 2 Output water temperature setup                            1    1 1    nn nnne nnn nnn ne nnn                 51  9 3 3 Menu    Language selection                                                                                                                                                                                   51  9 3 4 Menu g                                    51  9 3 5 Menu 5 SW Tank active                                                                  52  9 3 6 Menu G                          o o D ITEM 53  9 3 7 Menu 7 Suplemental electric                                                                     rien nenne nnn nnn nnns 53  9 3 8 Menu 9  GSM                issus sura senate anna Fama                       PI RCM UR                     54  9 3 9 Menu 9 The equithermal                                                                          56  9 3 10 Menu
22.  EMT ut                             57                 SERVIS                 ubi NINE piii des                     Ru PUER               57  9 4 1 Menu 11 1 Prog ANS energie ee 59  9 4 2 MIS M MEAE N C           60  9 4 3 Menu 11 3 IR      ea ie          eu ticles ola        IR PEE Pe bes 61  9 4 4 Menu LLA                  Rr                               Q 61  9 4 5 Menu 11 5 FIImnd DararBeleE S  ein ana aka dd la diri Fa PUN CHE Kad bU D CE          61  9 4 6 Menu 11 6   Putnp  on                                65  9 4 7 Menu 11 7_SW Tank pump On e euere 65  9 4 8 Menu 118 Tete TO Dtm 65  9 4 9 Menu 11 9 Setup Fans       ico ites a a    ME dvi    66  9 4 10 Me  nu 11 10  BOUNCE OUT U Einer 67  9 4 11 Menu 11 11 Equithermal regulation                             01 2  2       6 6   6                  nun        nennen nnn nennen 68  9 4 12 Menu 11 12          an ON ee een 70  9 4 13 MEM ILIS               CEANN sorka    EO 72  9 4 14 Menu 11 14 COMM OUIATON  sun na a na nw vba ee vu rS TRES 74  9 4 15 Mener 11 15     PISA ETE ETT mm 75  Sa lee SERE                                             76  9 5 1                   EI I m m e                       77  9 5 2 Menu 12 2 Water temperature                                               77  9 5 3 Menu 12 3 Feeder   1 MMS              QUE cuv RE a Kw E Er weY Ek EQ PERI                           en eh EK T               78  9 5 4 Menu 12      PUA           een een 79  9 5 5 Menu 12 5  5W Tank            nennen 81  9 5 6 Menu 1
23.  FEEDER 2 4         e 3        SENSOR OF FEEDER 1      ME   XV11B  gt      0 KT 2 RESERVE 4 c  eS f bs2v s oczav                4     ei XV8B       amp        gy     XV9A  22 ime      ul       RESERVE 1 MEE           5  XV9B   39    Fre          3             EE       B et  7               s       5 2 Q  Um id                          i  Lee deep rds eu           emi  S      omm mri Zn  lt  lt    1                     iuga  P    3 PUMP X  ae  eee        ERN m    13                   16  i        I 3  DRAUGHT CLEANING      K14  PE         L         ASHREMOVAL 9       E PE 5    L                                         0  P       en L     men     1    Q                           x  PE K23 2         4     15 2 i I SERVOMOTOR D  2                  pUMPOFSWTANK         1          LBS 2                 E    7      I 3 FLUE FAN                        E          PI y m          LE nil mm 2    o  1                             x             rd 6  1           I         EMERGENCY THERMOSTAT         OF FUEL TRACKS    L  t POWER SUPPLY 230V    104    Picture 51    EXPANDER        2008                L   x     RS 485  o ser He    PE 0   4  L        BINARY INPUTS  EXTERNAL     with support power of 12V  PROTECTION FU 1     XV2   O  openen collector   16B        3 O RELAY OUTPUT    3  4  OUTPUT 2301   6A  O    3    OUTPUT 230V   12A       Picture 52 Block scheme of EXPANDER connection       2   clips description    m                3 PE N  50Hz  400 250 V  TN S           FA 1  L7 25 3 B      
24.  FROM FUEL STORAGE     F1 feeder delivers fuel from fuel storage to the burning chamber  It comprises of a pipe delivery path with an  overflow part and an end sleeve  The feeder is built into the fuel storage under an angle  which cannot exceed  450  If the angle was any bigger  fuel could be dispensed inaccurately  The transporter has its own electric drive   which is controlled by the control unit  The feeder is supplied in various lengths accommodating specific types of  storage tanks     Feeder F1 and F2 gearboxes are equipped with impulse sensors  which ensure safe operation of the boiler     Feeder F1 set comprises of     4 5 1 Body of feeder with flange   4 5 2 Axle less spiral  diameter 38 mm in KP12  KP22  diameter 56 mm in KP62  4 5 3 A small bar for mounting of the spiral   4 5 4 Motor and gearbox   4 5 5 Connecting hose to F2 feeder   4 5 6 Impulse revolution sensor    4 5 2       4 5 4      lt p 4 5 6    A    Toj             4    Picture 17 Feeder 1    4 6 BOILER SHEATHING INCLUDING HEAT INSULATION    The product sheathing is manufactured from steel sheet metal  It is painted with durable paint applied with the  powder painting technology  KOMAXIT   which is highly resistant to outside conditions and ensures long term  perfect look of the product  Heat insulation 2 or 8 cm thick is done with heat insulation ROCKWOL boards     The sheathing consists of the following parts     4 6 1  Left side plate     including coverings  4 6 2  Right side plate     including co
25.  MODE on the keyboard and also  directly control individual parameters with cursor arrows  lt  If     IV        AUTO  MANUAL  Switching between automatic operation and manual mode is done with this button   Yellow LED near the button is on in the AUTO mode        MODE    By pushing this button repeatedly  we can select the boiler operation mode  The display will successively show    these signs        Currently selected mode is confirmed by pushing the      gt  ENTER button  The control system will switch to  MANUAL MODE    Switching to automatic mode is done by pushing the button    AUTO MANUAL    AUTO mode represents automatic boiler operations based on firmly set output  the output value is selected by  the service personnel     MOD mode represents automatic boiler operation  The control unit automatically changes the immediate output  to one of ten output levels to fit the needs of the heating system in the best possible manner     EQT mode is an automatic boiler operation with heating water of defined temperature being let in the heating  system  The heating water temperature depends on the outside temperature and heat properties of the facility  being heated  The control unit automatically changes the immediate output to one of ten output levels to fit the  needs of the heating system in the best possible manner     Note  We can switch modes in any random moment of boiler operation   Note  If a mode with automatic output change  MODx  EQTx  is selected  the yellow LED n
26.  NN CN       9 4 12 Menu 11 12 Modulation    Power output modulation is an automatic mode of the boiler in which the control unit changes the power output  as well as the other operating parameters automatically as per the existing need for temperature in the building   The goal of this operating mode is to reach a balance between the heat requirement of the building and the  amount of heat manufactured by the boiler     The program uses automatically the power output values set up in memories 1   10 so that the frequency of  undesirable Standby states     Important note  Some parameters is set for the specific fuel type for the mode modulation  The fuel is  selected up front in menu 10     MENU 11 12 Modulation will appear on the display unit after the PIN for the Producer menu has been correctly  entered and after set uo to this menu has been done by cursor arrows   11     After pushing the         ENTER button a short message will appear     return to set the program  on which the boiler will start to heat after starting the moduation   9 4 12 1 Menu 11 12 1 Starting program    We enter the menu of starting program by pushing the    ff    arrows        By pushing key        ENTER we will enter set up of the program where the boiler starts heating after       modulation has been turned on          Using the cursor arrows     lt         gt     determine the new number of the starting program which will be in force  after it has been confirmed     Confirm the newly set up val
27.  Tank is active see chapter 6  SW TANK  ACTIVE    42    Automatic boiler for biomass     Service manual    8 DISPOSAL OF PRODUCT AFTER THE END OF ITS SERVICE LIFE    Product is made out of materials the waste of which does not have any hazardous properties     The following main kinds of waste will be generated after the end of the product 5 service life     Steel exchanger  jacketing  feeders  bin     waste code 170405  category O   Heat insulation  ROTAFLEX  SIBRAL      waste code 170604  category O   Ceramic grate  reflector and plates on door     waste code 170103  category O   Control unit with sensing and control elements     waste code 200136  category O     8 1 NATURAL PERSON    Shall perform disposal of the product as follows     8 1 1 Steel waste shall be sold to the nearest scrap yard   8 1 2 Heat insulation and ceramic parts shall be disposed of as mixed municipal waste   8 1 3 The control unit with sensing and control elements is subjeck to return collection     Return collection takes place in seller s plant  where was this product purchased or at the manufacturer of the  boiler  Return collection is free of charge     In accordance with current requirements of environmental protection the electronic parts of the poduct does not  contain lead     Still do not dispose el  equipment as a municipal waste     8 2 LEGAL ENTITY    Shall perform disposal as per Act no  185 2001     Act on wastes as amended  Waste shall be sorted as per the  kind and category  see main 
28.  boiler is operating in mode of electrrical ignition by values of parameters in specific program set up in MENU 6   and service menu      AUTO   gt I lt  blinking   boiler is operating in the mode of electrical ignition and el  spirals are in this process     MOD1  2 10   Boiler is operating in automatic modul mode by values of parameters stored in memory of CU  in MENU 2  5  6   and service menu      EQT1  2 16   Boiler is operating in automatic equitherm regulation mode by values of parameters stored in memory of CU  v  MENU 2  5  6  9 and service menu  and by outside temperature    SW Tank  the boiler is working in the automatic mode of hot service water priority heating as per the values of parameters  saved in the memory P10  MENU 5 5  and service menu      MANUAL  Boiler is not not working in manual mode  In Menu 1     Direct control     is possible to control individual parts of  the boiler and monitor inputs stages     STANDBY  quiet mode of the boiler when the boiler is not burning actively  Boiler is ready on the basis of implus from  surrounding equipmnts  thermostats  GSM Modem  to restore the supply of heat      AUTO    blinking   indicates an ongoing process of adding and igniting of fuel in the boiler operating mode without automatic  ignition under the STANDBY state      B    indicates situation when the heater s thermostat is switched in     active  Blinking letter B will be displayed on the  display unit outside the periods of time adjusted in the MENU 5  SW
29.  burning or not    The ongoing routine of Automatic Ignition may be terminated only by the operator by switching over to the mode  MANUAL  Service is than responsible for the correct set up to a automatic operation     Note  If the boiler is working in the mode AUTOx  MODx  EQTx or SW TANK and power supply is  interrupted the boiler will start with the electric ignition routine after the power supply is resumed       CHIMNEYER   the key is used for service measurement during periodic checks of combustion products  Having the    key been depressed  the boiler will start heating at the adjusted output of the boiler and on the programme  entered in the service menu as program chimney     47    Key    CHIMNEYER is possible to press in any automatic modeu     AUTO    C SETUP    4g  CHIMNEYER 11 22    MIX 045 SRV 008    AUTO   MANUAL    wor E       0                     sam  J    peiie    MODULATION       SETUP  4g CHIMNEYER 11 22    MIX 045 SRV 008              E     o  moe        o               o    staat 8         Automatic boiler for biomass     Service manual    GSM    FAN  MAIN FLUE    1    EQUITHERM        SETUP  4g CHIMNEYER 11 22    MIX 045 SRV 008    AUTO   MANUAL              moe           ourPur EJ m    staat 8    preii       By re pressing key   CHIMNEYER boiler goes in to mode  in which it was before mode CHIMNEYER     Note  The control unit only operates in this mode  if the boiler is not in the STANDBY state  chapter 8     For correct operation  it is necessary to 
30.  for information and depends on the precision of fuel dosing     Note  Conversion of output is always carried out after a change of fuel dosing or after the RESET of the  control unit     Note    Constant values of the feeder F1 for some types of feeders   screw D38mm gear 1 56 K1   0700 wood pellets  screw D56mm gear 1 56        1340 wood pellets    It is possible then to ascertain easily the constant K1 by weighing a defined quantity of doses of fuel converted to  1 second  The factor K1 should be modified as per the following formulation  if a fuel the caloric value of which  substantially differs from that of wood pellets is used       1   K1   xx MJ   17 MJ    where xx is caloric value of fuel in MJ  caloric value of wood is 17 MJ   Enter the value K1upr into the control unit     67    Automatic boiler for biomass     Service manual  9 4 11 Menu 11 11 Equithermal regulation    Equithermal regulation is an automatic boiler operation mode  which allows heating water of defined temperature  to enter the heating system  The heating water temperature depends on the outside temperature and the heat  properties of the heated building  The control unit automatically changes the immediate boiler output between 10  output levels in order to match the requirements of the heating system in the best possible way  The program  automatically uses output values preset in programs 1     10 in order to minimize frequency of undesirable stand   by modes  This is a similar mode to output mo
31.  for switching the pump is temperature  which determine when the boiler is going to be  swicthed on  Swtcing the pump and cooling down the boiler is as a safeguard agains boiler overheating     9 5 6 Menu 12 6 Fan run out    Fan run in is a parameter which defines the working time of the fan after the boiler has entered the STANDBY  state  Setting makes it possible to improve emission parameters and optimizes fuel burnout     Important Note  Parametrs for the mode fan run out we set up to a specific fuel type  We select the fuel  type in Menu 10 pro rezim dob  h ventil  toru nastavujeme pro dany typ paliva  Palivo zvol  me predem v Menu 10     MENU 12 6 Fan run out will appear on the display unit after the PIN for the Producer menu has been correctly    entered and after set up to this menu has been done by cursor arrows   1     By pushing key        ENTER to go to the selection of the time parameter for the fan run in        Where dd is the existing set up value  DD is the newly required set up value and is blinking     The required run out value of the fan can be set up with the cursor arrows    f  U   Confirm the newly adjusted value by pushing the key         ENTER  The value DD will stop blinking and will be  saved in the working register for boiler operation in the automatic mode  The values dd and DD are identical  now    The value DD will start blinking again by repeated pushing the key    gt  ENTER and may be changed  Return  back to the menu  gt 6 Fan run out lt   b
32.  is for the equithermal curve selection  The equithermal curve defines the relation of the heating water  temperature flowing to the heating system and the current outside temperature  It is generally true that the  worse insulation properties of the heated building the steeper the selected curve  Curve 1 fits a building with bad  insulation  curve 16 reflects a building with a very good insulation     MENU 9   The electric supplemental heating will show on the display after a short note   MAIN MENU  The  setting can be changed by the    f    U arrows     By pushing the    gt  ENTER button display will show   Where ee is the current value  EE is the new value and it is flashing   The desired equithermal curve can be set with      gU arrows            increases the desired value by  1         decreases      desired value by     1    Confirm the newly entered value by pushing          gt  ENTER button  The EE value will stop flashing and will be  saved in the boiler operation working register in the EQTx mode   The ee and EE values are now identical     By pushing the ENTER button again  the EE value starts flashing again and can be changed  By pushing     AESC button you can return to the main menu     The EE value is accepted for further use  if the new value is confirmed by         gt  ENTER button  the EE value  is not flashing   If the EE value is flashing  it will not be accepted after return to the main menu and the original  value ee will be used instead     Note  The p
33.  must have outside protection      The relay output  X7 expander terminals  is designated for general use  The maximum load capability of each  output is up to 6A and the total current limitation for EXE2008 is 16A    Important note  This output must have outside protection       Note  This output can be used as a support of the triac output  X5 or X6  to minimize heat loses on the triac   Description of expander communication line    RS485 line for general use  connector X4 and X9   It is connected as a standard two conductor 120 Ohm  impedance connector  The inner resistance of the receiver is standard  12 kOhm  and enables a theoretical  connection for 32 line  participants   Signals A B are spaced to an inactive level by resistors  820 Ohm   The line  is loaded by an end resistor  120 Ohm      4 2 3 4 Description of      EEx2008 expander use    The expander and its properties can be used for     Control of pneumatic transfer including the turbine soft start    Control of pumps for multiple heating circuits    Control of spiral feeder motors    18    4 3    Automatic boiler for biomass     Service manual    BURNER HEATING CHAMBER INCL  FEEDER F1 WITH INDEPENDENT  DRIVE    The heating chamber is depicted in picture Nr  1 and is comprises of these parts     4 3 1  4 3 2  4 3 3  4 3 4  4 3 5  4 3 6  4 3 7  4 3 8  4 3 9    The burner body   F2 feeder including the drive   Impulse revolution sensor   Adapters for installation of a flexible hose   Adapter for fan installation   
34.  of these parts is as follows      increase turbulence of combustion products before entry to the exchanger     use additionally the so far unburnt residues of the gaseous combustible on the ceramic burning surface    direct the flow of combustion products through the exchanger     Installation of grate in to working surfase is done trought cleaning door of the boiler  Individual parts has to lift in  the angle and place in back part of the burning chamber upwards  After is pushed all the way up to ceiling of a  burning chamber the front side of the ceramic has to lift up in to a horizontal level and than place the ceramic  part downwards in to s grooves  Grooves of the ceramic grate are in front and back side of a burning chamber     Steps        Picture 32 Ceramic grate parts placement guide    6 5 INSTALLATION OF CERAMIC SHIELD       Picture 33 Ceramic shield    Insert the ceramic shield flatways across the boiler space and fit the part on holders over the door from inside    See picture no  34      Steps        Picture 34 Ceramic top placement guide    36    Automatic boiler for biomass     Service manual    6 6 CONNECTION OF ELECTRICAL PARTS    The electric parts connections can be performed by qualified personnel only  Connect the particular appliances  6 6 1     6 6 14 to corresponding terminals according to drawing in picture 51  During connecting the equipment  must be shut down with the main switch or disconnected from power supply by pulling the electric cord from 
35.  out  working regulations and instructions for operation and maintenance of large volume bins     5 5 BOILER ROOM VENTILATION    Permanent ventilation of the boiler within approximately 75 ms x hour    of fresh air has to be ensured  if a boiler  of approximately 20 kW of power output is operated     32    Automatic boiler for biomass     Service manual    6 PUTTING THE PRODUCTS INTO OPERATION    6 1 CONNECTION TO THE SYSTEM    Connection to the system is performed in a usual manner   see the below given installation dimensions of  products  Recommended connection of the boiler to the heating system     see pict  no  40   52     Important  With boilers KP 62  KP 62E   it is important to have both water output connect                 Picture 28 Installation dimensions of boiler    Filling the system with water takes also place in a standard way and the following principles have    to be adhered to at the same time       water for the heating system has to be clean  free from any admixtures  Its hardness has to meet the Czech  standard CSN 07 7401   1992   if the hardness does not meet this standard  it has to be treated with a    corresponding softener       if extremely hard water is used  there is a risk of  scale  formation   which is to the detriment of heat exchange       KP 12 12     1   Output of heating water G 1 1 2   2   Heating tube  0130 mm   3   Input of return water G 1 1 2    4   Eletric heater M 48 2   5   Outlet valve G 1 2     KP 22 22     1   Output of heati
36.  power and connecting parts             0 00                                           13  PROCESSOR xin T 13  DEseription or LSP ROO DD QE 16                         2       2 ette      net e Xo a iesu                a Epi 17  Burner bOSKP12  KP22  ne                                     elut RES             19  BUMEFKPOZ mieri                                                           ET cui DUM fmc MR ELE 20             KP62 with cleaning                         Ur P rA IATER          20  Cer reflector NP 12           22                 een 22  Twuospart cer  Fetlector KPOZ a ee Ee PR Eco t                                 22  Ceramic SING IG ren                                                                                                         22  Ceramic secondary Gl ale                                                                   22                                                                                                                   22  Rost Tr 23             drap  EE ETE 24  JACKEN KP22                                                                                 MEE 24                                E 25                                                                                   E               AO          26  Exchanger cleaning System    3 vata skin kx      AE nn nun naar                         27  External dspeontaltler                                                                              27  Fue                   eet               
37.  pushing the key        ESC or it is possible to continue  with the cursor arrows      ESC in selection of the next menu after pushing the key    12     Note  The principle of the operation of the boiler in the modulation mode is obvious from the attached  diagram on the picture no  50    Important  If we change the regulation period  for example  in case of small heating systems or  on the  contrary  in case of large ones   it is also necessary to change the values of temperature gradients in order to  preserve the regulation dynamics     9 4 13 Menu 11 13 Sweeping  cleaning    9 4 13 1 Menu 11 13 1 Burner cleaning    This menu is not used for operation of KPx2 model line boilers  The function must remain OFF during the whole  operation time     9 4 13 2 Menu 11 13 2 Ash  The program of this Menu provides automatic ash take out from the burning chamber into external ash container   The ash volume depends on the type of used fuel  on the boiler output and the heating time period  Therefore    the activation of the outfeed spiral scroll is directly tied to the number of Nr  1 feeder cycles     We enter the menu by pushing the    f  0U arrows     When you push the        ENTER button       We will enter the Menu  in which we either allow or prohibit the ash removal function     By pushing             ENTER button we enter the ON OFF switch for ash removal        By repeatedly pushing            ENTER button we will select the desired ON OFF mode  By pushing the     ESC  button 
38.  resistant to humidity are  recommended for appliances with temperature of combustion products from 30  C to 100  C      5 3 3 Fire regulations    CSN 73 0823   1984   fire and technical properties and combustibility grades  CSN 06 1008   1997     fire safety of heat installations  structure of boilers from fire safety aspect    5 3 4 Electrical  Government Regulation no 17 2003 Coll     CSN     EN 60 335 1 ed 2 20073  Electrical appliances for domestic and other similar use     Safety   General  requirements     CSN     EN 60 335 2 102 2007  Safety     Part 2 102  Special requirements for appliences burning gas  petroleum  and solid fuels containing electrical connections     5 3 5 Protection against noise    Government Regulation no  148 2006 Coll      product is fullfilling all requirements     5 4 STORAGE OF FUEL    Wood pellets have to be in a dry place protected against atmospheric effects because humidity damages the and  aggravates their burning parameters  Excessive humidity completely destroys pellets  They should be stored in a  different room than the boiler or at least 1 500 mm from the boiler     Operating stock of fuel may be stored in a special central bin which has to be manufactured from non   combustible material  Bins supplied by the manufacturer meet operating and safety requirements  They may be  filled without any limits up to their total volume     Large volume bins have to meet corresponding fire and safety regulations  The supplier is obliged to work
39.  thermostat reset button  You must hear the trigger click   The red reset button is  accessible without any tools by removing the top boiler cover and unscrewing the black coverings     Shut down the control unit with the switch for about 5 seconds and then turn it on again     Now the control unit is ready for further operation in the MANUAL mode     After that it is possible to switch to automatic boiler operation by pushing the    START and    ENTER buttons  if  the equipment was shut down for a long time       by pushing the    AUTO MANUAL button  if the boiler is still  burning     10 2 STOPPAGE     OVERHEATING  OPERATION THERMOMETER    The control unit has a program routine  which stores the emergency thermostat control  If the operation  thermometer indicates a temperature higher than 1009C  the boiler control unit will assure the boiler is shut down    This situation is indicated on the display by this message     Only the circulatory pump is running for heat removal from the boiler exchanger   Under normal conditions boiler overheating does not occur  therefore this situation is considered an emergency     86    Automatic boiler for biomass     Service manual    Faulty emergency thermostat  Replace the emergency thermostat        The emergency thermostat probe is not  Insert and tighten the emergency thermostat  inserted in its well  probe in the well     Service personnel attention is required  because it has to be determined why this state of failure  occurred and 
40.  to prevent escape of flue gases   Chimney and  boiler connection must have valid inspection    6 7 5 Check functionality of circulatory pump and its deaeration    6 7 6        electrical grid outlet must be always accessible  New electrical outlet must have a valid inspection     6 7 7   Check the heating chamber and ash receptacles  Clean from possible dirt    6 7 8 Check tank filling by specified fuel    6 7 9 Check operating parameters for the specific boiler type     7 BOILER SERVICE AND MAINTANANCE DURING OPERATION    Service and maintenance intervals are directly dependent on the type and quality of used fuel   If recommended fuel     wood pellets with clearly guaranteed quality parameters is used  service and maintenance  of the product during operation is very simple     7 1 SERVICE    Pellet boiler service comprises of only two tasks  The necessary presumption is use of guaranteed fuel endorsed  by the manufacturer  As a standard  use wood pellets with the 6mm or 8mm diameter     7 1 1 Refueling    The fuel level must be maintained in such height that there is always a minimum of 10cm pellets above the F1  feeder inlet  Insufficient pellet volume may result in irregular dispensing or boiler fire extinction     You will be told the presumed refueling interval by the service technician according to your specific configuration     Note  The refueling interval cannot be prescribed ambiguously     It depends on  Fuel bin size  The average boiler output in the particular 
41. 2 6 Fan run out   issseoscsias na eie pEr EY ou                                               Pia                                RE ER VE                82  9 5 7 Menu 12 7 Flue fart                sinisen een EYE WE RO etw ea M SOC Fr 82  9 5 8 Menu  12 9 Rotary SCNSONS ee een                         P EUP TID LC          LEE 82  9 5 9 Menu 12 9 GSM Emm 84  9 5 10 Menu 12 10 Service PIN                                                             meme nennen nes 84  9 5 11 Merig  12 11 Charge OF                      anna anna re rn aan era 84  26 MENU  SOFTWARE VERSION en ea ee erden 85  9 7 MENU 14 CODE ENTERING ea          ea ne SE ee 85                    6     EIER ALINA co MUST FM CMM RU NM MUNI AU RR                                nee             ONCE 86  10 1 STOPPAGE     OVERHEATING  EMERGENCY THERMOST  T        1  rien rn rina rk ru rn rk a n n rr 86  10 2 STOPPAGE   OVERHEATING  OPERATION THERMOMETER na 86  10 3 STOPPAGE   OVERHEATING IN THE FUEL                                                        87  10 4 STOPPAGE     BECAUSE OF FAULTY ATTENDANCE     5 52   5 naar ak aima y aima a aura rn                     rax n irai 88  10 5 STOPPAGE   BECAUSE OF LOW WATER                                                     nene nennen nennen nnns 88  10 6 STOPPAGE   BECAUSE OF LOW FLUE GASES TEMPERATURE                                            88  10 7 SER TE EN ENT T Rm                89  10 8 TEMPERATURE SENSOR            2                                                
42. 50Hz   Control unit supply max 40VA   Total maximum input 2kW  depending on outputs   Dimensions 450 x 155 x 50   Weight   2 8 kg   Protection class pursuant to CSN 33 2000 4 41 ed  I   2 2007    Protection from dangerous touching of live parts  pursuant to CSN 33 2000 4 41 ed  2 2007   Protection from dangerous touching of non live parts      automatic disconnection from  pursuant to CSN 33 2000 4 41 ed  2 2007 basic source   Protection from dangerous touching of non live parts   pursuant to CSN 33 2000 4 41 ed 2 2007 increased By connecting   amended    Shielding pursuant to CSN 60 529 IP31    By covering and insulation      Basic characteristics setting pursuant to norm CSN 33 2000 3         5 temperature  5    40             5 temperature  5    40   C  humidity 15     100   BA5 people skills   knowledgeable   BC3 ground contact     frequent     Described in detail in E2008 documentation       This equipment is designed in accordance to norms CSN EN 60335 1 and CSN EN 60335 2     Classification is in accordance to CSN EN 55014 2  Category II     4 2 1 1 Description of RJE2008 inputs    Unless specified otherwise  the majority of inputs is connected directly or through a converter to the processor  module and may not be connected to power circuits and outside sources of dangerous voltage  The input  terminals are protected against outside conditions  EMC   but they are galvanically connected with the terminal     See the VN barriers in the drawing  picture No  53      Therm
43. 8  GSM modem will appear on the display unit after a short script   MAIN MENU   and after setup to this  menu with cursor arrows    ff   U   8  GSM modem    By pushing the       ENTER button display will show     By pushing the        ENTER button display will show     Or    By pushing        ENTER  Button we change GSM modem function   By repeatedly pushing the        ENTER button you can change the ON OFF setting     Further menu selections are available by pushing the         pU arrows     We will use this MENU to adjust the number the control unit will communicate with  Failure SMS reports will be  sent to this number  A twelve digit number including national area code will appear by pushing the key     2 ENTER for example    Adjust the required number by cursor arrows    Jf   increases the value of the number in step of  1          reduces      value of      number in step of  1   lS   moves to the neighbouring digit to the right      es   moves to the neighbouring digit to the left   Add character   after last valid number  By this you will define amount of valid numbers     Confirm the adjusted number by pushing the key         ENTER    The following script will appear of the display unit   Having this been confirmed by pushing the key        ENTER  the control unit in cooperation with the modem will  make a check call to the selected telephone number  This state is indicated by the following message while the  number is being dialled and ringing    Finish the check ca
44. Connecting hose from inflammable material   Main fan   Electrical resistance spirals for automatic ignition   Cleaning equipment for the burner     in KP62 agro burner for burning less efficient fuel       Picture 9 Burner 50 KP12  KP22    19    Automatic boiler for biomass     Service manual    4 3 3       Picture 10 Burner KP62       Picture 11 Burner KP62 with cleaning    20    Automatic boiler for biomass     Service manual    The burner body   is a hollow weldment made from highly legated material with a bottom transversal fuel inlet   The fuel is delivered by a built in   2 feeder driven by an electric motor with a gearbox     A set of slit and round jets in the burning grill ensures inflow of air in order to facilitate controlled full burning of  delivered fuel during its stay in the burner chamber  The burned out fuel is subsequently pushed over the edge of  the chamber into the ash receiver     The inner space of the burner body is connected to an a r fan  whose revolutions can be regulated within a large  range depending on the required boiler output or the type of fuel being used   See MENU 11 9 Fans   chapter  9 4 9      Impulse revolution sensor    The gearboxes of the F1 and F2 feeders are equipped with impulse sensors  which ensure safe operation of the  boiler     Connecting hose to the F1 feeder made of inflammable material connect feeder 1 and feeder 2  It is part of  the transfer fuel lines  It must meet strict installation rules     It cannot have signific
45. ELIGNITION   PUMP   SWT PUMP  SIFH3Gx1   SIFH3Gx1   SIFH3Gx1   SIFH3Gx1   SIFH3Gx1 CYSY 4x0 5 SIFH3Gx1   SIFH3Gx1   SIFH3Gx1   SIFH 36x        p eb       Gr 4  My   230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V  90 VA 90 VA 90 VA 90 VA 40 90 VA 500 VA 500 VA 45 VA 45 VA  Picture 41 Electric connection of hydraulic scheme 1 x HC   SWH Tan    v6                        j  E        1 j            PERS              a      ea           Gay          1          4                          1 E ES   E            ua nn R E  i       i m 1  I  s 1            4      T          lc i iiie           Picture 42 Hydraulic scheme   1 x HC  SWH Tank    56    XV11B XV11A XV5B XV3A XV6B XV13B      RSENS1   RSENS2 T MIX TRETW          GAS   ROOM THER   SWT THERM  SYKFY 2x0 8   SYKFY 2x0 8    12V DC 12V DC                                      192     19 1     142   Kis1  iK 18 2 K 48 1      K 16 1  Ki152     23 1     232     132   Ki62           __                                                    gt  gt                   L FEEDER 1   FEEDER2   ASH   SWEEPING SERVO EL IGNITION   ELIGNITION   PUMP   SWT PUMP  SIFH3Gx1   SIFH3Gx1   SIFH3Gx1   SIFH3Gx1   SIFH3Gx1 CYSY 4x0 5 SIFH3Gx1   SIFH3Gx1   SIFH3Gx1   SIFH 36x        p eb       Gr 4  My   230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V  90 VA 90 VA 90 VA 90 VA 40 90 VA 500 VA 500 VA 45 VA 45 VA  Picture 43 Electric connection of hydraulic scheme 1 x HC  SWH Tank    96                Hydraulic scheme   1 x HC  SWH Tank    P
46. Flare time time set up  in which fuel must be provided to a burner for perfect fire through all surface of burner min 2 2 4 4    11 5 8  Referent temp  the minimum values of differences between water and flue gas temp  at the end of ignition process   C 10 10 10 10   11 5 9  Check burnt time out after changeover from STANDBY state  after which CU makes reference temp  measuring min 7 7 10 10               e                       determine value of boiler water temp   when the pum will start to circulate water in the system   C  1 7 SWT pump on determine value of boiler water temp   when the pum will start to circulate water in the system for SWT   C  1 8 Change of service PIN   posibility of service PIN change in each boiler    Fans set up of the type of used fan   Main fan type Selection of main fan type   control by used fan  Flue fan type Selection of flue fan type   control by used fan  Boiler output menu for calculation of output data on display    Output rated output of the boiler KW 19 29    weight of the fuel supplied by feedeer F1 per 1 second g sec 10  0       a                   OD                    Constant of feeder        Without Flue fan    11 11     TATA   11 11 2   11 11 3   11 11 4   11 11 5   11 11 6     Equithermal regulation  Starting programs  Gradient low  Gradient upper  zone     zone     Regulation period  Modulation  Starting programs  Gradient low  Gradient upper  zone     zone     Regulation period          Parametrs for automatic mode  when CU ch
47. If both switches are  simultaneously activated by operator mistake or by a program failure  both outputs will remain without voltage   The maximum load of each output is up to 6A and the current total limitation for RJE2008 is 10A  If the unit is  meeting the activation conditions  program  manual control and active emergency thermostats   these terminals  show grid voltage  The setup of the prongs enables for instance connection of a  SERVA  four way valve in solid  fuel boilers     4 2 1 3     RJE2008 communication lines description    RS485 line to the terminal  XV2 connector   This line is connected as a standard two wire conductor to 120 Ohm  impedance  The inner resistance of the receiver is standard  12 kOhm  and enables theoretical connection for 32  line  participants   Signals A B are  spaced  to an inactive level by resistors  820 Ohm   The line is loaded by an  end resistor  120 Ohm      RS485 line for general use  XV4A connector   This line is connected as a standard two wire conductor to 120  Ohm impedance  The inner resistance of the receiver is standard  12 kOhm  and enables theoretical connection  for 32 line  participants   Signals A B are  spaced  to an inactive level by resistors  820 Ohm   The line is loaded  by an end resistor  120 Ohm      RS232 line  connector XV12A  contains RxD  TxD and RING channels  The fourth connector pin is GNS  The line is  designated for general use  voltage levels are standard      10 to 12V  Transfer speed up to 115 kBit    
48. TUP    4g AUTO7 11 22            045 SRV 008    AUTO   GSM MANUAL oO    MAM FLUE       me 8        DUTPUT       stant        CHIMNEYERL           START    If the automatic ignition is permitted ba the programme  the main MENU 6   the following scripts will gradually    appear by pressing the key     ALARM    GSM    FAN  MAIN FLUE    T       44g AUTO7    AUTO    C SETUP    MIX  045 SRV 008    AUTO   MANUAL    ourputr        START    CHIMNEYERLJ    11 22    GSM    FAN  MAIN FLUE    I    MODULATION          SETUP    4g AUTO 11 22            045 SRV 008  AUTO   MANUAL Oo                    START                       I    EQUITHERM          SETUP  ug AUTO7 11 22    MIX 045 SRV 008   aa  E           wor          ourPur EJ    START                       _        If we confirm this offer by pressing the key ENTER  the boiler will start themode of automatic ignition  which is  indicated by blinking script AUTO and  gt I lt      If automatic ignition is prohibited by the programme  the main MENU 6   the following script wiil gradually appear    by pressing the key    and control unit will return back to mode MANUAL    Note  The programme routine of Automatic Ignition has absolute priority to be carried out in full extent  If  the routine is activated  it is not possible to interrupt or stop it in any way  This fact is an important condition for  reliable operation of the boiler because it is then possible only to ascertain indirectly from further behaviour of the  boiler whether it is
49. The minimum and maximum CC values are limited by the producer     Note  The recommended temperature to switch the SW Tank pump in is 60      Hot service water is  predominantly heated up to this temperature  If the pump is switched in at lower temperature  the water heated  in the heater will be cooled down through the boiler     9 4 8 Menu 11 8 Pin change    The service engineer may use his her own PIN in case of a particular boiler  Thus he she is sure that the  operating parameters adjusted by him her will not be changed by the user     MENU 11 8 PIN Change will appear on the display unit after the PIN for the menu  SERVICE  has been correctly  entered and after adjustment to this menu with the cursor arrows    ff        By pushing the button       ENTER to select this menu and the following script will appear    0 is blinking at the same time     The PIN user number  code combination  which enables access to the service menu is determined by the cursor  arrows            gt     The adjusted PIN value is confirmed by pushing the key     gt  ENTER     The following script will appear on the display unit    0 is blinking at the same time     The operator has to enter identical PIN again  The adjusted PIN value is confirmed by pushing the key     gt   ENTER  again    The PIN will be compared with the previously entered PIN and if both of them are identical  the new PIN value  will be accepted and the following script will shortly appear on the alphanumeric display unit    65 
50. able by pushing the    ff   U arrows     Note  Serviceman or a manufacturer will set this value by the technical requirements of the boiler  When  using he function of Suplemental electric heating  t  s necessary to equip boiler with heating spirapls build in the  boiler     Note  The electric supplemental heating spirals output is defined by the user or the designer  The  manufacturer will equip the boiler with the proper spirals based on an order  Professional firm can perform the  spirals mounting later     53    Automatic boiler for biomass     Service manual  By pushing      ESC button we are returning to mode MANUAL   AUTOx   MODx  EQTx  BOILER or it is  possible to continue by pushing 0 ff    arrows to future menu selection     Note  If the output  Menu 11 4     Configuration  is used for different function than electric heating  an  attempt to set this function will result in a  not installed  message     9 3 8 Menu 8 GSM modem    Activity of the control unit for cooperation with GSM modem is adjusted in the menu  Authorized participants for  operation of the boiler are determined by defining telephone numbers for communication  The system enables  remote control and monitoring of individual boilers as well as a network of boiler rooms  The function of an order  activated via the GSM modem is active until the moment of the next operation of the control unit with the  keyboard  Modem is installed by manufacturer or a service organization by the customer needs     MENU 
51. able material  which ovelap min  10 cm over the platform of  installed quipment  Floor in front of the cleaning door has to be out of non flammable material and min  60 cm     The necessary height over the boiler to the ceiling of the boiler room is approximately 450 mm  600mm with  KP62  for cleaning of the boiler     5 2 SAFE DISTANCE FROM COMBUSTIBLE MATERIAL  COMBUSTIBILITY GRADE OF MATERIALS     Grade A     non  combustible  stone  concrete  bricks  plasters  etc    Grade B     hardly combustible  inorganic insulation     Rotoflex  glass wool  basalt insulation  wood wool slabs  etc   Grade C1   low combustible   formica  versalit  fibreboard  hardwood  beech  oak     Grade C2     moderately combustible  soft wood  spruce   chipboard  rubber  floor covering    Grade        easily combustible   asphalt  tar paper  PVC  paper     etc    Minimum safe distance from bulk flammable materials of the type          and    is 200 mm in course of installation  of the boiler  as well as during its operation      This distance is double   i e  400 mm for easily combustible materials C3     As regards relation to the electrical network     it is necessary to ensure that the wall socket where the boiler is  connected is always accessible     5 3 LEGISLATION IN FORCE    The product may only be installed by an organization trained by the manufacturer with authorization     Electric parts may only be connected by an authorized person  CZ   the regulation number 50 1978  on  professional c
52. after run of the burner s feeder F2 of the automatic solid fuel boiler can be controlled with  the cursor arrows         U   This feature of the control unit is of use in case of boilers with two stage solution of  transport routes of fuel  The run in time determines the period of time in which the burner s feeder is in operation  longer time then the primary feeder F1  This feature of regulator facilitates passage of fuel and maintains  transport routes without fuel  This has effect on safe operation of the boiler and prevents from blazing the fuel in  the transport routes    The adjustment procedure is the same as that in the previous chapter     Note  The range of values RR is determined within the interval of 10  xx s where xx has to be a value less  than the sum of the values  feeder off   feeder on   run in  The software checks this value and will not allow its  adjustment outside the above mentioned range    Note  The adjusted value of run in is in force for all programs     9 4 4 Menu 11 4 Standby  Is an operating condition of the boiler when there is no requirement to deliver heat energy  See chapter 8   Automatic operation     MENU 11 4 Standby Time will appear on the display unit after the menu  SERVICE  has been entered and after  adjustment to this menu with the cursor arrows          U       gt 4 StandbyTime lt   By pushing the    gt  ENTER button display will show   where uu is the existing adjustment value  UU is the newly required adjustment value and is blin
53. anges output and temperature of output water    Program set up  when boiler will start after equitherm regulation turn on  5  lower limit of steepness of regulation curve  C 9  upper limit of steepness of regulation curve   C 12  temperature interval  during its reaching the output goes down by other output stage   C   temperature interval  during its reaching the output goes down by 1 output stage   C 5  period for evaluation of set up and reached output parameters min 10  parameters for auto  mode  during which CU auto  change output according to actuall thermal need   Program set up  when boiler will start after equitherm regulation turn on  5  lower limit of steepness of regulation curve 9  upper limit of steepness of regulation curve 12  temperature interval  during its reaching the output goes down by other output stage 3  temperature interval  during its reaching the output goes down by 1 output stage 9  period for evaluation of set up and reached output parameters                 11 13  Sweeping  cleaning set up paramenters for cleaning mechanism of the boiler  11 13 1    Cleaning of the burner this menu is not used     has to be permanetly disabled     m    a off       11 13 2     11 13 21   11 13 22   11 13 2 3     11 13 3   11 13 3 1    11 13 3 2   11 13 3 3   11 13 3 4   11 13 9 5     CTI    Ash   ON OFF   Number of feeding  Feedend time  Flue gas sweeping  ON OFF   Number of feeding  Feedend time  Time zone   Flue fan revolution  Configuration  Config K15 1  Conf
54. ant folds  which would block smooth fuel movement and must be built with an  inclination of minimum 50    in a relation to horizontal plane    Attachment to both adaptors must be tight     Cleaning of KP62 burner provides removal of excessive ash or cinder volume from the burner when burning  lower quality fuel  The drive of the cleaning mechanism is works together with ash cleaning     Note  Use of alternate fuels requires change of the burner type and also change of boiler program setup   Note  The cleaning mechanism burner drive and its installation are depicted in chapter 4 7     Cleaning system     21    Automatic boiler for biomass     Service manual    4 4 CERAMIC PARTS    These parts are an inseparable component of the combustion chamber of the boiler and  they have a major influence on the quality of burning     4 4 1 Ceramic reflector     placed on the top of the burner   4 4 2 Ceramic secondary grate     placed in the boiler body above the burner heating chamber  4 4 3 Ceramic plate     placed above the door   4 4 4 Ceramic door jacketing  mounted on the door         y           1                 4            ET                  y     Mw                   x    2 QUEE    Picture 12 Cer  reflector KP 12  KP 22 Picture 13 Two part cer  reflector KP62          KP 62 A    AA    Picture 15 Ceramic secondary grate       Picture 14 Ceramic shield Picture 16 Ceramic door casing    22    Automatic boiler for biomass     Service manual    4 5 F1 FEEDER WITH INDEPENDENT DRIVE 
55. appear on the display unit after the PIN for the menu  SERVICE  has been  correctly entered and after adjustment to this menu with the cursor arrows  12     By pushing        ENTER button to select this menu and the following script will appear    Where cc is the existing adjustment value  CC is the newly required adjustment value and is blinking     The current temperature of the output water which will turn the circulation pump on can be changed with the  cursor arrows          Note  The minimum and maximum CC values are limited by the producer    Note  The value ofthe pump temperature is set by manufacturer to 55  CH    Note  Run up of the pump from a temperature higher than the so called condensation temperature   approximately 55      has a significant effect on the service life of boilers     9 4 7 Menu 11 7 SW Tank pump on    Will determine the boiler water temperature at which the circulation pump to heat the hot service water will start  working     MENU 11 7 SWTank pump on will appear on the display unit after the PIN for the menu  SERVICE  has been  correctly entered and after adjustment to this menu with the cursor arrows       U      By pushing the button        ENTER to select this menu and the following script will appear    Where cc is the existing adjustment value  CC is the newly required adjustment value and is blinking   The current temperature of the output water which will turn the SW Tank pump on can be changed with the  cursor arrows       U     Note  
56. articular building has an equithermal curve constant  which is defined by the building  construction  The equithermal curve must be changed only after changes such as windows replacement  adding  of insulation  heating system remodeling  etc    Note  The equithermal curve is generally set by assumption and is adjusted based on test runs  After correct  setting it is not changed anymore        100    L                  ERIT       TEMPERATURE OF THE HEATING WATER    4LLLLLLLLLLLLLLLLLL    jt    0     35  32  29  26  23  20  17 1  8  5  2 16 19       TEMPERATURE    Picture 36 Equithermal curves 1   16  56    Automatic boiler for biomass     Service manual    9 3 10 Menu 10 Fuel selection    This MENU is for selection of fuel   MENU 10   Fuel will show on the display after a short note   MAIN MENU  The setting can be changed by the       DV arrows     By pushing the ENTER button the display will show the currently selected fuel type     and the type of the selected fuel     Different type of fuel can be set by the            arrows   Change the new fuel setting from OFF to ON by pushing the         ENTER button  This way a new type of fuel is  selected     The previously used fuel type is automatically turned off     By pushing     ESC button you can return to the main menu     Note  Boilers of the KP x2 model line are adapted for burning of different fuels  Feasibility of fuel other than  the guaranteed type must always be consulted with the manufacturer or with an authorized se
57. as been  correctly entered and after setting to this menu has been done by cursor arrows  ff 0U     9 5 3 1 Menu 12 3 1 Feeder on lower limit    The following script will appear by pushing the key        ENTER    By pushing key    gt  ENTER to go to the selection of the lower value of the operation time of the feeder F1     Where dd is the existing adjustment value  DD is the newly required adjustment value and is blinking    Use the cursor arrows       U to adjust the required value for the lower limit of operation time for the feeder Fi   Confirm the newly adjusted value by pushing the key    gt  ENTER  The value DD will stop blinking and will be  saved in the working register for boiler operation in the automatic mode  The values dd and DD are identical  now     The DD value starts blinking by repeated pushing the key    gt  ENTER and may be changed   Depress the key      ESC to return to the menu  gt 1  F on low li       The value DD has been accepted for further use  provided the new value has been confirmed with the key         ENTER   the value DD is not blinking   If the value DD is blinking  it will not be accepted after the return to  the MAIN MENU and the original adjustment value dd will still be used     78    Automatic boiler for biomass     Service manual  9 5 3 2 Menu 12 3 2 Feeder on upper limit    We will enter the following menu by means of the cursor arrows         U     By pushing key     gt  ENTER to go to the adjustment of the upper limit of the operati
58. c ee Tree 28  Collapsible bin assembly                                              nennen nnne nnn nnn 30  PREG CSG CUTIE tcp E T                                                   32  Installation  dimensions of DOG sisse eno a                      Sar oca Ro E x         Ka e Pe e o p e RED EE            33  Burner installation in   Doller   eset ouv ve Eee              Cia MEC Y dba kr           C RE EO ERI                            34  Ceramic                                       lated ene iN                      ee 35  Parts of secondary ceramic                                                                   6                                                                35  Ceramic grate parts placement                                          4                4                                                     36  S rne                                                                         36  Ceramic top placement guide                                                   1 66 nnne manne sanae nnne nnn nuns 36  Operation block diagrarm e                                                                                        45  EduithermalculVes 16          mre up MR TR MT ME             M IM UM EE 56  Operational block diagram   Service                                              nennen nun nun nennen nnn ne nnn nnn 58  Operational block diagram   Producer                                                                                         76  Principle OF EMG
59. cal installation version for input 3 PE N  50 Hz  400 230 V          5                        107  Dim          for the placement of       2 in boiler room     exam  of using collecting troughs           108  Directory information   consuption wood pellets for boiler family                                              109    Automatic boiler for biomass     Service manual    LIST OF TABLES   Table 1 Thermal and technical parameters of                                                                      7  Table 2 Solid harmful substances in combustion                                     eene      nenne nnne nnn nnn nnns 7  Table 3 Technical parameters of products                                 1 1          1                                                                                            7  Table 4 Electrical parameters  Of DLOGLIGEUS us cse                                                        Ease rp E DES URN ES 7  Table 5 Fuel and Is Daralmietels ossisqqat diria iu ra                            C x PAR LEN MEL             eT Ld 7  Table 6 senings     SEF Ver     Ve              Dad wa                  rater uas ter dip prada oni E E 110  Table 7 setings Service         TT oos secs                                                   PEERS EE 111  Table 8 Settings   Producer ver                                een 113    Automatic boiler for biomass     Service manual    1 IMPORTANT NOTES    This product may only be put into operation by an installation organizatio
60. control unit                  Pa      EI  Protection ofthe boilers wing            Po      Table 5 Fuel and its parameters    Wood pellets diameter 6 0   8 5 mm  approximately 16 18 MJ   kg  Water content Up to 10 96          Ash content Up to 1   0 8     1 0     Bulk weight 0 6     0 64 kg   dm3    Fuel delivery system PE PP bags 15   25 kg   bags Big Bag by 800   1100 kg  loose   fill  cistern        As a guaranteed fuels for all KP boilers are wood pellets  with parameters specified in table 5     Automatic boiler for biomass     Service manual    Boliers KP x2 are adapted for a burning of different kinds granulated fuels  Correct use of other than granulated  kind of fuel has to be always consulted with a manufacturer or an authorized service center  Authorized service  center will make a professional set up of the boiler for the type of the fuel which was specified by you     4 STRUCTURAL DESCRIPTION OF PRODUCTS    The structure adheres to the Czech standard CSN     EN 303 5   2000 i e  boilers for central heating    part 5  boilers for central heating with automatic fuel feed of rated heat output up to 300 kW      Main parts of the boiler are     4 1   Boiler body  4 2   Control unit of the boiler E2000  4 2 1   control unit RJE 2008  4 2 2 control terminal TE2008  4 3 Burning chamber  4 3 1 feeder F2 with independent drive  4 3 2 connecting flexible house  4 3 3   main fan  4 3 4 spirals for el  ignition  4 4   Ceramic parts  4 4 1 ceramic reflector  4 4 2 secondary ce
61. d the  telephone     mode is turned off   Note  The REM ON and REM OFF commands require installation and interaction with the room thermostat  Siemens REV 23     Note  After receiving a text message and switching the control unit to remote control  the LED diode  GSM   will be on  The remote control is ended by receiving a NORMAL text message or by pushing any button on the  control unit  boiler attendants are at home      Note  The control unit communicates only with telephone numbers  which the service personnel and the  service organization have put into it     Note  The text message structure sent by the control unit is as follows  DISPLAY  AUTO8 12 20  T2040  PT 1 BT 0 MODULACE 0 Pon 05 Poff 30 V 056 Tsp 145  256 60Kc     The meaning is     Tsp 145 Current burnt gases temperature   256 60Kc  Remaining SIM card balance       V 056 Current setting of the fan 56     55    Automatic boiler for biomass     Service manual    Note  The error text message structure sent by the control unit is as follows     DISPLAY  STOP STAGEx 12 20    status     control unit display  DISPLAY  STOP TEPL gt  95  status     control unit display  DISPLAY  STOP TEPL gt 100  status     control unit display    DISPLAY  STOP NO FIRE  status     control unit display  DISPLAY  Blocked FEEDER x  status     control unit display  DISPLAY  STOP EMER THERMx    status     control unit display       Errors description is listed in Chapter 10     Error messages    9 3 9 Menu 9 The equithermal curve    This MENU
62. dulation  Important role is assumed by the servomotor     The boiler water temperature value at which the boiler switches to the STAND BY mode is flexible and is by 159C  higher than the required heating water equithermal temperature  The low value is limited to 609C     Important note  Some parameters for the modulation mode are set for the given fuel type  Fuel is selected  beforehand in Menu 10     MENU 11 11 Modulation will appeared on the display after correctly entering PIN in the service menu and setting  by using      QU arrows     After pushing the         ENTER button a short message will appear     We enter the program settings the boiler will use for heating after modulation start     9 4 11 1 Menu 11 11 1 Start program    We enter the menu by pushing the    f    U arrows                Select the program the boiler will start heating after modulation activation by pushing         gt  ENTER button        Set the new start program number valid after confirmation by pushing the      ff   gt  U arrows     Confirm the newly selected parameter by pushing         gt  ENTER button  The value NN will stop flashing and  will be saved in the boiler memory for automatic mode operation  Values nn and NN are now identical  By  pushing the         ENTER button again the NN value starts flashing again and can be changed  By pushing     MESC button you can return to the main menu              is accepted for further use  if the new value is confirmed  by the        ENTER button  
63. e SW TANK s thermostat in the adjusted time period and  the boiler will operate in the mode SW TANK  The signal from the SW TANK will be ignored outside these time  periods  This state is indicated by blinking letter  B  on the display unit before the value of time     MENU 5 SW TANK active will appear on the display unit after a short script   MAIN MENU   and after setup to  this menu with cursor arrows  f     U   The following script will appear by pushing the key     gt  ENTER        on the display unit and after a short script   MAIN MENU   and after setup to this menu with cursor arrows       OU  The following script will appear by pushing the key   gt  ENTER    The script  will appear by repeated pushing of the key      gt  ENTER       and hh is blinking       hh is the time value in hours of the bottom limit for the time period 1     mm is the time value in minutes of the bottom limit for the time period 1    HH is the time value in hours of the top limit for the time period 1          is the time value in minutes of the top limit for the time period 1    The current state of hours or minutes may be changed by cursor arrows  ff IV      0   increases the value of hours in step of  1h  g  reduces the value of hours in step of  1h    If the bottom limit value in hours is adjusted  go on to the setup of minutes by pushing the cursor arrow        or  by pushing the key       ENTER    Oo ft   increases the value of minutes in step of  1min   g 0   reduces the value of minute
64. e advance is significant to ensure fire safety of the boiler     MENU 11 2 Advance will appear on the display unit after the menu  SERVICE  has been entered and after  adjustment to this menu with the cursor arrows         U  The following script will appear by pushing the key       ENTER  22  Advance       By pushing         gt  ENTER button display will show     Where aa is the existing adjustment value  AA is the newly required adjustment value and is blinking     Adjustment of the required advance operation time of the burner s feeder of the automatic solid fuel boiler can be  controlled with cursor arrows    fl    2  This feature of the control unit is of use in case of boilers with two stage  solution of transport routes of fuel  The advance time determines the period of time in which the burner s feeder  F2 will start working before the feeder F1  This feature of regulator facilitates passage of fuel and maintains  transport routes without fuel  This has effect on safe operation of the boiler and prevents from blazing the fuel in  the transport routes     nn   increases the required advance time of the feeder in steps of  1s   ov   reduces the required advance time of the feeder in steps of  1s   We will confirm the newly adjusted value by pushing the key    gt  ENTER  The value AA will stop blinking and is  stored in the working register for operation in the automatic mode of the boiler  The values of aa and AA are  identical now    The value AA will get blinking agai
65. e engineer  this code has to be stored well  If the PIN is lost   an intervention of the producer s employee is necessary     9 4 1 Menu 11 1 Programs    Timing of feeders and rotations of the fan are adjusted in this menu in order to adjust outputs and optimum  combustion   MENU 11 1 Programs will appear on the display unit after the correct PIN has been entered in the menu Service    Depress the key        ENTER to get into the menu to adjust operating values of the boiler for individual  programs     Fuel x is possible to select in menu 10  If you want to set a power of the boiler and using a specific kind of fuel   first select this fuel in menu 10  chapter 9 3 10   Use the cursor arrows            it is possible to select program no 1     10  Boiler program  Chimney program     Note  SW Tank program gets activated upon a request to deliver heat into the tank for the hot service water   Note  Chimneyer program gets activated under the mode of CHIMNEYER  adjusted by pushing the key on the  keyboard    By puching the key       ENTER to change parameters of a selected programs       where the value 05 is blinking     ON   is the value of feeder 1 operation in seconds  OFF   is the idleness time of the feeder 1 in seconds  V   is the value of fan s rotations in      Flue      itis a value of the flue fan revolutions  Fuel 1   number of currently selected fuel type    59    Automatic boiler for biomass     Service manual    New values for feeder 1 and the fan can be set by usi
66. ear the button is    turned on  The control unit switches automatically between ten output levels according to a preset mode   x    is  the number of current output      AUTO MODULATION EQUITHERM                                    48 EQT1O 11 22             045 SRV 008         mL  EE         SETUP    Er    ALARM C SETUP ALARM      Ag AUTO7 11 22    MIX 045 SRV 008    E AUTO  AUTO   GSM            1 mama El  AN    FAN     MAIN FLUE MAIN FLUE          MODE           EJ  staat E    CHIMNEYEREZ     MODE             EJ    sam 8                                     OUTPUT    Manual setting of the output level can be done in the following manner   a  Select the AUTO mode and confirm by pushing the         ENTER button  The boiler switched to the MANUAL  mode     b  Push the    OUTPUT button   the current output setting can be changed by the           arrows  You can select  one of 10 preprogrammed outputs levels     The new setting is confirmed by pushing the    gt  ENTER button   C  By pushing the    AUTO  MANUAL button we switch to the AUTOx mode     46    Automatic boiler for biomass     Service manual    Note  If the control unit operates in an automatic mode  AUTOx  MODx  EQTx  BOILER   the display will  show the current output after pushing the    OUTPUT button   AUTOx PP kW  nn      x   number of currently selected program  PP   boiler output corresponding to the selected program  nn   relative number showing the percentage in relation to nominal boiler output    AUTO     C SE
67. ect the fuel in Menu 10  Fan  revolutions and the consequent needed air volume may be different for different fuel types        Needed air volume setting is done the same way as above in this chapter     Return to MANUAL mode by repeatedly pushing the    AESC button or you can continue in your menu selection  with the    ff      arrows     9 4 5 5 Menu 11 5 5        fan    We enter the menu by pushing the           U arrows         Select the desired flue fan mode     ON or OFF   by pushing the        ENTER button in the automatic ignition  mode     Select the desired fan mode     ON or OFF   by pushing             ENTER button again   Return to Menu 11 5 5 by pushing the    ESC button     9 4 5 6 Menu 11 5 6        fan revolutions    We enter the menu by pushing the    f    U arrows          Select the desired flue fan revolution mode by pushing         gt  ENTER button in the automatic ignition mode     Important note  Fan revolutions are set for a particular fuel type  First we select the fuel in Menu 10  Fan  revolutions and the consequent needed air volume may be different for different fuel types     1       Needed air volume setting is done the same way as above in this chapter     Return to MANUAL mode by repeatedly pushing the     ESC button or you can continue in your menu selection  with the 0 t DU arrows     9 4 5 7 Menu 11 5 7 Flare time    We enter the menu by pushing the    f    U arrows          By pushing        ENTER button we will enter adjustment of the pe
68. ering of the building in an alternate program  Heating units are  protected from frost damage to the boiler and the heating system  The heating unit   TJ M 48 2 output  2 4  3  4  4 5 a 6 kW    Circulatory pump   Three way  four way  valve with a servomotor   Flue fan  for KP12  KP22 and KP62 boilers    Digital room thermostat   Tank for heating warm water  80     350      Accumulation vessels  for instance 500    750 I  1 000      Seasonal large volume fuel storage tanks   Spiral fuel feeder from seasonal tank     ensures automatic fuel refilling in the daily tank    Automatic fuel feeding from the seasonal tank     ensures automatic operations of the spiral feeder from  seasonal tank    Pneumatic fuel feeder from seasonal tank     for fuel refilling in the daily tank from a longer distance   Automatic control of another three loops  circulatory pump    GSM modem   for remote control and monitoring of boiler operation    Module for boiler connection to Ethernet communication network  Internet    Outside temperature sensor for equithermal regulation   Surface temperature sensor     in the fuel intake area    Surface temperature sensor     temperature measuring behind the mixing valve    Surface temperature sensor     temperature measuring of returning water    Connector outlet 2 pin   Connector outlet 4 pin   Compact hydraulic modules REGPON SYS   Compact hydraulic modules REGPON SWH   Compact hydraulic modules REGPON F    Note  Optional accessories are not included in the bo
69. erminals     14    Automatic boiler for biomass     Service manual    Emergency thermostats  K3 connector and copper capillary running through an opening     Both thermostats are serially connected and deactivation  disconnection  of either one of them leads to  disconnection of all outputs  except outputs on terminal K13 2  Reactivation of the emergency thermostat may be  done by qualified personnel only  Before reactivation  the service worker must assess the reason for this  occurrence     The LAMBDA probe  XV4B connector  is a specialized input designated for connection of the residual oxygen  sensor in burnt gases in the E2008 system  The terminals of this connector have a supply voltage 12V 1 5A for  the heating spiral of the probe and two terminals for controlled value input     4 2 1 2 RJE2008 outputs description    All control unit outputs are active and if they are switched on  their terminals will show grid voltage  phase or  total     Three prong relay outputs  terminals K14 1  K14 2  K15 1  K23 1  K23 2  K16   2  are designated for general use   The maximum load of each output is up to 6A and the current total limitation for RJE2008 is 10A  If the unit is  meeting the activation conditions  program  manual control and active emergency thermostats   these terminals  will show grid voltage     Three prong relay outputs  terminals K13 1  K13 2  are designated for general use  The maximum load of each  output is up to 6A and the current total limitation for RJE2008 i
70. ers  sensors  et al   in the respective modes  It also  enables MANUAL MODE of control  which is used for instance during the boiler initial operation  The control  system is comprised of the performance part located on the side of the boiler  position 4 2 1  and of the control  terminal  position 4 2 2   The terminal also comes in a different model with a two line foil keyboard display or it  may be equipped with a touch screen  The control system construction and its electrical shielding  IP 45  make  safe and reliable operation possible even under the demanding operational and climatic conditions common to  boiler rooms     E    i    UN                    Picture 3 E2008 Control System    The boiler modular set is comprised of these parts                                                       z       Terminal with mechanical buttons                zZ   Terminal with touch color display including connector cable  Get        MTSOSTV       V       Module              V       Module                                          V      GSM modem  cable  modem antenna  ape         Control unit and terminal connection               PK   z      L Control unit and main switch and emergency thermostat connection    PKo2       zZ    Z     basic control system set  V     optional parts of the control system  S     service equipment                 lt  lt    NIN       11    Automatic boiler for biomass     Service manual    E2008 is supplied from the electrical power network  voltage is 230V
71. es    Where dd is the existing set up value  DD is the newly required set up value and is blinking     Adjustment of the run out time for the circulation pump of the system will be carried out in the same way as  mentioned above in this chapter     We will return back to the mode MANUAL  AUTOX  MODX  SW TANK by repeated pushing the key     ESC  or it is possible to continue with the cursor arrows      ESC in selection of the next menu after pushing the key                Note  Pump run out is removing      excess heat from the boiler     80    Automatic boiler for biomass     Service manual    9 5 5 Menu 12 5 SW Tank pump limits    The producer will set up in this menu the upper and lower limit of the temperature range in which the circulation  pump of the heating system is turned on to heat the hot service water  The service engineer will be allowed to  change setting only within these limits in the chapter 6  Menu 10 7     MENU 12 5 SW Tank pump limits will appear on the display unit after the PIN for the Producer menu has been  correctly  entered and after adjustment to this menu has been done by cursor arrows       U      9 5 5 1 Menu 12 5 1 Lower limit  The following script will appear by pushing the key         ENTER     By pushing key       ENTER to      to the selection of the lower temperature limit for the output water in order to  turn on the circulation pump of the heating system     Where dd is the existing set up value  DD is the newly required set up value and 
72. f the AT value for reference temperature in      by which the  temperature of burnt gas has to be higher than that of the boiler water     Range  KK 0 99  typically 159C    Adjustment of the boiler water temperature increase is performed in the same procedure as mentioned above in  this chapter     Note  The electric ignition program routine is completed with a 3 minute interval in which the boiler heats at  the output level corresponding to the starting program after the MODULATION mode has been initiated v Menu  11 5 10    Having this interval been finished  the boiler enters the mode AUTO  AUTOx or SW Tank    The control unit is evaluating at this moment whether the temperature of burnt gas is higher than that of water  by the At value    temperature of burnt gas   temperature of water   This value is adjusted to 150C by the  producer     If the temperature of burnt gas is higher than the adjusted value At     Reference temperature  the boiler will  resume its operation     If the value is lower than At     Reference temperature  the control unit will make another attempt to ignite  without supply of new fuel  the ignition course will then again be evaluated via another measurement     If the value At     Reference temperature is exceeded  the boiler will resume its operation  if the value is lower or  equal  the control unit will stop operation of the boiler and the following script will appear on the display unit  STOP no ignition     9 4 5 9 Menu 11 5 9 Check burnt gas 
73. g coil      Important note  Time of the fiiring is given by selected fuel  Select the fule in Menu 10  Time of the firing is    specific to a selected fuel there could be big differences     where zzz is the existing adjustment value  ZZZ is the newly required adjustment value and is blinking     The required lower value to preheat preheating coils can be adjusted with the cursor arrows    f               increases the required red hot time in steps of   1min          reduces      required red hot time in steps of   1min   We will confirm the newly adjusted value by pushing the key    gt  ENTER  The value ZZZ will stop blinking and is  stored in the memory for boiler operation in the automatic mode of the boiler  The values of zzz and ZZZ are  identical now     The value ZZZ will get blinking again by pushing the key       ENTER and may be changed    By pushing    n ESC key to return back to the menu  gt 1  Red hot time  lt   The value ZZZ is accepted for further  use  provided the new value has been confirmed by the key     gt  ENTER   the value ZZZ is not blinking     If the value ZZZ is blinking  it will not be accepted when we return back to the MAIN MENU and the original  setting value zzz will still be used     9 4 5 2 Menu 11 5 2 Feed time    By using cursor arrows   f     we go to menu    By pushing        ENTER key to enter the adjustment of the operation time of the feeders F1 and F2  Thus we  ensure delivery of optimum quantity of fuel into the burner boiler for ig
74. g is a complex set of technical and program means  which ensure removal of solid waste  from warm water boiler exchanger pipes in regular intervals  The cleaning is performed by linear movement of  turbulators in the exchanger pipes  It is driven by an electric motor through a lever gearbox     The heat exchanger cleaning system can be mounted on the left or on the right side  Assembly of the particular  version is done in the manufacturing facility based on an order  A professional service firm can perform a change   left right  at the boiler location    The drive motor is connected with the control unit to terminals K14 1  N  PE     26    Automatic boiler for biomass     Service manual       Picture 22 Exchanger cleaning system    4 7 3 External ash container    The external receiver provides space for long term ash collection outside the burning chamber  It enables long   term service free operation even when using fuel with high ash content  It is attached to the boiler with a detent  lever  During boiler operation the lever must be in the lower position and the connecting piping between the  boiler and the ash receiver must be tight  Also the receiver cover must be tightly closed  Both of these  requirements prevent burning fumes release to the boiler room     The receiver is removed by moving the detent lever to the upper position and pulling it away from the boiler     Dispensing of the contents to the waste disposal container is best done by two people because of its 
75. g maximum saving    of fuel     2  Automatic ash removing and heat exchanger cleaning ensures a long time maintanance free and    maximum comfort of heating while keeping high burning efficiency     3  CONTROL UNIT with modern design     controls operation of the boiler  ensures automatic operation  high    operational reliability and long distance control     4  PRIORITY HEATING of hot service water   is secured by the structure and software package of the boiler    without any need for other control elemets     5  MODULATION PERFORMANCE of the boiler allows adjust production of the heat to an actual needs of the    building     6  Heating by EQUITHERM regulation of the water temperature to a needed temperature lowers the cost of    the heating     7  The burne system used with two independent drives and with a system of ceramic catalytic reflector  ensures perfect SMOKELESS FUEL COMBUSTION  which supports high thermal efficiency of the product  and also excellent ecological parametrs with the minimum content of harmful sustances in combustion    products  20 50x less than in case of classic boilers      8  SAFETY OF OPERATION given by separated structure of transport routes for fuel and by the selected    transport mode     9  The boiler makes it possible to ensure economical MODERATE HEATING of building by a suitably selected    syst  m using electric power   10             DESIGN AND SURFACE  Jacketingof the product is coated with    heavy duty COMAXITE COATING which    i
76. g of system pump and its deaeration   6 6 27 Functioning of boiler pump and its deaeration   6 6 28 Functioning of motor and correct rotation direction of ash removal spiral screw   6 6 29 Functioning of exchange cleaning motor   6 6 30 Functioning and correct rotation direction of servomotor   6 6 31 Functioning and timing of servomotor between limit positions and agreement of timing with SW setting  6 6 32 Correct functioning of electric ignition spirals   6 6 33 Correct functioning of attached thermometers  check with the button      ESC on the LCD display  6 6 34 Correct functioning of GSM communication menu  menu 8  chapter 9 3 8    6 6 35 Setting of a proper equithermal curve  menu 9  chapter9 3 9    6 6 36 Setting or changing servomotor timing  menu 11 15  chapter 9 4 15    6 7 CHECKING TASKS BEFORE BOILER FIRST OPERATION    The authorized service technician preparing the boiler for its initial operation must perform the following tasks  before start up  He will record results of all checking tasks     will fill a Certificate of Introduction to Service     see  appendix     6 7 1   Checking water volume in the heating system and corresponding water pressure   6 7 2   Check whether fittings between the boiler and the heating system are open   6 7 3 Check the heating system for leaks at all new connections     pressure test done by a professional firm     37    Automatic boiler for biomass     Service manual    6 7 4   Check the chimney connection  must be tight and safe
77. h cursor arrows    ff   U   The following script will appear by pushing the key         ENTER    The following script will appear by pushing the key         ENTER    Using the cursor arrows    ff         user will choose the corresponding language version for communication with  the operator from the following options    gt  Cestina lt     gt  English lt       Deutsch        Polski      gt  Espanol lt     gt  Italiano lt       Svenska    gt  Francais lt     gt                 lt   Confirm the selection by pushing      key        ENTER     Return back to the main menu  gt  3  Select Lang    by pushing the key   a ESC    Return back to the mode MANUAL or AUTO by repeated depression of the key        ESC or continue in selection  of the next menu by cursor arrows   f           9 3 4 Menu 4 Setup time  MENU 4 Setup time will appear on the display unit after a short script   MAIN MENU   and after setup to this  menu with cursor arrows    f     U   The following script will appear by pushing the key     gt  ENTER    The following script will appear by pushing the key     gt  ENTER    And the value HH is blinking     The current state of hours may be changed by cursor arrows   f  IV     51    Automatic boiler for biomass     Service manual    Jf   increases the value of the number in step of  1    g U    reduces the value of the number in step of  1      If the value of hour has been adjusted  go to the setup of minutes by pushing the cursor arrows       or confirm  the total setup 
78. he first range near the calculated water temperature  at which the boiler would automatically switch to  the STAND BY mode  When the boiler reaches this range  temperature   the boiler will automatically decrease its  output by one degree     We enter the menu by pushing the    f       arrows     Select the first temperature difference from the set output boiler water temperature  at which the boiler will  automatically change its output  by pushing the         ENTER button     First temperature difference setting is done the same way as above in this chapter    Return to MANUAL mode by repeatedly pushing         AESC button or you can continue in your menu selection  with the           U arrows    9 4 11 5 Menu 11 11 5 Range II    This is the second range near the calculated water temperature  at which the boiler would the automatically  switch to the STAND BY mode  When the boiler reaches this range  temperature   the boiler will automatically  decrease its output by another output degree     We enter the menu by pushing the    f    U arrows     Select the second temperature difference from the set output boiler water temperature  at which the boiler will  automatically change its output  by pushing the        ENTER button    Second temperature difference setting is done the same way as above in this chapter    Return to MANUAL mode by repeatedly pushing          ESC button or you can continue in your menu selection  with the D 1   U arrows    9 4 11 6 Menu 11 11 6 Regulati
79. he ignition spirals stop working only the sign AUTO is flashing  depending on  the current mode     The second line will read     M 045 E 045 S120 temperature behind the mix valve     required equithermal temperature   servomotor  position  mode EQT      MIX 045 SRV 120  temperature behind mix valve   servomotor position  mode AUTO  MOD  or after  pushing    n ESC   SPAL 142 VST 050 burnt gases temperature behind the boiler     temperature of returning water   recuperation  or after pushing      a ESC   Ven  12 HOR 050 outside temperature     burner temperature at fuel intake    Note  The required equithermal temperature value is displayed only in the EQTx mode  Outside temperature  and burner temperature will show correct value only if thermometers are on     Note  S120  SRV120  is the position of the servomotor in sec  The limit positions are set by the service  technician     44    Automatic boiler for biomass     Service manual    Boiler control by the user is possible within the framework shown in the following drawing   BLOCK DRAWING OF CONTROL UNIT OPERATION               TH  Cem       CHiMNEYER                     8 1             8 2 MOBIL No 1  8 3 MOBIL No 2  8 4 CREDIT No   8 5 SMS INFO ON OFF          SERVICE  PIN    18 SW VERSION              EI I NN  Picture 35 Operation block diagram   User    4            Automatic boiler for biomass     Service manual    9 2 OPERATION MODE SELECTION    The service personnel can choose the boiler operation mode with the button
80. he lower limit of the output water temperature for  the automatic boiler    Confirm the newly adjusted value by pushing the key    gt  ENTER  The value DD will stop blinking and will be  saved in the working register for boiler operation in the automatic mode  The values dd and DD are identical  now     The DD value starts blinking by repeated pushing the key    gt  ENTER and may be changed  By pushing key       ESC to return to the menu  gt 1  Lower limit lt   The value DD has been accepted for further use  provided the  new value has been confirmed with the key     gt  ENTER the value DD is not blinking   If the value DD is  blinking  it will not be accepted after the return to the MAIN MENU and the original set up value dd will still be  used     77    Automatic boiler for biomass     Service manual  9 5 2 2 Menu 12 2 2 Temperature   upper limit    We will enter the following menu by means of the cursor arrows         0U     By pushing        ENTER to enter the selection of the upper limit for the output water temperature        Adjustment of the upper limit for output water temperature shall be performed in the same way as mentioned   in this chapter above    We will return back to the mode MANUAL by repeated pushing the key    N ESC or it is possible to continue with  the cursor arrows     ESC in selection of the next menu after pushing the key    1      Note  The maximum temperature of the boiler water is limited to 900C   Note  1f it is not desirable for the user to ha
81. how to fix the problem    Reactivation    For automatic operation activation of the control unit and consequently the boiler the output water temperature  must dropped below 99  C  If this condition is not met  the control unit want will not be able to function    After that it is possible to switch to automatic boiler operation by pushing         START and    ENTER buttons  if  the equipment was shut down for a long time  or by pushing the    AUTO MANUAL buttons  if the boiler is still  burning     10 3 STOPPAGE     OVERHEATING IN THE FUEL PATHWAY    By adding a thermostat placed in the burner at the place of fuel entry the boiler safety can be increase and guard  against burned gases back draft through fuel pathways  This measure exceeds requirements of the safety norm  CSN EN 33 5     If the temperature at the plastic flexible hose connection to the burner increases to about 859C  the emergency  thermostat disconnects and the control unit stops the boiler operation     This state is indicated by a red ALARM control light     position 5 at the control panel and also by a message on    the display screen   STOP EMERG TERM2    An acoustic signal will sound at the same time     Under normal conditions boiler overheating does not occur  therefore this situation is considered an emergency     Service personnel attention is required  because it has to be determined why this state of failure  occurred and how to fix the problem     Plugged up jets in the burner  Clean the burner a
82. icture 44    97           5  a mt       _   4     oma i a  LT              Q9                                                  asl L    IK  ml  9        Picture 45 Hydraulic scheme   1 x HC  SWH Tank    86       Sans  ETE   gen         l     Oo       im            nes         LI                            Qo B       Picture 46 Hydraulic scheme 2 x HC   SWH Tank    66    XV11B XV11A XV5B XV3A XV6B XV13B XV9B XV7B               RSENS1   RSENS2   T MIX           W          GAS               1   ROOM TH2   SWT THERM  SYKFY 2x0 8   SYKFY 2x0 8   SYKFY 2x0 8           12V DC 12V DC  MS 02 MS 02 NTC 10000 NTC 10000 PT 1000         K192   K191   K142     14 1   K18 2K18 1    161 4 K152    K231   K232     132   K151   K162                                        es                                 NENNEN NN                  1   FEEDER2   ASH   SWEEPING            SERVO EL IGNITION   EL IGNITION   PUMP1    PUMP2   SWTPUMP  SiFH 3Gx1 SiFH 3Gx1 SiFH 3Gx1 SiFH 3Gx1 SiFH 3Gx1 CYSY 4x0 5 SiFH 3Gx1 SiFH 3Gx1 SiFH 3Gx1 SiFH 3Gx1 SiFH 3Gx1           M  M     Qf D         1   1  15 1        py  A  230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V 230 V  90 VA 90 VA 90 VA 90 VA 40 90 VA 500 VA 500 VA 45 VA 45 VA 45 VA  Picture 47 Electric connection of hydraulic scheme 2 x HC   SWH Tank    OOT          T         f                                                                 okuhi     Do okrun            Hydraulic scheme Cascade   2 x       SWH Tank    Picture 48    101    XV12A    K18
83. ig K17 2       set up parametrs for ash removing   allow or prohibit ash removing   ash removing is repeating  always by the amount of feeder F1 rotations   set up time of the ash removing mechanism   parameters set up for flue sweeping   allow or prohibit flue sweeping   on  ash removing is repeating  always by the amount of feeder F1 rotations  250  set up time of the flue gas sweeping mechanism   3  time zone set up  where flue gas cleaning is permited   8 00 22 00  set up of the flue fan revolutions while in flue gas cleaning 0  choice of multi purpose use of force output   set up function output K15 1  heating TO2 zkrat pump    El  Heating  set up function output K17 2  flue fan TO2 zkrat pump Flue fan    11 15  setting servo time running between the outermost positions                      10    off       on  250  3  8 00 22 00  0    El  Heating  Flue fan       off       on  150  3  8 00 22 00  0    El  Heating  Flue fan    Table 8 Settings   Producer   ver  1 1      Menuno   Menu name   Menu  description   meaning SETTINGS   VALUES         VERSION 6 x gear1 56   auger 38mm  KP62 auger 55mm  KP12 KP22 KP 62  PRODUCER            unit    EFIE  Locking licence for running of the boiler for limited time  Time lock turn on turn off time lock function off off off  Code code for unlocking of time lock  Time to lock set up time until locking of the automatic running of the boiler  Temperature limits limits of temperatures  in which it is possible to set up parameter Temperature
84. igits 0 9  lower case letters from the a z alphabet and upper case letters from  the A Z alphabet     9 5 1 Menu 12 1 Locking    Functions in this menu ensure time limited operation of the boiler  if required so by the interest of the producer   If the control unit displays the Menu 14  Code entering  the boiler is put into operation with time lock activation  for a limited period of time  The time lock may be cancelled after entering a 6 point alphanumeric code   differentiates upper case letters and lower case letters  in the menu 14  before the adjusted period of time  elapses  The control unit requires automatic entering after the period of time elapses     9 5 2 Menu 12 2 Water temperature limits    The producer shall set up the lower and upper limit for the temperature range for operation of the boiler in this  menu  The user will be allowed to change setting only in these limits in Menu 2     MENU 12 2 Temp  limits will appear on the display unit after the PIN for the Producer menu has been correctly  entered and after setting to this menu has been done by cursor arrows    11     9 5 2 1 Menu 12 2 1 Temperature   lower limit    The following script will appear by pushing the key         ENTER       By pushing key        ENTER to enter the selection of the lower limit for the output water temperature        Where dd is the existing adjusted value  DD is the newly required adjustment value and is blinking    Use the cursor arrows    f   to change the required value for t
85. iler price     4 11    The tank is supplied as optional accessory in sizes 100  400  700 and 1 400      The 400   tank has a special modification for pneumatic transfer    Atypical tank finish can be delivered based on special order after consultation with the manufacturer    The tank can be refilled up to full volume without limitations  Fuel refilling of tanks supplied by the boiler  manufacturer is safe  because the tank construction ensures safe distance of the operator from moving parts   During automatic boiler operation the filling tank cover must be closed     4 9 1  4 9 2  4 9 3  4 9 4  4 9 5  4 9 6  4 9 7  4 9 8    FUEL BIN    Bin 100     Bin 400   for pneumatic transfer   Bin 4001   Bin 700     Bin 1 400     Bin based on customer request     made to order  Bin 400   folding   Bin 7001   folding    29    Automatic boiler for biomass     Service manual    4 9 5    4 9 4  4 9 3    4 9 2    4 9 1       Y    Z   X 1500 mm       1000   lt  4000 mm   51900 mm    1520 mm    1320 mm  Yz iple mm Z 500 m     1275 mm 7500 m  Z 200 mm  Picture 25 Standard fuel bin sizes    Je lll 4  JEn s    010 7713          Picture 26 Collapsible bin assembly guide    30    Automatic boiler for biomass     Service manual    5 PLACEMENT OF THE PRODUCT IN BOILER ROOMS  PRINCIPLES OF  INSTALLATION    5 1 PLACEMENT OF PRODUCTS IN BOILER ROOMS    Minimum distances determine the space necessary to perform the operation and maintenance of the equipment   Boiler must be placed on horizontal non flamm
86. ill appear on the display unit after the PIN for the Producer menu has been correctly  entered and after adjustment to this menu has been done by cursor arrows   f  U   By pushing key     gt  ENTER  we go to menu     The number required by us will be adjusted with cursor arrows     1 ft   increases the number value in steps of  1      U   reduces the number value in steps of  1   i    moves to the neighbouring digit to the right       lt     moves to the neighbouring digit to the left   Add character   after last valid number  By this you will define amount of valid numbers   Confirm the adjusted number by pushing the key       ENTER     The following script will appear on the control unit    After this has been confirmed by pushing the key        ENTER the control unit will make a check call in  cooperation with the modem to a selected telephone number  Dialling and ringing is indicated by the following    script     Control call will be terminated by pushing the key        ENTER   Note  The ring through function may only be used after the modem has been connected and initiated     Note  The modem will be initiated by the control unit when the power supply is turned on and if the GSM  modem function ON is enabled  The modem has to be connected to the power supply before the control unit is  turned on     Note  The telephone number must include the national area code     Note  Control unit has phone number of the modem given by manufacturer  By that there is secured  monitori
87. increases fan revolutions by  1           decreases fan revolutions     1    The buttons     gt     lt   have a built in autorepeat function  automatic repeat  if the button is pushed for a  prolonged time     After pushing            ENTER button  the fan will switch on  The display will show     During operation fan revolutions can be increased with     gt  or decreased with        The flue fan can be turned off by pushing the         ENTER button     Note  Depending on selected configuration  the display may mean  TO2 pump  short circuiting pump   which  does not enable pump revolution control     9 3 1 5          1 5 CONTROL OF THE HEATING SYSTEM PUMP  The following will be displayed on the display unit    Turn the pump on after pushing the key         ENTER The following will be displayed on the display unit    Operation of pump is turned off by pushing the key       ENTER   9 3 1 6 Menu 1 6 CONTROL OF THE STORAGE WATER TANK PUMP  The following will be displayed on the display unit       Turn the SW TANK pump on after pushing the key         ENTER The following will be displayed on the display unit    Operation of the SW TANK pump is turned off by pushing the key       ENTER   9 3 1 7 Menu 1 7 CONTROL OF ELECTRIC IGNITION    The following will be displayed on the display unit       Turn the ignition on after pushing the key        ENTER The following will be displayed on the display unit       Operation of ignition is turned off by pushing the key       ENTER     Note  A
88. ing the key     gt  ENTER  The value DD will    79    Automatic boiler for biomass     Service manual    stop blinking and will be saved in the working register for boiler operation in the automatic mode  The values dd  and DD are identical now     The value DD will start blinking again by repeated pushing the key    gt  ENTER and may be changed  Return  back to the menu  gt 1  Lower limit lt   by pushing the key      ESC The value DD has been accepted for further  use  provided the new value has been confirmed with the key           ENTER   the value DD is not blinking   If the value DD is blinking  it will not be accepted after the return to  the MAIN MENU and the original set up value dd will still be used   9 5 4 2 Menu 12 4 2 Upper limit    We will enter the following menu by means of the cursor arrows          By pushing key       ENTER to go to the selection of the upper temperature limit for the output water in order to  turn the circulation pump of the heating system on     Where hh is the existing adjustment value  HH is the newly required set up value and is blinking     Adjustment of the upper limit for the output water temperature to turn the circulation pump of the heating  system on shall be performed in the same way as mentioned in this chapter above     We will return back to the mode MANUAL by repeated pushing the key      ESC or it is possible to continue  with the cursor arrows     gt  ESC in selection of the next menu after pushing the key    ft        No
89. ions of the boiler running 2   90 90    mi        Fanrun out   time of running of the fan after changeover of the boiler into STADBY state min  Flue fan Run in time of the flue fan operation after boiler go to STAND BY min    Rotary sensors set up of control parameters for the function of feeders F1 and F2  RS 1 time set up of time period  in which CU counts incoming pulses of feeder F1 Sec  RS 1 pulses set up of number of incoming pulses of feeder F1  which is expected in set time period ks  RS 2 time set up of time period  in which CU counts incoming pulses of fedder F2 Sec  RS 2 pulses set up of number of incoming pulses of feeder F2  which is expected in set up time period      129    GSMmaster   enables operating  settin up and monitoring of the boiler by the service centre  12 10        Reset service PIN set up service PIN on the value 1111  1211   P            ono       4                  c m         O                      7   5              p 5  aem    a                    420 604 295 525 plus service number    1492 1492 1492    RKP2 15 RKP2 15 RKP2 15    IN change enables set up original producer PIN  13  information about software version used in CU    14      Entercode   Menu for time lock unblocking  by entring correct pin the boiler will unlock    ETT    
90. is about one ceramic  Work carrefully so you do not damage all parts     Cleaning the draughts of combustion products    If there is automatic cleaning installed  there just has to removed a dust above exchanger by a vacuum  cleaner or by forfeiture dust throught pipes of heat exchanger in to a burning chamber     proceed as follows     close the burner door so that the boiler does not contaminate the boiler room too much when we will  clean the draughts     remove lid of the jacketing     dismantle the lid of the boiler body  4 screws  and place it on the floor  When you mount it back later   remove slightly ash from it and be careful not to damage insulation during this operation     now release ash from turbulators and  vacuum dust from the space above exchager    Note  With advantage we use ash separator and regular vacuum cleaner    Dismantling of the burner  remove the fan from the extension pipe on the flange of the burner     dismantle the flanged joint  4 screws  from the drive of the spiral chute feeder 2  remove the complete  feed screw and place aside  Check it for wear and tear at the same time     dismantle now the whole burner flange  4 screws  and remove the burner  Clean the whole inside  surface of the burner carefully with a wire brush  mainly in the place of the feeder s outlet and also in all  places of round and slotted nozzles  These places are most susceptible to sedimentation of solid  products of burning     40    Automatic boiler for biomass     Ser
91. is blinking     The required lower limit value of the output water temperature of the automatic boiler for solid fuel can be set up  with the cursor arrows          Confirm the newly set up value by pushing the key     gt  ENTER  The value DD will stop blinking and will be  saved in the working register for boiler operation in the automatic mode  The values dd and DD are identical  now  The value DD will start blinking again by repeated pushing the key    gt  ENTER and may be changed   Return back to the menu  gt 6 Fan run out lt   by pushing the key     ESC     The value DD has been accepted for further use  provided the new value has been confirmed with the key         ENTER   the value DD is not blinking   If the value DD is blinking  it will not be accepted after the return to  the MAIN MENU and the original set up value dd will still be used     9 5 5 2 Menu 12 5 2 Upper limit    We will enter the following menu by means of the cursor arrows    ff U   By pushing key       ENTER to go to the selection of the upper temperature limit for the output water in order to  turn on the circulation pump of the heating system     Where hh is the existing set up value  HH is the newly required set up value and is blinking     Set up of the upper limit for the output water temperature to turn the circulation pump of the heating system on  shall be performed in the same way as mentioned in this chapter above     We will return back to the mode MANUAL  AUTOX  MODX  SW TANK by repeated p
92. isplay will show     Servomotor close is turned off by pushing the        ENTER button   Note  In order to avoid servodrive damage  functions Servomotor ON OFF block each other     9 3 1 13 Menu 1 13 Display of inputs  The display will show        x     can have value 0 or 1  value 1     means active state  value 0     means inactive state    RT     room thermostat  WT   boiler thermostat  RS     F1 and F2 feeder rotation sensors  ET     emergency thermostat  burner thermostat   BI     state of binary inputs   for service purposes only   BI xxxx1     heating loop 2 room thermostat   BI xxx1x     heating loop 3 room thermostat    Note  After returning from    direct control    by pushing the     ESC button or by    time out   after 60 seconds  without touching the keyboard   all outputs will switch to the initial mode OFF and the boiler will switch to the  MANUAL mode     50    Automatic boiler for biomass     Service manual    9 3 2 Menu 2 Output water temperature setup    Output water temperature settings allows the user to adjust the operating mode requirements of the boiler  heating system or temporary conditions in the heating requirements   Note  Minimum and maximum 77 value is limited by mynufacturer     MENU 2  Temperature will appear on the display unit after a short script   MAIN MENU   and after setup to this  menu with cursor arrows   f     U   The following script will appear by pushing the key         ENTER    After pushing the key         ENTER we will get into 
93. ive and lever mechanism and must lubricate cleaning drives if needed     Anticipated intervals  1 x per year when using wood pellets  1 x per month when using alternative pellets    7 2 2 Burner grate cleaning    During checking it is necessary to pay attention to burning grate cleaning in order to avoid plugging of the burner  air jets    Always perform cleaning  when a continuous layer of ash exceeds 4cm    Clean the burner grate with jets simply by moving a scraper along the burner grate area     Anticipated intervals  1 x in 3     10 day wood pellets  1 x daily alternative pellets    7 2 3 Ceramic grate cleaning    The ceramic grate construction has a self cleaning feature  Dust particles do not stick to the grate after burning  pellets  Nevertheless check cleanliness of these parts  If needed  you can get rid of the dust particles by slightly  shaking the individual parts of the ceramic grate  After this procedure check correct placement of ceramic parts     Anticipated intervals  1 xin 4 month wood pellets  1 x month alternative pellets    Note  Perform this check when the burned gases temperature repeatedly or permanently exceeds 2009C   Important note  Ceramic parts could be extremely hot  Use a proper tool or protective gloves     39    Automatic boiler for biomass     Service manual    7 2 4 Annual audit    Every boiler of the KP series should undergo annual audit after the end of the main heating season  This audit is  necessary in order to prevent from possible no
94. ivery of electric current is restored     The manufacturer does not assume any liability for errors and subsequent damage caused by unskilled  operation of the equipment or by infringement of principles given in these Instructions for installation and  operation or by infringement of generally binding standards and regulations or by using inadequate fuel     If the boiler is moved or otherwise handled with  safety regulations which apply to handling with heavy  loads have to be adhered to     It is prohibited to place heavy loads on jacketed boiler and to step on it  It is recommended toremove the  protective transport after all the building and installation work has been completely finished     External ashtray has to be firmly connected to a boiler fitiing while in the operation  Cover of this ashtray  has to be closed  There could be a dangerous escape of combustion products in to a boiler room     Automatic boiler for biomass     Service manual    2 USE OF THE BOILER AND ITS ADVANTAGES    The series of automatic hot water boilers for wood pellets is designed mainly to heat family houses  small  municipal buildings  cottages and small plants or business buildings     The main advantages of products     1  AUTOMATIC OPERATION ensured by the control unit which cooperates with the indoor thermostat   thermostat of SW tank for hot watter  outside thermometer in the mode of equitherm regulation   eventually by superior control system  which ensures COMFORT for the user includin
95. kinds of waste  and handed over to an authorized entity for disposal     Exception is represented by control with sensing and control elements is subject to return collection ehich is  directly performed by the seller s plan where the product was bought or by the manufacturer of the boiler   Return collection is free of charge     In accordance with current requirements of environmental protection the electronic parts of the  poduct does not contain lead     43    Automatic boiler for biomass     Service manual    9 CONTROL UNIT OPERATION    9 1 USER SETTINGS     MAIN MENU    Control panel description           SETUP       Lg AUTO7 11 22  48  MIX 045 sauna   O  lt E  ON GSM COME  LE                     OW    OFF ourPUT                E  _     ENTER                       I           Esc    The boiler control unit can be turned on by pushing the lever to I position at the main switch located on the boiler  panel     The bold red display will show the immediate water temperature  for instance 048    The first line of the alphanumeric display 2 will show       The sign MANUAL in format AA mm  The temperature display 3 show immediate boiler water temperature or    B  Signs AUTOx  MODx  EQTx   BOILER or STAND BY in case the control unit was turned off in one of these  modes and automatic ignition is not allowed by the program or    C  Flashing sign AUTO and  gt I lt   if the unit is equipped with electric ignition and automatic ignition is allowed by  the program  From the moment t
96. king     Adjustment of the required standby time of the automatic solid fuel boiler can be controlled by cursor arrows      ft 0 The standby period determines the period of time when the automatic boiler is not burning actively  This  mode makes it possible to keep the automatic solid fuel boiler in the standby state under minimum costs and fuel  consumption  Only minimum quantity of burning fuel is kept in the burner space and full operation of the boiler  can be restored at any time  if necessary  If the adjusted standby period is exceeded  the boiler will restore  automatic operation for a period of 2 minutes and will then enter the standby state again     Note  The range of UU values has been determined by the producer within an interval of 720  70 minutes   Note  The adjusted value of standby is in force for all programs     9 4 5 Menu 11 5 Firing parameters    Adjusts parameters for automatic mode of boiler ignition  Time parameters adjusted in this program have to  ensure reliable ignition when the boiler is started cold     MENU 11 5 Firing param  will appear on the display unit after the menu  SERVICE  has been entered and after  adjustment to this menu with the cursor arrows 1 gU     9 4 5 1 Menu 11 5 1_ Red hot time     gt  5  Firing param  lt   By pushing        ENTER key we will go to menu     61    Automatic boiler for biomass     Service manual  By pushing the key        ENTER to enter selection of the time value for red hot time  operation time of       heatin
97. ll appear on the alphanumeric display unit by pushing the key         ENTER    where ddmmrr is the date of software creation in the following format  day  month  year     9 7 MENU 14 CODE ENTERING    If the control unit displays Menu 14  Code Entering  the boiler is put into operation with activation of the time  lock activation for a limited period of time  If the adjusted time lock period gets exceeded  this is indicated by the  following script on the display unit    To enter the code is possible in the boiler operation   Code incleudes small and big letters and numbers   After the correct code is entred MENU will disappear     85    Automatic boiler for biomass     Service manual    10 ERROR MESSAGES    10 1 STOPPAGE     OVERHEATING  EMERGENCY THERMOSTAT    The control unit is equipped with an emergency circuit for boiler overheating  The state of failure      OVERHEATING comes about when the water temperature at the boiler exit exceeds the 959C level  At this point  the emergency circuit of the control unit is activated and the boiler is shut down     This state is indicated by a red ALARM control light     position 5 at the control panel and also by a message on    the display screen   STOP EMERG  TERM1    An acoustic signal will sound at the same time     Only the circulating pump is working to ensure the heat removal from the boiler exchanger   Under normal conditions boiler overheating does not occur  therefore this situation is considered an emergency     Service pe
98. ll by pushing the key         ENTER     Note  The ring out function may only be used after the modem has been connected and activated    Note  Modem will be activated by the control unit when the power supply is turned on and provided the GSM  function   modem ON is allowed  The modem has to be connected to the power supply before the control unit is  turned on    Further menu selections are available by pushing the    f  gU arrows     This MENU is used to adjust the second number the control unit will communicate with  No failure messages will  come to this number  unlike the mobile number 1     The mobile number 2 is adjusted in the same way as mentioned in the MENU 8 2 Mobile number 1     Further menu selections are available by pushing the    ff      arrows     This MENU may be used to adjust the number of operator the control unit will communicate with in case of query  about the residual credit on a prepaid telephone card     Note  Information on the current credit level will be sent to the user with every SMS message sent by the  control unit     54    Automatic boiler for biomass     Service manual  Note  Number for information on credit may be found out from the operator  Example  T mobile  101      Further menu selections are available by pushing the              arrows     This function will allow or inhibit sending any report in case of any failure on the equipment  The following script  will appear by pushing the key       ENTER    Or    depending on the last cur
99. menu selections are available by pushing the    f    U arrows     Note  Service engineer or the manufacturer will adjust this value as per the technical equipment of the boiler   In order to use the function of electrical ignition  it is necessary for the boiler to be equipped with a burner boiler  with a heating coil used to ignite pellets     Note  The course of electrical ignition takes place as per the time parameters which are adjusted by a service  engineer when the boiler is being put into operation     Note  If electric ignition is  gt  OFF lt  the routine for direct mode START is not active    Important       there is a failure of EZ components boiler can work in reserve mode  See Chapter 7 10 fault  stages    9 3 7 Menu 7_ Suplemental electric heating    serves as protection against freezing of the heating system  for instance in unattended buildings  in case of  failure or fuel shortage     MENU 7   The electric supplemental heating will show on the display after a short note   MAIN MENU  The  setting can be changed by the    f  gU arrows     By pushing the        ENTER button display will show     or depending on the last current setting    The setting of the electric heating function can by changed by pushing the    gt  ENTER button    By repeatedly pushing the        ENTER button you can change the ON OFF setting    Select the desired setting and return to the MANUAL  AUTOx  MODx  EQTx or BOILER modes by pushing     NESC button  Further menu selections are avail
100. n after   5485 with a superordinate system    4 2 3 Expander EEx2008    The expander is designated for the increase      the number of inputs and outputs in the RJE2008 control unit     EXPANDER  EEX2008    EasySoft    SS ae       ro  Kk                       Picture 8 Expander EEx2008    It is designed as a DIN bar module where it occupies six positions  Its application is suggested in a remote  distributor where sufficient shielding will be ensured  The expander has its own power supply     4 2 3 1 Technical data    Supply 230V 50Hz  Control unit supply 5 VA  Dimensions 105 x 90 x 59  Weight    0 35 kg  Protection class pursuant to CSN 33 2000 4 41 ed  I   2 2007    Protection from dangerous touching of live parts  pursuant to CSN 33 2000 4 41 ed  2 2007   Protection from dangerous touching of non live parts      automatic disconnection from  pursuant to CSN 33 2000 4 41 ed  2 2007 basic source    Shielding pursuant to CSN 60 529 IP31    By covering and insulation    17    Automatic boiler for biomass     Service manual      Basic characteristics settings pursuant to norm CSN 33 2000 3     AA5 temperature  5    40   C   AB5 temperature  5    40   C  humidity 15     100   BA5 people skills   knowledgeable   BC3 contact with ground     frequent     Described in detail in E2008 documentation        The equipment is designed in accordance to norms CSN EN 60335 1 and CSN EN 60335 2     Classification is in accordance to CSN EN 55014 2  Category II     4 2 3 2 Description of bina
101. n by pusching the key    gt  ENTER and may be changed    Return to the main menu will be performed by pushing the key     ESC     The value AA has been accepted for further use  provided the new value has been confirmed with the key         ENTER  the value      is not blinking   If the value AA is blinking  it will not be accepted when we return  back to the MAIN MENU and the original setting value aa will still be used     Note  The range of values AA is determined within the interval of 70  xx s where xx has to be a value less  than the sum of the values  feeder off   feeder on   advance  The software checks this value and will not allow  its adjustment outside the above mentioned range    Note  The adjusted value of advance is in force for all programs     60    Automatic boiler for biomass     Service manual    9 4 3 Menu 11 3 Run in    Determines a period of time by which the feeder F2  burner s feeder  will stop operating sooner than the feeder  F1  The fuel is safely slid out into the burner  The run in is significant to ensure fire safety of the boiler     MENU 10  3  Run in will appear on the display unit after the menu  SERVICE  has been entered and after  adjustment to this  menu with the cursor arrows    f     U  The following script will appear by pushing the key        gt  ENTER    By pushing            ENTER button display will show     where rr is the existing adjustment value  RR is the newly required adjustment value and is blinking    The required time of 
102. n standard conditions in the next year of operation of the  equipment  If the annual audit is not performed as per the below mentioned programme  this may be considered  by the manufacturer to be the reason for rejection of guarantee conditions in the second year of use  At the same  time  the user gets exposed to a risk of any failure which may cause loss of operating certainty or large physical  damage     Annual audit   due to demanding activities   has to be entrusted to a trained servicing company which will make  record of the audit in the documentation of the boiler     We proceed as follows during the annual audit     Turn off the main switch of the control unit    disconnect the boiler from network by pulling the mains cord from the wall socket or by turning the  socket circuit off in the switchboard     As we will also work inside the boiler  let us the boiler 2   3 hours to cool down before we start next  work   After the boiler gets cooled down  we will start dismantling of ceramic parts through the burner door   i e    remove the ceramic shield over the burner door  by gradual moving to the left and  release it then to the bottom right side from the fixation aperture   remove the ceramic reflector by simple pulling forward    remove all parts of ceramic burning out grate  Lift the back side to a maximum possible hights  front  side lower down and remove the part out     Now remove all ash buildups by steel brush from ceramic parts     Note  Do not forget that it 
103. n trained by the manufacturer     This product may only be operated by adult persons  duly acquainted with the way the product is controlled and  duly acquainted also with these Instructions  If you adhere to the below mentioned principles  the product will  serve you reliably to your full satisfaction     1     2     3     4     5     6     7     8     9     10     11    N    12     13     14     15     It is prohibited to intervene in any way in the structure or electrical installation of products  Having the  equipment been disconnected from the electric network  the power supply cord has to be plugged from  the mains outlet     It is prohibited to use inflammable liquids for ignition     No inflammable materials may be stored on the boiler  neither may they be stored within the distance of  1 500 mm from the boiler  except for operating stock in the metal bin      In order to preserve long term service life of the boiler body  it is not recommended to operate the boiler  frequently under the temperature of 60  C  if the boiler is not protected with a primary circuit  The  temperature of 60  C should be considered as the minimum temperature     The check how the boiler is filled with fuel is only visual  Any verification with touch is prohibited as it  may result in injury     Never open door of the boiler if there is a ignition process  Blinking AUTO will apear on display in this  stage    The door of the boiler has always to be close shut  Should you perform any check  o
104. n which boiler will heat for heating SWH  Time period 2 setting of 2 time period  in which boiler will heat for heating SWH  Time period 3 setting of 3 time period  in which boiler will heat for heating SWH    Electric ignition turn on turn off el ignition mode including heater coil function  Electric heating turn on turn off el heating mode   tempering    GSM modem for cooperation with GSM Modem  insert of mob numb  for communication set competent users  On Off turn on turn off GSM communication of user with CU  Mobil No  1 number with which will CU communicate  This number willl recieve failure SMS info          Mobil No  2 second number with vhich CU will communicate  this number will not receive failure SMS info    Credit No  operator number for request of credit balance of paid mobile card  SMS info allow or prohibit SMS sending when there is contingent equipment failure    8 5   9 2 Equithermal curve   Selection of Equithermal curve for the specific object  1 16     10        Fuel   Selection of the fuel type  1 5        OTI    00 00  24 00  00 00 00 00  00 00 00 00    KP22 KP 62       00 00  24 00 00 00  24 00  00 00 00 00 00 00 00 00  00 00 00 00 00 00 00 00    Table 7 Settings   Service   ver  1 1    SERVICE menu blocked by PIN  contains a set of commands and settings acessible to service technicians    Menu   description   meaning SETTINGS   VALUES    1                           VERSION 6 x gear1 56   auger 38mm  KP62 auger 55mm     for set up time of feeding and ro
105. ng and asistence with boilers with GSM modem     9 5 10 Menu 12 10 Service PIN cancellation  Enter the menu 10  SERVICE and use this menu  if you do not know the user s PIN     MENU 12 10 Reset PIN will appear on the display unit after the PIN for the Producer menu has been correctly  entered and after set up to this menu has been done by cursor arrows       U      Short message will appier on the alfanumeric display by pushing key        ENTER  The service PIN is hereby set up to the value of 1111 and is available for a service intervention     9 5 11 Menu 12 11 Change of PIN    The PIN adjusted by the producer may be changed in this menu  The service organization or service engineer  may use their own PIN  if there is an option that the PIN adjusted by the producer can be abused  Thus he she is  sure that the operating parameters adjusted by him her will not be changed     84    Automatic boiler for biomass     Service manual    MENU 12 11 Change will appear on the display unit after the PIN for the menu Producer has been correctly  entered and after set up to this menu with the cursor arrows         U      We will enter the following menu by pushing the key       ENTER    Using the cursor arrows              gt     we will determine the new PIN  code combination  which will be in force  after confirmation  The adjusted PIN value is confirmed by pushing the key       ENTER     The control unit will prompt us to confirm this number by means of the following note    We will e
106. ng the            gt  li buttons     Note  The boiler output can be set by adjusting the  z  and  v  values  It is recommended that the output  setting in the individual programs is done in ascending order     the lowest output in Program Nr  1  the highest  one in Program Nr  10     Important note  The ascending order is mandatory in the Modulation mode       Example    Menu   11 1 1  Fuel 1 Program No 1 on05 off90 F30 FlueF40 minimum output 6 0 kW  11 1 2  Fuel1 Program No 2 0  05 off60     6 FlueF40 8 5 kW   11 1 3  Fuel1 Program No 3 0  05 off50 F40 FlueF45 10 0 kW   11 1 4  Fuel 1 Program No 4 0  05 off38 F48 FlueF45 13 0 kW   11 1 5  Fuel 1 Program No 5 0  05 off28 F50 FlueF45 17 0 kW   11 1 6  Fuel 1 Program No 6 0  09 off41 F53 FlueF50 20 0 kW   11 1 7  Fuel 1 Program No 7 on09 off34 F59 FlueF50 23 5 kW   11 1 8  Fuel 1 Program No 8 on09 off29 F64 FlueF55 26 0 kW   11 1 9  Fuel1 Program No 9 0  09 off27 F68 FlueF55 28 0 kW   11 1 10  Fuel 1 Program      10  on09 off25 F75 FlueF55 Nominal output 29 kW  11 1 11  Fuel 1 SWT Program 0109 off41 F64 FlueFt50 20 0kW   11 1 12  Fuel 1 Chimneyer Pr  on09 off25 F75 FlueF55 Nominal output 29 kW    Important note  Values  ON  and  OFF  can be changed only within limits set by the manufacturer  Values   V  and  V odt   can be changed from 30 to 100      9 4 2 Menu 11 2 Advance    Determines the period of time by which the feeder F2  burner s feeder  starts operating sooner than the feeder  F1  Fuel falls into the running screw  Th
107. ng water G 1 1 2   2   Heating tube  0150 mm   3   Input of return water G 1 1 2    4   Eletric heater M 48 2   5   Outlet valve G 1 2     KP 62 62bE   1   Output of heating water G 1 1 2   2   Heating tube  0160 mm   3   Input of return water G 1 1 2    4   Eletric heater M 48 2   5   Outlet valve G 1 2           and causes tension in the boiler body and this tension may cause damage to the homogeneity of the body     Attention     Impurities and sediments which might jeopardize failure free operation of pumps have to be thoroughly    rinsed before the system is finally filled with water     33    Automatic boiler for biomass     Service manual    6 2 INSTALLATION OF THE BURNER    The burner of the boiler is configured into one unit     the body of the burner   screw feeder   gear unit   motor    2 spirals for electric ignition including needful cable se picture no  9 10 11     Burner has to be placed in a flange on the back side of the boiler and fasten it by nuts M 10 with washers so  that  Horak nasad  me na pr  rubu na zadn   stran   kotle a pripevnime maticemi M 10 s podlozkami tak  aby t  snic   the  non flammable roupe is fitting evenly and very closely around circumference of the flange     Connect the cable of the feeder F2 on clip K19 1  kabel of the fan on clip K18 1  K18 2  picture 51   Place the fan  in flange     On the flange determined to a pellet supply connect by flexible hose and attach with fastener   Insert a boiler thermostat sensor in to a tube placed 
108. nition   Important note  The feeding time are to a specific fuel  Select the fuel in Menu 10  Feed time is needed for    each fuel different and it can be a big difference     Adjustment of the operation time of the feeders F1 and F2 is performed in the same way as mentioned above in  this chapter     We will return back to the mode MANUAL  AUTO  MODX by repeated pushing the key      ESC or it is  possible to continue with the cursor arrows ESC in selection of the next menu after pushing the key  12     Note  Operation of the feeder F2 is smooth  operation of the feeder 1 has the following rhythm  10 seconds  on  10 seconds off  This will achieve easier operation of the feeder F2  The operation of the feeder F2 exceeds by  15 seconds that of the feeder F1 in order to clear the transport route from fuel     9 4 5 3 Menu 11 5 3 Fan  We enter this menu by pushing the    1    arrows        In the automatic ignition mode we switch to shutting the main fan ON or OFF by pushing the         ENTER  button     Select the desired fan mode   ON or OFF   by pushing         gt  ENTER button again   Return to Menu 11 5 3 by pushing the     ESC button     9 4 5 4 Menu 11 5 4 Fan revolutions    We enter the menu by pushing the              arrows        In the automatic ignition mode we switch to fan revolution setting by pushing            ENTER button     62    Automatic boiler for biomass     Service manual    Important note  Fan revolutions are set for a particular fuel type  First we sel
109. nking  it will not be accepted after the return to the MAIN MENU and the original adjustment value cc will still  be used     9 5 8 2 Menu 12 8 2 1 NUMBER OF PULSES    We will enter the following menu by means of the cursor arrows       V     Go to the adjustment of the number of pulses from the feeder F1 which is expected in the adjusted time window  in the previous menu by pushing the key       ENTER     Expected number of pulses is set up by the same procedure as mentioned above in this chapter   We will return back to the mode MANUAL  AUTOX  MODX  SW TANK by repeated pushing the key     ESC       it is possible to continue with the cursor arrows      a ESC in selection of the next menu after pushing the key    010    9 5 8 3 Menu 12 8 3 F2 MEASUREMENT TIME    We will enter the following menu by means of the cursor arrows    f        We will enter the set up of the time window to measure pulses of the feeder 2 by pushing the               ENTER   Upper temperature gradient set up will be carried out in the same way as mentioned above in this chapter     We will return back to the mode MANUAL by repeated pushing the key       ESC or it is possible to continue with  the cursor arrows      ESC in selection of the next menu after pushing the key D 12     9 5 8 4 Menu 12 8 4 F2 NUMBER OF PULSES    We will enter the following menu by means of the cursor arrows    f  U     Go to the adjustment of the number of pulses from the feeder F2 which is expected in the adjusted time windo
110. nter the identical combination of numbers of the newly selected PIN  using the above mentioned  procedure  We will confirm by pushing the key    gt  ENTER  Acceptance of this new PIN will be confirmed by the  control unit by a short note on the alphanumeric display unit     If the identical PIN combination is not entered in the Check mode  the new PIN will be not accepted and the  control unit will notify it with a short note on the alphanumeric display unit     The whole above mentioned procedure has to be repeated for successful change of the PIN    Important  There is an option left by the producer how to enter the menu Producer in case the PIN is not  known or if the PIN is forgotten   However  RESET of the control unit is carried out  if this emergency option is  used and the producer s default values are adjusted in all registers     Recommendation  The adjusted and tested values of operating parameters should be recorded in the  operating og book of the boiler     Note  The PIN may contain digits 0 9  lower case letters from the a z alphabet and upper case letters from  the A Z alphabet  It is not possible to break through via the trial and error method a PIN entered by means of  this combination     9 6 MENU 13 SOFTWARE VERSION  This MENU is used to identify the software version easily     MENU 9 Software version will appear on the display unit after a short script   MAIN MENU   and after setup to  this menu with cursor arrows         U     A following short script wi
111. nu 11 13 3 by pushing the     ESC button    73    Automatic boiler for biomass     Service manual    We enter the menu by pushing the    f  0U arrows          Here we select the desired flue fan revolutions during flue cleaning  Tt is not recommended to perform flue sweep  when the boiler is hot or when the flue fan revolutions are high  Solid burning remains could enter the  environment    By pushing the    gt  ENTER button we switch to flue fan revolutions setting in the flue sweeping process     Important note  Fan revolutions are set for a particular fuel type  First we select the fuel in Menu 10  Fan  revolutions and the consequent needed air volume may be different for different fuel types        Needed air volume setting is done the same way as above in this chapter  The newly set value is confirmed by  pushing             ENTER button      Return to MANUAL mode by repeatedly pushing the    AESC button or you can continue in your menu selection  with the    ff DU arrows     9 4 14 Menu 11 14 Configuration  The control system E2008 offers the option of a multiple use of the inputs and outputs   9 4 14 1          11 14 1 Configuration K15 1    We enter the menu by pushing         f    U arrows     We enter the menu by pushing         gt  ENTER button     Here we can choose the function of this relay output    Another push of the        ENTER button will display the current output function   The next function can be selected with the    ff gU arrows     By pushing the    
112. nufacturer uses these fans for boilers of the KPx2 model line     Type7  R2E150  manufacturer EBM PAPST  Type8  R2E180  manufacturer EBM PAPST  Type9  R2E210  manufacturer EBM PAPST    66    Automatic boiler for biomass     Service manual    Confirm the selected flue fan type by pushing the        ENTER button  The display will briefly show the selected  fan type     The control unit will return to menu item    2  Flue fan type        9 4 10 Menu 11 10 Boiler output    Data on the rated output of the boiler as well as parameters of fuel feeders are entered in this menu  Values  entered in this way are used by the control unit to calculate the momentary output of the boiler for a particular  adjustment of operation of feeders and will display these data upon the operator s request  These set values will  not effect on actual boiler power output  Even with wrong set up boiler will work in correct power set in menu  11 1 Program     MENU 11 10 Boiler output will appear on the display unit after the PIN for the Producer menu has been correctly  entered and after adjustment to this menu has been done by cursor arrows    f  U      By pushing key       ENTER to enter the adjustment of rated output of the boiler the control unit is used for     Enter the adjustment of rated output of the boiler by pushssing the key         ENTER    where xx is the existing adjustment value  XX is the newly required adjustment value and is blinking   The new value of rated output of the boiler is adju
113. of time by pushing the key         ENTER and return back to the menu          moves to the neighbouring digit to the right          moves to the neighbouring digit to      left    The current state of minutes may be changed by cursor arrows    f  IV   ft   increases the value of the number in step of  1min     0   reduces the value of the number      step of  1min    If the value of minutes has been adjusted  go to the setup of seconds or return back to the repeated setup of  hours or confirm the total setup of time by pushing the key    gt  ENTER and return back to the menu  gt  4  Setup  of time               moves to the neighbouring digit to the right  le   moves to the neighbouring digit to the left    The current state of seconds may be changed by cursor arrows   f    U    ft   increases the value of the number in step of  15   g 0   reduces the value of the number in step of  1s   If the value of seconds has been adjusted by pushing the cursor arrows  go to the setup of hours or return back  to the setup of minutes     Confirm the setup of time by pushing the key    gt  ENTER  The programme will return back to the menu  gt Setup  time        Return back to the mode MANUAL or AUTO by repeated depression of the key       ESC or continue in  selection of the next menu by cursor              f  pY     9 3 5 Menu 5 SW Tank active    Up to three time periods for heating hot service water may be determined in this MENU     Note  The control unit will accept the signal from th
114. ollowing   a  General inputs      Analog  4x  range 0 to 2 5V  resolution 10bit     Binary  2x  log  zero OV to 2V  log  one 3V to 5V     Binary  2x  log  zero OV to 5V  log  one 7V to 12V       Binary  expander   2    log  zero OV to 2V  log  one      to 5V   b  Specialized inputs      thermometers PT 1000  2x      thermometers NTC 10000  3x      emergency thermostat  2x               thermostat  1x      LAMBDA probe  1x    C  Power outputs    9x ON OFF active  contact relay  AC  8A 230V     2   ON OFF active  semiconductor switch  AC  6A 230V       2x phases regulated synchronized with supply voltage   AC 230V  max  6A   d  Communication lines        RS485  2x      RS232  1x                         1x       Ethernet      WIFI  1x     SPI  1x    JTAG  1x     Auxiliary supply voltage output  1x DC 24V max  0 1A     The unit is constructed as an integrated 19  module  The unit is built in vertically either to the left or right side  of the lateral boiler covering  depending on the space possibilities of the boiler room     12    Automatic boiler for biomass     Service manual       Picture 4 RJE2008 Control unit    The unit itself consists of two modules  The power part is affixed to the unit cover        Picture 5 RJE2008 Control unit     power and connecting parts    E2008 Module processor is removable        Picture 6 Processor E2008    Both modules are connected by a connector cable     13    Automatic boiler for biomass     Service manual    TECHNICAL DATA    Supply 230V 
115. ometer inputs NTC10000    PT1000  connector markings  XV3A  XV5A  XV5B  XV2  XV6A  XV6B  are  connected as voltmeters  A D conversion 10BIT  range OV to 2 5V   The decrease of sensor resistance is  measured with constant electrical current     Binary inputs  connectors XV7A  XV7B  XV8A  XV8B  XV9A  XV9B   are equipped with PULL UP resistors 10 kOhm   connected to 5V voltage and ready for control by type OC  open connector  sensors or passive contacts     Binary inputs with supply supports  connectors XV11A  XV11B  are three pronged   they have an extra terminal  with supply voltage 12V and they are ready for sensor control of the OC type  open connector   while the load   PULL UP resistor  is expected in the sensor     Room thermostat  connector XV13B  is a specialized input     output  This is an active input  which is ready for a  metallic switch  If switched on  constant pulsating  10 ms is on  10 ms is off  current  range 0 to max  5 mA   open circuit voltage approximately  6 to  8  runs through the circuit  If this input is equipped on its side by an  E1074 adaptor  this channel can be used also as an output  A 10 ms time window  when electrical current is not  running through the circuit  is used to transfer additional information  This function can be used for instance to  control the room thermostat by GSM    This communication channel  input     output  is  floating  in relation to the other control unit circuits  Only  equipment with SELV may be connected to these t
116. ompetence in electrical engineering and trained by a manufacturer     Installation company or person installing the boiler has to adhere the following standards  and regulations  apart from other things or yours national equivalents     5 3 1 Heating system and boiler    CSN 06 0310   1983   central heating  designing  installation    CSN   EN 303 5  2000     boilers for central heating  part 5    CSN 06 0830   1996     security systems for central heating and heating of hot service water   CSN EN ISO 12100 2 2004   structure and versions of boilers     5 3 2 Venting    CSN EN 1443   Chimneys   general requirements 734200  9 2004     CSN 73 42 01     Chimneys and fume ducts  designing  implementation and connection of fuel consumers   02 2008    Pressure and temperature conditions necessary for safe operation of heat installations are described in the  following standards CSN 73 4201 and EN 13 384 1 and EN 13 384 2    Recommended draught of chimney has to be within the range specified by the manufacturer  See picture 27  in  connection with the installed power output of the boiler     31    Automatic boiler for biomass     Service manual    0 3    DRAUGHT  mbar      gt    x       9 9 1 8 9 10 20 30 40 50 60 70  RATED OUTPUT OF HEAT Q  kW               Picture 27 Required chimney draft    Chimney systems resistant to humidity in which condensation of water vapour is permitted are recommended in  order to ensure long term trouble free and safe operation of the boiler   Chimneys
117. on flange for pellet supply     With burner KP62 attach a security thermostat by two straps on a pipe of the fuel input in to a burner        Picture 29 Burner installation in boiler    34    Automatic boiler for biomass     Service manual    6 3 INSTALLATION OF THE CERAMIC CATALYTIC REFLECTOR    The ceramic catalytic reflector is manufactured from highly heat resistant material  1800  C   It has two functions     directs the flow of combustion products through the boiler body      assists very efficiently to burn out carbon substances and thus to reduce considerably harmful substances in  combustion products     The reflector is placed outside the combustion space during transport in order to prevent from any damage  The  shape of the reflector reminds a hollow semi cylinder with one face closed   see picture no  30        Picture 30 Ceramic reflector    The reflector is installed into the boiler on the surface of the burner boiler with the stop on its rear side and  symmetrically to its centre line     While in operation ceramic reflector has to touch the back part of isolation desk of the burner     If you do not keep it  there is a chance of burner damage or a Boiler   Check regulary      6 4 INSTALLATION OF SECONDARY CERAMIC GRATE    Individual parts of secondary ceramic grate on the picture no  31    KP 12 ZA     kP 22 A            KP 62 A    AA    Picture 31 Parts of secondary ceramic grate       35    Automatic boiler for biomass     Service manual    Function as such
118. on period    The regulation period is the boiler activity time interval in the EQTx mode  in which water temperature increase  or decrease is monitored and their immediate relation to the values of the lower gradient  Menu 11 12 2  and the  upper gradient  Menu 11 12 3  is assessed     We enter the menu by pushing the    f  0U arrows     Select the period setting in minutes by pushing the         ENTER button  The control unit uses this period for  evaluation of preset and current parameters and performs a regulatory interference if needed     Regulation period setting is done the same way as above in this chapter     Return to the MANUAL mode by repeatedly pushing         ESC button or you can continue in your menu  selection with the            arrows     Note  The principle of the boiler operation in the equithermal mode should by easy to see in the attached  chart     69    Automatic boiler for biomass     Service manual    Important note  If we change the regulation period  for instance in small or very large heating systems   it  is necessary to change also the temperature gradient values in a proper ratio in order to maintain regulation  dynamics          Comb Gas T           MIX T        T  of ret  Water         of out           of in        CD       SERVO       Outside T  Wk  Room Therm       SWT Therm       oo            CO C     CN  OQ  Pump                gt      T ALS    BSSLALAISLAR         SWT pump      o 0 9 o 99         n 3 28  gt    28    2SSRgaqn      NN NN
119. on time of the feeder F1     Adjustment of the upper limit for operation time of the feeder F1 shall be performed in the same way as  mentioned in this chapter above     We will return back to the mode MANUAL by repeated pushing the key    a ESC or it is possible to continue  with the cursor arrows      ESC in selection of the next menu after pushing the key    10     9 5 3 3 Menu 12 3 3 Feeder off lower limit    We will enter the following menu by means of the cursor arrows         U   By pushing key        ENTER to go to the adjustment of the lower limit of the idleness time of the feeder F1     Adjustment of the upper limit for idleness time of the feeder F1 shall be performed in the same way as mentioned  in this chapter above     We will return back to the mode MANUAL by repeated pushing the key    a ESC or it is possible to continue  with the cursor arrows      ESC in selection of the next menu after pushing the key    1 U     9 5 3 4 Menu 12 3 4 Feeder off upper limit    We will enter the following menu by means of the cursor arrows    ff U     By pushing key         ENTER to go to the adjustment of the upper limit of the idleness time of the feeder F1     Adjustment of the upper limit for idleness of the feeder F1 shall be performed in the same way as mentioned in  this chapter above     Note  It is not recommended to reduce the upper limit of the turn on time under 5 s    Important  Set up of the upper limit of the switch in time together with the adjusted lower limi
120. onal for  reliable and mainly safe operation of automatic boilers  Rotary sensors ensure higher level of this check    It is possible to define the time window to count pulses in this menu independently for every sensor as well as  the number of pulses which take place within this defined period of time     82    Automatic boiler for biomass     Service manual    MENU 11 8 Rotary sensors will appear on the display unit after the PIN for the Producer menu has been correctly  entered and after set up to this menu has been done by cursor arrows    ff U    9 5 8 1 Menu 12 8 1 F1 MEASUREMENT TIME    The following script will appear by pushing the key         ENTER    By pushing key         ENTER we will enter set up of time window in sec and we will count the incoming pulses in  this time window for the feeder F1     Using the cursor arrows    f  we will determine the new time value which will be in force after its confirmation     Confirm the newly set up value by pushing the key     gt  ENTER  The value CC will stop blinking and will be  saved in the memory for boiler operation in the automatic mode  The values cc and CC are identical now  The  value CC will start blinking again by repeated pushing the key    gt  ENTER and may be changed  Return back to  the menu 1  RS1 time     by pushing the key      ESC The value      has been accepted for further use  provided  the new value has been confirmed with the key        ENTER   the value CC is not blinking   If the value CC is  bli
121. ote  Fuel transportation pathways cleaning and electric parts work should be done by professional service  personnel     Important note  During any manipulation in the fuel pathway the main boiler switch must be turned off or  otherwise disconnected from electric supply     10 8 TEMPERATURE SENSOR ERROR    The boiler operation is affected by the operation thermometer to a large degree  In case it is damaged the boiler  cannot work properly  If temperature sensor error is detected  the boiler operation is stopped     This situation is indicated by a sign on the display          TEMP SENSOR ERROR    The boiler stoppage prevents incorrect boiler operation        Faulty temperature sensor Replace sensor     Boiler reactivation    After temperature sensor replacement by an authorized service personnel it is possible to switch to automatic  boiler operation by pushing the    START and    ENTER button  if the equipment was shut down for a long time   or by pushing the    AUTO  MANUAL buttons  if the boiler is still burning     89    Automatic boiler for biomass     Service manual    10 9 FLUE GASES TEMPERATURE SENSOR ERROR    The boiler burning check is done by measuring the flue gases temperature  The temperature sensor error is  indicated by a flashing error message  This failure does not present danger and the boiler operation is not  stopped     The display message reads     If the flue gases temperature measurement mode is on  pushing of the    a ESC button will result in this 
122. pathways Check  remove blockage  which prevents fuel  entry into feeder    Insufficient boiler output Increase boiler output  up to maximum nominal  output     Incorrectly selected boiler output Check the heating system size and the boiler  output  preferably by a professional firm     Boiler reactivation        After this it is possible to switch to automatic boiler operation by pushing         START and    ENTER button  if  the equipment was shut down for a long time  or by pushing the    AUTO MANUAL buttons  if the boiler is still  burning     10 6 STOPPAGE     BECAUSE OF LOW FLUE GASES TEMPERATURE    If the boiler had been in a STAND BY mode for only a short time and the boiler burns out anyway and switches  into the automatic operation AUTOx  MODEx  EQTx or boiler modes  the boiler adds fuel to a burned out burner   After a short time the boiler will analyze the flue gases temperature and it will realize that the boiler is not    burning and stop it and signal an emergency state on the display   STOP STATE3    Note  This boiler procedure works only if electric ignition is banned by the program     88    Automatic boiler for biomass     Service manual    Note  If electric ignition is allowed by the program  the service personnel mistake is eliminated by activation  of routine electric ignition at the moment the boiler realizes it is not burning  After ignition the boiler works in a  standard manner     Low quality fuel Replace fuel supplier     Stand by period is set inco
123. pen the door  carefully to prevent from getting jeopardized by gathered products of combustion or to prevent any  sparks flying out from the boiler from being the cause of any accident  Open the door slowly in order to  get the combustion chamber aerated towards the chimney  This procedure has to be adhered to when  the ash is being removed from the ash pan s space     If any work which generates inflammable vapours takes place in the boiler room  glueing the floor  etc     the boiler has to be out of operation and the fire has to be burnt out in the boiler     Having the heating season been finished  clean the boiler thoroughly as per the chapter 7   Maintenance   Products of combustion stuck to the walls of the exchanger may act corrosively for the whole period of  time when the boiler will be out of operation  If the burner is not cleaned  this may have effect on faulty  combustion  We recommend to hire a specialized company to perform this work     If you work on or near to the mechanically movable parts  fuel feeder  etc    ensure safe disconnection of  the equipment from electric voltage  There is a risk of injury     You should always operate the boiler only under parameters and in harmony with recommendations  given in these Instructions for installation and operation  If the boiler works in the AUTO mode and if  there is a failure of current  the boiler will start operation again with the electric firing programme  if this  programme has been installed  after the del
124. ption    AUTO 7 11 22  MIX 045  SRV 008                   MANUAL         FAN   4  MAIN FLUE 4              e  lt      ourpur            START B          CHMNEYERI          Picture 7 Description of terminal    16    Automatic boiler for biomass     Service manual    Control panel contains   pos   1  column indicators 2x10 LED tapes    pos   2  alphanumeric display 2x16 characters   pos   3  three digit seven segment LED   pos   4  foil keyboard with mechanical  click  and inserted indication diodes   pos   5  accentuated red indicator   pos   6  control indicators   pos   7  The main switch is placed on the front panel of the boiler near the terminal     The foil keyboard is especially designed for easy replacement of keys description by paper tabs insertion into the  individual spaces      pockets   This design enables a universal functional use and easy national versions of the  keyboard description  The keyboard is comprised of eleven buttons with a mechanical click  Every button has a  light indicator diode  The diodes are lit by using a particular button or by operation of the equipment  which is  controlled by the button     From the design viewpoint  this is an application controlled by a microprocessor and communicating with a  superordinate system after the RS485 interface  The terminal supply is provided from the superordinate system  RJE2008     4 2 2 3 Description of the connectors    XZ62 input     ISP entry programming terminal  XV61 terminal supply  communicatio
125. r has to be equipted with input water thermometer     9 4 15 Menu 11 15 Servomotor    This menu serves for servomotor operation period setting between two limits  Correct setting of this time period  is necessary for the correct temperature control function of output water  equithermal regulation  and closing and  opening of the servomotor     MENU 11 15 SERVO appears on the display after entering the Service Menu  Setting is done by using the      gU    arrows     After pushing the         ENTER button the alphanumeric display will read     sss is the current value  SSS is the newly set value and it is flashing     Confirm the newly set value by pushing the    gt  ENTER button     75    Automatic boiler for biomass     Service manual    9 5 MENU 12 PRODUCER    This MENU is accessible only to a manufacturer or TOP service technicians  It is safeguarded by four number  PIN code     12 PRODUCER         PIN    ENTER          12 1 1 TIME LOCK                   12 2 TEMPERATURE LIMITS    12 2 1 TEMP  LOWER LIMIT    12 2 2 TEMP  UPPER LIMIT       12 2 3 No  OF SAMPLES    12 3 FEEDER 1 LIMITS    12 3 1 FEEDER ON LOWER LIMIT  12 3 2 FEEDER ON UPPER LIMIT  12 3 3 FEEDER OFF LOWER LIMIT    12 3 4 FEEDER OFF UPPER LIMIT    12 4 1 LOWER LIMIT  12 4 2 UPPER LIMIT    12 4 3 ABSOLUT LIMIT    12 4 PUMP LIMITS    12 5 SWT PUMP LIMITS  12 6 FAN RUN OUT      12 6 1 FUELNo 1       12 5 2 UPPER LIMIT    126 2 FUELNo  2    12 5 3 ABSOLUT LIMIT  1263 Fims   12 7 1 FUEL No  1    12 6 5 FUEL No  5 12
126. r must be tightly attached in the right place to the boiler during  operation     Important note  After each visual check of burning or after ash removal you must always make sure that  the boiler door is tightly closed to avoid being stricken by flames from the burning chamber    Ajar or slightly  opened door will cause increased fire hazard and also negatively affect the fuel burning processes     7 1 3 Flue gases exchanger cleaning   Cleaning of the gas flue is done automatically in intervals set by the control unit program  Proper setting is done  in the manufacturing facility or later by an authorized service technician  Exchanger cleaning is performed  repeatedly several times per day depending on burning intensity  Exchanger cleaning can be limited by time  It is    not feasible to use exchanger cleaning for instance during night time     Note  In case the boiler shows signs of faulty burning  smokes when the door is open or the burnt gases  temperature is rising  check the efficiency of exchanger cleaning  Change the cleaning interval     7 2 MAINTENANCE    7 2 1 Burnt gases exchanger cleaning    Is done automatically  electric motor drives lever cleaning mechanism     Operation interval  set by the program  differs by fuel types     It is also possible to remove ash from the burning chamber by turning on the ash removing drive in the Menu        The service technician checks correct function of the equipment  checks turbulators for damage  correct function  of the dr
127. ramic grate  4 4 3 ceramic shield  4 5 Feeder F1 with independent drive  from fuel bin   4 6 A Jacketing of the boiler including heat insulation  4 7 Cleaning system  4 7 1   ash removing  4 7 2   heat exchager cleaning  4 7 3 external ashtray  4 8        fan  with KP12  22 is as a option     Other parts which can be delivered     4 9 Standard accessories  4 10 Optional accessories  4 11 Fuel bin  by needs of customer     Automatic boiler for biomass     Service manual    DIAGRAM OF THE PRODUCTS AND DESCRIPTION OF THE MAIN PARTS    4 1  4 11 BOILER BODY 4 4 2    FUEL BIN  CERAMIC SECONDARY GRATE  4 2 2  CONTROL PANEL                4 7 3  ASH CONTAINER                    4 1 2  DOOR       4 4 1  CERAMIC REFLECTOR  4 7 2  AUTOMATIC CLEANING SYSTEM 4 8  WITH TURBULATORS FLUE GAS EXHAUST WITH FAN  4 2 1 4 5  E 2008 FEEDER F1  CONTROL SYSTEM  4 3 2  CONNECTING FLEXI HOSE  4 3 1  4 3 FEEDER F2  BURNER  CHAMBER       2 4 7 1       MOTOR FOR ASH REMOVING  4    3    4    FE  EL  IGNITION  7 BE  7  EL HEATERSFOR    4 3 3  MODERATE HEATING   MAIN FAN  Picture 1 Diagram of the products and description of the main parts    4 1    Automatic boiler for biomass     Service manual    BOILER BODY  SCHEMA OF THE PRODUCTS AND DESCRIPTION OF THE  MAIN PARTS    is made of top quality steel metal sheets and pipes for boiler in form of a weldment  Its shape is adapted in such  a way so that combustion products are cooled down efficiently at individual levels of power output  which is   moreover  as
128. rent setting    By pushing        ENTER  Button we change SMS info function   By repeatedly pushing            ENTER button you can change the ON OFF setting     Note  A warning SMS message informing on any failure or operating conditions preventing from normal  operation of the boiler is sent to the mobile number 1 and to the number of the service workshop  if entered as a  GSM Master in the menu Manufacturer     Note  The control unit sends the following failure conditions   STOP  STOP NOT IGNITED  STOP TEMP  gt 95C  STOP  TEMP  gt 100C  BLOCKED FEEDER 1  BLOCKED FEEDER 2    By pushing      ESC button we are returning to mode MANUAL  AUTOx   MODx  EQTx  BOILER      it is  possible to continue by pushing 0 ff    arrows to future menu selection   Description of activity     The control unit program software is fitted with functions for receiving and transmitting short text messages  A  set of defined commands assures simple boiler operation     STATUS The control unit will respond with current status information    START This command will start the boiler  room thermostat virtual contact is  permanently ON     STOP This command will switch the boiler to the stand by mode  room thermostat  virtual contact is permanently OFF     NORMAL The boiler accepts the real time room thermostat status    REM ON The control unit will send a signal to the room thermostat  which is then  switched to the  telephone  mode    REM OFF The control unit will send a signal to the room thermostat an
129. riod in minutes the fuel in the burner boiler  has to be provided with in order to burn through well  The fuel has to burn on the whole surface of the boiler for  further automatic operation     Important note  The flare time is given for the specific fuel  Fuel can be selected in Menu 10  Plare time can  be different dipends of fuel type          Adjustment of the burning up period of the automatic boiler is done in the same procedure as mentioned above  in this chapter     Note  The adjusted time period to get the boiler burning will be repeated twice  After the adjusted time  interval RR elapses  the boiler will add more fuel shortly  5 s  and another RR interval will follow    Note  If modulation of the boiler output is allowed  the boiler will start heating on the starting program  adjusted in the modulation menu  chapter 9 4 12 1  MENU 11 12 1  after the program routine of automatic  ignition is finished     Important  Adjustment of parameters for electric ignition is partially dependent on the fuel used  The  service engineer responsible for correct adjustment of these parameters is obliged to test the equipment for    63    Automatic boiler for biomass     Service manual    functionality repeatedly  The demands for time result from the need to start the boiler from the state of being  completely burnt out and cold     9 4 5 8 Menu 11 5 8 Reference temperature    We enter the menu by pushing                   arrows     By pushing key        ENTER to enter adjustment o
130. rrectly Service technician will set longer stand by  period     Boiler reactivation     This happens only when electric ignition is off  Turn on the electric ignition in Menu 6 and fix it  Check possible  causes for boiler burn out  After this  it is possible to switch to automatic boiler operation by pushing the     START and    ENTER button  if the equipment was shut down for a long time  or by pushing the     AUTO  MANUAL buttons  if the boiler is still burning     10 7 BLOCKED FEEDER    The attendant is informed about this situation by a message on the display   This is a motor protection feature and an important fire protection point   In case the F2 feeder is blocked  the  whole fuel pathway could be filled with fuel and the fuel could burn through all the way to the tank      Stoppage prevents overload of the particular feeder motor and its possible destruction     Foreign object in the fuel Clean fuel pathways   Unsuitable fuel  crumbling pellets  Secure standardized fuel     Faulty motor or faulty motor power supply Check functionality of motor  check power  supply     Faulty gearbox Replace gearbox  Faulty impulse sensor Check sensor function  replace if needed     Boiler reactivation        After blockage removal by an authorized service it is possible to switch to automatic boiler operation by pushing  the    START and    ENTER button  if the equipment was shut down for a long time       by pushing the     AUTO  MANUAL buttons  if the boiler is still burning     N
131. rsonnel attention is required  because it has to be determined why this state of failure occurred and  how to fix the problem     Boiler water temperature is set to a high   Lower the boiler water output temperature  Menu 2   for  value  around 909C   instance to 809C     Insufficient heat removal from the boiler             Check the circulatory pump  you may switch to a higher output     circulatory pump is not running      27   Close the particular valves and clean the filter     cleaning filter is plugged up     Faulty hydraulics of the heating circuit   Change the heating circuit settings  change the heating circuit   all thermal heads are closed   wiring     Check temperature increase in the STAND BY mode and make  the time period longer  STAND BY  MENU 11 4   This should be  done by professional service personnel     Large volume of unburned fuel in        Carefully clean the burning chamber and perform professional  burning chamber  adjustment of burning     Stand by time is to short in a boiler with  electrical ignition turned off        Initial operation     For automatic operation activation the output water temperature must drop below 659C  If this condition is not  met  the control unit will not be able to function     Boiler operation reactivation is done in the following steps     1  We leave the boiler idle until the output water temperature drops below 659    see display   To speed up this  process we leave the pump running    2  After that we push the safety
132. rvice center  The  authorized service center will perform professional adjustment of the boiler according to the fuel type you  selected    Important note  Do not willfully change the fuel type unless the boiler is professionally adjusted for that  particular fuel  Boiler damage or dangerous operation status may result  The service organization must record the  adjustment to a different fuel type     9 4 MENU 11 SERVICE    This MENU is accessible only to manufacturer staff or by professional service organizations  The access is blocked  by four blocked PIN code agains a wrong use     5     Automatic boiler for biomass     Service manual    PIN       ENTER  gt  U              11 4 STANDBY TIME    11 6 PUMP         11 7 SW TANK PUMP ON    11 8 CHANGE SERVICE                 11 9 1 FAN TYPE  11 9 2 FLUE FAN TYPE  11 11 EQUITHERM REGULATION  11 12 MODULATION 11 11 1 STARTING PROGRAM  11 12 1 STARTING PROGRAM 11 11 2 GRADIENT LOW  11 12 2 GRADIENT LOW 11 11 3 GRADIENT UPPER  11 12 3 GRADIENT UPPER 11 1 4 ZONE    sis  11 125 Z0ONE2     11 11 6 REGULATION PERIOD    11 14 CONFIGURATION    11 12 6 REGULATION PERIOD       Picture 37 Operational block diagram   Service    58    Automatic boiler for biomass     Service manual    The Menu is PIN encoded  It contains a file of adjustments accessible to service engineers  Output stages  corresponding to the air quantity in course of burning and parameters ensuring safe and reliable operation of the  boiler are adjusted in individual menus  
133. ry inputs of the expander    Binary inputs supporting X1  X2 expander are  three prong   they have one 12 V terminal  and they are prepared  for control by OC  open connector  sensor     4 2 3 3 Description of EEx2008 expander outputs    Triac  motion sensor  active output  expander terminals X5  is designated for general use  The maximum load of  each output is up to 6A and the current total limitation for EXE2008 is 16A  If the unit is meeting the activation  conditions  program  manual control and active emergency thermostats   these terminals show grid voltage  The  angle of connection can be entered as percentage value or this value can be part of the expander inside  algorithms     Important note  This output must have outside protection       Triac  motion sensor  active output  expander terminals X6  is designated for general use  The maximum load of  each output is up to 12A and the current total limitation for EXE2008 is 16A  If the unit is meeting the activation  conditions  program  manual control and active emergency thermostats   these terminals show grid voltage  The  angle of connection can be changed from zero to 909  after that the relay is on  This function enables start up of  a motor with large input  this eliminates heat load for the semiconductor  This output can be run for lower  outputs as a standard controlled output  It can be activated from the control unit or this value can be part of the  expander inside algorithms     Important note  This output
134. s      step of  Imin    If the bottom limit value in minutes is adjusted  go on to the setup of the top limit value in hours for the time  period by pushing the cursor arrow     gt  or by pushing the key         ENTER     The top limit in hours and minutes for the time period is adjusted in the same way     52    Automatic boiler for biomass     Service manual    Return back to the menu 5 SW TANK ACTIVE or to the modes MANUAL  AUTOx   MODx or SW TANK by  repeated pushing the key   a ESC  The same provisions apply for setup of the bottom and top limit for the time periods 2 and 3     Time period 2    Time period 3    Note  For the correct function check the time set up in Menu 4   Note  The time zone cannot cross midnight  so it must be set accordingly     9 3 6 Menu 6_Electric ignition    Permits and inhibits function of electric ignition heating coils and the use of routines to start extinguished boiler  automatically     MENU 6 Electric ignition will appear on the display unit after a short script   MAIN MENU   and after setup to this  menu with cursor arrows  ff IV     By pushing the        ENTER button display will show     Or  or depending on the last current setting    The setting of the electric ignition function can by changed by pushing the        ENTER button   By repeatedly pushing             ENTER button you can change the ON OFF setting     Select the desired setting and return to the MANUAL  AUTOx  MODx  EQTx or BOILER modes by pushing     NESC button  Further 
135. s 10A  If the unit is meeting the activation  conditions  program  manual control and active emergency thermostats   these terminals show grid voltage  This  output is in RJE2008 used in the solid fuel application as a main switch of the circular pump  It is the only unit  output  which is live even when the emergency thermostat is inactive     Triac  motion sensor  relay passive outputs  terminals K19 1  K19 2  are designated for general use  The  maximum load of each output is up to 6A and the current total limitation for RJE2008 is 10A  If the unit is  meeting the activation conditions  program  manual control and active emergency thermostats   these terminals  show grid voltage  The K19 2 output is  dependent  on the K19 1 output     Voltage can be present on the K19 2 terminal only if terminal K19 1 had been switched on before that      Triac  motion sensor  relay active outputs  terminals K17 1  K18 2  are designated for general use  The    maximum load of each output is up to 6A and the current total limitation for RJE2008 is 10A  If the unit is  meeting activation conditions  program  manual control and active emergency thermostats   these terminals  show grid voltage  The angle of connection can be entered as a percentage value or this value can be part of the  algorithms     Four prong relay  terminals K15 2  K16 1  connects two outputs  which can be used for independent switching   They have only two common terminals   PE and N  These outputs are mutually blocked  
136. s perfectly resistant to environment effects and ensures perfect appearance of products on long term    basis  Design of whole solution is using a modern shape elements     11  This SUBSIDIED ABLE PRODUCT   is fullfilling all required conditions for obtaining subsidies in many    states of the European Union   12  LONG DISTANCE CONTROL and monitoring by internet or GSM connection     Automatic boiler for biomass     Service manual    3 TECHNICAL DATA OF THE BOILER KP X2    Table 1 Thermal and technical parameters of products     Parameter     Tune   KP ARNE   KP 2272           62 62       Efciency  rated output                912   908        906         in heating value 17 5MJ Kg and efficiency 9096       Table 2 Solid harmful substances in combustion     Parameter  Uni     KP ADE KP 2322   KP 6262      Average mass flow rate solid elements g   hrs  0 36 0 65 22  pollutions at rated power    Table 3 Technical parameters of products     Parameter          Unit                    KP 2222     KP 62 62    160  Connections  heating and return water       Heating surface    Dimensions  w   d  without ashtray 47 7x 980 614x980 45x1360    Dimensions  h   Working overpressure of water  Hydraul loss AT 10K  Hydraul loss AT 20K 2 77  Required draught  Recom operating temp  of heating water  Lowest temp  of incoming water    Table 4 Electrical parameters of products     Parameter Umi   KP12 2E   KP 2222        62162     Connecting votas     20       10  SOHzi2Hz _  EI  Protection ofthe 
137. s prescribed by annual check   up     Plugged up chimney flue  Clean boiler chimney flue     Insufficient flue pull or back draft  Call professional chimney sweep  solution must  be designed by professional firm     Initial operation   For automatic operation activation the output water temperature must dropped below 659C  If this condition is  not met  the control unit will not be able to function        Boiler operation reactivation is done in the following steps     We leave the boiler idle until the output water temperature drops below 659C  see display   To speed up this  process we leave the pump running    After that we push the safety thermostat reset button  You must hear the trigger click   The red reset button is  accessible without any tools by removing the top boiler cover and unscrewing the black coverings   Shut down  the control unit with the switch for about 5 seconds and then turn it on again    Now the control unit is ready for further operation in the MANUAL mode     After that it is possible to switch to automatic boiler operation by pushing the    START and    ENTER button  if  the equipment was shut down for a long time  or by pushing the    AUTO MANUAL buttons  if the boiler is still  burning     87    Automatic boiler for biomass     Service manual    10 4 STOPPAGE     BECAUSE OF FAULTY ATTENDANCE    If the boiler was switched to MANUAL mode and remained in this mode for too long  the boiler fire burned out    If the attendant now switches into automa
138. s section 4Bx2 5 4  50x25 65x25  junction box  cross section    schematic  symbol                   switchboard Boiler KP xxE switchboard central grouding  identification  equipment switchboard boiler switchboard bonding  as per possibilities boiler room as per possibilities  as per location as per the       location of  equipment    NOTE   type of version     closed protection  IP55    in the building    customer s  requirement    and location  in the building    as per possibilities  of the building    and location    in the building       open protection  1  20 Voltage system    dimensions  E 3 PE N  50Hz  400 250 V  TN C S   division    Protection against dangerous contact voltage    supply  from the top via automatic disconnection from the source  outlets  down Increased protection    operation  by electrically instructed persons via additional bonding    Picture 54 Electrical installation version for input 3 PE N  50 Hz  400 230 V  TN C S    LOT    THE SPACE FOR BOILER  WITH ASH CONTAINER                SAMPLES OF TRANSPORTATION BY COLLECTING THROUGH SETS    COLLECTING THROUGH SET       Picture 55 Dim  Req  for the placement of KPx2 in boiler room     exam  of using collecting troughs    80T    Boiler output  kW     Picture 56    60T                                                    0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17  Wood pellets consumption  kg hour     DIRECTORY INFORMATION   CONSUMPTION WOOD PELETS FOR BOILERS TYPE KP AT ACHIEVEMENT 4 5   62 kW    Director
139. sisted by a newly developed system of turbulator of combustion products  The exchanger is shaped  in such a way so that the exhaust pipes of combustion products can be cleaned individually and efficiently     Boiler body i fitted with the following     4 1 1  4 1 2    4 1 3  4 1 4  4 1 5  4 1 6  4 1 7  4 1 8    4 1 9  4 1 10    4 1 3    steel weldment with turbulator heat exchanger   1 pc  of door  allowing inspection of conbustion and burner while in operation  installation of all ceramic  parts before starting the operation and possible cleaning of the burning chamber   flue gas exhaust   diametr of the flue   130   150   160 mm fot individual types which are in table 3   output of heating water    112      inside thread    input of return water    112      inside thread    rear flanged orifice in order to install the burner syst  m   an outlet of Y2         order to install an inlet  outlet  valve   extension piece with inside thread M48 x 2 mm in order to make it possible to install an electrical  heating unit   turbulators  event  with system of semiautomatic cleaning of the heat exchanger    opennig on top for cleaning covered by a lid of the boiler  s body    4110 4 1 8       4 1 5    Picture 2 Boiler body    10    Automatic boiler for biomass     Service manual    4 2 CONTROL SYSTEM OF THE BOILER    The Boilers are equipped with the E2008 control system  This control system enables automatic boiler operation  with the help of control and regulation features  thermomet
140. sted with the cursor arrows            gt  U     Confirm the newly adjusted value by pushing the key       ENTER  The value XX will stop blinking and will be  saved in the memory boiler operation in the automatic mode  The values xx and XX are identical now  The XX  value starts blinking by repeated pushing the key      gt  ENTER and may be changed  Depress the key    a ESC to  return to the menu  gt    Power  KW         The value      has been accepted for further use  provided the new value has been confirmed with the key         ENTER   the value XX is not blinking   If the value XX is blinking  it will not be accepted after the return to the  MAIN MENU and he original adjustment value xx will still be used     We will enter the following menu by means of the cursor arrows               Enter the adjustment of the F1 feeder s factor by pushing the key    gt  ENTER This factor gives the average dose  of fuel delivered into the boiler for 1 second    The factor is adjusted with cursor arrows in usual way    We will return back to the mode MANUAL  AUTOX  MODX or SW TANK by repeated pushing the key        ESC     Important note  constant feeder setting for the type of fuel  Fuel choose in advance in Menu 10 Constant  feeders reflects both the amount of fuel  dose for 1 sec  but also the calorific value of fuel used     Note  Entered values of the boiler output and factor of the feeder F1 are used by the control unit to calculate  the output indirectly  The value stated is only
141. switch in the contact of the room thermostat or cool the boiler down    for example  by turning the circulation pump on  see chapter 5 1  direct control  under the temperature value of  the outlet water Menu 2  chap  6     9 3 MAIN MENU    9 3 1 Menu 1 Direct control   Pressing the key         ENTER   after short blinking of the  Main Menu  CU goes over to MENU1 Direct control  The MENU 1 makes it possible to control very simply all outputs and to check the state of input signals  It is  beneficially used to put the boiler into operation or in case of service interventions     Note  Direct control of feeders has to be used when the fuel runs out and the fuel feeders are empty  see  chapter 7 10 Lack of pellets in the bin      Using the cursor arrows    ff    we may go to the next or previous MENU  we can return to the previous menu  or we can leave the menu by repeated depression of the key     ESC     9 3 1 1 Menu 1 1 Control of feeder Fi   After a next pressing        ENTER appears   xxx The period of feeder operation in sec    we may change the operation period of the feeder 1 by cursor arrows       gt   increases the operation period by  10sec            reduces the operation period by    10sec  Turn on the Feeder 1 after the key      gt  ENTER has been depressed  The following will be displayed on the    display unit  Feederi ON  The feeder will stop when the value 000 is reached     The operation period of Feeder 1 may be increased      or reduced      during operation 
142. t for idleness  of the feeder F1 has to ensure that the dosing which corresponds to the maximum power output of the boiler will  not be exceeded     9 5 4 Menu 12 4 Pump limits    The producer will set up in this menu the upper and lower limit of the temperature range in which the pump of  the heating system is turned on  The service engineer will be allowed to change setting only within these limits   kapitola 6   Menu 10 6      Producer shall set up also the absolute temperature under which the pump will always be turned on regardless of  ambient conditions  This mode of the pump control increases operating reliability of the boiler and prevent from  boiler overheating in case of wrong adjustment of the boiler  for example  short standby period      MENU 12 4 Pump limits will appear on the display unit after the PIN for the Producer menu has been correctly  entered and after setting to this menu has been done by cursor arrows     WU      9 5 4 1 Menu 12 4 1 Lower limit    The following script will appear by pushing the key         ENTER     By pushing key        ENTER to go to the selection of the lower temperature limit for the output water in order to  turn the pump of the heating system on     Where dd is the existing set up value  DD is the newly required set up value and is blinking   The required lower limit value of the output water temperature of the automatic boiler for solid fuel can be set up  with the cursor arrows    f  U  Confirm the newly set up value by push
143. tations of fan  for setting of outputs and optimal burning  settings parameters    settings parameters    settings parameters    settings parameters      Program 1  Program 2  Program 3  Program 4    Program 5  Program 6    Program 7  Program 8  Program 9  Program 10    settings parameters      settings parameters    settings parameters    settings parameters    settings parameters    settings parameters      F1 off  F1 on  FAN  F1 off  F1 on  FAN  F1 off  F1 on  FAN  F1 off  F1 on  FAN  F1 off  F1 on  FAN  F1 off  F1 on  FAN  F1 off  F1 on  FAN  F1 off  F1 on  FAN  F1 off  F1 on  FAN  F1 off  F1 on  FAN      for 3096 of nominal boiler output    for 4096 of nominal boiler output    for 5096 of nominal boiler output    for 6096 of nominal boiler output    for 7096 of nominal boiler output    for 8096 of nominal boiler output    for 85  of nominal boiler output    for 9096 of nominal boiler output    for 9596 of nominal boiler output    for 10096 of nominal boiler output    ond off90 F030 FlueFO  ond off66 F033 FlueFO  ond off53 F036 FlueFO  ond off45 F040 FlueFO  ond off38 F042 FlueF0  ond off33 F045           0    ond off30 F047 FlueF0  ond off28 F051 FlueFO  ond off26 F054 FlueF0  ond off24 F055 FlueF0    ond off60 F030 FlueFO        off60 F030 FlueFO  on9 off60 F034 FlueFO  on9 off48 F037 FlueF0  on9 off40 F040 FlueFO  on9 off34 F043 FlueFO  on9 off32 F046 FlueF0  on9 off29 F051 FlueFO  on9 off27 F054 FlueF0  on9 off25 F057 FlueF0    ond off61 F030  FlueF100  ond off40 F030
144. te  Maximum temperature level of the boilers water is limited to 70     fro starting a pump  so it pevents  boier overheating  Minimum temperature must be kept above value condensing temperature  559C    9 5 4 3 Menu 12 4 3 Absolut limit    We will enter the following menu by means of the cursor arrows    02     By pushing key       ENTER to go to the selection of the absolute temperature of the output water in order to  turn the pump of the heating system on     Where aa is the existing set up value  AA is the newly required set up value and is blinking     Adjustment of the upper limit for the output water temperature to turn the pump of the heating system on shall  be performed in the same way as mentioned in this chapter above     We will return back to the mode MANUAL  AUTOX  MODX  SW TANK by repeated pushing the key      ESC  or it is possible to continue with the cursor arrows      a ESC in selection of the next menu after pushing the key    ony     Note  The maximum temperature of the boiler water to turn the pump on is limited to 700C in order to  prevent the boiler from overheating  The minimum temperature has to be maintained above the condensation  temperature  550C      9 5 4 4 Menu 12 4 4 Pump run out time    We will enter the following menu by means of the cursor arrows D    U     By pushing key         ENTER to go to the selection of the time in minutes for run out time of the pump of the  syst  m after he boiler enter the Standby state  default value  4 minut
145. the    outlet     Connect  Connection terminal  6 6 1 Feeder motor F2 K19 1  N  PE  6 6 2 Impulse sensor F2 XV11A  6 6 3 Electronic ignition spiral cables K23 1 K23 2  N  PE  6 6 4 Fan K18 2 K18 1  PE  6 6 5 Flue fan  if used  K17 2 K17 1  PE  6 6 6 Feeder motor F1 K19 2  N  PE  6 6 7 Impulse sensor F1 XV11B  6 6 8 Flue thermometer XV6B  6 6 9 System pump K13 2  N  PE  6 6 10 Boiler pump K16 2  N  PE  6 6 11 Servomotor 3  4      way valve K15 2  K16 1  N  PE  6 6 12 Room thermostat cable XV13B  6 6 13 Boiler thermostat cable XV7B  6 6 14 Surface temperature sensor XV5B  6 6 15 Surface temperature sensor  of returning water XV3A  6 6 16 Outside temperature sensor XV5A  6 6 17  Module ETHERNET  XV10  6 6 18  GSM Modem  XV12A  6 6 19  Module Expander  XV4A    Important note  Fan 6 6 4 and flue fan 6 6 5 are controlled proportionally  The fan neutral conductor must  be connected to blue terminal K17 1 or K17 2    It may not be connected to the common neutral conductor    blue terminal N     With the help of MENU 1  direct control   to be checked by qualified personnel     6 6 20 F1 feeder motor function and correct rotation direction   6 6 21 F2 feeder motor function and correct rotation direction   6 6 22 Correct functioning of F1 feeder impulse sensor and simultaneously   6 6 23 Correct functioning of F2 feeder impulse sensor   6 6 24 Functioning of fan and linearity of its regulation   6 6 25 Functioning of flue fan and linearity of his regulation  if used    6 6 26 Functionin
146. the NN value is not flashing   If the NN value is flashing  it will not be accepted after  return to the main menu and the original value nn will be used instead     9 4 11 2 Menu 11  11 2 Lower gradient    The lower temperature gradient is the required minimum temperature increase in a monitored time interval  If  the increase is lower  the boiler will automatically increase its output in the next time interval     We enter the menu by pushing the              arrows     Select the lower temperature gradient setting by pushing the         ENTER button     Lower temperature gradient setting is done the same way as above in this chapter    Return to MANUAL mode by repeatedly pushing          ESC button or you can continue in your menu selection  with the D 1   U arrows    9 4 11 3 Menu 11 11 3 Upper gradient    The upper temperature gradient is the required minimum temperature increase in a monitored time interval  Tf  the increase is upper   the boiler will automatically decrease its output in the next time interval     We enter the menu by pushing the    f    U arrows     Select the upper temperature gradient setting by pushing the    gt  ENTER button     Upper temperature gradient setting is done the same way as above in this chapter     68    Automatic boiler for biomass     Service manual    Return to MANUAL mode by repeatedly pushing the     ESC button or you can continue in your menu selection  with the    ff DU arrows     9 4 11 4 Menu 11 11 4            I    This is t
147. the axis of the pipe and should not thus drag  against the wall of the pipe  which is one of reasons why smooth operation is blocked      The joint has to be treated with a sealing paste before the flange of the drive is installed  which is an  important measure against smoke penetration     Individual part of the extension grate have to be placed precisely in their correct order     The ceramic reflector has to be placed symmetrically in the corresponding bed of the burner and  plugged in the stop to the rear side  Individual bearing surfaces  of the burner and reflector  have to be  in mutual contact     Having the back installation been done completely  check via gradual visual check whether all parts are  installed correctly  Finally  try operation of the spiral chute feeder  Its operation has to be calm and  without any disturbing noise    Re entry into service  After the maitenance is done connect boiler to a power line a trun on main switch   Check if feeders are fill with a fuel and that the pellets are transported in to a burner   Press buttn    START and confirm by pressing button        ENTER     If the boiler is not going to be used in summer time  like heating of service water   we keep the main  switch off     41    Automatic boiler for biomass     Service manual    7 3 OPERATING CONDITIONS   BASIC DISPLAY    AUTO1  2 10   Boiler is operationg in automatic mode by values of parameters in specific program  v MENU 2  5  6  and service  menu       AUTO   blinking  
148. the menu where we may change output water temperature        where tt is the existing setup value  TT is the newly required setup value and is blinking     The required output water temperature of the automatic boiler may be adjusted with cursor arrows            This  temperature is a significant parameter to control the operation of the boiler  If the output water temperature  reaches the adjusted value  the boiler will get to a so called STANDBY MODE   see chapter 7 9      Hf   increases the required output water temperature in step of  1           reduces the required output water temperature in step of  1        We will confirm the newly adjusted value by pushing the key         ENTER  The value TT will stop blinking and is  stored in the working register for operation of the boiler in some of the automatic modes     The values of tt and TT are identical now     The value TT will get blinking again by repeated depression of the key    gt  ENTER and        be changed   Depress the key      a ESC to return to the main menu     The value TT is accepted for further use  if the new value has been confirmed by the key     gt  ENTER   the value  TT is not blinking   However  If the value TT is blinking  it will not be accepted when we return back to the MAIN  MENU and the original setting value tt ill still be used     9 3 3 Menu 3 Language selection    MENU 3 Language selection will appear on the display unit after a short script   MAIN MENU   and after setup to  this menu wit
149. tic operation by pushing the    AUTO  MANUAL button  the boiler will  add fuel into a burned out burner  After a short time the boiler will analyze the flue gases temperature and it will  realize that the boiler is not burning and stop it and signal an emergency state on the display     Note  This boiler procedure works only if electric ignition is banned by the program     Note  If electric ignition is allowed by the program  the service personnel mistake is eliminated by activation  of routine electric ignition at the moment the boiler realizes it is not burning  After ignition  the boiler works in a  standard manner        Faulty attendance Ignite the boiler manually     Boiler reactivation    After this it is possible to switch to automatic boiler operation by pushing the    START and    ENTER button  if  the equipment was shut down for a long time  or by pushing the    AUTO  MANUAL buttons  if the boiler is still  burning     10 5 STOPPAGE     BECAUSE OF LOW WATER TEMPERATURE    If the boiler does not reach 459C temperature within 30 minutes after switching to automatic operation or if  during operation the temperature drops below 409C for more than 30 minutes  the control unit will assess this  situation as non standard and will stop the boiler operation     This is indicated by a display message     Low quality fuel Check the fuel by a professional firm  change if  need it    Shortage of fuel Add fuel to the tank and fill pathways by manual  feeder control     Blocked 
150. time interval  Quality of used fuel    Anticipated interval     see anticipated burning times in table 1     Note     seasonal tank may be installed to the boiler  Refueling is controlled automatically or manually     7 1 2 Emptying the external ash containers  It is generally true that ash must be removed any time the ash level exceeds 2cm level below the side edges of  the external ash container     Before you remove the external ash container  switch the boiler to the MANUAL mode by pushing the     AUTO MANUAL button  This way you will avoid spontaneous commencement of ash removal and escape of  burnt gases during time when there is no external ash container in place     Anticipated intervals  1 xin 6 month  KP12     KP22  when using wood pellets  1xin 2 month  KP62  when using wood pellets    It is also possible to remove ash from the burning chamber by turning on the ash removing drive in the Menu        Note  The ash container removal interval depends on the following   Equipment output  volume of used fuel per given time period   Quality of fuel  When using alternative fuel  this interval shortens    significantly   Correct boiler adjustment     Type of boiler installed     Important note  After checking the ash volume in the container or after ash removal  always close the  receptacle cover carefully  This way you will prevent escape of burnt gases to the boiler room     38    Automatic boiler for biomass     Service manual    Important note  The external ash containe
151. to set the water temperature Menu 2 is the value of water temperature at which the    boiler automatically reduces power by one degree     We enter the menu by pushing the    f    U arrows     By pushing key       ENTER we will enter the adjustment of the second temperature deviation from the adjusted  temperature of the output water in the boiler at which the power output of the boiler will be changed    automatically     Adjustment of the second temperature deviation shall be carried out in the same way as mentioned above in this  chapter     We will return back to the mode MANUAL by repeated pushing the key        ESC or it is possible to continue  with the cursor arrows      ESC in selection of the next menu after pushing the key    12     71    Automatic boiler for biomass     Service manual  9 4 12 6 Menu 11 12 6 Regulation period    Regulation periond is boiler time frame in the mode MODx  which monitors the increase or decrease water  temperature and its immediate relationship to the value of the lower gradient  menu 11 12 2   the upper gradient   menu 11 12 3     We enter the menu by pushing the    f  DU arrows     By pushing key        ENTER we enter setup period in minutes  With this period control unit is evaluating set  parameters and those which were achieved and it does a possible regulation intervention    The regulation period set up shall be performed in the same way as mentioned above in this chapter     We will return back to the mode MANUAL by repeated by
152. turer  immediately after having been ascertained     6  If the conditions described in the items 1     5 have been not met  the above mentioned  guarantee may not be required from the manufacturer     The manufacturer reserves the right of product innovations  which may not be part of this manual   Important note  Hydraulic connection schemes as you see are based on actual experiences of Kp  boiler operations  User can use this scheme as it Is  or it can modified it to his needs     But that is up to the person who is in charge of the heating system  like project manager or  installation company    therefore PONAST is not liable for its correct solution and functionality     91    MODULATION OFF MODULATION ON    BOILER OPERATING WITHOUT AUTOMATIC HEAT DEMAND BOILER OPERATING WITH AUTOMATIC  POWER REGULATION  HEAT OUTPUT IS TIME   POWER REGULATION   HEAT OUTPUT IS    REGULATED   MODE ON   OFF    BOILER OUTPUT REGULATED BY THE HEAT DEMAND       Picture 39 Principle of the modulation    c6             Hydraulic scheme   1 x HC   SWH Tank    Picture 40    93    XV11B XV11A XV5B XV3A XV6B XV13B      RSENS1   RSENS2 T MIX TRETW          GAS   ROOM THER   SWT THERM  SYKFY 2x0 8   SYKFY 2x0 8    12V DC 12V DC                                      192     19 1     142   Kis1  iK 18 2 K 48 1      K 16 1  Ki152     23 1     232     132   Ki62           __                                                    gt  gt                   L FEEDER 1   FEEDER2   ASH   SWEEPING SERVO EL IGNITION   
153. turer provides guarantee      for the boiler on a period of 24 months from the date of putting into operation  however  not longer than  30 months from the date of shipment from the manufacturing plant     for the boiler body on a period of 60 months from the date of putting into operation     ceramic parts are not covered by the warranty     GUARANTEE CONDITIONS    1  User is obliged to ensure installation of the boiler and putting it into operation only by an  authorized servicing organization which has the manufacturer s accreditation and the user is also  obliged to send the letter of guarantee number 1 to the manufacturer s address immediately  after the product has been put into operation     2  The boiler has to be operated only within these Instructions for operation and only prescribed fuel         be used  wood pellets     6 8 5 mm   free from any admixtures and foreign object     3  If the user wants to claim any form of guarantee  he she has to submit duly filled in letter of  guarantee number 2     4  The user is obliged to demonstrate that the product was maintained in regular intervals which are   described in the chapter  MAINTENANCE   Regualr annual maitenance has to be done by trained pesrson who is  also responsible for the record of it within 14 days  list is part of manual    service intervention or repaire has to  be correctly recorded and sended to a manufacturer     5  Every notification of defect has to be done in writing to the address of the manufac
154. ue by pushing the key    gt  ENTER  The value NN will stop blinking and will be  saved in the memory for boiler operation in the automatic mode  The values nn and NN are identical now  The  value NN will start blinking again by repeated pushing the key    gt  gt  ENTER and may be changed  Return back to  the menu  gt 1  Start progr    by pushing the key    ESC The value NN has been accepted for further use   provided the new value has been confirmed with the key      ENTER   the value NN is not blinking   If the value  NN is blinking  it will not be accepted after the return to the MAIN MENU and the original set up value nn will  still be used     70    Automatic boiler for biomass     Service manual    9 4 12 2 Menu 11  12 2 Lower gradient    Lower temperature gradient is requered minimum grow of the temperature in monitored time passage  If the  grow is lower  the boiler will aoutomatically raise its power output for the next time passage of operation     We enter the menu by pushing the    f       arrows     By pushing key       ENTER we will enter set up of the lower heat gradient program     Lower temperature gradient adjustment will be carried out in the same way as mentioned above in this chapter   We will return back to the mode MANUAL by repeated pushing the key       ESC or it is possible to continue  with the cursor arrows      ESC in selection of the next menu after pushing the key            9 4 12 3 Menu 11 12 3 Upper gradient   Upper temperature gradient is req
155. uered maximum grow of the temperature in monitored time passage  If the  grow is higher  the boiler will aoutomatically lower its power output for the next time passage of operation     We enter the menu by pushing the    f    U arrows     By pushing key         ENTER we will enter set up of the upper heat gradient program     Upper temperature gradient adjustment will be carried out in the same way as mentioned above in this chapter   We will return back to the mode MANUAL by repeated pushing the key        ESC or it is possible to continue  with the cursor arrows      ESC in selection of the next menu after pushing the key            9 4 12 4 Menu 11 12 4 ZoneI   The first approach zone to set the water temperature Menu 2 is the value of water temperature at which the  boiler automatically reduces power by one degree     We enter the menu by pushing the              arrows     By pushing key        ENTER we will enter the set up of the first temperature deviation from the set up  temperature of the output water in the boiler at which the power output of the boiler will be changed    automatically     Adjustment of the first temperature deviation shall be carried out in the same way as mentioned above in this  chapter     We will return back to the mode MANUAL by repeated pushing the key    n ESC or it is possible to continue  with the cursor arrows      ESC in selection of the next menu after pushing the key    12     9 4 12 5 Menu 11 12 5 Zone II  The second approach zone 
156. unt of fuel in the tank Refill the fuel bin     Reactivation    e Fill the F1 feeder with fuel by running the F1 feeder  see MENU 1     e Ignite the boiler by using the electric ignition routine or ignite the boiler manually    e After this it is possible to switch to automatic boiler operation by pushing        START and    ENTER  buttons                90    Automatic boiler for biomass     Service manual  10 12 CLEAN THE BOILER    This is not a true error state  The boiler control unit only points out neglected maintenance     If the flue gases temperature exceeds the 2509C temperature for a short time  normal operation temperatures  are below 2009C   the boiler will assess this situation as dirty exchanger  The boiler must be cleaned immediately     This situation is indicated by a flashing display message     At the same time the control system will lower the boiler output by one degree in order to prevent further  increase of the flue gases temperature  If the flue gases temperature reaches high value again  the boiler output  will be lowered again     Dirty boiler heat exchanger Complete boiler cleaning     see annual inspection    psit Shorten the boiler flue cleaning period     service technician     Unsuitable fuel type Complete boiler cleaning     see annual inspection  Shorten the boiler flue cleaning period     service technician     High boiler output Lower fuel dispensing values     service technician        11 GUARANTEE AND LIABILITY FOR DEFECTS    The manufac
157. ushing the key     a ESC  or it is possible to continue with the cursor arrows      ESC in selection of the next menu after pushing the key    010     Note  Maximum temperature level of the boilers water is limited to 70     fro starting a pump  so it pevents  boier overheating  Minimum temperature must be kept above value condensing temperature  559C     Note  Recomended temperature for switching the pump of SW tank is 60  C  This is the temperature which is  used for preheating of the SW Tank hot water  If the pump is going to switch by lower temperature  hot water  from SW Tank will cool down trough the boiler     9 5 5 3 Menu 12 5 3 Absolut limit    We will enter the following menu by means of the cursor arrows       U     By pushing key        ENTER to go to the selection of the upper absolute temperature for the output water in  order to turn on the circulation pump of the heating system     Where aa is the existing set up value  AA is the newly required set up value and is blinking     Adjustment of the upper limit for the output water temperature to turn the circulation pump of the heating  system on shall be performed in the same way as mentioned in this chapter above     81    Automatic boiler for biomass     Service manual    We will return back to the mode MANUAL  AUTOX  MODX  SW TANK by repeated pushing the key     ESC       it is possible to continue with the cursor arrows      ESC in selection of the next menu after pushing the key    nf     Note  Maximum value
158. utomatic turning off will take place after 60 seconds in order to prevent from damage to heating coils  in case of omission     49    Automatic boiler for biomass     Service manual  9 3 1 8 Menu 1 8 CONTROL OF HEATING    The following will be displayed on the display unit       Turn heating on by pushing the key        ENTER The following will be displayed on the display unit       Operation of the heating is turned off by pushing the key       ENTER    Note  Automatic turning off will take place after 60 seconds in order to prevent from damage to heating coils  in case of omission    Note  By the choosen configuration the output can have meaning of control    Pump TO2  constrictive pump   9 3 1 9 Menu 1 9 Boiler flue sweeping   The display will show     Flue sweeping is turned on by pushing the        ENTER button  The display will show   Flue sweeping is turned off by pushing         gt  ENTER button    9 3 1 10 Menu 1 10 Ash removal   The display will show    Ash removal is turned on by pushing the        ENTER button  The display will show     Ash removal is turned off by pushing the     gt  ENTER button     9 3 1 11 Menu 1 11 Opening servomotor  The display will show     Servomotor opening is turned on by pushing the    gt  ENTER button  The display will show     Servomotor opening is turned off by pushing the        ENTER button     9 3 1 12 Menu 1 12 Closing servomotor  The display will show     Servomotor closing is turned on by pushing the    gt  ENTER button  The d
159. ve an option to change the operating temperature of the boiler   adjust the lower and upper temperature limit to the same required value     9 5 2 3 Menu 12 2 3 Temperature of samples    Displayed temperatures  boiler water temperature  outside temperature  flue gases temperature  etc   are  measured and analyzed periodically by the control unit as an average value calculated from a set number  of samples     MENU 12 2 3 Number of samples will appear on the display after you enter the correct PIN in the Manufacturer    Menu  You can reach it with the              arrows     Switch to the selection of the number of samples for the calculation of the average value of the displayed  temperatures by pushing the         ENTER button        Suitable number of temperature measurements  samples  can be selected with the    ff gU arrows   Note  If the number of selected samples is incorrect  the temperature value may flash  Incorrect number of  samples may cause excessive measurement time     Return to MANUAL mode by repeatedly pushing the    AESC button or you can continue in your menu selection  with the    ff      arrows     9 5 3 Menu 12 3 Feeder F1 limits    Time limits and limits adjusted in this program have to ensure operation of the boiler at the necessary power  levels  Boiler Output is unambiguously given by the quantity of fuel delivered to the boiler during a unit of time     MENU 12 2 3 Feeder 1 limits will appear on the display unit after the PIN for the Producer menu h
160. verings  4 6 3  Upper cover   4 6 4  Front lower cover   4 6 5  Back lower cover   4 6 6  Back cover   including covering  4 6 7  Door cover   4 6 8  Terminal KP62 cover    23    Automatic boiler for biomass     Service manual         4 6 3         3 0       4 6 6       AA    N  4 p  e Wu   auo a  gt     SN  N    eo Ya  E    M                4 6 5      28      1    1    4 6 4    x 4 6 1 4 6 7    Picture 18 Jacketing KP12         4 6 2          4 6 3               Picture 19 Jacketing KP22    Automatic boiler for biomass     Service manual       Picture 20 Jacketing KP62    25    Automatic boiler for biomass     Service manual    4 7 CLEANING SYSTEM    The automatic cleaning system of the boiler significantly affects time of service free operation of the boiler     4 7 1 Ash removal    Ash removal is a complex set of technical and program means  which ensure ash removal from burner heating  chamber to external ash receiver in a regular intervals  The ash is taken out by a spiral conveyor  It is driven by  an electric motor through a toothed chain transmission     The ash removal system can be mounted on the left or on the right side  Assembly of the particular version is  done in the manufacturing facility based on an order  A professional service firm can perform a change  left right   at the boiler location     The motor is connected to the control unit with terminals K14 2  N  PE        Picture 21 Ash removal system    4 7 2 Heat exchanger cleaning    Heat exchanger cleanin
161. vice manual    finally  remove all solid waste located inside the air box of the burner  Tilt the burner gradually in order  to pour out all impurities from the burner through the pipe of the fan  Work until the burner is  completely cleaned     if automatic ignition is installed on the burner  dismantle both spirals and remove all impurities from the  air box of the burner through the installation apertures   Cleaning of burning chamber    In order to prevent from increased dustiness  we recommend to place the lid of the boiler body on the  boiler for this time     While cleaning  we may not forget about the placement bars of the extension grate which have to be  perfectly cleaned so that individual parts of the extension grate can be precisely placed on them back     After complete assembly of all boiler parts remove ash to the external ash container by manually turning    on the ash removal drive in manual control in Menu 1     Remaining ash can be removed by scraper from a burning chamber in to a auger     Back installation of all parts  Should be done in reverse order  Ensure mainly the following in course of this activity     Electric resistance coils   Maximum tightness has to be ensured between the flange of spirals and the  wall of the burner     The flange of the burner has to be put precisely so that the packing cord of the flange fits tightly on the  protruding ribs of the body all over the circumference     The spiral chute feeder should be anchored precisely in 
162. w  in the previous menu by pushing the key        ENTER    Expected number of pulses is set upd by the same procedure as mentioned above in this chapter   We will return back to the mode MANUAL  AUTOX  MODX  SW TANK by repeated pushing the key     ESC       it is possible to continue with the cursor arrows      a ESC in selection of the next menu after pushing the key    0170    Note  It is permitted for the time window to be longer than the operation time of a feeder      one feeding  cycle period  The control unit totals the operation times     83    Automatic boiler for biomass     Service manual    Note  If the recorded number of pulses in the time window is higher than or equal to the set up number  the  operation of feeders is permitted  If the number is lower  the control unit will stop the operation of the boiler and  the following failure message will appear on the alphanumeric display unit  Blocked feeder x      Important  The set up number of pulses to the value of 000 turns off sensors of rotations of the feeder F1 or  F2  This may result in dangerous operating conditions of the boiler     9 5 9 Menu 12 9 GSM Master    Having been completed with the GSM modem  the control unit makes it possible to manage  adjust and monitor  the boiler by the service centre  The service centre s telephone number is entered in this menu  Operating  parameters of the boiler may be changed and operating instructions may be entered from this telephone number     MENU 12 9 GSM Master w
163. we return to Menu 11 13 2     We enter the menu by pushing the    f  OU arrows        Here we set the number of Nr  1 feeder cycles  after which ash removal will commence  The outfeed spiral screw  will operate for a period defined in the following menu        Select this menu by pushing the       gt  ENTER button and this message will appear          72    Automatic boiler for biomass     Service manual  By pushing the        ENTER button again we switch to the time period setting of the outfeed spiral screw  The    time is set in minutes   cc is the current value  CC is the new desired value and it is flashing     The current time period of the ash outfeed spiral screw can by adjusted by the    f    U arrows   9 4 13 3 Menu 11 13 3        sweeping    The program of this Menu provides automatic boiler heat exchanger cleaning  The exchanger cleaning frequency  depends on the type of used fuel  on the boiler output and the heating time period  Therefore the flue sweeping  activation of the outfeed spiral screw is directly tied to the number of Nr  1 feeder cycles     We enter the menu by pushing the    f    U arrows     When you push the        ENTER button    We will enter the Menu  in which we either allow or prohibit the flue sweep function     By pushing         gt  ENTER button we enter the ON OFF switch for flue sweeping             By repeatedly pushing            ENTER button we will select the desired ON OFF mode       pushing         AESC  button we return to Menu 11
164. weight           Picture 23 External ash container    27    Automatic boiler for biomass     Service manual    4 8 FLUE FAN    The flue fan can significantly contribute to a problem free and reliable boiler operation in case the natural  chimney flue is low  When using the flue fan the chimney must be tight and without outlets above the flue fan  connection  Fan revolutions and consequently the required flue can be set in menu 11 1     Programs  If the flue  behind the boiler is too high  it is unfavorable for optimal burning and the manufacturer recommends maximum  flue regulation by the particular flue reducer  Keep connections recommended by the manufacturer     The flue fan is connected to terminals K17 2 and the ground wire to K17 1        Picture 24 Flue fan assembly    4 9 STANDARD ACCESSORIES    Feeder Nr  1  the feeder length corresponds to the fuel bin and the particular installation used   Outside temperature sensor for equithermal regulation   Surface temperature sensor     measuring of temperature behind the mixing valve   Surface temperature sensor     measuring of temperature of returning water   Cleaning tools  scraper for manual cleaning of the boiler body    Outlet inlet valve   2        KP boiler operation and service manual   Quality and completeness certificate of the product     Warranty Certificate    28    4 10    Automatic boiler for biomass     Service manual    OPTIONAL ACCESSORIES    Fuel storage  elective size    Electric heating unit     for temp
165. y information   consuption wood pellets for boiler family KP          FUEL 1  PELLETS        FUELS    Table 6 Settings   User   ver  1 1      Menuno    Menu name   Menu   description   meaning Settings   values    KP12       oe Main menu VERSION 6 x gear1 56   auger 38mm  KP62 auger 55mm   1     Direct control menu serving to direct control of connected equip  and control of input signals and processes  Feeder 1 start of feeder 1 function   Feeder 2 start of feeder 2 function   Fan start of air of combustion fan function 30 100    Flue fan Start of flue fan function 30 100     Pump start of heating system pump function  SWTank Pump start of SW Tank pump system function    EI  Ignition start of electric ignition of boiler   only for control system El function   Heating start of electric tempering of heating system   only for control system EH function   Flue sweep Start flue sweep function   Ash removing start ash removing function to external ash container   Servo open start servomotor open function   Servo close start servomotor close function   Check out inputs control of state of input signals   Room Therm    SWTank Therm    Rotary Sensors F1   F2    setting required value of maximum temperature of boiler output water  Select language setting of language SW version of control unit  CU     Setuptime   setting of the right time on CU    SW tank activate possibility of setting three time periods for heating of hot service water  SWH   Time period 1 setting of 1 time period  i
166. y pushing the key      ESC The value DD has been accepted for further  use  provided the new value has been confirmed with the key    gt  ENTER   the value DD is not blinking   If the  value DD is blinking  it will not be accepted after the return to the MAIN MENU and the original set up value dd  will still be used     We will return back to the mode MANUAL  AUTOX  MODX  SW TANK by repeated pushing the key     ESC or  it is possible to continue with the cursor arrows        ESC in selection of the next menu after pushing the key       ft U  9 5 7 Menu 12 7 Flue fan run out    Fan rundown is a parameter  which defines the time of fan operation after the boiler switches to the STAND BY  mode  The setting enables to improve emission parameters during boiler stoppage and optimizes fuel  afterburning and ensures exhaust of burned gases     Important note  The parameters for flue fan rundown mode are set for the particular fuel type  Fuel is  selected beforehand in Menu 10     MENU 12 7 Flue fan rundown will appear on the display after you enter the correct PIN in the Manufacturer    Menu  You can reach it with the         DU arrows     Switch to the fan rundown time parameter selection the pushing         gt  ENTER button     dd id a current value  DD is the newly selected value and it is flashing   Same notes apply as in the preceding chapter     9 5 8 Menu 12 8 Rotary sensors    It is absolutely necessary to ensure operation of feeders and to know whether they are really functi
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Manuel_installation_mars 2011.odt  Bitte lesen Sie die Bedienungsanleitung bevor Sie mit der  Audit qualité : contenu et mode d`emploi  JBL On Time OnStage IV  Hobart HBR300 Scale User Manual  Operation Manual 09/2012 (Rev. B)  Q n°1 Q n°8 Q n°2 Q n°9 Q n°3 Q n°10 Q n°4 Q n°11 Q n°5 Q n°12 Q  Nostalgia Electrics JFD-100 Use and Care Manual  Holmes HFH441 User's Manual  Diamond Multimedia XtremeTV PVR560RCPCI User's Manual    Copyright © All rights reserved. 
   Failed to retrieve file