State Railway of Thailand

image

Contents

1. SCSI niteat ette tees I oS T 9 e c o ea PS eee co a F 2 lt EERI PRS ASS oe od e SENSIT ORERE RIKERE SSR ICI lt E ER aT o tet 5 i Figure 4 Side View and Top view with dimension of Bogie Turntable layout Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity SRTET gt 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 30 State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 hr N SRT Electrified Train Co Ltd 4911 amp amp 4 Locking The Locking mechanism of the turntable will be effected via a locking wedge This locking wedge has to be positioned in the respective recess In the edge angle four locking recesses are mounted Unlocking operation of the locking wedge is effected manually by hand The turning of
2. 4911 amp amp 9 Installation Facility General SRTET provide facilities along with installation and construction of the civil works Where one exists in our Main depot Klongton Depot Supplier should be able to determine what facilities and other related equipment for pre installed as well SRT SRTET denied compensation costs or otherwise as to the installation subject The basis facilities and Support unit as below 9 1 Power Supply 9 1 1 SRTET provide Electricity with AC 400 Volt 3 Phase N E 50 Hz are be able connected with power socket as capacity 32 Amps type 9 1 2 Each Power socket of 9 1 1 can reserved as needed 9 1 3 If Supplier have requested capacity more higher than 9 1 1 they must provide auxiliary units like as Generator Cable and Circuit Protection to support by themselves 9 1 4 SRTET not allowed to modify Ring main circuit from Main Distribution Panel Distribution Board 9 2 Overhead Crane 9 2 1 SRTET provide Overhead Crane as below only at installation area 9 2 1 1 One 1 unit of Capacity SWL 10 Tons 9 2 1 2 One 1 unit of Capacity SWL 3 2 Tons 9 3 Temporary Workshop amp Storage 9 3 1 will provide temporary area that facilitate for working during installation as per scheduling 9 4 Besides of 9 1 9 2 and 9 3 must in charge by supplier N N x lt a d o E o a 2 o E T
3. e 4911 amp amp 15 Submission General To submit documents related to an effective implementation and monitoring missions in the first act SRT SRTET will have to check the validity of the regulations and practices in force The process is carried out according to regulations both before and after Supplier will be taken to comply with the requirements strictly The basis requirement have to meet as below 15 1 Supplier must submit design drawings and specification of system of Jacks within fifteen 15 days to SRT SRTET after signed the contract received Purchase order from SRT SRTET 15 1 1 Final Drawing and specification of system of Jacks will approved from SRT SRTET before supplier start to produced 15 2 Supplier must send full details of Concrete foundation Drawing As built Drawings both of hard copy and soft copy to SRT SRTET within fifteen 15 days after signed the contract received Purchasing order from SRT SRTET and refer to 4 3 15 3 Concrete foundation have to approved by local engineer Valid License from COE is a must and holding with second class level or higher and make copies of inspection sheet to SRT SRTET after he she have done 15 4 Concrete testing report should be done before installed of each jack Supplier will make a copies of report to SRT SRTET before installed each Jacks also 15 5 All of any copies of final As built Drawings Final of speci
4. 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 72 M ry State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 6 3 7 If detail submission of 6 3 2 need to be updated after proceeding or during work is running Supplier must have informed to SRT SRTET by a letter with reasonable and attached copies of update drawing and detail After SRT SRTET agreed by confirmation supplier can performed accordingly 6 4 Those Electrical equipments and accessories like as Control cable Cable conduit etc SRT SRTET respected with Device standards Installation and Safety discipline are concerned with some standard as follow 6 4 1 EIT 6 4 2 6 4 3 TISI 6 4 4 NEMA 6 4 5 NEC 6 4 6 IEC 6 4 7 IEEE 6 5 According to a surveying are found to improve the structure of underground pattern of the whole or part to be prepared to renovate or rebuilt the existing structure to compliance with engineering principle Supplier must implement and adhere to standards of Electrical construction which can not be used as an excuse or a reason to avoid the decline in contract operations e N x Q lt 4 E o a E 2 2 o gt gt
5. 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 8 Mn State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 3 7 5 ATTACHMENT BS TRAILER BOGIE A6Z0000031638 3 7 6 ATTACHMENT B6 TRAILER BOGIE A6Z00000437429 3 7 7 ATTACHMENT B7 ADDRESSES AND SIGNS EXTERIOR A6Z00000541227 3 7 8 ATTACHMENT B8 WAGON DMB A6Z00000580015 3 7 9 ATTACHMENT B9 ADDRESSES AND SIGNS EXTERIOR A6Z00000595719 3 7 10 ATTACHMENT B10 WAGON PTOSLW A6Z00000580017 3 7 11 ATTACHMENT B11 ADDRESSES AND SIGNS EXTERIOR A6Z00000596685 3 7 12 ATTACHMENT B12 WAGON TOS A6Z00000580018 3 7 13 ATTACHMENT B13 ADDRESSES A SIGNS EXTERIOR A6Z00000585639 3 7 14 ATTACHMENT B14 WAGON DMOS AV00000580019 5 c 2 gt me c 2 um 5 9 e lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 9 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TR
6. D cc lt a TRACKs Facilities system Utilities system and Equipments or Devices supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity e 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 16 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF an re Manos Hi SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 8 Safety measures Regulation and Testing General The standard Safety measures Regulation and Testing shall be subject to inspection or test by the Commercial alliance prior to acceptance In the even supplier of manufacturer equipment or some defective in material or workmanship or otherwise not in conformity with specification requirement the Commercial alliance shall have the right to reject the items or require acceptable correction at before shipment to SRT SRTET The basis requirement shall meet as below 8 1 The Entire lifting system is built and tested according to 8 1 1 BS EN ISO 1493 2010 Vehicle Lifting Platforms 8 1 2 ENISO 13849 Safety of Machines 8 1 3 EN 60204 T1 T
7. an re Manos Hi SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 LANAITUULAMANUALANIE 4911 amp amp Figure 12 Front view of Bogie Lifting o 9 a S a lt Figure 13 Top view of Bogie Lifting Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 55 M ry State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 LANAITUULAMANUALANIE e 4911 amp amp o 2 a o0 2 a e lt Figure 14 3D view of Bogie Lifting E Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity SRTET gt 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 56 State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 SRT Electrified Train Co Ltd 4911 amp amp 2
8. amp amp 5 6 All Concrete foundation have to finished before Bogie Lifting ready to install not less than ninety 90 days or follow Concrete testing if available 5 7 Concrete testing report should be done before installed of Bogie Lifting 5 8 SRTET allowed Supplier to explore the area which beneficial for support civil work and prepared in various ways according to 5 1 5 2 and 5 3 5 9 Floor finishing is make the same pattern of previous state Coating material type amp color is upon SRT SRTET requirement 5 10 During construction period supplier have to fixed authorized person at least one 1 person who is supervised and controlled onsite construction working according to safety manner SRT SRTET required at least engineer level with Engineering license from COE authorized deputy representative 5 11 During construction and Civil work if any defected are found on TRACKs Facilities system Utilities system and Equipments or Devices supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier 5 12 If detail submission of 5 3 need to be updated after proceeding or during work is running Supplier must have informed to SRT SRTET by a letter with reasonable and attached copies of update drawing and detail After SRT SRTET agreed by confirmation supplier can performed accordi
9. e 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 77 M ry State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013
10. 7 gt gt a a 5 wn lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 73 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 7 Safety measures Regulation and Testing General Tested and certified Support system and control function of existing mobile lifting jack to abide by all the features and practical applications Mobile lifting jack may testing in control function which to approved termination is correctly Measuring are including the use of special tools and standard procedure Supplier will be responsible for all the procedures and test reports The basis requirement shall meet as below 7 1 Support system is tested according to table 4 Function Testing Detail Mobile lifting jack control functions to approved Test group operation termination are corrected Test individual each Jacks Test Emergency loop and release Rail width on TRACK Report of standard gauge measurement Report of Leveling at Before and after hold up the A cars in 24 hours Concrete Test Report of concrete testing Electrical insulation test if any R
11. jacks at TRACK 22 February 2013 4911 amp amp Table of contents PART 1 Electric Upper Under Floor Lifting Jack 1 SCredudt 6 2 Specification of commodity 7 3 Description of the individual Lifting Jack Component for Lifting the car at the bogie 8 4 Concrete foundation for each Jacks esses 10 5 Operating Sequence ed ad 12 6 Special Rail system Lifting 13 7 Electrical Control for The Operation of sixteen 16 sets of Lifting 14 8 Safety measures Regulation and Testing eene enne 17 9 Supply Record Past esses enn ener te tenent 18 10 Warranty Claim RR 19 11 Transportation and 1 eterne tentes 20 12 Installation Facility 21 22 14 Commissioning and Training eene nennen 23 15 bu
12. DEPOT WASTE WATER TREATMENT ROLLING STOCK 5 2 10 ATTACHMENT A10 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 21 5 2 11 ATTACHMENT 11 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 22 5 2 12 ATTACHMENT 12 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE 1 SHEET 9 OF 10 5 2 13 ATTACHMENT A13 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE G SHEET 7 OF 10 5 3 After Supplier signed the contract received Purchase order they must submit As built Drawings and completed details of Concrete foundation for Bogie Lifting to SRT SRTET within fifteen 15 days 5 4 The final of As built Drawings from 5 3 is acceptance and approval from engineer he she is holding with a valid second class level of Engineer license from COE 5 5 The Concrete foundation can be proceeded after SRT SRTET agreed in any Term and Condition and refer from 5 3 and 5 4 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 3 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 60 State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911
13. Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 3 Anti roll off Improvement General The anvil of the lifting truck is fixed arrangement The anvil is connected to a rail bridge which serve for lifting a bogie maximum is 10 tons The existing rail bridge is equipped with anti roll off pocket preventing the Bogie form installation inadvertently Supplier must improve existing anti roll off pocket upgrade to Mechanical safety interlocking Supplier must design and make a function of Mechanical Interlocking Anti roll off pocket shall have new feature as below 3 1 Mechanical Interlocking 3 1 1 Release function when need enter a bogie to Bogie Lifting 3 1 2 Locking function when a bogie parking on Bogie Lifting 3 1 3 Permanent and secure when lift up and lift down a bogie 3 1 4 Release function when need remove a bogie out from Bogie Lifting 3 2 Design and Fabrication 3 2 1 Supplier must design of 3 1 and provide good material for fabrication 3 2 2 Mechanical Interlocking are be used same as Bogie lifting for Railway s workshop 3 3 Painting and primer layer 3 3 1 Primer layer is under SRT SRTET assigned 3 3 2 Color for improve units shall be same as previous 3 4 Supplier must send full detail of Anti roll off with drawing and how to install to SRT SRTET before proceeding 3 5 According to a surveying
14. The Manual is standard principle of manufacturer which will be presented and delivered via ordering SRT SRTET prefer to have Operator manual Parts book and Service manual which appropriate to their needs All manual shall be furnished with each unit In addition of all Parts book and manuals must be current with unit delivered The basis requirement have to meet as below 13 1 Supplier have to delivery three 3 of copies of details concerned document to SRT SRTET The bilingual is Thai and English as per set of copies 13 2 pattern of document of 13 1 is prepared for SRT SRTET with both of Hard copies and Soft copies 13 3 Supplier must submit of 13 1 13 2 with in thirty 30 days after Acceptance record is done x o0 2 Lu 2 gt a gt lt lt 2 lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 22 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 14 Commission Training General Commissioning must comply with the standard profile o
15. and completed details of Concrete foundation for Bogie Turntable to SRT SRTET within fifteen 15 days 7 4 The final of As built Drawings from 7 3 is acceptance and approval from engineer he she is holding with a valid second class level of Engineer license from COE 7 5 Concrete foundation can be proceeded after SRT SRTET agreed in any Term and Condition refer from 7 3 and 7 4 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 35 Mn State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 7 6 Concrete foundation have to finished before Bogie Turntable ready to install not less than ninety 90 days or follow Concrete testing if available 7 7 Concrete testing report should be done before installed of Bogie Turntable 7 8 Floor finishing is make the same pattern of previous state Coating material and color type is upon SRT SRTET requirement 7 9 SRTET allowed Supplier to explore the area which beneficial for support civil work and prepared in various ways according to 7 1 and 7 2 7 10 During construction period supplier have to fixed authorized person at least one
16. designed providing supply and installation by supplier 7 4 6 The Cable length from the location of the Main Control Cabinet to the individual Jacks must be isolated 7 47 Connection cable in standard design are hard wire directly to the Control box on each Jacks and to the terminal of the Main Control Cabinet 7 4 8 Connection for each jacks must use with Connector under standard of IP55 7 4 9 Electrical Construction of Power supply system and Underground pattern Supplier must submit Designed s drawings and detailed of material to SRT SRTET before start Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 15 State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp work SRT SRTET will approved final drawings and accepted all specification of material from supplier s details by confirmation 7 4 10 Those Electrical equipments and accessories like as Power Cable Mould Case Circuit Breaker MCCB etc SRT SRTET respected with Device standards Installation and Safety discipline are concerned with some standard as below 7 4 10 1 EIT 7 4 10 2 MEA 7 4 10 3 TI
17. 1 person who is supervised and controlled onsite construction working according to safety manner SRT SRTET required at least engineer level with Engineering license from COE or authorized deputy representative 7 11 During construction and Civil work if any defected are found on TRACKs Facilities system Utilities system and Equipments or Devices supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier 7 12 If detail submission of 7 3 need to be updated after proceeding or during work is running Supplier must have informed to SRT SRTET by a letter with reasonable and attached copies of update drawing and detail After SRT SRTET agreed by confirmation supplier can performed accordingly 7 13 According to a surveying are found to the structure of the whole or part to be prepared to renovate or rebuilt the existing structure to compliance with engineering principle Supplier must implement and adhere to standards of construction which can not be used as an excuse or a reason to avoid the decline in contract operations 9 a 4 c 5 9 lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 36 Mr State Railway of Thailand Extension rail 3 sets Relo
18. 2013 4911 amp amp Qo E erer 13 14 15 16 17 18 DEPOT ROLLING STOCK WORKSHOP GROUND FLOOR FRAMING PLAN ZONE 8 SHEET 8 10 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 14 SHEET 2 2 DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT EL 37 42 ZONE 15 SHEET 1 2 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 17 SHEET 2 2 DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT EL 37 42 ZONE 18 SHEET 1 2 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 15 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 16 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 17 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 20 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 21 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 22 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE 1 SHEET 9 OF 10 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE G SHEET 7 OF 10 DEPOT WASTE WATER TREATMENT ROLLING STOCK ROLLING STOCK WORKSHOP LV LAYOUT UW SHEET 1 OF 1 ROLLING STOCK WORKSHOP LV PANEL BOARD UW SHEET 1 OF 2 ROLLING STOCK WORKSHOP LV PANEL BOARD UW SHEET 2 OF 2 ROLLING STOCK WORKSHOP SINGLE LINE DIAGRAM P
19. 3 sets Relocate 1 unit of Bogie OF an re Manos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 e 4911 amp amp 2 Technical Data 2 1 Type of Turn table Flush mounted Turntable 2 2 TRACK width 1 435 mm 1 5 mm 2 3 Carrying capacity for crossing 100 Kn 2 4 Carrying capacity for turning 100 Kn 2 5 Loading Capacity of the cover wheel load as minimum 30 Kn Wheel 2 6 Turntable diameter 3 400 mm 2 7 Rail system Rail cross 2 8 Position of Turntable Lockable and hand operated Refer to main 0 every 907 360 total manually operated 2 9 Variation of horizontal and vertical alignment of Turntable rails under 3 mm full load condition 2 10 between Turntable cover and shop floor 10 mm as maximum 2 11 between Turntable and shop rail 10 mm as maximum 2 3 4 connecting rail 2 12 Number of adjacent rail TRACKs TRACKS 2 13 Number of castor 8 castors as minimum 2 14 Positioning at adjacent rail TRACKs hinged lock device Manual positioning by hinged lock device 2 a c 5 eo N lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 29 Mr State Railway of Thailand Extension rail 3 sets Relocate 1
20. 5 Tons 16 units The requirement as below 1 1 Supplier must do Civil work Concrete foundation to support of 16 units of existing jack capacity 12 5 Tons 16 units when applied to TRACK 22 T22 1 2 Supplier must provide and installation to completed of Steel Plate for each jacks at TRACK 22 T22 1 3 Supplier must confirmed pit structure is safely after have been renovated or rebuilt Concrete foundation along the TRACK 22 T22 and also existing facilities and waste water system in pit shall able used as a previous state 1 4 Supplier must provide completed installation of Electrical supply and Control cable to support same function at new and alternate location of existing mobile Lifting Jack at TRACK 22 T22 with parallel connected to Main control panel at TRACK 24 24 1 5 work and Concrete foundation are response by supplier The scope include Surveying Designed Materials providing Construction Testing Official approve from engineering license 1 6 Supplier shall certified testing report The certified including Leveling Concrete testing Electricity Insulation testing Load capacity approved e N x o lt gt N E o i E 2 o gt n i o 5 wn cc lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity e 16 sets 12 5 Tons plus 1 set of Bogie T
21. Bogie Turntable PAGE 14 State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 e 4911 amp amp 7 2 17 The Operation of the Group of Jacks will be done by a Control pendant according to the pre selection made at the Touch Screen Panel of the Main Control Cabinet 7 2 18 The Control pendant is equipped with buttons for Up Down and an Emergency button 7 2 19 The Control pendant can be connected to a socket at Main Control Cabinet 7 3 The Control Panel which are built on to every Jacks have the following function or Lamp monitors 7 3 1 One 1 Emergency Shut off 7 3 2 Indicator Lamp Loaded when support anvil is loaded by the Carbody 7 3 8 Emergency Shut off on the Jack has been activated Red Lamp 7 3 4 Additionally there are push buttons integrated for load anvil forward backward 7 4 Power Supply and Connected cable 7 4 1 SRTET will provide Main Supply circuit for Main control cabinet of The Lifting Jack 7 4 2 SRTET reserved Power Electrical circuit at existing Distribution Panel mentioned Distribution Panel name is UW In addition to SRT SRTET will provide reference copies of As built Drawings for Power supply and Location as below ATTACHMENT A 7 4 2 1 ATTACHMENT A14 DEPOT WASTE WATER TREATMENT ROL
22. Co Ltd Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable Extension rail 3 sets Relocate 1 unit of Bogie Lifting and Support Base for Existing mobile lifting jacks at TRACK 22 February 2013 PAGE 12 OF PAGE 77 LANAITUULAMANUALANIE 4911 amp amp 6 Special Rail system Lifting Beam General The special rail was introduced to replace some section of original set that is used now Installation is a necessity each of Cutting and Decorate the Rail profile which take responsibility by Supplier In accordance with the appropriate Drawings and strong as the original model Details in this section include cutting and welding metals plus improve the load base support as a Civil work The basis requirement shall meet as below 6 1 6 2 6 3 6 4 6 5 The System is designed with a Special Rail system The Car run on the total length of the installation on the Wheel treads In the area of the lifting beams the Bogie will be lifted at the remaining tread surface by lifting beams The foundation for the special rail system in the area of the lifting beams must be prepared by Civil work of Supplier according to the Sketch of Special Rail Profile in the area of the lifting beam The Special Rails are in scope of Supplier and will be welded on the welding ground to be supplied by Civil work as per s
23. If damage of Jacks are found or SRT SRTET s properties or assets are damage from unpacking and carrying in cases Supplier shall replace the defective part property and asset s value of all cost to SRT SRTET with the least possible root cause and reasonable delay letter 11 3 Lifting Jacks system shall be qualified via CE certificated e c 2 2 a 2 o 2 lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 20 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 12 Installation Facility General SRTET provide facilities along with installation and construction of the civil works Where one exists in our Main Depot Klongton Depot Supplier should be able to determine the concerned of facilities and other related equipment for pre installed as well SRT SRTET denied compensation costs or otherwise as to the installation subject The basis facilities and Support unit as below 12 1 Power Supply 12 1 1 SRTET provide Electricity with AC 400 Volt 3 Phase N E
24. Installation 13 Commissioning 14 Testing 15 Training course Herein the following abbreviation are used for the convenience as following SRT is mean State Railway of Thailand Bangkok Thailand SRTET is mean SRT Electrified Train Co Ltd Bangkok Thailand COE is mean Council of Engineer of The Kingdom of Thailand EIT is mean The Engineering Institute of Thailand Under H M The King s Patronage MEA is mean Metropolitan Electricity Authority Thailand TISI is mean Thai Industrial Standards Institute Thailand NEMA is mean National Electrical Manufacturers Association NEC is mean National Electrical Code is mean Verband Deutscher Elektro Techniker IEC is mean International Electrotechnical Commission EEE is mean Institute of Electrical and Electronics Engineers DIN is mean Deutsches Institut f r Normung BS is mean British Standards EN is mean European Standards ISO is mean International Organization of Standardization CE is mean European Conformity NDT is mean Non Destructive Testing Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 2 M ry State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd
25. Ltd jacks at TRACK 22 February 2013 4911 amp amp 3 6 Concrete foundation have to finished before testing by Rolling train and a Bogie 10 tons not less than ninety 90 days or follow Concrete testing if available 3 7 Concrete testing report should be done before testing by Rolling train and a Bogie 10 tons 3 8 SRTET allowed Supplier to explore the area which beneficial for support civil work and prepared in various ways according to 3 1 3 2 and 3 3 3 9 Floor finishing is make the same pattern of previous state Coating material type amp color is upon SRT SRTET requirement 3 10 During construction period supplier have to fixed authorized person at least one 1 person who is supervised and controlled onsite construction working according to safety manner SRT SRTET required at least engineer level with Engineering license from COE or authorized deputy representative 3 11 During construction and Civil work if any defected are found on TRACKs Facilities system Utilities system and Equipments or Devices supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier 3 12 If detail submission of 3 3 need to be updated after proceeding or during work is running Supplier must have informed to SRT SRTET by a letter with r
26. as below ATTACHMENT A 7 2 1 ATTACHMENT 1 DEPOT ROLLING STOCK WORKSHOP GROUND FLOOR FRAMING PLAN ZONE 8 SHEET 8 10 7 2 2 ATTACHMENT A2 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 14 SHEET 2 2 7 2 3 ATTACHMENT A3 DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT EL 37 42 ZONE 15 SHEET 1 2 7 2 4 ATTACHMENT A4 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT P EL 37 42 ZONE 17 SHEET 2 2 7 2 5 ATTACHMENT A5 DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT Hs EL 37 42 ZONE 18 SHEET 1 2 E 7 2 6 ATTACHMENT DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 15 7 2 7 ATTACHMENT A7 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 16 7 2 8 ATTACHMENT A8 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 17 7 2 9 ATTACHMENT A9 DEPOT WASTE WATER TREATMENT ROLLING STOCK 7 2 10 ATTACHMENT A10 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 21 7 2 11 ATTACHMENT A11 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 22 7 2 12 ATTACHMENT A12 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE I SHEET 9 OF 10 7 2 13 ATTACHMENT A13 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE G SHEET 7 OF 10 7 3 After Supplier signed the contract received Purchase order they must submit As built Drawings
27. be performed manually 1 6 Design with machined rail profile Radius is close to UIC60 The rail profile will be welded on the Bogie Turntable frame 1 7 cover plate on the Bogie Turntable is checker plate with anti slip surface The thickness of 9 2 d c 5 2 bo eo N lt checker plate is 8 to 10 with stiffener underneath 1 8 The roll cover capacity of the cover plates is three 3 tons minimum per wheel 1 9 At one cover plate three lifting lugs are provided to take out the cover plate in case of maintenance at the support rollers 1 10 The Bogie Turntable will be painted as required in the specification by one layer of primer and two layers of final paint each with thickness of 40 um micro millimeters The color type is RAL is according to SRT SRTET requested 1 11 Supplier must install The Bogie Turntable to desired and proper position 1 12 Civil work and Concrete foundation are response by supplier The scope include Surveying Designed Materials providing Construction Testing and Official approve follow engineering license from CEO 1 13 Supplier must provide Testing and Commissioning with full functions system 1 14 Supplier must provide Training Course Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 28 Mr State Railway of Thailand Extension rail
28. bridge width at machine Report of standard gauge measurement Report of standard gauge measurement Rail width combination TRACK and machine at same alignment both TRACK and machine Report of Leveling at Before during and after hold up 4 cars in 24 hrs Concrete Test Report of concrete testing Electrical insulation test Main supply Report of Insulation testing The test above have to done in house and completed installation at SRTET s site Leveling and Alignment Table 1 Lifting Jack system Testing details Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 17 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 9 Supply Record Past achievement General The background of manufacturer and Quality certification are qualified program for systems of Lifting Jack in Railway sector which is widely used internationally and without being prosecuted in terms of the defect of the products Supplier in Thailand is a Representative or Distributor from Lifting Jack s Manufacturer must have a good track record with the Public trading Government State Enterprise and
29. extension will be subject to the standards that define and support the load safely Extension rail must meet in details of each section are as follows 2 1 Location of TRACK 23 T23 2 1 1 Extension rail connection points between end of Existing TRACK and Start line of New Bogie Turn Table 2 1 2 Support the weight of vehicle along TRACK 213 SRT SRTET will supply mentioned rail profile as needed UIC60 Steel rail standard 2 1 4 Two 2 side of TRACK 23 T23 in parallel is fixed 2 1 5 Accessories and additional concerned devices for install is supply and done by supplier 2 1 6 Rail welding is done by supplier SRT SRTET will accepted in standard method only 2 1 7 Civil work and Concrete foundation on TRACK is necessary to approved 2 1 8 Supplier must confirmed of 2 1 7 and do for construction in safety manner 2 2 Location of TRACK 22 T22 2 2 1 Extension rail connection points between end of existing TRACK and Start line of Existing a c 2 n x m lt Bogie Turntable 2 2 2 Support the weight of vehicle along TRACK 2 2 3 SRT SRTET will supply mentioned rail as needed UIC6O Steel rail standard 2 2 4 Two 2 side of TRACK 22 T22 in parallel is fixed 2 2 5 Accessories and additional concerned devices for install is supply and done by supplier 2 2 6 Rail welding is done by supplier SRT SRTET will accepted in standard method only 2 2 7 Civil work and Concrete
30. nnn nnns tnnt nana 62 6 Warranty and uiro e RR 63 7 Installati n Facility tete e as 64 8 SUBMISSION tne ca ee 65 PART 5 Support system for Existing mobile lifting jacks at TRACK 22 1 TEE O 66 2 Description of Support system sess erasa rasta nas tassa nan 67 3 Concrete foundation sss eene nennen nen ssi ra 68 4 Steel eeiam ERI tn MM cR IR E 70 LU xj c m 71 6 Power Supply and Control Cable nnt nnne tenth 72 7 Safety measures Regulation and Testing sees nins 74 amp Warranty and Claim oerte et du didt e edad n d ena 75 9 Installation eiie il p Rete OR US 76 e teens eerie tard eee 77 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity i 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 4 Mn State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February
31. of Accessories and device to SRT SRTET within fifteen 15 days 4 2 Accessories and device for Installation can be proceeded after SRT SRTET agreed in any Term and Condition and refer from 4 1 4 3 Accessories and device for installation to a new and never been used before 4 4 Accessories and device for installation with the disorder during installation The replacement will be provided with the same or not less than previous 4 5 Supplier must attach documentation of Procedure and how to install the extension rail as actual performed to SRT SRTET together of 4 1 4 6 Installation method can be proceeded after SRT SRTET agreed any Term and Condition and refer from 4 5 a c 2 n x lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 48 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 5 Safety measures Regulation and Testing General Tested and certified to install the extension rail to abide by all the features and practical applications Measuring are including the use of special tools and standard
32. place If damage of The Bogie Turntable are found or SRT SRTET s property or asset are damage from unpacking and carrying in cases Supplier shall replace the defective part property and asset s value of all cost to SRT SRTET with the least possible root cause and reasonable delay letter 2 a 4 c gt tc lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 39 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 11 Installation Facility General SRTET provide facilities along with installation and construction of the civil works Where one exists in our Main depot Klongton Depot Supplier should be able to determine what facilities and other related equipment for pre installed as well SRT SRTET denied compensation costs or otherwise as to the installation subject The basis facilities and Support unit as below 11 1 Power Supply 11 1 1 SRTET provide Electricity with AC 400 Volt 3 Phase 50 Hz are be able connected with power socket as capacity 32 Amps type 11 1 2 Each Power socket of 11 1 1 can reserv
33. same without improvement but must be confirmed and have a certify by the expert The facilities and waste water system underground of pit shall operated same as previous state Pit shall meet as below 5 1 Supplier must offer the possibility for its strong and steady with the submission together of 3 if there is a need to improve or strengthen the walls of pit supplier shall submit the drawing and the process updated simultaneously 5 2 SRTET allowed Supplier to explore the area which beneficial for support civil work and prepared in various ways according to 5 1 5 3 Facilities such as electrical system lighting systems compress air system and waste water systems must be able to operate normally after update the structures or improve the strength of the pit 5 4 Floor finishing and wall are make the same pattern of previous state Coating material type amp color is upon SRT SRTET requirement 5 5 During construction and Civil work if any defected are found on TRACKs Facilities system Utilities system and Equipments or Devices supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier 5 6 If detail submission of 5 1 need to be updated after proceeding or during work is running Supplier must have informed to SRT SRTET by a letter with reasonable and attached copies of update drawing and deta
34. short 4 1 3 New cable of 4 1 2 must connect from Main supply circuit at Distribution panel refer with SRTET s Building power schematic 4 2 Underground pattern 4 2 1 New design must do according to same pattern of previous state 4 2 2 Equivalent component is allowed under SRT SRTET agreed 4 2 3 Power socket is water proof protection 4 3 Those Electrical equipments and accessories like as Power Cable Cable conduit etc SRT SRTET respected with Device standards Installation and Safety discipline are concerned with some standard as follow o 2 a S ea q lt 4 3 1 4 3 2 4 3 3 TISI 4 3 4 NEMA 4 3 5 4 3 6 4 3 7 IEEE Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 59 M rr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Ss SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 5 Concrete foundation for Bogie Lifting General Foundation system is configured to meet the needs of both Safety load and Appropriate standard of Civil works The design and materials of construction it s important to have a process control from expert Supplier may supply the dome
35. tons If there is an error in the description of the commissioning it must be completely revised and updated within a given period supplier shall fixed that period The training is a specific topic from the manufacturer which must be filed to SRT SRTET at least fifteen 15 days before start training course The basis requirement have to meet as below 13 1 Supplier have to commissioning and local training at SRTET after installed to SRT SRTET s engineer s not less than two 2 days 13 2 Trainer s is authorized person from manufacturer only 13 3 Training course expense miscellaneous cost and concerned cost is response by Supplier 2 2 c 5 o0 Lr lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 42 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos Hi SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 14 Submission General To submit documents related to an effective implementation and monitoring missions in the first act SRT SRTET will have to check the validity of the regulations and practices in force The process is carried out according to regulati
36. what facilities and other related equipment for pre installed as well SRT SRTET denied compensation costs or otherwise as to the installation subject The basis facilities and Support unit as below 8 1 Power Supply 8 1 1 SRTET provide Electricity with AC 400 Volt 3 Phase N E 50 Hz are be able connected with power socket as capacity 32 Amps type 8 1 2 Each Power socket of 8 1 1 can reserved as needed 8 1 3 If Supplier have requested capacity more higher than 8 1 1 they must provide auxiliary units like as Generator Cable and Circuit Protection to support by themselves 8 1 4 SRTET not allowed to modify Ring main circuit from Main Distribution Panel Distribution Board 8 2 Overhead Crane 8 2 1 SRTET provide Overhead Crane as below only at installation area 8 2 1 1 1 unit of Capacity SWL 10 Tons 8 2 1 2 One 1 unit of Capacity SWL 3 2 Tons 8 3 Temporary Workshop amp Storage 8 3 1 SRTET will provide temporary area that facilitate for working during installation as per scheduling 8 4 Besides of 8 1 8 2 and 8 3 must in charge by supplier E gt 2 0 a lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 64 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Z
37. workmanship for a period of at least one 1 year The warranty shall begin the date the system is completed of installation and commissioning at SRTET Klongton Depot A warranty Card or Certificate shall be provide accordingly The basis requirement have to meet as below 8 1 Support system for Existing mobile lifting jacks at TRACK 22 T22 and Concrete foundation is required one 1 year of warranty after completed of commissioning and testing refer effective date is form Acceptance sheet 8 2 During warranty period SRT SRTET refuses any cost of expense from supplier if any cases out of warranty notice 8 3 During warranty period if have any delayed of service activities from Supplier after both of parties are conclude The mentioned expense and charge shall be paid to SRT SRTET within one 1 month from the date of notification e N x o lt 4 N E o 2 2 x o gt gt gt a a wn lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 75 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013
38. x ul o n gt n gt gt a a 5 N lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity e 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 76 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 10 Submission General To submit documents related to an effective implementation and monitoring missions in the first act SRT SRTET will have to check the validity of the regulations and practices in force The process is carried out according to regulations both before and after Supplier will be taken to comply with the requirements strictly The basis requirement have to meet as below 10 1 Supplier must submit design drawings and specification of Accessories and device for installation of Support system for Existing mobile lifting jacks at TRACK 22 T22 within fifteen 15 days to SRT SRTET after signed the contract received Purchase order from SRT SRTET 10 1 1 Final Drawing and specification of Accessories and device for installation of Support system for Existing mobile lifting jacks at TRACK 22 T22 will approved from SRT SRTET before supplier proceeding 10 2 Supplier must send
39. 013 4911 amp amp 8 Submission General To submit documents related to an effective implementation and monitoring missions in the first act SRT SRTET will have to check the validity of the regulations and practices in force The process is carried out according to regulations both before and after Supplier will be taken to comply with the requirements strictly The basis requirement have to meet as below 8 1 Supplier must submit design drawings and specification of Accessories and device for installation Extension rail installed Method within fifteen 15 days to SRT SRTET after signed the contract received Purchase order from SRT SRTET 8 1 1 Final Drawing and specification of Accessories and device for installation Extension rail installed Method will approved from SRT SRTET before supplier proceeding 8 2 Supplier must send full details of Concrete foundation Drawing As built Drawings both of hard copy and soft copy to SRT SRTET within fifteen 15 days after signed the contract received Purchasing order from SRT SRTET and refer to 3 3 8 3 Concrete foundation have to approved by local engineer Valid License from COE is a must and holding with second class level or higher and make copy of inspection sheet to SRT SRTET after he she have done 8 4 Concrete testing report should be done before installed Extension rail Supplier will make a copie
40. 1 Technical data of Bogie Lifting show figure 15 as below Carrying capacity of each lifting jack 5 291 Carrying capacity of the entire lifting jack installation 10 51 Number of lifting jacks of the installation 2 pcs In lower position from upper edge of rail 450 mm Stroke 1500 mm In upper position from lower edge of rail _ 1950 mm Length of lifting beam 3000 mm Lifting speed Lowering speed 560 mm min Load O adjustable Dimension from middle of screw up to front edge of base plate 805 mm Intermittent duty I END Power output of each lifting jack 1 5 Voltage 400V Frequency 50Hz Type of protection I Max sound level T5dB A _ Weight of each lifting jack 950kg Driving gear o fixed O movable electrical rail bound O moveable on max surface pressure with nominal load Prax 0 5 N mm max permitted surface pressure of concrete B 25 2 DIN 1045 1988 lt gt 20 25 DIN EN 206 1 2001 DIN 1045 2 2001 Prax zui 7 N mm Figure 15 Technical data of Bogie Lifting o d 2 a 5 ea q lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 57 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF 24 SRT Electrified Train Co Ltd
41. 23 T23 and can be access from New Bogie Turntable enters to New location of Bogie Lifting directly Bogie Lifting shall have new feature and character as below 2 1 New direction 2 1 1 Counterclockwise 90 from original 2 1 2 Beam support Rail bridge must keep straight line and same level with Extension rail from end point of New Bogie Turntable to New location of Bogie Lifting 2 2 Base unit Location 2 2 1 Putin pit New Concrete foundation 2 2 2 Anchor blot fixed 2 3 Rail Bridge Level 2 3 1 alignment at lowering is same level of extension rail at TRACK 23 T23 2 4 Main Power supply socket if any 2 4 1 Relocated existing Main power supply socket in pit if Concrete foundation obstructed 2 4 2 New location is a properly 2 5 Coverage Checker plate s fabrication at Bogie Lifting on ground floor is necessary to filled with safety topic supplier must response fabricated and installed 2 5 1 Supplier must submit Drawing amp Specification of Coverage to SRT SRTET for approval before fabricated 2 6 Existing unit show as below figure 11 12 13 and 14 o 2 a go bo ea q lt Figure 11 Side view of Bogie Lifting Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 3 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 54 State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF
42. 32 Electrical Equipment of Machines 8 1 4 VDE 0100 T1 T726 Jacking and Hoisting Equipment 8 15 The Machinery Directive 2006 42 EC Machinery Directive 8 1 6 Completeness Check 8 1 7 All function test of the system will be done 8 1 8 Dimension Check will be done 8 1 9 For Lifting Jack the following test at the Supplier Factory FAT shall be done 8 1 10 Leveling and alignment need test plus report at before and after lift up train 8 1 11 Additional required of 8 1 10 is SRT SRTET need lift up train and hold it up with in twenty four 24 Hours before lift it down plus report of Leveling and alignment after this 8 1 12 Testing Function as Table 1 Function Testing Detail Lifting and Lowering without Load Lifting in completed working rage Check of the Lifting and Lowering Speed with nominal Load 20 mm per min E gt o 2 Lu c 2 a 4 lt a Function fulfilled without any visible permanent deformation Function fulfilled without any visible permanent deformation Dynamic Lifting with 25 overload for 10 minutes Static loading with 50 overload for 10 minutes Safety devices Functional test Group operation Can be performed Test of automatic synchronization rage of 4 5 Can be performed Rail width on TRACK Report of standard gauge measurement Rail
43. 50 Hz are be able connected with power socket as capacity 32 Amps type 12 1 2 Each Power socket of 12 1 1 can reserved as needed 12 1 3 If Supplier have requested capacity more higher than 12 1 1 they must provide auxiliary units like as Generator Cable and Circuit Protection to support by themselves 12 1 4 SRTET not allowed to modify circuit from Main Distribution Panel Distribution Board 12 2 Overhead Crane 12 2 1 SRTET provide Overhead Crane as below only at installation area 12 2 1 1 One 1 unit of Capacity SWL 10 Ton 12 2 1 2 One 1 unit of Capacity SWL 3 2 Ton 12 3 Temporary Workshop amp Storage 12 3 1 will provide temporary area that facilitate for working during installation as per scheduling 12 4 Besides of 12 1 and 12 2 must in charge by supplier c o 2 c 2 a a E cc lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity e 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 21 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 13 Manual General
44. ACK 22 February 2013 4911 amp amp 4 Concrete foundation for each Jacks General Foundation system is configured to meet the needs of both Safety load and Appropriate standard of Civil works The design and materials of construction it s important to have a process control from expert Supplier may supply the domestic construction including raw material SRT SRTET be recognized and affirmed for Concrete foundation and Construction work from a certified engineer who holds a license by COE Position of all Jacks are show in Figure 3 The basis requirement shall meet as below 4 1 Supplier must designed proper specification of Concrete foundation and response Civil work according to standard construction with well condition for Sixteen 16 sets of Jack 4 2 SRT SRTET provide reference copies of Civil amp Construction drawings as current state of Building following as below ATTACHMENT A 4 2 1 ATTACHMENT 1 DEPOT ROLLING STOCK WORKSHOP GROUND FLOOR FRAMING PLAN ZONE 8 SHEET 8 10 4 2 2 ATTACHMENT A2 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 14 SHEET 2 2 4 2 3 ATTACHMENT DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT EL 37 42 ZONE 15 SHEET 1 2 4 2 4 ATTACHMENT A4 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 17 SHEET 2 2 4 2 5 ATTACHMENT A5 DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCE
45. ANEL BOARD UW SHEET 1 OF 1 ATTACHMENT B WaONAWPWNE PRPRPRPPR FPWNRSO 4 CAR TRAIN ASSEMBLY A6Z00000580014 MOTOR BOGIE 1 A6Z00000634524 MOTOR BOGIE 2 A6Z00000632836 MOTOR BOGIE A6Z00000435016 TRAILER BOGIE A6Z0000031638 TRAILER BOGIE A6Z00000437429 ADDRESSES AND SIGNS EXTERIOR A6Z00000541227 WAGON DMB A6Z00000580015 ADDRESSES AND SIGNS EXTERIOR A6Z00000595719 WAGON PTOSLW A6Z00000580017 ADDRESSES AND SIGNS EXTERIOR A6Z00000596685 WAGON TOS A6Z00000580018 ADDRESSES A SIGNS EXTERIOR A6Z00000585639 WAGON DMOS AV00000580019 eR Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting jacks at TRACK 22 February 2013 PAGE 5 OF PAGE 77 4911 amp amp 1 Electric Upper Under Floor Lifting Jack For 4 Cars Unit of Train Model SIEMENS Deciro360 2 1 Requirement General One 1 system of Lifting Jack This system consists of sixteen 16 sets of Electric Lifting Jack and minimum capacity is 12 5 Tons per set for lifting complete set of SRTET Klongton Depot Vehicle Max four 4 cars per system with eight 8 bogies at their wheels and support the lifted car body by
46. DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 17 3 2 9 ATTACHMENT A9 DEPOT WASTE WATER TREATMENT ROLLING STOCK 3 2 10 ATTACHMENT A10 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 21 3 2 11 ATTACHMENT A11 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 22 3 2 12 ATTACHMENT A12 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE I SHEET 9 OF 10 3 2 13 ATTACHMENT A13 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE G SHEET 7 OF 10 3 3 After Supplier signed the contract received Purchase order they must submit As built Drawings and completed details of Concrete foundation for each section of Extension rail to SRT SRTET within fifteen 15 days 3 4 The final of As built Drawings from 3 3 is acceptance and approval from engineer he she is holding with a valid second class level of Engineer license from COE 3 5 The Concrete foundation can be proceeded after SRT SRTET agreed in any Term and Condition and refer from 3 3 and 3 4 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 3 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 46 State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co
47. JIR YX sexe Lir N lt gt tah x mar TERN u LA 27 AMIS AR Ss H State Railway of Thailand Specification of Commodity and Requirement Project of Year 2013 Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable Extension rail 3 sets Relocate 1 unit of Bogie Lifting and Support system for Existing mobile lifting jacks at TRACK 22 Content of ABSTRACT PART 1 PART 2 PART 3 PART 4 PART 5 Electric Upper Under Floor Lifting Jack Bogie Turntable Extension Rail Relocate Bogie Lifting Support system for Existing mobile lifting jacks at TRACK 22 4911 amp amp State Railway of Thailand wish to select and purchase Electric Upper Under Floor Lifting Jack with capacity sixteen 16 sets 12 5 Tons with plus one 1 set of Bogie Turntable three 3 sets extension rail Relocate one 1 unit of existing Bogie Lifting and Support systemfor Existing mobile lifting jacks at TRACK 22 These requirement installed at Maintenance centre Klongton Depot of SRT Electrified Train Co Ltd Bangkok Thailand Supplier must do as below 1 Designed 2 Provided 3 Manufacturing 4 Assembly 5 Pre Testing 6 Delivered 7 Concrete foundation Work 8 Civil Work 9 Electrical construction and Termination 10 Rail fabrication and welding 11 Anti roll off improvement 12
48. LING STOCK 7 4 2 2 ATTACHMENT A15 ROLLING STOCK WORKSHOP LV LAYOUT UW SHEET 1 OF 1 7 4 3 3 ATTACHMENT 16 ROLLING STOCK WORKSHOP LV PANEL BOARD UW SHEET 10F 2 7 4 2 4 ATTACHMENT 17 ROLLING STOCK WORKSHOP LV PANEL BOARD UW SHEET 2 OF 2 7 4 2 5 ATTACHMENT A18 ROLLING STOCK WORKSHOP SINGLE LINE DIAGRAM PANEL BOARD UW SHEET 1 OF 1 7 4 3 The Cable supply from Main Supply circuit to Main Control Cabinet and Control box of each jacks is supply and done by Supplier In addition to supplier must do following 7 4 3 1 Designed Provide Supply and Installation of Mold Case Circuit Breaker MCCB which proper power demanding capacity of Lifting Jack system as used for Distribution Board UW 7 4 3 2 Designed Provide Supply and Installation of Cable Ladder Trunking Conduit Junction Box from Distribution Board UW to drop point location that need a x o 0 2 Lu 2 gt a gt Z E lt a continued in underground pattern to Main Control Cabinet of Lifting Jack system 7 4 4 The Cable root on above 7 4 3 2 from drop point to Main Control Cabinet of Lifting Jack system is keep in a standard of underground pattern designed providing supply and installation by supplier 7 4 5 The Cable root on above 7 4 3 from Main Control Cabinet Control to Control box of each jacks is keep in a standard of underground pattern
49. MENT EL 37 42 ZONE 18 SHEET 1 2 4 2 6 ATTACHMENT DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION E o o 2 gt c 2 a cc lt a ZONE 15 4 2 7 ATTACHMENT A7 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 16 4 2 8 ATTACHMENT A8 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 17 4 2 9 ATTACHMENT A9 DEPOT WASTE WATER TREATMENT ROLLING STOCK 4 2 10 ATTACHMENT A10 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 21 4 2 11 ATTACHMENT A11 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 22 4 2 12 ATTACHMENT A12 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE I SHEET 9 OF 10 4 2 13 ATTACHMENT A13 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE G SHEET 7 OF 10 4 3 After Supplier signed the contract received Purchase order they must submit As built Drawings and completed details of Concrete foundation for each sets of Jack to SRT SRTET within fifteen 15 days 4 4 The final of As built Drawings from 4 3 is acceptance and approval from engineer he she is holding with a valid second class level of Engineer license from COE 4 5 The Concrete foundation can be proceeded after SRT SRTET agreed any Term and Condit
50. SI 7 4 10 4 NEMA 7 4 10 5 NEC 7 4 10 6 IEC 7 4 10 7 IEEE 7 5 Supplier must dismantle existing underground cabling and all sockets of parallel systems at TRACK 23 T23 connection that goes through to original feature and functional of main control panel at TRACK 24 T24 It will be under the operational control and supervised by SRTET 7 6 Supplier must dismantle existing of termination for cabling from TRACK23 T23 to main control panel at TRACK 24 T24 Demolition within the main control cabinet and consistent with approach of 7 5 It will be under the operational control and supervised by SRTET 7 7 After completed of 7 5 and 7 6 the old function of Existing mobile lifting jack must be operate normally at one side performance by cabling of TRACK 24 T24 s side It will be under testing by SRTET 7 8 During operation along this contract whether the construction installation testing of any system Existing mobile lifting jack on controlled by cabling from one side of TRACK 24 T24 will still work as normal after achieving of 7 5 7 6 and 7 7 7 9 If there is a need to suspend have use of 7 8 which are necessary to the operation Supplier must be given reasonable and explanation of a need by the letter to SRTET 7 10 During Electrical construction Termination and Testing if any defected are found on x o o 2 c 2
51. SRT SRTET after he she have done 9 4 Concrete testing report should be done before installed Bogie Lifting Supplier will make a copies of report to SRT SRTET before installed unit of Bogie Lifting also 9 5 All of any copies of final As built Drawings Final of specification Accessories and device Concrete testing report Leveling Alignment report and commissioning Testing Report are proved and confirmed with Official company s sealing 9 6 The final release edition of 9 5 must submit to SRT SRTET within thirty 30 days after acceptance record is done gt 2 a lt END OF PART 4 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 65 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 5 Support system for Existing mobile lifting jacks at TRACK 22 1 Requirement General SRT SRTET wish to move the existing mobile Lifting Jack to TRACK 22 T22 in case of TRACK 24 T24 not ready Maintenance program obstruction by others The capacity of existing mobile Lifting Jack is 12
52. Supplier must attached one 1 set of copy of Certificate Letter for Bidding Tender o0 E 2 gt a 2 o 2 lt Auction Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 18 M rr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF ZA SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 e 4911 amp amp 10 Warranty and Claim General The Lifting Jack system shall be fully warranted against defective material and workmanship for a period of at least one 1 year The warranty shall begin the date the system is completed of installation and commissioning at SRTET Klongton Depot A warranty Card or Certificate shall be provide accordingly The basis requirement have to meet as below 10 1 The Lifting Jacks system is required one 1 year of warranty after completed of commissioning and testing refer effective date is form Acceptance sheet 10 2 During warranty period SRT SRTET refuses any cost of expense from supplier if any cases out of warranty notice 10 3 During warranty period if have any delayed of service activities from Supplier after both of parties are conclu
53. WORKSHOP TOP SLAB REINFORCEMENT EL 37 42 ZONE 18 SHEET 1 2 3 2 6 ATTACHMENT DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 15 3 2 7 ATTACHMENT A7 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 16 3 2 8 ATTACHMENT A8 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 17 N N x lt gt N E o e E E x o gt 4 gt 7 a a lt a 3 2 9 ATTACHMENT A9 DEPOT WASTE WATER TREATMENT ROLLING STOCK 3 2 10 ATTACHMENT A10 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 21 3 2 11 ATTACHMENT A11 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 22 3 2 12 ATTACHMENT A12 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE I SHEET 9 OF 10 3 2 13 ATTACHMENT A13 DEPOT ROLLING STOCK WORKSHOP WHEEL REPROFILING and TRAINWASH CLEANING FIRST FLOOR PLAN ZONE G SHEET 7 OF 10 3 3 After Supplier signed the contract received Purchase order they must submit As built Drawings and completed details of Concrete foundation for each sets of Jack to SRT SRTET within fifteen 15 days 3 4 final of As built Drawings from 3 3 is acceptance and approval from engineer he she is holding with a valid second class level of Engineer license from COE Specific
54. amp amp 3 Description of the individual Lifting Jack Component for Lifting the at bogie General Primarily by consistent and features all the same The production process including raw materials from suppliers who were determined by manufacturer The sixteen 16 sets of Jack has all the same features from manufacturer Sample draft of two 2 units of Jack show as Figure 2 The basis requirement shall meet as below 3 1 Lifting Columns 3 1 1 Steel Construction Consisting of a large base frame Steel profile are DIN Standard or equal 3 1 2 Rigid Base Plate Prepared for fixing of the jack on the floor by anchor bolts 3 1 3 Cross beam bolted to the gantry frames 3 1 4 Transport eye hooks for crane set up 3 1 5 Painting color of Jacks assigned from SRT SRTET 3 2 Actuating Elements 3 2 1 Each carrying nut Bronze is accompanied by a safety nut Steel 3 2 2 Automatic Lubrication system of Screw unit must be considered 3 2 3 Self Locking tension loaded Acme Screws Tr 60 8 3 2 4 Screw with self aligning roller thrust bearing 3 2 5 Protection boots above and below for protection the screw 3 2 06 Low wear Smooth running spur gearing with flange mounted three phase induction motor one 1 set of jack will be operated by one 1 Gear Motor as minimum 3 2 7 High degree of stop accuracy and safety via electro magnetic breaker 3 2 8 Safety device for emergency stop if lifting carriage is block during low
55. and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 4 Steel Plate General New sixteen 16 sets of Steel Plate is necessary to use force sharing the weight of each four 4 cars while being lifted by existing mobile lifting jack is in use same of TRACK 24 T24 and provide a stable foundation and footing system New function of TRACK 22 T22 must have same a stable system also In work particular may take the feature of TRACK 24 T24 or new created to better conform to the safety and suitability Steel Plate shall meet as below 4 1 Supplier must designed proper specification of Steel Plate Provided Fabrication installation and response Civil work according to standard construction with well condition to support existing mobile lifting jack Lifting Jack is 12 5 Tons 16 units at TRACK 22 T22 4 2 After Supplier signed the contract received Purchase order they must submit Drawings and completed details of Steel Plate for each sets of Jack to SRT SRTET within fifteen 15 days 4 3 The final of Drawings from 4 2 is acceptance and approval from engineer he she is holding with a valid second class level of Engineer license from COE or combined together with statement and bill of quantities of 3 4 4 The Sixteen 16 sets of Steel Plate can be proceeded after SRT SRTET agreed
56. any Term and Condition and refer from 4 2 and 4 3 4 5 During installation if any defected are found on TRACKs Facilities system Utilities system and Equipments or Devices supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier 4 6 If detail submission of 4 2 need to be updated after proceeding or during work is running Supplier must have informed to SRT SRTET by a letter with reasonable and attached copies of update drawing and detail After SRT SRTET agreed by confirmation supplier can performed e N x lt 4 N E o e 2 2 x o gt 2 gt gt a a wn lt accordingly Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 70 M rr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Ss SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 5 Pitstability General Existing Pit in TRACK 22 22 must be updated to be strong and stable due to structure and foundation have been modified or use the
57. are found to improve the Anti roll off upgrading if some structure of the whole or part to be prepared to renovate or rebuilt the rail bridge structure to compliance with engineering principle Supplier must implement and adhere to standards performed which can not o 9 o0 eo lt be used as an excuse or a reason to avoid the decline in contract operations Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 58 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos Hi SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 e 4911 amp amp 4 Power supply improvement General Existing Power supply socket keep in a pit cable in underground type Otherwise when relocated and fixed Bogie Lifting at new location then Supplier shall explore the place of the socket if it is necessary to improve new design and dismantle is a must Supplier shall provide and install the equipment required to operate normally Power supply shall meet as below if necessary to improve 4 1 Power cable 4 1 1 Same specification of previous 4 1 2 Cable must use a new if existing unit damage from dismantle or it is to
58. art for Concrete foundation shall applied if necessary 2 2 Steel Plate 2 2 1 Sixteen 16 sets of new steel plate must applied and support between Load of each cars to Concrete foundation is locally on TRACK 22 T22 2 2 2 The modernization and state of the art for steel plates shall applied if necessary 2 3 Pit 2 3 1 The pit of TRACK 22 T22 is must be used same as previous state with according to safety manner after renovate or rebuilt Concrete foundation along the TRACK 2 3 2 If there is a need to improve the structure until the structure and strength of the wall at pit or braced weight change supplier must be refreshed to reflect the new structure to support the weight along the pit 2 3 3 The facilities and waste water system in pit shall make as same pattern if they were have change from 2 3 2 N N x Q lt 4 N E o a 2 2 x gt o gt gt 7 t o 5 N wn ecc lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity e 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 67 M ry State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 3 Conc
59. ating Sequence and Procedures to be followed in order and in accordance with a standard practices of the Lifting Jack system in maintenance field of the railway system The proposed procedure is a very up to date and contemporary SRT SRTET prefer with satisfaction in the safety and friendly to the user and ease of troubleshooting is not complex Operating Sequence Procedure shall meet the following minimum demanding 5 1 5 2 5 3 5 4 5 5 The Car body will be raised by the Bogie Lifting units to the maximum position The Linear actuator will be moved by pendant to the extended position Controlled by limit switch The Bogie lifting units will be lowered again for a small distance until the Car body is completed loaded by the body support anvil After the load anvil is fully retracted and loaded by the Car body the Bogie could be lowered by the Bogie Lifting Jack If the support is not loaded a lowering of the Bogie is not possible Interlocking function is a must In addition to the detailed initial of 5 1 5 2 5 3 and 5 4 Supplier can be useful and profitable to use as needed if any They can offer in terms of specification Operation Procedure agreement between the supplier and SRT SRTET E 2 2 gt a gt nm o E lt a er State Railway of Thailand SRT Electrified Train
60. ation of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 68 M ry State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 3 5 foundation can be proceeded after SRT SRTET agreed any Term and Condition and refer from 3 3 and 3 4 3 6 Concrete foundation have to finished before need to testing by existing mobile lifting jack ready to install not less than ninety 90 days or follow Concrete testing if available 3 7 Concrete testing report should be done before installed or for testing of existing mobile lifting jack 3 8 SRTET allowed Supplier to explore the area which beneficial for support civil work and prepared in various ways according to 3 1 3 2 and 3 3 3 9 Floor finishing is make the same pattern of previous state Coating material type amp color is upon SRT SRTET requirement or refer with previous specification 3 10 During construction period supplier have to fixed authorized person at least one 1 person who is supervised and controlled onsite construction working according to safety manner SRT SRTET required at least engineer level with Engineering licens
61. cate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 8 Safety measures Regulation and Testing General The standard Safety measures Regulation and Testing shall be subject to inspection or test by the Commercial alliance prior to acceptance In the even supplier of manufacturer equipment or some defective in material or workmanship or otherwise not in conformity with specification requirement the Commercial alliance shall have the right to reject the items or require acceptable correction at before shipment to SRT SRTET The basis requirement shall meet as below 8 1 The Bogie Turntable system is tested according to table 2 Function Testing Detail Rail width at Turntable Report of standard gauge measurement With and without Bogie 10 tons Manual test Rotation performance by pushing from 0 to 360 With and without Bogie 10 tons Manual test at locking state of every 90 With Bogie 10 tons moving from outer rail Rail connection overlap to inner rail of Turn table pass to inner rail of Turntable without obstruction With and without Bogie 10 tons with measuring report With and without Bogie 10 tons Manual test Friction sound by pushing from 0 to 360 Friction sound shall acceptable from SRT SRTET The test abo
62. d 24 PART 2 Bogie Turntable 1 RE QUIPGIM eni opere de aue ad Edo dud 28 2 Technical Data nr iticetet eet det tc E 29 3 General dIMENS niece secte tance crie tia eh eb eh eb US 30 31 5 Centre with bearing ec tasa oer dus ue ERR EH E ETHER PER LEN TEE 32 6 Bogie Turntable feature 33 7 Concrete foundation for Bogie Turntable 35 8 Safety measures Regulation and Testing sess eene nennen nennen entr nnn 37 9 Warranty and ice ttt Ee te 38 10 Transportation and Packing Unpacking essent tentent tenen 39 11 Installation cer vett ei e eate Pn a ER ERE ERE E AE HERE 40 17 SEICRC 41 13 Commissioning and Training etnia e i i cer e Veg 42 14 ta e A 43 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 3 AEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train C
63. d compensation costs or otherwise as to the installation subject The basis facilities and Support unit as below 7 1 Power Supply 7 1 1 SRTET provide Electricity with AC 400 Volt 3 Phase N E 50 Hz are be able connected with power socket as capacity 32 Amps type 7 1 2 Each Power socket of 7 1 1 can reserved as needed 7 1 3 If Supplier have requested capacity more higher than 7 1 1 they must provide auxiliary units like as Generator Cable and Circuit Protection to support by themselves 7 1 4 SRTET not allowed to modify Ring main circuit from Main Distribution Panel Distribution Board 7 2 Overhead Crane 7 2 1 SRTET provide Overhead Crane as below only at installation area 7 2 1 1 One 1 unit of Capacity SWL 10 Tons 7 2 1 2 One 1 unit of Capacity SWL 3 2 Tons 7 3 Temporary Workshop amp Storage 7 3 1 SRTET will provide temporary area that facilitate for working during installation as per scheduling 7 4 Besides of 7 1 7 2 and 7 3 must in charge by supplier c 2 c gt x m lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 51 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2
64. de The mentioned expense and charge shall be paid to SRT SRTET within one 1 month from the date of notification gt gt o 2 Lu me c 2 a p 4 E lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 19 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 LANAITUULAMANUALANIE 4911 amp amp 11 Transportation and Packing Unpacking General The supplier shall be fully responsible for all shipment and freight charge sea voyage and filing freight claims lies is also The consignee is SRTET Klongton Depot Packing Unpacking is done completely with any expense of supplier The basis requirement have to meet as below 11 1 Packing from manufacturer The Lifting Jack shall be carefully packed and protected for sea voyage Domestic logistic Supplier must response for all parts be delivery to SRT SRTET in good and proper conditions and ready to be installed 11 2 Unpacking at SRTET Klongtan Depot Supplier must response for Heavy machinery auxiliary equipment and man power to unpacked and place any part at assign place
65. e from COE authorized deputy representative 3 11 During construction and Civil work if any defected are found on TRACKs Facilities system Utilities system and Equipments or Devices supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier 3 12 If detail submission of 3 3 need to be updated after proceeding or during work is running Supplier must have informed to SRT SRTET by a letter with reasonable and attached copies of update drawing and detail After SRT SRTET agreed by confirmation supplier can performed accordingly 3 13 According to a surveying are found to improve the structure of the whole or part to be prepared to renovate or rebuilt the existing structure to compliance with engineering principle Supplier must implement and adhere to standards of construction which can not be used as an excuse or a reason to avoid the decline in contract operations e N x lt N E o 2 D 2 x o gt gt 7 a a wn lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 69 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting
66. easonable and attached copies of update drawing and detail After SRT SRTET agreed by confirmation supplier can performed accordingly 3 13 According to a surveying are found to improve the structure of the whole or part to be prepared to renovate or rebuilt the existing structure to compliance with engineering principle Supplier must implement and adhere to standards of construction which can not be used as an excuse or a reason to avoid the decline in contract operations a c 2 c gt x o lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 47 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 4 Accessories and device for Installation Extension rail installed Method General Accessories and device for installation is the responsibility of the supplier to supply and install a complete in short list same as drawing presented to the SRT SRTET The basis requirement shall meet as below 4 1 After Supplier signed the contract received Purchase order they must submit completed details of Specification and Technical data for each sets
67. ecification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity SRTET gt 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 25 State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 mE jacks at TRACK 22 February 2013 LANAITUULIAMANUALAWI 4911 amp amp 1524 490 xg pi x c o Lu 2 gt a gt 2 lt a ae EE Figure 3 Sample Layout of Positioning of each Jacks Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity SRTET gt 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 26 nM State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF zs SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 1 E o E 2 gt a gt E lt State Railway of Thailand SRT Electri
68. ed as needed 11 1 3 If Supplier have requested capacity more higher than 11 1 1 they must provide auxiliary units like as Generator Cable and Circuit Protection to support by themselves 11 1 4 not allowed to modify Ring main circuit from Main Distribution Panel Distribution Board 11 2 Overhead Crane 11 2 1 SRTET provide Overhead Crane as below only at installation area 11 2 1 1 One 1 unit of Capacity SWL 10 Tons 11 2 1 2 One 1 unit of Capacity SWL 3 2 Tons 11 3 Temporary Workshop amp Storage 11 3 1 SRTET will provide temporary area that facilitate for working during installation as per scheduling 11 4 Besides of 11 1 11 2 and 11 3 must in charge by supplier a 2 4 c 5 o0 eo N lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 40 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 12 Manual General The Manual is standard principle of manufacturer which will be presented and delivered via ordering SRT SRTET prefer to have Operator manual Parts book and Service manual which appropriate to th
69. eir needs All manual shall be furnished with each unit In addition of all Parts book and manuals must be current with unit delivered The basis requirement have to meet as below 12 1 Supplier have to delivery three 3 of copies of details concerned document to SRT SRTET The bilingual is Thai and English as per set of copies 12 2 Copy pattern of document of 12 1 is prepared for SRT SRTET with both of Hard copies and Soft copies 12 3 Supplier must submit of 12 1 and 12 2 with in thirty 30 days after Acceptance record is done 2 a c 5 lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity N a or 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 41 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 13 Commission Training General Commissioning must comply with the standard profile of each device Supplier shall submit a detailed work prior to commissioning to SRT SRTET within fifteen 15 days before Commissioning program started The commissioning process must be completed prior to testing with SRT SRTET on maximum load herein is Motor Bogie 10
70. electrically adjustable load supports Installation at TRACK 23 T23 SRTET Klongton Depot and Jack system must be have Concrete foundation support on the load of vehicles System shall meet as below 1 1 Supplier must Provide completed unit of Electric Upper Under floor Lifting Jack 1 2 Supplier must install to desired and proper position 1 3 Civil work and Concrete foundation are response by supplier The scope include Surveying Designed Materials providing Construction Testing and Official approve follow engineering license from CEO 1 4 Supplier must do for Electrical construction completely 1 5 Supplier must provide Testing and Commissioning with full functions system 1 6 Supplier must provide Training Course x o e bo gt o 2 c 2 a a D lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 6 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 LANAITUULAMANUALANIE 4911 amp amp 2 Specification of commodity General It is the intent of these specification to describe a Electric Upper Under Flo
71. eport of Insulation testing The test above have to done in house and completed installation at SRTET s site Leveling and Alignment Table 4 Support system for Existing mobile lifting jacks at TRACK 22 T22 Testing details 7 2 Testing Existing mobile lifting jack at TRACK 22 22 in the machine test function is performed by SRTET but will coordinate with supplier to confirm the termination of the work carried out by supplier have to meet a completed 7 3 f some defect of testing and verify of 7 2 have found and both parties are conclude in term of termination defected supplier must correct and complete prior to test lift up the vehicle N N x lt 4 Nn E o 2 5 o E T x o 4 gt n 4 a 5 lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 74 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 8 Warranty and Claim General The Support system except pit if not renovate and cabling shall be fully warranted against defective material and
72. ering 3 2 9 Electrical monitoring of Carrying and Safety nut Breakage 3 3 Lifting Carriages 3 3 1 Welded Construction 3 3 2 Shielded Wheel flanged rollers with integrated bearing 3 4 Load Anvil 3 4 1 Fixed design with lifting beams rail bridge connected to the load anvils x o 2 Lu gt 2 gt gt 2 cc lt 3 4 2 Each of Load Anvil must have Pay load checking sensor 3 4 3 Anti roll off and Roll off guard 3 5 Body Support nut 3 5 1 Supporting portal fixed between the two 2 lifting columns with integrated load anvil 3 5 2 The load anvil can be electrically moved forward and backward in order to reach the jack pad at car body 3 5 3 Integration of load anvil is a loaded limit switch 3 6 Coverage Checker plate s fabrication at each Jacks on ground floor is necessary to filled with safety topic supplier must response fabricated and installed 3 6 1 Supplier must submit Drawing amp Specification of Coverage to SRT SRTET for approval before fabricated 3 7 Vehicle details as ATTACHMENT B 3 7 1 ATTACHMENT B1 4 CAR TRAIN ASSEMBLY A6Z00000580014 3 7 2 ATTACHMENT B2 MOTOR BOGIE 1 A6Z00000634524 3 7 3 ATTACHMENT B3 MOTOR BOGIE 2 A6Z00000632836 3 7 4 ATTACHMENT B4 MOTOR BOGIE A6Z00000435016 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity
73. f each device Supplier shall submit a detailed work prior to commissioning to SRT SRTET within fifteen 15 days before Commissioning program started The commissioning process must be completed prior to testing with Rolling Train 4 cars If there is an error in the description of the commissioning it must be completely revised and updated within a given period supplier shall fixed that period The training is a specific topic from the manufacturer which must be filed to SRT SRTET at least fifteen 15 days before start training course The basis requirement have to meet as below 14 1 Supplier have to commissioning and local training at SRTET after installed to SRT SRTET s engineer s not less than five 5 days 14 2 Trainer s is authorized person from manufacturer only 14 3 Training course expense miscellaneous cost and concerned cost is response by Supplier E o c o 2 Lu c 2 a a Z cc lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 23 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013
74. fication of Jack system and Drawings Concrete testing report Leveling Alignment report and commissioning Testing Report are proved and confirmed with Official company s sealing 15 6 Allof any Manual copies of 13 15 7 The final release edition of 15 5 and 15 6 must submit to SRT SRTET within thirty 30 days after acceptance record is done 5 gt o 9 me c 2 a gt cc lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity e 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 24 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 LANAITUULAMANUALANIE e 4911 amp amp sym 30j aju03 Tq paying 0 1 e 8 15211 2 51112 i VELIS x o gt 2 gt c 2 7 a Q D Z 4 o 2 lt a m amp H Bal 22 r alg D HE E f 218 z TE i i X H af PRGA SEINS CS Oe Se Pe ee a E gt gt Figure 2 Sample pattern of two sets of Jack Sp
75. fied Train Co Ltd Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable Extension rail 3 sets Relocate 1 unit of Bogie Lifting and Support Base for Existing mobile lifting jacks at TRACK 22 February 2013 PAGE 27 OF PAGE 77 LANAITUULAMANUALANIE 4911 amp amp 2 Bogie Turntable Manual Turntable for Bogie unit 10 tons 1 Requirement General One 1 set of Manual Bogie Turntable for Bogie unit 10 tons with TRACK width of 1 435 mm SRTET Airport Rail Link s Standard gauge and installed to TRACK 23 T23 at SRTET Klongtan Depot according to our reference Figures and Drafting The Bogie Turntable is equipped with locking unit which centre and fixes the Bogie Turntable in the required limit position with a tipping sheet steel Before turning the locking device is released by the operators manually The requirement shall as below 1 1 The Bogie Turntable one 1 set with a diameter 3 400 mm are fixed to the Concrete foundation 1 2 Turning by center pin design 1 3 The Bogie Turntable are equipped with rail cross and manually operated locking devices 1 4 Operation via retractable push bar and locking devices every ninety degree 90 The push bar is stored inside the Bogie Turntable under a cover plate with hinges 1 5 The locking of the Bogie Turntable every ninety degree 90 must
76. foundation on TRACK is necessary to approved 2 2 8 Supplier must confirmed of 2 2 7 and do for construction in safety manner 2 3 New location of Bogie Lifting at TRACK 23 T23 2 3 1 Extension rail connection points between end of New Bogie Turntable and start point of beam support Rail bridge of Bogie Lifting 2 3 2 Support the weight of Bogie ten 10 tons along extend rail 2 3 3 SRT SRTET will supply mentioned rail as needed UIC60 Steel rail standard 2 3 4 Two 2 side of TRACK 23 T23 in parallel is fixed 2 3 5 Accessories and additional concerned devices for install is supply and done by supplier 2 3 6 Rail welding is done by supplier SRT SRTET will accepted in standard method only 2 3 7 Civil work and Concrete foundation on TRACK is necessary to approved 2 3 8 Supplier must confirmed of 2 3 7 and do for construction in safety manner Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 45 M ry State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 3 Concrete foundation for Extension rail General Foundation system is configured to meet the needs of both Safety load a
77. full details of Concrete foundation Drawing As built Drawings both of hard copy and soft copy to SRT SRTET within fifteen 15 days after signed the contract received Purchasing order from SRT SRTET and refer to 3 3 10 3 Concrete foundation have to approved by local engineer Valid License from COE is a must and holding with second class level or higher and make copy of inspection sheet to SRT SRTET after he she have done 10 4 Concrete testing report should be done before installed Existing mobile lifting jacks at TRACK 22 T22 Supplier will make a copies of report to SRT SRTET before installed unit of Existing mobile lifting jacks at TRACK 22 T22 also 10 5 Leveling and alignment report must submit to SRT SRTET after commissioning and testing done completely 10 6 All of any copies of final As built Drawings Final of specification Accessories and device Concrete testing report Leveling Alignment report and commissioning Testing Report are proved and confirmed with Official company s sealing 10 7 The final release edition of 10 6 must submit to SRT SRTET within thirty 30 days after acceptance record is done N N x lt a d E o a 2 o E T x ul o n gt n gt gt a a 5 N lt a END OF SPECIFICATION Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity
78. have no history of bankruptcy proceedings in the past The basis requirement have to meet as below 9 1 A list of manufacturer record and performance Certificates of the clients not less than four 4 Countries with good track record in Railway sector mentioned in Train Lifting Jack s products only 9 1 1 The delivery of record system of lifting system for rolling stock supply to Australia USA Canada Japan South of Korea Singapore Malaysia and European Countries The delivery record supplying to the others countries on above and The delivery record before A D 2000 are not acceptable 9 1 2 Supplier must attached one 1 set of copy letters of 9 1 1 for Bidding Tender Auction and each different of letters must proved by Official company s sealing of clients Railway operators 9 1 3 Mentioned Project in past achievement would require a individual contract valued at no less than ten 10 million BAHT of them in the date of signing the contract only 9 1 4 Supplier must attached one 1 set of copy concerned evidences of 9 1 3 for Bidding Tender Auction and each different of letters must proved by Official company s sealing of clients Railway operators 9 2 The Lifting Jack system shall be one of the Main products of the manufacturer with ISO 9001 is required 9 2 1 Supplier must attached one 1 set of copy of Certificate for Bidding Tender Auction 9 3 supplier agent in Thailand must have authorized from manufacturer 9 3 1
79. i 2 A 7 X a c 5 E Figure 9 Detail 2 and Detail Y d PART2 Figure 10 Actual Bogie Turntable e Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity CSRTET w 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 34 State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 7 Concrete foundation for Bogie Turntable General Foundation system is configured to meet the needs of both Safety load 10 tons of bogie and Appropriate standard of Civil works The design and materials of construction it s important to have a process control from expert Supplier may supply the domestic construction including raw material SRT SRTET be recognized and affirmed for Concrete foundation and Construction work from a certified engineer who holds a license by COE The basis requirement shall meet as below 7 1 Supplier must designed proper specification of Concrete foundation and response Civil work according to standard construction with well condition for support load on Turn Table 10 Tons of one bogie 7 2 SRT SRTET provide reference copies of Civil amp Construction drawings as current state of Building following
80. i e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 9 Submission General To submit documents related to an effective implementation and monitoring missions in the first act SRT SRTET will have to check the validity of the regulations and practices in force The process is carried out according to regulations both before and after Supplier will be taken to comply with the requirements strictly The basis requirement have to meet as below 9 1 Supplier must submit design drawings and specification of Accessories and device for installation of Bogie Lifting at new location within fifteen 15 days to SRT SRTET after signed the contract received Purchase order from SRT SRTET 9 1 1 Final Drawing and specification of Accessories and device for installation of Bogie Lifting at new location will approved from SRT SRTET before supplier proceeding 9 2 Supplier must send full details of Concrete foundation Drawing As built Drawings both of hard copy and soft copy to SRT SRTET within fifteen 15 days after signed the contract received Purchasing order from SRT SRTET and refer to 5 3 9 3 Concrete foundation have to approved by local engineer Valid License from COE is a must and holding with second class level or higher and make copy of inspection sheet to
81. il After SRT SRTET agreed by confirmation supplier can performed accordingly 5 7 According to a surveying are found to improve the structure of pit stability of the whole or part to be prepared to renovate or rebuilt the existing structure to compliance with engineering principle Supplier must implement and adhere to standards of construction which can not be used as an excuse or a reason to avoid the decline in contract operations N N x po lt a o E o e 2 T x o n gt n 4 a 5 lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 71 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF an re Manos Hi SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 6 Power supply and Control system General At new and alternate location of existing mobile lifting jack at TRACK 22 22 might include electric supply and controlling same as electrical drawing of the original virtual address of the control power in different positions of Jacks The specification must have at least the same type of products and be working at environme
82. ion and refer from 4 3 and 4 4 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 10 M ry State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 4 6 Concrete foundation have to finished before Lifting Jack ready to install not less than ninety 90 days or follow Concrete testing if available 4 7 Concrete testing report should be done before installed of each jack 4 8 5 allowed Supplier to explore the area which beneficial for support civil work and prepared in various ways according to 4 1 4 2 and 4 3 4 9 Floor finishing is make the same pattern of previous state Coating material type amp color is upon SRT SRTET requirement 4 10 During construction period supplier have to fixed authorized person at least one 1 person who is supervised and controlled onsite construction working according to safety manner SRT SRTET required at least engineer level with Engineering license from COE authorized deputy representative 4 11 During construction and Civil work if any defected are found on TRACKs Facilities system Utilities system and Equipments or Devices s
83. ketch of Figure 1 Scope of Civil Work Scope of Lifting Jack Maker 1030 20 ENDO j Figure 1 Sketch of special rail profile in the area of the lifting beam Each Lifting Beam is equipped with automatic working anti roll of devices The wheel tread are embedded in a special machined pocket for anti roll of function During installation Special Rail if any defected are found on existing rail supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier x o e gt o 9 Lu gt c 2 7 a a Z E cc lt a a er State Railway of Thailand SRT Electrified Train Co Ltd Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable Extension rail 3 sets Relocate 1 unit of Bogie Lifting and Support Base for Existing mobile lifting jacks at TRACK 22 February 2013 PAGE 13 OF PAGE 77 e 4911 amp amp 7 Electrical Supply and Control for The Operation of sixteen 16 sets of Lifting Jack General Qualifications and requirements for control system it is designed and configured to meet the specifications of manufacturer s standard A
84. l of Extension rail except rail profile consist of rail connection points accessories and completed of civil work and Concrete foundation are required one 1 year of warranty after completed of commissioning and testing refer effective date is form Acceptance sheet 6 2 During warranty period SRT SRTET refuses any cost of expense from supplier if any cases out of warranty notice 6 3 During warranty period if have any delayed of service activities from Supplier after both of parties are conclude The mentioned expense and charge shall be paid to SRT SRTET within one 1 month from the date of notification 2 c gt x o e lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity N a or 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 50 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 7 Installation Facility General SRTET provide facilities along with installation and construction of the civil works Where one exists in our Main depot Klongton Depot Supplier should be able to determine what facilities and other related equipment for pre installed as well SRT SRTET denie
85. nd Appropriate standard of Civil works The design and materials of construction it s important to have a process control from expert Supplier may supply the domestic construction including raw material SRT SRTET be recognized and affirmed for Concrete foundation and Construction work from a certified engineer who holds a license by COE The basis requirement shall meet as below 3 1 Supplier must designed proper specification of Concrete foundation and response Civil work according to standard construction with well condition for Extension rail 3 2 SRT SRTET provide reference copies of Civil amp Construction drawings as current state of TRACK Location following as below ATTACHMENT A 3 2 1 ATTACHMENT A1 DEPOT ROLLING STOCK WORKSHOP GROUND FLOOR FRAMING PLAN ZONE 8 SHEET 8 10 3 2 2 ATTACHMENT A2 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 14 SHEET 2 2 3 2 3 ATTACHMENT A3 DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT E EL 37 42 ZONE 15 SHEET 1 2 5 3 2 4 ATTACHMENT A4 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 17 SHEET 2 2 x 3 2 5 ATTACHMENT A5 DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT EL 37 42 ZONE 18 SHEET 1 2 3 2 6 ATTACHMENT A6 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION amp ZONE 15 3 2 7 ATTACHMENT A7 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 16 3 2 8 ATTACHMENT A8
86. ng Supplier must have informed to SRT SRTET by a letter with reasonable and attached copies of update drawing and detail After SRT SRTET agreed by confirmation supplier can performed accordingly N N x lt a 4 o E o e 2 T x o 4 n gt n 4 a 5 lt 6 3 Underground pattern 6 3 1 Supplier shall designed provide and Installation for cable underground root pattern from current Control panel at TRACK 24 T24 to each sockets or connectors of individual jacks at TRACK 22 T22 6 3 2 The respect underground pattern as needed shall submit details to SRT SRTET with fifteen 15 days after Supplier signed the contract received Purchase order 6 3 3 The specification and details of equipment can be proceeded after SRT SRTET agreed in any Term and Condition and refer from 6 3 2 6 3 4 Concerned equipment is the new and never been used before 6 3 5 All concern accessories is responsible by Supplier 6 3 6 During installation if any defected are found on TRACKs Facilities system Utilities system and Equipments or Devices supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity
87. ngly 5 13 According to a surveying are found to improve the structure of the whole or part to be prepared to renovate or rebuilt the existing structure to compliance with engineering principle Supplier must implement and adhere to standards of construction which can not be used as an excuse or a reason to avoid the decline in contract operations o 2 a bo ea q lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 61 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 6 Safety measures Regulation and Testing General Tested and certified to install new location of Bogie Lifting to abide by all the features and practical applications Measuring are including the use of special tools and standard procedure Supplier will be responsible for all the procedures and test reports The basis requirement shall meet as below 6 1 Install new location of Bogie Lifting is tested according to table 4 Function Testing Detail Rail bridge width Report of standard gauge measurement Without a Bogie 10 tons Report of Leveling measuremen
88. nt of TRACK 22 T22 However the Control cabinet still fixed at TRACK 24 T24 with same power supply and controlled to drive unit of each jacks at TRACK 22 T22 Power supply and Control system shall meet as below 6 1 Power supply 6 1 1 Power supply used from current Control cabinet at TRACK 24 T24 6 2 Control cable and Connector socket 6 2 1 Supplier shall provide actual length Installation and termination of new control cable from Current Control cabinet at TRACK 24 T24 position to new location of each jacks at TRACK 22 T22 6 2 2 The specification and details of equipment shall submit to SRT SRTET with in fifteen 15 days after Supplier signed the contract received Purchase order 6 2 3 The specification and details of equipment can be proceeded after SRT SRTET agreed in any Term and Condition and refer from 6 2 2 6 2 4 Control cable and Connector socket is the new and never been used before Specification is equal or better than existing 6 2 5 All concerned accessories is responsible by Supplier 6 2 6 During installation and termination if any defected are found on TRACKs Facilities system Utilities system and Equipments or Devices supplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier 6 2 7 If detail submission of 6 2 2 need to be updated after proceeding or during work is runni
89. ntrol console 7 2 1 Emergency Stop All pole effective 7 2 0 Motor Protection via excess current release gt o 9 Lu me c 2 2 o p 4 2 e lt a 7 2 3 Upper 150 mm maximum Lower operating Limit Switch 7 2 4 Upper Lower safety Limit Switch 7 2 5 Wear Nut Monitoring 7 2 6 Monitoring travelling Nut lift off 7 2 7 Contactor Control that the control system monitors whether any of contactors of the Jack actuator motor become stuck 7 2 8 Limit Switch Loaded on body supports 7 2 9 Rotation Monitoring of each screw 7 2 10 Automatic Synchronization monitoring of joint operated lifting platforms realized by PLC Programmable Logic Controller tolerance 4 or 5 mm 7 2 11 Lowering movement 150 mm maximum to O after simultaneous pushing of two buttons at Single Vehicle Master Control Station 7 2 12 Release remote control pendant for group mode 7 2 13 Alarm function by Sound and Light 7 2 14 Operation hour counter via Touch Screen Panel HMI Human Machines Interface 7 2 15 The Electrical Control is build and inspected according to the VDE and EN 1493 and EC Machinery Directive 2006 42 EC Standard 7 2 16 The Fault message and Synchronization level are full proof against any Voltage loss Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 3 16 sets 12 5 Tons plus 1 set of
90. o Ltd jacks at TRACK 22 February 2013 4911 amp amp PART 3 Extension Rail 1 Ct e pene ui datas e 44 2 Description of the individual Extension rail nnn nennt 45 3 Concrete foundation for Extension 46 4 Accessories and device for Installation Extension rail installed 48 5 Safety measures Regulation and Testing sss eene nnns tanta ania 49 6 Warranty derum M 50 7 lnstallation 51 Bi SUBMISSION ee in e ee etr 52 PART 4 Relocate Bogie Lifting MM Cc I B M Rl 53 2 Description of Relocated esses sees tassa nns 54 3 Antiroll off Improvemint iiiter een etre dre en iden onn eed epa arde une eden 58 4 Power supply improvement eene sias sias sas sas 59 5 Concrete foundation for Bogie Lifting 60 6 Safety measures Regulation and Testing sess esee nennen entr
91. ons both before and after Supplier will be taken to comply with the requirements strictly The basis requirement have to meet as below 14 1 Supplier must submit design drawings and specification of The Bogie Turntable within fifteen 15 days to SRT SRTET after signed the contract received Purchase order from SRT SRTET 14 1 1 Final Drawing and specification of The Bogie Turntable will approved from SRT SRTET before supplier start to produced 14 2 Supplier must send full details of Concrete foundation Drawing As built Drawings both of hard copy and soft copy to SRT SRTET within fifteen 15 days after signed the contract received Purchasing order from SRT SRTET and refer to 7 3 14 3 Concrete foundation have to approved by local engineer Valid License from COE is a must and holding with second class level or higher and make copy of inspection sheet to SRT SRTET after he she have done 14 4 Concrete testing report should be done before installed The Bogie Turntable Supplier will make a copies of report to SRT SRTET before installed unit of The Bogie Turntable also 14 5 All of any copies of final As built Drawings Final of specification of The Bogie Turntable and Drawings Concrete testing report Leveling Alignment report and commissioning Testing Report are proved and confirmed with Official company s sealing 14 6 All of any Manual copies of 12 14 7 The final release edition of 14 5 and 14 6 must
92. or Lifting Jack with capacity sixteen 16 sets 12 5 Tons Material furnished shall be new and at least of standard quality currently used commercially confirming to current engineering and manufacturing practices Material shall be free from defects that adversely affect the function or appearance of the finish unit Unit have to meet the following minimum specification 2 1 Capacity dynamic static of one 1 set of Jack 12 5 Tons 2 2 Capacity of the entire lifting system dynamic Sixteen 16 sets of Jack 200 Tons 2 3 Motor Capacity per Bogie 2 Sets of Jack not less than 2 3 0 Kw 2 4 Lifting and Lowering speed not less than 300 mm min 2 5 Minimum Lifting Height at Rail Level 2 200 mm from 2 6 Maximum Lifting Height not less than rail level 2 7 Total height of Jack not more than 4 000 mm 2 8 Weight of one 1 unit of jack not more than 1 500 1 800 Kg o 5 bo 5 a o 2 2 gt gt o 4 o E e lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 7 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 e 4911
93. or unlocking and manual tuming February 2013 ible 2 PERRO OO SRK ROP Ro Top view of Bogie Turntable layout ing is poss 0000 00 008 SOS SRTET CRUSH ISSS ot Seat SoH SS zum lt 3 gt 5 Ae RS SRT Electrified Train Co Ltd ee Sens 60009500 RRO 2 o Groundview EE 9 0297010 0 0 0 0 0 0 1 Groundview Figure 7 Locking Unlocking Position with Detail of Centre bearing and roller bearing o c f i o gt o 2 a I gt o gt Bogie Turntable feature 6 General Drawings and sample unit picture as Figure 7 8 9 and 10 Detail turning and locking device M1 Locked Position rails centered lever for unlocking and manual turning 4911 amp amp Detail 2 1 5 2 Detail Y M1 5 z E ao P2 i e p sm MPn MM HI Q X T F S Sse Bh WV WS SS SS S A WE T5 SS Nis 4
94. pleted Install of Extension rail UIC60 Steel rail standard Supplier must install to desired and proper position Civil work and Concrete foundation are response by supplier The scope include Surveying Designed Materials providing Construction and Official approve follow engineering license from Supplier shall certified completed of testing report a c 9 x o lt a er State Railway of Thailand SRT Electrified Train Co Ltd Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable Extension rail 3 sets Relocate 1 unit of Bogie Lifting and Support Base for Existing mobile lifting jacks at TRACK 22 February 2013 PAGE 44 OF PAGE 77 4911 amp amp 2 Description of the individual Extension rail General Extension rail are additional rail to support for full functional maintenance serviced of below At TRACK 23 T23 Rail connection points between end of existing TRACK and Start line of New Bogie Turntable At TRACK 22 T22 Rail connection points between end of existing TRACK and Start line of Existing Bogie Turntable At new location of Bogie Lifting at TRACK 23 T23 Rail connection points between end of New Bogie Turntable and Start point of beam support rail bridge at Bogie Lifting TRACKs
95. procedure Supplier will be responsible for all the procedures and test reports The basis requirement shall meet as below 5 1 Extension rail is tested according to table 3 Function Testing Detail Track width Report of standard gauge measurement Leveling and Alignment Report of Leveling measurement Rail joint welding Report of NDT The test above have to done in house and completed installation at SRTET s site Table 3 Extension rail Testing details a c c gt x o lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 49 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 6 Warranty Claim General The Install of Extension rail shall be fully warranted against defective material not include Rail and workmanship for a period of at least one 1 year The warranty shall begin the date the system is completed of installation and commissioning at SRTET Klongton Depot A warranty Card or Certificate shall be provide accordingly The basis requirement have to meet as below 6 1 The Instal
96. proper location if any The requirement as below 1 1 Supplier must provide completed Dismantled of existing Bogie Lifting s position 1 2 Supplier must provide completed Installed of Bogie Lifting at new location 1 3 Supplier must improved Anvils of lifting truck and rail bridge of existing system to upgrading with anti roll off pocket preventing and Mechanical interlocking s function new location 1 4 Supplier shall improve power supply to new location of Bogie Lifting in the proper location if any 1 5 Civil work and Concrete foundation are response by supplier The scope include Surveying Designed Materials providing Construction Testing Official approve from engineering license 1 6 Supplier shall certified complete of testing report o gt 2 S9 a lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 53 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 e 4911 amp amp 2 Description of Relocated General Relocated Bogie Lifting is related to the corresponding area of the New Bogie Turntable at TRACK
97. rete foundation Improvement General At TRACK 22 T22 Foundation system is configured to meet the needs of both Safety load and appropriate standard of Civil works The design and materials of construction it s important to have a process control from expert Supplier may supply the domestic construction including raw material SRT SRTET be recognized and affirmed for Concrete foundation and Construction work from a certified engineer who holds a license by COE Position of foundations and Jacks are compare with existing current address of TRACK 24 24 The basis requirement shall meet as below 3 1 Supplier must designed proper specification of Concrete foundation and response Civil work according to standard construction with well condition for existing mobile lifting jack Lifting Jack is 12 5 Tons 16 units on TRACK 22 T22 3 2 SRT SRTET provide reference copies of Civil amp Construction drawings as current state of Building following as below ATTACHMENT A 3 2 1 ATTACHMENT 1 DEPOT ROLLING STOCK WORKSHOP GROUND FLOOR FRAMING PLAN ZONE 8 SHEET 8 10 3 2 2 ATTACHMENT A2 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 14 SHEET 2 2 3 2 3 ATTACHMENT A3 DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT EL 37 42 ZONE 15 SHEET 1 2 3 2 4 ATTACHMENT A4 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 17 SHEET 2 2 3 2 5 ATTACHMENT A5 DEPOT ROLLING STOCK
98. rovide accordingly The basis requirement have to meet as below 7 1 The Installed of Bogie Lifting at new location Anti roll off Improvement Power supply improvement if any and Concrete foundation are required one 1 year of warranty after completed of commissioning and testing refer effective date is form Acceptance sheet 7 2 During warranty period SRT SRTET refuses any cost of expense from supplier if any cases out of warranty notice 7 3 During warranty period if have any delayed of service activities from Supplier after both of parties are conclude The mentioned expense and charge shall be paid to SRT SRTET within one 1 month from the date of notification o gt 2 a lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity N a or 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 63 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 8 Installation Facility General SRTET provide facilities along with installation and construction of the civil works Where one exists in our Main depot Klongton Depot Supplier should be able to determine
99. s of report to SRT SRTET before installed unit of Extension rail also 8 5 All of any copies of final As built Drawings Final of specification Accessories and device Concrete testing report Leveling Alignment report and commissioning Testing Report are proved and I n c gt x Lu lt confirmed with Official company s sealing 8 6 The final release edition of 8 5 must submit to SRT SRTET within thirty 30 days after acceptance record is done END OF PART 3 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 52 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 4 Bogie Lifting Relocated 1 Requirement General SRT SRTET wish to move the current position of the Bogie Lifting at the same line of TRACK 23 T23 by a direction counterclockwise 90 of the original The Bogie Lifting is support for lift up a Bogie on weight of ten 10 tons Supplier will be responsible for the demolition of the Concrete foundation Civil work Dismantle Installation Anti roll off improvement and improve power supply installed in the
100. stic construction including raw material SRT SRTET be recognized and affirmed for Concrete foundation and Construction work from a certified engineer who holds a license by COE The basis requirement shall meet as below 5 1 Supplier must designed proper specification of Concrete foundation and response Civil work according to standard construction with well condition for Bogie Lifting 5 2 SRT SRTET provide reference copies of Civil amp Construction drawings as current state of Area location following as below ATTACHMENT A 5 2 1 ATTACHMENT 1 DEPOT ROLLING STOCK WORKSHOP GROUND FLOOR FRAMING PLAN ZONE 8 SHEET 8 10 5 2 2 ATTACHMENT A2 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 14 SHEET 2 2 5 2 3 ATTACHMENT DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT EL 37 42 ZONE 15 SHEET 1 2 5 2 4 ATTACHMENT A 4 DEPOT ROLLING STOCK WORKSHOP BOTTOM SLAB REINFORCEMENT EL 37 42 ZONE 17 SHEET 2 2 5 2 5 ATTACHMENT AS DEPOT ROLLING STOCK WORKSHOP TOP SLAB REINFORCEMENT EL 37 42 ZONE 18 SHEET 1 2 5 2 6 ATTACHMENT A6 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION o gt 2 a a lt ZONE 15 5 2 7 ATTACHMENT A7 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 16 5 2 8 ATTACHMENT A8 DEPOT ROLLING STOCK WORKSHOP PILING AND FOOTING LOCATION ZONE 17 5 2 9 ATTACHMENT A9
101. submit to SRT SRTET within thirty 30 days after acceptance record is done 2 a d c 5 eo N lt END OF PART 2 Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 43 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 1 Requirement PART 3 Extension Rail General Extension rail have in demand length to approx 10 meters per side two 2 sides is as a needed with TRACK width of 1 435 mm SRTET Airport Rail Link s Standard gauge for location is on TRACK 22 T22 TRACK 23 T23 and extension rail demand length to approx 4 meters per side two 2 sides is as a needed with TRACK width of 1 435 mm SRTET Airport Rail Link s Standard gauge for between New unit of Bogie Turntable to New location of Bogie Lifting In addition to supplier to be ensured of the concrete reinforced foundation to support the weight of vehicle on TRACK 22 T22 and TRACK 23 T23 and weight ten 10 tons of each bogies of New location of Bogie Lifting along the Extension rail The requirement as below 1 1 1 2 1 3 1 4 Supplier must provide com
102. t Leveling and Alignment Lift up and hold with a Bogie 10 tons during and after in 24 hrs Report of Leveling measurement Test interlock function with Bogie by Lift up Anti roll off and Lift down Concrete Test Report of concrete testing Electrical insulation test if any Report of Insulation testing The test above have to done in house and completed installation at SRTET s site Table 4 New location of Bogie Lifting Testing details o gt 2 0 a lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 62 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 7 Warranty and Claim General The Installed of Bogie Lifting Anti roll off Improvement Power supply improvement if any and Concrete foundation shall be fully warranted against defective material and workmanship for a period of at least one 1 year The warranty shall begin the date the system is completed of installation and commissioning at SRTET Klongton Depot A warranty Card or Certificate shall be p
103. the Bogie Turntable will be effected via pushing the bogie to the desired position If the bogie is in the correct position the Bogie Turntable has to be locked via manual tipping of the locking rod inside the respective locking recess At the locking wedge two screws and nuts are mounted which enable an exact adjustment of the wedge inside the recess The details is show as below of Figure 5 Locked position Unlecked posilion Hole for unlocking of locking wedgs 2 2 4 c 5 M o0 eo N lt Figure 5 Locking wedge and Locking Unlocking position Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 31 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF an re Manos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 5 Centre pin with bearing The spherical roller bearing of the centre pin unit and each bearings are from SKF or FAG For the lubrication of the axial bearing a lubrication nipple is mounted on to each of the centre pin bearing housings The details show as below of Figure 6 T om Hii Lubrication access hole x ZZ Ie LLL i L
104. ubrication nipple PTT E S S j Center bearing E ES ABEL a S HE d t d v 5 Z 7 m 4577 E se f f 2 eus v co Figure 6 Centre pin and Central Bearing with Lubrication way E lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity x 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 32 M rr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 39111 25 Qc van nsuuwilaa dani mw 5 Unlocked Position turn eiSog z 14 Vd SS i ws KG PAGE 33 OF PAGE 77 Detail Y iz 7 777 thout cover plates thout cover plates Deta I i A 7 lew wi IEW WI Groundvi Groundv of turntable 16 sets 12 5 Tons plus 1 set of Bogie Turntable Extension rail 3 sets Relocate 1 unit of Bogie Lifting and Support Base for Existing mobile lifting Electric Upper Under Floor Lifting Jack capacity jacks at TRACK 22 Specification of Commodity and Requirement telescopic lever stored position f
105. unit of Bogie OF Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 e 4911 amp amp 3 General dimension The General dimension is show at Figure 4 3400 E Tn i H H locking recesses every 90 5 4 c 5 i Bb EL TEA LBP RRR EO N A I eeose o I Re SOA N Bhd REECE ebd E lt ARIRE LEER RR 92992990 0 9 929299 9 9 HERES I m HOO OOO SUM RRC SORE Videt e be 59292022592 S UT T PERLER REEERE
106. upplier must be notified to SRT SRTET within seven 7 days However if these defected not from existing material defective then SRT SRTET will make claim noticed to Supplier 4 12 If detail submission of 4 3 need to be updated after proceeding or during work is running Supplier must have informed to SRT SRTET by a letter with reasonable and attached copies of update drawing and detail After SRT SRTET agreed by confirmation supplier can performed accordingly 4 13 According to a surveying are found to the structure of the whole or part to be prepared to renovate or rebuilt the existing structure to compliance with engineering principle Supplier must implement and adhere to standards of construction which can not be used as an excuse or a reason to avoid the decline in contract operations x o gt o 2 c 2 7 a a E Lu lt a Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity e 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 11 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 4911 amp amp 5 Operating Sequence General The Oper
107. urntable PAGE 66 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF Zi e Lifting and Support Base for Existing mobile lifting PAGE 77 SRT Electrified Train Co Ltd jacks at TRACK 22 February 2013 e 4911 amp amp 2 Description of Support Base General The TRACK 22 T22 have a feature is similar to TRACK 24 T24 which is kind of pits are specified The structure may be different from TRACK 24 T24 and the current setting will be the weight of the 4 cars of vehicle which has been used An additional of sixteen 16 steel plates to distribute the weight for each current Existing mobile lifting jacks combined to Concrete foundation structuring Most hi light important supplier to be studied in detail of current issued and structure to reflect capacity when lift up 4 cars of vehicle in safety manner If some current structure is safe and TRACK 22 T22 was supported by above Supplier is able to carry more locally but if any part of the original structure to be renovated or rebuilt supplier can not be used as an excuse to deny responsibility Support system at TRACK 22 T22 shall have the feature and character as below 2 1 Concrete foundation 2 1 1 Each concreted foundation sixteen 16 place must support and available for each units of exiting mobile lifting jack Lifting Jack is 12 5 Tons 16 units 2 1 2 The modernization and state of the
108. utomatic control must comply with standard and safety of the Lifting Jack system in Railway sector Most of Electrical Electronic Mechatronic and Computer control equipment have to sophisticated products and the most world wide used In addition to supplier must do complete of dismantle old parallel of power and control cable at TRACK 23 T23 The basis requirement shall meet as below 7 1 Control Cabinet for the following functions 7 1 1 Lockable main switch 7 1 2 Selection for choice of individual group mode set of group of jacks for lifting the requested number of Bogie by Touch screen panel HMI Human Machines Interface 7 1 3 Group mode follow according to the selection made at the control console 7 1 4 One 1 Emergency shut off button at each Jack 7 1 5 Indicator lamp for display of fault message 7 1 6 Total connected Value for 8 Bogie not less than 16 x 3 0 Kw 7 1 7 Operating Voltage 24 Vdc 7 1 8 Protection class of Motor IP55 7 1 9 Additional the Gear Cam Limit Switches are equipped with encoders which provides exact information about the heights of all participating lifting platforms 7 1 10 The Synchronization of the Jack can be regulated within an area of 4 or 5 mm 7 1 11 When a maximum deviation in the system s synchronization of 10 mm occur the jacks automatic shut off 7 1 12 Each Jacks are equipped with a flash light which lights up during operation 7 2 The Following safety features will be indicated on the Co
109. ve any delayed of service activities from Supplier after both of parties are conclude The mentioned expense and charge shall be paid to SRT SRTET within one 1 month from the date of notification 2 a c 5 lt Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity N a or 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 38 Mr State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF a n anos A SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 10 Transportation and Packing Unpacking General The supplier shall be fully responsible for all shipment and freight charge sea voyage and filing freight claims lies is also The consignee is SRTET Klongton Depot Packing Unpacking is done completely with any expense of supplier The basis requirement have to meet as below 10 1 Packing from manufacturer The Bogie Turntable shall be carefully packed and protected for sea voyage Domestic logistic Supplier must response for all parts be delivery to SRTET in good and proper conditions and ready to be installed 10 2 Unpacking at SRTET Supplier must response for Heavy machinery auxiliary equipment and man power to unpacked and place any part at assign
110. ve have to done in house and completed installation at SRTET s site Locking system Leveling and alignment 9 a d c 5 bo Lr tc lt Table 2 Bogie Turntable Testing details Specification of Commodity and Requirement Electric Upper Under Floor Lifting Jack capacity N 16 sets 12 5 Tons plus 1 set of Bogie Turntable PAGE 37 MEN State Railway of Thailand Extension rail 3 sets Relocate 1 unit of Bogie OF c rud SRT Electrified Train Co Ltd Lifting and Support Base for Existing mobile lifting PAGE 77 jacks at TRACK 22 February 2013 4911 amp amp 9 Warranty Claim General The Bogie Turntable system shall be fully warranted against defective material workmanship for a period of at least one 1 year The warranty shall begin the date the system is completed of installation and commissioning at SRTET Klongton Depot A warranty Card or Certificate shall be provide accordingly The basis requirement have to meet as below 9 1 Bogie Turntable and Concrete foundation are required one 1 year of warranty after completed of commissioning and testing refer effective date is form Acceptance record 9 2 During warranty period SRT SRTET refuses any cost of expense from supplier if any cases out of warranty notice 9 3 During warranty period if ha

Download Pdf Manuals

image

Related Search

Related Contents

Curriculum vitae Daisy de la Caridad Pérez Brito  HFX900 Manual V0.98  322 05 00 Rev2 Folheto de Instruções Panificadora Prime  PTM-Pro Users Guide Farm and Estate  8616-2002 resume FR  検査技術科学専攻  新規申請用PDFをダウンロード  DC7  Dymola - Dynamic Modeling Laboratory  Visualize o manual  

Copyright © All rights reserved.
Failed to retrieve file