Home
        424 S 428 S 424 RS Service manual
         Contents
1.                                                                                                     fig  15    The schematic structure is shown in fig  16                 fig  17   4 Move the exchanger towards the rear side of the  boiler and extract it    Reassemble the d h w  heatexchangercarrying outthe   removal operations in the reverse order        Attention  Reassembling the exchanger be sure to   A v A V putthe off center location securing pin indicated in   fig  18 towards the left side of the boiler                   Primary hydraulic circuit  Domestic hot water circuit  fig  16    PEN Removal    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component        1 Empty the primary circuit and the d h w circuit of  the boiler fig  18    12    7 Pump  LEE Function    The pump  A in fig  19  has the function of making the  water in the main circuit circulate through the main heat  exchanger and therefore through the c h system  dur   ing the c h function  or through the secondary heatex   changer  during the d h w  function      Note  the pump can be stopped by the intervention of  the low limit water pressure switch                                                                                                                                                     fig  19    LEN Checks    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component       Check that the pump 
2.                                                  High and low limit  water pressure switches    fig  52    EEJ Display circuit operation    The following drawing  fig  53  and list illustrate the  position of each light and its function     The colours are referred to the transparent windows of  the control panel cover                                   fig  53  1 Boiler on     green  It indicates the operation of the boiler     When the boiler is switched on  the indicator is continu   ously lit except after the extinction of the burner during  the c h  operation     In this condition the light flashes for a period of 3 min   utes indicating the reignition delay state of the boiler   This flashing indication is notaffected by the position of  the function selector on the control circuit  see sect   9 4      Switching the boiler on  the light could remain switched  off for a period not longer than 20 seconds due to the  reset time of the control system     2 Heat request     green    22    This light indicates the heat request signal from the  electronic control circuit and it comes on when the  water temperature  d h w  or c h  circuit  is lower than  the requested on the control panel     During d h w  operation it coincides with the ignition of  the burner     During c h  operation the light could be on and the  burner could remain off due to the room thermostat  and or time switch that don   t call for heat     3 D h w  request     green    This light comes on when the boi
3.               fig  48  4 position the spindles as in fig  49 and mountthe  panel cover     After having installed the control panel make sure the  central heating    l  and domestic hot water tempera   ture      adjustmentknobs can move freely  halfa turn                                                                              fig  49    Electronic control circuit       EEN Thermal control in the  s    mode    Switch in the   function mode  Y    Green LED on    See functioning with the function  switch in the  mode             YES   sec  9 10        NO                          Is primary circuit  temperature higher than that  selected        YES NO                Request for heat from  room thermostat       NO YES    Circulator off Starts the circulator  Ignition device off Supplies the ignition device  fig  50    EXI Thermal control in the     mode    Switch in the   function mode    Circulator off  m YES NO   gt  Ignition device off  Y    Circulator on             Is domestic  hot water outlet temperature  lower than that  required     YES    Supplies the ignition device Ignition device off    fig  51    21    10 Display circuit  EF Function    The boileris equipped with a pcb thatdisplays some in   formation about the operation of the appliance     The electric signals that operate the display circuit are  given directly by the electronic control circuit or by the  water pressure switches                 Electronic control circuit                                       
4.      18    EXI Function selectors    The function selectors    6     fig  36 and fig  39  are  microswitches with which itis possible to selectthe vari   ous modes of functioning of the boiler     In fig  39 the selectors are illustrated in the configur   ation in which the p c b  is setin the factory  natural gas  boiler                                                E S         Reignition delay    M         Gas pressure calibration  N     Gas change  7           No function  ON  1               OFF  0   fig  39  O  Selector2    Itselects the functioning ofthe boileron the basis ofthe  type of gas used     It allows the selection of the maximum supply current  given to the modulator device     To set correctly the selector follow the table of fig  40                    Gas supply Position of selector   Approx  Max current  trough the modu   lator device   Natural gas 120 mA   L P G  165 mA   fig  40  O Selector 3    It forces the functioning of the boiler in order to permit  the optimal gas pressure atthe burner to be adjusted  during the ignition phase     The adjustment  see section 9 5  is done by means of  the potentiometer  8  marked  ACC   fig  36      Afterthe adjustmentoperations bring the selector back  to the normal position  ON                              adt ON  1      gt  OFF 0    Normal gas pressure calibration  fig  41  O Selector 4    It makes it possible to select the minimum time that  must pass between two ignitions of the burner in c h  function         
5.      38    fig  90    disconnect the switch     unscrew the nut that holds the switch to the  bracket E and remove the thermostat     reassemble the switch carrying out the oper   ations in reverse order              Safety thermostat    39       21 Shortspare parts list    Key   G C  partno    Description Q ty   Manufac  Manufacturer s reference  turer part no     MA e ncn  WH o                  AX o   mns   wsnmetecwermonum 20021720     WI m a a a    Air pressure switch  mod  424  1 LN Natalini Type M 1 4 mbar  Honeywell C6065 1 4 mbar   Air pressure switch  mod  428  1 LN Natalini Type M 1 6 mbar  Honeywell C6065 1 6 mbar     H ss   mevew SOON  CaS   W x  AA  Emm  Combustion chamber panes merum      i  eoms i   fio fes ESOS 10 ese                  eTo CO AN 0 EE   una   Ens DE ESE    14  114 988 Pump BG1002 101   Myson CP53   WU TIER  E00 699 Pump  high head  BG1901 104  Myson CP63  e E emeses    EE EE 10 E    000   0   0        1e ear  Ohw tow swich merses 10 E 0207                      EE AN p  euens                                Sioh menar pressen eb EM DLE EN    lew iver presesh  ste       i  e001 22 E  a fs frer o O a e  ENCON probe wan orar cram fi feer                         m ens IES 100 en 00000  ENE ES  suanms               E   eus   peemmseme 70 p E 207      m     meme acetum E                             alternative       40    Short spare parts list                 17962 0682 1 9811  12A3     
6.     30  135 L  FU Uo ccr ou Dueb oer roce pd 30  15 2   GREEKS  ct CE ORDER 30  15 37 REMOVA I   otto vaa t eo or ete e 31  16 By pass valve             nnn 32  TG eT JPUDCUOTL eos cci boreali asta ele bot 32  16 2  JRemoval zc vetet ee 32  17 Water pressure switch and pump rele      33  LAA FUNCION a ert Gana s 33  17 2     CHECKS at epe ebrei fs 33  17 3 Removal of the pressure switch          33  17 4 Removal of the pump rel                 33  18 Flue fan  venturi  air pressure switch       34  18 L   Function ia Bande a dana 34  1 2   CGHECKS  cda da npe bene peret haba 34  18 3 Removalofthefan                     35  18 4 Removal of the air pressure switch       35  19 Ignition and detection electrodes          36  19 L   EUNCUON sies jou Erg erben P xe Yes 36  19 2  Check oe e OD eR TENES 36  19 35 Removal isis a ERR EN 36  20 Safety thermostat               ssseeeeee 37  20 1 Function taser ind apra doi 37  202   CheckS ice e tem eR N 37  20 3 1 Removal  cei e eC tna 38  21 Shortspare parts list                     40       1 Overall information    IHE Overall View                      Automatic  air release Fan  valve Ne me      Main heat E A ra i Expansion    vessel         exchanger IF j t R      L   y y  Safe   FERT i Air pressure             Main circuit    me    e8  flow switch z    EM     E  Full seq   Control                          i ignition device  32a l n Gas inlet    ty  thermostat probe switch  Ignition A 2 ui  electrodes E A ae Combustion  chamber  Bur
7.   16    7 Unscrew the screw R that holds the d h w  heat  exchanger  the bolt S that holds the valve to the  frame  fig  33  and remove the valve        fig  33    The diverter mechanism is composed by two parts  To  reach them remove the hydraulic actuator as explained  atthe step 3 ofthe partRemoval ofthe membrane ofthis  chapter     With a suitable spanner unscrew both plugs indicated  in fig  34 and remove the parts ofthe diverter mechan   ism        fig  34    Reassemble the valve proceeding in the reverse order     9 Electronic control circuit    EX Function    Inlet Information       d h w  temperature probe  main circuit temperature probe  d h w  pressure switch   c h flow switch                function switch   d h w  temperature reg   c h temperature reg   function selectors   max  c h power reg   ignition gas pressure reg   room thermostat                                                                                  Outlet command       Flame ignition    control device  Gas modulator  Pump             fig  35    The fundamental function ofthe control circuit is that of  controlling the boiler in relation to the external needs   heating the room  heating the water for d h w  use  op   erating in orderto keep the temperature ofthe hydraulic  circuits constant     This is obviously possible within the useful power and  maximum working temperature limits foreseen     Generally  the control circuit receives inlet information  coming from the boiler  the sensors  orfr
8.   ON  1   lt  gt  OFF  0     M                      2  o  2   D    w  3   2    fig  42    EXE Ignition gas pressure regulator    By using the device  8   fig  36  marked    ACC     on the  circuit board  itis possible to adjust the gas pressure at  the injectors in the ignition phase     This pressure is maintained at the injectors untilignition  occurs  ionization signal      To carry out the adjustment move the function selector  n  3 downwards  adjustment  and use the adjustment  device  8   ACC      Bring the gas pressure atthe injectors to the value indi   cated in the tables  data for gas adjustment  stated for  each model in the second part of the manual  ignition  pressure      By rotating the device clockwise the pressure in   creases     Check the regular ignition of the burner by turning the  boiler on and off repeatedly     After the adjustment operation move the selector up   wards  normal            Lt  a      ON  1   lt  gt  OFF  0                       Normal gas pressure calibration    fig  43    EXI Max  c h power regulator    By using device 7  fig  36  marked    RISC     on the cir   cuitboard  you can limitthe maximum useful output de   livered in the c h function  This adjustment does notin   fluence the maximum useful output delivered in d h w   function     By rotating the device clockwise the pressure in   creases     EXA Checks      Check that the fuse is complete    If the control circuit does not supply any device  pump   gas valve  etc   check tha
9.   vcl   lt TL    EN  adIAap aduanbas   ny    529up Q syusuoduo      sBulpulm  dund    A  N    o   Jebueuoxe yeay  m y g    E ma          omiso  fa      uem         ia    ON     yo SI Jajlog ayy USym  SNA Aayes ay Woy SAL ILM    y 3 uo uogelado Bul   Jnp anjen Aajes ay  woy SHL Je3eAA      W Wp Jo 3381 MOY MOT    ameduwaa  w u p JOOd     unuu  3e sujewal JauInq ayy o  anssard sep    y Inq Ap2auoo sajelado Jaj10q SUL    t    PA     393 gt 8e1q Ul yal 0U       enueu ayy jo uon2es       5 Main heat exchanger    EX Characteristics    The main heat exchanger  A in fig  12  has the function  of transferring heat of the gas produced by combus   tion to the water circulating in it                                                                                                                                               fig  12    The hydraulic circuit consists of five elliptic pipes con   nected together in series  fig  13                                                                                                                                 fig  13       EVEN Removal    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Empty the main circuit of the boiler  2 Remove the front panel of the case  3 Remove the sealed chamber cover   For models 424 S  424 RS       4a Remove the cover of the combustion chamber     5a Remove the front partof the flue gas hood by un   screwing the screw B  fig  14a        fig  14a  For 
10.  SBOP Jellog eur    WoO  pa  duue  3nox201   yo  uea15  3u61     uo JS 10Q        Was ue4    apo  Wu p 40   Y D Ul Jeune HAS JOU SBOP 1   10q SUL    t    PA     E RR    N       sjoyafu    an ea ssed   Ag A L       A 2 O es      E AO Io A ANA  a e  gt  w    pn a  gt  w    a ae a op AAA E SA  pera o E pol E    ema   A A A cg ino ce c n  Ll  Si n sp       gt  wl   gt  SAN    Aa  A AE eee m   gt  e A e  e tano tu TD oe cod OS IO  BL AP E E E ASA   ap ow  uo AA    mm    samj           m     Area p p T ow v    v  eS  313  o  5  la  D   lt  a  c     o  un     a   gt     eponoe e uon2ejeg    m  x  3  w       EAR  o  pee     lt   o  un  un  fp    8        m        Sj9   oeJq Ul yal 0U       enueu ayy jo uonoes    a  N       N  N    CET  ver  TT    CST  cCVL    un   e   T  zc   lt   y   lt    D    N  00  pa  a     N  r4    Dey Q syusuoduo        Hulpuy3ne4 blo    Fault finding    swa  O OS DD LL o OS          apouu     wy p uo Ap2auoo sajelado Jajl0q SUL  Jesy jou saop WAS  S   y  gt  ay pue 2906 Say3eal PNI Uew  ay  yo aumeladula  ay  epoul u 5 uo      wuy p yo Bulmeip e Buunp   ue e epouu y 2 ui uonejedo Jenbay      dez ayy Woy IEM plod     wuy p Ajddns jou saop sayjiog ay     apou    WUu p Ul Anp2auoo sajelado Je loq SUL  Jesy jou saop WAS  S y   ay L     Ajsnonuguod suns duund ay        3906 Jnoge   3e 1da3 si eurgejeduue N1 ureuu   ay pue wu p eui Buimelp noyjym  U  A   UO SWN JS  OQ SLA epouu IUM  JO Jeuuuuns ui  uxiMs uonounj 9u YIM    Jejioq ASION  u 2 ui Buiuonoun  sejnbay   M
11.  main circuit and the d h w  circuits of  the boiler     32    3 remove the hydraulic actuator B  fig  75  as ex   plained in the section Diverter valve and d h w   pressure switch of this manual     remove the fork C and the pipe D     D       fig  75  rear view of the boiler     5 Unscrew the connector E and remove the by     pass valve F  fig  76         fig  76    6 reassemble the by pass valve as illustrated in  fig  76 and proceeding in reverse order     17 Water pressure switch and  pump relay    HAN Function    The boiler is equipped with two water pressure  switches which are connected to the main  c h   water  circuit     They have two different operating points and  by  switching an electric circuit  they indicate the water  pressure by means of the display circuit  fig  77      The lower limit pressure switch interrupts the power to  the pump via the pump relay  in the event that the sys   tem pressure drops below 0 5 bar     Display circuit       High limit    water pressure D  switc    gt      y      VF     A  Low limit t      water pressure    switch                               Pump  rel         fig  77    The high and low pressure switches can be identified  by the color of the pastic plug situated on the end of  each switch     The table below gives further details     Pressure switching point  bar     Re       FEA Checks    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Switch offthe boile
12.  of the air pressure switch    Note that there are two different air pressure  switches with different operating values for the  424 S  424 RS and 428 S boilers     Refer to the short spare parts list for the correct  selection of the switch     NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Remove the front panel of the body and the lid of  the sealed chamber     2 Disconnect the wires of the air pressure switch     3 Remove the two pipes from the air pressure  switch     4 Unscrew the screw D  two for the pressure switch  of fig  80c  which holds the air pressure switch to  the frame  fig  82            fig  82    Warning  reassembling the air pressure switch   refer to fig  80a b or c to connect correctly the wir   ings and to fig  81 to connect the venturi device to  the air pressure switch     35    19 Ignition and detection electrodes    FEF Function    Three electrodes are fitted on the burner  Two of them  are the ignition electrodes and are fitted near the front  part of the burner  The ignition sparks take place be   tween their metallic edges over the central ramp of the  burner during the ignition sequence     The third electrode is the detection electrode and it de   tects the presence of the flame     An    Ignition          1                           Detection    fig  83    FUN Checks      Check the position of the electrode edges    NN Warning  isolate the boiler from the mains  electricity s
13.  operator coil    1 Remove the front panel of the case and lower the  control panel     2 Disconnectone of the two connectors  3   fig  58   ofthe modulating operator and measure the elec     25    Gas valve    Ep    fig  60       trical resistance of the coil    Its electrical resistance value must be approx   125 O    Check the modulating operator coil   Remove the front panel of the case and lower the  control panel    Remove the full sequence ignition device  see the  section 11 3 of this manual      Measure the electrical resistance between the  leads of the on off operators as illustrated in  fig  60     Upper on off  operator  approx  1 260 O                Lower on off  operator  approx  30000     PEN Removal    NN Warning  isolate the boiler from the mains    26    electricity supply before removing any    covering or component     Remove the front panel of the case and lower the  control panel     Remove the full sequence ignition device  see the  section 11 3 of this manual      Disconnect the modulating operator     Unscrew the eightscrews indicated in fig  61 and  remove the valve     Reassemble the valve carrying out the removal  operations in reverse order                 13 Main circuit flow switch    FER Function    The main circuitflow switch  A in fig  62  is a device that  controls the speed of water that crosses the main heat  exchanger                                                                                                                         
14.  point   Valve outlet gas pressure test point    Gas pressure maximum adjuster    Y Oo Ui A W N HG    Gas pressure minimum adjuster     PEN Adjustment          fig  58  view from the left side of the boiler        fig  59    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Remove the front panel ofthe case and lowerthe  control panel as described in the section 2 2     2 open the gas pressure tap  4  atthe valve input   connect a gauge and check the gas pressure of  the supply network     3 close the gas pressure tap  4      4 open the gas pressure tap  5 atthe valve output  and connecta pressure gauge     5 remove the protection cap from the mechanical  pressure adjustment elements     6 disconnect one of the two connectors  3  of the  modulating operator     7 start the boiler     8 rotate the minimum pressure adjuster  7  until  you obtain the espected pressure  by rotating  clockwise the pressure increases      9 turn the boiler off and connect the wire to the  modulating operator     10  startthe boiler     11 rotate the maximum pressure adjuster    6    until  you obtain the espected pressure  by rotating  clockwise the pressure increases      12 tum the boiler off and disconnect the gauge     Atthe end of the adjustment ensure to seal the gas  test point     EEN Checks    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component      Check the modulating
15.  pressure switch in YES       standby  Y  Starts fan      lt  lt    Stops fan  Memorizes shutdown  Shutdown indicator light turns on A      NO Fan pressure switch YES  gt   working  Y  Waitume Starts Wait time starts  k   Presence  Ne of flame  VE   L NO Fan pressure switch YES    working        Waiting time    YES  i finished     Starts ignition sparks  Opens gas valve  Ignition time starts          Presence  of flame           NO YES        Closes gas valve  Stops fan  YES   Stops ignition sparks  Memorizes shutdown  Turns shutdown indicator light on       Ignition time fin     NS ished        Stops ignition sparks  Gas valve open                               NO Reset push button YES  pressed   Closes gas valve  r       YES Presence of flame  NO  gt    YES Fan pressure switch NO             working     fig  57  24    12 Gas valve    FERRE Function    The gas valve controls the gas inflow to the boiler  burner     By means of an electric command given to the on off  operators the passage ofthe gas through the valve can  be opened or closed     By means ofan electric command given to the modulat   ing operator the pressure can be varied and therefore  the gas flow rate to the burner  modulation   The modu   lator device has mechanical organs which permit the  adjustmentofthe minimum and maximum pressure ex   iting the valve      PREM Nomenclature of the parts    On  off operators   Modulating operator   Modulating operator s electric connectors  Valve inlet gas pressure test
16.  switch position          L LNE     N   NEUTRAL        ACTIVE CIRCUIT  Heat request on d h w              NACTE CIRCUIT  a  F2  1 6 A T  PTC TRANSFORMER                                                                                                                         J4 1  L N  a Eg     gs m gt  nv  S   TO THE CENTRAL  z CIRCUIT S  E LOW VOLTAGE  rm 12V  SECTION  J4 4   HZ  A e G  o  O e       IGNITION  B 9     DEVICE  gt  N  A      or gas valve    J4 3 K2  RELAY  A 4 5 13 17 3 8  CENTRAL HEATING  PRESSURE  SWITCH                         A Time switch    2 J3 3  E O OA N  C Frostat  jumper shown     B  Room thermostat  jumper shown        Function switch position    Heat request on d h w     F2  1 6 A T  PTC TRANSFORMER                                                                                                                        N  zy p gt  21V   go TO THE CONTROL  HOE CIRCUIT S  25 K1  RELAY  LOW VOLTAGE  D    gt  12y  SECTION  J4 4 dnd   A         lo  IGNITION  B 2 nmn EE 8  ties K2  RELAY    4 5 13 7 J3 8   o NE    PRESSURE  pta SWITCH  O                         A Time switch    J  3 2  3 3  LO DO  gt  N  C Frostat  jumper shown     B  Room thermostat  jumper shown     Diagrams       EX Control circuit voltages                                                                                                                                                          230 V   network  C h D h w  Room  o J thermostat    DE Se ce Z  E ca  er  e  e C h   et AAA eC fiw s
17.  uo UanIb      njea SLA ui y ejeduuoo pue     zT P  S ees  anjen seb ayy  JO UIOd 353  38pno ayy Je aunssaud seb uinuirumu au 204d    Asoy Majes ay  jo uonusAJadur ayy pue PNI UleLU  ay  jo Bunesy   Jano ay  esne   pjnoo ssed   Aq patuwel y        enueu uope  e3sul osje das    5ul 113994109 Sy   UA puen 9ujjo sseupunos40J529u5  J9loq   ay Aq 19eq pe  ons jou si seb 3sneyxe yey  aunsud pue   se  ueijeo    das  payjeysul A  p2au102 si jeuruueg any ay PUA  uA  suononasqo jo e  uesqe pue sseupunos JO  529u5  39pIooq   uonej eisui ayy uo ueAI6 sanjen ayy UM y e1edujo   pue    uone14edo buunp pue 3s21 Je J9 IOq SLA M     ZT Was 995   3N8A se6 au1jo1urod1sa139 ur BUA We eunssa  d seb ouj  9u  5     SO AJe  dois    Jo uonisod au    adid Ajddns seb ayy yo sseupunos eu AjusA Z    uon  euuoo  enneu pue au Jo Auejod ay 29u5   sasny   euaxa pue 6njd    ajqed Ajddns jo Qubaqul ayy AUA   N  jenneu pue  1  euj usamaq    A0bZ   0Zz 10139949 IT    v nm  s z y  3 nm o  O  3   lt   alo  O6 3 S   S A  lt    lt l  uol o  c     o  un     a  E     ENT   dmm  R   emen    m  x  3  w     n  o      lt   o  un  un   p    8      1     N  yejsouuaty Majes    N  00  A  o  a    nN  H    c    e Li       eqoJd  dwaz 113419 ure W MO       ST E      q 2 d uone n6a1  asny    yams aunssaid  wu q     Sue1quiauJ  aAjeA J  P  ALA   19  eduui     10301  dwn d     s10Je1ado jjo     uo  SALA seo   q 9 d  Ba1  sio1  9Jes uonounJ     q   d uogejnbay     dnoj6 uoneiep  IALA JOHAL     4ojesado Hunejnpow  JALA sec OOO    Cet
18. 0000000       fig  63      Mechanical function    1 Remove the front panel ofthe case and lowerthe  control panel as described in the section 2 2 of  this manual     2 Remove the fork C thatholds the main circuitflow  switch B  fig  64         3 Start and stop the boiler in c h operation  time  switch and external controls must call for heat   and verify the position of the shaftD referring to  fig  65    Boiler OFF       Boiler ON    fig  65    27    Main circuit flow switch    EEEN Removal    NN Warning  isolate the boiler from the mains    m     fig  66    28    electricity supply before removing any  covering or component    Removal of the membrane   Remove the front panel ofthe case  lower the con   trol panel and empty the main circuit    Remove the fork E that holds the main circuit flow  switch B  fig  64     Unscrew the four screws F  open the hydraulic  operator and remove the membrane G  fig  66         4    Assemble the part proceeding in reverse order     Assembling the part  ensure to place the concave  side of the membrane towards the actuator plate H  and the reference hole indicated in the seat       fig  66        Removal of the switch   1 Switch off the boiler  remove the front panel ofthe  case  lower the protection plate and lower the  control panel    2 Remove the fork C that holds the switch placed  on the valve and remove the switch  fig  64     3 Open the box and disconnect the switch    4 Reassemble the switch proceeding in the reverse    order     1
19. 4  9 Electronic control circuit                  17  Oi     inen 17  9 2 Selection and adjustment devices        17  9 3 Checking the temperature               17  9 4 Function selectors         o  ooooooo    18  9 5 Ignition gas pressure regulator           19  9 6 Max  c h power regulator                19  9 7 GheCKS dinine eatae aa DA 19  9 8 Removal of the control circuit            19  9 9 Thermal control in the  88  mode         21  9 10 Thermal control in the        mode         21  10 Display circuit                sese 22  IQ L    E  lctionr  zoom ez ere E oh 22  10 2 Display circuit operation                 22    10 3  Remowal     ee Een 22    11 Full sequence ignition device              23  TL  FUNCION  al nee 23  VAG   gt  OC lie cKs    5 8 cided een Probe ete e da 23  11 3    Removal  Joli soa ec acea 23  11 4 Ignition sequence                      24  12 Gas valVe   iniciaran 25  TZT     EUHCUOTI 5a es ni cd 25  12 2 Nomenclature of the parts               25  12 3 Adjustment lisaa 25  12 4    GheckS  oce Gish ohana ease X RR 25  12 5  Removal  aata ad Rex 26  13 Main circuit flow switch                27  T31 FUNCION iin reves co caet 27  13 2  Checka cinta Oka ete ete ht 27  13 3    RemoVval  vrai nacre oranda een oe 28  14 D h w  filter and flow limiter                29  141 General notes           0c ccc eee eee 29  14 2 Removal of the filter                     29  14 3 Flow limiter              ooooooo oo     29  15 Temperature probes                  
20. 4  D h w  filter and flow limiter     TE General notes    The input port of the d h w  circuit is provided wit a net  filter and its function is to stop the passage of any impu   rities through the circuit     The d h w  filter is located in the c h  return group  indi   cated in fig  67            fig  67    IV Removal of the filter    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Remove the front panel of the case  the lower  protection plate  lower the control panel and  empty the d h w  circuit     2 Unscrew the plug A  fig  68  and extract the filter        fig  68    TEN Flow limiter    424 S bolers are provided in the factory with a flow li   miter rated at 10 litres min     If the flow rate of the d h w  circuit on the 428 S boiler  is too high  it is also possible to limit it installing a flow  limiter  The following sizes are available     Nominal flow rate  litres min  Colour       To install the flow limiter operate as in the following se    quence    1 Remove the d h w  filter as explained in the sec   tion 14 2    2 Unscrew the part B  fig  69  and remove it from  the body of the filter    3 Install the flow limiter C putting its smaller diam   eter side towards the part B    4 Install the filter following the removing sequence  in reverse order        fig  69    29    15 Temperature probes    FEF Function    The temperature probe has the function of converting  the temperature of the water of 
21. Wall hung  fan flue  room sealed gas boiler    Models     424 S  428 S  424 RS    BIASI S p A    37135 Verona  Italy    Via Leopoldo Biasi  1  Stabilimento    33170 Pordenone  Italy   Via Pravolton  1 B    GAIA    Service manual    Leave this manual adjacent to the gas meter    sa Savio    Table of contents    1 Overall information                   o  1  1 1 Overall VIEW il acra 1  1 2 Hydraulic diagram        oo oo o o o o ooo   1  2 General access and emptying hydr  circuits 2  2 1 Nomenclature         ccc cece ee ees 2  2 2 Body panels             cece eee 2  2 3 Access to the electric parts of the   control panel    3  2 4 Access to the sealed chamber           3  2 5 Emptying the main circuit               3  2 6 Emptying the d h w  circuit              3  3 Diagrams               enn nn n nnn 4  3 1 Wiring diagram              00 eee eee 4  3 2 Functional flow diagrams                5  3 3 Control circuit voltages                  7  4 Faultfinding                  eee 8  5 Main heatexchanger                  ee 11  5 1 Characteristics sida aaa 11  5 2 Removal ni rd 11  5 3 ACA Aad inte ELTe renes 11  6 D h w  heatexchanger                     12  6 1 FUNCION etre qr eoe d CR 12  6 2 ROMO luna E CR C IN 12  Dd Pump   5 vsies esten Dno ca  dae 13  7 1 FUNCION eee APA 13  7 2 Checks  castrar tad es 13  7 3 Removal ced e Ne AS 13  8 Diverter valve and d h w  pressure switch   14  DI   FUNCION aa teda ta 14  8 2 CheckKS   eec Re cct 14  8 3 Removal   cere CR ac e e DD T 1
22. ble Room thermostat 1 Ww  bk   plack L br  w   white i  Pered Power line     lt  b  gy   grey N gly  y   yellow    g y   green yellow        direct connection with the ignition and flame control device          Pump  relay                Time switch    Diagrams       ERE Functional flow diagrams      L  LINE    N   NEUTRAL    ACTIVE CIRCUIT  INACTIVE CIRCUIT                                                                                                          TO THE CONTROL  CIRCUIT S LOW  VOLTAGE  SECTION          HA   gt N  J3  8                            General layout    function switch position off  E  F2  1 6 AT  O TRANSFORMER  J4 1  L  gt  O         O DO     CAAAAAAAS  O L7 NYC NC CNN   5x  a GE i   po 5h K1  RELAY   J4 4 OF YY   A e DO  ol SR UN C  O     B O   A GA  j4 3 K2  RELAY     i5 13 7  TIU O     O  C   m          O          f                            CENTRAL HEATING  PRESSURE  SWITCH             J3 2 J3 3   A Time switch N   B  Room thermostat  jumper shown  m E Ee   C Frostat  jumper shown   Function switch position e  Heat request on c h   E  F2  1 6 AT  TRANSFORMER            S1  FUNCTION  SWITCH                 gt                                                                 A Time switch  B  Room thermostat  jumper shown   C Frostat  jumper shown              COM OO                   TO THE CONTROL  CIRCUIT S LOW  VOLTAGE  SECTION          y N  J3 8          CENTRAL HEATING  PRESSURE  SWITCH    J3 2 J3 3  D O  D  gt  N    Diagrams          Function
23. ctions in c h  fig  37   the signal  coming from the primary temperature probe is com   pared to the signal given by the instrument panel  through the adjustment made by the user  knob JII     The result of such a comparison operates the modula   tion of the gas valve  consequently changing the instan   taneous useful output of the boiler       D ON A UN uN    17    Electronic control circuit             adjustment    ON OFF  adjustment    modulating                            Central heating temperature          fig  37    When the boiler functions in d h w   fig  38   the signal  coming from the d h w  temperature probe is compared  with the signal given by the instrument panel through  the adjustment made by the user  knob          Seconda  heat exchanger                                     Gas L  inlet r    ga  75  C          A      ge we     ee 165   32 1     EE  53   ze 9      n      Domestic hot water  temperature       fig  38    Normally  the result of the comparison between these  two signals directly operates the adjustment elements  ofthe gas valve  adjusting the useful output generated  in order to stabilize the temperature ofthe exiting water     If during the functioning in d h w  mode  the tempera   ture of the primary circuit goes over 759     the useful  outputis automatically reduced so that the primary cir   cuit cannot reach excessive temperatures     The control sequences in   function and in   function  are illustrated in detail in sections 9 9 and 9 10
24. eJp A ogerpeuuuul yo suum Je log SUL     uo WUN  jou seop Jaj1oq eui 3nq suum uej eu     A  pue suo gt   ulee say pue yo seo6  spuo  es may  e 10    w y p pue U D UO say Je Jlog SUL    eUunssaJd seb paxy e q aunq  ay  yo pue UO s  yAms Jaj1oq SUL    uone npouu pauo gt ul    Yayo YI  euuey si alay pue   siou  SI UORSNQUIO     ANG suni Je ioq au p    t    pA    mwa Tt 1   O S _        re e E E   CAE  uH  AE EA AA AAA  E tac   gt  gt  AL AA    amma US MO CO CO ASC IESO             a AS EEE CALA  y AA AA    EEC          i    EO IS IS     A A ASA TAE  EA O LEE EL AA  ES paa do e VB NER A A   a ee EL E  Eu OEA Er ur  fmmompmouseso fmf                 EGER IE Aa dul Jp  ri won od  o qr ur  MEE ww C T 3  T 0 0 oup opus      wwww     m         wm    A AAA AAA  a sup ee CA ee  ae a AN a      A    2    D  a          n    m wn  HEE  D  D  5 x  Uu  ct  o E   gt  2   lt   5 3  uo n  o g      pM  m    eponoe e uon2ejeg    8     Sj9  joeJq ui yal a10u      enueuu ayy jo uon2es       co  LS  a  N     LA  2            E INE O O SS IS  esae  8  ELSE      v  w  w  eim   D     2  qa   2313  n   lt   Uo   eo  rm  c   D  un     A  3     N  N    CET  vet  cCIL    N  n  N  00  pa      a    CST  cCVvl    nN  r4    Day Q sueuoduio      Fault finding     ET  Jogiuui Byes moy e yasul  Auessadau JI yry 00  J2 moy 40 UBIY 00  ainssald  m uy p     Senj eA  Jadoud 104 jenueuu uonej ejsur ayy  0  JaJ9oy    9SSo  UOISUEdxa 3Y  jo uonezunssaJd ALA AD9YI     s10y99fU  Jo sseuues  SY    UA  3epjooq uonejjesur ayy
25. eck    Itis possible to verify the general operation ofthe valve  by measuring the voltage between the leads of the  d h w  pressure switch during the operation on c h and  d h w     NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Switch off the boiler and open the control panel     2 Connect a meter  set for direct voltage measure   ment  to the points indicated in fig  23     3 Switch the boiler on   position and verify the volt   ages during c h and d h w  by matching the read   ings with the values indicated in the section 3 3     14                       000000                                  00000000                                  fig  23    Check the mechanical function    1 Switch offthe boiler  remove the front panel ofthe  case  the lower protection plate and lower the  control panel     2 Remove the pressure switch as explained in the  section 8 3    Removal of the switch        3 Open and close a d h w  tap and verify the posi   tion of the shaft B referring to fig  24     2    D h w  tap OPEN    4    D h w  tap CLOSED       fig  24    EEN Removal    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component       Removal of the membrane   Removethe frontpanelofthe case  lowerthe con    trol panel and empty the d h w  circuit    2 Remove the forks C and move away the pipes D    fig  25     rear view of the boiler      m    Diverter valve and d h 
26. ed                                     fig  62    This device controls the regular functioning of the  pump  the presence of water in the primary circuitofthe  boiler and the absence of obstructions ofthe main heat  exchanger during the c h function as well as during the  d h w  function     As a consequence of any one of these causes the main  circuit flow switch cuts    off an electric circuit by means  of a microswitch  B in fig  64  installed on it     The main circuit flow switch is connected to the elec   tronic control circuit and its intervention prevents or  stops the burner ignition cycle but does not send the  boiler in the lock state     FEF Checks    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     Y    General check    Itis possible to verify the general operation ofthe switch  by measuring the voltage between its leads during the  operation on c h or d h w     NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Switch off the boiler and open the control panel    2 Connect a meter  set for alternating voltage   230V  measurement  to the points indicated in  fig  63    3 Switch the boiler on    position and verify the volt     age by matching the readings with the values  indicated in the section 3 3           oooo                                K1             K2          00000000                                  G 0000                000
27. ed on electronic ignition boilers with forced flue gas  expulsion carries out the following fundamental func   tions     O does a sequence of operations  ignition cycle   which lead to the ignition ofthe gas atthe burner    O checks the presence of the flame during the en   tire period in which it is activated    O supplies the fan and checks its functioning by  means of the signal coming from the flue gas  pressure switch     The ignition device is supplied by the electronic control  circuit when the ignition of the burner is requested     The ignition device has a safety function and any in   correct interventions or tampering can result in condi   tions of dangerous functioning of the boiler     The ignition device can lock the functioning of the boiler   lock state  and stop its functioning up to the resetting  intervention  The lock is signalled by the ignition ofthe  lock lamp and the device can be reset only by using the  reset push     button placed on the instrument panel     Some components which are connected to the device  that  can activate the lock state  The causes of a lock  state could be     O  theintervention ofthe safety thermostat  primary  hydraulic circuit     a fault on gas feeding    faulty ignition  ignition electrode  its wiring and  connection     faulty flame detection  detection electrode  its wir   ing and connection     gas injectors plugged   faulty gas valve  on off operators  or not electri   cally supplied   O faulty ignition device    othe
28. er cover     Verify the soundness ofthe fitting between the main cir   cuit pipe and the temperature probe C  fig  88      Verify the integrity of the capillary which connects the  probe to the switch  If the capillary is broken the switch  opens automatically        Overheat temperature value    Setthe temperature control knobs to their max  position  and run the boiler in d h w  and c h  Allow the boiler to    37    Safety thermostat    reach its maximum operating temperature  monitorthe  temperature display on the control panel   The boiler  should operate and maintain a temperature below that  of the safety thermostat and no overheat intervention  should occur     Itis not permissible to change the factory setting ofthe  safety thermostat  The safety thermostat must be re   placed ifits operation temperature is too low and there   fore constantly interrupts the correct functioning of the  boiler and notallowing itto reach its maximum permiss   ible operating temperatures       Electrical function    Remove the cover ofthe control panel as described in  the section 2 3   Disconnectthe switch and check its electrical function     Normally  no intervention  the contact must be closed   electrical resistance zero O      POE Removal    1 Removethe frontpanelofthe caseand the sealed  chamber cover    2 remove the springs which hold the temperature  probe and extract the probe from the sealed  chamber     3 remove the cover of the control panel as de   scribed in the section 2 3
29. he detection electrode is  longer than the one of the ignition electrodes     20 Safety thermostat  ES Function    The safety thermostat  A in fig  86  is a device that  senses the temperature ofthe main circuit water which  flows in the outlet pipe of the main heat exchanger     Ifthe temperature control system ofthe boiler fails and  the temperature of the main circuit reaches a danger   ous temperature  the safety thermostatopens the elec   tric circuit which supply the full sequence ignition de   vice     Consequently  the gas valve operators are no more  activated and the gas flow to the burner is stopped                                                                                                                                 ow  gl    4  eq q      d                                  fig  86    The safety thermostat does not re  set automati   cally  To reset  itis necessary to remove the plug B  and push the re   setbutton with the help ofa tool on  the instrument panel  fig  87            fig  87    The safety thermostat has two parts     O the temperature probe C which is fitted on the  outlet pipe of the main heat exchanger  fig  88     and the electric switch D which is fitted in the con   trol panel  fig  89        fig  88             fig  89    EB Checks    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     w Position of probe and integrity    Remove the front panel of the case and the sealed  chamb
30. is not seized and that the  movement of the rotor is not subject to mechanical im   pediments     With the boiler off  remove the front panel and lower the  instrument panel  Remove the air release plug of the  pump and turn the rotor with a screwdriver       Check the electrical completeness     Remove the service panel  disconnect the connector to  the electronic control circuit  see electrical diagram   and measure the electrical resistance between the  pump supply conductors   fig  20     Electrical resistance of the windings  at ambient tem   perature  on switch position 3 must be about    210 O     Myson CP53   180 O     Myson CP63  high head alternative    220 O     Salmson MYE30   120 O   Salmson MYL50  high head alternative     Lessee Connector          P  P  oooco                      fig  20      Check the absence of starting defects     With the boiler off remove the front panel and lowerthe  control panel     for Myson pump  unscrew the plug ofthe pump by hand   the plug cannotbe removed   Pull itand turn the rotor   Start the boiler and verify if the motor runs     for Salmson pump  high head alternative   remove the  air release screw ofthe pump  Startthe boiler and with  a screwdriver  have the rotor turn in the direction of the  arrow  Ifthere is a defectin starting  the rotor will begin  to turn normally only starting it manually       Check that the impeller is integral with the rotor     Remove the pump head loosing the screws which hold  itto the pump bod
31. ler operates on d h w   4 Main circuit pressure     yellow   green   red    These lights indicate the pressure of the water in the  main  c h   circuit     Ifthe leftone  yellow  is on  this means thatthe pressure  is too low  approx  below 1 bar   If the right one  red   comes on  the water pressure is too high  approx  over  2 bar      The central light  green  indicates the right pressure  and the correct filling of the circuit   5 Main circuit temperature     green   yellow    These lights indicate the water temperature in the main   c h   circuit     All the lights are green with the exception of the right  one that is yellow and indicates the highest tempera   ture     Only one ata time of these light is turned on     The lights are turned on referring to the signal that  comes from the central heating temperature probe   Consequently  the reading of the temperature can be  altered by a faulty temperature probe      TEN Removal    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Remove the cover of the control panel as de   scribed in the section 2 3 of this manual     2 disconnect the connector A  remove the two  screws B  fig  54  and remove the circuit board                                            fig  54    3 assemble the circuit following the disassembly  procedures in the reverse order     11 Full sequence ignition device    ERN Function    The ignition and flame control device  type  4565DD   us
32. model 428 S       4b Remove the front part of the flue gas hood by un   screwing the four screws C  fig  14b     5b Remove the cover of the combustion chamber       fig  14b   6 Unscrew the automatic air valve connection nut  D and remove the valve  fig  14a     7 Separate the heat exchanger from the hydraulic  circuit  loosening the inlet and outlet pipe fittings    For models 424 S  424 RS      8a  movetheright pipe and free the right connection   lower the right side of the exchanger and extract  it from the front    For model 428 S      8b  Extractthe heat exchanger  from the front    9 Unscrew the pipe E  fig  14b  from the heat ex   changer    10 Assemble the heatexchanger carrying outthe re   moval operations in reverse sequence     EERE Cleaning    If there are deposits of soot or dirt between the blades  of the heat exchanger  clean with a brush or non   me   tallic bristle brush     In any case  avoid any actions thatcan damage the pro   tective varnish with which the exchanger has been cov   ered     11    6 D h w  heat exchanger 2 Remove the front panel of the case and lower the  instrument panel    SH Function 3 Completely unscrew the two Allen key screws B    in fig  17 the right one is shown  which hold the   exchanger to the brass deviator groups     The d h w heat exchanger  A in fig  15  allows the in   stantaneous transferral of heat from the primary hy   draulic circuit to the water destined for d h w use                                                    
33. n  its left and right side     2          fig  4    To remove the side panels loosen the screws B  fig  5    bring the base of the panels far from the boiler and lift  them  freeing them from the side hooks of the frame     To remove the lower protection plate completely un   screw the screws B and remove the plate  fig  5                                 fig  5    To gain access to the supply terminal block and to the  parts located behind the control panel unscrew the  screws C and lower the panel  fig  6                                    PEN Access to the electric parts of the control  panel     w Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     To gain access to the parts located inside the control  panel remove the four screws D  fig  7  and remove the  cover pulling it towards the front           fig  7    PY Access to the sealed chamber    To gain access to the parts contained in the sealed  chamber it is necessary to remove the cover of the  sealed chamber     Forthis purpose  remove the front panel ofthe case and  remove the screws E as indicated in fig  8                 fig  8    FEN Emptying the main circuit    1 Close the c h circuit isolation valves F  fig  9      General access and emptying hydraulic circuits          fig  9    2 Open the draining tap G  fig  10  until the boiler is  completely emptied                       fig  10    To facilitate the downflow of water  remove the front  panel  also 
34. ner     na   h w   Detection    heat exchanger  electrode   rd Salaam  Gas valve M JN    7 Pump    Diverter ve   _ Kg    Q BiH li ern  D h w  temp 1 DE Ch  probe         D h w  temp    flow  probe                                                                                                                   return  y   Frontview Rear view  fig  1  FF Hydraulic diagram  Central hetaing  c h  operation Domestic hot water  d h w   operation  V j V F  2                          SN  NS                                                                                                                                                    Y             p                                                       P   D h w D h w     C h C h  h w   water supply water return inlet outlet  fig  2    2 General access and emptying  hydraulic circuits    PA Nomenclature          fig  3    Right side panel    Front panel   Lower protection plate  Control panel   Case lid   Left side panel    PEF Body panels    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     oO U1 A WN H    Forthe most part ofthe check and maintenance oper   ations itis necessary to remove one or more panels of  the case     The side panels can be removed only after the removal  of the front panel     To remove the front panel remove the two screws A   fig  4  and bring the base of the panel far from the  boiler     Lift the front panel freeing it from the hooks placed o
35. om the outside   knobs  room thermostat  etc    processes them and  consequently acts with outlet commands on other  components of the boiler  fig  35      EF Selection and adjustment devices    Onthe control circuitseveral selection  adjustmentand  protection devices are located   fig  36      Several of these devices are directly accessible by the  user  function switch  temperature adjustment poten   tiometers etc   others are accessible by removing the  cover                                                           fig  36   function switch   fuse F2  1 6 A    K1 relay   K2 relay  ignition device control    d h w  temperature reg  potentiometer  function selectors   c h maximum power adjustment  RISC    ignition gas pressure adjustment  ACC    c h temperature reg  potentiometer    EE Checking the temperature    The control circuit makes it possible to separately ad   just the c h water flow and d h w  outlet temperature     The temperature ofthe wateris converted into an elec   tric signal by means of temperature probes    The user  setting the desired temperature with the  knobs ofthe instrument panel operates the variable el   ements  5 and 9 in fig  36  of the control circuit     If the power requested is lower by about 40  of the  maximum useful output  the control is done by igniting  at the minimum power and turning off the burner  on     off function   Ifthe power is higher the boiler will modu   late down to 40  of its maximum power output     When the boiler fun
36. pump relay is located under the display circuit  To  remove it     1 gain acces to the electric parts of the control  panel  See sect 2 3      2 remove the display circuit  see sect 10 3   3 disconnect the wirings and remove the relay     33    18 Flue fan  venturi  air pressure  Switch    FER Function    The boilerhas a fan whose function is thatofforcing the  expulsion ofthe products of combustion     The fan is supplied by the full sequence ignition device  atthe beginning of the ignition cycle     Its correct functioning is controlled by means of a sys   tem of a built in venturi device and an air pressure  switch     HEJ Checks      Check of the fan    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     Remove the front panel of the body and the lid of the  sealed chamber     Disconnectthe connectors A  fig  79  and measure the  electrical resistance of the motor that has to be about  47 O        34      Check of the air pressure switch operation    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Remove the front panel of the body and the lid of  the sealed chamber    2 Disconnect the wires and check the electrical re   sistance between its connections    Between COM and NO the contact must be open     Between COM and NC the contact must be closed   electrical resistance zero      Refer to the fig  80a b orc in accordance with the type  of air p
37. r  Remove the front panel ofthe  case  lower the control panel and empty the main  circuit     If you need to verify the operating point of the  switches  connect a suitable water pressure  gauge to a test point of the circuit near the boiler     2 disconnect the connectors to the pressure  switches and measure the electrical resistance  between the connections  fig  78      When the circuit is empty  the contact between  the connection COM and the connection NC  must be closed  the contact between COM and  NO must be open        fig  78    3 Gradually fill the circuit  The lower limit pressure  switch  brown plug  must switch ata pressure of  about 0 5 bar     Verify that the contact between COM and NC is  open and between COM and NO is closed     4 To check the high limit pressure switch  red plug   further increase the pressure ofthe circuit  ltmust  switch ata pressure of about 2 bar  Verify the con   tacts as explained above     After this test  remember to decrease the water  pressure to an adequate value     Removal of the pressure switch    1 Empty the main circuit of the boiler     2 remove the front panel of the body  the right side  panel and lower the control panel     3 disconnect the wirings from the pressure switch  and unscrew it     4 Reassemble the switch carrying out the removal  operations in the reverse order     Reassembling the pressure switch  refer to the  diagram of the section 3 1 to connect correctly  the wirings     Removal of the pump relay  The 
38. r components like the flue gas pressure switch can  temporarily stop the ignition of the burner but allow its  ignition when the cause of the intervention has  stopped     fig  57 shows the sequence of the operations that are  carried out at the starting of every ignition cycle and  during normal functioning     HEN Checks     M Shutdown sequence  Start the boiler until the burner is ignited     OO O     1    While the burner is on  turn the gas supply off  The de   vice should carry outa complete ignition cycle and then  shutdown     When turning the boiler on and off with the function  switch  the device should notreset itself and the burner  should not turn on     HEN Removal    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Remove the front panel of the case and lower the  control panel  see sect  2 2      2 unscrew the screw A and remove the protection  cover B  disconnect the flame detection cable C  and the ignition cable D  fig  55         fig  55  view from the left side of the boiler     3 remove the cable clamp and disconnect the two  wires     4 remove the ignition device by moving it from to   wards left  fig  56      mey          fig  56    23    Full sequence ignition device    FER ignition sequence       Supply from the electronic control circuit                Shutdown                                                             YES NO  K    memorised   Resets shutdown              3    NO Fan
39. remove the sealed chamber cover and  loosen the nut H  fig  10  of the automatic air bleed  valve    Tight it again once the emptying has been completed     PUN Emptying the d h w  circuit  1 Close the d h w  circuit cut   off valve    fig  11      2 Open one or more hot water taps of the plant until  the boiler has been completely emptied           3 Diagrams    EF Wiring diagram                                                                                                                                                                  Fan  Airpressure Water pressure Water pressure  switch switch switch  High limit Low limit   red plug   brown plug   Ignition Flame detection Safety Resetpush Shutdown NC NO NC COM NO  electrodes electrode thermostat button lamp NC  ES  3 z    b  hw gy a  a Q Bp  fr COM NO COM  f   P rs o4  b Display circuit L L   type 10 81 tee te  B  8 Bois  eH br  ef  b  enr  eH bk  eq  b   0  ei  br  Ignition and fl S  control device K B o  o  K2 2   Control circuit al                                  type 10 80                                                          y E    o      3 fer bk   eT w   MS el b   M ot bk  N     N     M e  em M  9  9                                                                                                amp       f  ay 1       Gas valve Domestic hot Central heating Domestic hot Circulator Central heating  water NTC NT water pressure pressure  switch switch  Electric supply connection  Frostat   bk  br   brown    E  bub
40. ressure switch used     These switches are interchangeable     3 Connect the black wire  COM  and the brown  wire  NC     4 Run the boiler  the fan must run  and check the  the electric resistance between COM and NO    Between COM and NO the contact must be  closed  electrical resistance zero     Remember that in this condition the boiler runs  only for the ignition safety time and than it goes  on Safety lock   out  The above described testhas  to be carried out during this period     NO NC    COM    fig  80a  COM  NO    MSX         PIS  Pd    row we  b i a    fig  80b                 COM  NO  NC 1  SEI   H  connection      connection  x  222  25  fig  80c     EEN Removal of the fan    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Remove the front panel of the body and the lid of  the sealed chamber    2 disconnect the connectors A and the earth con   nection B  fig  79     3 disconnect pipes which connect the venturi de   vice to the air pressure switch    4 unscrew the screws C and extract it from the ex   haust flue duct than move it towards the front of  the boiler    5 remove the fan    6 assemble the fan carrying out the removal oper   ations in reverse sequence    Warning  reassembling the fan  refer to fig  81 to   connect correctly the venturi device to the air pres    sure switch         upper pipe    lower pipe      or H connection    fig  81    Flue fan  venturi  air pressure switch  FEF Removal
41. t the fuse F2 is complete   fig  44      The F2 fuse can be reached by removing the panel  cover     If the fuse is blown replace it with one that has the same  characteristics after having identified the cause of the  interruption     Electronic control circuit    oF M                                                        1 6 A           fig  44    CEN Removal of the control circuit    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     1 Remove the cover of the control panel as de   scribed in the section 2 3 of this manual     2 Delicately flex the hooks indicated infig  45 and  disconnect the four connectors A                                                          fig  45    3 unscrew the three screws B and move away the  bracket C  fig  46               fig  46    4 unscrew the three screws D and remove the cir   cuit  fig  45      19    Electronic control circuit    5    assemble the control circuit following the disas   sembly procedures in the reverse order     Attention  in order to facilitate the mounting of the  cover     1    fig  47    20    position the knobs of the panel as illustrate in  fig  47        dp    tp d  d                 O  e     B       insert the spindles in the potentiometers E and F   fig  48  and rotate them fully clockwise     extract the spinldes and insert them with the flat  side pointing in the direction shown in fig  48                                                         
42. the hydraulic circuit  where itis installed into an electric signal  resistance      The relation between temperature and electrical resis   tance is stated in fig  70          Sa GG A PA pae IE  Aaa a  RARE oe a REN 10 Sid eet  EN  on ERG ERE EU EP talca  Se HH    ERR ER MAA  ERE EH ERE ERE RE    N    ceg   E Eq p EE EE  Ed E ER GRE Gi RR E ERE I ER 0  ERES ER 90005 sale ERE RET UNES  Eur pps us p  aaa Pere Tp  TER RR ERE B AE ER ER GUT LU A 8  PARA A A E A    20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100       fig  70    In the boilers with mixed function  c h   d h w   two  temperature probes are assembled  one on the output  of the main heat exchanger  main circuit temperature    30    A   fig  71 and fig  72  one on its input  before   fig  71 and    probe   the pump  d h w  temperature probe  B  fig  73                                                                                                                                                      c h c h d h w  d h w     flow return water inlet water outlet    fig  71    EEN Checks       Temperature resistance relationship    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     Disconnect the cable from the temperature probe     Measure the temperature of the pipe near the tempera   ture probe and check the electrical resistance accord   ing to the graph in fig  70    Remember that a temperature probe failed in short cir   cuitsends a signal to the con
43. trol circuitata temperature  equivalent to 100c     A disconnected or interrupted  temperature probe sends a signal at a temperature  equivalent 09    thus the burner will always be on maxi   mum power     Temperature probes     EEN Removal    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component    To remove the main circuit orthe d h w  tempera   ture probes follow the same sequence    Refer to fig  72 for the main circuit temperature  probe  to fig  73 forthe d h w  temperature probe    1 Remove the front panel of the case and lower the  instrument panel    2 empty the main circuit of the boiler    3 remove the electric connector of the temperature  probe and unscrew it    4 assemble the temperature probe carrying outthe  removal operations in reverse order                 fig  73       31    16 By pass valve  HAH Function    The by   pass valve is located between the c h water  flow and return  A in fig  74  and its function is that of  guaranteeing a minimum flow across the main heat ex   changer also if the circulation across the c h system is  completely closed                                                                                                                                               fig  74     EN Removal    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component    1 Remove the front panel of the case and lower the  control panel    2 empty the
44. upply before removing any  covering or component    Remove the front panel of the body  the sealed   chamber cover and the combustion chamber panel     Check for the correct distance between the metallic  edges of the ignition electrodes and refer it to the  fig  84     4mm    aL  Li    a                   fig  84    36    Check the integrity of the detection electrode and en   sure that its metallic edge is correctly placed over the  ramp of the burner       Check the connection wires    NN Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     Remove the front panel of the body  the lid of the sealed  chamber and the cover of the combustion chamber     Check for the integrity of the insulation of wires which  connect the electrodes to the ignition device     FEE Removal    1 Remove the front panel of the body  the sealed  chamber lid and the combustion chamber panel     2 Remove the burner unscrewing the four screws  placed at the right and left sides of the burner     3 Remove the grid unscrewing the two screws  placed on the rear side of the burner     4 Unscrew the screws A  fig  85  which hold the  electrodes to the burner        5 Extract the electrodes from the burner     6 disconnect the electrode wires from the full se   quence ignition device     7 Assemble the electrodes carrying outthe removal  operation in reverse order   In order to recognize the electrodes refer to  fig  83     Note  the metallic edge of t
45. w  pressure switch    Assembling the part  ensure to place the concave  side of the membrane towards the actuator plate     fig  27      When fixing the actuator to the valve  fit the refer   ence shaft  in the seat of the valve  fig  28         fig  25    3 Loose the screws E and remove the hydraulic  actuator F  fig  26         fig  28         Removal of the switch    1 Switch offthe boiler  remove the front panel of the  case  the lower protection plate and lower the  control panel     2 Remove the fork K that holds the d h w  pressure  switch L placed on the right side of the valve and  remove the switch  fig  29     3 Open the box and disconnect the switch     fig  26 4 CP the switch proceeding in the reverse  order        4 Unscrew the six screws G  open the hydraulic  actuator and remove the membrane H   fig  27            Removalofthe valve and the diverter mechanism    1 Switch offthe boiler  remove the frontpanel ofthe  case  the lower protection plate and lower the  control panel    2 Drain the d h w  and the c h circuits     3 Completely loosen the connections to the hy   5 Assemble the part proceeding in reverse order  draulic circuits indicated in fig  30        fig  27    15    Diverter valve and d h w  pressure switch    fig  30  4        fig  31         5 Remove the forks that hold the d h w  pressure  switch O and the main circuit flow switch P and  separate the switches from the valve  fig  32      6 Disconnect the temperature probe Q              fig  32  
46. witch  e  g si 4  CG Ty C  o  o  o Ignition device  o E O S   o  Circulator  Lr  HO  Al  E 6  E EEN E  EX E   EA A  2 y N27   D h w   S 5 flow switch  y o  5 o  5 e  E e Main circuit  u e temperature  e probe  D h w   temperature  eee EE probe  a  never zero  short circuit  never 12V   open circuit  Modulating  operator  Electronic control circuit  ganen  Fan evice  o  Overheat thermostat b    tbo  gy      br    Tr9  Shut  down lamp bk    L e  and resetbutton Bi  br    Tr9  br    Tro  b    r e  p O  Air pressure switch  F ha    re             Electronic control circuit    Electrical voltages in Volts during normal operation with burner on at maximum power     urepe SA20    J9110q aly pue enunuoo S  peds uon   1UBI AY    uo 3461  3 useop JaUINQ SY       3D UOQIUBI SY  sues JaJ1Oq eui  uopng   ysnd 3esai ayy Buissald Ag   uo  pad  due  3n0x201       ulebe   S5 20  J9 10q   Q4 pue enunuoo sueds  uO0qIubI ayy     uo suf jouung ay       3D UOQIUBI SY  sues Je oq eui  uopnq ysnd jesai ayy Buissald Ag   uo  pad  due  3n0x201    d   ee el dis    dn          hm               Apoou    102 sajelado pue uo suum Je log eui  uopng   ysnd jesa ayy Buissald Ag     uo  pa  duue  3n0x201    WoO  pa  duue  3no3201   uo pad 3ubi  ainssaid yN utei   uo  u    16  WUBI     uo 13 109        Was ue4    apouu  Wu p Jo   Y D Ul Jeune PAS JOU SBOP Ja IOq eur    WO  pa  duue  3nox201   uo uaa 1961  eunsseJd PNP UILEN   uo  u    16  quf     uo 13 109        Was ue4    epouu  Wu p Jo   Y D Ul Jeune HAS JOU
47. y and check thatthe impeller is firmly  jointed with the rotor     Removal    Nx Warning  isolate the boiler from the mains  electricity supply before removing any  covering or component     If the clearance to the right side of the boiler is re   stricted  the removal of the pump can be easily  achieved by first removing the head by unscrewing  the four Allen keys screws  B in fig  21  the two on  the upper side indicated      1 Empty the main circuit of the boiler     2 Remove the front panel ofthe case  the right side  panel and lower the control panel     3 Disconnect the connector C  fig  21      4 Completely unscrew the connection nuts D and  remove the pump     5 Before the reassembling  carefully clean the sup   port seat of the gasket     6 Reassemble the pump carrying out the removal  operations in the reverse order        fig  21  13    8 Diverter valve and d h w   pressure switch    EX Function    The diverter valve  A in fig  22  has the function of mod   ifying the hydraulic circuit of the boiler by means ofan  hydraulic command given by the opening of a d h w   tap in order to send the water that exits the main heat  exchanger towards the c h system or towards the  d h w  heat exchanger     Moreover it operates the d h w  pressure switch which  acts on the electronic control circuit                                                                                                                                                  fig  22    EF Checks      General ch
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
T'nB LPXPERTM camera kit  BACKWALL WITH METAL PEGBOARD  A very old document  Instrucciones de servicio TOP 1252 TOP 1252 M TOP  MANUAL DEL USUARIO - Icon Heath & Fitness  Notice d`utilisation et de montage SPRAY  Guia do Usuário Guia do Usuário - Support  Le ministère de l`Intérieur (préfectures)    Copyright © All rights reserved. 
   Failed to retrieve file