Home

691-379B - CDN 3083-S200M User Manual english.indd

image

Contents

1. 25 INA 3080 Surge Coupling Unit CDN 3083 S200M Surge Decoupting Network N L1 To Generator Output Low Figure 13 Example of IEC coupling L3 N Alternative connection possibilities are summarized in table 1 hereafter 5 2 IEC coupling modes CDN 3083 5200 EN Surge Network mum x lc RN PN 9 NIAE urge Coupling EN LIV giu x18 ee E 1 ail o be e a 7 o C a ee Pe Figure 14 IEC coupling basic configuration All IEC EN 61000 4 5 coupling possibilities are listed For easy understanding the coupling network INA 3080 input is identified by X1 while the outputs are marked with X2 and X3 Depending on coupling mode selected following con nections are to be established for TASEO Advanced Test Solutions for EMC 26 IEC line to line Generator Loop on Decoupling network output INA 3080 CDN 3083 5200 High Low L1 L2 L3 L1 N x1 X2 to X3 11 12 2 X2 to X3 11 13 L3 X2 to X3 12 X to X2 L2 11 xi X3to X2 2 13 1 X3 to X2 L3 N X1 X3 to X2 L3 L1 X1 L1 X3 to X2 2 13 12 x1 L2 to X2 X2 IEC line to ground Generator Loop on Decoupling network output INA 3080 CDN 3083 52
2. MANUAL HIGH CURRENT COUPLING DECOUPLING NETWORK CDN 3083 S200M USER MANUAL 6691 3798 COMPLIANCE TEST SOLUTIONS Advanced Test Solutions for EMC MANUAL HIGH CURRENT COUPLING DECOUPLING NETWORK CDN 3083 S200M USER MANUAL CONTENTS 2 1 2 2 2 3 2 3 1 2 3 2 3 4 4 1 4 2 4 2 1 4 2 2 4 2 3 4 2 4 4 3 4 3 1 4 4 5 5 1 5 2 5 3 Explanation of the symbols used in this manual Safety advice Safety measures Installation Installation of an equipment under test power switch Applicable safety standards Leakage current Applications Assembling of test rig and the CDN sub units Installation of a test rig Preparation of the CDN 3083 S200M Mounting of the common earth bars Mounting positioning plates Assembly for IEC coupling Assembly for extended IEC coupling EUT connections EUT power feed Test conditions Coupling modes overview Phase synchronisation IEC coupling modes Extended IEC coupling mode Effects on the EUT Maintenance Technical specifications CDN 3083 S200M Warranty Addresses a 10 11 12 15 16 17 17 18 20 21 22 22 23 24 24 25 28 30 31 32 35 36 1 EXPLANATION OF THE SYMBOLS USED IN THIS MANUAL Please take note of the following explanations of the symbols used in order to achieve the optimum benefit from this manual and to ensure safety during operation of the equipment The following symbol draws your attention to a circum
3. 2 x1 Y3 to Y3 Yes Y2 x3 X2 X1 PE Y3 to Yes y2 X3 2 Table 2 Selection of extended IEC coupling modes TASEO Advanced Test Solutions for EMC 29 30 6 EFFECTS ON THE EUT The surge pulse contains considerable energy When super imposed on the mains a significant resultant current can occur if the EUT becomes defective The effects can be very different depending on the characteristics of the equip ment undergoing the test No effect Brief faulty operation without permanent damage Reduction of the insulation resistance or similar Quality affected life expectancy Change in the technical specification of the device under test Flash over in cables connectors and equipment Bursting of components Explosion of components Burning of parts caused principally by resultant mains current when mains superposition mode is used Damage to equipment systems or components that are electrically or induc tively coupled to the pulse current path When testing with high energy surge pulses a test on gt a device should never be considered as being damage free until a subsequent thorough investigation proves that the EUT is still fully intact Manual high current coupling network CDN 3083 S200M 7 MAINTENANCE Ml Basically there is no need of maintenance and the CDN 3083 S200M does contain serviceable parts The housing may be cleaned with a moist cloth with possibly just a trace of detergent liquid
4. 9 L1 lel zt le N On Figure 7 Location of IEC coupling module oe Figure 8 View of IEC coupling module Manual high current coupling network CDN 3083 S200M 4 2 4 Assembly for extended IEC coupling 21 For extended IEC coupling add both coupling units INA 3080 on the position ing plate and press it slightly down into the positioning holes Fix the INAs by pushing the black quick snap on knobs down The CDN 3083 S200M is now ready to use INA 3080 CDN 3083 S200M SPEE Unit Surge Decoupling Network ume Comin 3 A 12 L3 po Q INA 3080 Surge Coupling Unit E CDN 3083 S200M Surge Decoupling Network N L1 1 a Figure 10 View of extended IEC coupling modules Because of the coupling capacitors the mains voltage ni can be present at the HV connectors when the EUT power supply is switched on The HV connectors must therefore always be hooked up to the generator before the mains and the EUT power supply are switched on TASEO Advanced Test Solutions for EMC 22 4 3 EUT connections The CDN 3083 S200M is equipped with EUT terminals suitable for a max wire gauge of 110 mm2 AWG 4 4 0 230 A torque max 20 Nm with a proper circuit breaker and an emergency off The in house power distribution needs to be equipped button as per IEC EN 61010 1 2010 4 3 1 EUT power feed The power is fed in via 5 core cable le
5. Connect the device to be tested according to the relevant safety specifica tions and with due regard to the magnitude of the pulse voltage selected Take the necessary measures to cope with any possible explosion or out break of fire m Switch on the EUT power supply n Operate the generator as instructed in its manual and carry out the required tests AS Itis assumed that the test rig has been set up in accordance with the foregoing notes and that the device to be tested has been connected taking the relevant safety measures into account EUT input voltage is limited to max 440 Vrms line to line and 440 vrms line to ground If this level is exceeded the generator will be damaged HH When used with a generator NSG 3040 or Modula the Manual high current coupling network 3083 S200M 4 2 Preparation of the CDN 3083 S200M 17 Prepare the test setup according to the chosen standard and put both decou pling network units etc to the place where the CDN shall be used for testing 4 2 1 Mounting of the common earth rails Place the two surge decoupling networks in parallel to each other Looking from the top make sure that the N L1 network is below the L2 L3 network To enable proper synchronisation assure that side L1 being placed next to L2 Use the delivered isolated allen key to screw the copper earth rails on to both ends of the decoupling networks 2 x 2 screws each side per
6. Industrial spirit is also a suitable cleaning agent Other solvents are not permitted Only specialist or trained maintenance personnel may carry out internal work on the instrument In the event of more service or repair work being necessary the instrument should be returned to a Teseq service center accompanied by an appropriate description of the problem The instrument contains no fuses TASEO Advanced Test Solutions for EMC 31 32 8 TECHNICAL SPECIFICATIONS CDN 3083 S200M mmm The CDN 3083 S200M is a 3 phase manual coupling network for surge interfer ence pulses as per IEC EN 61000 4 5 and other related standards The CDN 3083 S200M base set consists of Accessories required either IEC coupling set or Extended IEC coupling set 1 x Surge decoupling network CDN 3083 S200 L1 1 x Surge decoupling network CDN 3083 S200 L2 L3 2 x Earth rails 1 x Wheel set 1 x Allen key isolated 1 x User manual 3083 S200M 1 x Test certificate 2 x Coupling configuration sheets 1 x INA 3080 Surge coupling unit 2 x INA 3080 Surge coupling unit 1 x Connection cable Following complementary items are required for phase synchronisation Modula NSG 3040 CDN 3061 1 X INA 3084 synchronisation unit for NSG 3040 and Modula 2x Cable 1 m with each a Fischer Fischer plug Manual high current coupling network 3083 S200M Pulse voltages current EUT power supply voltage Current Frequency Mains
7. together with the solid earth line assure a proper connection this in combination with a rugged housing Figure 2 EUT power supply connector The coupling network CDN 3083 S200M serves to inject the following standard ized surge pulses from the surge generator into the mains supply to the device under test Voltage surge of up to 6 kV which follows the 1 2 50 Us curve open circuit Current surge of up to 3 which follows the 8 20 us curve short circuit conditions The CDN 3083 S200M is designed to be used with an EUT supply of up to 620 Vrms line to line and 400 Vrms line to ground at 200 A Coupling surge pulses with higher voltages up to 8 kV is in principle possible but in case the EUT draws low currents the backfilter chokes may go in satura tion due to the higher surge kickback currents and provide no more a good backfiltering performance Operation is manual simple and designed to be safe Manual high current coupling network CDN 3083 S200M 4 ASSEMBLING OF TEST RIG AND THE 15 CDN SUB UNITS mmm The CDN 3083 S200M contains following parts Accessories IEC coupling set 1 INA 3080 Surge coup Extended IEC coupling set 2 INA 3080 Surge coup 1 Connection cable 0 5 Depen tary items for NSG 3040 NSG 3060 with 1 Surge decoupling network CDN 3083 S200 N L1 1 Surge decoupling network CDN 3083 S200 L2 L3 2 Earth rails 1 Allen key isolated 1 User manual CDN 3083 S200M 2 Coup
8. when working on the terminals It is recommended to connect the CDN 3083 S200M through a properly rated power switch device which should be located close to the test setup In order to ensure an easy and quick acces to the EUT power same should be clearly and visibly labelled as a device for EUT power on off switching The inhouse power distribution needs to be equipped with a proper circuit breaker and an emergency off button as per IEC 61010 1 2010 Two independent protective earth connections are necessary for the test system an d the EUT These must be connected back to the local permanent installation or to a fixed permanent protective earth conductor Operate the equipment only in dry surroundings Any condensation that occurs must be a lowed to evaporate before putting the equipment into operation Do not exceed the permissible ambient temperature or humidity levels Use only Officially a pproved connectors and accessory items TASEO Advanced Test Solutions for EMC 10 2 3 Installation of an equipment under test power switch It is recommended to connect the CDN through a properly rated power switch device which should be located close to the test setup In order to ensure an easy and quick access to the equipment under test EUT power same should be clearly and visibly labelled as a device for EUT power on off switching The in house power distribution needs to be equipped with a proper c
9. 00 High Low N L1 L2 L3 N PE x PE X2tox2 X3 L1 PE x PE X2to X2 L2 PE x PE to 2 L3 PE x PE X3 to X3 2 Table 1 Selection of IEC coupling modes Manual high current coupling network CDN 3083 S200M Figure 17 IEC coupling L2 PE TASEO Advanced Test Solutions for EMC 27 28 Figure 18 IEC coupling L1 PE 5 3 Extended IEC coupling mode For extended coupling modes a second INA 3080 needs to be added on the CDN 3083 S200M Sume oak Sues Cs nig 8 L3 12 L3 tX2 L3 mum 9 yc E PA T Tr EN zl 12 1x3 m m ed M Ee E CDN 3083 S200M Y2 EN 9 Surge Decoupling Network L1 ma 5 9 LEES 1 Ils EN 1Y3 Be aB E Figure 19 Extended IEC coupling basic configuration Manual high current coupling network CDN 3083 S200M Generator Loopon Connection Decoupling networ output INA 3080 from X1toY1 CDN 3083 S200M High Low N L1 L2 13 X1 PE Yes Y2 x3 x2 x1 L1 X2 to 0 x3 X1 L2 X2 to X3 X2 X1 L3 Y3 to Y2 0 Y2 x1 PE Y2 to Y3 X1 PE to Y2 Y2 X1 PE X2 to X3 x1 PE to X2
10. 40 92 francesales teseg com Japan Teseq K K T 4813 5725 9460 F 81 3 5725 9461 japansales teseq com Switzerland Teseq AG T 41 32 681 40 50 F 41 32 681 40 48 sales teseq com UK Teseq Ltd T 44 845 074 0660 F 44 845 074 0656 uksales teseq com July 2014 Teseq Specifications subject to change without notice Teseq is ISO registered company Its products are designed and manufactured under the strict quality and environmental requirements of the ISO 9001 This document has been carefully checked However Teseq does not assume any liability for errors or inaccuracies
11. ads Do not mismatch the EUT power input of the CDN and the EUT power output Use only the delivered isolated allen key to screw the cables to the terminals Never touch the terminals during the EUT power is on EUT power input EUT power output CDN 3083 S200M Surge Decoupling Network 0 13 al CDN 3083 S200M Surge Decoupling Network N L1 Figure 11 Identification of EUT power input and output Manual high current coupling network CDN 3083 S200M Figure 12 View of EUT power input connection side 4 4 Test conditions Every test rig must be planned carefully All the instrumentation should be readily accessible and rigidly positioned The whole test assembly should be supplied from the HE same mains connection in order to prevent uncontrolled flow of pulse current in other parts of the system Installa tion in a Faraday cage ensures that non associated items and equipment are not disrupted by pulses radiated from the cabling or the device under test Connections to the EUT must be of low impedance and be made with high contact pressure Otherwise welding or arcing may occur at the contact points TASEO Advanced Test Solutions for EMC 24 5 COUPLING MODES OVERVIEW in the following all possible coupling modes are described The following example shows a coupling from L3 to N whereby the generator High output is connected to the INA 3080 surge coupling unit in put One e
12. decoupling EUT connection Max temperature Coupling modes Dimensions Weight Optional accessories IEC coupling modes 6 6 kV 3 3 max 33 620 Vrms line to line 400 Vrms line to ground 500 VDC max 200 Arms or DC max per line DC to 60 Hz 400 Hz max with increased power loss 0 2 MH 10 Screw terminals 230 A up to 110 mm AWG 4 4 0 FO Surge differential lines to PE common to PE with optional INA 3080 coupling unit for extended IEC coupling 850 x 520 x 345 LX D x H mm CEOS BON 80 kg approx MD 300 Current measuring probe MD 200 200A Voltage measuring probe Line to ground 9 uF L1 PE L2 L3 N PE Line to line 18 uF L1 N 1 12 1 13 L2 N L2 L3 L3 N TASEO Advanced Test Solutions for EMC 34 Optional IEC coupling modes possible only with second INA 3080 Lines to ground 9 UF L1 L2 L1 L3 PE L1 N PE L2 L3 PE L2 N PE 13 N PE L14 L2 L3 PE L1 L2 N PE L1 L3 N PE L2 L3 N PE L14 L2 L3 N Manual high current coupling network CDN 3083 S200M 9 WARRANTY Teseq grants a guarantee of 2 years on this instrument effective from the date of delivery During this period any defective component part will be repaired or replaced free of charge or if necessary the instrument will be replaced by another of equivalent value The decision regarding the method of reinstati
13. given to the connections between the CDN 3083 S200M and the equipment under test EUT The EUT may only be tested when placed inside a suitable protective enclosure which should provide protection against flying fragments fire and electric shock The pulse voltage must not be able to find its way to unearthed metal objects in the event of the EUT failing Only use the instrument in a dry room Never leave the instrument unattended when the EUT is switched on Regularly check the heat of the CDN using the built in thermometer and switch EUT off if the temperature exceeds 70 Do not open the instrument Repairs and adjustments must only be carried out by qualified maintenance personnel Do not continue to use the CDN in case of any mechanical damage occur The CDNs housing and the cables have both insulating and screening function which can only be assured while the housing is intact Return the damaged CDN to a Teseq service centre immediately for repair 2 2 Installation The test system conforms to protection class 1 Local installation regulations must be respected to ensure the safe flow of leakage currents Manual high current coupling network 3083 S200M Operation without a protective earth connection is for bidden Therefore it is imperative to screw both earth copper rails to the CDN Switch off EUT power before accessing EUT power in or out terminals Use the insulated allen key always
14. ile the effects of the pulses are concentrated on the equipment under test yet on the other hand the back ilter must not result in any significant voltage drop n order to keep voltage losses within reasonable limits at increasing current evels there are five different classes of filter inductances defined in IEC 61000 4 5 Ed 3 up to 16 A 16 to 32 A 32 to 63 A 63 to 125 A and 125 to 200 A including Specific tolerances for the pulse duration and the peak voltages for each class The CDN 3083 S200M conforms to the tolerances of the 125 to 200 A class The back filter inductance has been selected to be 0 2 mH Manual high current coupling network 3083 S200M The nominal maximum current rating of 200 A per phase can during short test periods be considerably exceeded The unit will tolerate the frequently encountered inrush currents without complaint and in extreme cases it can be overstressed until the internal environment has reached the max temperature of 70 C CDN 3083 S200M is delivered with external fans mounted Supply cables for the fans are part of the delivery It is recommended to turn on the fans when the CDN 3083 S200M is used the upper load range Example EUT current gt 100 A or when environmental temperature is high gt 30 C Figure 1 TASEO Advanced Test Solutions for EMC 14 The CDN 3083 S200M is tested for safety in compliance with IEC 61010 The rugged connection terminals
15. ircuit breaker and an emergency off button as per IEC EN 61010 1 2010 The test setup should only be accessible to trained personal Dimensioning of mains supply and rating of fuse protection of AC or DC power supply must conform with national prescriptions and EUT requirements Inappropriate arrangement mounting cabling or handling of the device under test or the protective elements can make the protective features that are incor porated in the concept of the instrument worthless 2 3 1 Applicable safety standards Development and manufacture is in compliance with ISO 9001 The instrument complies with the safety requirements of IEC EN 61010 1 safety requirements of electrical equipment for measurement control and laboratory use The interference immunity has been tested in accordance with EN 61326 1 It is the user s responsibility to ensure that the test rig does not emit exces Sive electromagnetic interference EMI that might affect other items The test System itself does not produce any excessive radiation however the injection of interference pulses into the EUT can result in the device and or its associated cables starting to radiate EMI To avoid radiating unwanted interference into the environment the standards organisations recommend that the test rig be operated in a Faraday cage Manual high current coupling network 3083 S200M 2 3 2 Leakage current 11 3083 S200M generates high leakage currents t
16. ling configuration sheets 1 Traceable calibration certificate Screw set 8 wheels with brakes ing unit ing unit m Fischer Fischer connector ding on generator used the CDN set may include following complemen CDN 3061 B 1 INA 3084 Synchronisation unit for NSG 3040 2x Cable 1 with each a Fischer Fischer connector TASEO Advanced Test Solutions for EMC 4 1 Installation of a test rig This section describes the check up and installation of the CDN 3083 S200M coupling network after delivery and provides a checklist on the functions of the unit after being transported or after significant changes of the test rig were performed Installation should only be carried out by qualified personnel a Check the delivery for completeness b Check the unit for any signs of transportation damage Report any damage found to the carrier immediately c Study the manual d Setup the surge generator in accordance with the instructions its manual but do not however switch the instrument on e For convenience place the coupling network close to the generator f Connect the protective earth to the terminal The same protective earth should also be connected to the earth terminal of the generator Plug the high voltage connectors into the surge generator Connect the INA 3084 synchronisation unit to the generator Connect the EUT supply Switch on the mains power at the generator Choose the appropriate coupling mode
17. nd is looped in order to get the recommended 18 uF capacitance required for line to line coupling according to IEC EN 61000 4 5 The other pulsed end is connected to L3 The generator low output is directly connected to the N li 5 1 Phase synchronisation In the INA 3084 synchronisation unit the input voltage L1 to N ne is wired out for Sync reference The approximately 2 meter long cable of INA 3084 needs to be connected to the EUT mains input plug located on the rear side of the NSG 3040 The phase angle indicated on the display of NSG 3040 is always in relation with the L1 N reference For coupling settings different from L1 to N coupling it is up to the user to make the phase angle correction and enter the angle phase shifting value required phase The value of the phase angle shifting in relation with the selected coupling path and is installation and wiring dependent At first use of the test system it is recommended to make the phase angle setting verification using MD 200 Probe and to edit a phase angle correction table to be used during further operation For synchronisation purpose the cable end of the INA 3084 synchronisation unit needs to go to the EUT power input connection of the generator Never run the CDN with a loose end of the coupling unit All connectors need to be plugged Manual high current coupling network CDN 3083 S200 M To Generator synch Input To Generator Output High
18. network Make sure that the copper rail is properly mounted and tightened Use only the delivered screws TASEO Advanced Test Solutions for EMC 18 Figure 4 Assembly of copper earth rail After this preparation work the CDN is stable enough for being turned to its side prior to mounting the wheels at the bottom of the case if required 4 2 2 Mounting positioning plates Screw the base plates positioning plates of the synch unit and of the cou pling unit with the knurled screws to the foreseen holes on the outside of the decoupling networks Connect the synch lines safety banana connector to the decoupling units If CDN 3083 S200M decoupling networks are not placed correctly the positioning plates can not be screwed on Manual high current coupling network CDN 3083 S200M L Figure 5 Location of synchronisation unit and of positioning plate Figure 6 Synchronisation plate and positioning plate r h TASEO Advanced Test Solutions for EMC 20 4 2 3 Assembly for IEC coupling For coupling add the coupling modules INA 3080 in the middle of the positioning plate and press it slightly down into the positioning holes Fix the INA by pushing the black quick snap on knobs down The CDN 3083 S200M is now ready to use T E 3083 S200M L Surge pecouping Network L3 et ie dz 9 INA 3080 ell Surge Coupling Unit L L2 E L1
19. ng the func tional capability is at the sole discretion of Teseq Excluded from the guarantee are damages or consequential damages caused through negligent operation or use as well as the replacement of parts subject to degradation The guarantee is rendered invalid by any intervention by the customer or a non authorized third party The goods are to be returned in the original packing or other equivalent packing suitable for the purpose of the foreseen means of transport Teseq shall accept no responsibility for damage in transit TASEO Advanced Test Solutions for EMC 35 Headquarters Teseq AG 4542 Luterbach Switzerland T 41 32 681 40 40 F 41 32 681 40 48 sales teseq com www teseq com China Teseq Company Limited T 86 10 8460 8080 F 86 10 8460 8078 chinasales teseg com Germany Teseq GmbH T 49 30 5659 8835 F 49 30 5659 8834 desales teseq com Singapore Teseq Pte Ltd T 65 6846 2488 F 65 6841 4282 singaporesales Taiwan Teseq Ltd T 4 886 2 2917 8080 F 886 2 2917 2626 taiwansales Q9 teseq com USA Teseg Inc T 1 732 417 0501 F 1 732 417 0511 Toll free 1 888 417 0501 usasales teseq com To find your local partner within Teseq s global network please go to www teseq com Manufacturer Teseq AG 4542 Luterbach Switzerland T 41 32 681 40 40 F 41 32 681 40 48 sales teseq com France Teseq Sarl T 33 139 47 42 21 F 33 1 39 47
20. o ground by specification Therefore the EUT power supply connection needs to be free of differential circuit breaker protection Local installation regulations must be respected to ensure the safe flow of leakage currents Always first connect the PE wire to CDN 3083 S200M Use only nationally approved connectors and accessory items Ensure that a reliable return path for the interference current is provided between the EUT and the coupling decoupling network TASEO Advanced Test Solutions for EMC 12 3 APPLICATIONS E The manual coupling network CDN 3083 S200M fulfills the requirements called for in the surge standard IEC EN 61000 4 5 including the new features concern ing high currents The form factor perfectly suits the demands placed on the instrument in its working environment In its basic form the coupler is made for use on a floor or for table top placement in an EMC laboratory or in a development workshop t can be even mounted onto the wall to have free space on the test bench High current couplers may need to be taken to test sites where it is commonly impossible to move large installations in For convenience the CDN 3083 S200M can be disassembled in handy parts and can be easily moved to other places njecting surge pulses into power connections always involves a careful weigh ing up of partially conflicting requirements On the one hand the power network has to be protected from the interference signals wh
21. oltage is limited to max 440 Vrms line to line and 400 Vrms line to ground If this level is exceeded the generator might be damaged When used with a generator NSG 3040 or Modula the When used with generator NSG 3060 and for EUT voltage gt 440 Vrms do not set pulse repetition rate lt 20 seconds The NSG 3060 may be damaged if this is not respected Manual high current coupling network 3083 S200M Lethal danger from high voltages and the risk of radiating illegal electromagnetic interference The CDN 3083 S200M may only be installed and used by authorised and trained EMC specialists electrical engi neers The CDN 3083 S200M must only be used for EMC tests as set down in these operating instructions Personnel fitted with a heart pacemaker must not operate the instrument and must not be in the vicinity of the test rig while it is in operation Lethal danger from high voltages and the risk of high levels of electromagnetic radiation being generated When the system is used in conjunction with options accessories or other equipment the safety instructions concerning those devices must also be observed TASEO Advanced Test Solutions for EMC 2 1 Safety measures Persons fitted with a heart pacemaker must not operate the instrument and should not be in the vicinity of the test rig when pulses are generated The test rig must provide adequate insulation protection for up to 5 kV surge Particular care should be
22. stance where non observation of the warning could lead to inconvenience or impairment in the performance Example This connection must not be confused with the EUT power input The following symbol draws your attention to a circumstance where non observation of the warning could lead to component damage or danger to the operating personnel Example Never connect or disconnect the EUT while the test system is performing a test Never connect or disconnect the coupling path while the test system is performing a test TASEO Advanced Test Solutions for EMC 5 Q 2 SAFETY ADVICE Improper or careless handling can be fatal The instru ment must only be used by trained personnel These operating instructions form an integral part of the equipment and must be studied carefully before putting the device into use It needs to be available to the operating personnel at all times All the safety instructions and advice notes are to be observed Keeping responsibility to the instructions and recommendations that follow is imperative The safety advice referring to the generators also applies and must be followed when using the instruments together with the CDN 3083 S200M Neither Teseq AG Switzerland nor any of the associated sales organizations accept any responsibility for personal injury or for material or consequential damage that may results through irresponsible or negligent operation of this equipment EUT input v

Download Pdf Manuals

image

Related Search

Related Contents

取扱説明書はこちら  Outline iMode devices and Java Applet  Philips In-Ear Headphones SHE2755  Axis 223M  85 dB(A)  TITLE - Qlima  Samsung 7200 Flat Panel Television User Manual  恒温恒湿槽(操作マニュアル PDF:306kB)  Sweep 2000M-CL-65 User Manual  Thermaltake WingRS-201  

Copyright © All rights reserved.
Failed to retrieve file