Home

Port-A-Cool PAC2KCYC01 Instructions / Assembly

image

Contents

1. PORT A COOL portable EYLLENE cooling units lt SETUP T IF USING INDOORS Place back of unit near a slightly opened window or door Awindow or door on the opposite side of the room should be left slightly open FILL WITH WATER Connect with standard garden hose or fill manually Once the tank is filled the water hose can be disconnected ADJUSTING WATER FLOW FOR OPTIMAL COOLING Turn pump on so water is flowing over pads Turn fan on and run for 5 minutes Adjust water flow to achieve narrow dry streaks on pads Turn water valve to the right if no dry streaks are present Turn water valve to the left iflarge areas of dry pad are present Allow 5 minutes between adjustments The water flow valve on each unit is set at max flow Adjust as needed before use For more information please see the owner s manual included with your Port A Cool unit all Mebane BARS araida vem aeai anndan CEE

Download Pdf Manuals

image

Related Search

Related Contents

Accuriss 57 User Manual    Septembre 2012 - Ville de Palaiseau  MANUALE DI ISTRUZIONE Spot Easy  Turtle Feeder  / CYLINDER SET (106cc/SCUT)取扱説明書  CARRELEC R 200 - 620  お手入れガイド  QL Quick Start GuideA(Sp) - Zebra Technologies Corporation  HP® LASERJET P1505  

Copyright © All rights reserved.
Failed to retrieve file