Home
Handy Home Products 19347-7 Instructions / Assembly
Contents
1. Notch ite Drip Edge P res OSes E 2217 Flush with starter row Notch 40 lt SHINGLES continued 3 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row BACK OF FRONT OF SHED SHED 1 mE Bend in 2 5 cm roof Notch Flush with rain slots Flush with rain slots 4 Continue installing rows of TP 2 5 cm shingles by staggering at front BACK OF SHED Notch Bend in roof FRONT OF SHED 5 Continue installing rows of shingles to the peak At the peak make sure there is a maximum of 5 or less to the rain slot as shown below If shingles overlap at ridge cut to peak with a utility knife 4 12 7 Cut om Ls L Top of rain slot 12 7 cm or less AN e f more than 5 to rain slot you must install another row of shingles 41 6 Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge 7 both sides are shingled you need to trim ends Strike a chalk line 1 from the edge 8 Using your shingle hooked blade carefully cut along the chalk line 2 9 You have finished shingling your roof Proceed to capping the ridge 42 e You will finish off the top of the roof with a ridge cap made from shingles _ 48 VEGIN 1 Cut shingles into THREE pieces Hint Use cut off pieces f
2. Note You will install these last two roof panels later Start on the other end and repeat process to install roof panels on the opposite side Remember panels flush to rafter at one end and overhang at other end Panels MEL overhang Panels flush to rafter Fig J w 29 Parts Required Fasteners Required X2 2 6 96 X86 1 1 4 Screws 2 2 x 6 x 24 3 4 X2 5 5 8 x 48 OSB Panel X2 X 5 5 8 13 7 8 OSB Panel ASSEMBLY STEPS NOTES 1 Install the 5 5 8 x 13 7 8 panel at top flush to peak Fig A and flush to panel next to it Secure with 1 1 4 screws into gable trim 2 Install the 5 5 8 x 48 panel flush to the 5 5 8 x 13 7 8 panel and flush to panel next to it Secure with 1 1 4 screws into gable trim Move to the opposite side and repeat process to install two more roof panels 4 Locate trim VX and UHA between side trims Fig B and under roof deck flush against RAFTER ENDS Fig C 30 VX Secure through roof deck into trim using 1 1 4 screws spaced 6 and 12 staggered as shown Repeat to install two more trims on the opposite side Flush at peak 13 7 8 Panel Install roof panels flush 48 Panel Fig A Flush UHA 1 1 4 Screws Fig B A Make sure VX and UHA i are flush against rafter ends VX and UHA Flush Pig against side trims Parts Required Fasteners Required X2 1x 4 x 60 X12 2 Nails ASSEMBLY STEPS
3. Call Us First DO NOT RETURN TO STORE For immediate help with assembly or product information call our toll free number 1 888 827 9056 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 am to 7 00 pm EST Saturday 8 30 am to 4 30 pm EST November through March M F 8 00 to 5 00 pm EST This page is intentionally left blank Customer Service 16815 11 21 2013 1 888 827 9056 1000 Ternes Drive Monroe MI 48162 f GABLE SHED 8 x 10 244 x 305 cm Includes 8 x 10 Building Instruction KEEP THIS MANUAL FOR FUTURE REFERENCE e BUILDING RESTRICTIONS AND APPROVALS Be sure to check local building department and homeowners association for specific restrictions and or requirements before building e ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits e SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page e CHECK ALL PARTS Inventory all parts listed on pages 4 6 Contact our Customer Service Team if any parts are missing or damaged e ADDITIONAL MATERIALS You will need additional materials to complete your shed See page 3 for required and optional materials and quantities Phillips Chalk Line Tool Belt gt Screwdriver Nail Pouch Q Utility Knife Ga
4. Angled End X24 3 Screws ASSEMBLY STEPS NOTES 1 Locate side trim VJA against siding flush at peak flush to top of siding and rafter Fig A There should be a 5 1 2 overhang at the bottom From the inside secure VJA using 3 screws 12 apart Fig B o 2 At the peak use two 3 screw to draw seam tight Fig A 3 Move to the opposite side and repeat to install two more VJA side trims 3 Sidi 8 Siding Flush to siding 1 3 Screw inside LEM SMS 5 1 2 j LES Fig B an PN VJA X4 3 Screw 2 3 Screws at seam Flush to top of idewall and rafter 2 DEES y X1 ASSEMBLY STEPS NOTES Roof panels may cause serious injury until securely fastened 28 Parts Required Fasteners Required X 48 x 96 OSB Panel a Y X4 2 Nails 3 Siding gap Flush Fig C You must square the roof by attaching one panel first You will use the panel s long edge a lever A to bring your roof into square Commonly known LA D as racking 47 _ lt Attach the 48 x 96 panel with the rough side up 3 painted grid lines side FLUSH with rafter edge KY 2 LL Fig A and flush at the peak Fig B Panel flush There will be a siding gap between the panel with rafter edge and gable trim Fig C y SNR oecure panel with two 2 nails in the corners PA 74 D Fig A Flush Move to the opposite end Usin
5. NOTES 1 Locate collar ties on the two rafters shown 2 Level and then nail using three 2 nails on each side Collar ties on these two rafters Level collar ties 2 Nails Parts Required Fasteners Required X1 Right Door X4 3 Screws X1 Left Door X2 1 1 4 Screws GAUGE BLOCK X32 37 Screws X1 2x3x69 ASSEMBLY STEPS NOTES 1 Reinforce the doors using 4 screws from behind the door into the trim Hint lay doors flat Fig A for easier screw installation Install screws to the pattern shown Fig B 2 Flip doors back over and orient the doors together so the offset is to the same side Top of door as shown Look for GREEN for LEFT door and RED for the RIGHT door The bottom edges of the doors are flush d ocrew on temporary supports across the door trim Fig C Use OO and GAA and tighten screws securely Hint Lay doors flat and install screws from behind Evenly space these screws ig AN The offset is the top of the door Green Red Right re Offset 2 Screws 7 Tad I 4 3 Screws in OO Tighten securely 2 1 1 4 Screws in GAA Tighten securely NES Bottom of doors are flush 32 3w Offset Parts Required Fasteners Required X1 1942 X 3 1 2 x 65 UVA X5 2 Finish Nails X1 2 3 69 X10 Screws X1 Door Assembly ASSEMBLY STEPS NOT
6. Q Drill Driver Shingle Blades Safety Glasses Drill Bit 2 philips Drive Bit Caulk Gun 3 Gun n e Gun Nails Hammer Exterior rated ath WOOD Wood Glue T Pencil aA Gloves _ amp QO Ladder N Clamps Square orm doma Paint Tools 252101 M Assistance Required two or more people 27 2 Mark part with pencil Ensure squareness V GEGIN Beginning of steps for assembly or installation Important required step or operation Helpful assembly hint Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A B C a aa Y A e This kit does not contain a floor frame or floor decking e No leveling materials are included with the shed kit e See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor as this will vary depending on your specific site IMPORTANT Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list of additional materials that are not
7. 10 2 61 0 EUM X2 2 x 4 x 46 3 8 5 1 x 10 2 x 117 8 cm X1 QU A 2xA4x56 5 1 x 102 x 142 2 2 12 4 72 51 10 2 825 cm 2 A 4 73 1 2 5 1 x 10 2 x 186 7 X1 SZ 2 K 4 x 89 5 1 x 10 2 226 1 X1 J 2x4x993 5 x 10 2 236 2 XA UP 2 K 4 x 96 5 1 10 2 243 8 cm 6 24 15 2 x 61 X2 LHA N2x3x29 5 1 x 7 6 x 58 4 cm X12 TZA 22 4 55 9 16 5 1 10 2 x 141 1 cm X2 JF J tix4x60 2 5x10 2x1524 cm x2 UHA jJ2x6x24 34 5 1 x 15 2 x 62 9 XA VJA 2 x 6 x 61 15 16 5 1 x 15 2 x 157 3 x2 2 x 6 x 96 5 1 x 15 2 x 243 8 cm 2 19 32x2 1 2 x 35 3 4 1 5 x 6 4 x 90 8 cm X2 19 32 x 2 1 2 x 63 1 16 1 5 x 6 4 x 160 2 cm X2 19 32 x 2 1 2 x 63 1 16 1 5 x 6 4 x 160 2 cm X2 19 32 x 2 1 2 x 96 1 5 x 6 4 x 243 8 cm 3 8 x 1 3 4 x 76 1 x 44 x 193 X2 CF 3 8 x 1 3 4 x 76 718 1 x 44 x 195 3 23 8 x 1 3 4 x 76 718 1 x 44 x 195 3 X2 GI 119 32 2 1 2 x 23 1 5 x 6 4 x 584 cm DOOR RAILS X2 19 32 x 2 1 2 x 32 1 5 x 64 x 81 3 cm DOOR RAILS X1 19 32 x 2 1 2 x 65 1 5 x 6 x 165 1 cm x2 00 2 KX 3 69 5 1 x 7 6 175 3 NOTE Panel parts are not stamped with part identification a 3 8 x 48 x 96 1 x 121 9 x 243 8 cm 1
8. S 7 f i 1 iy j A 1 jj N stable work surface for wall construction embly procedure during the build process to avoi e 3 2 7 5 E 2 Ez 55 509 s 5 m NG c 5 ws 2 O o e m dili Parts Required Fasteners Required X1 2 x 4 x 93 X6 3 Nails X2 2x4x72 X2 3 Screws X2 2 4 46 3 8 ASSEMBLY STEPS NOTES 1 Orient parts on edge on floor shown Measure and mark Attach upper part USA first 2 Nail using two 3 nails at each connection Except at center connection use 3 screws 93 1 1 1 462 SECOND install lower part USA using 3 screws Ju 263 8 262 NI gt Nl gt NI 3 Screws Mg 3 Nails 72 FIRST nail upper part USA using 3 nails Oy Du 452 455 465 Parts Required Fasteners Required X1 48 96 Wall Panel X32 2 Nails GAUGE BLOCK ASSEMBLY STEPS NOTES 1 Place panel on frame as shown with primed side facing up 2 Use a 3 4 gauge block Fig A at edge of panel Panel is 1 down from center board and 2 1 2 down from side board 3 Nail using 2 nails 6 apart on edges and 12 apart inside panel BIO Flush with frame Primed Side Up A 3 4 1 9 CM Fig A 4 Gauge Block For squareness maintain flush at edge and
9. in center Parts Required Fasteners Required X1 x48x96 Wall Panel BEN X32 2 Nails ASSEMBLY STEPS NOTES 1 Place panel on frame as shown with primed side facing up 2 Keep panel flush to other panel and to side frame Panel is 1 down from center board and 2 1 2 down from side frame 3 Carefully flip the wall over T Primed Side Up Flush with frame For squareness maintain flush at edges Flush Parts Required Fasteners Required X2 2 x 4 x 96 X20 3 Nails X4 2x4x72 X2 2x4x 24 ASSEMBLY STEPS NOTES For windows option see instructions packed with windows 1 Orient parts on edge on floor as shown Measure and mark 2 Attach with 3 nails two at each connection Angle nails at seams Use 4 Nails at seams 96 TP To Center 172 To Center To Center 24 RL 2 To Center 1 12 Offset Seams 4 4 N 96 24 RL TP X2 RL X2 Parts Required Fasteners Required X 30 48 76 Wall panel X36 2 Nails ASSEMBLY STEPS NOTES 1 Place the 48 x 76 panel onto the wall frame with primed side up as shown Use the gauge block to mark the 3 4 measurement on the wall stud Fig A Keep panel flush at top Secure panel with two 2 nails in the corners Fig B Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secur
10. 3 8 48 96 1 121 9 x 243 8 x OR x1 3 8 x 48 x 96 1 x 121 9 x 243 8 cm J Padl 1 x2 3 8 x 10 x 17 3 16 1 x 25 4 x 43 7 cm 1 x2 3 8 x 10 x 17 3 16 1 x 25 4 x 43 7 cm 1 L x4 2 11 3 8 48 96 3 8 48 76 3 8 24 76 RIGHT DOOR 1 121 9 243 8 1 121 9 193 1x61 x 193 cm 7 16 x 48 x 96 1 1 x 121 9 x 243 8 cm x2 7 16 x 13 7 8 x 96 1 1 x 35 2 x 243 8 cm x2 7 16 x 5 5 8 x 48 1 1 x 14 4 x 121 9 cm Roof panels are 7 16 1 1 cm thick mu 2 7 16 29 5 8 48 1 1 x 75 4 x 121 9 cm 2 7 16 13 7 8 29 5 8 1 1 x 35 2 x 75 4 7 16 x 5 5 8 x 13 7 8 1 1 x 14 4 x 35 2 cm VENT p T HANDLE x1 1 2 5 cm 1 2 5 cm Included with barrel bolt x1 BOXES 3 7 6 cm x4 BOXES 2 5 1 2 5 110 110 pai 1 1 2 3 8 cm w 3 7 6 64 2 5 em x90 ep 1 1 4 3 2 cep SS 4 9 e 3 7 6 cm Screws angled into 4 x 4 e 2 at each point frame and 4 x 4 touch Measurements to centers of 4x4 s MATERIAL REQUIRED 4 x4 x10 10 2 x 10 2 x 304 8 Treated Lumber Fasteners for Frame to 4 x 4 on 3 7 6 cm Screws shown as one option Minimum 40 3 7 6 cm screws exterior grade A
11. 72 TM bottom of header EM 2 Nails Flush m Parts Required Fasteners Required X1 2 4 72 X28 2 Nails X1 2 x 3 x 69 OO Temporary Brace X7 1 1 2 Nails X2 3 Screws x1 x48x96 Wall Panel ASSEMBLY STEPS NOTES 1 Place the 48 x 96 panel onto the wall frame with primed side up as shown Keep panel flush with vertical door frame and the first panel 2 the panel using 2 nails 6 apart on edges and 12 apart inside panel 3 Place TM as shown Flush to the side of the panel and 2 1 2 from the bottom of the panel Nail the panel to TM using 2 nails 6 apart 4 Attach brace OO with one 3 screw at each end to hold the 56 door opening 5 You have finished your front wall Carefully flip the wall over AN For squareness maintain 4 flush at edges 35 1 1 2 Nails i TM X1 Primed Side Up 72 TM 6 56 Hold this Door 4 21 2 Screw Opening Measurement 2 at each end Hold 56 door opening by attaching brace OO using two 3 screws Parts Required Fasteners Required X1 oide Wall Assembly X10 3 Nails X1 2x4x55 9 16 TZA X23 2 Nails x2 3 Screws ASSEMBLY STEPS NOTES 1 Stand side wall floor Overhang is to bottom of panel Center side wall on the 120 floor dimension 2 Use TZA rafter as a temporary brace Secure with two 3 screws 2 First nail along lower outside edge of panel to floor frame using 2 nails 6 apart Angle
12. ES 1 Mark the center of the 56 door opening Then install OO flush under siding using two 3 screws Fig A The doors will rest on OO for easier installation 2 Place the door assembly on OO with the gap centered on the mark Fig B Screw hinge boards into wall framing using 3 screws spaced evenly as shown Fig C Make sure screws go into framing d Locate trim UVA centered over doors flush to hinge trim Secure using five 2 finish nails Fig D 4 Remove the door braces ledger board and door spacers Check the doors swing properly Mark the center of 48 door opening Door spacing centered on mark eem 7 a N Center N mark Aa 5 Flush under siding Center o0 une Center OO under door opening 3 Screw Fig A 5 2 Finish nails Trim UVA is flush to hinge trim 17 1 2 5 3 Screws each side through hinge trim into framing Remove door braces ledger board and door spacers and check doors swing properly 33 Parts Required Fasteners Required X2 2 3 69 X14 2 Screws X2 1955 X 3 x 32 X16 34 Screws X2 1 x3x23 G ASSEMBLY STEPS NOTES 1 With left door closed center a weatherstrip OO vertically on the left door in the door opening Fig A OO will offset the left door 1 OUT past the door Fig B Secure OO using seven 2 screws through outside trim into OO 2 On the right door center OO vertically in door opening Fig A
13. N Use only wood treated for ground contact and fasteners approved for use with treated wood AN Always support frame seams Maximum between leveling Shingle 4x4 Runner 42 material locations Level 42 30 5 cm 48 30 5 shingle D Do not exceed 16 40 3 cm Gravel 2 Block x Gravel 4 Block LEVELING METHODS 2x4 Treated Lumber 8 Block 8 Block e Level under 4x4 runners only e Locate leveling material 12 30 5 cm from ends of runners and no more than 48 121 9 cm apart Asphalt shingles should be used between 4x4 runners and blocks or treated lumber Never use shingles in direct contact with ground e For best results and aiding in water drainage use gravel under each concrete block MATERIAL REQUIRED Gravel Solid Masonry Blocks in 1 2 4 or 8 thickness 2x4 Treated Lumber Asphalt Shingles AN Leveling higher than 16 40 3 cm is not recommended CONCRETE e If you are building your shed on concrete foundation see following page Caulk between sill plate and concrete Building Size Actual Size A B C Requires 2 2 x4 x 10 2 1 x 10 2 x 304 8 cm MUST be treated lumber x2 2 x 4 x 8 2 1 x 10 2 x 243 8 cm MUST be treated lumber x1 Caulk A Allow new concrete slabs to cure for at least 7 days e A treated 2 x 4 5 1 x 10 2 sill plate is required when installing your shed on concrete e Use a high quality ex
14. OO will offset the right door 1 IN from the door trim Fig C Secure OO using seven 2 screws through outside 3 Center UWA vertically between door trim Install from behind the door using 4 4 screws 4 Locate GI on top of UWA and between door trims as shown Install trim GI from behind door using 4 74 screws in each trim 32 1 8 4 34 Screws in each trim from inside door Parts Required Fasteners Required X2 Spring Loaded Bolts w Screws X8 1 Screws X1 Door Handle X2 1 1 2 Screws ASSEMBLY STEPS NOTES 1 Place upper bolt onto OO in open position with bolt end down from frame Bolt is open when loop is contacting base Fig A Mark and pre drill holes 2 Install bolt with screws supplied and drill a 6 hole for bolt to extend into Fig 3 Place lower bolt onto OO in open position with bolt end 75 up from floor Bolt is open when loop is contacting base Fig B Mark and pre drill holes for screws Fig A 4 Install bolt with screws supplied and drill hole for bolt to extend into Fig B N LOCATE AND PRE DRILL HOLES TO AVOID SPLITTING WOOD OVER DOOR FRAME drill for bolt 1 deep 5 Measure up 35 3 4 and drill a 4 hole thru door and part OO j i Fig C Re drill the hole larger with a 1 2 drill Be careful to avoid breaking thru OO Attach handle with screws supplied Fig D 4 HOLES EN LN m 5716 drill for 244
15. bolt 1 deep Z NN 35 3 48 1 1 2 Screws Keep drill square to avoid breaking through Fig D A Pre drill amp 1 1 2 drill thru 35 Parts Required Fasteners Required x2 197 x 3 63 1 16 X48 2 Finish Nails x2 197 x 3 63 1 16 X2 1 3 9 X2 197 x 3 x 35 3 4 EJA ASSEMBLY STEPS NOTES 1 Locate trims YOR and YOL with the primed side out flush at peak and flush to roof deck Fig A Secure with 2 finish nails 12 apart Fig A Move to the opposite side and repeat to install two more front and back trim pieces 2 Locate trim EJA and HAS between front and back roof trims Fig B and flush to roof deck Fig C Secure with 2 finish nails 12 apart Fig B Move to the other side and repeat to install two more trim pieces Primed side out Left 35 3 4 Long YOR Right Flush QQ VOL at seam S ul HAS C 7 7 4 74 96 Long Flush at peak and top of roof deck SEE n EJA amp HAS Flush to roof deck 2 Finish nails HAS and EJA flush to side trims Fig C 36 Parts Required Fasteners Required X4 1 3 4 x 76 2 1 3 4 76 7 8 2 1 3 4 x 76 7 8 48 2 Finish Nails ASSEMBLY STEPS NOTES 1 Locate 76 trim on side wall flush to front wall siding Fig A B and flush under 2x6 trim Fig C with pri
16. ch will be laid flat Measure and mark Attach with 3 nails two at each connection 2 Nail header with two 3 nails at ends and five 3 nails through top plate Fig A 3 NOTE NAIL HEADER QU USING THE FLOOR TO KEEP IT FLUSH Fig B FLIP FRAME OVER WHEN DONE SO THAT THE HEADER IS FACE UP Flush QU Fig B N 5 89 57 3 5 3 157 To Center N 157 To Center D f 0L 0 NV T ee ee 2 56 QU 5 AP SZ QU 135 THA THA X2 28 4 Parts Required Fasteners Required X1 7 48 x 96 Wall Panel X28 2 Nails X7 1 1 2 Nails X1 2x4x72 X1 2 4 9 UU x1 2x6 x 24 3 4 X1 Gusset ASSEMBLY STEPS NOTES 1 Place the 48 x 96 panel onto the wall frame with primed side up as shown Keep panel flush at vertical door frame and a 1 overhang on the bottom or the vertical door frame 2 Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Use 1 1 2 nail when nailing into the header and UU 1 Place TM as shown Flush to the side of the panel and 2 1 2 from the bottom of the panel Nail the panel to TM using 2 nails 6 apart 4 Center UU on the top plate as shown Put a UHA and a Gusset underneath UU for support to hold it against the panel Nail the panel into place with two 1 1 2 nails Primed Side Up 1 1 2 Nails TM X1 1 1 2 Nails For squareness maintain flush at both edges and 1 1 8 up from
17. e corner with two 2 nails Fig C Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Primed Side Up 48 A For squareness maintain flush at top and 4 on stud 3 4 1 9 CM 4 Gauge Block 76 Fig A 6 1 Overhang at bottom 2 Nails Fig B Fig C lt lt 1 9 1 9 Parts Required Fasteners Required X1 76 x 48 x 76 Wall panel X70 2 Nails X1 23 7 8 x 76 Wall Panel ASSEMBLY STEPS NOTES 1 Place the center 23 7 8 x 76 panel on frame as shown with primed side facing up Nail the panel using 2 nails 6 apart on edges 2 Place the end 48 x 76 panel on frame as shown with primed side facing up Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel 9 You have finished your side wall Carefully flip the wall over 4 Repeat the side wall steps to make a second Side Wall A T For squareness maintain flush at Primed Side Up panel edges 233 6 A u 1 Overhang For squareness maintain at bottom io at panel edges Primed Side Up 76 Parts Required X1 2 4 89 SZ X13 X2 2 4 73 1 2 X1 2 4 56 Fasteners Required 3 Nails ASSEMBLY STEPS NOTES 1 Orient parts on edge on floor as shown with the exception of the header whi
18. g 2 3 nails T between studs Angle nails to hit floor frame Fig C 22 3 Nails 3 Screws 1 1 2 Nails 2 Nails 3 Nails Fig C Parts Required X1 Front Wall Assembly ASSEMBLY STEPS NOTES It is important to secure the front wall in the following order Begin by standing the front wall on the floor Center front wall on floor side to side Make sure the side wall bottom plates are securely in the 1 1 2 gaps of the front wall Check the 56 door opening is held before nailing Nail the front wall to the floor using 2 nails 6 apart Angle nails to hit floor frame Fig A Be sure the measurement between the panel edges is the same along the entire length Then secure with one 2 nail in the upper corner Fig B Nail along the side panel edge into the frame using 1 1 2 nails spaced 6 apart From inside secure the front wall frame using 3 screws through the frame into the floor Fig C and through the frame into the upper side wall rail Fig B and lower side wall rail Fig D Repeat steps to secure the left side of the front wall Remove the door brace Remove temporary brace You have finished standing your walls Fig D Fasteners Required X22 1 1 2 Nails X8 2 Nails x8 3 Screws Angle into floor frame Fig A Fit frame into 1 1 2 gap 3 Screw 2 Nail Same Measurement 2 Nail Angle into floor frame Remove door b
19. g the long edge of the panel as a lever move the panel side to side until the top corner is flush to the peak Fig D and there is 3 4 measurement on the rafter Fig E Secure panel with two 2 nails in the corners Fig E Parts Required Fasteners Required ex 48 x 96 OSB Panel X130 2 Nails X2 13 7 8 x 96 OSBPanel 2 6 29 5 8 x 48 OSB Panel a x2 13 7 8 x 29 5 8 OSBPanel ASSEMBLY STEPS NOTES on Roof panels may cause serious injury until securely fastened T 4 Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2 nail into each rafter Fig E End measurements from OUTSIDE of panel Move to the top of the panel and keep spacing between the center of the rafters Secure with one 2 nail into each rafter Fig E Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Attach the 13 7 8 x 96 lower roof panel flush to first panel along edge and with the 3 4 measurement Fig F 2 Nails 5 Attach one upper 13 7 8 x 29 5 8 roof panel flush to the installed panel Fig G and flush at peak Fig H AN The end panels overhang the rafters and there is a 1 4 reveal of the 2x6 trim Fig J Nail the roof panels using 2 nails 6 apart 6 Attach the lower 29 5 8 x 48 roof panel flush to the center panels Fig G and upper panel Nail the roof panel using 2 nails 6 apart
20. iddle rafters on marks Hold rafter end flush to top plate and inside of wall panels and secure using 3 screws angled through rafter into top plate Fig A Move to the opposite end and repeat to secure the other rafter end 4 Repeat steps to attach all rafters 3 Screw angled to hit top plate Fig A Install end rafters flush to front and back wall panel These measurements to center of rafters 24 24 N LL From outside 24 24 24 From outside of rafter of rafter N Siding 001 05 Siding 96 All rafters flush to top plate and inside of panels 3 Screws at ends angled to hit top plate 29 Parts Required Fasteners Required X4 x 10 x 17 3 16 2 Right amp 2 Left Gable Filler Pd DEN X60 1 1 2 Nails X2 2 3 23 4 3 Screws ASSEMBLY STEPS NOTES 1 Place Gable Brace on end rafter between wall panel and rafter gusset 2 Level and attach using two 3 screws into the bottom of the rafter 3 Locate gable fillers centered on seam and vent opening Fillers should be flush or below rafter 4 Fasten using 1 1 2 nails as shown Be sure to nail the lower panel to the rafters as well Repeat on opposite side to attach the other two gable fillers Center seam in vent opening LHA Line up seams 1 1 2 Nails Primed Side Out 26 Parts Required Fasteners Required X4 2 x 6 x 61 15 16
21. ide of doors and all 4 edges Note Prime all in primed exterior wood before painting Follow directions provided by manufacturer e Install over roof on gable side Fig A e Do not use nails on side of drip edge that hangs over side of building e Only nail top of drip edge as shown Roof Felt Edge flush to trim onip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer 39 e Follow directions provided by manufacturer and these instructions se G wem N Familiarize yourself with a 3 Tab Shingle Notch SHINGLE NAIL Notch PATTERN TH 2 5 cm 4 2 5 cm Half A Rain Slot Full Rain Slot Nails never DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS V GEGIN 1 Install first starter row upside down and color up with a 1 overhang at back and bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip egde install shingles flush with drip edge BACK OF SHED FRONT OF SHED 4 Nail 4 Nails AN TABS UP 1 2 5 cm overhang or flush with drip edge Shingle overlaps 1 2 5 cm overhang roof decking past roof deck 2 Beginning at front of shed install first row of shingles with notch at 1 past roof edge or flush with drip edge BACK OF FRONT OF SHED 1 SHED 2 5 cm ke Flush with starter row
22. included in our standard floor kit x2 2 4 8 5 1 x 10 2 x 243 8 cm Treated Lumber Cut lumber to 2 x 4 x 93 5 1 x 10 2 x 236 2 cm Treated Lumber 8 ea 3 7 6 hot dipped galvanized nails 3 TAB SHINGLES 5 Bundles 1 GALVANIZED ROOFINGNAILS 3LBS For Shingles E PAINT FOR SIDING 2 Gallons PAINT FOR TRIM 1 Quart Use 100 acrylic latex exterior paint 2 coats recommended Use 100 acrylic latex exterior paint CAULK N 2 Tubes WOOD GLUE Exterior Rated Use acrylic latex exterior caulk that is paintable DRIP EDGE 50 Feet 15 ROOFING FELT To cover 113 Sq Ft of roof area 1 GALVANIZED ROOFING NAILS 1 4 Lb For roofing felt REFER TO THE BACK OF THIS MANUEL AND THE MANUFACTURER S INSTRUCTIONS FOR INSTALLATION OF SHINGLES DRIP EDGE AND FELT Part Identification is stamped on some parts WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 1 1 2 x 3 1 2 3 8 x 8 9 cm RS x4 3 4 x 3 1 2 1 9 x 8 9 cm x3 1 1 2 x 2 1 2 3 8 x 6 3 cm e Check these locations for Part stamps 3 4 x 2 1 2 1 9 x 6 3 cm xt 1x 3x 5 2 5 x 7 6 x 12 7 Gauge Block for 3 4 1 9 cm y measurement X1 UU 2 x 4 x 9 5 1 x 10 2 x 22 9 cm 4 2 x 4 x 24 5 1 x
23. irst 2 2 27 5 7 5 5 2 22 gn 5 cm 5 e 5 cm lt m _ Score shingle then snap off angled cut Weather Seal Top of slot 20 to 22 Pieces Note You will need about 20 22 cut pieces 2 Install first ridge cap flush to shingles at front as shown FRONT OF SHED 3 Install second ridge cap 5 back as shown FRONT OF SHED 43 SHINGLES Ridge Cap continued 4 Continue installing ridge cap to back of roof Trim cap off flush to shingles 6 When you have 4 minimum of shingle color cut one piece to cap your roof A Cut at top of rain slot Cap 7 Install flush to shingles Flush to shingles 8 You have finished your ridge 44
24. me using 3 screws through the frame into the floor Fig C and l 3 Screw through the frame into the upper side wall rail Fig and lower side wall rail Fig D Fig C 21 Parts Required Fasteners Required X1 oide Wall Assembly X2 X11 X23 X12 ASSEMBLY STEPS NOTES It is important to secure the side wall the following order T T Begin by standing the side wall on the floor 1 Center side wall side to side on the 120 floor dimension In the corner make sure the bottom plate fits into the 1 1 2 gap of the back wall frame Fig A Nail the lower corners to the floor frame with one 2 nail each Angle the nails to hit the floor frame Fig A 9 3 Screw from inside 2 Nail Angle into 2 floor frame Bottom Plate Into 1 1 2 Gap A Nall Angle into floor frame 2 sure the measurement between the panel edges is consistent along the entire length Then secure with one 2 nail in the upper corner Fig B Nail along the side panel edge into the frame using 1 1 2 nails spaced 6 apart Nail along bottom of panel using 2 nails 6 apart Angle nail to hit floor frame Fig A 1 1 2 Nails 3 From inside secure the side wall using 3 screws 2 Nail through the back wall frame into the side wall bottom plate Fig A Same Secure side wall top plate into back wall frame with Measurement 3 screw Fig B Fig B 355 Nail through the bottom plate usin
25. med side facing out Install using 2 finish nails 12 apart e Locate 76 7 8 trim with angled end flush to side 76 trim and flush under 2x6 trim Fig B D with primed side facing out Install using 2 finish nails 12 apart 3 Repeat process at other corners to install all trim pieces Primed side faces out on both trims 76 7 8 Trim with angled end goes va on front and back Front trim flush under 2 x 6 trim 1 76 Trim gt with square end goes on the sides Edge of 76 trim is flush to front wall siding Siding Siding LL P Angled Trim Square Trim Flush 37 Parts Required Fasteners Required X1 Gable Vent X4 1 Pan Head Screws Exterior Grade Caulk ASSEMBLY STEPS NOTES 1 Caulk back of vent then locate vent in opening flush against siding 2 Insert 4 1 Pan Head Screws throught the holes in the corners of the vent into the side of the shed Note Must paint vents to validate warranty For best results use spray paint N 4 1 Pan Head Screws 38 PAINT amp CAULK NOT INCLUDED e Use acrylic caulk that is paintable Caulk at all horizontal and vertical seams between the trim and walls and all around the door trim e Use a high quality exterior acrylic latex paint When painting your building there are a few key areas that can be easily overlooked that must be painted e Bottom edge of all siding and trim e Ins
26. race from inside 23 Parts Required Car Fasteners Required X12 2X4 X 55 9 16 v X120 2 Nails X10 Gussets alils 2 3 Screws ASSEMBLY STEPS NOTES 1 You will assemble 6 rafters 2 Rafters have only ONE gusset 4 Rafters have TWO gussets Make a jig so rafters all have the same measurement using the shed floor and GAA 4 gauge block 2 Measure 96 from the corner and screw down the GAA 72 gauge block securely o Place rafter parts in jig as shown Apply glue to rafters where the gusset will fit Ends of rafters must touch at the peak Nail gusset to rafters with a 74 offset using twelve 2 nails in pattern shown Fig A 4 On TWO rafters install ONE gusset On FOUR rafters flip over rafter assembly and attach a SECOND gusset X 7 2 3 Screws Gauge Block T Offset Offset lt Glue where gusset installs 96 96 TZA X2 per assembly Q Assemble TWO rafters Assemble FOUR Rafters with ONE gusset with TWO gussets 24 Parts Required Fasteners Required X4 Rafter Assemblies w 2 Gussets X20 3 Screws X2 Rafter Assembly w 1 Gusset ASSEMBLY STEPS NOTES 1 Mark top of wall frames to measurement shown Locate end rafters flush against front wall panel and flush to top plate and inside of side wall panels Secure end flush to top plate using one 3 screw angled through rafter into top plate Fig A Move to the opposite end and repeat to secure the other rafter end o Center m
27. terior grade caulk beneath all sill plates e Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included e Check local code for concrete foundation requirements B C A 8 x 10 243 8 cm x 304 8 96 x 120 243 8 cm 304 8 120 304 8 cm 93 236 2 cm 96 243 8 cm 8 Building Size Actual Size LEVEL AND SQUARE FLOOR FRAME l Before attaching floor decking it is important to level and square the floor frame A level and square floor frame is required to correctly construct your shed 68 Begin 1 See page for the preferred floor leveling method 2 Use level and check the frame is level before applying floor panels 3 Check for frame squareness by measuring diagonally across the corners If the measurements are the same the frame is square The diagonal measurement will be approximately 153 11 16 390 4 cm 4 When the frame is level at ends of each runner Move to the opposite end of the frame Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A 5 Once the floor is level and square fasten the frame at each point the frame contacts the 4x4 runners lt gt q N M N Y N Y Y Y N N M Y Y Y N N Y au 7 f v y i if j 7 fh 1 f y f 7
28. to hit floor frame Fig A B 4 second nail through the bottom plate using two 3 nails between studs Angle nails to hit floor frame Fig A Angle nails to hit floor frame Fig A N 2 3 Nails INN between studs 1 Overhang Nails 6 Spacing Fig B 20 Parts Required Fasteners Required X1 Back Wall Assembly X19 2 Nails X11 1 1 2 Nails x4 3 Screws ASSEMBLY STEPS NOTES It is important to secure the back wall in the following order Begin by standing the back wall on the floor Center back wall side to side on the 96 floor dimension Framing rests on bottom plate In the corner make sure the back wall frame rests on the side wall bottom plate 3 Screw from inside Nail the lower left corner to the floor frame with one 2 nail Angle the nail to hit the floor frame Fig A Note There should be a 1 1 2 gap at the tia opposite side Gap Fig D Be sure the measurement between the panel edges is the same along the entire length Then secure with one 2 nail in the upper corner Fig B 2 Nail Same easurement Nail along the side panel edge into the frame using 1 1 2 nails spaced 6 apart Y nue Nail along bottom of panel using 2 nails 6 apart d Angle nail to hit floor frame Fig 25 2 Nail X Angle into floor frame 2 Nail Angle into Fig 7 frame From inside secure the back wall fra
Download Pdf Manuals
Related Search
Related Contents
Joyetech eGo ONE User Manual PDFファイル PBH-154 User Manual Sony VGN-FS960P User's Guide ALON MP3 Dictaphone for S60 3rd Edition EFS20 Dual Bilge Pump Controller Bell'O PR-25 User's Manual User`s Manual - Servi Catalogue KAOSSILATOR Owner's Manual Concept - Guillevin Industrial Automation Group Copyright © All rights reserved.