Home
        PermaFloat 2420 Installation Guide
         Contents
1.  the frame together  Put nails so the hardware covers them up   This method just makes it easier to hold together while attaching  hardware  A nail gun even makes it easier  You will be building  the frame right side up so make sure the top of the frame is  level  decking will not fit level if they are not         8  Cut the inside stringers to length  They will also  be 3   shorter than the sides stringers   Using a  square  nail these in place  We normally put  these inside stringers on 2  centers     9  Your frame should look like this        11  Measure down 1  from the top of the frame and clamp  outside comer in place  Use 1 clamp on top and one  clamp on bottom as shown  Make sure hardware is tight  against wood     12  Drill hole using either  1 2  for heavy hardware or 3 8  for  homeowner s hardware  nearest to the comer as shown    Regular steel bits work better than wood bits and last  longer      18 Use hammer and drive in bolt  Make sure the square on  the carriage bolt goes in the square of the hardware  If it  doesn t  use your pliers and turn the head  Drill the oppo   site inside hole and put in bolt       14  Take off clamps  The two bolts and hardware will  hold the corner together  Place the inside corner  and bolt   use a washer and nut  Snug up but do  not fully tighten hardware until later   Ifyoutighten 15  Attach male or female tabis to connect docks together  hardware it could warp the lumber and make as needed   decking very hard to attach  A straig
2. 1961 Industrial Blvd   Conyers  GA 30012   888  985 3626 Fax  770  860 1725  Division of Cellofoam   North America Inc  http  www cellofoam com       HOW TO BUILD  A WOOD FLOATING DOCK    STEP BY STEP INSTRUCTIONS  USING PERMAFLOAT   HARDWARE   FLOATS  RUBRAIL  AND ACCESSORIES    A 6    X 20    DOCK WITH A 4    X 10    RAMP  ARE SHOWN  BUT THE SAME PROCEDURE  APPLIES TO ANY SIZE WOOD DOCK       Tools Needed     Many wood docks have been totally built with hand tools but  it sure makes it easier with power tools  The least you need  is a square  chalk line  pencil  hammer  tape measure  2 C   clamps  power saw  pliers  1 2  drill bit  if using 1 4   hardware   9 8    drill bit  for homeowners hardware and cleat  bolts   1 4    drill bit for float drums  3 4    socket and wrench   9 16  open end wrench  power drill  If you have access to air  wrenches it is helpful  especially on big jobs        1  Assemble together all the hardware you need for the project   There is nothing more frustrating than missing one piece of  hardware while building  Depending on the size of the project   you will have lots of hardware  If you use the hardware as  designed  the dock will last 30 or more years  If you have  questions as to what hardware you need  give us a call           2  Like hardware  assemble together all the wood  you need for your project  We recommend at  least 2    x 8  x length pressure treated lumber   Be selective on your lumber  Lumber that is  dried out  bent or warped wi
3. eck    drill and drill side stringers for lag bolts  These  as well as all other fasteners should be hot dipped gal  the decking is on  the floats  Sst em TE p Make sure if you use vinyl or plastic  what stringer  vanized  SS sige nee e o E on centers the manufacturer recommends  Some of    put the plug on before attaching to the frame   them will only span 16         24  If you are using an internal pipe holder  cut  out the opening for this hardware        29  Don t forget to tighten down those bottom cross  stringer bolts        25  Decking can be done two ways  1  Lay down    boards even with the edge of the side stringer  and let excess hang over the other side or 2  Cut  boards alto the correct length   if you use method  1  screw boards down  then using a chalk line   cut all deck boards off to length        30  Nail down outside corner bumpers with stainless       26  Use a chalk line to determine where deck     screws are to go   using 2  x 6  decking  use  two deck screws for each stringer  If you are  using wet pressure treated wood you can  hold decking close together  In a few weeks  this wood will dry out and you will have a nice  space between boards  If you use plastic or  vinyl decking  you will have to space between  boards   Do not fasten down boards where  you have to tighten down hardware      31  Attach rubrail using the same stainless nails  We recommend a nail every       6    top and bottom     ring shank large head nails  Four nails on top    and fou
4. ht sided dock  will not be achieved         16  Clamp angle  drill and attach bottom cross  stringers with angles and washer plates    DO NOT TIGHTEN UNTIL LATER         y       Fx    CLEAT       18  Attach any accessories such as pipe  holder  cleat angles or chain retainers   Also attach any male or female single     T  if you are adding fingers to your  dock  If you are adding fingers to the   SINGLE end of your dock we have hardware   bedi  with tabs on both sides of the   FEMALE hardware     19  All hardware is now on  Do not fully tighten at this point        17  Attach inside stringers with angles and  washer plates  Do not tighten        23  Start Decking  Start with the end board on both  ends of the dock and temporarily fasten down with  a couple of deck screws  If it is an end board at  the end of a finger or end of a dock it should be  flush with the end stringer  If it is a section that     two sections are going to be pinned together  hang  those boards over 1 1 4   This will make the gap       EET NTE Gai m FE     between the two docks smaller  Although wood  et float drums in the right location  Make sure they 21  Attach floats with a 3 8  x3  or larger lag bolt  Use a 3 8  washer decking is stil the most commonly used  there  are square and flush to the side stringers  Use a 1 4    and a 1 2  washer for a larger bearing surface on the float drum  22  Just before decking  place the plastic plug in float drum   After mis A of vinyl and plastics such pol our M D
5. ll make your    Select your floats needed  We manufacture  Permatioats they are the best both in the shell  polyethylene and polystyrene foam filling  Many float  manufacturers claim they are the best  If they sell sec      onds  they aren t  We sell over 30 different sizes of  floats  Remember  a float could be in the water and  expected to function for the next 30 years  It should  also meet or exceed Corps  of Engineers Regulation          4  Getting Started  Cut one end of the outside  side stringers square  Measure and cut the  other end to length  This will be the length of  the dock     5  On the side stringers only  set your saw at 45   and cut in 1 2  from the end a 45   cut   This is to allow the radius of the hardware to fit    project much harder        6  Cut the end stringer to length  If you are using 1 1 2   thick pressure treated lumber  they would be 1 1 2     11 shorter than the width of the dock   The  long side stringer goes full length and the end stringers  are inside            10 Cut and nail 2 cross stringers  2 x6   to the bottom  Make  sure these cross stringers do not interfere with the float  drum placement  These would be the same width of the  dock  When you nail these in place make sure you main   tain the 2    centers  Use your tape measure and square by  measuring from corner to corner      36 CFR Part 327        7  Nail the outside frame together   You can use your floats as a  bench   We use a couple of hot dipped galvanized nails to hold 
6. r nails on the bottom        27  Attach cleats   drill down through decking into cleat  angles with 3 8  drill  Drive 3 8    bolts  place on  washer  nut and tighten        28  Now that decking is fastened down tighten all  hardware and screw down those loose deck  boards     32  This is a picture of a finished corner with an internal 3          33  Fit the sections together and put in the pins to hold  together  This is a little work but will be worth it when  you put the dock in the water and it doesn t fit  together  If you want to skip this  at least put pins in  hardware to make sure they fit  Sometimes there is  excess galvanizing which needs to be cleaned out        34  Finally  a dock you can be proud of and will last at  least 30 or more years              35  There are other accessories that might be added such as hoops  corner wheels  electrical  internal pile holders  etc  Some    of these need prior planning or you might need to take up a deck board to bolt down        Copyright protected  All rights reserved     
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Manual estufas con limpieza automatica policombustibles  3com Switch 4210 PWR 9-Port  5 ème Forum des RASED – 6 décembre 2014 « Vers une école    Duo de haut-parleurs stéréo Bluetooth® Mode d`emploi  FTPU - Office 2010 - United Nations Economic Commission for Europe  SBS SP3120T surge protector  CombiFinder Plus  Tripp Lite Smart line interactive USB UPS System  MATERIAIS DE CONSTRUÇÃO I – CIV237 - Escola de Minas    Copyright © All rights reserved. 
   Failed to retrieve file