Home
        American Standard Bathroom Aids Saver Bath Walls User's Manual
         Contents
1.                                                           4 754748 100 Rev  C    A  Apply a bead of tub surround adhesive down  each stud that will come in contact with the side  panels being sure to stay below the line  previously marked     B  Lay a bead of sealant along side panel mating  surface and tub ledge     Pencil line    ii         Tub Surround  Adhesive  studs           Sealant a edge                                                                                            D  Locate and drill a clearance hole in the center of the top  nailing flange and centered on each stud  see arrows as shown      Also drill clearance holes in the front nailing flange on each side  panel at approx  12  intervals  centered on the flange  see arrows  as shown      Install galvanized screws through each hole and into the studs   securing the wall panel     C  Align the top nailing flange of each side  panel with pencil line marked  Press firmly into  place to ensure proper adhesion to studs     Check alignment with all mating surfaces and  reposition if necessary           Sealant     side panel    Ssa    a surface     Ra                                                             Drill clearance  holes for screws  f    L                                              L             754748 100 Rev  C    Install temporary braces to hold the When installing greenboard  position  center of the back and side panels tight drywall screws above the top nailing  to the studs for approximate
2.  following toll free number   800  442 1902  www americanstandard com          7 754748 100 Rev  C    
3. ILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES  ALL OF WHICH ARE HEREBY EXPRESSLY DISCLAIMED  OR THE  EXTENSION BEYOND THE DURATION OF THIS LIMITED WARRANTY OF ANY IMPLIED WARRANTIES  INCLUDING THOSE OF  MERCHANTABILITY OR FITNESS FOR AN INTENDED PURPOSE   Some jurisdictions do not allow limitations on how long an implied warranty  lasts  or the exclusion or limitation of incidental or consequential damages  so these limitations and exclusions may not apply to you     7  Responsibility for compliance with local code requirements   Since local code requirements vary greatly distributors  retailers  dealers  installation  contractors and users of plumbing products should determine whether there are any code restrictions on the installation or use of a specific  product      This warranty gives you specific legal rights  You may have other legal rights that vary from state to state  For service under this warranty  you should  contact the following     In the United States  In Canada  In Mexico   American Standard Brands AS Canada ULC American Standard B amp K Mexico  P O  Box 6820 5900 Avebury Rd  S  de R L  de C V   Piscataway  New Jersey 08855 Mississauga  Ontario Via Morelos  330  Attention  Director of Consumer Affairs Canada L5R 3M3 Col  Santa Clara  Ecatepec 55540 Edo  Mexico  For residents of the United States  warranty Toll Free   800  387 0369 Toll Free  01 800 839 1200  information may also be obtained by calling www americanstandard ca www americanstandard com mx  the
4. INSTALLATION INSTRUCTIONS American Standard    Style That Works Better  SAVER    BATH WALLS    MODEL  2649BW  USE BATH WALL 2649BW WITH BATH TUB 2647 102 or 2647 202    Thank you for selecting American Standard     the benchmark of fine quality for over 100 years  To ensure this product is installed  properly  please read these instructions carefully before you begin   Certain installations may require professional help   Also be  sure your installation conforms to local codes     BEFORE YOU BEGIN        Local building codes vary by location  Observe all local plumbing and building codes     Unpack your new shower walls and inspect them carefully for damage  Verify that the walls are the correct size for your  installation  Refer to American Standard roughing in information for specific dimensions for each model     NOTE  Take extra care in handling the front surfaces of the walls  Use only non abrasive cloths to avoid scratching     REQUIRED TOOLS AND MATERIALS    TOOLS  MATERIALS     Pencil Tape Measure Acrylic Latex or Acrylic Silicone Sealant   Drill Caulking Gun Galvanized  or corrosion resistant  flat head screws 3 4  minimum length  Hole Saw or Level 2 x 4 lumber for additional wall studs as required   Sabre Saw Square Tub Surround Adhesive    1 x 4s if installing shower doors       PREPARATION     Saver    bath tub walls are to be installed directly ill x 1  over stud walls  Drywall is not required  ustration    A  Remove dry wall surface and ensure that       Each al
5. ate this limited warranty  the purchaser must go online to our website at www americanstandard us com warranty to register their bath walls within  thirty  30  days of purchase     In no event will American Standard be liable for the cost of repair or replacement of any installation materials including but not limited to tiles  marble etc   This limited warranty DOES NOT COVER the following     1  Defects or damages arising from shipping  installation  alterations  accidents  abuse  misuse  lack of proper maintenance and cleaning as directed in  the owner   s manual and use of other than genuine American Standard replacement parts  in all cases whether caused by a plumbing contractor   service company  the owner or any other person    2  Deterioration through normal wear and tear and the expense of normal maintenance    3  Commercial application    4  Options and accessories  American Standard   s limited warranty on these items is one year for parts only and excludes labor  This one year limited  warranty covers accessories manufactured by American Standard  e g  aprons  drains  grab bars  heaters  trim kits  against defects of material or  workmanship  Warranty coverage begins on the date the accessory was originally purchased by the owner    5  Postage or shipping costs for returning products for repairs or replacement under this limited warranty and labor or other costs incurred in  connection with product removal or installation under this limited warranty    6  ANY LIAB
6. cove  alcove is plumb and square   Illustration 1  ZB eed  and square   B  Identify your model number in the illustrations    which follow  Prepare studs as indicated        Product names listed herein are trademarks of AS America Inc        AS America Inc  2012 754748 100 Rev  C    Installation for use with tub Model  2647 202  The studs should be located as shown to properly support walls  Provide additional studs where illustrated   below                                ean  be nea    simmi     54mm     pe                                                                                                                                                                                                                     Installation for use with tub Model  2647 102  The studs should be located as shown to properly support walls  Provide additional studs where illustrated   below     lg     9 1 4    235mm            60    1524mm        l 10   a 10   gt    254mm   254mm                                                                                                                                                                                                       IMPORTANT   C  Rough plumbing and fittings must be installed before walls     NOTE  Installation over greenboard or firewalls  If installing wall panels over    greenboard and or firewall material  and not directly on the studs  your alcove  dimensions must consider the thickness of this material  Measure from the    insi
7. de of the finished walls        754748 100 Rev  C    INSTALLATION PROCEDURES     If you plan to install a bath shower door  a 1 x 4 must be installed in the pocket on the back of both side walls    A  Cut one end of the 1 x 4 to 45   as shown   Fig 1  Then cut the 1 x 4 to a length of 57 1 2     B  Apply a bead of tub surround adhesive in the pocket of each side wall  With 45   cut end down and angle facing out   attach board butting up to the top of the pocket  Allow time to cure     Nailing flange   top  Back view of Nailing flange   side wall   top    Typical of both   1x4 side walls     Butt to top   of pocket  Fig 1   ADHESIVE N    7 1x4 71 1 2   Nailing      WALL  1816mm     flange POCKET WALL Shower Front view of side   FRONT  NAILING Base    FLANGE 57 1 2    1461mm   Tub    wall  Typical of  both side walls   Tub  Surround  Adhesive    1x4    Butt to top 1       Wall pocket  of pocket   front                                                           A  Position the three panels into the alcove  Lower each  panel onto the bathtub to ensure that the panels fit Top Nailing flange  properly in the alcove     B  Mark the appropriate side panel  right or left  cutouts for  plumbing fixtures  Refer to plumbing fixture installation  instructions for hole dimensions and placement  Carefully  locate  mark and cut holes using the properly sized  hole saw           C  When satisfied with fit  mark a line across the top of the  panels on each stud  Remove the panels  The marked  l
8. ild liquid household  detergent cleaner  Do not use Lestoil  Lysol Disinfectant  spray or concentrate   or Lysol Basin  Tub and Tile Cleaner   Windex  Mr  Clean  Dow Disinfectant Bathroom Cleaner  or cleaning products in aerosol cans    e Do not use wire brushes  knives or sharp objects to remove stains  cigarette tar deposits  or other surface blemishes    e Abrasive cleaners or powders must not be used  since they will dull the surface  If the glossy surface loses  its sheen  dulled areas or light scratches can be restored by rubbing with a white  automotive type  polishing  compound and waxing with a  liquid wax     e Do not wax areas where you walk or stand       Do not allow nail polish remover  acetone  dry cleaning fluid  paint remover or other solvents to come into  contact with the surface    e Clean the surrounding surface immediately after using caustic drain cleaners    e Burning cigarettes will damage the surface    e Should damage to the fixture occur  repairs can be made quickly and easily    Your distributor or builder can provide details     AS America  Inc  Limited Lifetime Warranty for Saver    Walls    AS America  Inc   American Standard     warrants to the original consumer purchaser that it will  at its option  repair or replace this these walls or any of its  parts that are found by American Standard  in its sole judgment  to be defective under normal residential use and maintenance so long as it is owned by  the original consumer purchaser     To activ
9. ine will help align the panels in subsequent steps           Mark for  plumbing  fixtures  H                                  Bath Tub                                                       Front Nailing Flange     ng    L    3 754748 100 Rev  C                               Pencil line    A  Apply a bead of tub surround adhesive down each stud  that will come in contact with the back panel being sure  to stay below the line you marked  You do not need to  apply adhesive to the corner studs     B  Lay a bead of sealant along tub ledge     C  Reposition back panel aligned with pencil line and press ive  firmly against studs                                                                                                                                A     Locate and drill a clearance hole in the center of the top nailing flange and centered on each stud  see arrows as shown    e Also drill four evenly spaced clearance holes on the front nailing flange on each side  see arrows as shown      B  Ensuring mating surface is square and plum  Fig  2   install galvanized screws through each clearance hole  and into the studs  securing the wall panel     C  Add a bead of sealant down the vertical corner of the back panel  Fig  2            Drill clearance  hole for screw  in top nailing  flange             Drill clearance    Mating surface holes for screws     square and plum           Drill clearance  hole for screw  in front nailing   flange                               Sealant _ A   
10. ly 24 hours flange  If you choose to screw   while adhesive sets  Add cushioning through the nailing flange  you  between panels and braces to prevent MUST drill clearance holes in the  scratching the panels  flange to avoid cracking damaging  the flange                                                                             A  After greenboard is installed  apply finished sealant bead to all edges and joints  Follow sealant manufacturers     recommended cure time     B  Make connections to supply and drain lines     Green Board                                                                                                                      6 754748 100 Rev  C    POST INSTALLATION CLEAN UP  Remove all construction debris  Tile grout can be removed with a wooden popsicle stick or tongue depressor   Do not use wire brushes or any other metal implement on surface        Post installation clean up generally can be completed using warm water and liquid dishwashing detergent   Stubborn dirt or stains may be removed using granular Spic and Span   mixed with water     Painter s naphtha can be used to remove excess adhesives and or wet oil base paint     AFTERCARE and CLEANING    A WARNING  Cleaning products with labels that say    not suitable for use with ABS  acrylic or polystyrene     SHOULD NOT BE USED  Read all labels carefully        e Excessively hot water may cause surface damage    e HARSH CHEMICALS SHOULD NEVER BE USED ON SHOWER WALL SURFACE  Clean after use with a m
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  En direct 49.p65 - La vie nouvelle    Life Fitness HDHR9 User's Manual  APC Smart-UPS®    USER`S MANUAL  Leise-Walzenhäcksler Silent Shredder Hacheuse  ORP Controllers - Aquarius Technologies Pty Ltd  DI - DJMania    Copyright © All rights reserved. 
   Failed to retrieve file