Home
Site Preparation Guide
Contents
1. shipping and receiving to your installation site When the counter is on the dolly the external dimensions of the combined unit are listed in the table below Please verify that there are sufficient building clearances between shipping and receiving and your installation site for the passage of the dolly Dolly amp Unit Dimension Minimum building clearance wan fasmo Depen aon 102em hein azn ezm Weim 325lbs 150 UltraLo 1800 Alpha Particle Counter XIA LLC Page 12 II Checklists Use the checklists below to ensure that you have made all preparations for installing the UltraLo 1800 counting system If you have requested installation and training an XIA LLC representative will contact you to verify that all checklists are complete before setting up the installation date A Space and Layout checklist Date verified Requirements Location is away from Vibration from other instruments or devices Electrically noisy devices Location accommodates the dimensions and weights specified in Dimensions and weights on pg 9 Location meets the requirements specified in Space requirements on pg 3 B Gas checklist Date verified Requirements Source of Argon gas is available on site All metal plumbing is installed between Argon gas source and installation site Gas pressure at installation site is 21psi 150kPa Metal tubing at installation site is 1 4 OD and terminates at the appropriate location with necessa
2. 4 00 86 4 cm 3 56 9 cm 3 50 8 9 cm hele square lt 3 Front face of counter r EZ the Y DIA 0 28 1 25 3 2 cm Figure 5 Mounting hole locations UltraLo 1800 Alpha Particle Counter XIA LLC Page 8 6 Dimensions and weights The table below indicates dimensions and weights of the instrument and associated components Ensure that the installation site table and or bench space can accommodate the dimensions and support the weights In the table below Width is defined as the distance from the left side to the right side of the object and Depth is defined as the distance from the front to the back of the object Component Width in Depth in Height in Weight bs Counter Module closed 34 3 87 1 cm 40 0 101 6 cm 27 0 68 6 cm 330 150 kg Counter Module open 34 3 87 1 cm 40 0 101 6 cm 45 3 115 1 cm 330 150 kg Counter Module tray ext 34 3 87 1 cm 66 0 167 6 cm 27 0 68 6 cm 330 150 kg Support Module 16 0 40 6 cm 12 0 30 5 cm 8 5 21 6 cm 30 13 6 kg 13 5 34 3 cm 9 5 24 1 cm 10 5 26 7cm 5 2 2 kg Depth Figure 6 Views of the UltraLo 1800 UltraLo 1800 Alpha Particle Counter XIA LLC Page 9 7 Electrical requirements a System electrical requirements The UltraLo 1800 has minimal power requirements and can accept operatin
3. _ XA Instruments That Advance The Art UltraLo 1800 Alpha Particle Counter Site Requirements amp Planning Version 0 4 Friday February 15 2013 Table of Contents A B O O BF gt Site Preparation cn ee ee en oe ene rn E eee ee errors 3 Fos TUNE NEOVO N co nee ee ee ete eee eee eee eee 3 Installation Overview xine dcnseseaeciiwnsuau sicans Snawsaaeaacnssanea ebunsadanuentonelnoansacecvad Reuesecnswnneves Genmearadextaaearneouncae lt t 3 Ty Sitepreparation POCCSS vacacrinsindcactunsevasannavviwdeuasensaadeu gt asinlecqinnondcaulunnacoaeeieoendens dosaauieeqsandasteeasdenseens 3 Select tHe SUC essee R d Eia 3 Ty SACS UE NE a A E E A 3 2 CAA T N e A A E AE E E E E OEE E ET ATAT ON 5 3 Layout requirements sssessesesssssesrrsessrssrsesrrerrsrrseosreresesrrsesseressrsrssesrrsesseeresesseorrereseereseeseeeene 6 4 Reguired leara E ene enn EE EE eee eee ee ere 7 a Monine NeT ON a E EE E E E eee 8 6 Dimensions and weights cccccssscccessecccsecccenccceenceeceececeeeeeeseceeencessageceseueeeseaeesseeeeseneceteneeenens 9 Te EEC redui TNE EEEE EA 10 Prepare Tor WS Tel OI ssscinensaa i ea E 11 e AOE a E E T EA O E E O 11 Receiving and inspecting the SYSTEM sssssesssreessrerssressrererrresrersrrersrrroseerseerssreeseereseeessereseeeseeresees 12 t NUD OC CONTEN een E EE A eves sehuvieseadamudecttunnteis 12 2 Inspect shipping containers for CAMABE ccccccsesecccccsecccceescceeeesecceceee
4. ceceueceeseusecessaeaecetseneces 12 3 Shipping container diMenSiOnS essssssssssssrrsssrrrssrrrsrtrssrrnsrtrrsrtesstrusrresrtrurtresstresrersrteerresrresereene 12 CRECER TS serrie E E A 13 SCS a AV OU CHOC T e aan E E A TE 13 EAEE e orate N E E SA O AE A E AE E E E 13 Electrical CHECKIISt ccsessccccccssssseccccseessececsseeessecccsseessececsseusseeseeeseesseseesseussesesessausseseessanseesesenaas 13 System receipt and INSpeECtION iapacetncatecceseactebsnceawess ieuriteoninbsscacsbancatecesscerasesaonadbsia thourisaconsieibeossveacees 14 UltraLo 1800 Alpha Particle Counter XIA LLC Page 2 I Site Preparation Tasks A Instrument Overview The UltraLo 1800 is a state of the art alpha particle counting system that uses a gas filled ionization chamber and pulse shape analysis to achieve the lowest possible backgrounds and shortest possible counting times The instrument is to be used only by technologists trained both in laboratory techniques and procedures and in the use of the instrument The customer is responsible for validation of any results and compliance with any requirements that pertain to their procedures and uses of the instrument B Installation Overview Before the system arrives at your location please prepare your site for the installation process according to the instructions that follow If an XIA LLC representative will be present to help install the instrument and associated devices your site must b
5. ction The laptop can connect to a local network either via a standard Ethernet cable using the RJ45 type connector on the laptop or by using a wireless connection UltraLo 1800 Alpha Particle Counter XIA LLC Page 10 D Prepare for installation 1 Safety and materials a Safety notes The UltraLo 1800 is a heavy instrument see Dimensions and weights on pg 9 and is to be moved and positioned with caution and care If you decide to lift or move the instrument after it has been installed do not attempt to lift or move the instrument without the assistance of others the use of appropriate moving equipment and proper lifting techniques Improper lifting can cause injury Moving or lifting the instrument may require three or more persons Please exercise caution when running the gas supply lines to the installation site Pressurized gas poses a Safety hazard if appropriate precautions are not followed The customer is responsible for compliance with any safety requirements that pertain to the installation of the gas supply lines b Materials for installation maintenance The following tools are necessary for installation and maintenance e Box wrenches for use with gas fittings 1 2 9 16 5 8 e Hex keys for use with latches panels 5 16 1 8 3 32 e Screwdrivers for use with electronics Size 0 1 or 1 2 Phillips c Materials for routine operation No tools are required for routine operation but from time to
6. e prepared prior to their arrival 1 Site preparation process 1 Se a wa e Review this guide Select the installation site Meet requirements gas electrical network Stock the site Receive and inspect the system shipment Move system to installation site C Select the site 1 Space requirements a System components The shipment includes the following components Counter module Support module ThinkPad control laptop Cables and Tubing not shown OO WF gt UltraLo 1800 Alpha Particle Counter XIA LLC Page 3 b Setup requirements A typical setup is shown below in Figure 1 24 0 61 cm Gas Inlet y 60 0 152 cm TE a Laptop can be placed elsewhere but must be within 6 feet 1 8m of counter Yy lt 65 0 165 cm 95 0 241 cm aa 50 0 127 cm A 46 0 117 cm 27 0 69 cm Gas Inlet 1 8 4 6 cm y 4 Figure 1 Space Requirements For details on space requirements see Dimensions and weights on page 8 For additional information on necessary clearances see Required clearances on page 7 For details on the location of the gas inlet and associated tolerance see Gas Inlet Location on page 5 UltraLo 1800 Alpha Particle Counter XIA LLC Page 4 2 Gas requirements The UltraLo 1800 requires a source of pure dry Argon gas ideall
7. g voltages between 1OOVAC and 240VAC with a fluctuation of 10 of nominal at 50 60 Hz The instrument will be pre configured by XIA LLC for the appropriate line voltage based on the country where the installation site is located or by the voltage specified by customer if specifically provided The maximum power consumption of the UltraLo 1800 is less than 0 100 kW at 110VAC However typical power consumption during active measurement as well as during standby is 0 05 kW at 110VAC A single outlet with a good ground connection is required Ideally this outlet will be well isolated or separate from any circuits powering electrically noisy systems or devices that can cause power surges such as vacuum pumps stepper motors ovens refrigeration units etc If you wish to install and use an uninterruptible power supply UPS isolation transformer or surge protector you must still provide a single solid ground connection between the instrument and the building s main electrical ground b Summary Rated Voltage Rated Freq Typ a Typ Power Max Power VAC Eo E kW 100 240 10 50 60 o5 010 100 240 10 50 60 UNE T UN E c Network Computer requirements While not required for operation the laptop should be connected to the internet in order to receive software and firmware updates from XIA LLC Additionally there are several support scenarios that significantly benefit by using an active internet conne
8. loff gas to the counter In regards to gas consumption the UltraLo 1800 has two defined flow rates normal 3 5 LPM and purge 15LPM When you insert a new sample the system runs at the purge rate for about 45 minutes after which the flow is automatically throttled down to the normal rate for the measurement Your gas consumption will depend on how many times you insert new samples For reference the counters at XIA run off of 230 liter liquid dewars One counter running daily measurements averaging at least 1 purge day will consume the dewar in a bit over two weeks UltraLo 1800 Alpha Particle Counter XIA LLC Page 5 3 Layout requirements The UltraLo 1800 is fairly sensitive to microphonics As such the counter should be located in a relatively quiet space with reduced foot traffic and away from acoustically noisy machinery such as fans pumps etc Verify that the installation location e ls not adjacent to vibration sources such as pumps compressors or fans Excessive vibration will affect instrument performance e Is not adjacent to electrically noisy devices such as ovens stepper motors refrigeration units etc e Allows the laptop to be within 6 feet 2 meters of the instrument UltraLo 1800 Alpha Particle Counter XIA LLC Page 6 4 Required clearances During instrument setup and maintenance it is necessary to access the back of the counter module and the support module If the back of the instrument face
9. ry tolerance C Electrical checklist Date verified Requirements Appropriate grounded power receptacles are available at installation site See Electrical requirements pg 10 An active tested LAN internet connection is available UltraLo 1800 Alpha Particle Counter XIA LLC Page 13 D System receipt and inspection Date verified Action The measured building clearances can accommodate the dolly and main instrument body dimensions See Shipping container dimensions pg 12 Received the system and inspected the shipping containers for mishandling or damage Reported to the XIA service representative any signs of mishandling or damage to the shipping container UltraLo 1800 Alpha Particle Counter XIA LLC Page 14
10. s a wall it will be necessary to have enough space to access the back of the counter and support module from the side When changing a sample for measurement the sample tray opens and extends 26 0 inches 66 cm forward from the instrument s front face See Figure 3 below for illustration When loading or removing a sample the user may wish to stand to either side of the extended tray or alternatively in front of the extended tray For comfortable operation add additional space for the user 3 feet 1m as appropriate EEE EL lt _ 26 0 66 cm _ gt Figure 3 Counter with sample tray extended During instrument maintenance it may be necessary to open the counter module to access and service various internal components See Figure 4 below for illustration A total of 46 inches 117 cm of vertical clearance is required for this operation 43 8 111 3 cm y DR Figure 4 Counter opened for maintenance UltraLo 1800 Alpha Particle Counter XIA LLC Page 7 5 Mounting hole locations Should the user wish to secure the counter module to a table or bench for earthquake safety or otherwise the mounting hole pattern is provided below The vibration isolating feet are symmetrically located underneath the counter body 4 20 size hardware would be appropriate Mounting hardware is not supplied with the UltraLo 1800 21 75 55 25cm xs Counter Body Outline 3
11. time you may wish to clean the sample tray to prevent contamination from building up XIA LLC recommends the following materials for cleaning e Radiacwash available from Biodex Medical Systems e Distilled Deionized water e Methanol or Isopropyl alcohol e Powder free gloves The user manual will provide additional details on recommended cleaning supplies and methods UltraLo 1800 Alpha Particle Counter XIA LLC Page 11 E Receiving and inspecting the system 1 Shipped Contents All shipments include the following e UltraLo 1800 Counting Module e UltraLo 1800 Support Module e Cable assembly Gas tubing kit e Laptop control computer e PCB kit 2 Inspect shipping containers for damage Carefully inspect the shipping containers and report any damage to an XIA service representative Specifically check the condition of all ShockWatch stickers present on the outside of the shipping container Should an indicator be red carefully follow instructions listed on sticker Record any damage or mishandling on the shipping documents 3 Shipping container dimensions All items will arrive in one large shipping container crate The dimensions for the crate are listed in the table below Minimum building clearance wian asinos Depn asn 109cm Heim 625m 158m Weism 5001B5 2254 The main instrument body UltraLo 1800 Counting Module is shipped on a dolly to facilitate transportation of the relatively heavy unit from
12. y the gas provided is boiloff from a tank of liquid Argon All metal tubing i e copper or stainless should be used when running the gas from the source tank to the UltraLo 1800 and the plumbing system should be free from leaks The gas pressure at the input to the UltraLo 1800 is required to be 21psi 150kPa 5 The gas input fitting on the UltraLo 1800 is a Swagelok type connector P N SS 400 61 and requires OD metal tubing All necessary fitting hardware is supplied with the UltraLo 1800 system The installation process for the gas tube and fitting is straightforward If an XIA LLC representative is present during system installation they will perform this installation step Figure 2 Gas Input Interface Image from swagelok com a Gas Inlet Location The location of the gas input fitting is called out in Figure 1 Prior to the scheduled date of installation the gas tubing must be run from the gas source to the site of installation and terminate at the specified gas inlet location The termination of the metal tube at the gas inlet location shall be run in such a manner as to provide approximately 10 of play in all directions for final alignment during system installation b Summary Requirement at input to UltraLo Specification C 174 OD metal tube As called out in Figure 1 10 all directions c Gas supply and consumption Our recommendation is to use a dewar of liquid Argon and plumb the boi
Download Pdf Manuals
Related Search
Related Contents
Manuel d`utilisation en français - Le site du HP-41CX GE 27998GE5 Cordless Phone LE CONCEPT DE POTENTIALITÉ PSYCHOTIQUE Manual de Instruções 実験テキストの補足 Manual - Dental ABS PWS 10-125 CE PWS 13-125 CE GEL AUTO-ACTIF FORCE OCEANE open the User`s Manual révision du taux d`actualisation des investissements publics Copyright © All rights reserved.